Town of Greenwich. Strategic Technology Plan

Size: px
Start display at page:

Download "Town of Greenwich. Strategic Technology Plan"

Transcription

1 Town of Greenwich Strategic Technology Plan Executive Summary May 6, 2013 Prepared for: Town of Greenwich 101 Field Point Road Greenwich, CT PaSFge ihttp://

2 Acknowledgements BerryDunn would like to thank the employees of the Town of Greenwich for collaboratively working with us to develop this Strategic Technology Plan for the Town. Not only did department representatives participate in the planning process, but also each department valued the opportunity to participate and demonstrated an understanding that a successful strategic technology plan is as much about participating in the process as it is about the final plan. We truly appreciate the level of cooperation, support, and feedback we received from the employees of the Town. Throughout the project, we met with members of Town leadership so that executive level input could be contributed to the plan. We would like to thank the members of Town management for their time and contributions to the project. The key ingredient for future success of technology initiatives is the commitment level of necessary financial and managerial resources. Strategic Technology Plan Executive Summary Page 2 May 6, 2013

3 Executive Summary The Town of Greenwich has approximately 942 employees who serve a population of approximately 60,000 residents. The Town recognizes that their information systems and business processes have evolved in a reactionary manner to meet the growing needs of employees interacting with the information systems on a regular basis. The IT Department of the Town of Greenwich increases the quality and efficiency of the Town s information systems by approaching problems with an enterpriselevel focus. The Town has conducted technology planning projects in the past with assistance from external consultants resulting in Strategic Technology Plans in 2002 and In continuing with this focus on technology planning, the Town issued a Request for Proposal (RFP) in January 2012 for a Strategic Technology Plan. In July 2012, the Town retained Berry Dunn McNeil & Parker (BerryDunn) to conduct a strategic technology planning project that would result in the development of a three-year Strategic Technology Plan. The first phase of this project focused on assessing the current technology environment at the Town. BerryDunn began by requesting background documentation from the Town in order to gain a better understanding of the current IT environment. In addition, a Strengths, Weaknesses, Opportunities, and Threats (SWOT) Worksheet was distributed to Department Leads to complete. Nearly all departments participated in the SWOT survey process. In September 2012, BerryDunn conducted on-site fact-finding meetings with all Town departments. The focus of the fact-finding meetings was to understand the technology tools currently in use and their related strengths and weaknesses. The discussions also included potential technologies Town staff were interested in to improve business processes. Also while on-site, BerryDunn toured the Town s IT facilities and met with IT Department employees individually to gain an understanding of the roles and responsibilities of the IT staff and the current technology environment in the Town. Planning Framework The findings from the assessment phase resulted in a summarized list of technology strategic issues identified by both BerryDunn and the Town. A strategic issue is a challenge or problem faced by the Town that relates to the use and/or management of technology. Each strategic issue has been allocated to one of three functional areas: management and operations, applications, and technical. The list of strategic issues is organized based on these categories, further defined below: Management and Operations (M): Management and Operations Issues are related to how the Town supports the technology tools and infrastructure in place, how technology is planned for and acquired, and how resources are positioned to support technology in the Town. Applications Issues (A): Applications Issues are related to the applications that are used to support Town users in core business processes, including providing services to Town citizens. Technical Issues (T): Technical Issues are related to the Town s core technology infrastructure and how it is developed and maintained to be cost efficient and effective. Strategic Technology Plan Executive Summary Page 3 May 6, 2013

4 The Preliminary List of Strategic Issues was discussed, confirmed, and prioritized as part of the Strategic Issue Prioritization Work Session facilitated by BerryDunn. This work session included representatives from all departments in a collaborative discussion designed to build consensus in the resulting priorities assigned to each Strategic Issue identified as part of the assessment. The prioritized list of issues is contained in Section 3.1 of the Strategic Technology Plan. The top ten Prioritized Strategic Technology Issues are listed in the following table. Table 1: Top Ten Prioritized Strategic Technology Issues Top Ten Prioritized Strategic Technology Issues Priority Issue ID Strategic Technology Issue 1 A1 The Human Resources Department reported that the Munis application is not meeting their needs for human resources and payroll functionality. 2 T6 The Town does not always receive timely network support. 3 M1 There are instances when the support provided by the Town Help Desk does not meet department needs. 4 T4 Town staff could have increased connection capabilities while working in the field. 5 M3 An established Town-wide IT Steering Committee does not exist. 6 M2 7 A3 8 A8 The Town s desktop replacement schedule does not optimize standardization or utilize laptops or tablets. The Town is using multiple software applications to manage the permitting, inspection, and code enforcement processes. Multiple departments are using manual and paper-based processes, disparate databases, and outdated/not-upgraded applications for primary business processes. 9 M5 The Town does not have a current IT Disaster Recovery and Business Continuity Plan. 10 M6 Technology training end users is limited. BerryDunn also facilitated work sessions with IT and Town leadership to confirm the Mission and Objectives of each group in consideration of this Strategic Technology Plan. The following two tables contain the Mission and Objectives of both the IT Department and the Town for this Strategic Technology Plan. Table 3: IT Department Mission and Objectives IT Department Mission and Objectives Mission: The Town of Greenwich Information Technology Department provides and supports cost-effective solution and technical leadership in the Information Technology area to accomplish organizational and departmental goals that facilitate delivery of excellent services to the Town departments/divisions and to the Town Residents. Objectives: Procure, install, and maintain computer hardware, software, and computer-related services for the Town of Greenwich municipal departments. Services included but are not limited to the Town-wide Municipal and Local Area Networks, Internet access, , web related services and multiple departmental Strategic Technology Plan Executive Summary Page 4 May 6, 2013

5 IT Department Mission and Objectives applications. Assist all Town departments in developing and evaluating proposals for all projects that have any association with use of Information Technology. Provide computer related training and education to develop a technology literate work force. Maintain data standards in order to improve data interchange between different applications. Manage and maintain the Town s GIS data with 54 layers and GIS related applications/services. Maintain operations of GIS office distributing maps and GIS data to the Town employees and general public. Objectives: Table 4: Town Technology Objectives Town Technology Objectives Implement technologies that are progressive but not on the verge of cutting edge. Increase the Town s use of mobile computing technologies where they support specific business processes. Implement technology tools to track performance measures to understand improvements in services as well as returns on investment. Continue to leverage technology to support increased efficiencies and effectiveness in serving the Town s residents. Town-Wide Technology Projects and Initiatives Immediately following the Strategic Issue Prioritization Work Session, department representatives were then asked to review the prioritized list of strategic issues and complete initiative planning worksheets to document technology projects that would address the strategic issues. Each department submitted two to three projects which allowed a variety of perspectives to contribute to the combined list that would eventually form this Strategic Technology Plan. BerryDunn developed a second list that was combined with those initiatives submitted by Town department representatives. The Projects and Initiatives Work Session facilitated by BerryDunn in December allowed departments to discuss, confirm, and score each initiative or project. Collaboration and involvement of all departments was a key ingredient to this successful effort, which became the basis for the Strategic Plan. The table below summaries the projects and initiatives developed collaboratively by the Town and BerryDunn and ranked in the Strategic Initiative Prioritization Work Session Table 5: List of Strategic Initiatives List of Strategic Initiatives ID Initiative Strategic Issue(s) A Conduct a gap-fit analysis related to the Munis application's core financial modules. A2 B Conduct a needs assessment related to CityView for the Town departments not using the application. A3 C Develop a Document Management Action Plan. A4 Strategic Technology Plan Executive Summary Page 5 May 6, 2013

6 ID D E F List of Strategic Initiatives Initiative Document and communicate the procedure for managing content on the Town's website at the department level. Identify deficiencies in the Town's system and develop an action plan to meet Town needs. Establish Town IT Working Group(s); one with a focus on Town Departments and another on inter-agency (BOE, Police, Libraries). Strategic Issue(s) A6 A7 A8, M3, M4, M12 H Implement a Town-wide system for scheduling meeting rooms. A10 I Adjust the Help Desk model in the IT Department and develop a plan for functional improvements. M1 J Create a Project Management focus in the Town for enterprise projects. M7, M11 K Reorganize the Desktop Replacement Plan and identify the need for laptops and tablets. M2 L Update the Town's IT Disaster Recovery Plan. M5 M Plan and implement technology training for end users and IT Department staff. M6 N Develop, update, and communicate IT policies and procedures. M8, M9, M10 O Transition the Town to Voice over IP telephony (VoIP). T1 P Perform an analysis of the Municipal Area Network and Internet access. T2, T4, T6, T7 Q Conduct an IT Security Audit. - The following table identified the projects and initiatives in each Plan year along with their associated timelines and budgets. Table 6: Projects and Initiatives in Each Plan Year Projects and Initiatives in Each Plan Year ID Project/Initiative Timeline Budget F Year-One Projects and Initiatives Establish Town IT Working Group(s); one with a focus on Town Departments and another on inter-agency (BOE, Police, Libraries). Year 1 0 C I P L Develop a Document Management Action Plan. Adjust the Help Desk model in the IT Department and develop a plan for functional improvements. Perform an analysis of the Municipal Area Network and Internet access. Update the Town's IT Disaster Recovery Plan. Year 1-Year 3 100,000 Year 1-Year 3 145,000 Year 1 0 Year 1-Year 2 100,000 D Document and communicate the procedure for managing content on Year 1-Year 2 0 Strategic Technology Plan Executive Summary Page 6 May 6, 2013

7 Projects and Initiatives in Each Plan Year ID Project/Initiative Timeline Budget the Town's website at the department level. H A K M Implement a Town-wide system for scheduling meeting rooms. Year-Two Projects and Initiatives Conduct a gap-fit analysis related to the Munis application's core financial modules. Reorganize the Desktop Replacement Plan and identify the need for laptops and tablets. Plan and implement technology training for end users and IT Department staff. Year 1-Year 3 14,500 Year 2-Year 3 65,000 Year 2-Year 3 135,000 Year 2-Year 3 40,000 N Develop, update, and communicate IT policies and procedures. Year 2-Year 3 0 B J E O Q Conduct a needs assessment related to CityView for the Town departments not using the application Create a Project Management focus in the Town for enterprise projects. Year-Three Projects and Initiatives Identify deficiencies in the Town's system and develop an action plan to meet Town needs Transition the Town to Voice over IP telephony (VoIP). Conduct an IT Security Audit Year 2-Year 3 70,000 Year 2 45,000 Year 3 0 Year 3 100,405 Year 3 75,000 Implementing the Technology Plan Based upon the budget estimates for each of the projects and initiatives in this Plan, a three-year budget and timeline matrix is presented in Section 4.1 of the Strategic Technology Plan. These funding levels will result in increased future IT spending, as indicated in the table below. Table 7: Future IT Spending Levels Future IT Spending Levels ($) Year 1 Year 2 Year 3 Increased Base Budget 3,320,999 3,404,023 3,489,125 Strategic Plan Budget 135, , ,405 Total IT Budget 3,456,499 3,751,023 3,896,530 Town Budget 107,336, ,946, ,581,122 IT Spending Ratio 3.22% 3.44% 3.52% The future IT spending levels are depicted in the following figure. Strategic Technology Plan Executive Summary Page 7 May 6, 2013

8 3.55% 3.50% 3.45% 3.40% 3.35% 3.30% 3.25% 3.20% 3.15% 3.10% 3.05% Future IT Spending Levels Year 1 Year 2 Year 3 Figure 1: Future IT Spending Levels The Town will begin the implementation of the projects and initiatives contained in this plan during the next fiscal year. The Strategic Technology Plan will greatly impact the operations of the Town. Planning, selecting, deploying, and managing for improved systems and service delivery mechanisms will require strong leadership, clear strategic and tactical plans, and, where reasonable, comprehensive needs assessments to help identify the most important technology-related Town challenges. Once new technologies are implemented, the Town will need to actively communicate those services and their benefits to both internal and external stakeholders. For example, the Town should not expect that new e-government services will be widely used unless the services are effectively communicated, trained, and promoted. New technology services create significant opportunities to change how the Town manages daily operations. The Town must plan for significant business process changes that streamline operations and focus on using technology to improve customer service. The Town should consider the following requirements that a plan of this magnitude necessitates: Active executive management involvement and sponsorship will be critical to the successful adoption and continued support of the plan. Implementing a successful Strategic Technology Plan will require significant planning, increased capital investment, and human resources in order to successfully implement the Plan Initiatives. Project goals and objectives should be clearly communicated to stakeholders and progress should be proactively monitored. Business processes should be evaluated, and, where necessary, redesigned to take advantage of new technologies in order to meet the Town s desired objectives. Many changes will be non-technical. Rather, they will be cultural shifts, process changes facilitated by change management and policy and procedure adjustments. Departments must work cooperatively and collaboratively to facilitate effective change that is in the best interest of the Town. Strategic Technology Plan Executive Summary Page 8 May 6, 2013

9 Technical support staff will be critical to the success of the IT Strategic Plan s implementation. Internal stakeholders must be ready, willing, and able to use new technology and embrace effective change. It will be important for the Town to continue to evaluate the use of outsourced services where appropriate. Similar to the Munis application hosting service currently used by the Town, other opportunities to outsource specific IT services may arise. It is important to weigh the service level that can potentially be compromised when outsourcing services when compared to in-house support. It is important that over the next three years the role of IT at the Town continue to evolve and continually be assessing leading edge technology tools to solve technology issues at the Town. The role of IT should focus on problem solving while balancing other organizational needs such as security, access to data and E-government services. Some of the initiatives in this plan will assist IT in moving further towards a proactive focus on IT planning. One of the critical success factors for the implementation of the IT plan will be executive support and leadership for the projects in the plan. The IT Department and Town Department Heads has committed to undertaking the projects in this plan and executive support will be needed to secure and allocate the appropriate Town resources, as well as ensuring that projects outside the scope of this plan in current and future years are thoroughly evaluated before adjusting the existing priorities of the projects in the plan. Implementing the projects and initiatives in this plan not only require appropriate Town resources, but a structured project management methodology will also need to be established to increase the likelihood of project success. By undertaking this Strategic Technology Planning Project, the Town is proactively planning to make improvements in many areas throughout the Town. Thoughtful and well-planned investments in proven information technologies will allow the Town to be more efficient and effective for their stakeholders and constituents. The key to success is managing and executing the plan. It will require the full commitment of necessary financial and managerial resources. Strategic Technology Plan Executive Summary Page 9 May 6, 2013

Five-Year Information Technology Strategic Plan

Five-Year Information Technology Strategic Plan Five-Year Information Technology Strategic Plan January 12, 2010 Prepared for the Town of Wayland in collaboration with: Berry, Dunn, McNeil & Parker Table of Contents Section Page # ACKNOWLEDGEMENTS...

More information

Burlington IT Business Strategy

Burlington IT Business Strategy THE CITY OF BURLINGTON INFORMATION TECHNOLOGY BUSINESS STRATEGY 2009-2011 2 P a g e I T B u s i n e s s S t r a t e g y Burlington IT Business Strategy Table of Contents 1.0 Executive Summary 3 2.0 Overview

More information

DEPARTMENT OF INFORMATION TECHNOLOGY

DEPARTMENT OF INFORMATION TECHNOLOGY DEPARTMENT OF INFORMATION TECHNOLOGY CITY OF Think Explore Pasadena A D O P T E D O P E R A T I N G B U D G E T F I S C A L Y E A R 2 0 1 1 Chief Information Officer (1.00) IT Administration (3.00) Customer

More information

Risk Management Primer

Risk Management Primer Risk Management Primer Purpose: To obtain strong project outcomes by implementing an appropriate risk management process Audience: Project managers, project sponsors, team members and other key stakeholders

More information

Robert M. Ford Director of Technology Entry Plan

Robert M. Ford Director of Technology Entry Plan Robert M. Ford Director of Technology Entry Plan Thank you for the opportunity to join the team at the Lincoln Public Schools. I am very excited about the chance to work with faculty, staff, administrators,

More information

TABLE OF CONTENTS BACKGROUND AND INTRODUCTION... 5 PURPOSE... 5 SCOPE... 6 RISK ASSESSMENT PROCESS... 6

TABLE OF CONTENTS BACKGROUND AND INTRODUCTION... 5 PURPOSE... 5 SCOPE... 6 RISK ASSESSMENT PROCESS... 6 TABLE OF CONTENTS BACKGROUND AND INTRODUCTION... 5 PURPOSE... 5 SCOPE... 6 RISK ASSESSMENT PROCESS... 6 RISK ASSESSMENT AND EVALUATION METHODOLOGY... 6 RESULTS... 8 RISK ASSESSMENT GAPS... 9 RISK ASSESSMENT

More information

INFORMATION TECHNOLOGY GOVERNANCE IN PENNSYLVANIA. Executive Summary

INFORMATION TECHNOLOGY GOVERNANCE IN PENNSYLVANIA. Executive Summary INFORMATION TECHNOLOGY GOVERNANCE IN PENNSYLVANIA Executive Summary The Commonwealth of Pennsylvania has launched a comprehensive IT management transformation. This transformation is evolving the IT governance

More information

City of Naperville Strategic Technology Plan. August 26, 2014

City of Naperville Strategic Technology Plan. August 26, 2014 City of Naperville Strategic Technology Plan August 26, 2014 How We Arrived Here Progression from the City s Strategic Plan Be recognized as an egovernment innovator Examine technology Citywide Study the

More information

Performance Audit Concurrent Review: ERP Pre-Solicitation

Performance Audit Concurrent Review: ERP Pre-Solicitation Performance Audit Concurrent Review: ERP Pre-Solicitation April 2002 City Auditor s Office City of Kansas City, Missouri 24-2001 April 10, 2002 Honorable Mayor and Members of the City Council: We conducted

More information

Assessing Your Information Technology Organization

Assessing Your Information Technology Organization Assessing Your Information Technology Organization Are you running it like a business? By: James Murray, Partner Trey Robinson, Director Copyright 2009 by ScottMadden, Inc. All rights reserved. Assessing

More information

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C013 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 15 th, 2006

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C013 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 15 th, 2006 Corporate NO: C013 Report COUNCIL DATE: June 26, 2006 COUNCIL-IN-COMMITTEE TO: Mayor & Council DATE: June 15 th, 2006 FROM: General Manager, Finance, Technology & HR FILE: 1340-01 SUBJECT: City of Surrey

More information

EXHIBIT 12. Bloomsburg University of Pennsylvania Technology Plan 2006

EXHIBIT 12. Bloomsburg University of Pennsylvania Technology Plan 2006 EXHIBIT 12 Bloomsburg University of Pennsylvania Technology Plan 2006 Bloomsburg University of Pennsylvania Technology Plan 2006 Technology Planning Committee 2005-06 Dr. Brett Beck Ms. Regina Bobak Dr.

More information

State of Vermont Joint Fiscal Office. Independent Review of State Information Technology Projects and Operations (H.492 Sec. 36)

State of Vermont Joint Fiscal Office. Independent Review of State Information Technology Projects and Operations (H.492 Sec. 36) State of Vermont Joint Fiscal Office Independent Review of State Information Technology Projects and Operations (H.492 Sec. 36) Project: Next Generation Case Management System (Judiciary) Interim Update

More information

Managed Services. Business Intelligence Solutions

Managed Services. Business Intelligence Solutions Managed Services Business Intelligence Solutions Business Intelligence Solutions provides an array of strategic technology services for life science companies and healthcare providers. Our Managed Services

More information

Information Services and Technology FY 2014-16 Performance Plan

Information Services and Technology FY 2014-16 Performance Plan Contents I. Mission Statement... 1 II. Department Overview... 1 III. Program Description and Responsibilities... 2... 2 ATOM... 2 Systems and Applications... 2 Justice... 3 Land Systems... 3 Support Services...

More information

Technology Strategic Plan For The Town of Dartmouth, MA

Technology Strategic Plan For The Town of Dartmouth, MA Town of Dartmouth, MA Five-Year Information Technology Strategic Plan May, 2015 Table of Contents I. Introduction... 1 A. Project Background... 1 B. Report Format... 2 C. Work Performed... 2 II. Planning

More information

Toronto Maintenance Management System Application Review. the exercise to harmonize business practices is completed;

Toronto Maintenance Management System Application Review. the exercise to harmonize business practices is completed; STAFF REPORT March 30, 2004 To: From: Subject: Audit Committee Auditor General Toronto Maintenance Management System Application Review Purpose: The purpose of this audit was to assess how well the Toronto

More information

INFORMATION TECHNOLOGY

INFORMATION TECHNOLOGY MISSION STATEMENT The Information Technology department provides technology, telecommunications and information systems leadership and strategic planning while ensuring efficient, cost effective implementation

More information

Enterprise IT Portfolio Governance and Management Model

Enterprise IT Portfolio Governance and Management Model STATE OF MICHIGAN Department of Information Technology Enterprise IT Portfolio Governance and Management Model NASCIO 2007 RECOGNITION AWARDS CATEGORY: IT PROJECT AND PORTFOLIO MANAGEMENT Enterprise IT

More information

State of Minnesota. Enterprise Security Strategic Plan. Fiscal Years 2009 2013

State of Minnesota. Enterprise Security Strategic Plan. Fiscal Years 2009 2013 State of Minnesota Enterprise Security Strategic Plan Fiscal Years 2009 2013 Jointly Prepared By: Office of Enterprise Technology - Enterprise Security Office Members of the Information Security Council

More information

Office of the Auditor General AUDIT OF IT GOVERNANCE. Tabled at Audit Committee March 12, 2015

Office of the Auditor General AUDIT OF IT GOVERNANCE. Tabled at Audit Committee March 12, 2015 Office of the Auditor General AUDIT OF IT GOVERNANCE Tabled at Audit Committee March 12, 2015 This page has intentionally been left blank Table of Contents Executive Summary... 1 Introduction... 1 Background...

More information

Contents. 3 Overview. 4 Snapshot of the Future. 4 Vision. 4 Guiding Principles. 5 The Strategy. 6 What Will We Do? 6 Create a Customer-Centred Culture

Contents. 3 Overview. 4 Snapshot of the Future. 4 Vision. 4 Guiding Principles. 5 The Strategy. 6 What Will We Do? 6 Create a Customer-Centred Culture CUSTOMER SERVICE STRATEGY 2013 Contents 3 Overview 4 Snapshot of the Future 4 Vision 4 Guiding Principles 5 The Strategy 6 What Will We Do? 6 Create a Customer-Centred Culture 6 Update Corporate Customer

More information

CITY OF BOULDER IT GOVERNANCE AND DECISION-MAKING STRUCTURE. (Approved May 2011)

CITY OF BOULDER IT GOVERNANCE AND DECISION-MAKING STRUCTURE. (Approved May 2011) CITY OF BOULDER IT GOVERNANCE AND DECISION-MAKING STRUCTURE (Approved May 2011) I. Citywide IT Mission, Goals and Guiding Principles The following mission, goal and principle statements are applied throughout

More information

Agency for State Technology

Agency for State Technology Agency for State Technology 2015-2018 Statewide Information Technology Security Plan The Way Forward Rick Scott, Governor Jason M. Allison, State CIO Table of Contents From the Desk of the State Chief

More information

Audit of the Management of Projects within Employment and Social Development Canada

Audit of the Management of Projects within Employment and Social Development Canada Unclassified Internal Audit Services Branch Audit of the Management of Projects within Employment and Social Development Canada February 2014 SP-607-03-14E Internal Audit Services Branch (IASB) You can

More information

A Final Report for City of Chandler Strategic IT Plan Executive Summary

A Final Report for City of Chandler Strategic IT Plan Executive Summary A Final Report for City of Chandler 6 January 2004 Table of Contents 1. Executive Summary... 1 1.1 Background... 2 1.2 Chandler Business and IT Context... 3 1.3 Chandler s IT Strategic Direction... 5 1.4

More information

Asset management guidelines

Asset management guidelines Asset management guidelines 1 IT asset management (ITAM) overview Objective Provide a single, integrated view of agency assets in order to allow agencies to identify the asset location and assess the potential

More information

Information Technology Strategic Plan 2014-2017

Information Technology Strategic Plan 2014-2017 Information Technology Strategic Plan 2014-2017 Leveraging information technology to create a competitive advantage for UW-Green Bay Approved December 2013 (Effective January 2014 December 2017) Contents

More information

Making Strategic Planning Work

Making Strategic Planning Work Making Strategic Planning Work Strategic Planning: A Basic Framework By Brent Stockwell The Importance of Stakeholder Trust and Engagement in Strategic Planning By Joseph P. Casey Strategic Planning: A

More information

The Seven-S S Model. A framework to guide and evaluate organization development to achieve vision and produce desired performance results.

The Seven-S S Model. A framework to guide and evaluate organization development to achieve vision and produce desired performance results. The Seven-S S Model A framework to guide and evaluate organization development to achieve vision and produce desired performance results. Framework The 7 S model has its origins from the classic, 'The

More information

The PNC Financial Services Group, Inc. Business Continuity Program

The PNC Financial Services Group, Inc. Business Continuity Program The PNC Financial Services Group, Inc. Business Continuity Program 1 Content Overview A. Introduction Page 3 B. Governance Model Page 4 C. Program Components Page 4 Business Impact Analysis (BIA) Page

More information

4.1 Identify what is working well and what needs adjustment. 4.1.1 Outline broad strategies that will help to effect these adjustments.

4.1 Identify what is working well and what needs adjustment. 4.1.1 Outline broad strategies that will help to effect these adjustments. (Overview) Step 1 Prepare 1.1 Identify specific issues or choices that the planning process should address. 1.2 Develop an organizational profile. 1.3 Identify any information that must be collected to

More information

Review of Information Technology Expenditure Summary 16 November 2011. Dr John Hogan. Registrar

Review of Information Technology Expenditure Summary 16 November 2011. Dr John Hogan. Registrar Review of Information Technology Expenditure Summary 16 November 2011 Dr John Hogan Registrar Recap on scope The objective of the review was to recommend ways to improve the University s value for money

More information

CAPITAL IMPROVEMENT PROGRAM (CIP) MANAGEMENT & TRACKING PROCESS, SYSTEMS, & PEOPLE APPROACH

CAPITAL IMPROVEMENT PROGRAM (CIP) MANAGEMENT & TRACKING PROCESS, SYSTEMS, & PEOPLE APPROACH CAPITAL IMPROVEMENT PROGRAM (CIP) MANAGEMENT & TRACKING PROCESS, SYSTEMS, & PEOPLE APPROACH ABSTRACT Aditya Ramamurthy, PMP, ARCADIS US, Inc. Like most water and sanitary sewer utilities around the nation,

More information

Office of the Chief Information Officer. Annual Report 2012 13

Office of the Chief Information Officer. Annual Report 2012 13 [Type text] Office of the Chief Information Officer Annual Report 2012 13 This page is intentionally blank Message from the Minister As the Minister Responsible for the Office of the Chief Information

More information

Office of the Chief Information Officer

Office of the Chief Information Officer Office of the Chief Information Officer Business Plan: 2012 2015 Department / Ministère: Executive Council Date: November 15, 2012 1 P a g e This Page Left Intentionally Blank 2 P a g e Contents The Business

More information

Guidelines. for setting up. Dedicated Project Team. Page 1 of 14

Guidelines. for setting up. Dedicated Project Team. Page 1 of 14 Guidelines for setting up Dedicated Project Team Page 1 of 14 Foreword The National e-governance Plan of Indian Government seeks to lay the foundation and provide the impetus for long-term growth of e-governance

More information

Technology Master Plan 2010-2015 Irvine Valley College

Technology Master Plan 2010-2015 Irvine Valley College Technology Master Plan 2010-2015 Irvine Valley College Adopted Fall Term 2010 V4.0 Created By: Irvine Valley College Page 1 6/21/2010 Table of Contents Introduction and Overview... 3 Background and Planning

More information

Enterprise Security Tactical Plan

Enterprise Security Tactical Plan Enterprise Security Tactical Plan Fiscal Years 2011 2012 (July 1, 2010 to June 30, 2012) Prepared By: State Chief Information Security Officer The Information Security Council State of Minnesota Enterprise

More information

2 Update to Strategic Technology Plan Final Report City of Jacksonville, NC. December 2007

2 Update to Strategic Technology Plan Final Report City of Jacksonville, NC. December 2007 2 Update to Strategic Technology Plan Final Report City of Jacksonville, NC December 2007 Prepared by: The CIO Collaborative 9850 S. Maryland Parkway - Suite A-5293 Las Vegas, NV 89183 Phone: 702-914-1889

More information

Leveraging innovative security solutions for government. Helping to protect government IT infrastructure, meet compliance demands and reduce costs

Leveraging innovative security solutions for government. Helping to protect government IT infrastructure, meet compliance demands and reduce costs IBM Global Technology Services Leveraging innovative security solutions for government. Helping to protect government IT infrastructure, meet compliance demands and reduce costs Achieving a secure government

More information

Technology Services Strategic Plan

Technology Services Strategic Plan Technology Services Strategic Plan 2014 Table of Contents A Changing Landscape... 3 Values... 4 Technology Services Goals... 5 Employee Engagement... 6 Operational Efficiency... 7 Agency Satisfaction...

More information

Town of Andover. Strategic Information Technology Plan Findings and Recommendations. Version 3.0 March 2010

Town of Andover. Strategic Information Technology Plan Findings and Recommendations. Version 3.0 March 2010 Town of Andover Strategic Information Technology Plan Findings and Recommendations Version 3.0 March 2010 Andover Strategic Information Technology Plan Table of Contents I Project Overview II Executive

More information

OPTIMUS SBR PROCESS IMPROVEMENT. Streamline your outdated process for maximum efficiency. CHOICE TOOLS. PRECISION AIM. BOLD ATTITUDE.

OPTIMUS SBR PROCESS IMPROVEMENT. Streamline your outdated process for maximum efficiency. CHOICE TOOLS. PRECISION AIM. BOLD ATTITUDE. OPTIMUS SBR CHOICE TOOLS. PRECISION AIM. BOLD ATTITUDE. Streamline your outdated process for maximum efficiency. PROCESS IMPROVEMENT WHO WE ARE OPTIMUS SBR is a management consulting firm focused on supporting

More information

Saldanha Bay Municipality. Risk Management Strategy. Inclusive of, framework, procedures and methodology

Saldanha Bay Municipality. Risk Management Strategy. Inclusive of, framework, procedures and methodology Inclusive of, framework, procedures and methodology Contents 1 Introduction 1 1.1 Legislative Framework and best practice 1 1.2 Purpose of Enterprise Risk Management 2 1.3 Scope and Applicability 3 1.4

More information

1 YORK REGION INFORMATION TECHNOLOGY STRATEGY (YRITS)

1 YORK REGION INFORMATION TECHNOLOGY STRATEGY (YRITS) Report No.3 of the e-government Sub-Committee 1 YORK REGION INFORMATION TECHNOLOGY STRATEGY (YRITS) The e-government Sub-Committee recommends the following: 1. The presentation made by Louis Shallal, Director

More information

University of Oregon Information Technology Risk Assessment. December 2, 2015

University of Oregon Information Technology Risk Assessment. December 2, 2015 December 2, 2015 Table of Contents EXECUTIVE SUMMARY... 3 BACKGROUND... 3 APPROACH... 4 IT UNITS... 5 NOTED STRENGTHS... 5 THEMES... 6 IT RISKS... 11 IT RISKS DESCRIPTIONS... 12 APPENDIX A: BAKER TILLY

More information

MANATEE COUNTY SCHOOL DISTRICT RISK ASSESSMENT UPDATE PROCESS REPORT

MANATEE COUNTY SCHOOL DISTRICT RISK ASSESSMENT UPDATE PROCESS REPORT MANATEE COUNTY SCHOOL DISTRICT RISK ASSESSMENT UPDATE PROCESS REPORT Shinn & Company LLC was contracted by the Manatee County School Board (the Board ) to update the current risk assessment. The initial

More information

Network Technology Refresh Briefing

Network Technology Refresh Briefing Network Technology Refresh Briefing Presented to the Dallas City Council August 26, 2008 Communication & Information Services Outline Network Technology Refresh Background Why should we refresh the Network?

More information

Eastern Illinois University information technology services. strategic plan. January,

Eastern Illinois University information technology services. strategic plan. January, Eastern Illinois University information technology services strategic plan January, 2014 Introduction With the selection of emerging technologies as one of the six themes of the university s recent strategic

More information

Appendix G: Organizational Change Management Plan. DRAFT (Pending approval) April 2007

Appendix G: Organizational Change Management Plan. DRAFT (Pending approval) April 2007 Appendix G: Organizational Change Management Plan DRAFT (Pending approval) April 2007 Table of Contents TABLE OF CONTENTS... 1 INTRODUCTION:... 2 ABT ORGANIZATIONAL CHANGE MANAGEMENT SCOPE... 2 PEOPLESOFT

More information

Iowa State University Proposal for HR-01 ISU HR Operating Model

Iowa State University Proposal for HR-01 ISU HR Operating Model Iowa State University Proposal for HR-01 ISU HR Operating Model Overview: Iowa State University proposes undertaking the HR-01 ISU HR Operating Model business case to transform the quality, manner and

More information

Managed Information Technology Services For the Town of Moraga

Managed Information Technology Services For the Town of Moraga Request for Qualifications Managed Information Technology Services For the Town of Moraga Deadline for Submittal: Wednesday, December 5, 2012 No later than 2:00 p.m. Prepared by: Stephanie Hom Administrative

More information

Management Information Systems (MIS) & Geographic Information Systems (GIS) Departmental Statement

Management Information Systems (MIS) & Geographic Information Systems (GIS) Departmental Statement Section 2-20 Management Information Systems (MIS) & Geographic Information Systems (GIS) Departmental Statement The Department is charged with coordinating the implementation and application of information

More information

1 YORK REGION INFORMATION TECHNOLOGY STRATEGY (YRITS) 2006 UPDATE

1 YORK REGION INFORMATION TECHNOLOGY STRATEGY (YRITS) 2006 UPDATE Report No. 1 of the e-government Sub-Committee 1 YORK REGION INFORMATION TECHNOLOGY STRATEGY (YRITS) 2006 UPDATE The e-government Sub-Committee recommends the adoption of the recommendation contained in

More information

Application Overhaul. Key Initiative Overview

Application Overhaul. Key Initiative Overview Scott D. Nelson Research Managing Vice President This overview provides a high-level description of the Application Overhaul Key Initiative. IT leaders can use this guide to understand how to develop an

More information

Business Plan: Information Technology Services (ITS)

Business Plan: Information Technology Services (ITS) Business Plan: Information Technology Services (ITS) How does this service contribute to the results identified in the City of London Strategic Plan? A Sustainable Infrastructure A Caring Community Fundamental

More information

Quality of Community School Sponsor Practices Review (QSPR)

Quality of Community School Sponsor Practices Review (QSPR) Quality of Community School Sponsor Practices Review (QSPR) Recent legislation, Amended Substitute House Bill 555, requires the Ohio Department of Education (ODE) to develop and implement a sponsor evaluation

More information

Office of Information Technology. County of Dallas FY2014 FY2018 Information Technology Strategic Plan

Office of Information Technology. County of Dallas FY2014 FY2018 Information Technology Strategic Plan Office of Information Technology County of Dallas Letter from the Office of Information Technology This Information Technology Strategic Plan is the culmination of hard work and collaboration by County

More information

Information Technology Master Plan Update: IMTech February 28, 2011

Information Technology Master Plan Update: IMTech February 28, 2011 Information Technology Master Plan Update: IMTech February 28, 2011 Information Technology Master Plan Update: Agenda Background City of Georgetown s Vision Technology Transformation Approach Assessment

More information

Position Description: Chief Information Officer Department: Information Technology Information Technology FLSA Status: Exempt. Revised: October, 2014

Position Description: Chief Information Officer Department: Information Technology Information Technology FLSA Status: Exempt. Revised: October, 2014 Position Description: Chief Information Officer Department: Information Technology Division: Information Technology FLSA Status: Exempt Location: Griffiss Revised: October, 2014 PURPOSE: I. Assure the

More information

Ralston Public Schools - Technology Project For district Administrators

Ralston Public Schools - Technology Project For district Administrators IT EFFECTIVENESS & STRATEGIC PLANNING PROJECT Technology Strategic & Tactical Plan Executive Summary April, 2013 Contents The purpose of this document is to summarize the Technology Tactical Plan for Ralston

More information

THE STRATEGIC PLAN OF THE INDIANA PUBLIC RETIREMENT SYSTEM FOR THE PERIOD OF FISCAL YEARS

THE STRATEGIC PLAN OF THE INDIANA PUBLIC RETIREMENT SYSTEM FOR THE PERIOD OF FISCAL YEARS THE STRATEGIC PLAN OF THE INDIANA PUBLIC RETIREMENT SYSTEM FOR THE PERIOD OF FISCAL YEARS 2016-2018 TABLE OF CONTENTS INTRODUCTION TO THE STRATEGIC PLAN 4 GOALS, OBJECTIVES & KEY OPERATIONAL REQUIREMENTS

More information

Request for Expressions of Interest On a contract to perform: Renewal of Information Technology Strategic Plan 2013-2018

Request for Expressions of Interest On a contract to perform: Renewal of Information Technology Strategic Plan 2013-2018 Request for Expressions of Interest On a contract to perform: Renewal of Information Technology Strategic Plan 2013-2018 for City of Pitt Meadows Table of Contents Table of Contents... 2 General Information...

More information

ERP. Key Initiative Overview

ERP. Key Initiative Overview Jeff Woods Research Managing Vice President This overview provides a high-level description of the ERP Key Initiative. IT leaders can use this overview to better understand what they need to do to prepare

More information

Financial Services FINANCIAL SERVICES UTILITIES 57 FINANCIAL SERVICES AND UTILITIES 2016-2018 BUSINESS PLAN. CR_2215 Attachment 1

Financial Services FINANCIAL SERVICES UTILITIES 57 FINANCIAL SERVICES AND UTILITIES 2016-2018 BUSINESS PLAN. CR_2215 Attachment 1 CR_2215 Attachment 1 Financial Services FINANCIAL SERVICES & UTILITIES 57 FINANCIAL SERVICES AND UTILITIES 2016-2018 BUSINESS PLAN Acting Branch Manager: Stacey Padbury Table of Contents INTRODUCTION Our

More information

ICT budget and staffing trends in the UK

ICT budget and staffing trends in the UK ICT budget and staffing trends in the UK Enterprise ICT investment plans to 2013 January 2013 TABLE OF CONTENTS 1 Trends in ICT budgets... 1 1.1 Introduction... 1 1.2 Survey demographics... 1 1.3 IT budget

More information

Standards for Developing and Implementing Administrative Systems at UC Davis

Standards for Developing and Implementing Administrative Systems at UC Davis Page 1 of 7 Standards for Developing and Implementing Administrative Systems at UC Davis Introduction The purpose of this document is to describe Standards for Developing and Implementing Administrative

More information

Brochure HP Workflow Discovery for FSI

Brochure HP Workflow Discovery for FSI Brochure HP Workflow Discovery for FSI Enhance productivity, improve processes and reduce costs Businesses today need to run more efficiently, and you re probably considering every alternative to help

More information

Optimizing the Data Center for Today s State & Local Government

Optimizing the Data Center for Today s State & Local Government WHITE PAPER: OPTIMIZING THE DATA CENTER FOR TODAY S STATE...... &.. LOCAL...... GOVERNMENT.......................... Optimizing the Data Center for Today s State & Local Government Who should read this

More information

ENTERPRISE ARCHITECTUE OFFICE

ENTERPRISE ARCHITECTUE OFFICE ENTERPRISE ARCHITECTUE OFFICE Date: 12/8/2010 Enterprise Architecture Guiding Principles 1 Global Architecture Principles 1.1 GA1: Statewide Focus 1.1.1 Principle Architecture decisions will be made based

More information

OPERATIONAL ANALYSIS STATUS REPORT JUNE 2015

OPERATIONAL ANALYSIS STATUS REPORT JUNE 2015 & OPERATIONAL ANALYSIS STATUS REPORT JUNE 2015 PROJECT SUMMARY In late 2013, the Indy Chamber, under the guidance of our member businesses, released a comprehensive Operational Analysis of the Indianapolis

More information

SEVEN REASONS TO CONSIDER ERP IN THE CLOUD SPECIAL REPORT SERIES ERP IN 2014 AND BEYOND

SEVEN REASONS TO CONSIDER ERP IN THE CLOUD SPECIAL REPORT SERIES ERP IN 2014 AND BEYOND SEVEN REASONS TO CONSIDER ERP IN THE CLOUD SPECIAL REPORT SERIES ERP IN 2014 AND BEYOND CONTENTS INTRODUCTION 3 TRY BEFORE YOU BUY 4 TAKE ADVANTAGE OF THE MOST ADVANCED TECHNOLOGY 6 GENERATE MEASURABLE

More information

MANAGED SERVICES PROVIDER. Dynamic Solutions. Superior Results.

MANAGED SERVICES PROVIDER. Dynamic Solutions. Superior Results. MANAGED SERVICES PROVIDER Dynamic Solutions. Superior Results. REVOLUTIONIZE YOUR INSTITUTION BY FULLY LEVERAGING THE BENEFITS OF TECHNOLOGY MAXIMIZE YOUR TECHNOLOGY INVESTMENTS ENHANCE SECURITY OF YOUR

More information

FDA STAFF MANUAL GUIDES, VOLUME I - ORGANIZATIONS AND FUNCTIONS FOOD AND DRUG ADMINISTRATION OFFICE OF OPERATIONS

FDA STAFF MANUAL GUIDES, VOLUME I - ORGANIZATIONS AND FUNCTIONS FOOD AND DRUG ADMINISTRATION OFFICE OF OPERATIONS SMG 1117.2111 FDA STAFF MANUAL GUIDES, VOLUME I - ORGANIZATIONS AND FUNCTIONS FOOD AND DRUG ADMINISTRATION OFFICE OF OPERATIONS OFFICE OF INFORMATION MANAGEMENT AND TECHNOLOGY OFFICE OF INFORMATION MANAGEMENT

More information

PKI Deployment Business Issues

PKI Deployment Business Issues An OASIS PKI White Paper PKI Deployment Business Issues By Amir Jafri and June Leung (FundSERV Inc.) For the Oasis PKI Member Section OASIS PKI White Paper OASIS (Organization for the Advancement of Structured

More information

2011 NASCIO Recognition Award Nomination State of Georgia

2011 NASCIO Recognition Award Nomination State of Georgia 2011 NASCIO Recognition Award Nomination State of Georgia Nomination Category: Enterprise IT Management Initiatives Title of Nomination: Georgia Enterprise Technology Services Nomination Submitted By:

More information

2007 Follow-Up Report on the Audit of Information Technology January 2005

2007 Follow-Up Report on the Audit of Information Technology January 2005 2007 Follow-Up Report on the Audit of Information Technology January 2005 Natural Sciences & Engineering Research Council of Canada & Social Sciences & Humanities Research Council of Canada October 2007

More information

Measuring Success Service Desk Evaluation Guide for the Midsized Business: How to Choose the Right Service Desk Solution and Improve Your ROI

Measuring Success Service Desk Evaluation Guide for the Midsized Business: How to Choose the Right Service Desk Solution and Improve Your ROI BEST PRACTICES WHITE PAPER Measuring Success Service Desk Evaluation Guide for the Midsized Business: How to Choose the Right Service Desk Solution and Improve Your ROI Table of Contents INTRODUCTION...1

More information

Information Technology Strategic Plan

Information Technology Strategic Plan Information Technology Strategic Plan July 2013 Table of Contents Executive Summary 4 Planning Process 4 PVAMU Planning Assumptions 5 IT Mission Statement 7 IT Values 7 IT Vision Statement 8 Landscape

More information

Single Sourcing as Enabler for SAP Clients

Single Sourcing as Enabler for SAP Clients Single Sourcing as Enabler for SAP Clients Gert Keuschnigg IBM Business Consulting Services Vienna, April 2005 Table Of Contents Initial Situations at Clients and Goals of Single Sourcing Approaches of

More information

Has Your Organization Out-Grown Your Helpdesk? A guide to determine when your company is at the right stage to shift to a Service Desk.

Has Your Organization Out-Grown Your Helpdesk? A guide to determine when your company is at the right stage to shift to a Service Desk. Has Your Organization Out-Grown Your Helpdesk? A guide to determine when your company is at the right stage to shift to a Service Desk. 1 P a g e Has Your Organization Out-Grown Your Helpdesk? A guide

More information

ChemTracker Consortium The higher education collaboration for chemical inventory management and regulatory reporting

ChemTracker Consortium The higher education collaboration for chemical inventory management and regulatory reporting RESEARCH ChemTracker Consortium The higher education collaboration for chemical inventory management and regulatory reporting Tracking chemical inventory is necessary for safety management as well as regulatory

More information

WHITE PAPER December, 2008

WHITE PAPER December, 2008 INTRODUCTION Key to most IT organization s ongoing success is the leadership team s ability to anticipate, plan for, and adapt to change. With ever changing business/mission requirements, customer/user

More information

Leveraging the erate Program to Get a Next-Generation Communication System. November, 2012

Leveraging the erate Program to Get a Next-Generation Communication System. November, 2012 Leveraging the erate Program to Get a Next-Generation Communication System November, 2012 Agenda 1. erate Basics 2. 10 Important Considerations 3. Brush School District (Case Study) 4. Mitel AnyWare for

More information

state of south dakota Bureau of Information & Telecommunications Provide a Reliable, Secure & Modern Infrastructure services well-designed innovative

state of south dakota Bureau of Information & Telecommunications Provide a Reliable, Secure & Modern Infrastructure services well-designed innovative Strategic Plan 2015-2017 state of south dakota Bureau of Information & Telecommunications 1GOAL ONE: Provide a Reliable, Secure & Modern Infrastructure services security technology assets well-designed

More information

Municipality of Chatham-Kent

Municipality of Chatham-Kent Municipality of Chatham-Kent IT Strategic Plan Authors: Michael Barron, Allan Evans, Paul J. Mackin, Debra Rimmer, Chad Robbins, Francis Roque Owner: Helen McLaren Creation Date: February 7, 2008 Version:

More information

FACILITIES MAINTENANCE

FACILITIES MAINTENANCE Program Direction and Accountability 1. The district s maintenance and operations department has a mission statement and goals and objectives that are established in writing. a. The maintenance department

More information

ICT budget and staffing trends in Healthcare

ICT budget and staffing trends in Healthcare ICT budget and staffing trends in Healthcare Enterprise ICT investment plans November 2013 ICT budget and staffing trends in Healthcare P a g e 1 www.kable.co.uk / The id Factor Ltd / + 44 (0) 207 936

More information

Department-wide Systems and Capital Investment Program

Department-wide Systems and Capital Investment Program Department-wide Systems and Capital Investment Program Mission Statement The Department-wide Systems and Capital Investments Program (DSCIP) is authorized to be used by or on behalf of the Treasury Department

More information

Guidelines 1 on Information Technology Security

Guidelines 1 on Information Technology Security Guidelines 1 on Information Technology Security Introduction The State Bank of Pakistan recognizes that financial industry is built around the sanctity of the financial transactions. Owing to the critical

More information

civic Infrastructure Development - The 4 Strategic and Community Improvement Plans

civic Infrastructure Development - The 4 Strategic and Community Improvement Plans Goal 1: Ensure residents are being served by an efficient, cohesive and comprehensive delivery model. Strategic Objective: Investment in and support of community infrastructure and services that reflects

More information

Managing business risk

Managing business risk Managing business risk What senior managers need to know about business continuity bell.ca/businesscontinuity Information and Communications Technology (ICT) has become more vital than ever to the success

More information

SAP Thought Leadership Customer Relationship Management. Transforming Tax Processes with CRM and

SAP Thought Leadership Customer Relationship Management. Transforming Tax Processes with CRM and SAP Thought Leadership Customer Relationship Management Transforming Tax Processes with CRM and Analytics Solutions Improving Citizen Focus by Enhancing Service and Compliance Tax agencies must operate

More information

University of Michigan Health System Finance Competency Model

University of Michigan Health System Finance Competency Model University of Michigan Health System Finance Competency Model Performance Planning & Staff Development Version 1.2 May 2012 Contents Introduction to the Concept of Competency... 3 Competency Model Development...

More information

CIPS Exam Report for Learner Community:

CIPS Exam Report for Learner Community: CIPS Exam Report for Learner Community: Qualification: Unit: Exam series: Advanced diploma in procurement and supply AD2 Management risk in supply chains November, 2013 Exam Series INFORMATION FOR CANDIDATES

More information

Change Management in Libraries: An Essential Competency for Leadership

Change Management in Libraries: An Essential Competency for Leadership Purdue University Purdue e-pubs Proceedings of the IATUL Conferences 2014 IATUL Proceedings Change Management in Libraries: An Essential Competency for Leadership Catherine B. Soehner University of Utah,

More information

Section 4 MANAGEMENT CONTROLS AND PROCESSES. Section 4

Section 4 MANAGEMENT CONTROLS AND PROCESSES. Section 4 Section 4 MANAGEMENT CONTROLS AND PROCESSES Section 4 MANAGEMENT CONTROLS AND PROCESSES MANAGEMENT CONTROLS AND PROCESSES FEATURED IN THIS SECTION 4.1 Information Management Framework... 1 4.2 Strategic

More information

Reality Solutions Ltd 2016

Reality Solutions Ltd 2016 Using business software and solutions to manage your business workflow, processes, administration and financials is essential in the highly competitive advanced technological world we all work in today,

More information

Cosumnes River College Planning

Cosumnes River College Planning Cosumnes River College Planning TITLE: Information Technology Strategic Plan, March 2014 OFFICE OF PRIMARY RESPONSIBILITY (OPR): COLLABORATIVE GROUPS: REFERENCED DOCUMENTS: Learning Resources and College

More information