BRAND NEW ST.HELENS DEVELOPMENT REVIEW. October 2007
|
|
|
- Claribel Walsh
- 9 years ago
- Views:
Transcription
1 BRAND NEW ST.HELENS DEVELOPMENT REVIEW October 2007
2 Lake District Southport M57 Liverpool M58 Preston M62 M6 M6 St.Helens M6 M61 M65 Wigan M6 M61 M62 Warrington Bolton M62 M60 M60 M66 Manchester Salford Contents Foreword 3 Infrastructure 4 Employment 8 Public Services & Education 11 Tourism & Leisure 15 Residential 18 Planning & Development Listings 22 Awards 32 Wirral M53 Runcorn M56 M6 M56 Knutsford North Wales M56 M56 M53 Chester Glasgow Leeds Birmingham Cardiff London
3 FOREWORD St.Helens is undergoing a spectacular post-industrial revolution and nowhere has this transformation been more marked than in the realm of recent physical developments. Working closely with the private sector, and capitalising on our prime regional connectivity and catchment midway between Liverpool and Manchester, the result has been a major uplift in St.Helens appeal as a profitable business base, desirable residential location, and attractive visitor destination. This is best highlighted by a few choice facts: We are one of the top 11 centres in the UK in terms of business start up growth rates 1 We are the most car-friendly location in North West England 2 We offer one of the best Planning Services in the country 3 Combine these with the iconic new Central Station featured on the cover, the prospect of a fantastic stadium worthy of the current Rugby League World Champions, three new Urban Villages under construction, and a host of other major commercial and place shaping developments in the pipeline, and it all adds up to a winning formula. This document is intended to review the significant schemes successfully implemented in the Borough over the last two years up until 31 August 2007, while previewing key future physical developments. This is part of the Brand New St.Helens initiative - an integrated range of new branding, materials, and activities, all aimed at promoting St.Helens plc and further accelerating the Borough s transformation by renewing our image, raising our profile, showcasing our assets and benefiting our economy. St.Helens is a passionate, innovative, and enterprising place, and I am positive you will find this publication interesting, useful, and inspiring! We are home to officially the best Chamber in Britain 4 Our Cultural Quarter has now won 18 regional and national urban design awards An internationally renowned artist has been commissioned to create a landmark new artwork in St.Helens overlooking the M62 as one of only 7 UK Channel 4 Big Art Project sites. Carole Hudson Chief Executive, St.Helens Council October Source: 2007 Barclays Bank survey 2 Source: 2007 Virgin Money survey 3 Source: the Planning Advisory Service, Source: British Chambers of Commerce, 2007 Brand New St.Helens Development Review 3
4 M62 M62 A580 A58 A57 A58 A58 A49 A580 A572 A599 A570 A571 A570 A570 A578 A568 M57 M58 M58 TO LIVERPOOL TO SOUTHPORT TO LIVERPOOL TO MANCHESTER TO MANCHESTER TO PRESTON TO BIRMINGHAM TO RUNCORN & M56/M53 M6 M6 M / 11a 3I 2X 2K 2Z 2Y 2W 2R 3B 5S 5Y 5Z 5V 5T 3G 2BB 5AA 5KK 5EE 2CC 5MM 5II 5LL 5CC 5JJ 2CC 5PP 5FF 5D 4A 5C 2O 5A 2L 2C 5U 3C 3E 2Q 5P 2M 2T 2P 5Q 5GG 5ZZ 5DD 5SS 2AA 5QQ 5XX 5W 2V 2I 4J 2D 2F 5H 5K 5J 5X 5R 3J 5F 1B 1B 1B 1B 1B 3H 5O 3L 5HH 5E 5G 5L 4F 2G 4H 3M 2DD 3A 2B 2A 2U 1A 1C 4B 4I 4M 5M 5N 1F 1E 3F 3K 2S 3D 4E 4L 4D 5I 1G 5OO 5B 1D 4G 4K 5BBB 5AAA 5CCC 5DDD 2N 2J 2H 4C 5BB 2E 5WW 5VV 5NN 5RR 5YY 5UU
5 Key to Developments INFRASTRUCTURE 1A Blackbrook Bypass 1B St.Helens Boundary Markers 1C The Needle 1D Church & Community Centre, Willow Road 1E St.Helens Central Station 1F Town Centre Focal Point 1G Brickfields Community Woodland EMPLOYMENT 2A Catapult Too 2B Merton Bank Industrial Estate 2C Station Road 2D Eurolink Sutton Manor 2E Tesco (Haydock) 2F Mere Grange 2G St.Helens Enterprise Centre 2H Robinson Country Leisure Mill Lane 2I Micklehead Business Village 2J Royden Engineering, Sandwash Close 2K Land at Old Boston Trading Estate 2L 8a Reginald Road Industrial Park 2M Land adjacent to 526a Fleet Lane 2N Land to the North West of Hazel Business Park 2O Plot Sankey Valley Industrial Estate 2P Land opposite Allotment Gardens, Bedford Street 2Q Cew Recycling Group, Merton Bank Industrial 2R Land at Old Boston Trading Estate 2S Land to the North of Pocket Nook Street 2T Former engineering works, Hertford Street 2U Next to Gregson House, Central Street 2V Land at Lea Green Farm East, Elton Head Road 2W Land at Old Boston Trading Estate 2X Land bounded by A580 Millfield Lane 2Y Empress Works, Penny Lane 2Z Land at Old Boston Trading Estate 2AA Zepro UK Ltd, Beaufort Street 2BB Earlestown Labour Club, Legh Street 2CC Ena Shaw Ltd, Lea Green Business Park 2DD Tesco s, Chalon Way PUBLIC SERVICES & EDUCATION 3A 3B 3C 3D 3E 3F 3G 3H 3I 3J 3K 3L 3M YMCA - The Beacon Patterson Street, Newton-le-Willows Ellamsbridge Road Dunedin Street St.Helens Hospital St.Helens Council CYPS Building Newton Community Hospital St.Helens Crematorium Land adjacent to Senley Green Community Hall Carmel College Vocational Skills Centre, St.Helens College Technology Campus Cowley High School St.Helens College TOURISM & LEISURE 4A Ariete 4B North West Museum of Road Transport 4C Pottery Farm Mill Lane Rainford 4D Ravenhead Retail Park 4E Ravenhead Retail Park 4F Land between 103 & 111 Church Street 4G Haydock Park Racecourse 4H West Point 4I St.Helens Retail Park 4J Land South of Fairchild Farm 4K Haydock Park Racecourse 4L Mainsway Ltd, Burtonhead Road 4M Saints Stadium RESIDENTIAL 5A St. Aidans C of E Community Primary School site 5B Cooper Avenue 5C Land formerley Borron Road 5D Land adjacent to fire station, Borron Road 5E Land site of former Grange Park Hotel, 369 Prescot Road 5F Land between Knowsley Road & Eccleston Old Road 5G Land at junction of Bewsey Street & Whittle Street 5H Eccleston Park Golf Club, Rainhill Road 5I Land junction of Glover Street & Bold Street 5J The Meads, Portico Lane 5K Land at the East of Nutgrove Road & Rainhill Road 5L Land at the West of 1 Ravenhead Row & Factory Row 5M HQ St.Helens 5N Former Arriva building, Hall Street 5O 5P 5Q 5R 5S 5T 5U 5V 5W 5X 5Y 5Z 5AA 5BB 5CC 5DD 5EE 5FF 5GG 5HH 5II 5JJ 5KK 5LL 5MM 5NN 5OO 5PP 5QQ 5RR 5SS 5TT 5UU 5VV 5WW 5XX 5YY 5ZZ 5AAA 5BBB 5CCC 5DDD Former Hamblett School Bowling Green Inn, 220 Watery Lane Land adjacent to 19 Pennine Close Land at Lowther Crescent Penrith Road Former site of Catherine Way Land between Bradlegh Road & Catherine Way Land between 1 and 23 Fisher Street Site of former garage compound and houses Land off Elton Head Road Land at Lowther Crescent Penrith Road Land at Park Avenue North Land at Laurel Avenue & Cedar Cresent. Plots Sherbourne Park, Jubits Lane Claremont, Main Street Billinge Site of former Kimerley Avenue Land at Egerton Street Land at Lea Green Colliery & Lowfield Lane Land fronting & including Concourse Way Penrith Road Land encompassing Brook Cottage Farm & Watery Lane Land incorporating Argyle Street & Chapel Street Land North of Richards Grove & land East of Boardman's Lane St.Helens Service Station Park Road Part of Lea Green Urban Village Grange Park Labour Club, Upland Road Tannery Farm, Elephant Lane Land between 60A & 28 Vista Road Land at Pipit Avenue Newton-le-Willows M T B Chrysler Dealership, Mill Lane Land adjacent to former Griffin Inn, Peasley Cross Land East of Boardmans Lane Land at Egerton, Emlyn & Gower Street Land site of 1 Borron Road Former Hamblett School site Land between 60A & 28 Vista Road Rainford Labour Club, Ormskirk Road Land at Somerset Street & Sussex Grove Former poultry farm, South Lane Land at Sutton Road / Baxters Lane Former bowling green site, Marsden Avenue Former Caledonia Peugeot garage, Knowsley Road Land incorporating Chapel Street & land incorporating Argyle Street Land North of Richards Grove & land East of Boardman's Lane
6 INFRASTRUCTURE St.Helens has benefited from significant investment in new and enhanced infrastructure during the last two years, seeking to maximise the competitive advantage and potential of its prime regional location, connectivity and population catchment. These works have spanned major rail as well as road infrastructure, plus significant investment in place-shaping public realm, art, and information projects. These have been both at key approaches into the Borough, as well as in the town centre, in order to further improve the accessibility and aesthetic appeal of the Borough s economic and cultural hub. The emphasis throughout has been on quality of design as well as function. Infrastructure advances have played a key role in the positive transformation of not just the Borough s connectivity and physical environment but also its image. The crowning glory will come during 2008 with the creation of a landmark new artwork 5 overlooking Junction 7 of the M62 at the gateway to Merseyside, that is intended to become an internationally recognised new icon for England s Northwest. The work by internationally renowned artist Jaume Plensa has been commissioned by St.Helens Council as part of the Channel 4 s Big Art Project. 4 Brand New St.Helens Development Review Town Centre Focal Point 5 Subject to planning permission being secured
7 Key Infrastructure Projects Blackbrook Bypass The Needle Status: Project Lead: St.Helens Council Delivery Partners: Merseytravel, Birse Civils Ltd Cost: 8.4 million Funding: Department of Transport The Blackbrook Bypass was the only major new road construction in the Northwest during on time and within budget, the project provides a major environmental as well as economic boost for the Borough, by significantly reducing traffic through a heavily populated area and speeding up access to the town centre from the eastern East Lancashire Road approach. The scheme comprises a new 1.3km singlecarriageway road, plus a footpath and cycleway along the full length. This bypasses West End Road, and runs from the Ship Inn on Blackbrook Road to the A58/A580 junction at Pewfall, while a spur connects the new roundabout on the bypass to Vicarage Road. Status 6 : Project Lead: St.Helens Council Delivery Partners: Frank Whittle Partnership, Birse Civils Ltd Cost: Circa 85,000 Funding: NRF 7, NWDA 8, SRB 9, Local Transport Plan, Birse Civils, LCP Retail The 20 metre high polished stainless steel Needle provides a new landmark that is visible from most parts of the town centre. Having been installed in the middle of a new spiral stair case from ground level to the rooftop car park of the Hardshaw Shopping Centre, it makes a telling contribution in terms of function as well as aesthetic form in so far as the previous stairwell had been disused for some years. The light radiating from the top of the Needle is intended to signify the newly regenerated George Street Quarter where it is sited reaching for the stars. 5 Subject to planning permission being secured 6 The status of development throughout the document is as at 31 August Neighborhood Renewal Fund 8 North West Development Agency 9 Single Regeneration Budget The Needle Brand New St.Helens Development Review 5
8 Key Infrastructure Projects Town Centre Focal Point Boundary Markers Status: Phase 2 completed; additional phases on-going. Project Lead: St.Helens Council Delivery Partners: Mayfield Construction Cost: 6.7million Funding: St.Helens Council, SRB, ERDF This comprehensive town centre public realm renovation project has built on the urban design principles utilised in the George Street Cultural Quarter which has now won 18 regional and national awards. Inspired by design ideas from leading European cities, the scheme has used the highest quality materials to resurface the core town centre retail area, as well as install new lighting, seating, trees, and other attractive environmental enhancements. New infrastructure has also been installed to maximise the town centre s potential to host speciality events, tied to the Borough s ambitious tourism development agenda. The project has already won the prestigious Green Apple environmental award on the basis of contractors Mayfield s record of recycling over 95% of materials, and it is anticipated that more accolades will follow. Status: Project Lead: St.Helens Council Delivery Partners: PalfreyGreer, Vinyline Cost: 100,000 Funding: LEGI 10 The unique and innovative new Welcome to St.Helens markers installed at five key gateways to the Borough use high tech design to impart both information and a sense of arrival to the tens of thousands of passing motorists. To complement their striking asymmetric shape and convey the notion of a dynamic, modern Borough, the signs incorporate special vinyl panels featuring stunning images and promoting major events, that are regularly replaced. It is thought that St.Helens is the first area in the country to use replaceable panels in this novel and practical way, which is part of the wider Brand New St.Helens promotional initiative to raise and enhance the profile of St.Helens plc. 10 Local Enterprise Growth Initiative Boundary Markers 6 Brand New St.Helens Development Review
9 Key Infrastructure Projects St.Helens Central Station Status: Project Lead: Merseytravel Delivery Partners: SBS Architects Cost: 6.2 Million Funding: Local Transport Plan, ERDF 11 The iconic 21st Century design of the new Central Station provides a fitting sense of arrival for rail passengers disembarking in St.Helens town centre. This is enhanced by the relocation of the station entrance which now looks out down Bickerstaffe Street into the George Street Cultural Quarter, whose success and high class urban design provided Merseytravel and the architects with the inspiration and confidence to create something extraordinary. St.Helens Central Station The combination of durable copper-clad fins and translucent, glass walls reference the Borough s renowned heritage in terms of manufacturing and glass-making innovation. 11 European Regional Development Fund Brand New St.Helens Development Review 7
10 EMPLOYMENT The St.Helens economy is on the up, as evidenced by the 4,000 new jobs created and the fact that average earnings have increased by over 20% since 2002, at a rate of 4% above the national average. Meanwhile, a 2007 Barclays Bank survey identified St.Helens as one of the top 11 centres in the UK in terms of business start-up growth rates. St.Helens already provides some of the best business support in the country thanks to its unique approach to private sector engagement and the Council s delivery relationship with St.Helens Chamber. This has been further enhanced by being the only district in the Northwest to be awarded Local Enterprise Growth Initiative (LEGI) funding ( 13.4 million) in Round 1. With its three themes of Enterprise Culture, Business Growth, and Business Environment, the LEGI programme has already borne significant dividends after only 18 months in the form of more than 500 new businesses started and around 1,150 new jobs created. Both inward investment and local reinvestment remain buoyant thanks to the Borough s evident benefits in terms of connectivity, catchment, and cost. Developers have also recognised the increased demand for quality office space and are working hard to fulfil it. As the range and scale of the regeneration schemes profiled in this section demonstrate, and with confidence at an all-time high, it is clear that St.Helens means business! 8 Brand New St.Helens Development Review St.Helens Enterprise Centre
11 Key Employment Projects Catapult Too Status: Project Lead: St.Helens Council Delivery Partners: The Archdiocese Cost: Approximately 1.3million Funding: ERDF, NRF, SRB Catapult Too involved the redevelopment of two historic buildings within the Holy Cross Church complex in the George Street Cultural Quarter to create 13 managed workspace units, complete with landscaping, and a feature public art work. The units range in size from 15m 2 to 55m 2 and were designed with St.Helens burgeoning creative industries sector in mind. The development builds on the previous success of Catapult One at nearby Haydock Street, also in the George Street Quarter. Catapult Too Brand New St.Helens Development Review 9
12 Key Employment Projects Mere Grange Tesco Haydock Micklehead Business Village St.Helens Enterprise Centre Status: Under Construction Project Lead: Langtree Group plc Delivery Partners: English Partnerships, St.Helens Council Cost: Phase 1 12million Funding: Langtree plc, ERDF, EP s, National Coalfields Programme Mere Grange will be a prestigious, 32,000m 2 business park on one of St.Helens most prominent sites, less than a mile from Junction 7 of the M62 and on the arterial Linkway that provides rapid transit from St.Helens town centre to the motorway. The scheme will be developed over five phases following the completion of extensive infrastructure, public realm and landscaping works. Phase 1 features ten modern self-contained small office units ranging from 296 m² to 753 m² in size. Once completed, Mere Grange will be the largest office development in St.Helens and will make a significant contribution to the local economy in terms of inward investment, job creation, and facilitating local company expansion. Status: Under construction Project Lead: Tesco Delivery Partners: Tesco Cost: Unknown Funding: Private Sector The new 5500m² Tesco store in Haydock will not only provide a significant new convenience shopping outlet for local residents, but is also a major employment scheme in its own right. Due to open in November 2007, the store will create over 280 full and part-time jobs, with more than 100 allocated to staff recruited via the award-winning Tesco Regeneration Partnership Initiative, in collaboration with the Council, Chamber and other agencies. This initiative focuses on the socially disadvantaged and long-term unemployed by targeting jobs at people who are currently not working, rather than seeking to attract staff from other employers in the locality. Status: Under construction Project Lead: Partnership Projects Delivery Partners: Private Sector Cost: Unknown Funding: Private Sector Micklehead Business Village is currently under construction on a brownfield site close to Lea Green Industrial Estate. The self-contained two-storey office units will start from 149m 2 in size, with planning consent for total of 18 units to be built. Attractive landscaping and on-site car parking for staff and visitors form an integral part of the business village concept, which has already proved successful in other areas of the UK. Status: Project Lead: St.Helens Chamber Delivery Partners: St.Helens Council, Langtree PLC Cost: 6million Funding: LEGI, ERDF, St.Helens Chamber This flagship LEGI project involves the provision of contemporary new office space on the once-brownfield site at Chalon Way in the town centre. The ground floor will provide two to six person offices suites to be targeted at new SMEs generated in the main via the LEGI programme. The first floor will comprise business training and conference facilities, while the second floor will be the new HQ for St.Helens Chamber itself. This will not only serve to support the future sustainability and growth of the Chamber, but will also mean that new start-ups receive on-site all the support they require to grow and flourish. Tesco Haydock 10 Brand New St.Helens Development Review
13 PUBLIC SERVICES & EDUCATION St.Helens status as an increasingly attractive residential and business location means that expectations around public services and education are understandably high. This section profiles a series of major investments in public service infrastructure, which in terms of both their quality and scale reflect the determination of public bodies in the Borough to raise their game even further. This is exemplified by the Council s successful 150million Building Schools for the Future bid to further enhance and modernise the Borough s secondary schools. These new developments will make a significant contribution not only to the provision of even better local public services, but also to the Borough s wider regeneration and visual appeal in terms of the new jobs and the improved quality of the public realm they will provide. Cowley Language School Brand New St.Helens Development Review 11
14 Key Public Services & Education Projects YMCA Beacon Project St.Helens Hospital Status: Project Lead: YMCA Delivery Partners: St.Helens College, Merseyside Connexions, Learning & Skills Council Cost: 8million Funding: ERDF, NRF, LSC, Connexions, YMCA St.Helens YMCA s Beacon development provides a range of services intended to give people the life chances they need, all under one roof. The scheme features five key components - a one stop service centre, a purpose-built childcare facility, training and development suites, a sports, leisure and cultural facility, and finally a base station from which young people can access help and advice on employment and education opportunities. Status: Under construction Project Lead: St.Helens & Knowsley Hospital Trust in partnership with PFI New Hospitals Delivery Partners: Taylor Wimpey Cost: 90million Funding: PFI St.Helens Hospital is undergoing a massive redevelopment to enhance the provision of patient-focused health care for the Borough s residents. The plans encompass a new four-floor, 25,000m² building to house new diagnostic facilities for the Radiology, Pathology and Cardio-Respiratory Departments, as well as modern state-of-the-art operating theatres and outpatient amenities. A glazed atrium will provide aesthetic appeal, while extensive external landscaping is intended to create an attractive and relaxing environment for visitors and patients alike. Beacon Project St.Helens Hospital 12 Brand New St.Helens Development Review
15 Key Public Services & Education Projects St.Helens College Town Centre Campus Status: Under construction Project Lead: St.Helens College Delivery Partners: Learning & Skills Council Cost: 63million Funding: Private/Public Sector This large scale development will not only create a modern, new educational facility that befits one of the Top 5 Colleges in the UK, but will also contribute to the ongoing positive transformation of St.Helens town centre. This brand new campus will involve renovating and incorporating the historic Smithkline Beecham Clocktower into an overall new-build plan, that includes spacious and accessible reception and social gathering areas plus upgraded contemporary teaching and learning facilities, all within a safe and secure userfriendly environment, using sustainable technology throughout. St.Helens College Town Centre Campus Brand New St.Helens Development Review 13
16 Key Public Services & Education Projects Carmel College Atlas House Cowley Language School Status: Status: Status: Project Lead: Carmel College Project Lead: Nextdom Project Lead: St.Helens Council Delivery Partners: Ryders, AA (Project Manager) Cost: Approx 17million Funding: Carmel College, LSC This will involve the extensive modernisation and enhancement of an outstanding Sixth Form College in St.Helens western suburbs. The centrepiece of the Masterplan is a new Centre for Media and Music, and the scheme will almost double the size of the existing campus overall. Innovative design and the use of energy-efficient materials throughout will help provide an attractive 21st Century educational facility for the local community. Delivery Partners: St.Helens Council Cost: Unknown Funding: Private Sector This development will involve the construction of contemporary new office accommodation to house the whole of St.Helens Council s Children & Young People s Services Department, which is currently spread over several sites. This will maximise operational efficiency for the benefit of local service users, as well as serving to regenerate a gateway town centre site. Atlas House Delivery Partners: Wilmott Dixon Cost: 21million Funding: Building Schools for the Future, St.Helens Council, DCSF This project is an integral element of a wider 150million Building Schools for the Future investment and modernisation programme. If approved, the 21 million scheme will see the complete rebuild of Cowley High School - already one of the best schools in the region - on the nearby site of the former Windlehurst and Hurst primary schools, with a purpose-built new Sixth Form centre being constructed on the current Hard Lane site. Carmel College 14 Brand New St.Helens Development Review
17 TOURISM & LEISURE The St.Helens visitor economy now attracts more than 7.3million people a year, spending over 129million (Source: STEAM, 2006). This reflects the Borough s growing status as a regional visitor destination of choice, linked to its location, all-round entertainment and leisure offer, and specific product strengths in terms of spectacular sport, global heritage, rural recreation, and unique events. The Borough is cited by the Northwest Development Agency (NWDA) as an example to others in terms of its passion, commitment, and integrated approach to tourism development, which is centred on very close joint working with leading local tourism businesses and external partners. The highlighted projects give an insight into the range and scale of the ever developing tourism and leisure offer, while a number of other significant schemes are currently in the pipeline, including the Channel 4 Big Art Project, aimed at capitalising on and expanding our mounting reputation, profile and success. Proposed new Saints Stadium Brand New St.Helens Development Review 15
18 Key Tourism & Leisure Projects Ariete Restaurant Status: Project Lead: Private Sector Delivery Partners: Private Sector Cost: Unknown Funding: Private Sector Located on the historic High Street in Newton-le-Willows, Ariete combines the old with the new to great effect. The listed derelict archway that previously marked the gateway to Haydock Park, is now the entrance to a spacious, high quality restaurant featuring extensive glazing and modern décor. The Italian name is derived from the ram s head insignia atop the arch, symbolising the well designed fusion of a historic façade with the stylish contemporary interior of this striking addition to the Borough s burgeoning nightlife scene. North West Museum of Road Transport Status: Project Lead: The North West Museum of Road Transport Trust Delivery Partners: St.Helens Council Cost: 1.5million Funding: ERDF, SRB, NRF, NWCCRP 12, Transport Museum St.Helens newest regional visitor attraction was re-opened in 2006 following full-scale refurbishment. The Museum details North West England s transport heritage and houses one of the country s finest collections of vintage buses within the former Old Hall Street Bus Depot on the edge of the George Street Cultural Quarter. The extensive use of glass and modern materials, including solar panelling, has been integrated with the original brick structure to create an attractive and informative visitor experience while retaining the character of the original building. Ariete Restaurant North West Museum of Road Transport 16 Brand New St.Helens Development Review 12 Northwest Coalfield Communities Regeneration Programme
19 Key Tourism & Leisure Projects Ravenhead Retail Park Haydock Park Racecourse Saints Stadium Status: 4 Phases completed, 2 remaining Project Lead: Private Sector Delivery Partners: Private Sector Cost: Unknown Funding: Private Sector Already one of the UK s top 20 retail parks, Ravenhead is largely completed, with 70% of the retail units built, fitted, and occupied by tenants including B & Q, Next, Boots, JJB, Currys and Frankie & Benny s. Situated opposite the proposed new Saints Stadium and just off the Linkway providing rapid transit between St.Helens town centre and the M62, the two final phases of development will provide additional retail and leisure space. Status: Project Lead: Haydock Park & Jockey Club Racecourses Delivery Partners: Unknown Cost: Unknown Funding: Haydock Park & Jockey Club Racecourses Haydock Park Racecourse is set to increase its status as one of the leading and most visited racecourses in the country by altering its track in order to accommodate more race fixtures. Realigning and widening the sprint track will create two flat courses, enabling adequate rest-time for each course over the busy summer months along with an increase in the number of race days. This follows on from significant additional recent investment in refurbishing the main stands, both internally and externally, to further enhance the enjoyment of the raceday experience and Haydock Park s appeal as a leading regional business, conferencing and events venue. Status: Application Project Lead: Langtree Delivery Partners: St.Helens Rubgy League Football Club, St.Helens Council, NWDA, Tesco Cost: 21million (Stadium only) Funding: Private/Public Sector This long-awaited application seeks to provide a new 18,000-capacity stadium for the current World Rugby League Champions on the derelict, 46-acre former United Glass Bottling Plant site. If approved, this landmark development will be situated at a strategic gateway to the town centre at the top of the M62 Linkway, while a new Tesco Extra superstore will be developed alongside. Works on both are scheduled to begin in 2008, with the first game being prospectively played in the new stadium in Consent will also be sought to convert the current town centre Tesco store on Chalon Way into new high quality retail space capable of attracting large national retailers. The intention is also to redevelop Saints historic 116 year-old current ground at Knowsley Road, in order to provide new family housing. Haydock Park Racecourse Ravenhead Retail Park Brand New St.Helens Development Review 17
20 RESIDENTIAL St.Helens has experienced a significant upsurge in demand by both residential developers and would-be homeowners in recent years. This is reflected in the completion of over 2,400 new homes during , plus the fact that the Borough has one of the highest quotas in the Northwest in terms of the numbers of new homes able to be built. The reasons for this heightened demand are clear. The Borough s location and connectivity midway between Manchester and Liverpool makes it a great residential base for people working throughout the majority of the Northwest. This allure is enhanced by an all-round leisure offer that spans glorious countryside, first class sport and amenities, a year-round calendar of quality events, and vibrant shopping and nightlife. Meanwhile, the fact that local house prices are growing at above national and regional average rates while remaining lower than many comparator areas, suggests greater affordability now combined with good long-term value for money. The developments profiled in this section convey St.Helens varied and growing quality residential offer, ranging from town centre apartments and urban villages, to executive and family homes, and rural retreats. 18 Brand New St.Helens Development Review Former United Reform Church
21 Key Residential Projects Eccleston Park Golf Club Housing Former United Reform Church Heyescroft Status: Status: Complete Status: Project Lead: Briery Homes Project Lead: WDI Properties Project Lead: Arena Housing Delivery Partners: Eccleston Park Golf Club Delivery Partners: Unknown Delivery Partners: Hulme Upright Manning Cost: Unknown Cost: Unknown Cost: Unknown Eccleston Park Golf Club Housing Funding: Private Sector This attractive development involved the conversion of red-brick agricultural buildings into 18 high quality homes, in the appealing, tranquil grounds of Eccleston Park Golf Club. Funding: Private Sector This unique residential development tastefully fuses the old - a listed church building, with the new - a modern annex. The scheme involved converting the United Reform Church in Newton-le-Willows into nine high quality two-bedroom apartments, with a further six provided within a glass walkway linked annex utilising matching sandstone, plus exterior landscaping. Funding: Housing Corporation, Arena Housing & St.Helens Council Heyescroft is a three-storey Extra care village comprising 92 one- and twobedroom apartments, together with community facilities, landscaping, car parking. The development is intended for people aged 55 years or over who have a housing or care need, and will provide with 24-hour care and support on hand for those who need it. 30 of the units will be for rent, 30 will be shared ownership with Arena Housing Association, and 32 will be for sale. The facilities are to include a shop, hairdresser, therapy room/fitness suite, launderette, IT and television suite, plus a communal dining room, lounge and greenhouse. Eccleston Park Golf Club Housing Brand New St.Helens Development Review 19
22 Key Residential Projects HQ St.Helens Status: Under construction Project Lead: Countryside Properties Delivery Partners: Private Sector Cost: Unknown Funding: Private Sector Bordering on the George Street Cultural Quarter, and close to the new Central Station, the HQ development will provide stylish, purpose-built, one- and two bedroom town centre apartments, all planned and designed with modern urban living in mind. HQ St.Helens 20 Brand New St.Helens Development Review
23 Key Residential Projects Worsley Brow Urban Village Hamblett Site Status: Project Lead: HJ Banks & Company Ltd Delivery Partners: Private Sector Cost: 140million Funding: Private Sector The Worsley Brow Urban Village will see the transformation of a derelict and underused 50-hectare site at Moss Nook, Sutton into a vibrant 1,200-home community. In addition to quality housing and amenities, the proposals include tree-lined boulevards, village greens, allocated open spaces, a network of smaller green areas, plus three Sport England-standard, full-sized football pitches, and changing facilities. This will be the largest of the three urban villages that have now been approved, with that at Lea Green already on site. Status: Project Lead: Miller Homes Delivery Partners: Private Sector Cost: Unknown Funding: Private Sector This project will see the site of a former school transformed into a substantial housing development, incorporating 55 dwellings. It will incorporate some housing for the over 55 s, along with a proportion of affordable housing. The accommodation has been designed in harmony with the surrounding area, with landscaping being undertaken to enhance the site further. Worsley Brow Urban Village Brand New St.Helens Development Review 21
24 PLANNING & DEVELOPMENT LISTINGS The projects featured so far in this publication represent just selected highlights of the developments in St.Helens that, as of 31 August 2007, have recently been completed, are currently under construction, or have submitted planning applications and are awaiting approval. This section offers an at-a-glance overview of all the principal physical regeneration projects at different stages of development across five main categories - Infrastructure, Employment, Public Services & Education, Tourism & Leisure, and Residential. All of these projects are plotted on the map of St.Helens contained inside the back cover, putting into clear visual context the volume of physical development and regeneration activity that is taking place in the Borough. 22 Brand New St.Helens Development Review
25 Infrastructure Listings Map Ref Development Stage of Development Brief Description 1A Blackbrook Bypass See page 5 1B St.Helens Boundary Markers See page 6 1C The Needle See page 5 1D Church & Community Centre, Willow Road New build church & community centre. 1E St.Helens Central Station Under construction See page 7 1F Town Centre Focal Point Phase 2 completed See page 6 1G Brickfields Community Woodland Application Installation of paths, benches and access controls. Brand New St.Helens Development Review 23
26 Employment Listings Map Ref Development Stage of Development Brief Description 2a Catapult Too See page 9 2b Merton Bank Industrial Estate Rebuild of existing workshop. 2c Station Road Office building. 2d Eurolink Sutton Manor Construction of two light industrial blocks comprising of seven units. 2e Tesco (Haydock) Under construction See page 10 2f Mere Grange Under construction See page 10 2g St.Helens Enterprise Centre See page 10 2h Robinson Country Leisure Mill Lane Change of use from B8 (storage & distribution) to B2 (general industrial) 2i Micklehead Business Village See page 10 2j Royden Engineering, Sandwash Close Two extensions to existing buildings. 2k Land at Old Boston Trading Estate Reclamation & regrading of land, together with contrucation of access for economic development purposes 2l 8a Reginald Road Industrial Park Erection of 20 industrial units, each approximately 100sq m, & associated car parking. 2m Land adjacent to 526a Fleet Lane Construction of one building to accommodate six B1 industrial units, plus associated car parking & lighting. 2n Land to the North West of Hazel Business Park Erection of two buildings for B1, B2 & B8 use (creating 1618 sq m of floorspace) plus ancillary works. 2o Plot Sankey Valley Industrial Estate Warehouse including vehicle service workshop & associated car parking. 2p Land opposite Allotment Gardens, Bedford Street Three buildings comprising of 13 light industrial units (Class B1c) plus car parking & ancillary works. 2q Cew Recycling Group, Merton Bank Industrial Installation of 9MW Gasification Plant to generate electricity from reclaimed wood. 2r Land at Old Boston Trading Estate One industrial unit (2229 sq m), plus associated car parking, servicing & landscaping. 24 Brand New St.Helens Development Review
27 Employment Listings Map Ref Development Stage of Development Brief Description 2s Land to the North of Pocket Nook Street Driving test centre plus associated works & landscaping. 2t Former engineering works, Hertford Street Three general industrial units (Class B2), plus ancillary works. 2u Next to Gregson House, Central Street Change of use to open storage of building materials & siting of steel container for storage of plant & Machinery 2v Land at Lea Green Farm East, Elton Head Road Erection of nine business units (B1) and ten business/general industrial units (B1/B2) with associated access & car parking 2w Land at Old Boston Trading Estate One industrial unit (2194 sq m) for storage, distribution & general industry, plus ancillary works. 2x Land bounded by A580 Millfield Lane Construction of industrial unit (B2), with ground floor office & mezzanine floor, car parking & landscaping works. 2y Empress Works, Penny Lane Proposed office development to provide four three-storey units of varying sizes, plus associated car parking. 2z Land at Old Boston Trading Estate Three industrial units (6016 sq m) for manufacturing & storage, plus layout, parking, storage & fencing. 2aa Zepro UK Ltd, Beaufort Street Application Construction of eight starter industrial units contained within one block, plus refurbishment of the existing industrial units. 2bb 2cc Earlestown Labour Club, Legh Street Ena Shaw Ltd, Lea Green Business Park Application Application Demolition of existing Labour Club, plus erection of a three storey mixed use building comprising of retail units (ground floor) & office units (second floor). Erection of one building comprising of five units. Unit 1 would be a mixed use of general industrial (B2) & retail (A1), with the remaining four units for general industrial use (class B2) plus ancillary office accomodation. 2dd Tesco s, Chalon Way Application Brand New St.Helens Development Review 25
28 Public Services & Education Listings Map Ref Development Stage of Development Brief Description 3a YMCA - The Beacon See page 12 3b Patterson Street, Newton-le-Willows Children's centre. 3c Ellamsbridge Road SureStart nursery. 3d Dunedin Street Children's centre. 3e St.Helens Hospital Under construction See page 12 3f Atlas House Under construction See page 14 3g Newton Community Hospital Under construction Demolition of exisitng buildings & redevelopment to provide a new two-storey community hospital, ancillary buildings, car parking & associated landscaping. 3h St.Helens Crematorium Under construction Change of use of land from agricultural to centery & creation of additional car parking. 3i Land adjacent to Senley Green Community Hall Under construction Two storey Primary Care Centre (Including a GP's Practice, Minor Surgery & Baby Clinic), plus a Pharmacy Dispensary, carparking and ancillary works. 3j Carmel College See page 14 3k Vocational Skills Centre, St.Helens College Technology Campus Demolition of outdoor activities centre & erection of two & three storey building & associated car parking. 3l Cowley Language School See page 14 3m St.Helens College Application See page Brand New St.Helens Development Review
29 Tourism & Leisure Listings Map Ref Development Stage of Development Brief Description 4a Ariete See page 16 4b North West Museum of Road Transport See page 16 4c Pottery Farm Mill Lane Rainford Under construction 18 hole golf course with clubhouse (converted from existing house & barn), plus nine hole golf course, driving range, indoor academy & shop, along with ancillary car parking and landscaping. 4d Ravenhead Retail Park Phases 1-4 completed See page 17 4e Ravenhead Retail Park Application for the erection of a four-storey hotel with undercroft car parking & ajoining pub / restaurant. 4f Land between 103 & 111 Church Street Mixed use scheme for five-storey building with retail use (A1) on ground floor & 21 one & two bedroomed apartments above. 4g Haydock Park Racecourse See page 17 4h West Point Mixed use development for retail (A1/A3) & leisure (D2) plus ancillary works & car parking. 4i St.Helens Retail Park Erection of four non-food retails (A1) units, one with a mezzanine level, totalling 2573 sq m of new floorspace, plus extension of an existing unit (including a mezzanine level) creating a total of 2051 sq m of new floorspace. Ancillary works & car parking. 4j Land South of Fairchild Farm Erection of eight stables and a haybarn in a single building plus associated works. Change in use of land for keeping eight horses. 4k Haydock Park Racecourse See page 17 4l Mainsway Ltd, Burtonhead Road Demolion of existing buildings & erection of 5760 sq m of retail units & associated car parking. 4m Saints stadium Application See page 17 Brand New St.Helens Development Review 27
30 Residential Map Ref Development Stage of Development Brief Description 5a St. Aidans C of E Community Primary School site Erection of a two storey building consisting of 36 apartments, plus associated works & car parking. 5b Cooper Avenue Construction of 38 dwellings. 5c Land formerley Borron Road Erection of 28 dwellings. 5d Land adjacent to fire station, Borron Road Construction of 15 apartments. 5e Land site of former Grange Park Hotel, 369 Prescot Road Creation of 22 apartments. 5f Land between Knowsley Road & Eccleston Old Road Construction of 39 apartments. 5g Land at junction of Bewsey Street & Whittle Street Erection of 21 apartments. 5h Eccleston Park Golf Club, Rainhill Road See page 19 5i Land junction of Glover Street & Bold Street Construction of 18 apartments. 5j The Meads, Portico Lane Erection of 17 dwellings. 5k Land at the East of Nutgrove Road & Rainhill Road Construction of 28 dwellings. 5l Land at the West of 1 Ravenhead Row & Factory Row Construction of 17 dwellings. 5m HQ St.Helens Under constuction See page 20 5n Former Arriva building, Hall Street Under constuction Demolition of existing building & construction of six-storey building containing 28 residential apartments plus semi-basement parking. 5o Former Hamblett School Residential development including means of access. (Reserved matters include siting, design, external appearance & landscaping). 5p Bowling Green Inn, 220 Watery Lane Demolition of the Bowling Green Inn & the erection of two three-storey apartment blocks, comprising a total of 23 apartments. 5q Land adjacent to 19 Pennine Close Outline application for residential development, all matters except siting & access reserved. 5r Land at Lowther Crescent Penrith Road Replan of the mews / town houses to plots of the previously approved layout. 28 Brand New St.Helens Development Review
31 Residential Map Ref Development Stage of Development Brief Description 5s Former site of Catherine Way Erection of 23 dwellings, associated car parking & ancillary buildings. 5t Land between Bradlegh Road & Catherine Way Under construction Erection of 26 dwellings, along with associated buildings & car paking. 5u Land between 1 and 23 Fisher Street Construction of 17 houses. 5v Site of former garage compound and houses Erection of 22 two-storey terraced & semi-detatched houses. 5w Land off Elton Head Road Reserved matters application for the construction of 90 dwellings following an earlier application. 5x Land at Lowther Crescent Penrith Road Alteration to an earlier application to incorporate 30 one & two bedroom apartments. 5y Land at Park Avenue North Under construction Residential development comprising 113 dwellings & associated works & landscaping. 5z Land at Laurel Avenue & Cedar Cresent. Residential development comprising of 56 dwellings, public open space (including the relocation of a children's play area) plus ancillary works & landscaping. 5aa Plots Sherbourne Park, Jubits Lane Erection of 11 three-bedroomed houses & three one-bedroomed apartments (14 dwellings in total). 5bb Claremont, Main Street Billinge Redevelopment of site to form ten residential properties (including the erection of five dwellings). 5cc Site of former Kimerley Avenue Outline application for residential development. All matters except siting & access are reserved. 5dd Land at Egerton Street Siting & means of access of 16 semi-detatched houses. Design, external appearance & landscaping reserved for future consideration. 5ee Land at Lea Green Colliery & Lowfield Lane Under Construction Outline application for residential development including a public open space provision & local centre. External appearance, siting, design & landscaping reserved for future consideration. 5ff Land fronting & including Concourse Way Erection of two three-storey buildings, comprising of 28 apartments (with 14 per block), plus associated car parking. Permission also granted for the erection of six bungalows. Brand New St.Helens Development Review 29
32 Residential Map Ref Development Stage of Development Brief Description 5gg Land encompassing Brook Cottage Farm & Watery Lane Demolition of two houses & existing farm buildings, & the erection of two apartment blocks comprising 15 apartments. 5hh Land incorporating Argyle Street & Chapel Street Outline application for the demolition of the existing properties & construction of 46 new affordable homes plus an enclosed car park. 5ii Land North of Richards Grove & land East of Boardman's Lane Outline application for a residential development & means of access. 5jj St.Helens Service Station Park Road Erection of a two and three storey apartment block to create 18 dwellings. 5kk Part of Lea Green Urban Village Outline planning application for the erection of 54 apartments & four houses. 5ll Grange Park Labour Club, Upland Road Residential development for 16 low cost units, comprising a two-storey building & and a two & three storey building with associated parking & landscaping. 5mm Tannery Farm, Elephant Lane Under Construction Demolition of exisiting buildings & erection of a two - 2 1/2 storey 90 bed care home & day centre, with ancillary accommodation for staff training/accommodation (two flats) & other associated works including car parking & landscaping. 5nn Land between 60A & 28 Vista Road Two x two-storey buildings, comprising of 14 sheltered apartments for the over 55's, plus associated access, carparking & landscaping. 5oo Land at Pipit Avenue Newton-le-Willows Substitution of house types on plots 1-11 & 21-22, reducing the total number of dwellings to 22. 5pp M T B Chrysler Dealership, Mill Lane One three-storey building & one 2 1/2, three & 3 1/2 storey building, comprising a total of 43 apartments, plus layout, access, car parking & landscaping. 30 Brand New St.Helens Development Review
33 Residential Map Ref Development Stage of Development Brief Description 5qq Land adjacent to former Griffin Inn, Peasley Cross Construction of 15 apartments, plus associated landscaping & car parking. 5rr Land East of Boardmans Lane Under Construction Application for approval of reserved matters associated with a previous application. 5ss Land at Egerton, Emlyn & Gower Street Residential development comprising 37 two & three storey houses & six bungalows. 5tt Land site of 1 Borron Road 2, 3 & 4 storey building consisting of 32 apartments, layout car parking & landscaping 5uu Former Hamblett School site Reserved matters application following an earleir application for the erection of 55 dwellings. 5vv Land between 60A & 28 Vista Road Application Application for approval of reserved matters associated with a previous application. 5ww Rainford Labour Club, Ormskirk Road Application Demolition of existing Labour Club to facilitate the construction of a new Labour Club & 19 residential units. 5xx Land at Somerset Street & Sussex Grove Erection of 80 two-storey houses & 6 bungalows. 5yy Former poultry farm, South Lane Application Redevelopment of poultry unit site for a single dwelling & site remediation to enhance / protect Scheduled Ancient Monument. 5zz Land at Sutton Road / Baxters Lane Application Erection of 214 dwellings & associated works. 5aaa Former bowling green site, Marsden Avenue Application Proposal for 12 residential units, comprising two bungalows, six flats & four houses, plus access road & carparking. 5bbb Former Caledonia Peugeot garage, Knowsley Road Application Mixed use development consisting of 80 residential units & a 100 bed nursing home. 5ccc Land incorporating Chapel Street & land incorporating Argyle Street Application Demolition of existing buildings & erection of 44 new affordable houses. 5ddd Land North of Richards Grove & land East of Boardman's Lane Application Application for approval of reserved matters associated with a previous application. Brand New St.Helens Development Review 31
34 AWARDS The impressive, radical recent physical transformation of St.Helens has been recognised by a host of regional and national awards. The George Street Cultural Quarter alone has scooped 18 regional and national regeneration and urban design awards, including: Royal Institute of Chartered Surveyors 2005 Town Centre Regeneration award Royal Town Planning Institute 2006 Town Centre Regeneration award Association of Town Centre Management Regeneration award RENEW Northwest Exemplar status Other accolades accorded to recent developments in the Borough include the Northwest Business Insider 2005 Public Sector property award, and a 2007 Green Apple award for the 97+% recycling rate achieved by the Town Centre Focal Point comprehensive public realm renovation project. In addition, St.Helens Council s Development Services Sub-Division, comprising Planning and Building Control functions, received a Charter Mark for excellent customer service in 2006, which was successfully retained in George Street Quarter 32 Brand New St.Helens Development Review
35 Disclaimer: The utmost care has been taken to ensure the accuracy of all the information throughout this publication at the time of going to print, however St.Helens Council accepts no responsibility for any omissions or errors. The views expressed in this publication are not necessarily those of St.Helens Council. Application Under construction
36 For further details about any of the schemes profiled in this document, or for general Planning & Urban Design enquiries, please contact Mark Dickens, Development Services Manager, via or For information online, please visit For Investment, Economic Development & Brand New St.Helens enquiries, please contact John Whaling, Economic Development Manager, via or Online information is available via which serves as a portal for all local economic development related sub-sites, links, & downloads.
FIRST STREET NORTH CREATING PLACES FOR PEOPLE
About This Consultation Manchester City Council and Ask Property Developments are seeking to develop First Street North, a 2.2 acre site to the north of the Number One Building, within the 20 acre First
Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with
Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020
WELCOME TO OUR EXHIBITION
WELCOME TO OUR EXHIBITION The purpose of the exhibition is to provide you with the opportunity to view our proposals and give feedback prior to the submission of a planning application to the London Borough
Welcome & background. www.theperfumefactory.info
Welcome & background Essential Living welcomes you to this community involvement event introducing the proposed redevelopment of The Perfume Factory, North Acton. EXISTING SITE PLAN AERIAL VIEW OF SITE
Welcome to our exhibition
Welcome to our exhibition Welcome to this public exhibition for Cherry Park, Westfield, Stratford. This exhibition has been organised to update residents on Cherry Park, the next phase of development in
Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009
Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009 Application No. 09/00389/LP - 51-61 Whytecliffe Road South, Purley, CR8 1. SUMMARY 1.1 This report concerns
CITY MEETS CENTRE. Be part of the Cardiff Exciting Hotel Development Opportunity
Exciting otel Development Opportunity CITY MEETS CENTRE JR Smart are seeking to secure an internationally branded hotel on part of the site and will consider the sale of part of the site for hotel development
A new Premier Inn for Ulverston
A new Premier Inn for Ulverston Premier Inn is seeking to invest approximately 5 million in a new 79 bedroom hotel and restaurant in Ulverston. The proposed hotel will occupy the site of the former Winder
05 AREA/SITE SPECIFIC GUIDELINES
05 AREA/SITE SPECIFIC GUIDELINES Site 1 - Glass Yard The leisure centre that is currently located on this site should move to a more central location in the town centre close to the existing public squares.
STADIUM PLACE. Atrractive 1, 2, 3 and 4-bedroom homes available through L&Q s Shared Ownership scheme
STADIUM Atrractive 1, 2, 3 and 4-bedroom homes available through L&Q s Shared Ownership scheme Computer Generated Image of Stadium Place is indicative only STADIUM STADIUM VITAL STATISTICS London Borough
Saltway Barn. Coln St Dennis, Cheltenham, Gloucestershire
Saltway Barn Coln St Dennis, Cheltenham, Gloucestershire Situation Saltway Barn is situated in a wonderful Cotswold landscape with views to the south over the adjoining countryside in the Cotswolds Area
WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.
WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas
A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013
A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth university of surrey November 2013 A new Garden Neighbourhood for West Guildford Preface Since the County and Borough Councils
The achievement of all indicators for policies in the whole plan collectively contribute to the delivery of Policy 1
Cornwall Local Plan 2010-2030: Proposed Monitoring Framework Part 1: Strategic Policies Policy 1: Presumption in Favour of Sustainable Development Policy 2: Spatial Strategy Policy 2a Key Targets Job provision
7 Temple Close Dorchester, Dorset
7 Temple Close Dorchester, Dorset 7 Temple Close, Dorchester, Dorset DT1 2QL A Modern Detached Four Bedroom House within the popular Castle Park residential part of Dorchester, close to Thomas Hardy School
Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015
Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1
The Green Belt A Guide for Householders
The Green Belt A Guide for Householders Introduction Much of Mole Valley lies within the Metropolitan Green Belt. This leaflet outlines the purpose, importance and characteristics of the Green Belt and
What to do in Liverpool?
OVER 60% NOW LET LOCATED BETWEEN LIVERPOOL ONE & THE ROPEWALKS RETAIL & LEISURE SPACE FROM 1,262 SQ FT New 198 bed Premier Inn Hotel Double height units Available end of 2012 7 new retail & leisure units
STAFF REPORT. December 20, 2004. North District Community Council. Director of Community Planning - North
STAFF REPORT December 20, 2004 To: From: Subject: North District Community Council Director of Community Planning - North Preliminary Report Respecting Revised Application OPA & Rezoning Application 01
Newham, London. Local Economic Assessment. 2010 to 20279. Newham - Economic Development
Newham, London Local Economic Assessment Newham - Economic Development 2010 to 20279 8. 7BLooking Forward: Planned Investment And The Scale Of Opportunity Summary Newham has the potential to attract approximately
On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers
FOR SALE On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers Land at Teville Gate, Teville Road, Worthing, West Sussex BN11 1AZ ibrochure - www.cbre-ibrochure.co.uk/worthing ENTER
FULL APPLICATION FOR ERECTION OF GARAGE MAINTENANCE UNIT AND PORTABLE OFFICE CABIN
6 February 2015 Delivered by post and planning portal Planning and Building Control Nuneaton and Bedworth Borough Council Town Hall Coton Road Nuneaton Warwickshire CV11 5AA Dear Sirs, FULL APPLICATION
Tewkesbury. March 2015
Tewkesbury March 2015 1. Market Update Retailer Trends International retailers still entering the UK but more selective about their store footprint. Right-sizing existing retailers want representation
Richmond upon Thames College. Draft Planning Brief. May 2008
Richmond upon Thames College Draft Planning Brief May 2008 1. Introduction 1.1 The purpose of this Planning Brief is to establish a development framework for the proposed comprehensive redevelopment of
A Borough Open for Business. Making Swale a better place
A Borough Open for Business Making Swale a better place Welcome to Swale We are working towards Putting Swale on the Map and we want to share with you the diverse and compelling offer we have for investors,
Change of use of an existing vacant office building to a Bed & Breakfast Guest House (Use Class C1) with proprietor's accommodation.
Item 4a Case Officer Ward Proposal Location Applicant 13/00168/FUL Caron Taylor Adlington And Anderton Change of use of an existing vacant office building to a Bed & Breakfast Guest House (Use Class C1)
LONDON BOROUGH OF HAVERING
LONDON BOROUGH OF HAVERING CORPORATE ASSET MANAGEMENT PLAN 2015-2019 Sections LONDON BOROUGH OF HAVERING CORPORATE ASSET MANAGEMENT PLAN CONTENTS 1 Introduction and Context 2 Corporate Vision 3 Policy
713 Finchley Road London NW11 8DH
Home 713 Finchley Road London NW11 8DH Residential Development Opportunity Previous Page Summary Summary: An opportunity to acquire a freehold residential development site within close proximity to Hampstead:
Neil Taylor Programme Manager Royal Borough of Kingston
Neil Taylor Programme Manager Royal Borough of Kingston James Berry MP for Kingston and Surbiton Greg Hughes Chair, kingstonfirst Opportunity Area Planning Framework Eric Owens Group Manager
Suites to suit from 2+ desks whatever your office, meeting or training room requirement speak to Business Space Solutions first!
Gateway West Business Centre, Gateway House, Newburn Riverside, Newcastle, NE15 8NX Suites to suit from 2+ desks whatever your office, meeting or training room requirement speak to Business Space Solutions
{MANCHESTER} A NEW NEIGHBOURHOOD FOR ENTERPRISE, CULTURE AND LIVING
{MANCHESTER} A NEW NEIGHBOURHOOD FOR ENTERPRISE, CULTURE AND LIVING ST. JOHN S OVERVIEW The vision behind St. John s is to create a new neighbourhood, a place that distinguishes itself by its unique cultural
Vote on for a: PUTTING PEOPLE FIRST
Vote on for a: PUTTING PEOPLE FIRST Guildford Borough Council Liberal Democrat Manifesto May 2015 A Fair Local Plan Liberal Democrat councillors aim to develop a fair Local Plan to raise the quality of
retail ideas refreshing communities regenerating HOME REGENERATION COMMUNITIES DESTINATIONS PORTFOLIO SCHEMES CONTACT
refreshing retail ideas regenerating communities 20+ UK retail schemes 3 million sq ft retail space 1.3 billion property portfolio regeneration through retail St. Modwen is the UK s leading regeneration
Site No 17 Former Weston Vinyls Site, Frome Location
Location Former Weston Vinyls site is situated on the A362 Vallis Road in the Western Part of Frome. The surrounding uses are primarily residential with residential to the North East and West. The Vallis
Glossop Design & Place Making Strategy
Supplementary Planning Document to the High Peak Local Plan June 2011 Design Brief for the Town Hall Complex GILLESPIES I GERALD EVE Reproduced from the Ordnance Survey map with the permission of Ordnance
Exempted Development - Frequently Asked Questions
Exempted Development - Frequently Asked Questions Important Pre-Conditions Please note all exempted development is subject to certain restrictions as set out in Articles 6, 7, 8, 9 and 10 of the Regulations.
London Bridge Quarter is an extraordinary project.
An introduction to London Bridge Quarter is an extraordinary project. This booklet is an introduction to what makes up this amazing place a mixed use vertical city that provides a wide-range of amenities
28 St Thomas Court, Bristol, BS1 6JG
28 St Thomas Court, Bristol, BS1 6JG Bristol City Centre Office Investment Long Leasehold Located in the heart of Bristol City Centre. Modern office accommodation recently fully refurbished. Let to Potato
CHARACTER TYPE 15 RAISED FRINGE SETTLEMENT
CHARACTER TYPE 15 RAISED FRINGE SETTLEMENT Character Area: Grange Park (15 RFS 1) Mossbank (15 RFS 2) Derbyshire Hill / Parr (15 RFS 3) Sutton (15 RFS 4) Key Characteristics settled areas located on raised
BASILDON BOROUGH COUNCIL
BASILDON BOROUGH COUNCIL Report to: Planning Committee December 05 PLANNING APPLICATION NO. 5/00699/FULL DEMOLITION OF ALL EXISTING OUTBUILDINGS AND REMOVAL OF ASSOCIATED LAWFUL USES AND TWO NO. RESIDENTIAL
Proposal for a Demonstration Exemplar at British Sugar, York
Executive 21 July 2009 Report of the Director of City Strategy URBAN ECO SETTLEMENT Proposal for a Demonstration Exemplar at British Sugar, York Summary 1. This paper outlines a proposal for funding a
Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.
Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is
1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.
1 Welcome Thank you for taking the time to attend this public exhibition of our proposals for residential development on Land at Daws Farm, Back Road, Writtle (site shown opposite). The exhibition comprises
315 First Ave NE Minneapolis, MN 55413
View Neighborhood View Project Details 315 First Ave NE Minneapolis, MN 55413 22,000 SF of Retail and Restaurant Space Available for Lease View Renderings View Maps View Area Plans Contact NORTHEAST MINNEAPOLIS
21.04 LAND USE. Managing amenity through land use strategies
21.04 LAND USE This section contains objectives and strategies for land use, under the themes of: Housing and community Retail, entertainment and the arts Office and commercial use Industry Education and
regeneration through retail
regeneration through retail St. Modwen is the UK s leading regeneration specialist. The company operates across the full spectrum of the property industry from a network of seven offices, a residential
We have consulted with internal and external. King Square Estate Newsletter. Regeneration Proposals
www.islington.gov.uk/housing Regeneration Proposals NOVEMBER 2014 Welcome to the third edition of the King Square newsletter, with the latest update on the King Square Estate regeneration project. This
MAIDENHEAD REGENERATION
MAIDENHEAD REGENERATION A BRIGHT FUTURE Maidenhead has a bright future as a centre for business, commerce, culture and leisure. Sitting in the heart of the Thames Valley, convenient to London and Heathrow,
Decision Due Date: 15 April 2015. Site visit date: 12 & 25 March 2015
App.No: 150172 (PPP) Officer: Toby Balcikonis Decision Due Date: 15 April 2015 Site visit date: 12 & 25 March 2015 Ward: Upperton Type: Planning Permission Site Notice(s) Expiry date: 21 March 2015 Neighbour
IF YOU KNOW KENDAL ALREADY, YOU LL BE FAMILIAR WITH ITS HISTORICAL CHARM, VIBRANT CULTURE AND DISTINCTIVE CUMBRIAN CHARACTER.
KENDAL. CUMBRIA KENDAL 02 IF YOU KNOW KENDAL ALREADY, YOU LL BE FAMILIAR WITH ITS HISTORICAL CHARM, VIBRANT CULTURE AND DISTINCTIVE CUMBRIAN CHARACTER. Experience the best of both worlds with a beautifully
Stanbridge House. Ruskin Road, Banbury, Oxfordshire, OX16 9FZ
Stanbridge House Ruskin Road, Banbury, Oxfordshire, OX16 9FZ A stylish new development of retirement apartments. Stanbridge House is conveniently located within an established residential area in the heart
Prime freehold development opportunity with planning permission Taggs Boatyard, 44 Summer Road, Thames Ditton KT7 0QQ
Prime freehold development opportunity with planning permission Taggs Boatyard, 44 Summer Road, Thames Ditton KT7 0QQ M25 Heathrow Airport A30 A205 CENTRAL LONDON A205 River Thames A309 River Thames River
MEMBERSHIP AT CELTIC MANOR
MEMBERSHIP AT CELTIC MANOR A UNIQUE DESTINATION The prestigious Celtic Manor Resort is set within 2,000 acres of parkland, offering a special place to relax and indulge in one magnificent retreat. As a
Mulberry Farmhouse SANDY LANE LOWER FAILAND
Mulberry Farmhouse SANDY LANE LOWER FAILAND Mulberry Farmhouse SANDY LANE LOWER FAILAND A charming period farmhouse in a rural setting, within easy striking distance of Clifton Village Drawing room Dining
TOWN & COUNTRY PLANNING ACT 1990
TOWN & COUNTRY PLANNING ACT 1990 Proposal by Betster Proposed change of use to Class A2 (Betting Shop) Site at: 71 High Street, Long Eaton STATEMENT IN SUPPORT OF PLANNING APPLICATION Prepared by Jonathan
Brand. The City (and/or an area within the city) Brand essence. People s experience of the brand
Liverpool A case study of rebranding Rebranding involves both the re-imaging and the regeneration of cities. It represents an interesting new perspective on urban geography. In this article a case study
MACCLESFIELD TOWN COUNCIL
MACCLESFIELD TOWN COUNCIL PLANNING COMMITTEE Agenda for the meeting to be held on Monday 22 nd February 2016 at 7pm at Macclesfield Town Hall. 1. APOLOGIES FOR ABSENCE 2. DECLARATIONS OF INTEREST To provide
Planning, Design & Access Statement
Planning, Design & Access Statement Hazell House, Burnthurst Lane, Princethorpe Client: Warwickshire & Northamptonshire Air Ambulance IG Land & Planning 1 Thornton Close, Crick, Northants, NN6 7GE Tel/Fax
Relevant Planning History P/2006/1070: Demolition of building and construction of supermarket and 14 2 bed flats. Withdrawn.
P/2010/1404/MPA St Marychurch Ward Former G A Insurance Buildng, Greenway Road/St Marychurch Road, St Marychurch Torquay Demolition of former G A building; formation of up to 7 retail units for purposes
August 2011. Energy Saving Trust contact: Paul Hegarty Local Delivery Manager [email protected] 0794456807
Community Support to Deploying Renewable Energy Projects in the Liverpool City Region Joining up community support outputs and energy infrastructure project mapping August 2011 Energy Saving Trust contact:
Gold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road.
WELCOME Gold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road. The site covers approximately 0.37 hectares and
The subject matter of this report deals with the following Council Objectives
REGULATORY SERVICES COMMITTEE 4 JUNE 2015 Subject Heading: REPORT Revision to committee resolutions to grant planning permissions subject to S106 Planning Obligation requiring infrastructure contribution.
CITY COUNCIL PACKET MEMORANDUM
CITY COUNCIL PACKET MEMORANDUM DOCUMENT: Final Plan and Final Plat SUBJECT: City Center Lenexa The Domain at City Center CONTACT PERSON: Beccy Yocham, Director of Community Development DATE: December 3,
10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR)
HPK/2012/0207 03/04/2012 WILL HEY FARM WATFORD LANE NEW MILLS MR & MRS M WILSON KIRSTY WILSON EQUINE AND WILL HEY FARM BED & BREAKFAST RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS
FOR SALE / TO LET ASTON HOUSE SCHOOL, 10 MONTPELIER ROAD, EALING, LONDON W5 2QP
FOR SALE / TO LET ASTON HOUSE SCHOOL, 10 MONTPELIER ROAD, EALING, LONDON W5 2QP LOCATION Ealing is an affluent, attractive and vibrant West London suburb approximately 8 miles to the west of Central London,
Alternatives and Design Evolution: Planning Application 1 - RBKC
3 Alternatives and Design Evolution: Planning Application 1 - RBKC Design Freeze Draft One (January 2011) Figure 3-19 3.82 The design freeze draft one was a point in time in the evolution of the Masterplan
GREENACRE OFF GORING ROAD F CRAYS POND F OXFORDSHIRE
GREENACRE OFF GORING ROAD F CRAYS POND F OXFORDSHIRE GREENACRE OFF GORING ROAD F CRAYS POND F OXFORDSHIRE Woodcote - 1 mile F Reading - 6 miles F Pangbourne on Thames - 3 miles F Oxford - 21 miles F Henley
KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005. YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156
APPENDIX C KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005 YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156 REPORT BY HEAD OF PLANNING AND DEVELOPMENT SUMMARY
Date: 15 September 2015. Cathedrals FOREWORD COUNCILLOR MARK WILLIAMS, CABINET MEMBER FOR REGENERATION AND NEW HOMES
Item No. 9. Classification: Open Date: 15 September 2015 Meeting Name: Cabinet Report title: Ward(s) or groups affected: Cabinet Member: Tate Modern Project Last 1m Contribution Cathedrals Councillor Mark
REFERENCES-COMMERCIAL. Montgomery County Community College. 60,000 Sq. Ft. Montgomery County Community College 12,000 Sq. Ft.
Montgomery County Community College West Campus Expansion 60,000 Sq. Ft. Warehouse adaptive reuse of the former Vaughn Knitting Mill, a major architectural component of Pottstown s Industrial Heritage.
NORTHUMBERLAND. FOR SALE Freehold Office Investment with Planning Consent for a 27,157 sq Ft (GIA) Student Housing Block
CGI of student housing Existing FOR SALE Freehold Office Investment with Planning Consent for a 27,157 sq Ft (GIA) Student Housing Block G U I D E P R I C E 4. 2 m i l l i o n m i l l i o n NORTHUMBERLAND
Sydney Airport District
Sydney Airport Business District 1 0 The abd: where business takes off This brand new commercial precinct, Sydney Airport Business District, features a combination of modern office towers, retail facilities,
Opal Service District Plan
8 The Opal Service District includes a variety of planned land uses including commercial, mixed-use, flex office, industrial, and hospitality. This Plan seeks to simplify the land use categories to allow
DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY
DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY 1.0 Introduction and Purpose 1.1 Clackmannanshire Council is seeking to dispose of a site at Alloa Road, Tullibody for redevelopment. The site extends
Mohammed Ageli. BA (Hons) DipArch ARB
Mohammed Ageli CV CV Mohammed Ageli BA (Hons) DipArch ARB 2012 Studio Ageli Architects Director and principal 2006 2012 Eric Parry Architects architect 2003 2005 PDD Architects Architectural assistant
Table 200.5.10.1 PARKING SPACE RATES AND PARKING SPACE OCCUPANCY
Table 200.5.10.1 PARKING SPACE RATES AND PARKING SPACE OCCUPANCY. AM = 6 a.m. to Noon. Adult Education School Adult Entertainment (A) in Policy Area 1 (PA1), Policy Area 2 (PA2) Policy Area 3 (PA3) at
Shonks Barn, Mill Street, Hastingwood For Sale Barn for Conversion - OIEO 325,000
Shonks Barn, Mill Street, Hastingwood For Sale Barn for Conversion - OIEO 325,000 Summary Description: ESSEX BARNS are offering For Sale this GRADE II CURTILAGE LISTED DETACHED BARN FOR CONVERSION WITH
Petre Wood. Langho Village
Petre Wood Langho Village welcome TO Petre Wood Introducing Petre Wood, the eagerly anticipated second phase of this development of highly desirable family homes in the picturesque village of Langho in
550,000. Westfield Close, BATH
Offers in excess of 550,000 Energy Efficiency Rating: D Westfield Close, BATH Detached Three Reception Rooms Three Bedrooms Kitchen and Utility Bath and Shower Rooms Garage & Driveway Parking Gardens Spectacular
Location Amenities HVAC Parking Technology Security and Life Safety Elevators Ownership and Management
MA A RR KK EE T T TOWER M R Location Market Tower is centrally located adjacent to Monument Circle in the heart of the Indianapolis Central Business District. Situated within a block of the State Capitol
4 Alternatives and Design Evolution
4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that
CONSERVATION AREAS & LISTED BUILDING APPLICATIONS DETERMINED 28 th November 2015-18 th December 2015
CONSERVATION AREAS & LISTED BUILDING APPLICATIONS DETERMINED 28 th November 2015-18 th December 2015 REF: 15/04747/TPO ADDRESS: Foxwood Green Close EN1 2TB PROPOSAL: Work to 1 Ash tree covered by LBE ORDER
Stunning Rural Location Three Reception Rooms Galleried Landing. Five Double Bedrooms Countryside Views Energy Efficiency Rating : D
Stunning Rural Location Three Reception Rooms Galleried Landing Five Double Bedrooms Countryside Views Energy Efficiency Rating : D Claxton Mill, Claxton, Norwich, NR14 7UG Guide Price 460,000 Reference
New Price. Firgarth Guest House Windermere. Offers around 685,000 Freehold CONTACT US. Delightfully appointed landmark guest house
New Price Firgarth Guest House Windermere CONTACT US Delightfully appointed landmark guest house 8 attractively decorated en suite letting bedrooms Really spacious two bedroom self-contained owners apartment
ST KATHERINES SHORNE KENT
ST KATHERINES SHORNE KENT ST KATHERINES SHORNE KENT DA12 3DP A Grade II Listed house of great distinction with views over the Thames Estuary. Reception Hall Drawing Room Dining Room Kitchen/Breakfast
Cutwell Farm. Tetbury, Gloucestershire
Cutwell Farm Tetbury, Gloucestershire Cutwell Farm Tetbury, Gloucestershire, GL8 8EB Tetbury ½ mile, Cirencester 11 miles, Stroud 10 miles, Bath 23 miles, M4 (Junction 17) 11 miles, M5 (Junction 14) 15
HurlinghamRetailPark. Aerial view of site. Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park.
HurlinghamRetailPark Aerial view of site Welcome Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park. Londonewcastle, a specialist residential developer, has been
Site Size 1.06 Ha (2.62 acres) or thereby PRESTIGIOUS RESIDENTIAL DEVELOPMENT OPPORTUNITY WITH DETAILED PLANNING PERMISSION IN THE HEART OF ST ANDREWS
PRESTIGIOUS RESIDENTIAL DEVELOPMENT OPPORTUNITY WITH DETAILED PLANNING PERMISSION IN THE HEART OF ST ANDREWS Site Size 1.06 Ha (2.62 acres) or thereby Detailed Planning Consent for 71,900 sqft. of residential
