Load Flow Analysis: Base Cases, Data, Diagrams, and Results
|
|
|
- Edwina Rose
- 9 years ago
- Views:
Transcription
1 ANUDlSiTM-40 Load Flow Analysis: Base Cases, Data, Diagrams, and Results by E.C. Portante, J.A. Kavicky, J.C. VanKuiken, and J.P. Peerenboom Decision and Information Sciences Division, Argonne National Laboratory, 9700 South Cass Avenue, Argonne, Illinois October 1997 Work sponsored by Navy Engineering Logistics Office
2 @ This report is printed on recycled paper.
3 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness. or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, proctss, or service by trade name, trademark, manufac-. turer, or otherwise does not necessarily constitute or imply its endorsement, rewmmendation. or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof..
4
5 CONTENTS ACKNOWLEDGMENTS... vi NOTATION... vii ABSTRACT... 1 INTRODUCTION Purpose Objective and Accomplishments Report Organization COLLECTION OF DATA FOR PECOLF MODEL Description of ComEd System Overview of ComEd Load Flow Model FORMAT CONVERSION FROM PTI TO PECOLF... 7 Differences between PTI and PECOLF... Extracting ComEd Data from the MAIN Data Set... Deriving PECOLF Parameters from PTI Data... Caveats in Reconverting PECOLF to PTI MODELING THE COMEDSYSTEM Modeling Internal Network Elements... Modeling Boundary Buses and External Systems... Bus Renumbering... Implications of the Adopted Modeling Approach... Validating the Conversion Process and PECOLF Model OBTAINING CONVERGENCE IN THE PECOLF ENVIRONMENT Convergence Criteria and Program Constants... General Guidelines for Minimum-Error Runs... Difficulties Encountered... Major Data Adjustment to Match PTI Reference Case
6 CONTENTS (Cont.) 6 SIMULATION RESULTS ComEd System Operating Characteristics Simulation Accuracy Relative to PTI Results SINGLE-LINE DIAGRAMS Description of Single-Line Diagrams Directory for Single-Line Diagrams and Load Flow Models INFORMATION QUERY SYSTEM SUMMARY AND CONCLUSIONS BIBLIOGRAPHY APPENDIXES (available as separate documents); contact James A. Kavicky, Decision and Information Sciences Division, Argonne National Laboratory, phone: , fax: , A: B: C: D: E: F: G: H: I: PTI Load Flow Input Data Dictionary PECO Load Flow Input Data Dictionary Coding Sheets for PECO Load Flow Input Data Description of Conversion Programs PTI Load Flow Simulation Results: Light-Load Case PECO Load Flow Simulation Results: Light-Load Case MAIN and ComEd Transmission Planning Criteria Directory for Single-Line Diagrams and Load Flow Models: Light-Load Case Information Query System Description iv
7 TABLES 2.1 ComEd s Major Interconnections Elements That Compose the ComEd System Breakdown of Buses According to Opefating Voltage Major Differences between PTI and PECOLF Input Data Formats Differences between PTI and PECOLF Input Data Groupings and Sequencing Derivation of PECOLF Parameter Values from PTI Values... PECOLF Convergence Tolerance and Program Constants Summary of PECOLF Simulation Results... 24
8 ACKNOWLEDGMENTS The authors gratefully acknowledge the support and guidance provided by the program sponsors, Tom Johnson and Tracy Rolstad. Their detailed knowledge of load flow analysis techniques, tools, and data requirements was invaluable in performing this work. We also thank Argonne staff member Bill Buehring for his technical oversight and program contributions and Marita Moniger for her editorial assistance. vi
9 NOTATION ANL ASCII ComEd DBF kv LTC MAIN MVA MVAR MW NERC OH PECOLF PSSE PTI SLD svs Argonne National Laboratory American Standard Code for Information Interchange Commonwealth Edison Company database file kilovolt load tap changing Mid-America Interconnected Network megavolt ampere megavolt ampere reactive megawatt North American Electric Reliability Council overhead Philadelphia Electric CompanyLoad Flow Power System Simulator for Engineering Power Technologies Incorporated single-line diagram static VAR system
10 I LOAD FLOW ALYSIS: BASE CASES, DATA, DIAGRAMS, AND RESULTS by E.C. Portante, J.A. Kavicky, J.C. VanKuiken, and J.P. Peerenboom ABSTRACT This report describes how an electric utility system is modeled by using load flow techniques to establish a validated power flow case suitable for simulating and evaluating alternative system scenarios. Details of the load flow model are supported by additional technical and descriptive information intended to correlate modeled electrical system parameters with the corresponding physical equipment that makes up the system. Pictures and technical specifications of system equipment from the utility, public, or vendor are provided to support this association for many system components. The report summarizes the load flow model construction, simulation, and validation and describes the general capabilities of an information query system designed to access load flow parameters and other electrical system information. 1 INTRODUCTION 1.1 PURPOSE This report summarizes the results of a load flow analysis case study performed by Argonne National Laboratory (ANL) for the Navy Engineering Logistics Office (NELO). This work was part of an overall energy systems modeling and analysis effort designed to develop a validated power flow study that facilitates understanding of power flow concepts. To simplify data collection requirements and illustrate key concepts, a representative power system in the United States - the Commonwealth Edison Company (ComEd) in northern Illinois - was chosen for the study. The analysis methodology used in this illustrative case study and the lessons learned from the study will assist NELO in conducting power flow studies of operational areas of interest. 1.2 OBJECTIVE AND ACCOMPLISHMENTS The objective of the load flow analysis work was to apply a convergent power flow model to a representative electric power system to establish a validated power flow case study suitable for simulating and evaluating alternative system scenarios. The Philadelphia Electric CompanyLoad Flow (PECOLF) model, which conforms to the model specifications provided
11 2 by NELO, was used in the analysis. The ComEd system was selected because of its technical complexity, which allowed all major concepts pertaining to power flow studies to be addressed, and its proximity to ANL, which facilitated site visits and access to data. The selection was also supported by the fact that a cooperative working relationship already exists between ANL and ComEd staff members. In conducting the illustrative case study, ANL: Collected and validated ComEd load flow data, comprehensive technical data on generator characteristics, and slides of towers, substations, and generating stations. Completed the Power Technologies Incorporated (PTQ-PECO conversion program, including all pertinent auxiliary programs. These auxiliary programs included the bus renumbering program, boundary node extraction program, and bus and line comparison programs. Used PECOLF to simulate the ComEd system, covering light load, summer peak load, and winter peak load conditions. Fine-tuned equipment settings to provide an excellent match between PECO results and published PTI output reports. Completed a directory that links the single-line diagrams (from the current year, 1995, and previous reporting year, 1994) to the 1995 load flow models by providing information on the specific location of nodes in the single-line diagrams. Prepared two sets of annotated, single-line diagrams. The larger diagrams (1994) show the connections between network elements in detail, with descriptive, readable labels that identify lines and stations and provide transformer and generator ratings. The smaller diagrams (1995) provide a better perspective of the connections between systems; each bus is numbered to correspond with its number in the PECOLF model. Implemented a database and query system for the ComEd network and load flow information. The query system was written in FoxPro (version 2.6) and operates on a Windows 3.1 platform. These accomplishments are described more fully in the subsequent sections of the report.
12 3 1.3 REPORT ORGANIZATION The remainder of this report is organized as follows. Section 2 describes the data collection effort and provides a brief overview of the ComEd system. Section 3 describes data collection and translation steps that were needed in preparation for the load flow simulations. The focus of Section4 is on efforts needed to represent interconnections between ComEd and neighboring systems. Section 5 summarizes convergence criteria and the behavior of the load flow model. In Section 6, simulation results are provided; these are followed by single-line diagram discussions in Section 7. Section 8 introduces the information query system developed specifically to assist in data access, browsing, and editing. Finally, Section9 provides a brief overall summary of this work. Appendixes A through I contain the actual data items and images described in this report. The appendixes can be obtained by contacting James A. Kavicky, Decision and Information Sciences Division, Argonne National Laboratory; phone: , fax: ;
13 4 Argonne collected three sets of load flow data: one set for the 1996 projected light load case, one for the 1995 summer peak load case, and one for the 1995 winter peak load case. The data were purchased directly from the Mid-America Interconnected Network (MAIN) region of the North American Electric Reliability Council (NERC). They were on three diskettes corresponding to the three load flow conditions mentioned above. Each diskette contained the following files in compressed American Standard Code for Information Exchange (ASCII) format: 0 Load flow input data for MAIN in PTI-Power System Simulator for Engineering (PSSE) format, Load flow simulation results for MAIN in PTI-PSSE format, and Data dictionary (full names of all abbreviated substation names and symbols for the MAIN system). The ComEd system is an integral component of the MAIN region and is tightly interconnected with neighboring utilities through 7 6 5, 3 4 5, and 138-kV lines. The embedding of the ComEd system within the MAIN data set is important, since the interconnections significantly affect ComEd s operations. Modeling the ComEd system as an isolated system required that ComEd-related information be extracted from the MAIN superset and that the surrounding network be represented as an electrical equivalent. This process of data preparation and translation is discussed in more detail in Section DESCRIPTION OF THE COMEDSYSTEM ComEd was founded in 1898 and has since grown to be a 25,400-MW utility with annual revenues of more than 6 billion dollars. With present assets of about 24 billion dollars, it serves a population of about 8.2 million people over a land area of 11,540 square miles. Its electrical customers include about 3,000,000 residential, 300,000 small commercial and industrial, 1,500 large commercial and industrial, and 12,000 other customers. The utility is headquartered in Chicago, Illinois. ComEd is an important component of the MAIN system. It is a predominantly nuclear-based utility; nuclear energy accounts for approximately 7 1% of its total annual energy output. The system s peak load (about 19,000 MW in 1995) occurs in the summer. ComEd has a total installed capacity of approximately 25,40OMW, of which 49% is nuclear, 31% is coal, 17%is oil, and 3% is natural gas. A number of small hydro generating stations exist, but they do not contribute significantly (on a percentage basis) to the overall capacity mix. ComEd s overhead (OH) transmission system spans a total length of about 5,000 circuit miles and operates on the following voltage levels: 765, 345, 138, 69, 34.5, 18, and 12.5 kv. Its underground transmission system consists mainly of 69- and 138-kV lines covering a total
14 5 distance of about 375 circuit miles. The primary distribution uses 5-, 13-, and 35-kV circuits. ComEd s major interconnections are summarized in Table OVERVIEW OF COMED LOAD FLOW MODEL The ComEd system model consists of about 650 buses and 820 lines. About 55 of the nodes are generator buses; of these, 15 are voltage-controlled, either directly or remotely, by load tap changing (LTC) transformers. The entire MAIN load flow model consists of about 10,000 buses and 35,000 lines. An analysis of the ComEd system model at light-load conditions (April 1996) is presented in Table 2.2. About 26 of the 200 transformer entries in Table 2.2 are not stand-alone units but represent tertiaries of three-winding autotransformers. These tertiary windings contain mainly capacitor banks for controlling reactive power within the transformer. They are represented in the model as lines with negative reactance. About 10 transformers are clearly designated as LTC transformers with lower and higher limits to accommodate tap adjustments. The rest are specified as transformers with fixed turn ratios. The buses may be further analyzed with respect to operating voltage, as shown in Table2.3. As Table2.3 shows, the ComEd system model is composed mainly of 138-kV substations. Most of the lower voltage buses (e.g., 12.5 to 13.8 kv) represent generator nodes at the primary end (low-voltage side) of step-up transformers. TABLE 2.1 ComEd s Major Interconnections No. of Voltage Total Interconnection Utilitya Circuits (kv) Capability (MVA) AEP EQ 3 765,345 3,892 IOWA 4 345,138 3,125 CILCO 3 345,138 2,503 NIPSCO 7 345,138 4,748 IPCO 8 345,138 2,812 WUMS 4 345,138 3,509 CIPS ,793 a AEPEQ = American Electric Power (equivalent), IOWA = Iowa-Illinois Gas and Electric Company, CILCO = Central Illinois Light Company, NIPSCO = Northern Indiana Public Service Company, IPCO = Interstate Power Company, WUMS = Wisconsin and Upper Michigan Systems, and CIPS = Central Illinois Public Service Company.
15 6 TABLE 2.2 Elements That Compose the ComEd System Element Number of Elements BUS ( kv) 647 Generator unit 55 Line 820 Transformer 200 Phase shifter 9 Direct-current line 0 TABLE 2.3 Breakdown of Buses According to Operating Voltage Operating Voltage (kv) Number of Buses
16 7 3 FORMAT CONVERSION FROM PTI TO PECOLF Conversion of PTI-formatted load flow data to the PECOLF structure involved three main processes: (1) extract ComEd data from the MAIN superset, ( 2 ) process ComEd-related information to comply with PECOLF formats and specifications with regard to units of measure, and (3) modify the properties of ComEd s boundary nodes to account for the effects of systems externally connected to ComEd. These processes are described in Sections Before these descriptions, Section 3.1 first explains the major differences between the PTI and PECOLF input data formats and structures. 3.1 DIFFERENCES BETWEEN PTI AND PECO/LF Conversion of load flow data from PTI to PECO was necessary for four main reasons. First, the programs use different formats. PTI-PSSE uses free format with space and comma delimiters, while PECOLF uses a fixed, space-delimited format. Second, the input data are grouped and sequenced differently in PTI and PECO. PTI has 13 data categories, while PECOLF has 4. Third, the different software packages use different units of measure to model the same parameters. Finally, bus numbering standards are different. PTI-PSSE uses a five-digit numbering scheme, while PECOLF allows only up to four digits. The differences between PTI and PECO that are relevant to the data conversion process are summarized in more specific terms in Table 3.1. TABLE 3.1 Major Differences between PTI and PECO/LF Input Data Formats Item PTI-PSSE PECOLF Input data in ASCII format Free format, space- or commadelimited FORTRAN fixed format, spacedelimited No. of data categories 13 Line resistance 4 Per unit Percent Line reactance Per unit Percent Line charging Per unit Megavolt ampere reactive (MVAR) Generator modeling Several units can be connected to a single bus Only one unit can be connected to a bus Static capacitors Three modeling options: discrete, fixed, and continuous Two modeling options: fixed and continuous Bus numbering Uses five-digit numbers Allows only up to four-digit numbers Direct-current (DC) line Models two-terminal or multiterminal DC lines No logic for treating DC lines
17 8 The main data groupings for PTI and PECO input data are compared in Table 3.2. Clearly, the PTI-PSSE code has a more finely decomposed set of data than does PECOLF. The PECOLF data set appears as a compressed version of PTI-PSSE. Details on how specific PECOLF parameters are derived by using PTI raw data are discussed in Section 3.3. Appendix A provides detailed descriptions of the items included within each data group. Appendix A, as well as all the other appendixes mentioned in this report, can be obtained by contacting James A. Kavicky, Decision and Information Sciences Division, Argonne National Laboratory; phone: , fax: ; [email protected]. 3.2 EXTRACTING COMEDDATA FROM THE MAIN DATA SET Argonne acquired a large set of load flow data from MAIN. The data included all load flow information for the MAIN region, covering about 10,000 buses and 35,000 lines. ComEd accounts for about 650 (or about 6.5%) of the buses and 820 (or about 2.3%) of the lines. Since the data ANL purchased were in ASCII files, the data had to be converted and stored in database files (DBFs) so they could be processed to derive PECOLF values. A special program -EXTRACT1.PRG -was developed to extract ComEd data from the MAIN data set. The program captured all information contained in the MAIN data and stored the captured data in FoxPro DBFs. ComEd data were identified and segregated by using the area code number assigned to ComEd. The extracted data were stored in 13 DBFs according to the PTI data structure shown in Table 3.2. The field names of each of the 13 DBFs are described in TABLE 3.2 Differences between PTI and PECOLF Input Data Groupings and Sequencing PTI-PSSE PECOLF 1. Case identification 1. Case identification 2. Bus data 2. Bus data 3. Line and transformer data 4. Area interchange data 3. Generator data 4. Branch data 5. Transformer adjustment data 6. Area interchange data Two-terminal DC line data Switched shunt data Trans impedance correction data Multiterminal DC line data Multisection line grouping data Zonedata 13. Area transaction data
18 9 Appendix A. The extraction program also identified all boundary nodes and all tie lines connected to these nodes and stored this information in a separate DBF. The program used the conversion process described in Section 3.3 to derive PECOLF values. Then the program stored the PECOLF load flow input data in ASCII format. For the initial preparation of the PECOLF input data, the effects of systems around ComEd were not taken into account. A second program - EXTRACT2.PRG - was applied to process the ASCII file containing the PTI simulation results. Real and reactive power flow data on all tie lines connected to the ComEd system were captured by the program. The program used the captured information to adjust the properties of the boundary nodes so that flows through the tie lines were represented as local loads. A third program - the RENUMBR.PRG - was employed to assign a new set of number labels to the nodes in accordance with the specifications of the PECOLF model. Because ComEd was initially part of the large MAIN system, the numbers assigned to the buses were in five-digit formats. PECOLF allows only four-digit numbers to be used to label the buses. 3.3 DERIVING PECOLF PARAMETERS FROM PTI DATA Deriving the PECOLF parameters from PTI data involved an aggregation process in which several values from different data groups in PTI were combined to constitute a PECOLF value. For example, to complete the branch data for PECOLF, data from PTI s Branch Data Group, Transformer Adjustment Data Group, Transformer Impedance Correction Data Group, and Case Data Group had to be combined. To complete the PECO bus data, information had to be drawn from PTI s Bus Data Group, Generator Data Group, Two-Terminal DC Line Data Group, Multiterminal DC Line Data Group, and Switched Shunt Data Group. Table 3.3 shows in detail how each parameter in the bus data group and branch data group of PECOLF is derived by using PTI parameters. The parameters are presented and sequenced in the same manner as they appear in the PECO coding sheets shown in Appendix C. Appendix B gives the definition of columns appearing in the coding sheets. The PTI-PECO format conversion program, including the associated auxiliary programs, is described in Appendix D. 3.4 CAVEATS FOR RECONVERTING PECOLF TO PTI Converting load flow data from PTI to PECO is comparable to transforming a finely decomposed data set into a simpler one. The representation of data is simpler in PECOLF format than in PTI, partially because the data represent lumped network parameter values. For example, the shunt MVAR in PECOLF is actually the sum of the bus shunt reactance to ground and the switched shunt admittance (static capacitor banks) in PTI. Transforming the more detailed data into a more aggregated form is usually not a problem, because it is largely an integration task. The smaller pieces just have to be added together to form equivalent composite values. However,
19 10 the reverse operation is more difficult because clear guidelines on how to break down the data into smaller categories need to be in place. Some PTI parameters may be difficult to reconstruct from a PECOLF data set; they are listed here: BL (reactive component of shunt admittance to ground) and BINE (initial switched shunt admittance) from shunt MVAR values in PECOLF: The number of steps per block and the admittance increment for each step cannot be reconstructed, because PECOLF format does not provide guidelines for this. Generator real power limits: PECOLF does not provide this information. Impedance correction table: PECOLF does not provide this information. Direct-current (DC) line parameters: PECOLF does not have the capability to model DC lines. On the other hand, the ComEd model may be reconstructed in PTI format by using the FoxPro DBFs that were used to store the PTI data during the conversion process. By using a program that writes data in free format, the load flow model for an isolated ComEd system may readily be recreated in PTI format.
20 TABLE 3.3 Derivation of PECO/LF Parameter Values from PTI Values PTI PECO Parametera Column Unit Process Used to Derive PECO Value Parametera Unit PTI Data Group Bus Datu Bus number 1-4 ~ PTI bus numbers were originally in five-digit format. A renumbering program assigned the PTI five-digit numbers to a new set of four-digit numbers. The new number set ranged from one up to the total number of buses. I Bus data Bus type 8 PTI codes correspond to PECO codes as follows: PTI Description PECO IDE Bus data Bus name Load bus (no generation) 0 2 Generator bus 1 3 Swingbus 2 4 Isolated bus X Formed by combining the first eight letters of ME with the first four characters of BASKV, thereby creating a 12-character string. The last four characters of the bus name contained information on the base voltage as required by PECO. ME BASKV Bus data Voltage magnitude Per unit Taken directly from PTI values. VM Per unit Bus data Voltage angle Degree Taken directly from PTI valucs. VA Degree Bus data Generation MW Megawatt Taken directly from PTI values. PG Megawatt Generator data Generation in MVAR Megavar Taken directly from PTI values. QG Megavar Generator data
21 TABLE 3.3 (Cont.) PTI PECO Parametera Column Unit Process Used to Derive PECO Value Parametera Unit PTI Data Group Bus Data (Cont.) Minimum generation limit Megavar Taken directly from PTI values. QG Megavar Generator data Maximum generation limit Megavar Taken directly from PTI values. QT Megavar Generator data Controlled bus Takcn directly from PTI values. IREC Generator data Load MW Load MVAR Shunt Capacitorh-eactor Area code Megawatt In general, taken directly from PTI PL Megawatt Bus data values; however, for boundary buses, MW flows of all tie lines connected to the bus were aggregated and added to the local load. A negative resultant load implies MW import, while a positive value implies export of real power. Tie lines are lines that join ComEd with other utilities Megavar In general, taken directly from PTI QL values; however, for boundary buses, MVAR flows of all tie lines connected to the bus were aggregated and added to the local load. A negative resultant load implies MVAR import, while a positive value implies export of reactive power. Tie lines are lines that join ComEd with other utilities Megavar Evaluated as the sum of BINIT and BL; it was noted that BINIT and BL are mutually exclusive; that is, whenevcr BINIT is not zero, BL is zero, and vice-versa. Megavar Bus data BL Megavar Bus data BINIT Megavar Switch shunt data Taken directly from PTI values. IA Bus data
22 TABLE 3.3 (Cont.) PTI PECO Paramete? Column Unit Process Used to Derive PECO Value Parametera Unit PTI Data Group Brunch Datu From bus number 1-4 Taken directly from PTI values. I Branch data Continuation character 8 Automatically inserted for phase shifters and load tap changing transformers. To bus number 9-12 Taken directly from PTI values. J Branch data Circuit number 14 Taken directly from PTI values. CKT Branch data Area 16 Taken directly from PTI values. IA Bus data Resistance Percent Derived by multiplying R by 100%. R Per unit Branch data Reactance Percent Derived by multiplying X by 100%. X Per unit Branch data Line charging MVA Derived by multiplying B by 100 MVA base. B Per unit Transformer tap Per unit Taken directly from PTI values RATIO Per unit Branch data Minimum tap Per unit Taken directly from PTI values. RMI Per unit Transformer adjusted data Maximum tap Per unit Taken directly from PTI values. RMA Per unit Transformer adjusted data Phase shift angle Degree Taken directly from PTI values. ANGLE Degree Branch data Controlled bus number Taken directly from PTI values. ICONT Transformer adjusted data Normal MVA rating MVA Taken directly from PTI values. RATEA MVA Branch data Emergency MVA rating MVA Taken directly from PTI values. RATEB MVA Branch data
23 TABLE 3.3 (Cont.) PECO Parameter' Column Unit Process Used to Derive PECO Value PTI Parametera Unit PTI Data Group Brunch Datu (Cont.) MVA base MVA Taken directly from PTI values. SBASE MVA Case identification data Desired MVAR flow MVA Taken directly from PTI values. VMI MVAR Transformer adjusted data Minimum LTC volts Per unit Taken directly from PTI values. VMI Per unit Transformer adjusted data Degree Taken directly from PTI values. RMI Degree Transformer adjusted data Degree Taken directly from PTI values. RMA Degree Transformer adjusted data Desired MW flow Megawatt Taken directly from PTI values. VMI Megawatt Transformer adjusted data Controlled line No counterpart in PTI Calculated by the formula: (VMA-VMI)/STEPS VMA VMI STEPS Per unit Per unit Transformer adjusted data Taken directly from PTI values. VMA Per unit Transformer adjusted data Minimum phase shift angle Maximum phase shift angle Transformer available taps Maximum LTC volts a 2nd card 2nd card 2nd card 2nd card 2nd card 2nd card 2nd card 2ndcard See PECOLF or PTI-PSSE operations manual for complete description of parameters.' = not applicable.
24 15 4 MODELING THE COMED SYSTEM Modeling the ComEd system was a two-step process. First, data on the ComEd system were extracted from the MAIN data set. Then the boundary elements were modified to reflect the influence of the systems surrounding ComEd. 4.1 MODELING INTERL NETWORK ELEMENTS By using the area code assigned to ComEd as a key, all ComEd-owned buses and lines were extracted from the MAIN super set and stored in 13 DBFs according to the PTI data structure presented in Table 3.2. No further modification of the internal buses and lines was made, since this task was straightforward. The extraction process automatically identified and segregated tie lines and boundary nodes. Finally, a valid set of data for the internal elements was formed by eliminating all nonactive lines and isolated buses. The values for PECO parameters were then derived by using the process shown in Table 3.3. In the PECOLF model, DC lines were represented as a pair of supply and sink nodes with fixed values. However, since the ComEd system did not have any DC lines, no DC modeling activity was undertaken in this study. 4.2 MODELING BOUNDARY BUSES AND EXTERL SYSTEMS Because the PECOLF model is limited in terms of the size of the system that it can accommodate, it was not possible to model the entire MAIN system and use the PECOLF network reduction software to make an equivalent of the external system buses outside the ComEd system. PECO s network reduction module could not accept the 10,000-bus system of MAIN. As a result, an alternative boundary approach was chosen to model the influences of external system buses. The properties of boundary nodes had to be redefined to account for the influence of system interconnections. The main focus in modeling boundary buses is to properly represent interties. Interties provide channels through which electrical power may flow in or out of the ComEd system. More than one tie line may emanate from a boundary node. Both real (MW) and reactive power (MVAR) may flow through these lines. When the ComEd system is modeled as an isolated system, these tie lines disappear, but their effects are recognized by representing the power flow through them as local loads at the boundary buses. If more than one tie line connects to a boundary node, the MW and MVAR flows through all the lines are combined and added to the node s local load. A negative real power means that ComEd is importing real power, while a positive value implies that ComEd is exporting power. The same logic governs the convention for MVAR flows. In this modeling approach, the boundary buses that were originally designated as load buses remain classified as load buses even if their net load is negative. Negative loads are permitted in PECOLF. Buses with negative net load can be reclassified as generation buses (in which case the voltage would be assumed to remain constant) only if the buses are known to be close to a very strong external generation center.
25 I6 4.3 BUS RENUMBERING As mentioned in Section 3.1, a renumbering program had to be run to convert PTI s five-digit bus numbers to four-digit numbers suitable for PECOLF use. A new set of numbers was arbitrarily assigned to the buses. The new set was simply a sequential count of the buses from the first one up to the total number of buses in the ComEd load flow model. The final set was not completely consecutive, because one node was found to be isolated and had to be excluded from the valid set. 4.4 IMPLICATIONS OF THE ADOPTED MODELING APPROACH By representing the MW and MVAR flows through the tie-lines as local loads at the boundary buses, the isolated model fixed the impact of the interties on ComEd s operation. The isolated ComEd model is valid only for exactly the same conditions as those that prevailed in the pre-extracted state of ComEd. In using the isolated model to examine outage contingencies and transient stability, one should adhere to the assumption that injections from the external system as well as the external voltages remain constant during disturbances within ComEd. If this assumption is not taken into account, the analysis may lead to inaccurate results, because the interties (represented as loads) are precluded from transmitting compensating or synchronizing power to ComEd during disturbances. For any major line outage within ComEd that occurs without a change in load, isolated ComEd model simulations could result in different line flows than those that would result if ComEd were simulated in the context of the full MAIN model. Because of this limitation, care must be exercised in using the isolated model for sensitivity analysis and stability studies. The isolated model now operates on the basis of the assumption that flows through the interties are either fixed or change proportionately with the loads. 4.5 VALIDATING THE CONVERSION PROCESS AND PECO/LF MODEL As explained in Section 3.2, the conversion process essentially consists of executing the following programs: EXTRACT 1.PRG, EXTRACT2.PRC3, and RENUMBR.PRG. The analyst intervenes intermittently during the process to consolidate the outputs and assemble the PECOLF-formatted data set. EXTRACT 1.PRG captures and stores ComEd-related information from PTI-formatted MAIN data and generates initial PECOLF-formatted load flow input data. EXTRACT2.PRG reads intertie and boundary node information from known PTI simulation results and then uses these data to modify properties of boundary nodes. RENUMBR.PRG completes the process by assigning four-digit number codes to the buses. Two categories were tested to validate the conversion process. First, the accuracy of the units of measure (e.g., whether the values are per unit or percent) and format (e.g., whether the parameters are pasted in the appropriate columns and whether they should be floating point or integer type) was tested. Second, the ability to obtain a convergent solution with results consistent with the known PTI reference case was tested. The latter test is the ultimate validity check for the process. The converted data must be such that the PECOLF program will lead to a
26 17 convergent solution within a reasonable number of iterations. In addition, the results must compare favorably with published PTI output. Testing for correctness in units of measure and format was an iterative and tedious process. As errors were detected during initial iterations, incremental modifications were made in the programs to improve the results. The 1994 MAIN system, in PTI format, was a complex case consisting of about 10,000 buses and 35,000 lines. Errors were detected by comparing results of the program runs with the original values: Comparisons were conducted on a line-by-line and bus-by-bus basis. When necessary, manual calculations were performed to validate results. Validity of the conversion process was first confirmed when the model run for the ComEd system converged. More important, results of the run compared favorably with the known reference data. The ComEd-related data had to be extracted, and effects of interties had to be incorporated in the model. Because of the huge volume of MAIN data, numerous other auxiliary programs were developed to automate the validation of results and minimize the number of trial runs. These included, among many others, the BUS-CHECK, COMPARE, and BALANCE programs. BUS-CHECK was used in conjunction with the renumbering program to make sure that all remotely controlled buses were consistently renumbered as the main nodes were assigned new numbers. The COMPARE program compared the PECO output with the PTI results on a line-by-line and bus-by-bus basis. The BALANCE program looked into the supplydemand situation of the model before a PECOLF run, since a substantial imbalance in supply and demand due to erroneous data conversion could make convergence difficult. Parameters of interest to analyze when comparing PECOLF and PTI results are the following: From each originating node ( From Bus ): 1. Mw flows, 2. MVARflows, 3. MVAflows, 4. Power factor, 5. Voltage, and 6. Shunt MVAR. For each generator node: 1. MW dispatch, 2. MVAR dispatch,
27 18 3. Power factor, and 4. Voltage. 0 For each LTC transformer: 1. Tap position, 2. MVAflows, 3. MW flows, and 4. MVARflows. 0 For phase shifters: 1. Tap setting, 2. Phase angle, 3. MVAflows, 4. Controlled MW flows, and 5. MVARflows.
28 19 5 OBTAINING CONVERGENCE IN THE PECO/LF ENVIRONMENT 5.1 CONVERGENCE CRITERIA AND PROGRAM CONSTANTS Table 5.1 presents convergence tolerance and program constants used in the PECOLF simulation runs. A desired performance standard was for the model to converge to a solution within 10 iterations. 5.2 GENERAL GUIDELINES FOR MINIMUM-ERROR RUNS The following guidelines were developed on the basis of lessons learned from initial attempts to achieve convergence. They are presented in a list that can be reviewed before a PECO load flow run. They assume that PECO-formatted input data have been formed through the execution of the EXTRACT 1.PRG, EXTRACT2.PRG, and RENUMBR.PRG programs. Using parameter values other than those displayed in this list may result in an aborted run or a nonconvergent case. TABLE 5.1 PECOLF Convergence Tolerance and Program Constants Variable Description Value P Q V M L H PT QT A B MI Bus mismatch criterion for real power, per unit Bus mismatch criterion for reactive power, per unit Voltage tolerance for automatic tap changers, per unit Maximum number of network configuration changes before 40 reoptimal ordering Voltage criterion for table of exceptionally low voltages, per unit 0.95 Voltage criterion for table of exceptionally high voltages, per unit 1.05 Total absolute mismatch for real power, per unit a Total absolute mismatch for reactive power, per unit b Voltage delta criterion for table of excessive bus voltage changes, 0.05 per unit Percent of ratings used when listing monitored lines 100 Maximum number of iterations 40.0 a b The criterion for total absolute mismatch for reactive power is determined by the formula: per-unit QT tolerance = (no. of lines + no. of buses) / (maximum no. of lines + maximum no. of buses). The criterion for total absolute mismatch for real power is determined by the formula: per-unit PT tolerance = per-unit QT x 0.6.
29 20 The following steps outline the process for obtaining convergence: In PECOLF, choose Option 4 for the load flow solution approach. This option is intended for use with cases that are difficult to solve. Option 4 initiates a Newton-Raphson solution. The maximum MVAR limits for all nonfixed regulated buses will be increased by 1,000 MVAR until the case is close to convergence. When convergence is near, the limits will be restored to their original values. Check if a swing bus has already been designated. The EXTRACT1.PRG and EXTRACT2.PRG programs do not automatically assign a swing bus. To be consistent with MAIN assumptions, chose the same generator unit as that chosen in the PTI data as the swing bus. Check the data set for isolated check if any bus is of type X ). Although the PECOLF program would normally identify an isolated bus during the initial run, a prior screening of the bus data would shorten turnaround times and avoid complications. Check the dispatch schedule of generators marked Gen Out. Although these generators have been relabeled as type 0 (load bus), their scheduled MW and MVAR outputs may still be nonzeroes. If so, reduce all generation output to zero. Check all generator outputs again for consistency with original PTI data. Set all static VAR system (SVS) buses (type 3 ) to type 0 buses to fix the shunt capacitor assignment. The type 3 designation does not work well in PECO, especially in conjunction with transformers with negative reactance. Represent transformers as they originally were in PTI format. Fixed transformers should be modeled as fixed, and LTC transformers should be modeled as LTC transformers. Modeling all transformers as variable tap transformers could result in solutions requiring an excessive number of iterations (more than 70). Fixing all transformers, on the other hand, would result in nonconvergence, because of limitations imposed on availability of reactive power. 5.3 DIFFICULTIES ENCOUNTERED Few difficulties were encountered before convergence was attained. Except for the light load case, which was the first case processed, all the cases attained convergence in, at the most, three attempts. More difficulties were encountered in matching results with PTI values than in attaining convergence. Some of the difficulties were as follows:
30 21 1. The use of type 3 buses for SVS buses would not allow convergence to occur. The type 3 bus has to be changed to a type 0 bus in order for the program to run without errors. 2. A convergence tolerance of 0.01 (default for small systems) for total Q and P mismatch led to about 70 iterations before convergence was obtained. Applying the formulas presented in Section 5.1 led to cases that converged within 15 iterations. 3. Failure to initially assign a swing bus suddenly halted program execution. The difficulty was that no message associated with this error was indicated in the printouts. 5.4 MAJOR DATA ADJUSTMENT TO MATCH PTI REFERENCE CASE A comparison of initial PECOLF simulation results with PTI reference case results indicated substantial differences in the magnitude and direction of power flows and dissimilarities in voltage magnitude and angles. Controlled MW flows through phase shifters were also substantially different. In some cases, the MVAR flows through the phase shifters were in directions opposite to those of the flows in the reference case. MVAR dispatch of generators was also substantially different. Some of the adjustments made to bring the initial PECOLF simulation results closer to PTI s were as follows: 1. MW flow through phase shifters was adjusted. The difference in controlled MW flow stemmed from the fact that PTI allows the controlled MW to vary within a certain band, while PECOLF defines a single specific value corresponding to the upper limit of the band. To enable the phase shifter to control exactly the same power as that controlled in PTI-PSS/E, solution values were specified for the phase shifters in PECOLF. 2. MVAR flow through phase shifters was adjusted. Tap positions in phase shifters were noted to be substantially different in both programs, which caused a significant difference in VAR flows. The MVAR flow through phase shifters is very sensitive to transformer tap positions. A very small (e.g., 0.02 per unit) change in tap position could reverse the direction of MVAR flow. Magnitudes of MVAR flows could also be significantly altered by modifying the tap positions. To enable the phase shifters to indicate the same VAR flows as in PTI, the PECOLF tap settings were gradually fined-tuned to match those in PTI. This effort involved a number of trial and error runs. 3. The LTC tap position was adjusted. For some reason, PECOLF and PTI solutions for finding the final tap setting for some of the LTCs in the system differed. This difference resulted in different voltage levels in some buses and differences in MVAR flows as well. To attain an identical
31 22 voltage level at the pertinent voltage-controlled bus, PECOLF lower or upper tap limits were changed to allow the tap setting to correspond to solution values found in PTI output. 4. An alternate swing bus was selected, particularly for the light load case. The choice of swing bus affects the levels of MW and MVAR flows in the system and the MW and MVAR dispatch among generators. The match between PTI and PECO solutions for MW and MVAR flows improved greatly when a new swing bus was selected. The swing bus originally indicated in PTI was Joliet 29;7u24. The alternate swing bus chosen was Joliet 29;8u24. This effort also involved a number of trial runs.
32 23 6 SIMULATION RESULTS Appendix E presents the simulation results from PTI-PSSE, and Appendix F presents those from PECOLF. The PTI simulation results were obtained from MAIN and served as reference information for validating the results of the PECOLF modeling and simulation. The information shown in Appendix F is an actual PECOLF printout from a successful load flow simulation run. Simulation results shown in Appendix F cover the light load case only. Results for the winter and summer peak cases are also available from the Federal Energy Regulatory Commission bulletin board. 6.1 COMED SYSTEM OPERATING CHARACTERISTICS Results of simulations for the light, summer peak, and winter peak load conditions are summarized in Table 6.1. A breakdown of the major elements that make up the system is shown in Section A of the table for each scenario. The number of active elements varies for each case. Different loading conditions require a different number of dispatched generators, line connections, and equipment settings. For example, during peak load, about 36 generating units were on line, while about 12 were on line during light load. During peak load conditions, 14 transformers were set as LTCs, while only 10 were set as LTCs during light load. Section B of Table 6.1 gives ComEd s supply-demand characteristics. The summer peak and light load cases represent the upper and lower bounds of ComEd s operation, respectively. ComEd s peak load in 1995 was about 18,500 MW. Minimum load was about 7,300 MW in Line charging MVA varies across the cases, although it is essentially a function of the number of lines and voltage. For a system of exactly the same configuration, the line charging MVA should be more or less constant regardless of the level of system load. Line losses also vary across cases. Line losses are mainly a function of load. On a percentage basis, the system losses range from about 1.5 to 2.076, which is an excellent range for any system. Average power factor at load buses is about to ComEd s planning criteria target a base power factor of about 8598% in load substations. The average operating power factor of generators ranges from to During light load conditions, the line charging MVA predominates in the system, resulting in a relatively small amount of shunt MVARs (2 17 MVARs) and a negative (capacitive reactive power) loss of about 1,500MVAR. It also results in the system tending to operate at higher voltage levels (95 buses violated the upper voltage constraint of 1.05 per unit). The highest voltage in the system is about per unit or about 3.5% above the upper bound. In general, ComEd s planning criteria limit the voltage variation from 92% to 105% of the nominal voltage. In terms of power outflow from the system, ComEd exports about 170MW and 400 MVAR during light load conditions.
33 24 TABLE 6.1 Summary of PECO/LF Simulation Results 1996 Light Load 1995 Summer Peak Load 1995 Winter Peak Load , 345,230, 69, ,345, 230,69, ,345, 230,69, ,280 4, ,172 3, ,508 3, ,426 6,291 4,006 18,04.8 8, ,611 3,056 (252) 81 15,061 3,037 3,553 14,825 5, , Default values Default values Default values Itema A. System Components Total no. of buses Total no. of lines Total no. of transformers No. of phase shifters DC lines Voltage levels (kv) B. Supply-Demand Characteristics Generation MW MVAR Shunt static MVAR Load MW MVAR Losses MW % MVAR Line charging MVAR Net export (import) MW MVAR C. Violations No. of overloaded lines No. of low-voltage buses No. of high-voltage buses D. Convergence Characteristics No. of iterations Solution time (s) Convergence tolerance E. Simulation Accuracy Relative to PTI Line MW flows Percentage of lines within 2% dev Percentage of lines within 5% dev Average deviations (76) Line MVA flows Percentage of lines within 2% dev Percentage of lines within 5% dev Average deviations (%) Bus voltage magnitude Percentage of buses within 2% dev Bus voltage angles Averaxe deviations (%) a dev = deviation.
34 25 During the summer peak load conditions, ComEd imports about 252 M W but continues to export MVARs. System loss is about 3.5 times the amount experienced during light load, but these ratings remain at about a 2% level. Peak load conditions required the injection of about 4,000 MVARs from shunt capacitors across the system. The shunt capacitor banks supply nearly 40% of the total inductive VAR requirements of the system. The remaining 60% is supplied by the generators. Voltage in practically all buses is within the 0.95 to 1.05 operating band, which is consistent with the system planning criteria. No overloaded lines were identified. ComEd s operation and planning criteria are described in detail in Appendix G. This appendix provides further information on how the system is designed and operated. 6.2 SIMULATION ACCURACY RELATIVE TO PTI RESULTS A line-by-line and bus-by-bus comparison program was developed to compare PECOLF results with the PTI solved reference case. Accuracy with respect to PTI was expressed in terms of the percentage of elements (either lines or buses) in PECOLF whose values matched those of PTI s within a specified deviation tolerance. The results of this comparison are summarized in Section E of Table 6.1. As can be seen in Table 6.1, 91-95% of the lines in PECOLF model had MW flows within a 2% deviation of PTI values. Within a 5% deviation tolerance, the percentage of lines correspondingly increased to about 9598%. This 95-98% set was composed mainly of significantly loaded lines (Le., lines whose loading levels are above 5 MW). Similar observations can be made for MVA flows. The voltage profile demonstrates an even better match; 100% of the buses had voltage magnitudes within a 2% deviation. For voltage angles, the average deviation was 3-7.4%. All generators had real power outputs within a 2% deviation, and 97-98% of them had power factors within a 2% deviation. However, deviations in MVAR dispatch among generators were substantial, ranging from 2.6% to 144%. A more detailed comparison of the outputs on a line-byline basis (light load case) is presented in Appendix D. A detailed bus-by-bus comparison is presented in Appendix E. Factors that most likely caused the discrepancies in MVAR flows follow: 1. The tap positions of LTCs need to be further adjusted to improve the voltage profile of remotely controlled nodes. Tap positions affect voltage magnitudes and consequently the amount of MVAR available in the system. 2. Round-off errors in MVAR loads can accumulate to as much as 30 MVARs and magnify the impact of these loads on individual generator dispatch.
35 26 3. Line shunts, which were modeled explicitly in PTI, were neglected in PECOLF, because of their small values (less than 0.3 MVAR), but they can aggregate to as much as 30 MVARS. Further adjustments to the magnitude of the generator terminal voltages can be made to alter MVAR dispatch. Increasing the magnitude of desired generator voltages will increase MVAR injection; doing the reverse will have an opposite effect.
36 27 7 SINGLE-LINE DIAGRAMS 7.1 DESCRIPTION OF SINGLE-LINE DIAGRAMS To complement the load flow analysis, two sets of ComEd system single-line diagrams (SLDs) were submitted. The small diagrams (approximately 1 ft by 2 ft) represented the 1995 configuration of the ComEd system. The lage diagrams (approximately 2 ft by 3 ft) depicted the ComEd system in The small diagrams, although more current, did not clearly present the labels and other details of system connections. However, their reduced scale allowed viewers to get a better perspective of the system. The large diagrams used much clearer and larger labels and symbols. The set of small diagrams consisted of 22 sheets. Each sheet had a number and x and y labels to define the coordinates for any particular element on the sheet. The set included a directory page listing the names of the substations and generation stations, the number of the sheet on which each appears, and the x and y coordinates defining the location within the sheet. Annotations were made on the small diagrams to include PECOLF bus numbers next to full bus names. The original large diagram set consisted of 11 sheets without x and y labels. No directory page accompanied the set. To define locations of the various system elements, x and y labels were developed, with the x axis consisting of numbers and the y axis consisting of letters. To make the diagrams even more usable, a directory was developed to link the various substations, taps, and generation stations to the load flow model and to provide a means of locating specific substations in the drawing more conveniently. This single-line diagram (SLD) directory is described in the next section. 7.2 DIRECTORY FOR SINGLE-LINE DIAGRAMS AND LOAD FLOW MODELS The main function of the SLD directory is to associate the bus names (in all three base load cases) to their corresponding locations in the small and large diagrams. The directory contains the following information: (1) complete bus name, (2) PTI load flow model bus number, (3) PECO load flow model bus number, (4) abbreviated PECO bus name, (5) station number as assigned by ComEd, (6) location in small diagram, and (7) location in large diagram. The directory was developed by using information from the MAIN data dictionary, PECOLF input data, PTI/LF input data, and x and y coordinates on the small and large diagrams. Hard copies of the directory (light load case) are presented in Appendix F. The directory can appear in five forms, depending on the field used to index the data. The directory may be indexed by complete bus name, PECOLF bus name, station number, voltage level, or PECOLF bus number.
37
38 29 8 INFORMATION QUERY SYSTEM An information query system was developed to support the power flow modeling and simulation work. The main purpose of the query system is to consolidate the various electronic data generated during the implementation of the project. It is also intended to format and organize the various outputs. The main function of the query system is to allow users to view and browse through information from pertinent *databases and ASCII files. The system also includes limited editing functions. A search feature is included to allow for quick access to specific information. The query system consists of four main modules: (1) PTI data structure, (2) PECO data structure, (3) SLD directory, and (4) system description. A more detailed description of the query system is presented in Appendix I.
39 30 9 SUMMARY AND CONCLUSIONS This report summarizes the completion of validated load flow case studies that can now be used to assist NELO in applications for other operational areas of interest. Load flow data, which were originally in PTI-PSSE format, were converted to PECOLF format. Validation of the data and model were completed by using various auxiliary programs and information from known published sources. The model must be used with the understanding that the interties have been modeled as fixed local loads of the boundary buses. System simulations covering light, winter peak, and summer peak load conditions were undertaken. Overall, the model simulation results for 91-95% of the significantly loaded elements were accurate to within a 2% deviation from the reference values. The annotated SLDs are an important aid in understanding the connections and bus designs of substations. The x and y coordinates developed for the diagrams are most useful for locating these substations, especially when they are used in conjunction with the SLD directory. Photographic images further assist users in understanding the nature and configuration of system components. All relevant information pertaining to the power flow modeling and simulation of the ComEd system can be accessed via the information query system developed for the study. The query system provides a flexible foundation for even more comprehensive information retrieval or editing capabilities. In addition, the system can be easily adapted to represent any electrical system and its associated load flow and technical information. Finally, as a result of the completion of the load flow cases and the accompanying software, a basis has been established for potential developments of missing data heuristics. Data limitations are frequently very problematic with respect to constructing representative load flow simulations. However, the case study developed for this effort could provide sufficient logical links between known system component characteristics and visual images and thereby support heuristic estimates of the operating parameters for unknown or uncertain components.
40 31 10 BIBLIOGRAPHY Debs, A., 1988, Modern Power Systems Control and Operations, Kluwer Academic Publishers. Electric Power and Light, 1995, EL&P Electric Utility Industry Directory, Pennwell Publishing Company. Electrical World, 1992, Electrical World Directory of Electric Utilities 1993 Edition, McGrawHill, Inc., New York, N.Y. EPRI, 1980, Bundled Circuit Design for kv Compact Transmission Lines, Vol. 1: Electric Power Research Institute, Palo Alto, Calif., Feb. EPRI, 1982, Transmission Line Reference Book, 345 kv and above, Second Edition, Electric Power Research Institute, Palo Alto, Calif. Kundur, P., 1994, Power Systems Stability and Control, McGraw-Hill, Inc. PMJ, 1988, PMJ Power System Analysis Package, Version 5.01, User s Guide, Capacity and Transmission Planning Subcommittee, Pennsylvania-New Jersey-Maryland Interconnection, June. PTI, 1994, Introduction to PSSE Power Flow and Steady State Analysis, Power Technologies Incorporated, Schenectady, N.Y., Sept.
LAB1 INTRODUCTION TO PSS/E EE 461 Power Systems Colorado State University
LAB1 INTRODUCTION TO PSS/E EE 461 Power Systems Colorado State University PURPOSE: The purpose of this lab is to introduce PSS/E. This lab will introduce the following aspects of PSS/E: Introduction to
Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3
Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3 Basics of Power systems Network topology Transmission and Distribution Load and Resource Balance Economic Dispatch Steady State System
Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives. Final Report
Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives (Required per CPUC Decision No. C10-1328) Final Report (Submitted with Public Service s 2011 ERP) Executive Summary The objective
Introduction to PowerWorld Simulator: Interface and Common Tools
Introduction to PowerWorld Simulator: Interface and Common Tools 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 [email protected] http://www.powerworld.com Fault Analysis Analysis
OPTIMAL DISPATCH OF POWER GENERATION SOFTWARE PACKAGE USING MATLAB
OPTIMAL DISPATCH OF POWER GENERATION SOFTWARE PACKAGE USING MATLAB MUHAMAD FIRDAUS BIN RAMLI UNIVERSITI MALAYSIA PAHANG v ABSTRACT In the reality practical power system, power plants are not at the same
Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055
Generation Interconnection Feasibility Study Report-Web Version For PJM Generation Interconnection Request Queue Position Z1-055 South Bend Generation Project March 2014 PJM Interconnection 2014. All rights
PowerWorld Simulator
PowerWorld Simulator Quick Start Guide 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 [email protected] http://www.powerworld.com Purpose This quick start guide is intended to
Power Technology Issue 106. Modeling of Three-Winding Voltage Regulating Transformers for Positive Sequence Load Flow Analysis in PSS E
SIEMENS Siemens Energy, Inc. Power Technology Issue 106 Modeling of Three-Winding Voltage Regulating Transformers for Positive Sequence Load Flow Analysis in PSS E Carlos Grande-Moran, Ph.D. Principal
Load Dispatcher (Class Code 5223) Task List
A. Load Dispatching, General Load Dispatcher (Class Code 5223) Task List 1. Prior to work shift speaks to Load Dispatcher(s), reviews hardcopy and computer logs, and looks at the dispatcher's diagram board
Radial Distribution Test Feeders
Radial Distribution Test Feeders Distribution System Analysis Subcommittee Report Abstract: Many computer programs are available for the analysis of radial distribution feeders. In 1992 a paper was published
Record Specification and File Format for Specifying Contingency Definitions and Remedial Actions Schemes
Record Specification and File Format for Specifying Contingency Definitions and Remedial Actions Schemes Date : October 22, 2013 December 6, 2013 January 21, 2015 August 28, 2015 November 6, 2015, November
4.1.1 Generator Owner 4.1.2 Transmission Owner that owns synchronous condenser(s)
A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure
SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD
SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD HOLLAND CLIFF HEWITT ROAD 230 KV TRANSMISSION LINE PROJECT ELECTRIC ALTERNATIVE EVALUATION STUDY BLACK & VEATCH CORPORATION B&V Project 146026(G)
Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process
Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process Presented by: Marianne Mannschreck Date: Welcome A Look at the Net Energy Metering
Power System Simulation for Engineers (PSS/E version 33)
Power System Simulation for Engineers (PSS/E version 33) Here are instructions for accessing and using the PSS/E-33 software. On-campus students should access this software at any of the computers in the
Power Technology Issue 104. Modeling of Two-Winding Voltage Regulating Transformers for Positive Sequence Load Flow Analysis in PSS E
SIEMENS Siemens Energy, Inc. Power Technology Issue 104 Modeling of TwoWinding Voltage Regulating Transformers for Positive Sequence Load Flow Analysis in PSS E Carlos GrandeMoran, Ph.D. Principal Consultant
Steady-State Power System Security Analysis with PowerWorld Simulator
Steady-State Power System Security Analysis with PowerWorld Simulator S: Power System Modeling Methods and Equations 00 South First Street Champaign, Illinois 680 + (7) 384.6330 [email protected]
COMPARISON OF THE FACTS EQUIPMENT OPERATION IN TRANSMISSION AND DISTRIBUTION SYSTEMS
COMPARISON OF THE FACTS EQUIPMENT OPERATION IN TRANSMISSION AND DISTRIBUTION SYSTEMS Afshin LASHKAR ARA Azad University of Dezfoul - Iran [email protected] Seyed Ali NABAVI NIAKI University of Mazandaran
Fault Analysis I13-1. 2008 PowerWorld Corporation
Fault Analysis Analysis of power system parameters resulting from a ground or line to line fault somewhere in the system Simulator contains a tool for analyzing faults in an automatic fashion Can perform
Contouring and Advanced Visualization
Contouring and Advanced Visualization Contouring Underlay your oneline with an image Geographic Data Views Auto-created geographic data visualization Emphasis of Display Objects Make specific objects standout
FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003
F R C C FRCC Standards Handbook FRCC Automatic Underfrequency Load Shedding Program Revision Date: July 2003 FRCC Underfrequency Load Shedding Program Modification and Approval Process Requests to modify
Voltage Stability Improvement using Static Var Compensator in Power Systems
Leonardo Journal of Sciences ISSN 1583-0233 Issue 14, January-June 2009 p. 167-172 Voltage Stability Improvement using Static Var Compensator in Power Systems Department of Electrical/Computer Engineering,
SAMPLE OF THE STUDY MATERIAL PART OF CHAPTER 3. Symmetrical Components & Faults Calculations
SAMPLE OF THE STUDY MATERIAL PART OF CHAPTER 3 3.0 Introduction Fortescue's work proves that an unbalanced system of 'n' related phasors can be resolved into 'n' systems of balanced phasors called the
IESO Supply Deliverability Guidelines
PUBLIC IMO_GDL_0021 IESO Supply Deliverability Guidelines Issue 3.0 This document is to be used to evaluate long-term system adequacy and connection assessments Public Disclaimer The posting of documents
Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas
Electric Power Systems An Overview Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Overview Power Generation Conventional power generation Power generation from renewables
Power System Simulation for Engineers (PSS/E): Fault Analysis
Power System Simulation for Engineers (PSS/E): Fault Analysis Table of contents: A. GENERAL INSTRUCTIONS 1 B. REQUIRED DATA 2 C. READING AN EXISTING CASE 2 D. SAVING A CASE 4 E. CREATING A NEW CASE 4 F.
A Direct Numerical Method for Observability Analysis
IEEE TRANSACTIONS ON POWER SYSTEMS, VOL 15, NO 2, MAY 2000 625 A Direct Numerical Method for Observability Analysis Bei Gou and Ali Abur, Senior Member, IEEE Abstract This paper presents an algebraic method
Chapter 3 AUTOMATIC VOLTAGE CONTROL
Chapter 3 AUTOMATIC VOLTAGE CONTROL . INTRODUCTION TO EXCITATION SYSTEM The basic function of an excitation system is to provide necessary direct current to the field winding of the synchronous generator.
Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering
Title 20 PUBLIC SERVICE COMMISSION Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES Chapter 02 Engineering Authority: Public Utility Companies Article, 2-121, 5-101 and 5-303, Annotated Code of Maryland.
VOLTAGE CONTROL IN DISTRIBUTION SYSTEMS AS A LIMITATION OF THE HOSTING CAPACITY FOR DISTRIBUTED ENERGY RESOURCES
VOLTAGE CONTROL IN DISTRIBUTION SYSTEMS AS A LIMITATION OF THE HOSTING CAPACITY FOR DISTRIBUTED ENERGY RESOURCES C. Schwaegerl*, M.H.J. Bollen, K. Karoui #, A. Yagmur + *Siemens AG, # Tractebel STRI AB
Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid
Pakistan Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid Final Report: Executive Summary - November 2015 for USAID Energy Policy
Reactive Power and Importance to Bulk Power System OAK RIDGE NATIONAL LABORATORY ENGINEERING SCIENCE & TECHNOLOGY DIVISION
Reactive Power and Importance to Bulk Power System OAK RIDGE NATIONAL LABORATORY ENGINEERING SCIENCE & TECHNOLOGY DIVISION Outline What is Reactive Power and where does it come from? Why is it important?
Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP
Grid Interconnection & Contract Development Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP Submittal Instructions Prior to submitting your application and
Power Technology Issue 106
SIEMENS Siemens Energy, Inc. Power Technology Issue 106 Customized Data Validation in PSS E Lu Wang, Ph.D. Staff Software Engineer [email protected] Introduction PSS E users maintain huge amounts of
MINISTERIE VAN ECONOMISCHE ZAKEN GENERAL COST COMPARISON BETWEEN UNDERGROUND CABLES AND O.H. LINE SYSTEMS FOR H.V. TRANSMISSION
MINISTERIE VAN ECONOMISCHE ZAKEN GENERAL COST COMPARISON BETWEEN UNDERGROUND CABLES AND O.H. LINE SYSTEMS FOR H.V. TRANSMISSION REPORT ON NETWORK RELIABILITY ASPECTS OF THE CHOICE LINE VERSUS CABLE FOR
GLOSSARY. Glossary of Terms for Capacity Based Demand Response PUBLIC. Issue 3.0 GOT-1
PUBLIC GOT-1 GLOSSARY Glossary of Terms for Capacity Based Demand Response Issue 3.0 This document provides a glossary of terms with definitions used in the Capacity Based Demand Response program. Public
Step Voltage Regulators
Step Voltage Regulators Don Wareham Field Application Engineer Today s Agenda Introduction Voltage Regulator theory Voltage Regulator application considerations Installation and proper bypassing Wrap-up/questions
Federal Wage System Job Grading Standards for Electric Power Controlling, 5407. Table of Contents
Federal Wage System Job Grading Standards for Electric Power Controlling, 5407 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 TITLES... 2 GRADE LEVELS... 2 SPECIAL ADDITIONAL RESPONSIBILITIES...
..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark...
..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark... TIME MARK CORPORATION 11440 EAST PINE STREET TULSA, OK 74116 USA tel 918 438-1220 fax 918 437-7584 www.time-mark.com
Summary of CIP Version 5 Standards
Summary of CIP Version 5 Standards In Version 5 of the Critical Infrastructure Protection ( CIP ) Reliability Standards ( CIP Version 5 Standards ), the existing versions of CIP-002 through CIP-009 have
IMPROVED NETWORK PARAMETER ERROR IDENTIFICATION USING MULTIPLE MEASUREMENT SCANS
IMPROVED NETWORK PARAMETER ERROR IDENTIFICATION USING MULTIPLE MEASUREMENT SCANS Liuxi Zhang and Ali Abur Department of Electrical and Computer Engineering Northeastern University Boston, MA, USA [email protected]
Estimating Line-Flow Limits
Estimating Line-Flow Limits University of Wisconsin-Madison May 1, 2013 Specifying reasonable line-flow limits requires two quantities: the surge impedance loading for the line and an estimate of the line
COMPARISON OF INDIRECT COST MULTIPLIERS FOR VEHICLE MANUFACTURING
COMPARISON OF INDIRECT COST MULTIPLIERS FOR VEHICLE MANUFACTURING Technical Memorandum in support of Electric and Hybrid Electric Vehicle Cost Estimation Studies by Anant Vyas, Dan Santini, and Roy Cuenca
Selecting Current Transformers Part 1 By Darrell G. Broussard, P.E.
By Darrell G. Broussard, P.E. Introduction: As engineers, we are aware that electrical power systems have grown. How much have they grown? When was the last time you specified a 2400-volt system, a 4160-volt
Introduction to Paralleling of LTC Transformers by the Circulating Current Method
TAPCHANGER CONTROLS Application Note #11 Introduction to Paralleling of LTC Transformers by the Circulating Current Method 1.0 ABSTRACT This Application Note discusses the elements of paralleling load
The design and performance of Static Var Compensators for particle accelerators
CERN-ACC-2015-0104 [email protected] The design and performance of Static Var Compensators for particle accelerators Karsten Kahle, Francisco R. Blánquez, Charles-Mathieu Genton CERN, Geneva, Switzerland,
Secure SCADA Communication Protocol Performance Test Results
PNNL-17118 Secure SCADA Communication Protocol Performance Test Results M.D. Hadley K.A. Huston August 2007 Prepared for U.S. Department of Energy Office of Electricity Delivery and Energy Reliability
Physical Address: City: State: Zip Code:
Application for Small Generator Facility Interconnection Tier 2, Tier 3 or Tier 4 Interconnection (For Small Generator Facilities with Electric Nameplate Capacities of 10 MW and less) Applicant Contact
CONSULTANT REPORT. Behavior of Two Capstone 30kW Microturbines Operating in Parallel with Impedance Between Them CALIFORNIA ENERGY COMMISSION
CALIFORNIA ENERGY COMMISSION Behavior of Two Capstone 3kW Microturbines Operating in Parallel with Impedance Between Them CONSULTANT REPORT MARCH 2 CEC-2-2 Arnold Schwarzenegger, Governor CALIFORNIA ENERGY
Modelling framework for power systems. Juha Kiviluoma Erkka Rinne Niina Helistö Miguel Azevedo
S VISIONS SCIENCE TECHNOLOGY RESEARCH HIGHLIGHT 196 Modelling framework for power systems Juha Kiviluoma Erkka Rinne Niina Helistö Miguel Azevedo VTT TECHNOLOGY 196 Modelling framework for power systems
16 West Coast Regional Plan
16 West Coast Regional Plan 16.1 Regional overview 16.2 West Coast transmission system 16.3 West Coast demand 16.4 West Coast generation 16.5 West Coast significant maintenance work 16.6 Future West Coast
Basic Electrical Technology Dr. L. Umanand Department of Electrical Engineering Indian Institute of Science, Bangalore. Lecture - 33 3 phase System 4
Basic Electrical Technology Dr. L. Umanand Department of Electrical Engineering Indian Institute of Science, Bangalore Lecture - 33 3 phase System 4 Hello everybody. So, in the last class we have been
Recommended Practice for Software Acquisition
Recommended Practice for Software Acquisition PSIG 003/2000 Objective: To develop a set of practices that may be used in the acquisition of pipeline simulation software. Pipeline Simulation Interest Goup,
Hybrid processing of SCADA and synchronized phasor measurements for tracking network state
IEEE PES General Meeting, Denver, USA, July 2015 1 Hybrid processing of SCADA and synchronized phasor measurements for tracking network state Boris Alcaide-Moreno Claudio Fuerte-Esquivel Universidad Michoacana
Impedance Matching. Using transformers Using matching networks
Impedance Matching The plasma industry uses process power over a wide range of frequencies: from DC to several gigahertz. A variety of methods are used to couple the process power into the plasma load,
Voltage regulation in distribution systems - Tap changer and Wind Power
CODEN:LUTEDX/(TEIE-5270)/1-59/(2010) Industrial Electrical Engineering and Automation Voltage regulation in distribution systems - Tap changer and Wind Power David Sáez Romero D of Industrial Electrical
Modeling and Testing of Unbalanced Loading and Voltage Regulation
National Renewable Energy Laboratory Innovation for Our Energy Future A national laboratory of the U.S. Department of Energy Office of Energy Efficiency & Renewable Energy Modeling and Testing of Unbalanced
Effective: September 10, 2006 Vermont Attachment 1 to Rule 5.500 Public Service Board Page 1 of 6
Public Service Board Page 1 of 6 STANDARD APPLICATION FOR INTERCONNECTION OF GENERATION RESOURCES IN PARALLEL TO THE ELECTRIC SYSTEM OF: (Interconnecting Utility) Preamble and Instructions: An owner of
Dynamic Security Assessment in the Future Grid. Vijay Vittal Ira A. Fulton Chair Professor Arizona State University
1 Dynamic Security Assessment in the Future Grid Vijay Vittal Ira A. Fulton Chair Professor Arizona State University 2 Key requirements for DSA Need to perform DSA as close to real time as possible Need
TERMS AND CONDITIONS
Virginia Electric and Power Company TERMS AND CONDITIONS XXIV. GENERATOR INTERCONNECTION STANDARD Electric generator interconnection service includes only the ability to interconnect an electric generator
WINDING RESISTANCE TESTING
WINDING RESISTANCE TESTING WINDING RESISTANCE TEST SET, MODEL WRT-100 ADWEL INTERNATIONAL LTD. 60 Ironside Crescent, Unit 9 Scarborough, Ontario, Canada M1X 1G4 Telephone: (416) 321-1988 Fax: (416) 321-1991
CO-ORDINATION OF PARALLEL AC-DC SYSTEMS FOR OPTIMUM PERFORMANCE
CO-ORDINATION OF PARALLEL AC-DC SYSTEMS FOR OPTIMUM PERFORMANCE Ana Diez Castro & Rickard Ellström Ying Jiang Häfner Christer Liljegren Vattenfall Utveckling AB ABB Power Systems Gotlands Energiverk AB
Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.
Generation Interconnection System Impact Study Report For PJM Generation Interconnection Request Queue Position X1-114 Sandyston January 2012 Preface The intent of the System Impact Study is to determine
Preliminary Feasibility Assessment For. The Rio Tinto Alcan to BCH Transfer Limit of 460 MW. With 50% Series Compensation on Both KMO KIT lines
Preliminary Feasibility Assessment For The Rio Tinto Alcan to BCH Transfer Limit of 460 MW With 50% Series Compensation on Both KMO KIT lines Report : ASP2010-T001 July 2010 Asset Strategy & Planning,
COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited
PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date
Scope of Restoration Plan
RWG Area Restoration Review Worksheet (10/28/09) EOP-006-02 Directory 8 EOP-005 NYSRG Rule G Text Restoration Plan Requirement R1.Each Reliability Coordinator shall have a Reliability Coordinator Area
Wide Area Monitoring Current Continental Europe TSOs Applications Overview
Wide Area Monitoring Current Continental Europe TSOs Applications Overview Version 5 System Protection & Dynamics Working Group 20th September 2015 1. Content 1. Content... 2 2. Introduction... 3 3. Main
Guidelines for ATS selection: How to choose the right transfer solution for your power application.
Power topic #7012 Technical information from Cummins Power Generation Inc. Guidelines for ATS selection: How to choose the right transfer solution for your power application. > White Paper By Gary Olson,
Generator Interconnection and Deliverability Study Methodology Technical Paper
Generator Interconnection and Deliverability Study Methodology Technical Paper July 2, 2013 Generator Interconnection and Deliverability Study Methodology Table of Contents Introduction... 1 Section One:
Multiregional Modeling Working Group (MMWG) Procedural Manual
SC MC MMWG Eastern Interconnection Reliability Assessment Group Multiregional Modeling Working Group (MMWG) Procedural Manual Version 14 Version History Original: November 8, 2007 Version 2: April 10,
Together we create reliable products, thus ensuring development of power industry of continents.
PRODUCT CATALOGUE Together we create reliable products, thus ensuring development of power industry of continents. By continuous improvement we transform our knowledge, energy and experience of the generations
SHE Transmission. 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015
SHE Transmission 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015 Summary This paper presents SHE Transmission s views and approach on the impact of transmission losses on the transmission
Rotary Phase Converters
FACTS from Ronk Electrical Industries, Inc. Bulletin 11981 Rotary Phase Converters ROTOVERTER Pat. No. 3,670,238 ROTO-CON Pat. No. 4,158,225 What are the ROTO-CON and ROTOVERTER power converters? The ROTO-CON
ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe
NETWORKS ESB Networks Response to ERGEG Consultation on Voltage Quality Regulation in Europe Date: 22 February 2007 Distribution System Operator ESB Networks Page 1 of 12 Contents 1.0 INTRODUCTION...3
Nuclear Power Plant Electrical Power Supply System Requirements
1 Nuclear Power Plant Electrical Power Supply System Requirements Željko Jurković, Krško NPP, [email protected] Abstract Various regulations and standards require from electrical power system of the
Chapter 9 Balanced Faults
Chapter 9 alanced Faults 9.1 Introduction The most common types of fault are (in order) single-line-to-ground fault, line-to-line fault, and double-line-to-ground fault. All of these are unbalanced faults.
GPS Interfacing of Banediya Feeder (M.P) Using MI Power Software
GPS Interfacing of Banediya Feeder (M.P) Using MI Power Software Swati Paliwal 1, V.K Tayal 2, H.P Singh 3 Assistant professor, Department of Electrical & Electronics Engineering, Northern India Engineering
When designing. Inductors at UHF: EM Simulation Guides Vector Network Analyzer. measurement. EM SIMULATION. There are times when it is
Inductors at UHF: EM Simulation Guides Vector Network Analyzer Measurements John B. Call Thales Communications Inc., USA When designing There are times when it is circuits for necessary to measure a operation
Modeling of Transmission Lines
Modeling of Transmission Lines Electric Power Transmission The electric energy produced at generating stations is transported over high-voltage transmission lines to utilization points. The trend toward
CLASS Voltage Regulation Scheme. 27 February 2014
CLASS Voltage Regulation Scheme 27 February 2014 Functional Specifications and Voltage Regulation Scheme for the Autonomous Substation Controllers (ASCs) Date: 27 February 2014 Page 2 of 26 Table of Contents
SIMULATING HYBRID ENERGY GRIDS IN SMART CITIES FOCUS ON ELECTRIC ENERGY SYSTEMS
Sawsan Henein AIT Austrian Institute of Technology Electric Energy Systems Research Group SIMULATING HYBRID ENERGY GRIDS IN SMART CITIES FOCUS ON ELECTRIC ENERGY SYSTEMS Sustainable Places 2015 Savona,
Overview of the IESO-Administered Markets. IESO Training. Updated: January, 2014. Public
Overview of the IESO-Administered Markets IESO Training Updated: January, 2014 Public Overview of the IESO-Administered Markets AN IESO TRAINING PUBLICATION This guide has been prepared to assist in the
APPLICATION NOTE. Increasing PV Hosting Capacity on LV Secondary Circuits with the Gridco System empower TM Solution
APPLICATION NOTE Increasing PV Hosting Capacity on LV Secondary Circuits with the Gridco System empower TM Solution INCREASING PV HOSTING WITH EMPOWER TM SOLUTION Executive Summary Distributed solar photovoltaic
CHAPTER 1 INTRODUCTION
CHAPTER 1 INTRODUCTION Power systems form the largest man made complex system. It basically consists of generating sources, transmission network and distribution centers. Secure and economic operation
A progressive method to solve large-scale AC Optimal Power Flow with discrete variables and control of the feasibility
A progressive method to solve large-scale AC Optimal Power Flow with discrete variables and control of the feasibility Manuel Ruiz, Jean Maeght, Alexandre Marié, Patrick Panciatici and Arnaud Renaud [email protected]
Transmission Planning Standards for the Baltimore Gas & Electric Company Transmission System
Transmission Planning Standards for the Baltimore Gas & Electric Company Transmission System Prepared By: Transmission Planning Unit Baltimore Gas & Electric Company Table of Contents 1. INTRODUCTION
Guidelines for Monthly Statistics Data Collection
Guidelines for Monthly Statistics Data Collection Final version Data Expert Group 31 May 2015 1. Table of contents 1. Table of contents... 2 2. Remarks... 3 3. Introduction... 3 4. Geographical perimeter
PacifiCorp Original Sheet No. 476 FERC Electric Tariff, Substitute 6 th Rev Volume No. 11 APPENDIX 2 TO SGIP
PacifiCorp Original Sheet No. 476 APPENDIX 2 TO SGIP SMALL GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: Designated Contact Person: Address: Telephone Number: An Interconnection
General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System
General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System Direction Planification des actifs et expertise de transport February 2011 TABLE OF CONTENTS 1. CONDUCTING
THE PER-UNIT SYSTEM. (2) The per-unit values for various components lie within a narrow range regardless of the equipment rating.
THE PER-UNIT SYSTEM An interconnected power system typically consists of many different voltage levels given a system containing several transformers and/or rotating machines. The per-unit system simplifies
Requirements for Offshore Grid Connections. in the. Grid of TenneT TSO GmbH
Requirements for Offshore Grid Connections in the Grid of TenneT TSO GmbH Bernecker Straße 70, 95448 Bayreuth Updated: 21 December 2012 1/10 Requirements for Offshore Grid Connections in the Grid of TenneT
BIASING OF CONSTANT CURRENT MMIC AMPLIFIERS (e.g., ERA SERIES) (AN-60-010)
BIASING OF CONSTANT CURRENT MMIC AMPLIFIERS (e.g., ERA SERIES) (AN-60-010) Introduction The Mini-Circuits family of microwave monolithic integrated circuit (MMIC) Darlington amplifiers offers the RF designer
Conservation Voltage Reduction (CVR)
Conservation Voltage Reduction (CVR) Nicholas Abi-Samra Senior Vice President October 15, 2013 DNV GL Energy Table of Contents What does CVR do? Why Does CVR Work? DNV GL s CVR Project Experience Needs
1 Introduction. 2 The Symmetrical Component Transformation. J.L. Kirtley Jr.
Massachusetts Institute of Technology Department of Electrical Engineering and Computer Science 6.06 Introduction to Power Systems Class Notes Chapter 4 Introduction To Symmetrical Components J.L. Kirtley
STATCOM Application at VELCO Essex Substation
STATCOM Application at VELCO Essex Substation Gregory Reed John Paserba Terrence Croasdaile Mitsubishi Electric Power Products, Inc. Warrendale, Pennsylvania, USA Masatoshi Takeda Naoki Morishima Yoshi
SC Series: MIS Chip Capacitors
DATA SHEET SC Series: MIS Chip Capacitors Applications Systems requiring DC blocking or RF bypassing Fixed capacitance tuning element in filters, oscillators, and matching networks Features Readily available