1 Further information Skanska AB Contact Noel Morrin, Senior Vice President Sustainability A2 Pepperhill to Cobham Highway Widening project, UK Case Study 40 Aspects of Sustainability This project highlights the following: The A2 highway widening project in Kent, UK, has improved road safety, reduced congestion, boosted the regional economy and mitigated the potential impacts on sensitive species. Social Aspects Human Resources Corporate Community Involvement Business Ethics Health and Safety Environmental Aspects Energy and Climate Materials Ecosystems Local Impacts Economic Aspects Project Selection Supply Chain Value Added Project Introduction The A2 highway between the Pepperhill and Cobham junctions in Kent, UK, has been partially relocated and widened. The section of highway is 7km long and carries over 110,000 vehicles per day. The old stretch of highway was severely congested during peak hours, suffered frequent accidents and ran close to the town of Gravesend, significantly disrupting local residents. Congestion was forecast to worsen as traffic volumes continue to increase and as the Kent Thameside regeneration project progresses. Skanska is carrying out the US$ 242 million project for the Highways Agency, and is scheduled for completion in early spring The project was implemented as a Highways Agency Early Contractor Involvement initiative. Skanska was involved in the planning, design and management of the entire project, which has involved widening the highway from three to four lanes in both directions as part of a strategy to provide a consistent standard of highway from the M25 to the M2 in Kent. The existing A2 route between Pepperhill and Marling Cross has been relocated south away from Gravesend, adjacent to the Channel Tunnel Rail Link, and the stretch between Marling Cross and Cobham has been widened. The redundant stretch of highway close to Gravesend has been landscaped to provide a green corridor. The area is of archaeological interest and the adjacent Shorne and Ashenbank Woods, which is a Site of Special Scientific Interest, is home to protected and endangered species, such as badgers and great crested newts. As a major transport route linking London with Dover and Continental Europe, the project could have had serious economic consequences if not properly managed.
2 Contributing Toward Sustainable Development The A2 improvement has reduced journey times, enhanced safety and reduced disruption for the residents of Gravesend. The project has also improved run-off quality from highway drainage, sustainable transport provision and has enhanced biodiversity in the area. During design and construction, local stakeholders were informed and involved in the project, and public disruption was avoided as much as possible. The project had an exemplary occupational safety record and strived to create good relationships with all project partners and staff. Charitable community donations were made and local schools have been involved in the project. An archaeological study documented and preserved archaeological remains unearthed during the project. The project promoted regional economic development by employing local people, materials and services. Environmental impacts were minimised during construction and special mitigation plans were implemented to manage waste, safely deal with asbestos and to ensure that protected species were not compromised. Social Aspects Stakeholder involvement and communication As part of the Early Contractor Involvement initiative, Skanska was responsible for developing the design and managing the public inquiry process. Skanska organised a series of public meetings attended by over 2,200 people and developed the design accordingly with the local authorities. The highway was open throughout construction and public communication was a vital component of the project. Skanska appointed a public liaison officer to manage a public information strategy, which included a telephone information line, project newsletters distributed among the surrounding communities and media coverage of potentially disruptive road works. The Highways Agency website advised the public on lane closures and potential traffic disruptions, allowing motorists to receive updates. Skanska signed up to the Considerate Constructors Scheme and the project fulfilled the Scheme s requirements for being considerate to the public. with over 80 million vehicle movements through the site to the end of August However, reduced speed limits and restricted junction access were unavoidable consequences of the project. The project was planned to minimise the effects on local people by maintaining public walking, cycling and vehicular rights of way or by providing alternative routes. Project partner collaboration The project team strived to create a friendly and productive working environment by using open and transparent site communications, not applying excessive or unrealistic pressures to get work done and by encouraging managers and supervisors to be out on site. Consequently, the team received positive feedback from subcontractors who felt they were valued and fairly treated. Occupational health and safety As of August 2008, 1.4 million hours had been worked with no major injuries and no accidents resulting in more than 2 days of lost time. The project induction was longer than normal, which allowed health and safety staff to fully brief the team and demonstrated a genuine commitment toward the prevention of accidents. Small washproof cards were provided to the induction attendees listing emergency contact information. Minimising public disruption during construction Dual three-lane traffic flow was maintained throughout the project during peak hours due to the socio-economic importance of the A2 route,
3 The Near Miss initiative encouraged workers to report over 800 near miss incidents throughout the project, and helped to address many safety and operational issues before they resulted in incidents. Project specific safety considerations included the enforcement of 80 km/h highway speed restrictions during roadside construction activities. Motorist safety The old highway had a poor safety record, with 285 personal injury accidents and 1 fatal accident on the 7km route between July 1998 and June This was largely the result of substandard access onto the highway, which has been removed from the realigned and improved section. Computer modelling has estimated that the new design will prevent five fatalities, 28 serious injuries and 489 slight injuries in the first 30 years of operation. School education Skanska initiated project-related educational topics, such as local history, archaeology, safety and environmental management during presentations at local schools and school site visits. As of July 2008 approximately 420 children had visited the site and approximately 700 children had participated in presentations about the project at their schools. Skanska also organised educational school walks along the route at different stages of the construction. Reduced local resident disturbance The A2 has been relocated approximately 200m away from Gravesend town, and a low-noise surface and earth mounds have reduced noise disturbance by an average of 4.5 dba for 2,500 homes, and levels have halved for residents in over 250 properties. 400 properties have also been removed from the Air Quality Management Area as a result of the project. Minor increases in noise and air pollution for a small number of households were anticipated and weighed up against the benefit for the majority of local residents. Sustainable transport The redundant A2 route between Pepperhill and Marling Cross has been developed into a safe pedestrian, cycle and equestrian route, and is well connected to the new footbridges and existing local public rights of way. Existing footpaths have been widened and now incorporate cycleways. Archaeological study A team of archaeologists monitored the initial construction stages, to excavate and record any archaeologically significant finds. Topsoil was removed from an area 3 km long and 50 m wide for archaeological investigation. Archaeological finds included Neolithic tools over 10,000 years old, Bronze Age and medieval settlements, a Roman cemetery and three high status Roman burial sites. The Roman burial sites, dating from the 1st century AD, were among the best examples found in Britain and included bronze wear and pottery. The finds were displayed at an archaeological exhibition at Shorne Wood Country Park in May 2007, which invited local schools and attracted 1,400 visitors. Charitable donations Skanska organised fundraising events, made school improvements and donated to local charities. In spring 2008, a sponsored walk was organised for 600 children and their parents along the new highway, prior to opening, to raise money for their schools. School improvements included the redevelopment of a disused swimming pool into a playground, the construction of a mural wall to hide a local pub from the school s view and a playground extension. US$ 10,000 was donated to local organisations and charities, including a special needs school and a tree planting project. Economic Aspects Construction employment The project employed between 150 and 250 workers at different stages of the project. Well over half of the workforce was from the Kent area. Local materials and services 34 percent of the value of project materials and services were purchased from companies based within 30 km of the project, and 64 percent within 80 km. A local Gravesend company was contracted to undertake the structural concrete and reinforcement work and all trees and shrubs were sourced from a local nursery. Regional economic development The project is of significant strategic economic importance and is part of the government s continued investment in regional infrastructure to support economic development. The A2 widening project has reduced congestion and improved journey time reliability along the route. The project has also improved transport links to the Ebbsfleet International Railway Station and the Thames Gateway, which is the largest regeneration project in Europe.
4 Environmental Aspects Minimising environmental impacts during construction As part of the Early Contractor Involvement initiative Skanska was responsible for producing the Construction Environmental Management Plan to detail the environmental control, mitigation and compensation measures for the project, including water use, energy consumption and noise. The 4.5 million litres of water required each month for dust suppression during the earthworks and demolition activities were obtained from a borehole to reduce the burden on the public water supply. Site electricity consumption was within Action Energy s good practice guideline of 128 kwh/m 2 annually, and was estimated to be reduced by approximately a third in 2008 compared with 2007, equating to a saving of over 70 tonnes of carbon dioxide emissions. Noise disturbance during construction was below the normal levels from A2 traffic. Asbestos management Asbestos surveys were carried out for four houses, a hotel, two petrol filling stations and old highway structures that had to be demolished. Asbestos Containing Materials (ACMs) were identified in most of the structures and a report for each documented the location, quantity and type, along with recommended action for each material. The reports were submitted to the demolition subcontractor who safely removed all ACMs prior to demolition. Badger mitigation A badger survey identified five active setts close to the site. Three of which had to be closed, including a main sett, which required the construction of a replacement, and Skanska ensured that two other setts within 30m of the site were not disturbed. Natural England and a licensed badger specialist were consulted on the design of the artificial sett, which was constructed a year in advance of the main works to ensure that the overall construction programme was not affected. The new sett was constructed in the badger clan s territorial area and consisted of a network of plastic drainage pipes and chambers, constructed using untreated timber. The chambers and pipes were partially filled with soil and straw to encourage the badgers to dig and investigate the sett and many of the pipes were open ended to allow the badgers to form new tunnels and chambers. Temporary exclusion fencing and gates were used to gradually evict the badgers over a four-week period. The setts were then carefully excavated and a single remaining badger encouraged towards the new sett. Permanent badger fencing has been erected to prevent animals venturing onto the highway. Great crested newt mitigation Skanska conducted a biodiversity survey in 2004, which identified great crested newts, a protected species in the UK, on the northern verge of the A2 adjacent to the Shorne Wood Country Park. Mitigation plans were agreed with Natural England and carried out under the supervision of a licensed herpetologist. Preconstruction search and capture exercises were conducted, 1,200m of one-way reptile exclusion fencing was installed and maintained along the boundary of the park throughout the construction, and bucket traps were placed at 10 m intervals to trap and remove newts from construction areas. Vegetation in areas where winter construction activities were
5 scheduled was trimmed in October to make the area less desirable for amphibian hibernation. A cable trench within the amphibian habitat was dug under an existing footpath to reduce ground disturbance, and temporarily excavated soil was placed on protective mats on sub-optimal habitat. Promoting biodiversity The redundant section of highway has been developed into a 25 hectare green corridor for the residents of Gravesend by landscaping and planting 45,000 trees. 30,000 native trees and shrubs have also been planted in an 18 hectare area within the new highway boundary to blend the route into the surrounding environment. Wild flower meadows have been promoted to enhance biodiversity and to complement the adjacent natural habitats. A biodiversity net gain is expected to develop as the land lost to the project was agricultural and had little ecological value. Learning From Good Practice Skanska and the Highways Agency have benefited from the Early Contractor Involvement process, which allowed Skanska to develop an approach to the scheme, which integrated community work, environmental activities and archaeological investigations. Overall the scheme has delivered benefits to all interested parties and sets the standard for future projects with the Highways Agency. Improved water run-off quality A highway drainage system has been designed to minimise impacts on the water quality in the Ebbsfleet River and the underlying chalk aquifer, which is a source of potable water. The project has significantly improved the quality of water entering the aquifer as the previous highway provided no pollution control measures for road run-off. Six settlement ponds, with a capacity of 16,894 m 3, remove contaminated silt from road run-off and reed beds filter hydrocarbon and heavy metal pollutants. The highway is also equipped to contain accidental spills to prevent potentially dangerous substances reaching water systems. Waste management and recycling 96 percent of waste materials from the demolition and construction were either reused on-site or recycled off-site. Approximately 34,000m 3 of road planings and 50,000m 3 of crushed concrete were reused on the project or other projects. 235,000 m 3 of surplus excavated material was used to create 4km of landscaping along the redundant highway alongside the residential areas of Gravesend, which reduced the need to transport and dispose of the material off-site. Chalk excavated from the site was used for a 600mm capping layer, and reduced the need to import 154,800 m 3 of aggregate. Over 13km of redundant safety barrier was reused offsite, including in industrial parks and a tin mine. Lighting columns were reused on another Skanska highway project. Over 200 tonnes of scrap metal was recycled in total, and plastic and timber waste was recycled using local companies.
Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan
Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.
Development proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot
Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and
CONSTRUCTION SEQUENCE & PROGRAMME
CONSTRUCTION SEQUENCE & PROGRAMME 2 CONTENTS 1.0 Introduction 7 2.0 Key activities 8 2.1 Airport related activities 2.2 Construction of new roads and accesses 2.3 Earthworks zone a 2.4 Earthworks zone
Alphington sewer replacement
Alphington sewer replacement Frequently asked questions We understand you might have some questions for us so here are a few to provide you with more information. You are also welcome to call us on 1800
APPENDIX 4. Risk Tables
APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The
The Mersey Gateway Project
The Mersey Gateway Project The Mersey Gateway Project is a major scheme to build a new six-lane toll bridge over the River Mersey in the north west of England. It will link the towns of Runcorn and Widnes
Dorset Green SANGs Report
Dorset Green SANGs Report April 2012 FARRELLS Contents 1.0 Introduction 1.1 Accessible Green Spaces 2.0 SANGs Objectives 2.1 Proposals 2.2 Ecology Park 2.3 Village Green 2.4 Country Heritage Park 2.5 Dorset
Liquid Effluent Treatment Plant (LETP) Land Clean-Up
Liquid Effluent Treatment Plant (LETP) Land Clean-Up Frequently Asked Questions What is proposed? Magnox Ltd is proposing to remove the redundant Liquid Effluent Treatment Plant (LETP) at Harwell and to
Archant London Environmental Awards
Archant London Environmental Awards Environmental Business of the Year Big Yellow Self Storage PLC Barking Central, Hertford Road, Barking, IG11 8BL Introduction Big Yellow is a local business that has
E19: SUSTAINABLE PLACEMENT OF SURPLUS EXCAVATED MATERIAL
HIGH SPEED TWO INFORMATION PAPER E19: SUSTAINABLE PLACEMENT OF SURPLUS EXCAVATED MATERIAL This paper outlines the approach to sustainable placement of surplus excavated material for Phase One of the HS2
Appendix C. Municipal Planning and Site Restoration Considerations
Appendix C Municipal Planning and Site Restoration Considerations 67 68 Appendix C - Municipal Planning and Site Restoration Considerations This appendix contains best practice standards for site planning
Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited
Galloper Wind Farm Project Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513 Galloper Wind Farm Limited Document title Galloper Wind Farm Project Traffic Management Plan Status
Recycling & Energy Recovery Facility
Recycling & Energy Recovery Facility Cross Green Industrial Estate Leeds Environmental Statement Volume 1: Non-Technical Summary The Proposed Development Project Background Leeds City Council (LCC) intends
720 Contour Grading. General. References. Resources. Definitions
720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable
Site Layout & Traffic Plan
Location Site address: Norbury Manor Business Enterprise College, Kensington Avenue, Thornton Heath, Croydon CR7 8BT. The new block will be constructed on the existing hard play area. The construction
CHAPTER 24: ENVIRONMENTAL MANAGEMENT
Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document
DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008
DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008 INTRODUCTION The Department of Transport s Business Plan for the 2007/08 financial year stated the following: Government Aim: Quality Environment
Proposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.
Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area
Construction Traffic Management Plan
Construction Traffic Management Plan Proposed Additional Classroom Accommodation for Woolacombe Primary School Produced for and on behalf of Built Environments Team Devon County Council NPS South West
Sustainable Resource Management Ltd
6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects
A Developer s Guide: Watershed-Wise Development
A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another
Construction Traffic Management Plan
Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.
WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.
WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas
SUSTAINABLE URBAN DRAINAGE SYSTEMS
overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being
part 9 waste management
part 9 waste management 30m Hammerhead T-form 22m 21m Hammerhead Y-form 30m 18m Forward Side-Turn 25m 15m Reverse Side-Turn 30m Above: Recommended turning circles for waste collection vehicles 9 WASTE
Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.
Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is
Construction Traffic Management Plan
Construction Traffic Management Plan Proposed Additional Accommodation for SWDPLS Shinners Bridge Dartington Produced for and on behalf of Built Environments Team Devon County Council NPS South West Ltd
CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13
Note: Please refer to the end of this document for guidance notes about completing this form Q1. What is the full postal address of the site? Your response Q2. Planning reference and revision number (if
SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY
SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the
Gas to the West INFORMATION LEAFLET. gastothewest.com. [email protected]. www
Gas to the West INFORMATION LEAFLET 0800 975 2322 gastothewest.com @ [email protected] Gas to the West 1. INTRODUCTION This Gas to the West Project is a major energy infrastructure project to extend
PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan
PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON Construction Management Plan May 2013 CONTENTS Page No: 1.0 INTRODUCTION 1 2.0 PROJECT ORGANISATION AND RESPONSIBILITIES 2 2.1 Client
Household waste & recycling storage requirements
South Gloucestershire Council Guidance for Developers on Household waste & recycling storage requirements INTRODUCTION As part of the Council s aim to improve the quality of life for residents as well
The future development of air transport in the UK Make your views known
The future development of air transport in the UK Make your views known Contents Introduction 1 Introduction..................................................... 2 How much airport capacity should be provided
Recommendations for future developments
C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site
How To Write A Sustainable Resource Management Framework
FORTH REPLACEMENT CROSSING M9 Junction 1a Project Quality Plan: Volume 4 Sustainable Resource Management Framework Construction Issue RSMF 02: May, 2012 FORTH REPLACEMENT CROSSING M9 JUNCTION A1 SUSTAINABLE
approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013
Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a
Construction Logistics Plan Guidance
Construction Logistics Plan Guidance For planners MAYOR OF LONDON Transport for London Section 1 Introduction Contents Section 1 Introduction 3 Section 2 Policy background 6 Section 3 Typical contents
Cathkin Relief Road Planning Statement
Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide
London Paramount Entertainment Resort Workshops : Masterplanning & Infrastructure February / March 2015
London Paramount Entertainment Resort Workshops : Masterplanning & Infrastructure February / March 2015 Workshop agenda Presentations Breakout workshop sessions Feedback and outcomes for the masterplan
Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015
Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1
LEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS
For discussion on 2 April 2001 LC Paper No. CB(1)907/00-01(03) LEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS PWP Item No. 277CL Tseung Kwan O development, phase II, Remaining engineering works
Holly Lodge, Nuneaton Road, Mancetter PAP/2015/0659. 8 Harpers Lane, Mancetter PAP/2015/0669
Oak Tree Farm PAP/2015/0436 Agricultural Building to provide stock pen for Alpacas. Permission Granted Holly Lodge, Nuneaton Road, Mancetter PAP/2015/0659 Part of 21 day experiment No objection Pitched
HIGHWAYS. Drainage design on M25 motorway widening project (J16 - J23) Brijesh Vats
Drainage design on M25 motorway widening project (J16 - J23) 76 Brijesh Vats Drainage Engineer Highways & Transportation Abstract Drainage design on the M25 motorway comprises complex drainage networks
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local
DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY
DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY 1.0 Introduction and Purpose 1.1 Clackmannanshire Council is seeking to dispose of a site at Alloa Road, Tullibody for redevelopment. The site extends
CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES
CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention
Environmental guidelines for preparation of an Environment Management Plan
Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use
Living & Working Managing Natural Resources and Waste
Living & Working Managing Natural Resources and Waste 5.13 Managing Natural Resources and Waste Background 5.13.1 This chapter focuses on how we manage resources within the AONB. It includes renewable
Guide Document for Development of WHS Management Plans
DISCLAIMER: THIS DOCUMENT IS PROVIDED AS GUIDANCE TO ASSIST CONTRACTORS IN MEETING THEIR OBLIGATIONS UNDER THE WHS LAW AND NTG CONTRACTS. NTG DOES NOT ACCEPT ANY RESPONSIBILITY FOR THE CONTENTS OF CONTRACTORS
IALN11006400 /05 01 19.06.13. FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF
IALN11006400 /05 01 19.06.13 FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF Dear Sir / Madam Re: 12/02994 BCA Sports Hall Condition
Traffic Management During Construction
Traffic Management During Construction The construction of Dublin Port Tunnel couldn t begin until a traffic management plan had been developed and agreed to facilitate construction of the Tunnel and to
SECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
WELCOME. www.firstbase-haslemere.london
Aerial view of the existing site Welcome to the second public exhibition on our ideas for the future of the Haslemere Industrial Estate. We held our first public exhibition in June where we set out our
13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM
13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM This ESIA has identified impacts (both positive and negative) to the physical, natural and socio-economic environments, as well as to community and worker
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
Bedford s Network Management Strategy (2011 2021) November 2010
Bedford s Network Management Strategy (2011 2021) November 2010 Page 1 of 13 1. Introduction 1.1. The Bedford Borough Council Network Management Strategy has been developed to support local and national
COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO.
COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO. 6 RENEWABLE ENERGY Image Source: (Word Clip Art Stock Photo, 2011) Date: May, 2015 BACKGROUND PLANNING AND DEVELOPMENT SERVICES DEPARTMENT 789
COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited
COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT COPCUT RISE November 2010 Prepared by Capita Lovejoy on behalf of William Davis Limited Copcut Rise Land north of Copcut Lane, Droitwich Spa: Consultation
Green House, Hungary
Further information Skanska AB www.skanska.com Contact Noel Morrin, SVP Sustainability & Green Support [email protected] Green House, Hungary Case Study 109 Aspects of Sustainability This project
Major and Minor Schemes
1 Major and Minor Schemes Peterborough City Council has identified a number of proposals for major transport schemes over the next five year period that will support the planned housing and employment
TRAFFIC MANAGEMENT PLAN
TRAFFIC MANAGEMENT PLAN For: The construction and operation of a Photovoltaic (PV) Facility in Dabenoris, South Africa Prepared for: Alternative Energy Solutions (Pty) Ltd PO Box 4939 Tygervalley, South
Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants
Plan: O 02/00708/FUL Thames Ward (A) Address: Development: Applicant: London Works, Ripple Road, Barking Erection of replacement warehouse building and erection of two buildings in connection with builder
PLANNING & REGULATION COMMITTEE 16 JANUARY 2012
Division(s): Sutton Courtenay & Harwell Contact Officer: John Duncalfe ([email protected]) Tel: 01865 815356 PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 TO CRUSH, SCREEN, BLEND AND STOCK
Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s)
Permeable Pavers Permeable Interlocking Concrete Pavements (PICP s) CBC Title 24/ADA Compliant LEED Functional Optimum balance of surface infiltration and joint interlock Available in a 6 x 9 Quarry Stone
TRITON KNOLL ELECTRICAL SYSTEM CONSULTATION: QUESTIONNAIRE
RWE Innogy UK TRITON KNOLL ELECTRICAL SYSTEM CONSULTATION: QUESTIONNAIRE The Planning Act 2008 requires developers to undertake pre-application consultation before submitting an application for a Development
10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR)
HPK/2012/0207 03/04/2012 WILL HEY FARM WATFORD LANE NEW MILLS MR & MRS M WILSON KIRSTY WILSON EQUINE AND WILL HEY FARM BED & BREAKFAST RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS
Construction Management Plan Template
Plan Template Planning Permit Number:... Date Planning Permit Issued:... Approval Stamp (Office Use only): Standard Plan Template Project details Company Operational Details.. Directors Name Company Name
This plan forms one part of a suite of Asset Management Plans that have been developed:
E: D1: Levee Footpath Bank Asset Management Plan March July 2014 2015 This plan forms one part of a suite of Asset Management Plans that have been developed: A. Bridges B. Buildings C. Drainage D. Footpaths
Design and Construction policy for sustainable buildings and Campus environments
ESTATES SUPPORT SERVICE Design and Construction policy for sustainable buildings and Campus environments 1.0 INTRODUCTION The Higher Education Funding Council for England, responding to Governmental direction,
National Planning Policy for Waste
National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this
GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS
GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS April 2013 i Introduction This guide focuses on repair methods for some of the types of land damage that occurred on flat residential land as a result
Environment Committee 11 January 2016
Environment Committee 11 January 2016 Title Whole Life Costing of Footway Maintenance Treatments and Scheme Prioritisation Report of Wards Status Urgent Key Enclosures Commissioning Director, Environment
K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name
K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY 1. Applicant's Name Address (Street or Rural Route) (City & State) (Zip) Person to contact Title Phone Fax
Undergrounding high voltage electricity transmission. The technical issues
Undergrounding high voltage electricity transmission The technical issues This is an interactive PDF document with clickable links from the contents to all sections and back and also to URL and email links.
Construction Site Set Up Requirements
Process Code Number Revision COP A 035 B Document Title Construction Site Set Up Requirements B 1/11/10 SRC SAT DH Final A 1/10/10 SRC MI Draft comment Rev. Date Prepared Reviewed Approved Detail/Comment
Ardessie Hydro Electric Project
Ardessie Hydro Electric Project Appendix T - Traffic Management Plan 13 th December 2014 V1.0 Jacinta MacDermot DHG Hydro Ltd 7 St James s Gardens London W11 4RB [email protected] 077 888
MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT
Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public
SECTION 02221 SELECTIVE DEMOLITION
SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on
Environmental Site Inspection Checklist
Note : This form is designed for general use and may not be exhaustive. Modifications and additions may be necessary to suit individual projects and to address specific environmental issues and associated
Advice can also be sought from specific specialist officers in the Council.
Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information
INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS
INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS The Purpose of this document is to provide the Project Sponsor / Designer with comprehensive guidance on the range of issues
Tree Pits Operation & Maintenance Guide
Tree Pits Operation & Maintenance Guide What are tree pits? Tree pits collect stormwater runoff from small carpark areas or roads. Runoff filters through the tree roots and surrounding soil mix, trapping
Major Improvement Schemes in Basingstoke
Major Improvement Schemes in Basingstoke 1. Welcome Welcome to this exhibition, which provides information about the planned highway improvements being delivered in Basingstoke from 2015 2018. A30 Winchester
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government
London Underground Environment Strategy
London Underground Environment Strategy 2008 2013 mayor of london Transport for London Contents Introduction 3 London Underground Environment strategy 4 Managing environmental impacts 5 Embedding environment
Construction Management Statement. Introduction. Contents
Construction Management Statement Project Name Dee Point Primary School Introduction On all Morgan Sindall projects, the safety and welfare of all is of paramount importance. This document concentrates
CHANGE OF USE FROM AGRICULTURE TO A USE FOR CARAVAN STORAGE COMPOUND AND OPERATIONAL DEVELOPMENT.
2014/1898 BIRMINGHAM ROAD MERIDEN Application No: Ward/Area: Location: 2014/1898/S MERIDEN BIRMINGHAM ROAD MERIDEN Date Registered: 21/11/2014 Applicant: Proposal: MR VAUGHN WILLIAMS CHANGE OF USE FROM
Finance, Mining & Sustainability. The Gamsberg Zinc Project South Africa
Finance, Mining & Sustainability The Gamsberg Zinc Project South Africa Project Summary Discovered in 1971 Anglo American purchased 33% interest in 1974 and increased interest to 100% in 1998 Feasibility
(http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf
Possible Submission about Water and Flooding (See maps 3a and 3b) From Mole Valley Local Development Framework: Strategic Flood Risk Assessment Update 2012 (http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf