DATA CENTRE SUMMARISED PROFILE
|
|
|
- Thomasina Todd
- 9 years ago
- Views:
Transcription
1 ü Quality ü Environment ü Safety DATA CENTRE SUMMARISED PROFILE
2 COMPANY OVERVIEW Winthrop Engineering is one of Ireland s leading mechanical and electrical contrac1ng companies. Established in 1995, Winthrop now has offices in Dublin, Cork, Waterford and London and employs over 400 people. Winthrop Engineering & ContracEng Mechanical Electrical Fire Protec1on Data & Technology Maintenance Services Projected turnover for 2014/2015 is 60m Our focus is on the safe delivery of quality projects, on 1me and within budget. Winthrop is commixed to maintaining standards of excellence in all aspects of business. Large complex projects have been delivered across the IT, Industrial, Healthcare, Pharmaceu1cal, Public Works and Commercial sectors. Engineering Excellence Quality Delivery Safety On Site
3 Selected Project References
4 Data Electronics Ballycoolin, Dublin Interxion, Phases 1, 2, 3 & 5 ParkWest, Dublin Client: Data Electronics Value: 8,500,000 Size: All Phases comprised 3,888 sqm. Phase 1 648sqm fi\ed out. Winthrop Scope: Design & Build Mechanical, Electrical & Building Works. Main Contractor: Winthrop Commissioned by the Client to deliver an opera1onal Data centre. Exis1ng Premises to be converted to 3 floors of Data hall at 1296sqm/floor and adjacent 2,376 sqm Warehouse to be configured into M & E Plantrooms. Plant selected on an N+ 1 Basis with UPS on an N + N. Objec1ve was to achieve Tier IV compliance Client required design & cos1ng for full scale project. Winthrop then developed a phased build- out strategy to align with commercially viable Phases to suit Client funding plans. Security measures included electric gates, bollards, hand biometric scanners, IP presence detec1on CCTV. Client: Interxion Value: Phases 1,2,3,5 10.2m, Phase 4 pending Size: All Phases 2400sqm at 1.5kW/sqm Winthrop Scope: Mechanical & Electrical Design & Build Subcontract M & E Consultant: Ethos Engineering (for Winthrop) Main Contractor: StructureTone Limited Winthrop was commissioned to deliver an overall M & E Design & Build solu1on for Interxion. This fast track programme was planned across 4 Phases to ensure programme 1melines were met in a 1mely and cost effec1ve manner. Phases 1, 2, 3 & 5 are complete. Phase 4 is yet to commence. Project Summary: P1 & P2 Construc1on of 4 no. Data Halls & Plant. P3 Addi1onal Capacity in exis1ng Data Halls, P5 Extension to Data Centre, 2 New Data Halls and significant addi1onal plant. All plant was selected on an N + 1 basis, with N + N for the UPS. Fully detailed Integrated System Tes1ng (I.S.T.) planned & executed. For Program & cost advantage all electrical Switchgear & UPS were manufactured and assembled off site into purpose made Plant rooms which were then shipped to site intact and required final connec1ons only
5 MFN (Metromedia) CityWest, Dublin Worldcom MKI IDC Clonshaugh, Dublin Client: MFN (Metromedia) Value: 4,540,000 Size: 100,000 sq d Winthrop Scope: Mechanical Subcontract M & E Consultant: M.E.I.T. Associates, UK Main Contractor: StructureTone Ltd Winthrop secured the Mechanical & Controls System subcontract for the works which required the fast- track comple1on of the main plant & distribu1on system & the fit- out of the Ground Floor Data Hall space ini1ally. The overall program for the works was 16 weeks which included all associated building works, therefore the M & E scope had to be completed within a compressed 12 week window. Client: Worldcom Value: 4,400,000 Size: Total Data Hall Space 3,154sqm with 1,288msqm fully fi\ed out Winthrop Scope: Mechanical Subcontract Main Contractor: PaXon's Limited Winthrop won the Mechanical subcontract for the works which required the fast- track comple1on of the main plant & distribu1on system and the fit- out of 1,288 sqm of Data Hall space ini1ally. For program advantage the main Chilled Water plantroom was fully pre- fabricated off- site. All plant selected on an N +1 Basis with fully looped Chilled Water Distribu1on systems
6 Worldcom Erne Street, Dublin Wolfe ConsulEng Unit 10C, ParkWest, Dublin Client: Worldcom Value: 2,600,000 Winthrop Scope: Mechanical Subcontract Main Contractor: PaXon's Limited Fit- out of two floors of Technical space. Mechanical Scope comprised Full Chilled water system comprising three 600kW Chillers and 1 Dry coolers for free cooling and 35 in- room Close Control Units Chilled Water System was designed to operate at 10C Flow & 15C Return to u1lise Free Cooling by the Roof mounted Dry Cooler when ambient condi1ons favorable. Client: Wolfe ConstrucEon Value: 2,300,000 Winthrop Scope: Full turnkey solu1on, Design, Installa1on & Project Management Main Contractor: Winthrop Engineering Commissioned by the Client to deliver an opera1onal Data centre from ini1al premises selec1on, appointment of professional team and onto full installa1on, commissioning & handover. Client required design & cos1ng for large scale project including expansion to adjacent premises. Winthrop then developed a phased build- out strategy to comply with Clients funding plans
7 Inflow Kilcarberry Park, Dublin Data Electronics Kilcarberry Park, Dublin Client: Inflow Value: 2,000,000 Size: 2,000sqm of Data Hall in total with 616sqm fully fi\ed out. Winthrop Scope: Mechanical services Installa1on Main Contractor: StructureTone Ltd Mechanical subcontract to complete the Main Plant & Distribu1on with fit- out of ini1al phase. The overall program for the works was 16 weeks which included all associated building works, therefore the M & E scope had to be completed within a compressed 12 week window. Client: Data Electronics Value: 1,500,000 Size: Further fit- out to ( Inflow) by a new Owner Winthrop Scope: Design & Build Mechanical, Electrical & Building Works. M & E Consultant: Winthrop (McArdle MacSweeney Associates) Main Contractor: Winthrop Mechanical, Electrical & Building Works installa1on to complete fit- out of Data Hall and create new space. The project was carried out in a live and opera1onal data centre and all works were co- ordinated to ensure no down1me to exis1ng services.
8 Mentor Graphics East Park Shannon Free Zone, Shannon, Co. Clare Digiweb Blanchardstown Dublin Client: Mentor Graphics Value: 8,000,000 DuraEon: 9 months Winthrop Scope: M & E Specialist & Main Contractor: Winthrop were awarded the complete Turnkey works contract for the construc1on of the new Data Centre facility at Mentor Graphics (Ireland) Ltd. The project involves the Building and Fit- Out of Specialist Mechanical and Electrical Services at Mentor Graphics with the addi1on of a Tier 2+ Data Centre with plant facili1es and suppor1ng office space, car parking, service yard, new vehicular entrance and site services. Mentor Graphics is a leader in electronic design automa1on. They produce innova1ve solu1ons to enable Engineers overcome design challenges in the rapidly changing environment of board and chip design. Winthrop Engineering managed the Project Supervisor Construc1on Stage role throughout the works, and this required extensive consulta1on with the Shannon Airport Authority regarding lining opera1ons etc. Client: Digiweb Value: 400,000 Winthrop Scope: Mechanical & Electrical services Installa1on with builders works M & E Consultant: Tobin Consul1ng Engineers Main Contractor: Winthrop Engineering Winthrop Tendered and secured the full Scope for the upgrade and fit- out of an exis1ng Data Hall. All works were carried out in a live data center facility, and strict co- ordina1on was required with the client technical & facili1es management team to ensure all service transi1ons were carried out with no impact on normal opera1ons
9
EXAMPLE OF A DATA CENTRE BUILD
EXAMPLE OF A DATA CENTRE BUILD BT Harmondsworth Data Centre Hall 2 Upgrade Temperature Control have been involved in providing specialist to data centres for over 20 years, starting from providing specialist
Location. Central Business District. Ataturk Airport IFC. Sabiha Gökçen Airport
Welcome Zenium Istanbul One provides 12,000 square metres of high specification technical space across three purpose-built data centers. It is Turkey s first wholesale data center offering; the data halls
Datacentre Capability March 2015
Callaghan Engineering Consul-ng Engineers Project Managers Datacentre Capability March 2015 Callaghan Engineering Multi-discipline engineering & project management company Established in 1990 Offices in
Elliptical Mobile Solutions Data Center Solutions
Elliptical Mobile Solutions Data Center Solutions The Next Genera-on of Modular Data Centers Copyright Ellip.cal Mobile Solu.ons 2010 www.ellip.calmobilesolu.ons.com 1 EMS CURRENT PRODUCTS BENEFITS We
Capgemini UK Infrastructure Outsourcing
Together. Free your energies Capgemini UK Infrastructure Outsourcing Project Arthur Improved Data Centre Efficiency Paul Feeney Capgemini Tony Mills Spie Matthew Hall Project Arthur The Toltec data centre,
Cody Park One of Ark s high integrity data centre campus sites
UKC COMMERCIAL Cody Park One of Ark s high integrity data centre campus sites Ark is a privately held company that design, build, operate and finance third party data centre solutions tailored to meet
Help Framework. Ticket Management Ticket Resolu/on Communica/ons. Ticket Assignment Follow up Customer - communica/on System updates Delay management
Help for JD Edwards Our Help Framework Ticket qualifica/on Ticket crea/on Ticket Rou/ng Closures L1 issues Resolu/on KG SOPs Co- ordinate Ticket Assignment Follow up Customer - communica/on System updates
AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA)
AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) Site Biography Market Area: Washington, DC Area Location: Ashburn, VA 20147-6011 Address: All deliveries should be sent to
Design & Access Statement : Proposed Internal Devlopment & External Plant to Data Centre Facility, 35 Imperial Way, Croydon.
Design & Access Statement : Proposed Internal Devlopment & External Plant to Data Centre Facility, ARC-RP-A-002 Prepared by ARCMC Ltd July 2012: Issue A Contents 1. Introduction 2. Application Proposal
Subject: County of Los Angeles Data Center Space Requirement
Subject: County of Los Angeles Data Center Space Requirement The County of Los Angeles, Chief Executive Office, Real Estate Division (CEO-RED) is issuing this Property Search for the purchase of a vacant,
Wholesale Data Center Suites Available Now
Wholesale Data Center Suites Available Now FROM 2,500 to 100,000 Sq Ft A secure, fortified Mission Critical data center facility located in Innovation Park, Charlotte, NC Scalable data center suites available
Leveraging the Hybrid Cloud For Complete Data Protec:on. Private Public Managed
Leveraging the Hybrid Cloud For Complete Data Protec:on Private Public Managed Agenda Introduc>ons What is the Hybrid Cloud Data Protec>on Key Concepts Backup vs. Disaster Recovery How can I achieve Complete
DDC Sequencing and Redundancy
DDC Sequencing and Redundancy Presenter Sequencing Importance of sequencing Essen%al piece to designing and delivering a successful project Defines how disparate components interact to make up a system
Santa Clara, CA 95054
Leading-Edge Datacenter Facility Silicon Valley GENERAL In excess of 41,000 sq. ft. of raised floor 9 MVA of utility power into facility Purpose built Green Datacenter Sutton Roley Lic. 00793235 (408)
Data Center:Build-to-Suit
Data Center:Build-to-Suit A fortified 100,000 SqFt mission critical build-to-suit constructed on a secured 5 acre parcel at Innovation Park Charlotte, NC On-Site 120MW Substation Sourced from Two Independent
100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G
100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G The Opportunity Jones Lang LaSalle, Inc. (the Broker ) is please to offer the fee simple interest in 100 Locust Avenue (the
Company Profile. Unit 21, Port tunnel business park Clonshaugh Dublin 17
Company Profile Unit 21, Port tunnel business park Clonshaugh Dublin 17 History of the Company Alpha Mechanical services Ltd have been in operation since 2011, covering all aspects of work in the area
Strategic Data Centre Site Profiles. Data Centre Co-Location London East
Strategic Data Centre Site Profiles Data Centre Co-Location London East Document details Version: 1 Last Updated: 12/07/2013 Version 1.0 Page 1 of 5 Contents 1. LONDON EAST...3 1.1 LOCATION...3 1.2 TECHNICAL
Big Data. The Big Picture. Our flexible and efficient Big Data solu9ons open the door to new opportuni9es and new business areas
Big Data The Big Picture Our flexible and efficient Big Data solu9ons open the door to new opportuni9es and new business areas What is Big Data? Big Data gets its name because that s what it is data that
Introduc4on 6/29/12. Welcome to the SAFEGUARD PROPERTIES VENDOR CONFERENCE 2012
Welcome to the SAFEGUARD PROPERTIES VENDOR CONFERENCE 2012 Introduc4on Focus: Four Pillars of Success Timeliness Quality Growth Management 1 Session 1 Introduc4on Overview of four pillars Pillar 1 - Session
UK regional peering Northern Ireland. Mike Higgins
UK regional peering Northern Ireland. Mike Higgins 5NINES Global LLP NORTHERN IRELANDS FIRST MAJOR CARRIER NEUTRAL DATA CENTRE Total 100M Investment Total Investment Investment level ~ 100M; Dual Data
So#ware quality assurance - introduc4on. Dr Ana Magazinius
So#ware quality assurance - introduc4on Dr Ana Magazinius 1 What is quality? 2 What is a good quality car? 2 and 2 2 minutes 3 characteris4cs 3 What is quality? 4 What is quality? How good or bad something
Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants
Plan: O 02/00708/FUL Thames Ward (A) Address: Development: Applicant: London Works, Ripple Road, Barking Erection of replacement warehouse building and erection of two buildings in connection with builder
OPERATOR - FACILITY ADDRESS - DATE
. Facility Criteria (RFP).0 Location Characteristics Criteria Requirements 1 Ownership and Management: Please identify the owner(s) and managers of the property and indicate if there is on-site management.
LEVEL 3 DATA CENTER SERVICES IN OMAHA, NEBRASKA HIGH AVAILABILITY ENTERPRISE COMPUTING BUSINESS DEMANDS IT. LEVEL 3 DELIVERS IT.
LEVEL 3 DATA CENTER SERVICES IN OMAHA, NEBRASKA HIGH AVAILABILITY ENTERPRISE COMPUTING BUSINESS DEMANDS IT. LEVEL 3 DELIVERS IT. THE SCALE TO SUPPORT GLOBAL ENTERPRISE IT Designed and equipped to meet
Migrating to Hosted Telephony. Your ultimate guide to migrating from on premise to hosted telephony. www.ucandc.com
Migrating to Hosted Telephony Your ultimate guide to migrating from on premise to hosted telephony Intro What is covered in this guide? A professional and reliable business telephone system is a central
Security Installa-On in Rural Historic Courthouses
Security Installa/on in Rural Historic Courthouses Significance of Historic Courthouses in Texas Symbol of local pride and self- government Tangible link to the past Monument of community jus/ce When to
HealthcareBookings.com Security Set Up
HealthcareBookings.com Security Set Up Introduction... 2 Overview of the process for using HealthcareBookings.com... 2 Professionals... 2 Patients... 3 Passwords... 4 Hosting Security... 4 Overview of
How To Visit An Internet Data Center
AT&T Internet Data Center Site Specification Atlanta Area (Lithia Springs, GA) Site Biography Market Area: Atlanta and surrounding areas (Georgia, Alabama, Tennessee, Florida, North and South Carolina
AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ)
AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ) Site Biography Market Area: Phoenix, Mesa, Tempe, Chandler, Scottsdale, AZ Location: Mesa, AZ 85201 Address: 1301 University Blvd.
Case study; A sustainable Green Data Centre, fact or fiction?
Case study; A sustainable Green Data Centre, fact or fiction? Brian O Hora, BSc MBA MPM Networks & Infrastructure Manager Information Systems Services, Trinity College Dublin 200 Pearse Street Single UPS,
Site Preparation Management Co., Ltd. March 1st 2013 By Nara Nonnapha, ATD UPTIME
Site Preparation Management Co., Ltd. March 1st 2013 By Nara Nonnapha, ATD UPTIME 2 AGENDA SESSION -1 What is Data Center? SESSION -2 Equipment and Components SESSION -3 Standard in designing Data Center
AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA)
AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA) Site Biography Market Area: San Diego, CA Location: San Diego, CA 92121 Address: 5732 Pacific Center Blvd CLLI,POP, NPA/NXX Code:
2015-16 ITS Strategic Plan Enabling an Unbounded University
2015-16 ITS Strategic Plan Enabling an Unbounded University Update: July 31, 2015 IniAaAve: Agility Through Technology Vision Mission Enable Unbounded Learning Support student success through the innovaave
REQUEST FOR PROPOSAL WAYFINDING AND SIGNAGE CONSULTANT
REQUEST FOR PROPOSAL WAYFINDING AND SIGNAGE CONSULTANT Objective 1) The Wayfinding and Signage (W&S) Consultant shall develop a wayfinding and signage solution for the interior of Terminal One (only the
9,940 SF Office Building
204 East Rhapsody Drive, San Antonio, Texas 78216 BUILDING SIZE 9,940 Sq. Ft. (According to Bexar Appraisal District) LAND SIZE 0.6862 Acre or 29,890 Sq. Ft. (According to Bexar Appraisal District) BUILDING
Premium Data Centre Europe - 2012 Pricing, Business Model & Services
Premium Data Centre Europe - 2012 Pricing, Business Models & Services Premium Data Centre Europe - 2012 Pricing, Business Model & Services Table of Contents A list of figures used in this report 5 Methodology
CFD Beyond the Whitespace. Datacentres Central & Eastern Europe
CFD Beyond the Whitespace Datacentres Central & Eastern Europe September 2013 CONTENTS 1.0 Introduction 2.0 What is CFD? How it Works CFD in Data Centres 3.0 CFD Outside the White Space Case Study 4.0
Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015
Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015 Presentation Outline Mechanical Overview Chillers and Pumps Pipework and Ancillaries In Row Cooling Units
Payments Cards and Mobile Consul3ng Overview 2013
Payments Cards and Mobile Consul3ng Overview 2013 Our Services A digital publishing and marke3ng pla4orm for the future of payments Publishing Research Consul0ng Public Rela0ons Marke0ng/Branding Corporate
Dublin Airport Terminal 2. Ian Taylor 20 November 2007
Dublin Airport Terminal 2 Ian Taylor 20 November 2007 Ian Taylor Director, Arup (Ove Arup and Partners Ltd) Fellow of the ICE Civil Engineer 25+ years experience of large multi-disciplinary projects Hong
An Econocom Group company. Your partner in the transi4on towards Mobile IT
An Econocom Group company Your partner in the transi4on towards Mobile IT A few key figures 40 000 mobile terminals integrated annually 200 M of telecom expenses managed 50 000 mobility support 4ckets
Our Hosting Infrastructure. An introduction to our Platform, Data Centres and Data Security. www.in-tuition.net
Our Hosting Infrastructure An introduction to our Platform, Data Centres and Data Security www.in-tuition.net UK Infrastructure Infrastructure Overview Intuition Networks has provided managed Internet
AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL)
AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL) Site Biography Market Area: Chicago, IL Location: Lisle, IL 60532 Address: 4513 Western Avenue CLLI,POP, NPA/NXX Code: LSLEILAA, EQLAILAA
Data Center Solutions - The Containerized Evolution
Data Center Solutions - The Containerized Evolution Power IT Cooling 7 th Green Connected World Tsikogias Thanassis Data Centers Solutions Architect, IT Business Athens 2015 1 We are the global specialist
ORION Retail Systems. Orion Digital Integration Inc. Point of Sale Reinvented for a Mobile World
ORION Retail Systems Orion Digital Integration Inc Point of Sale Reinvented for a Mobile World O Orion Retail Systems ORION Digital Integraon Inc. - Corporate Profile Established in 2003, Orion Digital
Cloud Compu)ng in Educa)on and Research
Cloud Compu)ng in Educa)on and Research Dr. Wajdi Loua) Sfax University, Tunisia ESPRIT - December 2014 04/12/14 1 Outline Challenges in Educa)on and Research SaaS, PaaS and IaaS for Educa)on and Research
BASIC FIRE ALARM TRAINING
BASIC FIRE ALARM TRAINING What is a fire alarm system? Per the defini+on in NFPA 72 A system or por+on of a combina+on system that consists of components and circuits arranged to monitor and annunciate
WEBFIL LIMITED. Your Security Partner
WEBFIL LIMITED Your Security Partner ABOUT THE COMPANY WEBFIL is a state based company under the Andrew Yule Group. Andrew Yule & Co. Ltd. a Government of India Enterprise is multi product, multi unit
ICT and the Green Data Centre
ICT and the Green Data Centre Scott McConnell Sales Manager c/o Tanya Duncan MD Interxion Ireland Green Data Centres Our Responsibility Data centre greenhouse gas emissions are projected to quadruple by
Mission Critical DataCentres
Mission Critical DataCentres Your partner in delivering your vision of an enhanced Business and Living environment www.sepam.com www.comitass.com www.acis-i.com CP69 Perimeter Fence, CCTV & Access Control
Digital Chicago. 600 south FeDeraL - chicago 9333 9377 grand ave - FranKLin ParK 350 east cermak - chicago
Digital Chicago 600 south FeDeraL - chicago 9333 9377 grand ave - FranKLin ParK 350 east cermak - chicago The Digital Chicago portfolio consists of three state-of-the-art data center facilities: 600 South
Strategic Data Centre Site Profiles Data Centre Co-Location London North
Strategic Data Centre Site Profiles Data Centre Co-Location London North Document details Version: 1 Last Updated: 12/07/2013 Version 1.0 Page 1 of 6 Contents 1. LONDON NORTH...3 1.1 LOCATION...3 1.2 TECHNICAL
COOKING THE ROOF CFD BEYOND THE WHITE SPACE
COOKING THE ROOF CFD BEYOND THE WHITE SPACE Alex Nock 20 November 2013 CONTENTS 1. Introduction» Introduction to RED» Modeling in Data Centres 1. What is CFD» How it works» CFD in Data Centres 3. Cooking
Building Datacentres in Russia for Multinational Clients
Building Datacentres in Russia for Multinational Clients Mike Segal Commercial Director IXcellerate Limited 29 October 2013 Agenda Opportunity: Datacentre Business Models Market Overview: The Russian Datacentre
AT&T Internet Data Center Site Specification New York III (Secaucus, NJ)
AT&T Internet Data Center Site Specification New York III (Secaucus, NJ) Site Biography Market Area: New York City, New Jersey, Upstate NY and Lower Connecticut Location: Secaucus, NJ 07094 Address: 15
DUTIES and GUIDANCE. for. BOARDS of MANAGEMENT. DEALING with ASBESTOS CONTAINING MATERIALS. before, during & after
DUTIES and GUIDANCE for BOARDS of MANAGEMENT on DEALING with ASBESTOS CONTAINING MATERIALS before, during & after SCHOOL REFURBISHMENT WORKS, DEMOLITIONS AND BUILDING WORKS PROJECTS CONTENTS CONTENTS...2
Maximize energy savings Increase life of cooling equipment More reliable for extreme cold weather conditions There are disadvantages
Objectives Increase awareness of the types of economizers currently used for data centers Provide designers/owners with an overview of the benefits and challenges associated with each type Outline some
MICRONIX, spol. s r.o.
MICRONIX, MICRONIX, is trading and consultancy company with a wide range of services especially in the field of industrial technologies. The company has it own installation team, which conducts the constructions
Analysis of data centre cooling energy efficiency
Analysis of data centre cooling energy efficiency An analysis of the distribution of energy overheads in the data centre and the relationship between economiser hours and chiller efficiency Liam Newcombe
Protec'ng Informa'on Assets - Week 8 - Business Continuity and Disaster Recovery Planning. MIS 5206 Protec/ng Informa/on Assets Greg Senko
Protec'ng Informa'on Assets - Week 8 - Business Continuity and Disaster Recovery Planning MIS5206 Week 8 In the News Readings In Class Case Study BCP/DRP Test Taking Tip Quiz In the News Discuss items
Legacy Data Centres Upgrading the cooling capabilities What are the options?
Legacy Data Centres Upgrading the cooling capabilities What are the options? Presentation Structure What is a Legacy Data Centre? What is CRAC cooling? ASHRAE Standards Overview Available Cooling Systems
Construction (Design and Management) Regulations 2007
MEETING Finance, Procurement and Property Committee AGENDA ITEM 14 MEETING DATE 9 th July 2007 DOCUMENT NUMBER FEP 1052 SUBJECT REPORT Construction (Design and Management) Regulations 2007 (12/06/07) by
DATA CENTERS. VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX 75024 VAZATA.COM
DATA CENTERS VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX 75024 VAZATA.COM DAL II MARSH LANE CARROLLTON TX OVERVIEW VAZATA s Dallas Data Center II (Dal II) is located at 2440 Marsh Lane
Global Data Center & Colocation Facilities
Global Data Center & Colocation Facilities Managed Hosting & Storage Services Managed Servers Virtualization services Database Management Managed Storage and Back up Services Managed Load Balancing SaaS/IaaS
GREEN DATA CENTER DESIGN
Jeffrey Menig Global Facilities Facility Engineering The application of multiple available technologies resulting in improved energy optimization without significantly increasing capital investment. A
Everything You Need to Know about Cloud BI. Freek Kamst
Everything You Need to Know about Cloud BI Freek Kamst Business Analy2cs Insight, Bussum June 10th, 2014 What s it all about? Has anything changed in the world of BI? Is Cloud Compu2ng a Hype or here to
MFX RELOCATIONS. Data Centre & Computer Room Relocations
MFX RELOCATIONS MFX Relocations is our specialist relocation division and can undertake any type of commercial move but also undertakes specialist moves which includes:- Specialist IT relocations (Data
Conservation & Restoration Cost Management ROGERSON REDDAN & ASSOCIATES LTD. PROJECT, CONSTRUCTION AND COST MANAGERS
Conservation & Restoration Cost Management SERVICE BROCHURE ROGERSON REDDAN & ASSOCIATES LTD. PROJECT, CONSTRUCTION AND COST MANAGERS Content Company Overview - Page 2 QS Services - Page 2 Conservation
Data Centers: Energy Efficient, Cost effective, Fast to build
Data Centers: Energy Efficient, Cost effective, Fast to build A.D. Robison Director of design and construction Yahoo! Data Centers March 2011 Yahoo!, Inc. Information and Communication Technology Portfolio
N O W A V A I L A B L E
N O W A V A I L A B L E 5 0, 0 0 0 S F P O W E R E D S H E L L D A T A C E N T E R I I Data Center Park Catawba County, North Carolina S P E C I F I C A T I O N S Contact Doug Hollidge for more information
Appendix 1a: Facilities Management Guide elements of FM Soft FM
Catering Responsibility for the management of on site catering often falls within the remit of the Facilities Manager. In the public sector this can range from the provision of vending or coffee bar type
Data Centre Basiglio, Milan Flexible, advanced and efficient by design.
Data Centre Basiglio, Milan Flexible, advanced and efficient by design. TelecityGroup Via Francesco Sforza 13 Milano 3 City 20080 Basiglio MI Italy Tel: +39 02 36679500 [email protected] www.telecitygroup.it
The Hybrid tri- genera0on system solar- bio- tric
The Hybrid tri- genera0on system solar- bio- tric S. Karellas and K. Braimakis [email protected], [email protected] Na0onal Technical University of Athens 1 st Solar Open Workshop Building Integrated
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)
Phone Systems Buyer s Guide
Phone Systems Buyer s Guide Contents How Cri(cal is Communica(on to Your Business? 3 Fundamental Issues 4 Phone Systems Basic Features 6 Features for Users with Advanced Needs 10 Key Ques(ons for All Buyers
