2 Setting Intent
3 Session Agenda The Story The Great Experiment Forward Together Call to Action
4 Session Outcomes Apply the model and tool Examine the elements of the model and tool Evaluate the use of model and tool in your practice
5 Steph McIntyre Project manager, Program manager, Portfolio manager, PMO, consultant, PMP, 2007 Individual Excellence PMI award winner, facilitator, project management coach, Nana, mom, wife, 2nd generation Calgarian, San Tan Valley owner, golfer and active, fit lifestyle, and always makes time to listen. Susana Slavnik Program manager, project manager, PMI Fellow, Certified management consultant, executive coach, Change manager, business strategist, facilitator, mom, wife, foodie, Suits fan, married in Banff, new cabin owner in the Kootenay s, who loves a good time or really good idea, and dreams of beating her 9yr old Mia in a ski race in Shelley Pinder Teacher, ESL in Eastern Europe, Passion for Adult Education, facilitation and instructional design, as well as less wordy slides. She designs, facilitates learning for project managers and project sponsors at the City, pursuing Doctor of Education in Distance Education, with a love of fun shoes, fitness and big ideas. Shelley did not approve of the word count on these slides
6 What is Project Management?
7 PM Responsibilities
8 The Story
9
10
11
12
13 What are Change Management deliverables on a project?
14
15
16
17
18
19 Integrated Project Management Approach PHASE 1 Project Management Change Management Start-Up Discovery Development Acceptance Closing Preparing for Change Managing the Change Reinforcing the Change DRAFT Integrate Project Management Develop Project Charter and Governance Structure COMPLETE Manage Project Records Complete Progress Reports Issue Change Requests Complete Project Documentation and Results Align Organization Strategy and Roadmap Stakeholder Analysis Define CM Roles and Responsibilities Define Change Vision / Case for Change Prepare Organization Design COMPLETE Conduct Change Readiness Assessment Develop Change Management Work Plan Develop Key Messages Assess Project Team Culture and Health Manage Adoption and Course Correct Conduct Impact Assessment Conduct Readiness Assessment Hand off Change Management to Operations Workstreams Across a Project Lifecycle Leader Engagement Communicate with Stakeholders Support Project Governance Model Development Identify Project Change Sponsor Sponsor / Key Stakeholder Interviews Sponsor Readiness Assessment Develop Project Communication Strategy Support Project Team Comms COMPLETE Identify Project Change Agents COMPLETE Build Communication Plan / Schedule Provide Support for Sponsors and Project Team Host Sponsorship Events (Visible Sponsorship) Execute 1-way and 2-way Communication Tactics / Events Collect Feedback Evaluate Communications Evaluate Feedback Build Capacity and Skills COMPLETE Training Needs Assessment Training Design & Development Knowledge Transfer Plan Measure Benefits and Value COMPLETE Define Project Benefits Measure Outcomes Against Benefits Issue Benefits Measurement Report Align Program Management Develop Program Strategy Establish Program Outcomes Develop Program Plan COMPLETE Align Projects to Program Outcomes Conduct 360 Team Feedback
20
21 Methodology Overall Program Phases Concept Benefits Realization Review Ideation Prelim Org Change Mgmt Plan RFI/RFP Process Design Change mgmt & Comm Plan Program/ Project Charter Redesigned Business Processes Implementation Data migration Plan Implementation Plan RFP/SOW Implementation Post Project Review Cost Analysis Project Health Review Benefits Realization Benefits Realization Review Project Execution Plan Project Budget Detailed Requirements Solution Design Training Plan Cutover Plan Closeout Phase Gate Health Check Business Case Vendor Statement of Work Sustainment Plan Project Plan Design Project Executon Plan Updated Business Case Phase Gate Health Check Phase Gate Health Check Phase Gate Health Check Gate 0 Gate 1 Gate 2 Gate 3 Gate 4 Final Program Monitoring & Controls Resource Management processes Document mgmt processes Financial Management processes Deliverables / Quality Management processes Risk, Issue, Action, and Change processes Reporting- Weekly and Monthly Project Planning: WBS/ PBS
22 Program Management Touchdown Program Implementation: Breakdown Structure Implemented & Transitioned Solution Program Quality Management Products Program Management Products Program Controls Program Strategies Data Conversion Code Development Training Report Development Development Environment Detailed Requirements Test Plan Future State/ Implemented Process Design Gantt Schedule (inc. Assignments) Project Charter Dryruns Maximo configuration Business process rollout Report Development QA Environment Business Process Design Test Scenarios & Test Cases User & Training Documentation Status Reports Vendor Management Plan Cutover Warranty Decommissiong Integration Development Data Migration Internal Communication External Communication Job Descriptions Data Retention Report Retention Unit Test Test Environment Training Environment Production Environment Solution Design Functional Specifications Technical Specs Defect Management Test Validation Unit Test Technical Support Documentation Solution Documentation Deployment Assessment Go/No Go RASCI (inc. Roles & Responsibilities) Project Budget Communication Plan Org Change Management Plan Release Build and configure Change Readiness Reporting, Data & Retention Load Testing Scalability & Capacity Code Reviews Peer Reviews Integration Testing User Acceptance Support Team GO LIVE Approval User GO LIVE Approval Risk, Issue, Change, Decision Logs Scope Change Management Deployment Plan Training Plan Infrastructure Solution Support Team Acceptance Change Control (CAB) ISPM Health Checks Sustainment Plan Traceability Management Final Approvals Project Close Out Transition to Operations January 21, 2014 Testing & Validation Project Controls Project Plans
23 Program Timeline
24
25
26 1. One key take-away as a PM? 2. How can we make this more useful?
27
28 In Summary Model and Tool has been built on a solid foundation Model and Tool can be customize to meet project/program type, scale The Model and the Tool addresses how project managers can easily incorporate change management into their project management practice.
29 Call to Action 1. Actively plan your projects with business and people change in mind, from the beginning. 1 st pass of planning business change 2 nd pass of planning people change 2. Integrate change management and change management resources into our project teams 3. Go to ACMP.org local Calgary chapter and find out for yourself what s going on
30 Conversation Continues 30
31 Integration is Yours to Lead!
32 PMI Practice is Evolving Here is a link to the Managing Change in Organizations: A Practice Guide: Center/Change-Management.aspx 32
33 Program Manager Progress Report THANK YOU!! 31-Mar-14 SC ToR
Project Management Change Management Procedure
Change Management Procedure Procedure # Description: Overview Outlines the steps for a Project Manager to manage change in an organization Objective To ensure that organizational change is managed in a
PMI Standard for Portfolio Management
Project : how organizations can measure and improve their performance PMI Standard for Milan, April 20th 2011 Walter Ginevri, PMP, PgMP Agenda 2 Evolution of PMI standard of PfM PfM definition and high-level
Using Your PMO to Drive Successful Organizational Change Management
Using Your PMO to Drive Successful Organizational Change Management Joe Saliunas, Booz Allen Hamilton 11 November 2012 1 Agenda Organizational change management overview Case studies PMBOK Guide processes
WHY DO I NEED A PROGRAM MANAGEMENT OFFICE (AND HOW DO I GET ONE)?
WHY DO I NEED A PROGRAM MANAGEMENT OFFICE (AND HOW DO I GET ONE)? Due to the often complex and risky nature of projects, many organizations experience pressure for consistency in strategy, communication,
MNLARS Project Audit Checklist
Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?
Department of Administration Portfolio Management System 1.3 June 30, 2010
E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2
Advanced Topics for TOGAF Integrated Management Framework
Instructor: Robert Weisman MSc, PEng, PMP CD [email protected] Advanced Topics for TOGAF Integrated Management Framework ROBERT WEISMAN CEO BUILD THE VISION, INC. WWW.BUILDTHEVISION.CA EMAIL:
IT Project Management Methodology. Project Execution Support Guide. Version 0.3
NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA IT Project Management Methodology Project Execution Support Guide Version 0.3 Table of Contents 1 INTRODUCTION... 4 1.1 When should Project Execution
IS&T Project Management: Project Management 101. June, 2006
IS&T Project Management: Project Management 101 June, 2006 Session Objectives Review basics management Discuss obstacles to effective management Share practices that work for you Empower you to try some
Introductory Certificate. The APM Project Fundamentals Qualification
The syllabus provides a summary of the coverage of the qualification, the details are then found in the learning outcomes and assessment criteria. Both the syllabus and the learning outcomes and assessment
Assessing the Appropriate Level of Project, Program, and PMO Structure
PMI Virtual Library 2011 Daniel D. Magruder Assessing the Appropriate Level of Project, Program, and PMO Structure By Daniel D. Magruder, PMP Executive Summary Does your organization have in-flight projects
Managing Change in Organizations. Sonja Streuber, PMP, SSBB
Managing Change in Organizations Sonja Streuber, PMP, SSBB Sonja Streuber Project Mgmt & Engineering, Six Sigma, Risk Mgmt & Risk Analysis: 2000 2003 Agilent Technologies 2003 2009 Lockheed Martin 2009
<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor
Microsoft Enterprise Project Management. James Wright Christopher Pond
Microsoft Enterprise Project Management James Wright Christopher Pond EPM Solution: Executive Overview and Discussion 1 Agenda 9:30 09:45 Introduction 9:45 10:45 Microsoft Project Server 2010 James Wright
Program Management Professional (PgMP) Examination Content Outline
Program Management Professional (PgMP) Examination Content Outline Project Management Institute Program Management Professional (PgMP ) Examination Content Outline April 2011 Published by: Project Management
Project Management: Improving performance, reducing risk When will you think differently about project management?
www.pwc.com/jg Project Management: Improving performance, reducing risk When will you think differently about project management? Who are your presenters? David O Brien Senior Manager Lara Haskins Senior
The Key to a Successful KM Project
Introduction An integrated PKM methodology enables organizations to maximize their investments by ensuring initiatives are on time and within budget, while sharing project challenges and successes that
Leveraging SharePoint for Project, Program, and Portfolio Management
Leveraging SharePoint for Project, Program, and Portfolio Management Addressing the Challenges of Communicating, Coordinating, Controlling, and Complying Delivered by Dean W. Farmer, MMS, PMP at the SIUE
Syllabus 2nd Edition
Syllabus 2nd Edition 2 Introductory Certificate Syllabus 2nd Edition 2nd Edition Introductory Certificate syllabus All of the syllabus elements should be taken within the context of a project and project.
SDLC- Key Areas to Audit in IT Projects ISACA Geek Week 2013 8/21/2013. PwC
SDLC- Key Areas to Audit in IT Projects ISACA Geek Week 2013 8/21/2013 1 Introductions and Projects Overview Presenters Charlie Miller and Andrew Gerndt The Coca-Cola Company Principal IT Auditors Atlanta,
Foundations of Project Management. Presented by: Kelly Baumer, MBA, PMP Mindy Rings, MBA, PMP
Foundations of Project Management Presented by: Kelly Baumer, MBA, PMP Mindy Rings, MBA, PMP August 18, 2014 Project Management Basics In the next slides we will cover: Basic project management terminology
Driving PPM Adoption Through Effective Change Management
Driving PPM Adoption Through Effective Change Management Presenters: David Boghossian, Founder, PowerSteering Software Jay Hoskins, PowerSteering Business PPM Consultant Welcome! Thank you for joining
Change Management in an IT Methodology Context
Change Management in an IT Methodology Context The Experience of TEDO (Technology Enterprise Delivery Office) December 2012 Speakers: Lydia Galanti ([email protected]) Iphigénie Ndiaye ([email protected])
Finding The PPM Sweet Spot
Finding The PPM Sweet Spot How the Cloud and a Top Down Approach Can Help Drive Project Portfolio Value Featured Presenter: Daniel Stang Research Director Welcome! Thank you for joining us. A few things
Building a Center of Excellence for Organization Change Management at Northwest Airlines Norm Schultz Sara Lykken
Building a Center of Excellence for Organization Change Management at Northwest Airlines Norm Schultz Sara Lykken 2008 NWA 1 Elements of Change See It Own It Do It Clear, compelling case for change Demonstrated
PMP Examination Tasks Puzzle game
PMP Examination Tasks Puzzle game Here is a great game to play to test your knowledge of the tasks you will be tested on in the actual examination. What we have done is take each of the domain tasks in
Defining change management
Defining change management Helping others understand change management in relation to project management and organizational change by Tim Creasey Director of Research and Development Prosci and the Change
Program Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated
Do not open this paper until instructed by the invigilator. Please note: This question paper must not be removed from the examination room.
APM Introductory Certificate in Project Management Exam paper Candidate Reference Number Date of Exam Location of the Exam General Notes Time allowed 1 hour Answer all 60 multiple choice questions Use
Appeals Case Management System Project. Scope Management Plan. November 20, 2014
Appeals Case Management System Project Version 1.0 Health and Human Services Agency, Office of Systems Integration Template Revision History REVISION HISTORY REVISION # DATE OF RELEASE OWNER SUMMARY OF
Complimentary Relationship Between ITIL and PMBOK
CSC NORTH AMERICAN PUBLIC SECTOR Complimentary Relationship Between ITIL and PMBOK August Chantilly Luncheon Linda Budiman, PMP ITIL Business Process Architect ITIL Service Manager, COBIT certified 8/20/2008
Project Management for Everyone
Project Management for Everyone Contact Information Adam Donaldson, PMP Business Management & Analysis Group System, Analytics & Insights Group Phone: (202) 994-6867 Email: [email protected] Objectives Basic
Prosci Change Management Arbeta strukturerat med beteendeförändringar
Prosci Change Management Arbeta strukturerat med beteendeförändringar Agenda Prosci intro Prosci Best Practice Research Findings The case for Change Management Prosci Project Change Triangle, inclduing
Effectively and Efficiently Managing Multiple Projects
Effectively and Efficiently Managing Multiple Projects Effectively and Efficiently Managing Multiple Projects Offered by: Askler, Fitch and Associates Course Length: One day Course Purpose The success
Module 7: Change Management
Module 7: Change Module 7: Change Integrating Project with Change They think by installing this system they will end my services let us see if they will ever manage to get it done What is the purpose of
Implementing a Project Portfolio Management (PPM) Solution. Sean Hansen, PMP
Implementing a Project Portfolio Management (PPM) Solution Sean Hansen, PMP Agenda Introductions First Fresh from Microsoft Ignite Why Implement a PPM Tool (recap) Are You Ready for a PPM Implementation?
U.S. Department of Education Federal Student Aid
U.S. Department of Education Federal Student Aid Lifecycle Management Methodology Version 1.3 06/30/15 Final DOCUMENT NUMBER: FSA_TOQA_PROC_STGRW.NA_001 Update History Lifecycle Management Methodology
Project Management Office Best Practices
An Oracle White Paper April 2009 Project Management Office Best Practices A step-by-step plan to build and improve your PMO Step by Step The first step to establishing a PMO is to determine your organisation
Water-Scrum-Fall Agile Reality for Large Organisations. By Manav Mehan Principal Agile consultant [email protected]
Water-Scrum-Fall Agile Reality for Large Organisations By Manav Mehan Principal Agile consultant [email protected] Interests and Experience Leading Change and Transformation in Large, Complex organisations
Request for Expressions of Interest On a contract to perform: Renewal of Information Technology Strategic Plan 2013-2018
Request for Expressions of Interest On a contract to perform: Renewal of Information Technology Strategic Plan 2013-2018 for City of Pitt Meadows Table of Contents Table of Contents... 2 General Information...
Enterprise Service Management (ESM)
Enterprise Service Management (ESM) A Reference Model for Adopting and Adapting IT Best Practices Across and Enterprise itsm003 v.3.0 Agenda and Objectives What are ESM Best Practices? What is the ESM
Prosci Research Methodology Training Advisory Services www.prosci.com +1-970-203-9332 [email protected]
Prosci Change Management Webinar Auditing Change Management Maturity Prosci Research Methodology Training Advisory Services www.prosci.com +1-970-203-9332 [email protected] 1 Prosci s Mission To help
October 7, 2011. Presented to. The PMI Washington DC Chapter. Pedro Agosto. Director of Client Services, XA Systems, LLC. pedro.agosto@xasystems.
October 7, 2011 Presented to The PMI Washington DC Chapter By Pedro Agosto Director of Client Services, XA Systems, LLC [email protected] Introduction Re-evaluating IT Services Today s Challenges
SUMMARY PROFESSIONAL EXPERIENCE. IBM Canada, Senior Business Transformation Consultant
Doreen Funk, MA 191 Discovery Ridge Blvd SW, Calgary Cell: 587-434- 0811 E- mail: [email protected] SUMMARY Senior management consultant with 20 years of experience in applying strategies and implementing
Project Management Life Cycle (PMLC)
Project Management Life Cycle (PMLC) Page 2 Project Management Life Cycle (PMLC) Introduction PMLC Working Group IT Business Process Management(BPM) IT Project Management Office (PMO) Finance System Support
ITIL Service Lifecycles and the Project Manager
1 ITIL Service Lifecycles and the Project Manager The intersection of IT Service and Project Delivery Presented to: Kansas City Mid-America PMI Chapter Mark Thomas January 17, 2011 1 Agenda 2 Introduction
Project Management (PMI Based)
Training Services ITIL, Cobit, ISO/IEC 20000, Project Management, Information Security, Business Continuity, Risk Management, Cloud Computing and Green-IT Project Management (PMI Based) Project Management
2003 Patricia Ensworth Page 1
1 1 Sample software development project 2 1.1 Start project 3 1.2 Initiation phase 4 1.2.1 Develop project charter 5 1.2.2 Project charter approved 6 1.3 Planning phase 7 1.3.1 Product activities 8 1.3.1.1
PROJECT MANAGEMENT FOR NON-PROJECT MANAGERS
PROJECT MANAGEMENT FOR NON-PROJECT MANAGERS NADC PTAC 2929 3 rd Ave., N., Suite 300 Billings, MT 59101 P. (406) 259-3804 F. (406) 259-4569 ww.nadc-nabn.org HIGHLINER CONSULTING GROUP, LLC. 255 E. Fireweed
General Notes Time allowed 1 hour. Answer all 60 multiple choice questions Use the proforma answer sheet provided.
Introductory Certificate The APM Project Fundamentals Qualification. Examination paper Candidate Number Date Location Examination Paper Sample Paper v1.4 General Notes Time allowed 1 hour. Answer all 60
Presented By: Leah R. Smith, PMP. Ju ly, 2 011
Presented By: Leah R. Smith, PMP Ju ly, 2 011 Business Intelligence is commonly defined as "the process of analyzing large amounts of corporate data, usually stored in large scale databases (such as a
VISUAL REQUIREMENTS MANAGEMENT WITH KANBAN. Mahesh Singh Co-founder/ Sr. VP Product, Digite, Inc.
VISUAL REQUIREMENTS MANAGEMENT WITH KANBAN Mahesh Singh Co-founder/ Sr. VP Product, Digite, Inc. Agenda 2 Quick Introduction/ Context How We Were.. ( Traditional Requirements Management, Release Scoping/
Second Amendment To the HIPAA 5010 and ICD-10 Technical Assistance and Support Services Contract
Second Amendment To the HIPAA 5010 and ICD-10 Technical Assistance and Support Services Contract This second Amendment to Contract Number is effective as of December 12, 2011, between the Iowa Department
Changing the way we Change 2015 MFMER 3481952-0
Changing the way we Change 2015 MFMER 3481952-0 Mayo Clinic after 150 years... 6 STATES 5 SCHOOLS 60,000 EMPLOYEES 1million PATIENTS from 135 countries 8 billion ENTERPRISE reinvests $400 million 2015
How Smart Businesses Embrace Change Lessons to Enable a Successful Business Transformation
How Smart Businesses Embrace Change Lessons to Enable a Successful Business Transformation January Paulk Director of Client Services Organizational Change and Business Process Management Services Agenda
IT Project Management Methodology. Project Scope Management Support Guide
NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA IT Project Management Methodology Project Scope Management Support Guide Version 0.3 Version Date Author Change Description 0.1 23 rd Mar, 2013 Gerald
Prepared by: Rick Leopoldi November 22, 2003
RL Consulting Project Best Practices for the Application ment Process Prepared by: Rick Leopoldi November 22, 2003 Copyright 2003 RL Information Consulting LLC. All rights reserved. Duplication of this
Time Management. Herb Pollard III
Time Management A Small Business Perspective Herb Pollard III Project Manager for Time Management - Pollard PMI Slide 1 Introduction: Time Management - Pollard PMI Slide 2 Project Phases and the Areas
PMO Starter Kit. White Paper
PMO Starter Kit White Paper January 2011 TABLE OF CONTENTS 1. ABOUT THE PMO STARTER KIT...3 2. INTRODUCTION TO THE PMO STARTER KIT WHITE PAPER...3 3. PMO DEVELOPMENT ROADMAP...4 4. PLAN PHASE...5 4.1 CREATE
Fundamentals of Project Management. A New Focus on Stakeholders
Fundamentals of Project Management A New Focus on Stakeholders Moderator Janelle Abaoag Project Insight Marketing, Public Relations [email protected] www.projectinsight.net All participants
Project Management vs. Change Management: Which Should Lead?
Project Management vs. Change Management: Which Should Lead? Presented by Jon Weinstein, President of Line of Sight to the PMI Washington DC Chapter October 23, 2012 2012 Line of Sight, LLC The Question
How To Manage Project And Portfolio Management In Microsoft Office 2010
Enterprise Project Management SOLUTIONS THAT LAST Challenges in PPM What is a Project? Why Project Management? Challenges in Project and Portfolio Management (PPM) Problems for PM and PPM Leaders Presentation
T14 "TIMELINES, ARTIFACTS AND OWNERS IN AGILE PROJECTS" Hubert Smits Rally Software Development BIO PRESENTATION 6/21/2007 1:30:00 PM
BIO PRESENTATION T14 6/21/2007 1:30:00 PM "TIMELINES, ARTIFACTS AND OWNERS IN AGILE PROJECTS" Hubert Smits Rally Software Development Better Software Conference & EXPO June 18-21, 2007 Las Vegas, NV USA
Project Management Office Charter
Old Dominion University Office of Computing and Communication Services Project Management Office Charter Version: 1.0 Last Update: February 18, 2010 Created By: Anthony Fox, PMP OCCS Project Management
Project Systems Management Providing Value-Added Solutions
Project Systems Management Providing Value-Added Solutions UPSTREAM MIDSTREAM AUTOMATION PROCESS & INDUSTRIAL PIPELINE PROCESS PLANTS Adding Value to Your Project Mustang couples global engineering, design,
Why are PMO s are Needed on Large Projects?
Why are PMO s are Needed on Large Projects? Keeps Project Manager focused on: Priority risks Priority issues Stakeholder alignment Technical challenges Ensures administrative tasks are completed: Projects
Company A Project Plan
Company A Project Plan Project Name: Close Optimization Project Example Prepared By: David Done - Project Manager Title: John Doe -Project Manager Date: March 17, 2011 Project Plan Approval Signatures
Dunja Hahn. Profile. Senior Consultant EDUCATION. 2010 Diploma in business administration (equivalent to Master)
Profile Dunja Hahn Senior Consultant Email: [email protected] EDUCATION PROFESSIONAL TRAINING 2010 Diploma in business administration (equivalent to Master) 2008 Economic interpreter of the English
Project Management Fundamentals. Office of the Senior Associate Vice President for Finance
Project Management Fundamentals Project Management Institute PMI is an aggregation of best practices from thousands of professional project managers Principles in this training are based on PMI methodologies,
Draft Documents RFP 3.2.4
Draft Documents RFP 3.2.4 In accordance with RFP 3.2.4, CNSI includes the required draft documents in the following order: Work Plan: Team CNSI provides a comprehensive draft Work Plan for the Iowa EHR
Achieving Business Analysis Excellence
RG Perspective Achieving Business Analysis Excellence Turning Business Analysts into Key Contributors by Building a Center of Excellence Susan Martin March 5, 2013 11 Canal Center Plaza Alexandria, VA
Positive Train Control (PTC) Program Management Plan
Positive Train Control (PTC) Program Management Plan Proposed Framework This document is considered an uncontrolled copy unless it is viewed online in the organization s Program Management Information
PMAP. Project Management At Penn PMAP
Project Management At Penn 1 Fundamentals Course Objective To provide you with an overview of Topics Project Management at Penn () Project Governance Phases & Project Management Activities Project Management
Project Management vs. Change Management Presentation to the National Institutes of Health July 21, 2015
Project Management vs. Change Management Presentation to the National Institutes of Health July 21, 2015 Presentation Objectives 1. Understand the key challenges and linkages between the disciplines. 2.
Information Management CoE A Pragmatic Approach
Information Management CoE A Pragmatic Approach Peter LePine- Practice Director Tom Lovell - Data Governance Specialist Information Management & Business Intelligence Practice Information Management &
Quality Assurance for SAP Implementations
Quality Assurance for SAP Implementations Combining the power of SAP Quality Assurance Services with the depth and breadth of experience and knowledge of the SAP corporate ecosystem to drive your end-to-end
Aligning CMMI & ITIL. Where Am I and Which Way Do I Go? 2006 - cognence, inc.
Aligning CMMI & ITIL Where Am I and Which Way Do I Go? 2006 - cognence, inc. Agenda Where Am I? Current Situation Process Improvement Objectives How Do I Get There? CMMI ITIL Mapping, Commonalities, Differences
Driving Project Success with Organizational Change Management
Driving Project Success with Organizational Change Management Agenda Introductions & Objectives OCM Defined Driving Project Success with OCM Building an OCM Capability Case Study: OPRS ERM Program Speakers
PROJECT MANAGEMENT PLAN <PROJECT NAME>
PROJECT MANAGEMENT PLAN TEMPLATE This Project Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome
Business Analysis Standardization & Maturity
Business Analysis Standardization & Maturity Contact Us: 210.399.4240 [email protected] Copyright 2014 Enfocus Solutions Inc. Enfocus Requirements Suite is a trademark of Enfocus Solutions Inc.
Benefits of conducting a Project Management Maturity Assessment with PM Academy:
PROJECT MANAGEMENT MATURITY ASSESSMENT At PM Academy we believe that assessing the maturity of your project is the first step in improving the infrastructure surrounding project management in your organisation.
State of Oregon. State of Oregon 1
State of Oregon State of Oregon 1 Table of Contents 1. Introduction...1 2. Information Asset Management...2 3. Communication Operations...7 3.3 Workstation Management... 7 3.9 Log management... 11 4. Information
Project Management Plan for
Project Management Plan for [Project ID] Prepared by: Date: [Name], Project Manager Approved by: Date: [Name], Project Sponsor Approved by: Date: [Name], Executive Manager Table of Contents Project Summary...
Using SAP Master Data Technologies to Enable Key Business Capabilities in Johnson & Johnson Consumer
Using SAP Master Data Technologies to Enable Key Business Capabilities in Johnson & Johnson Consumer Terry Bouziotis: Director, IT Enterprise Master Data Management JJHCS Bob Delp: Sr. MDM Program Manager
Project Manager and Business Analyst Collaboration
Project Manager and Business Analyst Collaboration Mike Sandberg Director, IT Business Analysis Center of Excellence Novell, Inc. Email: [email protected] LinkedIn: http://www.linkedin.com/in/mdsandberg
PgMP Credential. Christopher Talmont, PMP, PMI-RMP. February 23, 2011
PgMP Credential Christopher Talmont, PMP, PMI-RMP February 23, 2011 A b o u t M e 7 years of experience as an instructor and consultant of project scheduling software and best practices 4 years of experience
The new ASAP Methodology
The new ASAP Methodology Overview of the new ASAP Methodology for Implementation 7.x and ASAP Business Add-Ons Jan Musil Director, Global Project Management Office SAP Field Services Raimar Hoeliner Program
Methodical Notes for part-time BMCF TM study course M_SM / PROJECT MANAGEMENT
1 st session: INTRODUCTION TO PROJECT MANAGEMENT Objective of the thematic unit: To understand what is meant by Projects and to define Project Management. Students benefit by understanding the need to
Certified Change Management Professional (CCMP )
The Association of Change Management Professionals Certified Change Management Professional (CCMP ) Chapter One The Beginning ACMP: Advancing the discipline of change management CCMP Presentation Page:
Openbravo Services for Partners
Openbravo for Partners A pure channel organization devoted to Partner success # Devoted to Partner Success Openbravo for Partners are especially designed to accelerate partners practice towards business
Informatica Project Rightsize
Informatica Project Rightsize Strategy to Revenue Marketing Case Study Screen shots of video presenter and interviews Business Needs Informatica is a large organization born out of a number of strategic
People change management framework for High maturity Stakeholder management Training
People change management framework for High maturity Stakeholder management Training Communication Presenters: Deepthi Chimakurthy, Senior Consultant Padma Rengan, Manager Deloitte Consulting India Pvt