Canadian Electrical Code, Part I Full Impact Assessment

Size: px
Start display at page:

Download "Canadian Electrical Code, Part I Full Impact Assessment"

Transcription

1 Copyright CSA Group 2015 Canadian Electrical Code, Part I Full Impact Assessment Subject 3840 Section 8 Revisions to load calculations

2 CONTENTS 1 INTRODUCTION TO THE FULL IMPACT ASSESSMENT PURPOSE OF THE FULL IMPACT ASSESSMENT BACKGROUND OF THE CHANGE THE NATURE OF THE CHANGE The change How is it different from the status quo? PURPOSE/REASON FOR THE CHANGE What is the issue that the change is intended to address? How does the change accomplish the desired results? What are the implications/consequences if action is not taken? WHY IS ACTION REQUIRED AT THIS TIME? (14) PREVALENCE OF RULE USE IF ACCEPTED IMPACT ON KEY STAKEHOLDERS (16) Largest type of stakeholder who would benefit (24) Largest type of stakeholder who would be negatively affected (15) Other stakeholders affected on a frequent basis Is the proposed change limited to a specific group/geographic area? What is the affected stakeholders readiness to act on the change(s)? Recommended stakeholder management strategy Communication and implementation plan ANALYSIS OF ANTICIPATED ECONOMIC IMPACT (20) The jurisdiction or stakeholder s ability to compete, based on incompatibility with other standards (21) Complexity of implementation (is training required to implement the Rule?) (22) Total costs to implement (for example, cost to install, educate, manufacture, inspect, purchase additional product, and of the increased use of electricity) IMPACT ON BUSINESS: LARGE AND SMALL (IF APPLICABLE) WHAT IS THE PRACTICE/EXPERIENCE IN OTHER JURISDICTIONS? Page 1 19/12/2014

3 11.1 Are standards consistent with (or lesser/greater than) other jurisdictions? (23) Conflict with other Ministries or Codes Consequences for other Departments/Ministries, e.g., apprentice training Consequences for other Codes from other jurisdictions (US, European standards) CONSULTATION PROCESS PROPOSED EFFECTIVE DATE OF CHANGES APPENDIX 1 CODE RANKING TOOL VALUES Page 2 19/12/2014

4 1 INTRODUCTION TO THE FULL IMPACT ASSESSMENT The Full Impact Assessment follows the rationale of the Canadian Electrical Code Ranking Tool (CRT) and provides supporting information to validate the rankings of the CRT. It includes all the questions of the CRT either verbatim or modified. However, the scope of the Full Impact Assessment extends beyond that of the CRT and, therefore, the assessment includes additional questions that may help to substantiate the rankings. The CRT is referenced throughout the Full Impact Assessment. The questions from the CRT are identified in the Full Impact Assessment by numbers in parentheses. Whenever applicable, chapter titles also include references to the relevant sections of the CRT. The Full Impact Assessment follows the sequence of the CRT as closely as possible but, to enhance the analytical function of the document, risk-related and benefits-related questions have not been separated in the Full Impact Assessment. 2 PURPOSE OF THE FULL IMPACT ASSESSMENT The purpose of the Full Impact Assessment is to provide the provinces and territories with an enhanced rationale and detailed assessment of a particular change to the Canadian Electrical Code, Part I (CE Code, Part I). This assessment is submitted for review to provincial and territorial regulatory authorities to aid with their adoption process for the Code. Jurisdictions may decide to conduct further analyses or to hold additional consultations. 3 BACKGROUND OF THE CHANGE Section 8 is a general Section of the Code that specifies ratings for electrical equipment supplying various types of loads and calculates conductor ampacities for consumer s services, feeders, and branch circuits. Section 8 deals with a variety of situations and environments and assigns demand factors to various loads, recognizing that some loads are not likely to attain maximum loading at the same time as certain other loads (e.g., electric heating and air conditioning do not operate in a building at the same time). Section 8 applies demand factors for sizing conductors and overcurrent protection devices that serve a number of different loads. Because it is highly unlikely that all loads would draw maximum current simultaneously, demand factors are used to scale back the full loads of the combined downstream equipment to a lower level Page 3 19/12/2014

5 The following Rules in the current Code are being affected by the change: (A) Rules 8-204, 8-206, and establish a standard method for determining the minimum ampere rating for a service or feeder conductor supplying, respectively, schools; hospitals; and hotels, motels, dormitories, and buildings of similar occupancy. In each Rule, Subrule (1) describes the method of calculating the minimum acceptable ampacity of service or feeder conductors, and Subrule (2) lists the allowable demand factors to be applied to the minimum service or feeder conductor ampacities calculated in Subrule (1). (B) Rule provides requirements for determining minimum ampacities for service or feeder conductors for building occupancies other than those covered in Rules to (C) The method of calculating load by area is not practical when lighting loads on a feeder are not confined to one location within a building. Rule establishes an alternative method to the watts per square metre method for calculating loads that are supplied from a single panelboard but not located in one area within a building. (D) Rule 8-302(1) sets requirements for calculating the demands for show window lighting installations. The length of the window is measured at the base and a value of 650 W/m is applied to establish demand. Subrule (2) recognizes that some cycling loads are also continuous. 4 THE NATURE OF THE CHANGE 4.1 The change (A) Add a new Rule as follows: Basic load the load of lighting and receptacle circuits, based on the outside dimensions of a specific area of building occupancy, as listed in Table 14. Calculated load the load calculated in accordance with the applicable requirements of this Section. Demonstrated load historical maximum demand watt information recorded over at least a 24-month period for the same type of facility as the one in question, equated to watts per m 2. Page 4 19/12/2014

6 (B) Add a new Appendix B Note to Rule as follows: Rule Basic load It is intended by this definition that only a typical lighting and receptacle load within an area bound by the outside dimensions of that area signifies basic load. Such loads as outside lighting, specialty lighting (i.e., stage, show window lighting, etc.), electric space heating, or air-conditioning loads are not intended to be part of the basic load. Code users should be aware that the value of basic load for each particular building occupancy is different and is dependent on the type of occupancy from Table 14 and on load calculation requirements for residential occupancies. Demonstrated load The intent of this definition is to allow comparison of loads that are used in a similar fashion based on the type of fuel source for heating and cooling, type of occupancy, type of occupancy load, and type of operational requirements. It is intended by this definition that comparison may need to be made between facilities in the same geographic area and also in similar climatic conditions. With respect to determining demonstrated load and recognition of qualified persons, Code users should be aware that it may be advisable to consult with the regulatory authority having jurisdiction. (C) Relocate Subrule 8-302(2) to new Subrule 8-104(4) as follows: 8-104(4) A load of a cyclic or intermittent nature shall be classified as continuous unless it meets the requirements of Subrule (3). (D) Add a new Rule 8-106(6) as follows: (6) Where a feeder or service supplies motor or air-conditioning loads, a demand factor as determined by a qualified person shall be permitted to be applied to these loads, provided that a deviation has been allowed in accordance with Rule (E) Add a new Rule 8-106(10) as follows: (10) For loads other than those calculated in accordance with Rules and 8-202, feeder and service load calculations shall be permitted to be based on demonstrated loads, provided that such calculations are performed by a qualified Page 5 19/12/2014

7 person, as determined by the regulatory authority having jurisdiction. (F) Add a new Appendix B Note to Rule 8-106(10) as follows: Rule 8-106(10) It is intended by this Subrule that demonstrated load data could be used for the purpose of sizing of services or feeders. It is also intended by this Subrule that the qualified person, as determined by the regulatory authority having jurisdiction, who is responsible for the design should be able, upon request, to demonstrate to the regulatory authority having jurisdiction that historical data related to actual demand substantiates the fact that this historical demand is the maximum possible demand for the specific application. (G) Revise Rules 8-204(1)(c), 8-206(1)(c), and 8-208(1)(c) as follows: Schools Hospitals Hotels, motels, dormitories, and buildings of similar occupancy (see Appendix B) (1) The minimum ampacity of service or feeder conductors shall be based on the following: (a) no change (b) no change (c) electric space-heating, air-conditioning, and power loads total loads of other permanently connected equipment based on the rating of the equipment installed; plus (d) cord-connected equipment intended for connection to receptacles rated more than 125 V or 20 A based on (i) 80% of the rating of the receptacle; or (ii) the rating of the equipment intended for connection to the receptacle. (H) Revise Rule as follows: Other types of occupancy The minimum ampacity of service or feeder conductors for the types of occupancies specified listed in Table 14 shall be based on the following: (a) a basic load to be calculated on the basis of in watts per square metre as required by Table 14 for the area of the occupancy served based on the outside dimensions of the occupancy, with application of demand factors as indicated therein in Table 14; plus (b) special loads such as electric space-heating, air-conditioning, motor loads, power Page 6 19/12/2014

8 loads, show window lighting, stage lighting, etc., based on the rating of the equipment installed with demand factors permitted by this Code. (I) Move Rule 8-302(1) to 8-212(2) and revise Rule as follows. Rule Exit sign, emergency lighting, and show window loads Special lighting circuits (1) Where a panel is supplying specific special types of lighting, such as exit signs lights or emergency lighting lights, which may be located throughout a building such that it is impossible to calculate the area served, the connected load of the circuits involved shall be used in determining a feeder size. (2) For show window lighting installations, the demand load shall be determined on the assumption that not less than 650 W/m will be required measured along the base of the window(s), except a lower figure shall be permitted where a deviation has been allowed in accordance with Rule Rule connected loads (1) For show window lighting installations, the demand load shall be determined on the assumption that not less than 650 W/m will be required measured along the base of the window(s), except a lower figure shall be permitted where a deviation has been allowed in accordance with Rule How is it different from the status quo? (A) Currently, Rules 8-204(1), 8-206(1), and 8-208(1) read as follows: Schools Hospitals Hotels, motels, dormitories, and buildings of similar occupancy (see Appendix B) (1) The minimum ampacity of service or feeder conductors shall be based on the following: (a) no change (b) no change (c) electric space-heating, air-conditioning, and power loads based on the rating of the equipment installed. (B) Currently, Rule reads as follows: Other types of occupancy The minimum ampacity of service or feeder conductors for the types of occupancies Page 7 19/12/2014

9 specified in Table 14 shall be based on the following: (a) a basic load to be calculated on the basis of watts per square metre required by Table 14 for the area served based on the outside dimensions, with application of demand factors as indicated therein; plus (b) special loads such as electric space-heating, air-conditioning, power loads, show window lighting, stage lighting, etc., based on the rating of the equipment installed with demand factors permitted by this Code. (C) Currently, Rule reads as follows: Special lighting circuits Where a panel is supplying special types of lighting, such as exit lights or emergency lights, which may be located throughout a building such that it is impossible to calculate the area served, the connected load of the circuits involved shall be used in determining a feeder size. 5 PURPOSE/REASON FOR THE CHANGE 5.1 What is the issue that the change is intended to address? The actual load demand in commercial and industrial facilities can be significantly smaller than the calculated load as mandated by the current Code; this has been documented by data available from utilities. Under the current Code, all locations are treated in the same way for the purposes of load calculations and have to meet the same load minimums. As a result, many services end up under-loaded, with the actual load rarely above 50% of maximum. The industry has voiced a concern that the current Code Rules are unnecessarily limiting with regard to calculating building loads, resulting in greatly oversized electrical service equipment. This leads to the inefficient use of equipment and a greater environmental footprint. In addition, retrofitting more energy-efficient equipment is now possible, and the lack of a demonstrated load option has prevented users from fully exploiting the savings and the environmental advantages. 5.2 How does the change accomplish the desired results? The change is intended to clarify the terminology used in the Code and to improve consistency in its application. It will also allow the use of the new defined terms, Basic load, Calculated load, and Demonstrated load, under special application conditions introduced in Section 8. The introduction of the demonstrated load concept is designed to assist users in implementing a more energy-efficient installation, based on historical maximum demand load data over at least a 2-year period; these data are available from utilities. This change provides engineers/designers with an option for optimizing the size of service equipment and Page 8 19/12/2014

10 ensuring a more efficient and sustainable electrical installation. A qualified person is required to perform the calculations necessary to demonstrate to the regulatory authority having jurisdiction that the safety objectives of the Code are not compromised. 5.3 What are the implications/consequences if action is not taken? If the status quo persists, it will not be possible to design and install more energy- and costefficient electrical installations with regard to demand load calculations for commercial and industrial facilities. 6 WHY IS ACTION REQUIRED AT THIS TIME? This initiative is not driven by a particular deadline. The industry has asked for the change to permit more efficient and sustainable installations. 7 (14) PREVALENCE OF RULE USE IF ACCEPTED This change will apply to commercial and industrial facilities. Data for residential dwellings are not available. 8 IMPACT ON KEY STAKEHOLDERS 8.1 (16) Largest type of stakeholder who would benefit In the short term, electrical engineers/designers, contractors, and installations owners/ owners of commercial or industrial facilities are the largest groups who will benefit from the change. Engineers/Designers: This stakeholder group will be directly affected by the change because it is their responsibility to specify the minimum required demand load. This group is interested in providing cost-effective and safe designs and installation requirements to minimize the risk of injury to personnel, damage to facilities, and insurance and legal costs. As such, engineers/designers will need to receive a communication about the change (e.g., a formal letter from the authority having jurisdiction). Electrical contractors: This group of stakeholders is responsible for the application of the Code. As such, they need to be informed about changes to it to help ensure full compliance with its requirements. The updates can be delivered through formal training or through industry literature, depending on current practices in a particular jurisdiction. It is the responsibility of individual contractors to keep themselves informed about changes to the Code. Installation owners: This group of stakeholders will benefit immediately from the cost Page 9 19/12/2014

11 savings resulting from a more efficient use of electrical equipment, the potential for reduced installation costs, and a smaller environmental footprint. They will also benefit from incremental savings derived from operating equipment closer to its optimal load and temperature, resulting in reduced running and maintenance costs. In the long term, the environmental benefits may extend to the community as a whole. 8.2 (24) Largest type of stakeholder who would be negatively affected A stakeholder group that would be negatively affected was not identified. 8.3 (15) Other stakeholders affected on a frequent basis The change will affect a broad range of stakeholder groups, as follows: Trainers: This is a broad group that may include those providing training to other stakeholder groups, such as electrical contractors and installers of equipment as well as repair and maintenance personnel where applicable. Training programs and literature, including electronic content, will need to be updated to include the change. Other standards development organizations (SDOs): All references to the provisions of the Code that are being changed will need to be updated in documents published by other SDOs. Provincial/territorial electrical regulatory authorities: This group of stakeholders is responsible for enforcement of the Code and will, therefore, need to be informed of changes to it. Insurance: Insurance policies contingent on following the Code will need to be updated. Builders: This group will need to be informed of the change because the new requirements will have to be implemented in new construction. Inspectors: This group of stakeholders is accountable for enforcing compliance with the Code and needs, therefore, to stay informed about changes to it. It is the responsibility of a particular province or territory to make the information on Code changes available to electrical inspectors. Depending on the practice in a particular jurisdiction, changes can be communicated through training (provided by the jurisdiction or a third party) or through jurisdiction-specific or national industry literature. 8.4 Is the proposed change limited to a specific group/geographic area? The change will have nationwide application. Page 10 19/12/2014

12 8.5 What is the affected stakeholders readiness to act on the change(s)? Research has not revealed any evidence of the market not being ready to implement this change. 8.6 Recommended stakeholder management strategy Not applicable. 8.7 Communication and implementation plan Not applicable. 9 ANALYSIS OF ANTICIPATED ECONOMIC IMPACT 9.1 (20) The jurisdiction or stakeholder s ability to compete, based on incompatibility with other standards The change should not negatively affect a jurisdiction s competitive position. On the contrary, in the long run, competitiveness should be boosted by greater sustainability. 9.2 (21) Complexity of implementation (is training required to implement the Rule?) For the most part, the change can be included as an update in existing training programs. The only group who may require targeted training is engineers/designers, but such training can be kept to a minimum if it is provided as routine professional development training. 9.3 (22) Total costs to implement (for example, cost to install, educate, manufacture, inspect, purchase additional product, and of the increased use of electricity) The change is expected to reduce implementation costs. With regard to training, while it is important that the change be communicated to all the relevant stakeholder groups, this can be done in the course of routine training on changes to the Code. No dedicated training is necessary. 10 IMPACT ON BUSINESS: LARGE AND SMALL (IF APPLICABLE) Compliance costs: No additional costs are expected to result from compliance with the change. In fact, compliance may help to reduce project costs. Change of investment: Not applicable. Job creation/job loss. Not applicable. Page 11 19/12/2014

13 Labour mobility: Not applicable. Impact on import/export of goods: Not applicable. Certification and licensing: Not applicable. Insurance: Not applicable. Canadian Electrical Code, Part I Full Impact Assessment 11 WHAT IS THE PRACTICE/EXPERIENCE IN OTHER JURISDICTIONS? 11.1 Are standards consistent with (or lesser/greater than) other jurisdictions? Currently, there are no deviations from this requirement of the national Code in provincial electrical codes. Input from other jurisdictions is pending (23) Conflict with other Ministries or Codes No conflict has been observed Consequences for other Departments/Ministries, e.g., apprentice training Not applicable Consequences for other Codes from other jurisdictions (US, European standards) Not applicable. 12 CONSULTATION PROCESS Representatives from the following groups of stakeholders were involved in the consensus approval of this change as part of CSA Group s standards development process: Note: For details about the standards development process as it applies to the CE Code, Part I, please refer to Appendix C of the Code. Regulatory authorities from various provincial, territorial, and municipal electrical inspection authorities Owners/Operators/Producers from groups with national stature, representing the viewpoints of electrical equipment manufacturers, electrical installation designers and installers, and electrical installation users General interest groups with national stature, representing the viewpoints of (a) fire chiefs; (b) electric utilities; (c) committees responsible for related electrical codes and standards; (d) fire insurers; (e) labour; (f) issuers of building codes; and Page 12 19/12/2014

14 (g) educators. Canadian Electrical Code, Part I Full Impact Assessment A regulatory/legislative body may want to hold additional consultations with all or some of these groups within its jurisdiction to clarify issues specific to the jurisdiction. 13 PROPOSED EFFECTIVE DATE OF CHANGES The change will be included in the 2015 edition of the CE Code, Part I, to be published in January Page 13 19/12/2014

15 APPENDIX 1 CODE RANKING TOOL VALUES Reason for Change Safety consideration (Severity) Safety consideration (Frequency) Subject # For clarity 6 Crucial to harmonize Purely administrative 0 5 Community's desire to change - Environment, Health, Safety 7 Technological change/new Rule 8 Total Score for Reason for Change Extent of Use & Value Add Prevalence of rule use if accepted Number of stakeholders affected on frequent basis 10 Largest type of stakeholder who would benefit 10 Benefit to society Total Score for Extent of Use Risk for Changing Rule/Staying Status The jurisdiction or stakeholder's ability to compete based on incompatibility with other standards Complexity of implementation 8 Total costs to implement, e.g. cost to install, to educate, to manufacture,or inspect, increased product cost, increased cost of electricity. 7 Conflict with other Ministries or Code 0 Largest type of stakeholder who would be negatively affected 1 Total Score for Risk of Changing Rule/ Staying Status Quo 16 Total 83 Page 14 19/12/2014

2012 Canadian Electrical Code, Part I (CEC) Top Fifteen changes

2012 Canadian Electrical Code, Part I (CEC) Top Fifteen changes 2012 Canadian Electrical Code, Part I (CEC) Top Fifteen changes 1) Tamper resistant receptacles. 2009 CEC Required in dwelling units 2012 CEC Expanded to child care facilities First introduced in the 2009

More information

Ontario Electrical Safety Code 25 th Edition/ 2012

Ontario Electrical Safety Code 25 th Edition/ 2012 Ontario Electrical Safety Code 25 th Edition/ 2012 Ted Olechna Director, Codes and Standard Chief Engineer 1 What I Will Cover ESA s role is as the regulator Highlight of 2012 Code changes The Code and

More information

Section 3: Load Planning Bill Brown, P.E., Square D Engineering Services

Section 3: Load Planning Bill Brown, P.E., Square D Engineering Services Section 3: Load Planning Bill Brown, P.E., Square D Engineering Services Basic Principles The most vital, but often the last to be acquired, pieces of information for power system design are the load details.

More information

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations. PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to August 1, 2013. It is intended for information and reference purposes only.

More information

Questions and Answers for Heating and A/C Contractors

Questions and Answers for Heating and A/C Contractors 1. How do we accomplish grounding of furnaces and / or water heaters on two wire circuits? 250.134 Equipment Fastened in Place or Connected by Permanent Wiring Methods (Fixed) Grounding. Unless grounded

More information

Policy, Guidelines, and Procedures for Alternative Education Programs

Policy, Guidelines, and Procedures for Alternative Education Programs Policy, Guidelines, and Procedures for Alternative Education Programs Alternative Grade 10, 11, and 12 Recycled Paper September 2006 Table of Contents Preface... 1 Section I Introduction... 2 Section

More information

COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE 780 CMR, 6 th Edition FIRE PROTECTION SYSTEMS CHAPTER 9

COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE 780 CMR, 6 th Edition FIRE PROTECTION SYSTEMS CHAPTER 9 COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE 780 CMR, 6 th Edition FIRE PROTECTION SYSTEMS CHAPTER 9 GUIDELINES FOR THE PREPARATION OF FIRE PROTECTION SYSTEM NARRATIVE REPORTS 780 CMR 903.1.1 State

More information

First Published in The Wichita Eagle on January 2, 2015 ORDINANCE NO. 49-897

First Published in The Wichita Eagle on January 2, 2015 ORDINANCE NO. 49-897 OCA #230100 First Published in The Wichita Eagle on January 2, 2015 ORDINANCE NO. 49-897 AN ORDINANCE AMENDING SECTIONS 4.A.080, 4.1.020, 4.1.110, 4.2.010, 4.2.070, 4.2.125, 4.2.170, 4.2.175 AND 4.2.220;

More information

527 CMR: BOARD OF FIRE PREVENTION REGULATIONS

527 CMR: BOARD OF FIRE PREVENTION REGULATIONS 527 CMR 31.00: CARBON MONOXIDE ALARMS Section 31.01: Purpose and Scope 31.02: Definitions 31.03: General Installation Provisions 31.04: Specific Installation Provisions 31.05: Carbon Monoxide Protection:

More information

ELECTRICIAN TRADE REGULATION

ELECTRICIAN TRADE REGULATION Province of Alberta APPRENTICESHIP AND INDUSTRY TRAINING ACT ELECTRICIAN TRADE REGULATION Alberta Regulation 274/2000 With amendments up to and including Alberta Regulation 122/2014 Office Consolidation

More information

ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01)

ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01) ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01) Rule 28-900 Standby Generator Installations Due to the increasing number of standby generator installations being established to maintain continuity

More information

EMERGENCY LIGHTING AND CONTROL

EMERGENCY LIGHTING AND CONTROL I. Overview Emergency lighting control options are rapidly expanding in response to growing needs by design professionals and building owners to save energy and achieve aesthetic and functional design

More information

1. Enforcement Policy Effective Date This policy is effective immediately and applies to all industrial machinery on any project.

1. Enforcement Policy Effective Date This policy is effective immediately and applies to all industrial machinery on any project. MECKLENBURG COUNTY Land Use and Environmental Services Agency Code Enforcement Department Directive on Industrial Machinery: field and office procedures related to SB 490/NCGS 143-138(b) 1. Enforcement

More information

Arc Fault Circuit Interrupters Frequently Asked Questions

Arc Fault Circuit Interrupters Frequently Asked Questions Contents My AFCI is tripping! What do I do? What is the difference between branch feeder and combination type Arc Fault Circuit Interrupters? What is new with the 2008 NEC versus the 2005 NEC with respect

More information

BUSINESS PLAN 2012 2015

BUSINESS PLAN 2012 2015 BUSINESS PLAN 2012 2015 Electrical Safety Authority BUSINESS PLAN 2012 2015 1 ABOUT ESA Vision: An Ontario free of electrical fatalities and serious damage, injury, or loss. Mission: To improve electrical

More information

ELECTRICAL EMERGENCY SYSTEM PLAN REVIEW OVERVIEW OF CODE REQUIREMENTS

ELECTRICAL EMERGENCY SYSTEM PLAN REVIEW OVERVIEW OF CODE REQUIREMENTS ELECTRICAL EMERGENCY SYSTEM PLAN REVIEW What to Look for during Plan Review OVERVIEW OF CODE REQUIREMENTS First determine the type of emergency power system; is the system designed for Emergency or Legally

More information

FIRE ALARM SYSTEM RECORD OF COMPLETION

FIRE ALARM SYSTEM RECORD OF COMPLETION FUNDAMENTALS OF FIRE ALARM SYSTEMS 72 33 FIRE ALARM SYSTEM RECORD OF COMPLETION To be completed by the system installation contractor at the time of system acceptance and approval. 1. PROTECTED PROPERTY

More information

FIRE ALARM SYSTEM RECORD OF COMPLETION

FIRE ALARM SYSTEM RECORD OF COMPLETION FIRE ALARM SYSTEM RECORD OF COMPLETION To be completed by the system installation contractor at the time of system acceptance and approval. 1. Protected Property Information Name of property: Description

More information

BRANCH CIRCUIT AND FEEDER REQUIREMENTS

BRANCH CIRCUIT AND FEEDER REQUIREMENTS CHAPTER 36 BRANCH CIRCUIT AND FEEDER REQUIREMENTS SECTION E3601 GENERAL E3601.1 Scope. This chapter covers branch circuits and feeders and specifies the minimum required branch circuits, the allowable

More information

4. Critical success factors/objectives of the activity/proposal/project being risk assessed

4. Critical success factors/objectives of the activity/proposal/project being risk assessed ARTC Risk Management Work Instruction 2: 1. Conduct Risk Assessment Workshop This Work Instruction provides general guidelines for conducting a generic Risk Assessment workshop. The instructions supplement

More information

INSPECTION AND TESTING OF EMERGENCY GENERATORS

INSPECTION AND TESTING OF EMERGENCY GENERATORS INSPECTION AND TESTING OF EMERGENCY GENERATORS Certification requirements NFPA 101(00), Sec. 7.9.2.3 requires that emergency generators be installed, tested and maintained in accordance with NFPA 110,

More information

SECTION THREE CONSTRUCTION CODES

SECTION THREE CONSTRUCTION CODES SECTION THREE CONSTRUCTION CODES CHAPTER 36: Construction Codes in Michigan Purpose and Applicability of Regulations Manufacturing facilities and other businesses must be designed according to code in

More information

Buck - Boost Transformers

Buck - Boost Transformers Buck - Boost Transformers Contents Buck - Boost Transformers - Terms & Definitions... 48 Buck - Boost Transformers - Sizing... 50 Quick Reference Chart - 08, 0, 40 Volts Single & Three Phase... 5 Single

More information

Inspections must be conducted every three years in order to maintain an "approved" status on the City Of Bozeman Safe Rental Unit List.

Inspections must be conducted every three years in order to maintain an approved status on the City Of Bozeman Safe Rental Unit List. The purpose of the program is to ensure the health, safety, and welfare of those living in or near rental housing through the participation of owners, tenants, the city, and the community. This program

More information

A. General Information

A. General Information Conservation First Framework LDC Tool Kit Final v2 - Janurary 23, 2015 OVERVIEW OF CDM PLAN This CDM Plan must be used by the LDC in submitting a CDM Plan to the IESO under the Energy Conservation Agreement

More information

Radon in Indoor Air: A Review of Policy and Law in Canada

Radon in Indoor Air: A Review of Policy and Law in Canada Radon in Indoor Air: A Review of Policy and Law in Canada Executive Summary and Table of Contents (full report with appendices is available at www.cela.ca) November, 2014 Prepared by: Burgandy Dunn, Projects

More information

Tall Building Design Guidelines Status Update

Tall Building Design Guidelines Status Update STAFF REPORT ACTION REQUIRED Tall Building Design Guidelines Status Update Date: April 6, 2010 To: From: Wards: Reference Number: Planning and Growth Management Committee Chief Planner and Executive Director,

More information

Oakland County Executive Department of Facilities Management. Energy Management Procedures October 5, 2009

Oakland County Executive Department of Facilities Management. Energy Management Procedures October 5, 2009 Oakland County Executive Department of Facilities Management Energy Management Procedures October 5, 2009 1. Goal The acquisition and management of energy is fundamental to the mission and operation of

More information

Part III. Administrative, Procedural, and Miscellaneous

Part III. Administrative, Procedural, and Miscellaneous Part III. Administrative, Procedural, and Miscellaneous Deduction for Energy Efficient Commercial Buildings Notice 2006 52 SECTION 1. PURPOSE This notice sets forth interim guidance, pending the issuance

More information

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1

More information

RENEWABLE ENERGY. The Solar Thermal Ordinance for Efficient Water Heating in Barcelona

RENEWABLE ENERGY. The Solar Thermal Ordinance for Efficient Water Heating in Barcelona RENEWABLE ENERGY The Solar Thermal Ordinance for Efficient Water Heating in Barcelona BOOSTING SOLAR ENERGY Solar Thermal Ordinance brings efficient water heating to Barcelona As the Spanish city of Barcelona

More information

White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5

White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5 White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code June 2015 Revision 1.5 Shalhevet Bar-Asher; SolarEdge Technologies, Inc. Bill Brooks, PE; Brooks Engineering LLC

More information

photos.com Cost, Quality and Accountability Public Tendering versus Self-Performance for Municipal Infrastructure Delivery in Canada

photos.com Cost, Quality and Accountability Public Tendering versus Self-Performance for Municipal Infrastructure Delivery in Canada photos.com Cost, Quality and Accountability Public Tendering versus Self-Performance for Municipal Infrastructure Delivery in Canada For more than 200 years and with few exceptions, Canada s municipal

More information

STATE OF IOWA ELECTRICAL FAQ S

STATE OF IOWA ELECTRICAL FAQ S STATE OF IOWA ELECTRICAL FAQ S EXAMINATION AND LICENSING QUESTIONS What electrical code will be adopted? Per Iowa Administrative Code 661-504.1, the provisions of the National Electrical Code, 2008 Edition,

More information

Mike Holt s Illustrated Guide to. Rule 220.87, Articles 445, 700, 701, and 702. Based on the 2011 NEC

Mike Holt s Illustrated Guide to. Rule 220.87, Articles 445, 700, 701, and 702. Based on the 2011 NEC Mike Holt s Illustrated Guide to NEC Requirements for Generators and Standby Power Systems Rule 220.87, Articles 445, 700, 701, and 702 Based on the 2011 NEC Extracted from Mike Holt s Illustrated Guides

More information

Framework for Cooperative Market Conduct Supervision in Canada

Framework for Cooperative Market Conduct Supervision in Canada Framework for Cooperative Market Conduct Supervision in Canada November 2015 1 Purpose The Framework for Cooperative Market Conduct Supervision in Canada ( Cooperative Framework ) is intended to provide

More information

Summary Report. Electrical Contractor Community. for fiscal year 2012 (April 2011 - March 2012) FOR THE

Summary Report. Electrical Contractor Community. for fiscal year 2012 (April 2011 - March 2012) FOR THE Summary Report for fiscal year 2012 (April 2011 - March 2012) FOR THE Electrical Contractor Community About this Report We are pleased to provide this first Summary Report for the electrical contractor

More information

PROVINCIAL/TERRITORIAL COUNCIL Of MINISTERS OF SECURITIES REGULATION (Council) ANNUAL PROGRESS REPORT January 2013 to December 2013

PROVINCIAL/TERRITORIAL COUNCIL Of MINISTERS OF SECURITIES REGULATION (Council) ANNUAL PROGRESS REPORT January 2013 to December 2013 PROVINCIAL/TERRITORIAL COUNCIL Of MINISTERS OF SECURITIES REGULATION (Council) ANNUAL PROGRESS REPORT January 2013 to December 2013 BACKGROUND Since its formation in 2004, the Provincial-Territorial Council

More information

Classification Appeal Decision Under Section 5112 of Title 5, United States Code

Classification Appeal Decision Under Section 5112 of Title 5, United States Code U.S. Office of Personnel Management Office of Merit Systems Oversight and Effectiveness Classification Appeals and FLA. Programs San Francisco Oversight Division 120 Howard Street, Room 760 San Francisco,

More information

Homeowner Information Guide Electrical Safety. British Columbia Safety Authority

Homeowner Information Guide Electrical Safety. British Columbia Safety Authority Homeowner Information Guide Electrical Safety British Columbia Safety Authority The following information should be carefully reviewed before performing any electrical work. The information contained in

More information

IT Cost Savings Audit. Information Technology Report. Prepared for XYZ Inc. November 2009

IT Cost Savings Audit. Information Technology Report. Prepared for XYZ Inc. November 2009 IT Cost Savings Audit Information Technology Report Prepared for XYZ Inc. November 2009 Executive Summary This information technology report presents the technology audit resulting from the activities

More information

Branch Circuit Calculations

Branch Circuit Calculations Branch Circuit Calculations by Gerald Newton October 31, 1999 1. A 20 ampere, 120 volt, 2-wire branch circuit has a maximum load capacity of watts or volt-amperes. Reference: Using the following for Single

More information

OECD RECOMMENDATION CONCERNING GUIDELINES ON EARTHQUAKE SAFETY IN SCHOOLS

OECD RECOMMENDATION CONCERNING GUIDELINES ON EARTHQUAKE SAFETY IN SCHOOLS OECD RECOMMENDATION CONCERNING GUIDELINES ON EARTHQUAKE SAFETY IN SCHOOLS THE COUNCIL Having regard to article 5b) of the Convention establishing the Organisation for Economic Co-operation and Development

More information

2008-11 BUSINESS PLAN

2008-11 BUSINESS PLAN 2008-11 BUSINESS PLAN FIRE AND EMERGENCY SERVICES - NEWFOUNDLAND AND LABRADOR MESSAGE FROM THE MINISTER As Minister responsible for Fire and Emergency Services Newfoundland and Labrador (FES-NL), I am

More information

NFPA 70E 2012 Rolls Out New Electrical Safety Requirements Affecting Data Centers

NFPA 70E 2012 Rolls Out New Electrical Safety Requirements Affecting Data Centers NFPA 70E 2012 Rolls Out New Electrical Safety Requirements Affecting Data Centers A market position paper from the experts in Business-Critical Continuity TM Executive Summary Electrocutions are the fourth

More information

MASTER ELECTRICIAN CODE EXAMINATION EXAMINATION REFERENCE MATERIAL AND CONTENT OUTLINE. Answers to sample questions: CONTENT OUTLINE

MASTER ELECTRICIAN CODE EXAMINATION EXAMINATION REFERENCE MATERIAL AND CONTENT OUTLINE. Answers to sample questions: CONTENT OUTLINE Answers to sample questions: Question Answer Reference 1 4 Section 362.12(6) 2 2 Table 310-16; 310.15(B)(2)(a) 3 4 Table. 250-66 4 2 Table 430.250 & 430.52 5 2 American Electrician Handbook, Figure 7-159

More information

Harmonics in your electrical system

Harmonics in your electrical system Harmonics in your electrical system What they are, how they can be harmful, and what to do about them Abstract Harmonic currents, generated by non-linear electronic loads, increase power system heat losses

More information

Occupational Noise Induced Hearing Loss: Final Program Policy Decision and Supporting Rationale

Occupational Noise Induced Hearing Loss: Final Program Policy Decision and Supporting Rationale Occupational Noise Induced Hearing Loss: Final Program Policy Decision and Supporting Rationale October 2014 1 I Introduction: In September 2012, the WCB Board of Directors added Noise Induced Hearing

More information

Hanh Do, Director, Information System Audit Division, GAA. SUBJECT: Review of HUD s Information Technology Contingency Planning and Preparedness

Hanh Do, Director, Information System Audit Division, GAA. SUBJECT: Review of HUD s Information Technology Contingency Planning and Preparedness Issue Date: August 31, 2006 Audit Report Number 2006-DP-0005 TO: Lisa Schlosser, Chief Information Officer, A FROM: Hanh Do, Director, Information System Audit Division, GAA SUBJECT: Review of HUD s Information

More information

Statement of Mandate 2013-2014

Statement of Mandate 2013-2014 Statement of Mandate 2013-2014 Table of Contents Message from the Minister and Deputy Minister 1.0 Our Mandate... 4 1.1 Our Mission... 4 2.0 Our Priorities... 5 2.1 Make Life More Affordable and Breaking

More information

Electrical Plan Design

Electrical Plan Design CHAPTER 1 Electrical Plan Design Chapter Outline Chapter Outline Introduction The Design Process Understanding the Project Scope Defining Parts of the Electrical Plan Determining Applicable Standards Creating

More information

Contractor Safety Management

Contractor Safety Management 1.0 Introduction Memorial University will ensure that a diligent contractor management process is established. This procedure establishes requirements for contract administration and oversight of contractor

More information

The Taxation of Corporate Groups. Consultation Paper

The Taxation of Corporate Groups. Consultation Paper The Taxation of Corporate Groups Consultation Paper November 2010 Table of Contents 1. Introduction... 1 2. Policy Objectives... 2 3. The Unit of Corporate Taxation... 3 4. Loss Utilization in Canada

More information

Economic Growth and Green Energy

Economic Growth and Green Energy Economic Growth and Green Energy EGGE exists to provide proactive outreach, foster innovation and deliver resources which enable stakeholders to balance environmental stewardship, economic growth and social

More information

PV and the Electrical Code Page 1 PV and the Electrical Code

PV and the Electrical Code Page 1 PV and the Electrical Code PV and the Electrical Code Page 1 PV and the Electrical Code Canadian Solar Industries Association (CanSIA) PV and the Electrical Code Page 2 This course was prepared by the Canadian Solar Industries Association

More information

Rightsizing Electrical Power Systems In Large Commercial Facilities

Rightsizing Electrical Power Systems In Large Commercial Facilities Page 1 of 7 Rightsizing Electrical Power Systems In Large Commercial Facilities Michael A. Anthony, Member IEEE, Thomas L. Harman, Life Member IEEE James R. Harvey, Senior Member IEEE Abstract: For decades,

More information

ARTICLE 3 ELECTRICAL CODE DIVISION 1 GENERAL ADMINISTRATIVE PROVISIONS SEC. 93.0101. TITLE.

ARTICLE 3 ELECTRICAL CODE DIVISION 1 GENERAL ADMINISTRATIVE PROVISIONS SEC. 93.0101. TITLE. ARTICLE 3 ELECTRICAL CODE DIVISION 1 GENERAL ADMINISTRATIVE PROVISIONS SEC. 93.0101. TITLE. This ordinance shall be known as the Los Angeles Electrical Code, a portion of the Los Angeles Municipal Code.

More information

Who sets the rules for electrical testing and safety?

Who sets the rules for electrical testing and safety? Who sets the rules for electrical testing and safety? Application Note Alphabet soup There s no question that electrical safety is a key concern for electricians and engineers, their employers, unions

More information

HAWAII ADMINISTRATIVE RULES TITLE 18 DEPARTMENT OF TAXATION CHAPTER 235 INCOME TAX LAW RENEWABLE ENERGY TECHNOLOGIES; INCOME TAX CREDIT

HAWAII ADMINISTRATIVE RULES TITLE 18 DEPARTMENT OF TAXATION CHAPTER 235 INCOME TAX LAW RENEWABLE ENERGY TECHNOLOGIES; INCOME TAX CREDIT HAWAII ADMINISTRATIVE RULES TITLE 18 DEPARTMENT OF TAXATION CHAPTER 235 INCOME TAX LAW RENEWABLE ENERGY TECHNOLOGIES; INCOME TAX CREDIT 18-235-12.5-01 Definitions 18-235-12.5-02 Reserved 18-235-12.5-03

More information

Strategic and Operational Plan 2013-2015 1. 2013 2015 Strategic & Operational Plan

Strategic and Operational Plan 2013-2015 1. 2013 2015 Strategic & Operational Plan 1 2013 2015 Strategic & Operational Plan 2 Strategic Plan Vision Statement The elimination of occupational injury and illness in Saskatchewan. Mission Statement To ensure the execution of an integrated

More information

Heating, Refrigeration and Air Conditioning. Techniques Program Standard. The approved program standard for the

Heating, Refrigeration and Air Conditioning. Techniques Program Standard. The approved program standard for the Heating, Refrigeration and Air Conditioning Techniques Program Standard The approved program standard for the Heating, Refrigeration and Air Conditioning Techniques program of instruction leading to an

More information

Neutral Currents in Three Phase Wye Systems

Neutral Currents in Three Phase Wye Systems POWER SYSTEMS ENGINEERING DATA PUBLISHED BY SQUARE D, OSHKOSH, WISCONSIN Subject: Neutral Currents in Three Phase Wye Systems by Robert Arthur Square D Company Oshkosh, Wisconsin (414) 46-80 and R. A.

More information

RMM 306 Lockout/Tagout (LOTO) Program for the Control of Hazardous Energy Page 2 June 2016

RMM 306 Lockout/Tagout (LOTO) Program for the Control of Hazardous Energy Page 2 June 2016 RMM 306 Lockout/Tagout (LOTO) Program for the Control of Hazardous Energy Page 2 3 Related Documents 3.1 Occupational Health and Safety Act, R.S.O. 1990 3.2 Regulations for Industrial Establishments, R.R.O.

More information

1502 8.5 2-9-15 ORDINANCE NO. An ordinance amending Chapter 56, Dallas Electrical Code, of the Dallas City Code, as

1502 8.5 2-9-15 ORDINANCE NO. An ordinance amending Chapter 56, Dallas Electrical Code, of the Dallas City Code, as 1502 8.5 2-9-15 ORDINANCE NO. 2 9 6 33 An ordinance amending Chapter 56, Dallas Electrical Code, of the Dallas City Code, as amended; adopting with certain changes the 2014 Edition of the National Electrical

More information

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) 4.1 General Requirements 4.2 OHS policy Has the organisation an established and maintained

More information

UL guidelines, chapter 6.2 / 6.3 Motor Branch Circuits acc. to UL

UL guidelines, chapter 6.2 / 6.3 Motor Branch Circuits acc. to UL UL guidelines, chapter 6.2 / 6.3 Motor Branch Circuits acc. to UL Definition of Terms / Explanations Overview of Basic Devices Construction Types acc. to UL 508 Self-Protected Combination Motor Controller

More information

CONSTRUCTION MANAGEMENT

CONSTRUCTION MANAGEMENT CONSTRUCTION MANAGEMENT Characteristic of Construction Industry One of the biggest sector as * total turnover is more than $3,9 trillion annually * 7 million employee (USA) Affects vast and different industries:

More information

Low Frequency Notification Appliances

Low Frequency Notification Appliances A P P L I C A T I O N S G U I D E Low Frequency Notification Appliances APPLICATIONS GUIDE: LOW FREQUENCY NOTIFICATION APPLIANCES Low Frequency Notification Appliances Contents Introduction...3 Waking

More information

CHBA Briefing Note on Liability in the Residential Building Industry

CHBA Briefing Note on Liability in the Residential Building Industry CHBA Briefing Note on Liability in the Residential Building Industry Introduction Objectives The objective of this report is to present some recent developments in Canada on the topic of liability in the

More information

FAQs. Conserve package. Gateway... 2 Range Extender... 3 Smart Plug... 3 Thermostat... 4 Website... 7 App and Mobile Devices... 7

FAQs. Conserve package. Gateway... 2 Range Extender... 3 Smart Plug... 3 Thermostat... 4 Website... 7 App and Mobile Devices... 7 FAQs Conserve package Gateway... 2 Range Extender... 3 Smart Plug... 3 Thermostat... 4 Website... 7 App and Mobile Devices... 7 FAQs Gateway Can I have someone install my system for me? If you are concerned

More information

OF CPAB INSPECTION FINDINGS

OF CPAB INSPECTION FINDINGS PROTOCOL FOR AUDIT FIRM COMMUNICATION OF CPAB INSPECTION FINDINGS WITH AUDIT COMMITTEES CONSULTATION PAPER NOVEMBER 2013 The Canadian Public Accountability Board ( CPAB ) is requesting comments on the

More information

A guide to using variable-speed drives and motors in swimming pool halls

A guide to using variable-speed drives and motors in swimming pool halls A guide to using variable-speed drives motors in swimming pool halls Meeting the energy CO 2 reduction challenge Swimming pool halls are expensive to run, consuming large amounts of electricity. They are

More information

PART 2.11 SERVICE NL WORKPLACE HEALTH AND SAFETY INSPECTIONS

PART 2.11 SERVICE NL WORKPLACE HEALTH AND SAFETY INSPECTIONS PART 2.11 SERVICE NL WORKPLACE HEALTH AND SAFETY INSPECTIONS Executive Summary Service NL (the Department) through its Occupational Health and Safety (OHS) Branch (the Branch) has a mandate to maintain

More information

COUNTY OF LOS ANGELES BUILDING AND SAFETY DIVISION ELECTRICAL CODE FEE SCHEDULE (Title 27 of the County of Los Angeles Code, Ord No.

COUNTY OF LOS ANGELES BUILDING AND SAFETY DIVISION ELECTRICAL CODE FEE SCHEDULE (Title 27 of the County of Los Angeles Code, Ord No. COUNTY OF LOS ANGELES BUILDING AND SAFETY DIVISION ELECTRICAL CODE FEE SCHEDULE (Title 27 of the County of Los Angeles Code, Ord No. 2013-0049) Effective July 1, 2014, Electrical Permit Fees in the unincorporated

More information

12 Things Facility Managers Need to Know About Critical Power System Installation

12 Things Facility Managers Need to Know About Critical Power System Installation 12 Things Facility Managers Need to Know About Critical Power System Installation Are you considering managing your next power system installation in-house? As a facilities manager or other facility professional,

More information

Alliance of Credential Evaluation Services of Canada

Alliance of Credential Evaluation Services of Canada Alliance of Credential Evaluation Services of Canada General Guiding Principles for Good Practice in the Assessment of Foreign Credentials Prepared by: Provincial Assessment Committee - Canada Updated:

More information

Project Plan RESIDENTIAL PARKS ACT Review Project

Project Plan RESIDENTIAL PARKS ACT Review Project RESIDENTIAL PARKS ACT REVIEW PROJECT Project Plan RESIDENTIAL PARKS ACT Review Project Author: ARPRA NSW Creation Date: 26/08/11 Last Revised: 26/08/11 Version: 1.0 TABLE OF CONTENTS RESIDENTIAL PARKS

More information

Solar Access: Recommendations for the City and County of Denver

Solar Access: Recommendations for the City and County of Denver Solar Access: Recommendations for the City and County of Denver Prepared for the City and County of Denver, Colorado Prepared by Hannah Muller, U.S. Department of Energy Solar Energy Technologies Program

More information

BUSINESS SECTOR STRATEGY:

BUSINESS SECTOR STRATEGY: BUSINESS SECTOR STRATEGY: HOSPITALITY Created with: Ontario Restaurant Hotel & Motel Association (ORHMA) September 2011 Open for Business is Ontario s initiative to create faster, smarter and streamlined

More information

(Sample) Building Emergency Plan

(Sample) Building Emergency Plan (Sample) Building Emergency Plan for XXXXXX 2815 Commons Way Cincinnati, OH 45221 August 2016 University of Cincinnati Department of Public Safety Department a 2 Table of Contents A. Introduction B. Components

More information

Additional Guidance. for application to. HM Government Guide to Fire Safety Risk Assessment Residential Care Premises

Additional Guidance. for application to. HM Government Guide to Fire Safety Risk Assessment Residential Care Premises Additional Guidance for application to HM Government Guide to Fire Safety Risk Assessment Residential Care Premises Good Practice Guidance 2016 Additional Guidance agreed between the National Association

More information

Summary Profile: State Codes and Standards Committee (as of 7/1/13) Review Committee of Cognizance: Public Safety and Security STATUTORY REFERENCE

Summary Profile: State Codes and Standards Committee (as of 7/1/13) Review Committee of Cognizance: Public Safety and Security STATUTORY REFERENCE Summary Profile: State Codes and Standards Committee (as of 7/1/13) Review Committee of Cognizance: Public Safety and Security STATUTORY REFERENCE C.G.S. Sec. 29-251 ESTABLISHED 1969 ORGANIZATION LOCATION

More information

ONTARIO'S DRINKING WATER QUALITY MANAGEMENT STANDARD

ONTARIO'S DRINKING WATER QUALITY MANAGEMENT STANDARD September 2007 ONTARIO'S DRINKING WATER QUALITY MANAGEMENT STANDARD POCKET GUIDE PIBS 6278e The Drinking Water Quality Management Standard (DWQMS) was developed in partnership between the Ministry of the

More information

EXETER TOWNSHIP DRY OR WET CHEMICAL FIRE SUPPRESSION SYSTEMS

EXETER TOWNSHIP DRY OR WET CHEMICAL FIRE SUPPRESSION SYSTEMS DRY OR WET CHEMICAL FIRE SUPPRESSION SYSTEMS POLICY STATEMENT This policy applies to NEW Dry or Wet chemical fire suppression systems. The Authority Having Jurisdiction will not waive major criteria in

More information

CHAPTER 2 EXAMPLES AND TABLES

CHAPTER 2 EXAMPLES AND TABLES CHAPTER 2 EXAMPLES AND TABLES COMMENTARY AT 210.20(A) EXCEPTION An overcurrent device that supplies continuous and noncontinuous loads must have a rating that is not less than the sum of 100 percent of

More information

RESIDENTIAL PHOTOVOLTAIC SUBMITTAL REQUIREMENTS

RESIDENTIAL PHOTOVOLTAIC SUBMITTAL REQUIREMENTS DEVELOPMENT AND RESOURCE MANAGEMENT DEPARTMENT BUILDING AND SAFETY SERVICES 2600 Fresno Street, Third Floor Fresno, California 93721-3604 (559) 621-8082 FAX (559) 498-4357 RESIDENTIAL PHOTOVOLTAIC SUBMITTAL

More information

Gestão Integrada de Projectos. Arquitectura

Gestão Integrada de Projectos. Arquitectura Gestão Integrada de Projectos Prática Integrada como Visão Holística do Projecto (EXTENDED ABSTRACT) João Ricardo Vieira Lourenço Dissertação para obtenção do Grau de Mestre em Arquitectura JÚRI Presidente:

More information

Electrical Contractors. and the. New Jersey. Rehabilitation Code

Electrical Contractors. and the. New Jersey. Rehabilitation Code Electrical Contractors and the New Jersey Rehabilitation Code Alan Chech Electrical Seminars 609-890-7072 www.alanchech.com Information is based on the presently adopted electrical subcode NEC 2005. Current

More information

ORDINANCE NO. 18358-11-2008

ORDINANCE NO. 18358-11-2008 ORDINANCE NO. 18358-11-2008 AN ORDINANCE AMENDING THE FORT WORTH ELECTRICAL CODE, BY ADOPTING THE 2008 NATIONAL ELECTRICAL CODE, WITH LOCAL AMENDMENTS; AMENDING SECTIONS 11-1 THROUGH 11-4 OF THE CODE OF

More information

Just for Teachers: An Introduction to Workplace Health and Safety

Just for Teachers: An Introduction to Workplace Health and Safety Just for Teachers: An Introduction to Workplace Health and Safety This introduction is intended to give you an overview of the eight key aspects of workplace health and safety in Nova Scotia workplaces,

More information

Police use of Firearms

Police use of Firearms CODE OF PRACTICE ON Police use of Firearms and Less Lethal Weapons Contents 1. Introduction 1.1 Purpose of the code 1 1.2 Statutory basis of the code 1 1.3 Weapons covered by this code 2 1.4 Armed support

More information

2013 BUILDING ENERGY EFFICIENCY STANDARDS

2013 BUILDING ENERGY EFFICIENCY STANDARDS 2013 BUILDING ENERGY EFFICIENCY STANDARDS Title 24, Part 6, and Associated Administrative Regulations in Part 1 CALIFORNIA ENERGY COMMISSION Edmund G. Brown Jr., Governor MAY 2012 CEC 400 2012 004 CMF

More information

SUBMISSION TO THE MINISTRY OF TRAINING, COLLEGES AND UNIVERSITIES: PROPOSED MINISTER AND LIEUTENANT GOVERNOR-IN-COUNCIL REGULATIONS

SUBMISSION TO THE MINISTRY OF TRAINING, COLLEGES AND UNIVERSITIES: PROPOSED MINISTER AND LIEUTENANT GOVERNOR-IN-COUNCIL REGULATIONS SUBMISSION TO THE MINISTRY OF TRAINING, COLLEGES AND UNIVERSITIES: PROPOSED MINISTER AND LIEUTENANT GOVERNOR-IN-COUNCIL REGULATIONS REGULATORY REGISTRY POSTING NUMBER: 12-TCU003 PREPARED BY: ONTARIO COLLEGE

More information

Table 200.5.10.1 PARKING SPACE RATES AND PARKING SPACE OCCUPANCY

Table 200.5.10.1 PARKING SPACE RATES AND PARKING SPACE OCCUPANCY Table 200.5.10.1 PARKING SPACE RATES AND PARKING SPACE OCCUPANCY. AM = 6 a.m. to Noon. Adult Education School Adult Entertainment (A) in Policy Area 1 (PA1), Policy Area 2 (PA2) Policy Area 3 (PA3) at

More information

Engineering Series Ratings: Is It Practical?

Engineering Series Ratings: Is It Practical? Engineering Series Ratings: Is It Practical? By the National Electrical Manufacturers Association The 2005 National Electrical Code (NEC) introduces a change regarding series ratings for circuit breakers

More information

Electrical Product Safety in Ontario Consultation on Guidelines for Risk Assessment Methodology

Electrical Product Safety in Ontario Consultation on Guidelines for Risk Assessment Methodology Electrical Product Safety in Ontario Consultation on Guidelines for Risk Assessment Methodology presented by Peter Jackson CA, ORMP What is risk and risk assessment? Risk is something that may occur or

More information

Energy Benchmarking Report for Lafayette Elementary School Bound Brook, NJ

Energy Benchmarking Report for Lafayette Elementary School Bound Brook, NJ Energy Benchmarking Report for Lafayette Elementary School Bound Brook, NJ (for the period: March 2007 through February 2009) Prepared by: Background & Findings The New Jersey Clean Energy Program (NJCEP)

More information

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations. PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to December 26, 2015. It is intended for information and reference purposes

More information

Fire Alarm Systems Certification

Fire Alarm Systems Certification Fire Alarm Systems Certification The skills and knowledge listed under each task are suggestive of those involved in that task, but are not intended to constitute an exhaustive listing. 2.1 Submittal Preparation

More information

Rhode Island State Fire Marshal Fire Protection Systems Narrative Reports. What is a Narrative Report?

Rhode Island State Fire Marshal Fire Protection Systems Narrative Reports. What is a Narrative Report? RHODE ISLAND DIVISION OF STATE FIRE MARSHAL 1951 Smith Street, North Providence, RI 02911 Telephone: (401) 383-7717 Fax: (401) 383-8879 John E. Chartier, EFO, CFI State Fire Marshal Rhode Island State

More information