1 CITY OF KAWARTHA LAKES MUNICIPAL AIRPORT CNF4 A CASE FOR INVESTMENT & BUSINESS VISION Photo courtesy of Bob Burns

2 Table of Contents A 1 Pages 1. Executive Summary [1] - [11] 2. Foreword 1 3. Background Section 2 Existing Conditions 5 5. Existing Airport Aerial View 6 6. Figure 2.1 Existing Airport Layout Plan 7 7. Airport Facility 8 8. Current Conditions of Airport Infrastructure Aircraft Movement Activity Aviation Trends & Demand Projection Table 2.1 Aviation Demand Forecast Baseline & Target Project Airport Employment Activity Regional & Socio - Economic Impact Keeping The Airport Airport Development (Airside) Airport Development (Groundside) Figure 6.1 Proposed New Terminal Addition Concept Drawing Figure 6.2 Proposed Floor Plan for Terminal Addition Airport Development (Groundside) Cont d Medium Term Development Plan Figure 7.1 Medium Term Development Plan Figure 7.2 Terminal Area Development Plan Terminal and General Aviation area Development Future Airside Infrastructure Table 7.1 Extended Runway Zoning & Physical Characteristics Figure 7.3 Suggested Long-Term Land Use Plan Property Acquisition Requirements 41

3 Table of Contents A 2 Pages 28. Financial Plan Table 8.1 Summary of Baseline CIP Costs By Year ( ) Table 8.2 Summary of Target CIP Costs By Year ( ) Table 8.3 Summary of Target CIP Costs By Year ( ) Potential Funding Sources Table 8.4 Recommended Airport User Fees Current And Projected Financial Position Table Year Baseline Cash Flow Projection Table Year Target Cash Flow Projection Prospects For Self-Sufficiency Appendix A Glossary Appendix B Aerodrome Traffic Circuit Patterns Appendix C Nav Canada Aerodrome Chart 66

4 EXECUTIVE SUMMARY INTRODUCTION City of Kawartha Lakes Municipal Airport, categorized as a local/regional public general aviation (GA) registered aerodrome and located 3 kilometres northwest of the Lindsay town centre, is owned, operated and maintained by the City of Kawartha Lakes. Between 1979 and 2001, the Airport was managed, operated and maintained under a lease arrangement with Lindsay Airpark. In 2001, the City bought back the head lease and has since taken a much greater role in the day-to-day operation. In so doing, the City now has the ability to make key decisions regarding the Airport s operation and development according to local requirements, thus presenting a number of unique opportunities and challenges. The City s mission for the Airport is to provide the residents and businesses of Kawartha Lakes with access to convenient and cost-effective air transport services in a socially and fiscally responsible manner, while being progressive in its efforts to promote, develop and upgrade the Airport s lands and facilities. Since resuming management and operation of the Airport, the City has been actively working toward development and upgrading of the Airport, as well as implementing safety and service improvements in order to achieve full compliance with Federal regulations and accepted industry practice. In order to provide a blueprint for the future development of the Airport and to provide a clear plan for operation and management of the facilities, the City retained Marshall Macklin Monaghan Limited in 2002 to prepare a comprehensive Airport Master Plan, which updated the last Master Plan completed in Further studies were completed in 2007, (Airport Service Review & Economic Impact Study), 2008, (Airfield Pavement Condition Survey) as well as extensive public consultation, culminating in the setting up of an Airport Board to oversee the daily operations of the airport and implement development plans. PLAN OBJECTIVES The purpose of the Business Vision document is to provide guidelines for the orderly long-term development of the Airport s lands, operation and facilities which will satisfy aviation demand in a financially responsible manner, while at the same time resolving present and future aviation, environmental and socio-economic issues. In general, the Business Vision specifically addresses a 10-year horizon while preserving for long-term needs and opportunities. The primary objective of the Business Vision document is to present: the needs and desires expressed by community and business leaders, Airport users, tenants and staff through a consultation process; an inventory and financial value assessment, ($), of existing facilities, services, tenants and operational practices; [1]

5 historical statistics and forecasts for Airport demand, demographics and market trends; short-term and long-term improvements to meet current deficiencies and future demand; a land use plan and appropriate zoning controls for the Airport which foster development opportunities while protecting the existing and future onairport operations and surrounding land uses; an ultimate development plan which optimizes the potential use of lands without affecting increases in aviation related activities and promotes new tenants/users in order to enhance revenues; suggested marketing and business development strategies in order to enhance revenue sources, retain and expand the Airport tenant and user base; a financial plan with a long-term strategy for a self-sustaining facility and suggested changes to user fees and charges. AVIATION DEMAND The Airport currently, supports, or is capable of supporting, the following activities: scheduled service/passenger, mail and cargo; charter service passenger, mail and cargo; corporate and recreational (general aviation) users; air ambulance, military and government users; aviation support services, flight school and other commercial interests. The Airport presently handles approximately 3,000 annual itinerant aircraft movements and about 20,000 local movements: (estimated). Given the Airport s potential for innovative air service development and marketing, the target forecast projects General Aviation itinerant movements to increase by 3.5% per annum. A modest but growing component of the aviation traffic has been corporate/business charter operations. Although the success of charters has been primarily driven by the lack of scheduled service, growth of charter traffic is expected to continue due to increased activities related to tourism. At present, the Airport has no scheduled service, however, it is estimated that the market can sustain an annual passenger level of about 7,500. Provided that an air taxi/scheduled service can be attracted to service flights to Southern Ontario centres, such as Toronto, it is believed that this market sector could grow by 3.5% per annum. Local movements are primarily tied to the existing flight training operation, air ambulance and movements by locally based aircraft. It is expected that local movements will increase by 1.5% during the period consistent with growth in flight training and the number of based aircraft. [2]

6 To date, cargo volumes at the Airport have been relatively minor, and are typically associated with timesensitive and perishable goods. Cargo operations are dependent solely on the growth in the local and regional economy; therefore growth is expected at 1.0% per annum during the period. Currently there are over thirty (30) aircraft based at the Airport including those associated with the flight school. If expanded facilities and services are available at the Airport, the number of based aircraft could increase by 10% per annum until pent-up demand is satisfied, and thereafter 3.5%. In short, the best opportunity for growth will be from recreational and tourism needs. FACILITIES AND SERVICES The Airport s primary runway, categorized as an instrument Code 2B facility, is 1,067 metres (3,500 ft.) by 23 metres (75ft.) and is capable of accommodating most twin-engine aircraft and a limited number of corporate jets without restrictions. Based on the forecast, the runway will need to be extended to 1,198 metres (3,930 ft.) in order to accommodate projected commercial and corporate activity. The secondary runway is categorized as a non-instrument Code 2B facility, is 805 metres (2641 ft.) by 23 metres (75 ft.) and has an operational displacement of metres (360 ft.) at the Runway 03 end. The existing Airport layout is shown on Exhibit 1. The following is a short list of the Airport s other major facilities and equipment: 9,300 m2 (100,110 sq. ft.) asphalt aircraft apron connecting to the runways by way of two taxiways; a 620 m2 (6,674 sq. ft.) terminal/flight school/restaurant complex; aircraft fuel facility providing LL 100 and Jet A1 fuel; a variety of visual aids-(runway lighting, wind directional indicators, guidance signs, rotating beacon) and apron floodlighting; and a I0-unit GA hangar complex and one 375 m2 (4,035 sq. ft.) aircraft hangar. The two runways and the apron have been identified as requiring significant pavement rehabilitation. In addition, the apron floodlight is aging and inadequate for the present needs. The runway and taxiway lighting was fully replaced in The existing terminal/flight school/restaurant complex, constructed in the early 1960 s and expanded over the years, is not able to serve passenger or GA pilot needs. It is proposed that the complex be expanded and the facade improved. In order to improve safety for approaches into Runway 31 and to reduce approach minimums, it is recommended that an omni-directional approach lighting system (ODALS) and precision approach path indicator (PAPI) be installed to serve the Runway 31 approach. [3]

7 The Airport currently has one published runway approach procedure (VOR/DME). However, this procedure requires a visual circling procedure and only provides minimums down to 718 ft. In order to improve access and usability of the runway, it is recommended that the ODALS/PAPI visual approach aids (noted above) be implemented, in addition to a non-precision GPS approach procedure for Runway 31. These improvements should allow for approach minimums down to about 400 ft. This is important given the proposed Big Box store development to the south east of the airport. The table on page [6] is a summary of the recommended capital improvement program required to serve the shortterm (FY2013-FY2017) and long-term (FY2018-FY2022) needs of the Airport. The total short-term capital cost of the proposed program is $8.092 million in 2013 dollars. LAND USE The Airport property lies in a rural/agricultural area immediately west of the Lindsay Urban Area. The City of Kawartha Lakes Consolidated Official Plan was Council approved in 2010, and designates the airport lands within the revised Lindsay Urban Settlement Area in an industrial designation. This was done to recognize the existing airport and to plan supporting infrastructure to service that facility. highway commercial use adjacent to the southeast boundary and a future Community Development use immediately east of Highway 35. To protect airports from incompatible development, the Provincial Policy Statement and the City s Official Plan limit new residential development to those areas above a 30 Noise Exposure Forecast/Noise Exposure Projections. At this time, it is not believed that noise impacts exist beyond the limits of the Airport property (i.e. above NEF/NEP 30). In order to facilitate the controlled and progressive development of airport lands while maintaining safe operations, protecting existing and future lands, facilities and optimizing the Airport s economic potential, the Business Vision presents a land use plan intended to control development within the Airport property during the planning period. The Business Vision identifies areas for core airport operations, general aviation and terminal uses, aviation and nonaviation industrial/commercial development, and open space. In addition, the Business Vision offers intended uses and recommended development control guidelines for each designated area. The proposed land use is shown on Exhibit 2 The Airport consists of 68.1 ha (168.3 ac) of land bounded by Monarch Road to the west, Highway 35 to the east, and privately held lands to the north and south. The surrounding land use is generally agricultural with a [4]

8 EXISTING AIRPORT LAYOUT EXHIBIT 1 [5]

9 Improvement Description Cost (2013 $) Timeline Apron Rehabilitation 60, Apron Expansion & Parking Lot (Robinson) 80, Paving & Drainage around north T-Hangars 80, New T-Hangar Building (10) 620, New Internal Roadway (Gravel) 25, Apron Rehabilitation 121, Removal old fuel tanks 50, Runway Extension, widening and repave m 1,715, GPS, ODALS,PAPI,REILS, for Runway , Construction parallel taxiway m 1,420, Connection municipal services (Water & Sewer) 200, Parking & Apron lighting upgrades 15, Purchase Airport operational equipment 190, Runway Drainage, paving, lighting and painting 1,221, Interior Roads to service commercial/hangar area 600, Commercial/Hangar Area development 250, Perimeter fencing 285, Terminal renovation/rebuild 950, Total short-term 8,092,000 Land Acquisition 280, Monarch Road re-routing 215, Runway Extension to 4500 feet 650, Parallel Taxiway Extension to 4500 feet 350, unit T-Hangar construction 700, Total long-term 2,195,000 [6]

10 RECOMMENDED LAND USE PLAN EXHIBIT 2 [7]

11 ULTIMATE DEVELOPMENT PLAN The Case for Investment and Business Vision presents an ultimate development concept for a fully built-out airport which not only makes the best use of available lands, but helps ensure a flexible, responsible and logical plan of development. Such a concept plan will enable the City to make decisions today regarding development and expansion which will ensure that future needs and opportunities are not limited or constrained. The ultimate development concept as represented in Exhibit 3 contains the following planned features: development of a maximum Runway length of 1,372m (4500 feet) thus allowing for commercial and corporate air travel within North America; 13-31, aprons sized for Code C aircraft and access to Highway 35; development of a more prominent passenger and GA pilot terminal area north of the present location with expanded apron area; and redevelopment and expansion of the existing general aviation area, including space for additional hangars and apron area. In order to realize this long-term concept, the city will need to acquire, approximately 18.5 ha (46 ac.) of land to the north and west, as well as reroute a section of Monarch Road. development of a parallel taxiway on the north side of the airfield in order to improve runway capacity, safety and to help segregate commercial aviation activities from the general aviation/public side of the Airport; revised aerodrome reference code to 3C thus accommodating aircraft with wingspans of up to 36 metres (i.e. Boeing 737); development of an airside industrial/commercial area on the north side of the Airport, suitable for cargo, corporate, manufacturing, maintenance or other activities, with direct access to Runway [8]

12 LONG TERM DEVELOPMENT PLAN EXIHIBIT 3 [9]

13 AIR SERVICE & BUSINESS DEVELOPMENT For the Airport to achieve long-term sustainability it is crucial that air service be retained, expanded and attracted particularly that of passenger service which typically generates the most significant portion of an airport s revenue. In today s competitive and deregulated environment, it is incumbent on airport owners and operators to take a proactive role in developing and marketing for air services. This means staying abreast of industry trends, collecting relevant market data and partnering with travel agents, local/regional tourist boards/associations, municipalities, federal and provincial agencies and operators of regional tourist attractions. It is believed that air taxi/scheduled passenger service serving Kawartha Lakes is viable provided that an air carrier can be attracted that will provide a high quality, reliable and reasonably priced product offering. The City should seek to develop and exploit new innovative air service and business development strategies, such as: attraction and development of an air taxi/scheduled passenger service at the Airport; expansion of the Airport s permanent pilot base; promotion of inbound and outbound travel using air services (tied to the City s tourism strategy); on-site aviation industrial/commercial development (manufacturing, repairs, assembly); attraction of aircraft maintenance, overhaul and certification services; expansion of flight training services; development of general aviation hangars; and development and attraction of non-competitive special events (i.e. air shows, fly-ins, product/corporate launchings and civic ceremonies). FINANCIAL PLAN The Financial Plan prepared provides an analysis of the financial implications of the Case for Investment and Business Vision based on estimates surrounding present and future operations at the Airport. The Airport currently generates revenue from three main sources: fuel sales, aircraft parking fees, and terminal and hangar licenses. A comparison of the Airport s current fees and charges with that of other comparable airports indicates that the fees and charges are competitive. Despite this, some minor adjustments to fees and charges are recommended. Actual revenues derived from fuel sales are believed to be far below those expected, primarily due to the absence of a flight school in [10]

14 The new fuel facility was installed in 2011, and coupled with the new flight school, fuel sale revenues should be much improved from now on. Operating expenses are relatively low compared to the level of services provided; therefore, there appears to be no latitude for further reductions in expenses. On the basis of the cash flow analyses, the baseline (or low growth) scenario will not allow the Airport to realize an operating surplus during the planning period without external operating subsidies. Under the target (high growth) scenario, if the City embraces a proactive marketing, and business plan, the Airport could significantly improve its financial position, including an operating surplus throughout most of the period. With respect to the planned capital expenditures, there is no current government funding sources available for the types of improvements proposed. If the Airport were to achieve an annual passenger level of 1000 on commercial air services, the City could be eligible to receive funding through Transport Canada s ACAP program for all airside safety related improvements. It is believed that about one-half of the capital improvements identified could be eligible for ACAP funding. Should ACAP funding not be achievable, it is recommended that the City continue to lobby both levels of government, (Federal and Provincial) to provide the capital infusion necessary, spread out over the period from FY2013 to FY2017, to maintain and improve the quality, standard of facilities and services at the Airport. These capital improvements are necessary to maintain a reasonable level of service. The Airport is a key tool for the City s tourism and economic development strategy. OUTLOOK Since regaining full control of the Airport, the City has been successful in responsibly operating and managing the facility, while taking steps to improve services and safety. Despite planned capital expenditures in the Target scenario of about $8 million (in 2013 $ s) over the next five years that include expansion of the terminal/flight school/restaurant complex and rehabilitation, expansion, widening existing runways and apron, the City is committed to operating the Airport at a break-even financial position over the long-term. Given the Airport s strategic location and capacity for future development, the Airport could benefit from new opportunities which will ensure the long-term viability of the facility. In order to capitalize on these opportunities, the City will need to be proactive in attracting and retaining users and tenants, in establishing strategic partnerships and in marketing the benefits of the Airport. Because of the opportunities available, the long-term outlook for the Airport is positive. [11]

15 Foreword In 2002, an Airport Master Plan Study report was prepared by MMM Group which reviewed the current condition of the airport and its future potential as a major economic driver for the City of Kawartha Lakes. It identified reasons for support for development of a 1,3720m (4,500 ft.) runway and other infrastructure improvements at the City of Kawartha Lakes Municipal Airport. The proposed funding strategy for airport development required local, provincial and federal funding contributions, with the Province and the Federal Governments identified as providing the greatest majority of financial assistance. Both the Province and the Federal Government have not yet agreed to funding assistance. City of Kawartha Lakes Municipal Airport A Case for Investment and Business Vision is a follow-up to the 2002 report, as well as other studies for the purpose of acquiring funding of $8,000,000 to proceed with the planned airport development, principally using provincial and federal funds, and based on parameters that could best illustrate the development opportunities, revenue increases, job retention and job creation at the airport. These parameters along with the various estimates/assumptions used in this Business Plan report are, of course, subject to changing conditions; all dates are approximate and are for illustration purposes only. The results of this business vision should therefore be reviewed in this context. The City of Kawartha Lakes Airport Board provided overall direction for the preparation of the A Case for Investment and Business Vision. The Marshall Macklin Monaghan 2002 study provided much of the detail contained in the vision document. Other contributions came from Jocelyn Purcell, Inside Canadian Airports - Economic Impact Study 2007; Mike Osypchuck, Consultant Airport Service Review, 2007; AMEC Earth & Environmental - Airfield Pavement Condition Survey, 2008; Leigh Fisher Management Consultants Ontario Municipal Airports Update 2011; R Fortin & Associates Business Plan; Kawartha Lakes Flying Club, COPA 101, Eric Dumigan and Bob Burns - aerial and ground photos; City of Kawartha Lakes Public Works, Planning & Development Services, Finance & Engineering staff - technical support and advice; Judith Hayes - document editing and Tom Savage - aviation rules and regulations. George Sweetnam Ric McGee Mark Fisher Chair Mayor CAO Airport Board City of Kawartha Lakes City of Kawartha Lakes 1

16 1. Background The airport has been part of the transportation infrastructure in Kawartha Lakes since the early 1960 s.when it was constructed as a general aviation facility. This facility was upgraded over time and aviation business tenants were established at the airport. Facility was operated under a lease agreement until Between 1979 and 2001, the Airport was managed, operated and maintained under a lease agreement with Lindsay Airpark. In 2001, the City bought back the head lease in order to take a greater role in day to day operations. Since taking over management and operation of the airport in 2001, the City has been working toward development and upgrading of the airport, as well as implementing safety and service improvements in order to achieve full compliance with Federal regulations and accepted industry practice. A great deal of effort and activity has taken place regarding the airport: December 2002 Lindsay Airport Master Plan Study by Marshall Macklin Monaghan. In May of 2003, The Development and Public Works Committee submitted a report recommending safety repairs to the fuel system, navigational aids, beacon and culvert. From 2003 to 2007, City staff made repairs to the fuel system, installed new navigational aids and beacon, replaced the culvert under the taxiway, drilled a new well and flushed the septic system. It was recommended that staff and the Economic Development Advisory Board proceed with a full review of the Master Plan and formulate a business plan that involves community input. Council resolved that a task force be formed to review the master plan and formulate a business plan for the Lindsay Airport. This Airport Task Force was established in 2003 and was in existence until Airport Service Review Report 2007 & Airport Economic Impact Study 2007 & update The Airport Task Force held public consultations to get input from all stakeholders. At the Council Meeting of December 9, 2008, The Airport Task Force Final Report was received and accepted and Council gave the green light to pursue airport development. In 2008/2009, the City of Kawartha Lakes Municipal Airport Board was established with the mandate to implement the Task Force recommendations. June 26 th City of Kawartha Lakes Municipal Council passed Resolution CR that Council support The Case for Investment & Business Vision in order to seek funding opportunities from the Federal Government and The Province of Ontario. 2

17 Aviation Industry Requirements: Aviation in Canada operates on the principle that safety is a shared responsibility by all members in the industry, both on the ground and in the air. The Federal National Airports Policy NAP 1994 provided a framework that clearly defined the Federal government s role with Airports in Canada. Under NAP the Federal government withdrew from operational and financial involvement in regional and local Airports and became the regulator of the Industry. Now, Transport Canada sets the standards and regulations for the safe operation and maintenance of Airports in Canada. The department ensures compliance with standards and regulations through a regular program of comprehensive monitoring, inspections and audits. They also initiate training and promotional campaigns to encourage safe practices by aviation professionals in Canada. It is within this framework that the Lindsay Airport must operate. In 1999, Transport Canada introduced Flight 2005, a planning document used by the department to move the Civil Aviation program towards their new role as safety managers. Flight 2005 provided a safety framework used to identify Transport Canada s operating principles and values, described the direction for the next five years, provided safety targets, and identified key results. During the five years following the introduction of Flight 2005 advances have been made towards a safety focused and self-regulating industry. FIight 2010 has now been introduced and in keeping with the systems approach to managing risks for aviation organizations, Civil Aviation has begun to institute a formal framework for its own management systems through an Integrated Management System (IMS). So what does this mean for Airport owners and operators? These new regulations have placed greater responsibility on owners and operators to ensure compliance with these new regulations. Certified Aerodromes Airports are aerodromes certified under Subsection of the CARs. Despite regulations that govern registered and non-registered aerodromes, the onus remains on a pilot to determine whether an aerodrome is safe and suitable. Regulations are in place primarily to protect those unfamiliar with an airport environment - the fare-paying public and those residing in the vicinity that could be affected by unsafe airport operations. Operating rules are listed in CAR Ill, Sub-part I of the Canadian Aviation Regulations (CARs), which also set forth provisions for registering an airport in the Canada Flight Supplement (CFS) - a publication for pilots containing operating information for registered aerodromes and airports. 3

18 Certified Aerodromes cont d Certification requires an operator to maintain and operate the site in accordance with applicable Transport Canada standards listed in Transport Canada s TP Aerodrome Standards and Recommended Practices. Transport Canada staff conduct regular inspections to ensure compliance. Aerodromes in Canada must be certified when: They are located within the built-up area of a city or town; They are used by an air carrier as a main operations base, or for scheduled passenger carrying service; The Minister considers certification is in the public interest. Registered Aerodromes While listed, registered aerodromes are not certified as airports in the Canada Flight Supplement (CFS). Registered aerodromes are not subject to ongoing inspection by Transport Canada; however, they are inspected periodically to verify compliance with Canadian Aviation Regulations (CARs) and to ensure the accuracy of information published in the CFS. In spite of these efforts pilots planning to use a registered aerodrome are still expected to contact aerodrome operators to confirm CFS information is current. The Lindsay Airport was once a holder of a valid Airport Operators Certificate and considered a Certified Airport; however, the costs associated with maintaining certification was found to be too high. The Lindsay Airport gave up its certification and is now a Registered Aerodrome. In order for the City to require the airport to become a Certified Airport, numerous steps and actions would be required. A few of these actions would include, ensuring the infrastructure meets current standards, an inspection/audit completed by Transport Canada, and ensuring ongoing compliance with regulations. 4

19 2. Existing Conditions 2.1 Airport Location and Service Area The City of Kawartha Lakes Municipal Airport is located just west of the community of Lindsay, the business hub of the City of Kawartha Lakes. Located on the northeast border of the Greater Toronto Area (GTA), the City of Kawartha Lakes covers more than 300,000 hectares and is comprised of seventeen former municipalities, amalgamated in 2001, that are linked by the Trent Severn Waterway. Just over a one hour commute to the GTA, many Kawartha Lakes residents commute to the Toronto area for work. Known as the "Land of Shining Waters", the region is home to more than 250 lakes and rivers and has evolved into a prime recreational/cottage and retirement centre for GTA residents. Driving Distances to the City of Kawartha Lakes From Distance (KMs) Toronto 135 Hamilton 200 Fort Erie 285 Niagara Falls 260 Kingston 180 Montreal 450 Windsor 490 Lindsay 5

20 EXISTING AIRPORT Photo courtesy of Bob Burns View to the West 6

21 EXISTING AIRPORT LAYOUT PLAN Figure 2.1 7

22 2.2 Airport Facility The following facilities and services are available at the City of Kawartha Lakes Municipal Airport CNF4: Operating Areas Runway 13-31: 1067m x 23m (Code 2B Non-Precision) Paved and Lighted (Remote radio control access) Runway 03-21: 805m x 23m Turf (Code 2B Non-instrument) Taxiway Alpha: 171m x 11m Asphalt Taxiway Bravo: 417m x 11m Asphalt & Turf Main asphalt aircraft parking apron: 9300m2 Turf tie-down area for outdoor storage of aircraft Non designated Turf Taxiway Public parking facility Buildings Airport Terminal/Flight School/Restaurant/Pilots Lounge/Washrooms Building: 620m2 South Aircraft Hangar: 375m2 North 10 T-Hangar: 960m2 Other Aircraft Refueling Card Lock System: Avgas 100LL & Turbo/Jet A1 fuel Unicom MHz & ARCAL A web site ( is maintained for visitor information about the airport & facilities Card Lock Fuel System Pilots Lounge 8

23 2.3 Current Condition of Airport Infrastructure Key Infrastructure The key infrastructure for the operation of the Airport is the main runway, secondary turf (grass) runway, main aircraft apron and associated taxiway system. The Lindsay Airport Master Plan Study found the existing runway length to be adequate to serve the operating requirements for all aircraft types currently using the Airport and the present activity levels. However, in order to attract larger aircraft and accommodate increased usage, the main runway would need to be extended as well as the construction of a parallel taxiway. A preliminary inventory of the existing Infrastructure includes: Item Date of Construction Current Condition Runway Asphalt 1963 Fair. Extension and 1985 rehabilitated repave required Extended Drainage upgrading required Micro surfaced Runway Turf (grass) 1963 Good. Minor maintenance & Drainage work required. Taxiway A Alpha 1960 s Fair to good. Taxiway B Bravo 1960 s Good. Repaved and extended in 2012 Public Aircraft Apron Asphalt 1960 s Poor. Repave required. Runway Edge Lighting 2002 Excellent Taxiway Edge Lighting 2002 Excellent Apron Flood Lighting 1960 s Poor. Inadequate for area. Wind Directional Indicators Good. Rotating Beacon Good ARCAL Aerodrome Lighting Good Airfield Power Supply Good 9

24 Buildings The Lindsay Airport Master Plan Study completed in 2002 identified that the Air Terminal Building (ATB) is not able to serve passenger or GA pilot needs and required upgrading. The capital budget forecast includes an allocation to repair the ATB, and some work has been completed at this time. A preliminary inventory of the existing facilities includes: Building Date of Construction Current Condition Air Terminal Building (ATB) Mid-I960 s Poor (Requires upgrading). South Aircraft Hangar 1982 Good (Wall and roof have no insulation). North T-Hangars Mid-1980 s Good. Terminal Building (Airside) 10

25 2.4 Aircraft Movement Activity General Aviation Data Aircraft Movements: The City of Kawartha Lakes Municipal Airport currently handles an estimated 20,000 local aircraft movements annually. Itinerant activity at the airport is estimated to be in the range of 3,000 to 4,000 movements. Local movements at the airport primarily consist of flight training circuits and practice flights (touch and go), while flights operating between Lindsay and Oshawa, Buttonville and Toronto City Centre airports account for most of the itinerant movements. The Air Ambulance Service of Ontario also makes frequent use of the airport with both fixed wing aircraft and helicopters. The infrastructure at the City of Kawartha Lakes Municipal Airport has the potential to accommodate a variety of aviation services, including charter services, cargo operations, corporate users, military aircraft, and more. Air Ambulance Data Patients transferred out via airport: Average 143 per year 11

26 2.5 Aviation Trends General Aviation An article published by the US Airport Owners and Pilot s Association cites that the future of General Aviation is promising and currently makes up over 1% of the US GDP, which is almost as large as the petroleum industry. This article refers to seven key areas of anticipated GA growth: On-Demand Air Taxis (point to point travel); Corporate Aviation (regional flying); Entertainment and News Gathering (air shows, news coverage, flybys in film and video); Agricultural Services (aerial planting, fertilizer applications, crop dusting); Law Enforcement (patrol and pursuit, surveillance, evidence gathering, search and rescue); Overnight Freight (small packages and letters to outlying cities and towns); Personal Use (visiting tourist spots, sightseeing). The trends in the GA industry which may influence the forecasts for Lindsay Airport (either positively or negatively) include: Increase in production of GA aircraft - Since 1995, the production of GA aircraft has steadily risen. In the U.S., a number of manufacturers re-started production of new piston engine aircraft following passage of the General Aviation Revitalization Act in Rising cost of GA flight - Despite the recent increase in GA activity since 1995 and as a result of the tragic events of September 11, 2001, the cost of owning and operating aircraft is rising (principally due to the cost of aircraft insurance and aviation fuel). New technologies are influencing the use and safety of flight The use of technologies such as the global positioning system (GPS) are having a significant impact on the demand for and level of safety for GA flight. Fractional ownership programs The recent popularity of these programs is contributing to the increased awareness and utility of business/corporate aircraft, primarily jet and turboprop types. These programs allow businesses and individuals to purchase an interest in an aircraft and pay for only the time they use the aircraft. While fractional ownership in the United States is booming, it has been applied very limitedly in Canada primarily 12

27 because of Transport Canada s operating regulations and security laws, which differ from that of the FAA, in the United States. Should Transport Canada loosen regulations which currently restrict the viability of fractional ownership, then it should have a dramatic impact on business and corporate air travel. The age of GA aircraft is increasing The average age of used GA aircraft in the U.S. is approximately 35 years old. This number is expected to increase to 41 by the year General aviation demand has historically been influenced by population growth of the air service area, continued diversification of the local economy, and disposable income levels. As noted in Section 4, the population of the City of Kawartha Lakes is expected to increase 30,000 over the next 20 years. Disposable income for the community is expected to increase by roughly the same rate Ontario Aviation Trends Total aircraft movements among reporting Ontario municipal airports increased 15% between 2006 and 2010; an average of 3% p.a. Itinerant traffic represents approximately 57% of the total aircraft traffic among reporting airports Itinerant traffic grew a total of 16% between 2006 and 2010; an average of 4% p.a. Transport Canada forecasts that Canadian general aviation activity, on a national basis, will grow at a rate of approximately 2.6% per year. 2.6 Aviation Demand Projections Passenger Projections Lindsay Airport has historically never had scheduled passenger service. The primary reason for this is its proximity (within 2-hour driving time) to Greater Toronto Area (GTA) airports offering various levels of scheduled passenger service. These airports include L. B. Pearson International, Toronto City Centre, and Buttonville Airport. Because of the Airport s current lack of scheduled passenger service and the recent fluctuations in passenger air travel over the last few years, it is difficult to apply any existing national or regional scheduled air carrier forecasts to the Lindsay Airport situation. It is believed that the market can currently sustain an annual passenger level of about 7,500. However, it is reasonable to assume that new air taxi or scheduled service, if commenced by 2015, may take up to two years (by 2017) to fully absorb the pent-up demand since marketing efforts need time to take affect and markets need time to accept a new service. Therefore, the initial two years of new service may see up to 15% increases per annum. Further, it is believed that passenger service at the Airport, if appropriately marketed and provided by a consistent and conscientious carrier with reasonably priced service, could grow by 3.5% per annum beyond However, the caveat to this growth scenario is that no operators are currently expressing serious interest in providing air taxi or scheduled service. 13

28 2.6.2 Air Charter Projections The Airport had a small but growing charter business which is predominantly a result of the lack of scheduled service and the increase in use of GA charter rather than scheduled services (due to September 11th, 2001 and because of the time and cost factors at major hub airports). Some of this traffic could disappear if scheduled service were to be reintroduced. However, there are also many charter movements which are not dependent on users which otherwise might access scheduled service. The Airport has experienced a steady increase in trans-border charter movements (between the US and Canada) over the last five years. Trans-border tourism related movements, although still relatively few in number, are seeing steady increases. This sector is expected to grow due to the recent rise in fortunes for the tourism industry in the region. It is felt that charter traffic could increase by as much as 3.5% per annum during the planning period Itinerant Movement Projection The number of itinerant movements will be greatly influenced by the ability of the Airport to commence an air taxi or scheduled air service operation at the Airport. In addition, itinerant movements associated with tourism should also have a significant impact. Despite the national trends for itinerant traffic, it is believed that the Airport could realize an annual increase of 3.5% over the next 10 years Air Cargo Projection The airport handles a relatively small quantity of local inbound and outbound cargo. Currently, there are no scheduled dedicated cargo flights using the Airport and no information exists about the volume of cargo that is shipped from the Airport annually. Typically, cargo flights originating or destined for the Airport are of the just-in-time or perishable variety, and are sporadic at best. Because of the City s proximity to major cargo hub airports (i.e. Pearson International, Hamilton International), integrated cargo (Fedex, Purolator) and express courier operators tend to ship goods to/from the City via ground transportation. This trend is not expected to change over the long-term. The cargo demand for the Airport is, therefore, dependent on growth in the local and regional economy. Conditions indicate that the Airport would certainly not support a regular cargo operation based on current and forecast demand. However, this does not rule out that there maybe existing businesses within the region which have not yet made a linkage between their products and operation, and the use of the Airport as a cargo departure point. 14

29 The demand for air cargo at the Airport is expected to increase by 1.4% per annum which is consistent with the expected growth in population and disposable income Based Aircraft Projection It is believed that the number of based aircraft at the Airport has been limited over the last number of years due to: (1) the lack of available hangar and apron space; (2) the lack of AMO services; (3) the general degradation of the Airport s facilities. Should these three limitations be improved upon, it is believed that the Airport could see an annual increase of up to 3.5% in number of based aircraft over the next 10 years Local Movements Projection Based on the national trends and historical trends at the Airport, it is expected that the number of local movements will increase by at least 1.5% per annum. Although, national trends indicate a higher increase, the projection figure is limited due to the high proportion of local movements associated with the flight training operation. The flight training operation is only expected to increase by the same rate as the population, 1.4% annually. 2.7 Consolidated Projection In order to consider a realistic overall aviation demand projection and yet have a projection that can fully exploit the growth potential of the Airport, two demand forecasts are presented a baseline and a target projection. Table 2.1 summarizes the 10-year baseline and target projections for the Airport. Baseline Scenario For planning purposes, the traffic projections must recognize the realities of a flat or very modest (say about 1%) increase in revenue generating aircraft movements as a baseline projection. This is supported by the population and economic projections for the City. In addition, the baseline scenario reflects no scheduled passenger traffic, as is the case today. This will allow the review of pricing options and the assessment of other revenue sources or enhancements necessary for a baseline eventuality. Target Scenario.A more realistic target should be established to provide the Airport and the City with an aggressive, yet attainable, goal. This target should focus on the benefits to the Airport in terms of passengers and aircraft movements. 15

30 TABLE 2.1- AVIATION DEMAND FORECAST BASELINE & TARGET SCENARIOS Year No. of Based Local GA Itinerant GA Air Taxi/Charter Aircraft Movements Movements Passengers Baseline Scenario ,000 3, ,100 3, ,201 3, ,302 3, ,403 3, ,505 3, ,608 3, ,711 3, ,814 3, ,918 3,430 0 Target Scenario , , , , , , , , , , , , , , , , , ,896 16

31 3. Airport Employment Activity Direct Employment activity at the airport is estimated as follows: i) Government City of Kawartha Lakes: Airport maintenance, management and operations one part-time airport manager as well as contracted services for snow plowing and grass cutting. Total staff is estimated at 1.5 (FTE). ii) Aviation/Manufacturing E.B. Robinson Ltd: Aircraft maintenance & modification, 3D Cad Services, aircraft retrieval, instrument panels, Seabee LS 10 Corvette V8 engine conversions, and development of new Seabee* 6 passenger aircraft. Lessee of South hangar. Nine persons employed. Canadian Academy of Flight (April 2012): International flight school & training. Lessee of terminal office space & hangar. Anticipated six to nine persons will be employed. iii) Food Airportview Restaurant: Full service restaurant serving breakfast, lunch and dinner. 9 persons employed. Summary Direct Employment: During the year 2011, the Kawartha Lakes Municipal Airport supported an estimated 19.5 person years of employment. It is anticipated this will go to 30 person years in * This development could lead to significant employment opportunities for the area with the potential for 100+ manufacturing and technical jobs. 17

32 4. Regional Economic Impact Study In 2007, an Economic Impact Study report was prepared by Inside Canadian Airports for the City of Kawartha Lakes Airport. Study methodology and results are as follows: 4.1 Methodology The purpose of the study was to measure the contribution of the airport to the regional economy. To determine the economic impact, three types of impacts were measured: direct, indirect, and induced. Direct economic impact refers to the employment and revenues attributable to the commercial activities which physically take place at the airport. The indirect economic impact measures the value of goods and services purchased by airport businesses from other firms, in terms of the employment and revenues resulting from their operations in support of airport operations. The induced economic impact is the increase in employment and revenues resulting from direct and indirect airport activities. The jobs sustained by the direct and indirect airport activity generate an increase in household income. This drives the induced economic impact that results from an increase in purchases at local businesses. The traditional approach to estimating the economic impact of an airport involves in-depth interviews and detailed review and financial analysis of the operations of the businesses which operate at the airport. An alternative method, which has been used here, is the statistical approach. For this analysis, the economic impact of the City of Kawartha Lakes Municipal Airport has been estimated using a model originally formulated by the Transport Institute of the University of Manitoba. Transport Canada began using the Transport Institute model in 1993 to produce estimates of the economic impact of airports throughout the Pacific region. The decision to use the model followed an evaluation of the accuracy of the model against the traditional survey methodology. On average, the econometric model was found to produce estimates of revenues and employment which varied between 5 and10% of the survey estimates, producing fair and reasonable measures of an airport's economic impact. Ontario airports that have used the model include Brockville, Lake Simcoe Regional (Barrie), Sault Ste. Marie, Waterloo, Peterborough, North Bay, Niagara District Airport (St. Catherines), Haliburton/Stanhope, London, Dryden and Kingston. 18

33 4.2 Population/Industry and Labour Force Population: The current population of the City of Kawartha Lakes is estimated to be 74,561. Amalgamated in 2001, the area s population has grown by a total of 8.3% since 1996, and is expected to reach 105,000 by the year The largest population centres in the City of Kawartha Lakes are Lindsay, Fenelon Falls, Bobcaygeon and Omemee. An estimated 213,000 people live within 40 kilometres of Lindsay, and more than 4.2 million reside within a 100 kilometre radius of the City of Kawartha Lakes Municipal Airport. Population City of Kawartha Lakes 100,000 80,000 60,000 40,000 20,000 Industry and Labour Force: Industry Canada: Community Demographics Government of Ontario: Proposed Growth Plan for the Greater Golden Horseshoe The area has been successful in developing a diverse economy, and the labour force profile of the City of Kawartha Lakes illustrates the importance of manufacturing, retail trade, health care and construction to the local economy. Together these sectors represent 46% of the labour force. More than 130 manufacturing companies are located in the City of Kawartha Lakes; 25% of which export products outside of Canada. As the business hub of the region, Lindsay is home to the largest employers in the city. The municipal government is the largest single employer, followed closely by the Trillium Lakelands District School Board and Ross Memorial Hospital. 19

OCALA INTERNATIONAL AIRPORT MINIMUM STANDARDS FOR COMMERCIAL AERONAUTICAL ACTIVITIES

OCALA INTERNATIONAL AIRPORT MINIMUM STANDARDS FOR COMMERCIAL AERONAUTICAL ACTIVITIES OCALA INTERNATIONAL AIRPORT MINIMUM STANDARDS FOR COMMERCIAL AERONAUTICAL ACTIVITIES Revised June, 2012 1 OCALA INTERNATIONAL AIRPORT MINIMUM STANDARDS FOR COMMERCIAL AERONAUTICAL ACTIVITIES TABLE OF CONTENTS

More information

MASTER PLAN PREPARATION

MASTER PLAN PREPARATION Located in the East Valley of the Phoenix Metropolitan Area, Phoenix-Mesa Gateway Airport is a former military airfield that has successfully made the transition to a full service commercial passenger

More information

10 Aviation Element. 10.1 Introduction. 10.1.1 Purpose of Chapter

10 Aviation Element. 10.1 Introduction. 10.1.1 Purpose of Chapter 10 Aviation Element 10.1 Introduction 10.1.1 Purpose of Chapter This chapter provides the aviation element of the RFATS 2035 Long Range Transportation Plan. It describes the existing conditions and trends

More information

Nanaimo Airport Business Plan Summary June 2007 EXECUTIVE SUMMARY

Nanaimo Airport Business Plan Summary June 2007 EXECUTIVE SUMMARY Introduction EXECUTIVE SUMMARY The Nanaimo Airport Commission (NAC) engaged Jacobs Consultancy Canada Inc. (JC) to develop a Business Plan for the airport. The Business Plan incorporates the findings of

More information

Welcome. Pemberton Regional Airport Planning Continuum. and opportunities for dialogue 2005 2006 2007 2008 2009... PEMBERTON REGIONAL AIRPORT

Welcome. Pemberton Regional Airport Planning Continuum. and opportunities for dialogue 2005 2006 2007 2008 2009... PEMBERTON REGIONAL AIRPORT Welcome. The Village of Pemberton is initiating a community process on the future potential of the Pemberton Regional Airport and wants to hear from you! The purpose of this engagement is to: Communicate

More information

> Current Operations & Business Context. Bankstown Airport Master Plan 2004/05. Bankstown Airport / Master Plan > 29

> Current Operations & Business Context. Bankstown Airport Master Plan 2004/05. Bankstown Airport / Master Plan > 29 Bankstown Airport Master Plan 2004/05 Bankstown Airport / Master Plan > 29 8.1 Bankstown Airport s Role in the Sydney Basin Bankstown Airport is the premier GA airport in NSW. In addition to servicing

More information

Current and Forecast Demand

Current and Forecast Demand Existing Facilities A new terminal opened in September 2005 at the Southwest Florida International Airport (RSW), replacing the 17-gate original terminal that opened in 1983. The $438 million Midfield

More information

WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN CITY OF WATSONVILLE, SANTA CRUZ COUNTY, CALIFORNIA CHAPTER 3. AVIATION FORECASTS REVISED APRIL 2010

WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN CITY OF WATSONVILLE, SANTA CRUZ COUNTY, CALIFORNIA CHAPTER 3. AVIATION FORECASTS REVISED APRIL 2010 WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN CITY OF WATSONVILLE, SANTA CRUZ COUNTY, CALIFORNIA CHAPTER 3. AVIATION FORECASTS REVISED APRIL 2010 TABLE OF CONTENTS WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN

More information

COMMERCIAL AND GENERAL AVIATION

COMMERCIAL AND GENERAL AVIATION Existing Facilities Daytona Beach International Airport is served by a number of airside and landside facilities. The airport has three asphalt runways: Runway 7L/25R (10,500 feet long by 150 feet wide),

More information

Operations at Coulter Airfield

Operations at Coulter Airfield Operations at Coulter Airfield Outline Background Assets Budget Options Questions/Direction Vision (January 2010) 1. Maximize Economic Viability of Coulter Field as an Asset to the City Strategic Issue

More information

THE ECONOMIC IMPACT OF THE RUSS BEACH SMITHS FALLS / MONTAGUE AIRPORT

THE ECONOMIC IMPACT OF THE RUSS BEACH SMITHS FALLS / MONTAGUE AIRPORT THE ECONOMIC IMPACT OF THE RUSS BEACH SMITHS FALLS / MONTAGUE AIRPORT prepared for The Smiths Falls / Montague Airport Commission RP ERICKSON & ASSOCIATES AVIATION CONSULTANTS CALGARY, ALBERTA, CANADA

More information

Existing Facilities. Current and Forecast Demand

Existing Facilities. Current and Forecast Demand Existing Facilities JIA is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual Service Volume (ASV) of the runway

More information

Mary C. Frederick, RCE PMP Division Chief. Caltrans Division of Aeronautics 1

Mary C. Frederick, RCE PMP Division Chief. Caltrans Division of Aeronautics 1 Mary C. Frederick, RCE PMP Division Chief Caltrans Division of Aeronautics 1 Aeronautics Mission Assist in the development and preservation of a safe and environmentally compatible air transportation system

More information

Application For General Liability Coverage

Application For General Liability Coverage HOLMAN INSURANCE BROKERS LTD. Application For General Liability Coverage Instructions Please read carefully This application form deals with all areas of operations that may require this type of coverage.

More information

How To Know The History Of The Airport

How To Know The History Of The Airport Pekin Municipal Airport (C1) John C. Kriegsman Air Field: Fact Sheet General aviation airport included in the National Plan of Integrated Airport Systems (NPIAS) Federally funded at an estimated $6,81,412

More information

Cuyahoga County Airport - A Guide to Funding Capital Improvements

Cuyahoga County Airport - A Guide to Funding Capital Improvements 7.01 General CHAPTER 7 - FINANCIAL PLAN This chapter presents a financial plan to assist with future capital improvements and provide a guide for implementing the development of Cuyahoga County Airport.

More information

CHAPTER 8 - FINANCIAL PLAN

CHAPTER 8 - FINANCIAL PLAN 8.01 General CHAPTER 8 - FINANCIAL PLAN This chapter presents a financial plan to support capital improvement decisions and to serve as a guide for orderly development of Erie International Airport. It

More information

Economic Impact of The Charleston International Airport Complex

Economic Impact of The Charleston International Airport Complex Economic Impact of The Charleston International Airport Complex Conducted by: Center for Business Research Charleston Metro Chamber of Commerce PO Box 975, Charleston SC 940 January 05 Economic Impact

More information

COMMERCIAL AND GENERAL AVIATION

COMMERCIAL AND GENERAL AVIATION Existing Facilities Melbourne International Airport is served by three runways and a number of airside and landside facilities. The runways include Runway 05/23 (3,001 feet long by 75 feet wide), Runway

More information

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030. Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is

More information

Aerodrome Advisory Circular

Aerodrome Advisory Circular Aerodrome Advisory Circular AC(AD) NO-13 Integration of International Aviation Security (AVSEC) Measures into Designs and Constructions of New Facilities and alterations to Existing Facilities. CIVIL AVIATION

More information

Strategic Business Plan

Strategic Business Plan Williams Gateway Airport Authority Strategic Business Plan Fiscal Years 2011-2015 Adopted May 24, 2010 by the Phoenix-Mesa Gateway Airport Authority Board of Directors Page 2 TABLE OF CONTENTS Purpose...4

More information

DEPARTMENT OF INFRASTRUCTURE AND TRANSPORTATION

DEPARTMENT OF INFRASTRUCTURE AND TRANSPORTATION DEPARTMENT OF INFRASTRUCTURE AND TRANSPORTATION MANITOBA AIRPORT ASSISTANCE PROGRAM PROGRAM GUIDELINES THE MANITOBA AIRPORT ASSISTANCE PROGRAM Grants for airport operations and maintenance are available

More information

Page Intentionally Left Blank

Page Intentionally Left Blank Page Intentionally Left Blank Division Description The Airports Division, part of the Real Estate Assets Department (READ), is responsible for operating two general aviation airports, Montgomery Field

More information

Airport and Aviation Funding Programs

Airport and Aviation Funding Programs Chapter 7 Airport and Aviation Funding Programs Airports and aviation projects across the nation benefit from many funding sources including the federal, state, and local units of government. Some improvement

More information

COLUMBUS REGIONAL AIRPORT AUTHORITY. Economic Impact Study Update. Executive Summary

COLUMBUS REGIONAL AIRPORT AUTHORITY. Economic Impact Study Update. Executive Summary COLUMBUS REGIONAL AIRPORT AUTHORITY Economic Impact Study Update Executive Summary November 2012 INTRODUCTION Hearing a plane overhead is an everyday occurrence. But how many people stop to think that

More information

Planning requirements for heliports and helicopter landing sites

Planning requirements for heliports and helicopter landing sites Practice Note 75 December 2012 Planning requirements for heliports and helicopter landing sites The purpose of this practice note is to: 1. Explain how helicopter activity is regulated by the planning

More information

Appendix E FAA ALP Sheet Checklist

Appendix E FAA ALP Sheet Checklist Appendix E FAA ALP Sheet Checklist AC 150/5070-6B (incl. Chg. 1, 5/1/07) Airport Layout Plan Drawing Set The following list provides general guidelines in preparing the Airport Layout Plan set. The individual

More information

Transportation and Public Works. Business Plan 2002-2003

Transportation and Public Works. Business Plan 2002-2003 Business Plan 2002-2003 March 27, 2002 Mission Transportation and Public Works Construct, maintain and manage provincial highways, buildings and related infrastructure, and provide accommodation, property

More information

C HAPTER B USINESS AVIATION. Business Aviation

C HAPTER B USINESS AVIATION. Business Aviation 10 C HAPTER B USINESS AVIATION 10 Business Aviation v 10.1 B USINESS A VIATION Chapter 10 10.1 INTRODUCTION Business Aviation (BA) is the sub - set of General Aviation (GA) that serves corporate business

More information

An Action Plan for Toronto General Aviation The How and Why of initiating a new Executive Airport to replace Buttonville Airport.

An Action Plan for Toronto General Aviation The How and Why of initiating a new Executive Airport to replace Buttonville Airport. An Action Plan for Toronto General Aviation The How and Why of initiating a new Executive Airport to replace Buttonville Airport. By the Buttonville Flying Club Action Committee Contact: Mark Brooks, President,

More information

Snohomish County Airport Paine Field

Snohomish County Airport Paine Field Snohomish County Airport Paine Field PUGET SOUND REGIONAL COUNCIL AND THE REGIONAL AIRPORT SYSTEM The Puget Sound Regional Council (PSRC) is the planning agency for the central Puget Sound region, which

More information

Technical Chris Denich Types of LID Techniques for New Development Types of LID Retrofits

Technical Chris Denich Types of LID Techniques for New Development Types of LID Retrofits Julie Pomeroy, General Manager Brampton Flight Centre Chris Denich, M.Sc. Aquafor Beech Ltd Background Julie Pomeroy About Us Why LID What LID Challenges Technical Chris Denich Types of LID Techniques

More information

PROJECT PROPOSAL FOR THE SUPPLY AND OF A MULTI-PURPOSE AIRCRAFT HANGAR, A PARALLEL TAXI-WAY, NEW TERMINAL BUILDING AND

PROJECT PROPOSAL FOR THE SUPPLY AND OF A MULTI-PURPOSE AIRCRAFT HANGAR, A PARALLEL TAXI-WAY, NEW TERMINAL BUILDING AND PROJECT PROPOSAL FOR THE SUPPLY AND INSTALLATION OF A RADAR SYSTEM, CONSTRUCTION OF A MULTI-PURPOSE AIRCRAFT HANGAR, A PARALLEL TAXI-WAY, NEW TERMINAL BUILDING AND PRESIDENTIAL LOUNGE AT BANJUL INTERNATIONAL

More information

2006 Report Card for Pennsylvania s Infrastructure

2006 Report Card for Pennsylvania s Infrastructure AVIATION C- 2006 Report Card for Pennsylvania s Infrastructure Philadelphia International Airport (PHL) is currently one of the fastest growing airports in the world. It is also one of the most delay-prone

More information

Tauranga, Bay of Plenty

Tauranga, Bay of Plenty 19/12 720 NZZC Tauranga Aerodrome Airshow and Restricted Area NZR286 Effective: 28 to 29 JAN 12 PORTAVEX 2012 and CLAIC OF THE KY will be held at Tauranga AD during the period 27 to 29 JAN 12. This event

More information

Planning for Employment in the Greater Golden Horseshoe May 2008 Background Paper, Places to Grow

Planning for Employment in the Greater Golden Horseshoe May 2008 Background Paper, Places to Grow July 21, 2008 Mr. Brad Graham Assistant Deputy Minister Ontario Growth Secretariat 777 Bay Street, 4th Floor, Suite 425 Toronto, ON M5G 2E5 Re: Planning for Employment in the Greater Golden Horseshoe May

More information

The City of Rockwall Request for Proposals for Fixed Base Operator Services at Ralph M. Hall / Rockwall Municipal Airport

The City of Rockwall Request for Proposals for Fixed Base Operator Services at Ralph M. Hall / Rockwall Municipal Airport The City of Rockwall Request for Proposals for Fixed Base Operator Services at Ralph M. Hall / Rockwall Municipal Airport All proposals shall be addressed to: City of Rockwall Attn: Lea Ann Ewing, Purchasing

More information

NORTH TEXAS REGIONAL AIRPORT FACT SHEET. Approximately 60 miles north of Dallas, between Sherman and Denison, Texas

NORTH TEXAS REGIONAL AIRPORT FACT SHEET. Approximately 60 miles north of Dallas, between Sherman and Denison, Texas NORTH TEXAS REGIONAL AIRPORT FACT SHEET CONTACT: Mike Shahan, Airport Director 903-786-2904 airport@co.grayson.tx.us or Bill Retz, Project Manager 484-343-4040 retzw@comcast.net LOCATION: AIRPORT: Approximately

More information

3-4 June 2014 Sywell Aerodrome www.heliukexpo.com

3-4 June 2014 Sywell Aerodrome www.heliukexpo.com The UK Helicopter Trade Show 3-4 June 2014 Sywell Aerodrome www.heliukexpo.com Air-Med & Rescue: Rotor & Fixed Wing Fire Fighting Private, Commercial & Corporate Forestry & Survey Surveillance, Police,

More information

Chapter 11 Housing Page 11-1

Chapter 11 Housing Page 11-1 Housing Page 11-1 11(1) Municipal Standards for Condominium Developments That the following minimum Municipal Standards for condominium developments be established: Minimum Municipal Standards Parking

More information

The total estimated PFC revenue for the application is $266,900,000. The estimated charge effective date for this application is December 1, 2016.

The total estimated PFC revenue for the application is $266,900,000. The estimated charge effective date for this application is December 1, 2016. Public Notice of Application for Authority to Impose and Use Passenger Facility Charges (PFCs) at EWR, LGA, JFK and SWF and Amendment to Approved PFC Applications at EWR, LGA, and JFK The Port Authority

More information

APPENDIX B. Farmville Airport Access and Land Use Study. Individual Land Use Policy Reviews August 2008

APPENDIX B. Farmville Airport Access and Land Use Study. Individual Land Use Policy Reviews August 2008 Introduction APPENDIX B Individual Land Use Policy Reviews August 2008 A land use policy review was undertaken to understand the land use and other inter-related policy issues that may influence the Farmville

More information

Position Classification Standard for Aviation Safety Series, GS-1825. Table of Contents

Position Classification Standard for Aviation Safety Series, GS-1825. Table of Contents Position Classification Standard for Aviation Safety Series, GS-1825 Table of Contents SERIES DEFINITION... 2 OCCUPATIONAL INFORMATION... 2 EXCLUSIONS... 3 TITLES AND SPECIALIZATIONS... 4 CLASSIFICATION

More information

The Basic Curfew Ordinance 155727 The Non-Addition Rule 173215 The Additional Curfew Hour 171889 The Noisier Jet Phase Out 181106

The Basic Curfew Ordinance 155727 The Non-Addition Rule 173215 The Additional Curfew Hour 171889 The Noisier Jet Phase Out 181106 Disclaimer: For your convenience and quick reference, we have provided the ordinance establishing a noise abatement and curfew regulation for aircraft operating at Van Nuys Airport, as well as three other

More information

The Port of Oakland executed various settlement

The Port of Oakland executed various settlement Executive Summary 1 The executive summary provides a brief summary of the master plan for Oakland International Airport (OAK). It has the following sections: Background and Overview Background The Port

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 INTRODUCTION CHAPTER 3 ALTERNATIVES CONSIDERED The existing Afton Airport parallel taxiway, with its approximate 4,360 foot length, only accommodates one half of the runway s length, and is too short

More information

AIRPORTS ARE FOR PEOPLE WHO DON T FLY

AIRPORTS ARE FOR PEOPLE WHO DON T FLY AIRPORTS ARE FOR PEOPLE WHO DON T FLY How can an airport be for people who don t fly? They create jobs and wealth, save lives, helping to enforce the laws of the land and lower the cost of many products.

More information

ACKNOWLEDGEMENT. Townsville International Airport Master Plan 2023-1 -

ACKNOWLEDGEMENT. Townsville International Airport Master Plan 2023-1 - ACKNOWLEDGEMENT This Master Plan has been prepared in close consultation with the airline industry, airport tenants, Federal, State and Local Government agencies as well as the local community. Australian

More information

COMMERCIAL GENERAL LIABILITY INSURANCE APPLICATION - AIRPORT TENANTS (FBO)

COMMERCIAL GENERAL LIABILITY INSURANCE APPLICATION - AIRPORT TENANTS (FBO) QBAV-3019 (07-11) COMMERCIAL GENERAL LIABILITY INSURANCE APPLICATION - AIRPORT TENANTS (FBO) (Check which is desired) A QUOTATION INSURANCE POLICY RENEWAL POLICY Name of Applicant Address Applicant is:

More information

How To Study The Economic Viability Of A Regional Air Study In Saskatchewan

How To Study The Economic Viability Of A Regional Air Study In Saskatchewan Regional Airports in Saskatchewan: A Review Report Department of Highways and Transportation Northern Access, Air and Safety Unit Policy and Planning Division December 2002 Executive Summary On April

More information

2010-2011 Statement of Mandate. March 29, 2010

2010-2011 Statement of Mandate. March 29, 2010 2010-2011 Statement of Mandate March 29, 2010 Table of Contents 1. Message from Minister and Deputy Minister................................... 1 2. Department Mission...3 3. Department Mandate...3 4.

More information

(3) CATEGORY III means a permanent heliport facility. (4) COMMISSION means the City of Austin Airport Advisory Commission.

(3) CATEGORY III means a permanent heliport facility. (4) COMMISSION means the City of Austin Airport Advisory Commission. 13-1-171 DEFINITIONS. (A) Terms not otherwise defined in this article have the meaning prescribed by applicable aviation law, including Federal Aviation Administration Advisory Circular 150/5390-2A (Heliport

More information

RECURRENT FLIGHT SCHOOL SECURITY AWARENESS (FSSA) TRAINING

RECURRENT FLIGHT SCHOOL SECURITY AWARENESS (FSSA) TRAINING U.S. Department of Homeland Security Arlington, VA 22202 RECURRENT FLIGHT SCHOOL SECURITY AWARENESS (FSSA) TRAINING Recurrent FSSA Training for Flight School Employees and independent Certified Flight

More information

Part 150: Records of Approval

Part 150: Records of Approval Part 150: Records of Approval Boca Raton Airport, Florida Approved on 6/28/02 The approvals listed herein include approvals of actions that the airport recommends be taken by the Federal Aviation Administration

More information

Date: 10/10/2014 Initiated by: AAS-100

Date: 10/10/2014 Initiated by: AAS-100 U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Airport Pavement Management Program (PMP) Date: 10/10/2014 Initiated by: AAS-100 AC No: 150/5380-7B Change:

More information

ECONOMIC IMPACT OF THE SAN ANTONIO AIRPORT SYSTEM

ECONOMIC IMPACT OF THE SAN ANTONIO AIRPORT SYSTEM GRA, Incorporated Economic Counsel to the Transportation Industry ECONOMIC IMPACT OF THE SAN ANTONIO AIRPORT SYSTEM Home Office: 115 West Avenue Suite 201 Jenkintown, PA 19046 215-884-7500 215-884-1385

More information

Philadelphia County. Land Use and Growth Management Profile

Philadelphia County. Land Use and Growth Management Profile Philadelphia County is located in the southeastern corner of Pennsylvania and is bordered by the Pennsylvania counties of Delaware, Montgomery, and Bucks, and the New Jersey counties of Burlington, Camden,

More information

Plan of Construction Operations (PCO)

Plan of Construction Operations (PCO) REQUEST FOR PROPOSAL APPENDIX G Plan of Construction Operations 13 006 A Taxi A Expansionn CLIENT: TradePort International Corporation, Operators of John C. Munro Hamilton International Airport (YHM) April

More information

PUBLIC BOARD MEETING. March 25, 2010. Chinook Regional Hospital County Hall 960 19 Street South Lethbridge, AB. 1:15 to 2:00 p.m.

PUBLIC BOARD MEETING. March 25, 2010. Chinook Regional Hospital County Hall 960 19 Street South Lethbridge, AB. 1:15 to 2:00 p.m. CALL TO ORDER PUBLIC BOARD MEETING March 25, 2010 Chinook Regional Hospital County Hall 960 19 Street South Lethbridge, AB 1:15 to 2:00 p.m. A G E N D A * * * * * * * * * * * * * * * * * * * * * * * *

More information

THE NORTHERN ROCKIES REGIONAL AIRPORT

THE NORTHERN ROCKIES REGIONAL AIRPORT THE NORTHERN ROCKIES REGIONAL AIRPORT BUSINESS PLAN Prepared for Northern Rockies Regional Municipality Prepared by InterVISTAS Consulting Inc. 12 September 2011 i Executive Summary This executive summary

More information

ATAC International Business Development Strategy 2012/2013

ATAC International Business Development Strategy 2012/2013 ATAC International Business Development Strategy 2012/2013 EXECUTIVE SUMMARY This is Phase 6 of the GOA supported ATAC International Business Development Strategy (IBD) outreach to the International aviation

More information

goals and objectives objectives for the SCASP were:

goals and objectives objectives for the SCASP were: 1 executive summary 1 The South Carolina Airports System Plan (SCASP) of 2008 is to gain knowledge and understanding of the needs and requirements of South Carolina airports. The purpose of this project

More information

Sydney Airport District

Sydney Airport District Sydney Airport Business District 1 0 The abd: where business takes off This brand new commercial precinct, Sydney Airport Business District, features a combination of modern office towers, retail facilities,

More information

DEPARTMENT OF DEFENSE COMMERCIAL AIR TRANSPORTATION QUALITY AND SAFETY REQUIREMENTS INTRODUCTION

DEPARTMENT OF DEFENSE COMMERCIAL AIR TRANSPORTATION QUALITY AND SAFETY REQUIREMENTS INTRODUCTION DEPARTMENT OF DEFENSE COMMERCIAL AIR TRANSPORTATION QUALITY AND SAFETY REQUIREMENTS INTRODUCTION The Department of Defense (DOD), as a customer of airlift services, expects an air carrier or operator soliciting

More information

Charlotte County Airport

Charlotte County Airport Charlotte County Airport Origin Originally acquired by Charlotte County in early 1940s County leased the property to the US Army during WWII Army improvements were deeded back to the County as Surplus

More information

MICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics. Airport Capital Improvement Plan 2014-2018

MICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics. Airport Capital Improvement Plan 2014-2018 MICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics Airport Capital Improvement Plan 20142018 Prepared for: West Michigan Regional Airport Holland, Michigan August 2013 Contact: Mr.

More information

3.0 FACILITY REQUIREMENTS

3.0 FACILITY REQUIREMENTS 3.0 FACILITY REQUIREMENTS This chapter identifies the facility requirements necessary to meet existing and forecast airport requirements, satisfy FAA design standards, and improve safety. The facility

More information

Under Section: II Required Services: Under Section: III Leased Premises:

Under Section: II Required Services: Under Section: III Leased Premises: May 14, 2012 The following are submitted in response to questions and for clarification. Under Section: II Required Services: 4. Maintenance, repair, and servicing of aircraft: Please clarify that the

More information

Taoyuan Aerotropolis Infrastructure Project and. Taoyuan International Airport Terminal 3 Project TAIWAN

Taoyuan Aerotropolis Infrastructure Project and. Taoyuan International Airport Terminal 3 Project TAIWAN Taoyuan Aerotropolis Infrastructure Project and Taoyuan International Airport Terminal 3 Project TAIWAN The Taoyuan Aerotropolis Infrastructure Project, seen as a prime driver of Taiwan s future economic

More information

2010 Salida Community Priorities Survey Summary Results

2010 Salida Community Priorities Survey Summary Results SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive

More information

Radio Communications in Class D Airspace by Russell Still, Master CFI

Radio Communications in Class D Airspace by Russell Still, Master CFI Radio Communications in Class D Airspace by Russell Still, Master CFI Class D airspace is one of the most common parts of the airspace system that requires specific radio communications. Although you can

More information

Community Improvement Venture Initiative Preliminary Review and Business Case Presentation to Council, June 22, 2015

Community Improvement Venture Initiative Preliminary Review and Business Case Presentation to Council, June 22, 2015 Community Improvement Venture Initiative Preliminary Review and Business Case Presentation to Council, June 22, 2015 Study Background Community Improvement Venture Initiative (CIVI) is one of six key recommendations

More information

WHICH AIR TRAFFIC CONTROLLER TO CONTACT

WHICH AIR TRAFFIC CONTROLLER TO CONTACT WHICH AIR TRAFFIC CONTROLLER TO CONTACT 1. Introduction This article is written in order to explain to all beginners in the IVAO network the basics for any pilot to contact the correct air traffic controller.

More information

1 Aircraft Purchase Checklist BUYING YOUR FIRST AIRCRAFT : A STEP BY STEP GUIDE

1 Aircraft Purchase Checklist BUYING YOUR FIRST AIRCRAFT : A STEP BY STEP GUIDE 1 Aircraft Purchase Checklist BUYING YOUR FIRST AIRCRAFT : A STEP BY STEP GUIDE 2 Aircraft Purchase Checklist STEP 1 Determine the Make & Model which meets your travel requirements. Carefully examine your

More information

AIR SAFETY IN ADVANCED ECONOMIES

AIR SAFETY IN ADVANCED ECONOMIES . AIR SAFETY IN ADVANCED ECONOMIES A comparison of Australia s safety record with other advanced economies Safety Systems Office TRIM: D14/5926 Report Information Fields Document name Description A comparison

More information

Delaware Airpark Airport Business Plan

Delaware Airpark Airport Business Plan Airport Business Plan Final Technical Report Prepared for: Delaware River & Bay Authority Prepared by: R.A. Wiedemann & Associates, Inc. P.O. Box 621! Georgetown, KY 40324 (502) 535-6570! FAX (502) 535-5314

More information

1 ASIAN LONGHORNED BEETLE OUTBREAK

1 ASIAN LONGHORNED BEETLE OUTBREAK 1 THE REGIONAL MUNICIPALITY OF YORK REPORT NO. 10 OF THE REGIONAL COMMISSIONER OF TRANSPORTATION AND WORKS For Consideration by The Council of The Regional Municipality of York on October 16, 2003 1 ASIAN

More information

VANDERBILT COMPARISON

VANDERBILT COMPARISON Village of Vanderbilt Comparison One County, One Vision Master Plan (2000) 1 15 Improve recreation in Otsego County by assessing the availability and need to improve bike paths, county recreation facilities,

More information

Students were surveyed by Brailsford & Dunlavey in the fall of 2000 to determine their priorities for Commons program spaces.

Students were surveyed by Brailsford & Dunlavey in the fall of 2000 to determine their priorities for Commons program spaces. I-1 2.0 INTRODUCTION 2.1 BACKGROUND Located in the rapidly growing Inland Empire area of Southern California (Riverside and San Bernardino Counties), the University of California, Riverside is well positioned

More information

Program: Economic Development Program Based Budget 2015 2017. Page 309

Program: Economic Development Program Based Budget 2015 2017. Page 309 Program: Economic Development Program Based Budget 2015 2017 Page 309 Program: Economic Development Vision Statement: To be recognized by companies as the premier town in Canada in which to locate. Mission

More information

We look forward to the meeting, which will also address the next steps in the study process.

We look forward to the meeting, which will also address the next steps in the study process. Airport & Aviation Consultants November 26, 2013 Mr. Randall Malik Ms. Michelle Hannah Executive Director Project Manager Cuero Development Corporation TxDOT Aviation Division 212 East Main Street 125

More information

National Interagency Aviation Council (NIAC) Phase III Strategy

National Interagency Aviation Council (NIAC) Phase III Strategy National Interagency Aviation Council (NIAC) Phase III Strategy I am happy to be here today. Aviation remains a key component to wildland fire management. The future for the agencies will undoubtedly involve

More information

Appendix D: 2015 Program & Service Budget

Appendix D: 2015 Program & Service Budget Appendix D: 2015 Program & Service Budget Program & Service Budget by Program.. 1 Program & Service Budget by Sub-Program....... 2 Program & Service Budget by Service.... 3 Program & Service Budget by

More information

Chapter 8 Department of Health and Community Services Air Ambulance

Chapter 8 Department of Health and Community Services Air Ambulance Department of Health and Community Services Air Ambulance Contents Background.............................................................. 115 Scope...................................................................

More information

The Economic Impact of Commercial Airports in 2010

The Economic Impact of Commercial Airports in 2010 The Economic Impact of Commercial Airports in 2010 January 2012 Prepared for: Airports Council International North America Prepared by: CDM Smith 8805 Governor s Hill Drive Cincinnati, Ohio 45249 Table

More information

AVIATION INVESTIGATION REPORT A06F0014 MISALIGNED TAKE-OFF

AVIATION INVESTIGATION REPORT A06F0014 MISALIGNED TAKE-OFF AVIATION INVESTIGATION REPORT A06F0014 MISALIGNED TAKE-OFF AIR CANADA AIRBUS A319-114 C-FYKR LAS VEGAS, NEVADA 30 JANUARY 2006 The Transportation Safety Board of Canada (TSB) investigated this occurrence

More information

Township of Terrace Bay Drinking Water System Financial Plan

Township of Terrace Bay Drinking Water System Financial Plan Township of Terrace Bay Drinking Water System Financial Plan August 2014 Introduction Municipalities in Ontario recently adopted a full accrual accounting approach to tangible municipal assets in accordance

More information

O U R P L A N, O U R C I T Y

O U R P L A N, O U R C I T Y OUR PLAN, OUR CITY Message from the 2014-2018 Brandon City Council The City of Brandon's Mission Statement To improve safety, health, economic security and quality of life in our community The City of

More information

CRQ MASTER PLAN Public Workshop #2 CRQ MASTER PLAN Public Workshop #2

CRQ MASTER PLAN Public Workshop #2 CRQ MASTER PLAN Public Workshop #2 CRQ MASTER PLAN May 7, 2014 Overview/Agenda Welcome & Introductions Where we are Facility Requirements Optimum Targets Remaining within existing property limits Format of Workshop Station 1: Master Plan

More information

CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT

CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT 7.1.1 Definition of Resource Airspace management is defined as directing, controlling, and handling flight operations in the volume of air that overlies the

More information

Town of Mattawa Asset Management Plan. December 2013

Town of Mattawa Asset Management Plan. December 2013 Town of Mattawa Asset Management Plan December 2013 2 P a g e Town of Mattawa Asset Management Plan Executive Summary This Asset Management Plan is intended to describe the infrastructure owned, operated,

More information

Perfect Partners The Versatility of the King Air Ideal for Canada s Fast Air A MAGAZINE FOR THE OWNER/PILOT OF KING AIR AIRCRAFT

Perfect Partners The Versatility of the King Air Ideal for Canada s Fast Air A MAGAZINE FOR THE OWNER/PILOT OF KING AIR AIRCRAFT A MAGAZINE FOR THE OWNER/PILOT OF KING AIR AIRCRAFT AUGUST 2013 VOLUME 7, NUMBER 6 $4.50 Perfect Partners The Versatility of the King Air Ideal for Canada s Fast Air PRSRT STD U.S. Postage PAID Traverse

More information

Air Traffic Management Services Plan 2012-2017

Air Traffic Management Services Plan 2012-2017 Air Traffic Management Services Plan 2012-2017 Airservices Australia 2012 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process

More information

INDONESIA - LAW ON WATER RESOURCES,

INDONESIA - LAW ON WATER RESOURCES, Environment and Development Journal Law LEAD INDONESIA - LAW ON WATER RESOURCES, 2004 VOLUME 2/1 LEAD Journal (Law, Environment and Development Journal) is a peer-reviewed academic publication based in

More information

An airport for Western Sydney. Building Western Sydney s future

An airport for Western Sydney. Building Western Sydney s future Building Western Sydney s future Western Sydney is already Australia's third largest economy and, in its own right, would be our fourth largest city. The fourth largest city in Australia should have its

More information

WATERFRONT TORONTO Where city, lake and river interact

WATERFRONT TORONTO Where city, lake and river interact COMPASS Consulting Spring 2008 2008 COMPASS Consulting The Federal Government s Participation in the Toronto Waterfront Revitalization Initiative: an Evaluation WATERFRONT TORONTO Where city, lake and

More information

Municipal Readiness for Economic Development

Municipal Readiness for Economic Development Municipal Readiness for Economic Development Contents! Municipal challenges in the 21 st century! Investment trends in southern Ontario! Key sectors! What investors look for! Are you ready? Take the Test!

More information

Aircraft Management & Charter

Aircraft Management & Charter Aircraft Management & Charter We invite you to consider Landmark Aviation as the best single-source option for aircraft management, charter, FBO and MRO services. Fast Facts Over 60 years of proud aviation

More information

Case Study: Louisville Airport Kentucky

Case Study: Louisville Airport Kentucky Case Study: Louisville Airport Kentucky The Louisville International Airport is run by the Louisville Regional Airport Authority (LRAA) an autonomous municipal corporation that was established by Kentucky

More information