1 2015 Fall Asphalt Conference VDOT 2016 Traffic Engineering Specification Revisions and Work Zone Reminders Harry A. Campbell, P. E., Central Office, Traffic Engineering Division - October 6, 2015
2 2016 Paving Schedule Section 512 Maintaining Traffic Section 704 Pavement Markings & Markers Work Zone Reminders 2
3 512 Maintaining Traffic Closely Mirrors Section 512 in the new 2016 Road & Bridge Specifications WAPM Revision 1 effective April 1, 2015, for VDOT maintenance operations WAPM Revision 1 effective July. 1, 2015 for projects bid on or after July 1, 2015 For more details on the WAPM go to: 3
4 Temporary Signs That Require Weights +25 lbs. sandbag on each leg or two drum collar weights around the center of the stand: 4
5 Required July 2014 Temporary Signs 5
6 Temporary Signs No Longer Allowed 6
7 Vehicle Warning Lights and Vehicle Mounted Signs Vehicle Warning Lights Day and night, vehicle warning light visible 360 on work vehicles entering and exiting a work zone Seal beams flash rate 75 to 135 flashes per minute or Required July 1, 2017 Allowed until July 1,
8 Automated Flagger Assistance Device AFAD: Operated by 1 or more flaggers Cannot be used as a Portable Signal Cannot operate on a timed cycle If 1 flagger is used; must have an unobstructed line of site of the AFAD and approaching traffic 8
9 Section 704 Special Provisions Pavement Markings & Markers Reorganized and includes specifics & flexibility Not Perfect BUT BETTER Clarification in the Hour Rule for temporary lane and center line: 9 Interstates & freeways 55 MPH or greater (before opening the lane to traffic) Non-freeway roads ADT of 10,000 or greater (24 hours) Non-freeway roads ADT 3,000 and 9,999 (48 hours) Non-freeway roads ADT less than 3,000 (72 hours) Surface treatment, slurry and emulsion as soon as the surface has cured enough to hold the markings
10 Section 704 Special Provisions Provides the Engineer authority to exercise judgment using traffic volume, speed and lanes for non-freeway roads VDOT Road & Bridge Standards on-line: Section 1300 Revisions (Location & Design) Other temporary markings need to be specified in the contract (schedule of routes) Milled surface 15 mils thickness temporary marking Intermediate and final surface 8 to 10 mils temporary marking (thicker permitted) 10
11 Section Pavement Marking Lane lines and centerlines within 250 feet of the stop lines on approaches to signalized intersections with two or more approaching through lanes and 45 mph or greater speed limit, shall be temporarily or permanently marked within 24 hours, unless a time extension is approved by the Engineer. 11
12 Section Pavement Marking If specified in the Contract Documents, temporary symbol/message markings or edge lines be temporarily or permanently marked within 72 hours after the end of the workday when the corresponding existing markings were obscured, removed, or eradicated on non-freeway roads with 10,000 or greater ADT, and 96 hours on less than 12 10,000 ADT non-freeway roads.
13 Permanent Markings Installation Permanent markings (including symbol/message markings) completed within 30 days after the end of the last workday of continuous paving on that section of roadway except, Hydrocarbon thermoplastic markings completed within 45 calendar days Surface Treatment (slurry seal and latex emulsion) must fully dry, surface worn-in and fully swept before permanent pavement marking is applied: Up to 30 days if Type B Class VI is installed At least 14 days for all other materials 13
14 Permanent Markings Installation Infrared Instrument required to measure molten thermoplastic Type B, Class VI markings inlaid with a roller in a non-vibratory mode when the asphalt mat is between 100 and 180 degrees (excepting latex emulsion surfaces) Contrasting marking required on concrete bridge decks greater than 75 feet in length 14
15 Work Zone Reminders Poor Temporary Signs 15
16 Work Zone Reminders 7 Mounting Height 16
17 Work Zone Reminders Limited Access Ramps Misplacement of EXIT OPEN and EXIT w/ Arrow signs Inadequate or missing ramp tapers Improper guidance is given to the motorist 17
18 Next Steps: Pavement Marking Installation, Inspection and Paving Schedule Quantities Outreach by Central Office to Area Construction Managers and Inspectors necessary Outreach to Staff preparing the 2017 Schedule forthcoming 18
19 QUESTIONS 19
20 20 QUESTIONS??? Markings, Signs, TCD Specifications & Standards: Temporary Traffic Control: Temporary and Permanent Traffic Signals: ADA Policy: Additional Information: virginiadot.org/business/trafficeng-default.asp
SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.
Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to
Guidelines. Work Zone Access and Egress
Guidelines on Work Zone Access and Egress This document describes concerns associated with work zone access and egress. The document offers recommended practices and describes effective strategies and
Table of Contents. Traffic Control Devices (Signs, Channelizing Devices, Lighting Devices, Pavement Markings) 2-7
1 Table of Contents Introduction 2 Traffic Control Devices (Signs, Channelizing Devices, Lighting Devices, Pavement Markings) 2-7 Five Parts of a Traffic Control Zone 8 Buffer Space Guidance 9 Taper Length
Temporary Traffic Control for Building and Maintaining Single and Multi-Lane Roundabouts
Purpose and Background Temporary Traffic Control for Building and Maintaining Single and Multi-Lane Roundabouts Although roundabouts have recently gained popularity and use in the United States, minimal
Transportation Infrastructure Asset Management
2015 NW Region TTAP& BIA Symposium Transportation Infrastructure Asset Management March, 2015 Happy Longfellow, PE [email protected] (206) 394-3649 ASSET MANAGEMENT OVERVIEW What? Why? How? Inventory
Guidelines. Motorcycle and Bicycle Work Zone Safety
Guidelines on Motorcycle and Bicycle Work Zone Safety This document describes work zone conditions that can cause safety concerns for motorcyclists and bicyclists. The document offers recommended practices
How To Design A Crash Investigation Site
CHAPTER 7 CRASH INVESTIGATION SITES December, 2000 7. Crash Investigation Sites (CIS) 7.1. Introduction and Usage The idea of "crash investigation sites" or areas outside of the freeway mainline where
Delineation. Section 4 Longitudinal markings
Delineation Section 4 Longitudinal markings The delineation guidelines have been developed to assist in designing and maintaining a quality delineation system. The guidelines are to comprise 19 sections
Incident Management Response Plan Hampton Roads Highway Incident Management Committee
Incident Management Response Plan Hampton Roads Highway Incident Management Committee Multi-Jurisdictional Memorandum of Understanding Highway Incident Management Plan This memorandum of understanding
SIGNING SEQUENCE IN ADVANCE OF VEHICLE INSPECTION. STATIONS (VIS & MIS) Page 1of 3
Issued: JUL 2007 STATIONS (VIS & MIS) Page 1of 3 RECOMMENDED PRACTICES PART SECTION SUB-SECTION HIGHWAY SIGNS TYPICAL SIGNING PLANS General The safety of motorists using Alberta highways, and the maintenance
ADA POST INSPECTION CHECKLIST. Job No. Route County Location
ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks
DESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job
MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION Using the Full Range of Tools for a Challenging Job Report To: TTI Committee May 13, 2014 1 Pavement Management - Suggested Treatments
MATERIALS CERTIFICATION SCHOOLS
MATERIALS CERTIFICATION SCHOOLS Registration Process Online Registration Enrollment and payment for all personnel in the Materials Certification Schools must be done online through the VDOT University
Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -
Project Information Existing Conditions Cracked and settled pavement. Structural failure within the asphalt pavement section. Anticipated Project Elements Reconstruction of all asphalt pavement on US Route
MATERIALS CERTIFICATION SCHOOLS
MATERIALS CERTIFICATION SCHOOLS 2011, Virginia Department of Transportation Registration Process Online Registration Enrollment and payment for all personnel in the Materials Certification Schools may
VERTICAL SPEED CONTROL DEVICES
H-3.8 VERTICAL SPEED CONTROL DEVICES GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Vertical Speed Control Devices in the design and construction of elements
Pavement Markings. Street markings can be used to designate parking spaces, and painted curbs can be used to supplement parking restriction signing.
Pavement Markings Pavement markings can be a very cost-effective roadway improvement in terms of reducing crashes and providing guidance to drivers, especially at night. Part 3 of the MUTCD defines the
MATERIALS CERTIFICATION SCHOOLS 2016
MATERIALS CERTIFICATION SCHOOLS 2016 2014, Virginia Department of Transportation Registration Process Online Registration Enrollment and payment for all personnel in the Materials Certification Schools
PART I TRAFFIC VIOLATIONS
PART I TRAFFIC VIOLATIONS A. MOTOR VEHICLE STATUTES N.J.S.A. 39:3-4 Driving or parking unregistered motor vehicle 39:3-9a Failure to notify change in name $22 39:3-9a Failure to endorse license $42 39:3-10
Reference Guide to Work Zone Traffic Control Texas Engineering Extension Service (TEEX)
Reference Guide to Work Zone Traffic Control Texas Engineering Extension Service (TEEX) Infrastructure Training & Safety Institute (ITSI) Material in this guide is largely extracted from the March, 2006
Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES
Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES 11.5.1 Purpose To provide a uniform procedure for determining that the last structural layer meets the applicable straightedge
KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS
KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS I. GENERAL The following policy shall apply when the intent of the project is to
Monitoring Highway Assets with Remote Technology
Monitoring Highway Assets with Remote Technology For the Michigan Department of Transportation July 2013 DYE MANAGEMENT GROUP, INC. Project Scope Summary of Technologies Aerial Imagery with LiDAR Mobile
TEMPORARY TRAFFIC CONTROL SAFETY
TEMPORARY TRAFFIC CONTROL SAFETY BASIC PRINCIPLES OF WORK ZONE TRAFFIC MANAGEMENT Temporary traffic control zone safety has become an area of national concern as awareness of risk to workers, pedestrians,
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR HOT- MIX ASPHALT (HMA) BINDER AND SURFACE COURSE
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR HOT- MIX ASPHALT (HMA) BINDER AND SURFACE COURSE While its use is not required, this checklist has been prepared to
FIBER-OPTIC CABLE PLAN CHECK
Engineering Division 201 North Broadway, Escondido, CA 92025 (760) 839-4651, FAX (760) 839-4597 FIBER-OPTIC CABLE PLAN CHECK To: Date: Project: Project No. Address: Check No. Attn: Via: The attached plans
How To Improve Safety
Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,
SECTION 32 1816 PLAYGROUND SURFACING TILES
SECTION 32 1816 PLAYGROUND SURFACING TILES PART 1 GENERAL 1.01 SECTION INCLUDES A. Resilient playground safety surfacing tiles. B. Coordinate with work shown in other sections so the work is installed
BICYCLE AND IN-LINE SKATE LAWS ROAD SHARING RESPONSIBILITIES OF BICYCLISTS AND MOTORISTS, REQUIRED EQUIPMENT AND PARENTAL RESPONSIBILITY
BICYCLE AND IN-LINE SKATE LAWS ROAD SHARING RESPONSIBILITIES OF BICYCLISTS AND MOTORISTS, REQUIRED EQUIPMENT AND PARENTAL RESPONSIBILITY The statutes in this material have been generated from the database
FLAGGER TRAINING MANUAL
FLAGGER TRAINING MANUAL June 2012 (Rev. December 2012) INSTRUCTIONS This manual is for self-training. Everyone working as a flagger on Colorado Highway projects will have studied this document and successfully
North Carolina Department of Transporta on. Guidelines. Transporta on Management Plan Development
North Carolina Department of Transporta on Guidelines FOR Transporta on Management Plan Development Work Zone Traffic Control Cover Introduction Transportation Management Plan (TMP) Coordination TC Plan
WORK ZONE SAFETY & MOBILITY GUIDANCE DOCUMENT
WORK ZONE SAFETY & MOBILITY GUIDANCE DOCUMENT August 2007 Prepared by: Vermont Agency of Transportation The following document was drafted in response to updates made to the work zone regulations at 23
High-Speed Nondestructive Testing and Intelligent Construction Systems
High-Speed Nondestructive Testing and Intelligent Construction Systems 1st International Conference on Transportation Construction Management February 9-11, 9 2008 Orlando, Florida Ted Ferragut, P.E. NDT
John Hoang P.E. ADOT Traffic Engineering Group Phoenix Design Section
John Hoang P.E. ADOT Traffic Engineering Group Phoenix Design Section 1 Saw-cut groove in conjunction with (removable) temporary tape application Why should we saw-cut & use temp. tape? Would it be cost
SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES
SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES 1. DESCRIPTION. Asphalt Waterproofing Mix (AWM) is a highly elastomeric, polymermodified, impermeable asphalt
Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005
Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Purpose The purpose of this review is to capture for technical deployment the most advanced
Beginner s Permit. Survival Guide. Compliments of. (843) 263-5023 www.123drivedrivingacademy.com [email protected]
Beginner s Permit Survival Guide Compliments of (843) 263-5023 www.123drivedrivingacademy.com [email protected] Please use this study guide to assist you in studying for your written knowledge
SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION:
September 22, 2009 Updated November 16, 2009 SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION: 1. DESCRIPTION: The cross slopes of the roadway are to be constructed as detailed in the plans and within
Transportation Management Plan Template
DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County
City of Kelowna Traffic Management Guide. December 2010
City of Kelowna Traffic Management Guide December 2010 City of Kelowna Traffic Management Guide December 2010 Prepared by: Urban Systems Ltd. 304-1353 Ellis Street Kelowna, BC V1Y 1Z9 T: (250) 762-2517
Atlanta, Georgia Road Test
1. When driving your car Into traffic from a parked position, you should: A. Sound your horn and pull Into the other lane. B. Signal and proceed when safe. C. Signal other traffic and pull directly into
DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST
State of California Business, Transportation and Housing Agency DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST District / EA: District 3/ EA 03-3E380 Date Prepared: 1/10/2013 Prepared By: Robert Himes Stage
Traffic controllers and speed zones
Section 8 Traffic controllers and speed zones 8.1 Traffic Controllers 8.1.1 General (AS 4.10.2) (a) Equipment Traffic controllers shall wear approved high visibility clothing and shall control traffic
ORDINANCE NO. Section 21-197. Traffic laws apply to persons riding bicycles, shall be amended to read as follows:
ORDINANCE NO. AN ORDINANCE TO AMEND CHAPTER 21, ARTICLE V, CODE OF ORDINANCES, CITY OF MEMPHIS, TO UPDATE REGULATIONS REGARDING THE OPERATION OF BICYCLES WITHIN THE CITY OF MEMPHIS WHEREAS, the current
FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR
FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration
HIGHWAY DESIGN MANUAL
HIGHWAY DESIGN MANUAL Chapter 16 Maintenance and Protection of Traffic in Highway Work Zones Revision 85 April 8, 2016 This page is intentionally left blank. MAINTENANCE AND PROTECTION OF TRAFFIC Table
CHAPTER 2B. REGULATORY SIGNS
December 2000 Page 2B-1 CHAPTER 2B. REGULATORY SIGNS Section 2B.01 Application of Regulatory Signs Regulatory signs shall be used to inform road users of selected traffic laws or regulations and indicate
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,
SAFE CYCLING GUIDE. 7th Edition
SAFE CYCLING GUIDE 7th Edition BEFORE SETTING OUT A Check tire pressure B Check that the chain does not slip C Check the brakes D Check lights and reflectors: 1 A WELL-MAINTAINED BICYCLE is key 3 4 5 Adjust
EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING
EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING TEC has performed many GPS/GIS inventory projects and studies for the Ohio Department of Transportation (ODOT), Counties, and municipalities.
CID STREET INFRASTRUCTURE ASSESSMENT
ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for
CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON
Council Meeting Date: August 11, 2014 Agenda Item: 7(c) CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON AGENDA TITLE: Motion Authorizing the City Manager to Execute a Contract with Transmap Corporation
Bicycles and Proper Highway Restrictions
Arizona Revised Statutes azbikelaw.org Title 28 - Transportation Laws: Excerpts related to Bicycling w/annotations Law last changed April 17, 2000. My notations updated: (Mar 2014 -- added 28-905 "dooring"
11 Guardrail. W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use. Modified Guardrail. End Treatments and Transitions
11 Guardrail W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use Modified Guardrail End Treatments and Transitions Footings and Anchors Impact Attenuators Measurement and Payment
TEST ON Driving Safely Among Bicyclists and Pedestrians
TEST ON Driving Safely Among Bicyclists and Pedestrians Next you will take a 16 question test about driving safely among bicyclists and pedestrians. Please take out a sheet of paper to mark down and score
ODOT Inspection Certification Program
ODOT Inspection Certification Program Overview The Inspection Certification Program is one component of ODOT s Inspection Quality Assurance (QA) Program. The Inspection Certification Program provides training
Research Digest. Table of Contents. In this Issue: TxDOT Reports
FORWARD ALL REQUESTS TO: The University of Texas at Austin Center for Transportation Research LIBRARY 3208 Red River Suite 115 Austin Texas 78705-2650 Phones: (512) 232-3126 and (512) 232-3138 Fax: (512)
Safe and Effective Use of Law Enforcement Personnel in Work Zones. Participant Workbook. Federal Highway Administration
Federal Highway Administration Safe and Effective Use of Law Enforcement Personnel in Work Zones Participant Workbook Page 1 of 46 Welcome!! Safe and Effective Use of Law Enforcement Personnel in Work
Permit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address:
City of Woodland Park Internet Service Provider (IPS) Permit for Installation of Telecommunication Infrastructure within City Owned Rights-of-Way (up to five locations per single permit) Permit No. Permit
LIMITED SCOPE CONCEPT DEVELOPMENT REPORT
LIMITED SCOPE CONCEPT DEVELOPMENT REPORT Route 33 Resurfacing Project Eastbound: Milepost 24.2 to Milepost 28.9 Westbound: Milepost 24.3 to Milepost 28.9 Manalapan & Freehold Townships, Monmouth County
14-97. 14-97.002 Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise:
14-97 14-97.001 Purpose. This rule chapter sets forth an access control classification system and access management standards to implement the State Highway System Access Management Act of 1988. The implementation
Massachusetts Private Passenger Automobile Statistical Plan Appendix C Traffic Law Violations
The following abbreviations are used in Appendix C: M.G.L. c., Chapter and Section of the Massachusetts General Laws CMR Code of Massachusetts Regulations The following out-of-state incidents are to be
211 CMR: DIVISION OF INSURANCE 21 APPENDIX A: TRAFFIC LAW VIOLATIONS. The following abbreviations are used in Appendix A:
211 CMR: DIVISION OF INSURANCE 21 APPENDIX A: TRAFFIC LAW VIOLATIONS The following abbreviations are used in Appendix A: "M.G.L. c., ", " CMR ", Chapter and Section of the Massachusetts General Laws Code
Idaho Transportation Department. Work Zone Safety and Mobility Program
Idaho Transportation Department Work Zone Safety and Mobility Program DECEMBER 2008 PREFACE In September 2004, the Federal Highway Administration (FHWA) published updates to the work zone regulations at
PART I TRAFFIC RELATED VIOLATIONS
PART I TRAFFIC RELATED VIOLATIONS A. MOTOR VEHICLE STATUTES N.J.S.A 39:3-4 Driving or parking unregistered motor vehicle 39:3-9a Failure to notify change in name $55 39:3-9a Failure to endorse license
Bicycle Safety Enforcement Action Guidelines
Introduction Bicycle Safety Enforcement Action Guidelines People ride bicycles for many different reasons: fitness, recreation, or for transportation. Regardless of the reason for riding, bicyclists young
SAFE CYCLING GUIDE. 6th Edition
SAFE CYCLING GUIDE 6th Edition BEFORE SETTING OUT A WELL-MAINTAINED BICYCLE is key A Check tire pressure B Check that the chain does not slip C Check the brakes D Check lights and reflectors: 3 4 1 5 2
Section 300 Base Courses
Table of Contents 1. Importance of Base Courses... 300-1 2. Types of Bases... 300-3 A. Cement Treated Permeable Base Course... 300-3 B. Bituminous Concrete Base Courses... 300-6 C. Superpave Asphalt HMA
Construction Traffic Management Plan
Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.
EXHIBIT A Accessible Truck Routes Map
EXHIBIT A Accessible Truck Routes Map ASHEVILLE, NORTH CAROLINA ROUTE: A ROUTE: B ROUTE: C ROUTE: D ROUTE: E EXHIBIT A EXHIBIT B Craven Street Improvements Map ASHEVILLE, NORTH CAROLINA EXHIBIT B EXHIBIT
ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES
How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all
WATERPROOFING FOR CONCRETE STRUCTURES
MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck
City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address
City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address July 005 Prepared by DMCG Disability Management Consulting Group L.L.C. 801 Jonquil Place Columbia, MO 650 In
Flagger Training & Certification
Flagger Training & Certification Flagger Training & Certification TMI has a staff of qualified professionals whose knowledge and skills are invaluable to our classroom and online training programs. TRAFFIC
PRIORITIZATION PROCESSES
PROJECT SELECTION & PRIORITIZATION PROCESSES STIP Workshop Presented by: Bill Lawrence April 2011 Purpose and Review Overview of Project Selection Process Review Various Prioritization Processes Tk Take
11 p.m. to. Tuesday, June. will remain open. 14. closed
June 3, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 [email protected] Important Lane Closures June 5 11 Include Northbound Beltway Lanes, Eastbound Dulles Airport Access
FLEET MANAGEMENT SYSTEM FOR TRAFFIC CONTROL DEVICES. www.atstrafficgroup.com
FLEET MANAGEMENT SYSTEM FOR TRAFFIC CONTROL DEVICES OVERVIEW JamLogic is an semi-automatic or (optional) fully automated web-based application that wirelessly allows you to MONITOR, MAINTAIN and MANAGE
Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL
Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois
NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK
ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within
Guide to the Texas A&M Transportation Institute Mobile Retroreflectometer Certification Program
Guide to the Texas A&M Transportation Institute Mobile Retroreflectometer Certification Program Program Conducted by Texas A&M Transportation Institute In Cooperation with the Texas Department of Transportation
Document Name: Driving Skills. Purpose: To outline necessary driving skills required to maximize driving safety.
Document Name: Driving Skills Date Created: 8 October 2013 Date Reviewed: 4 February 2014 Date Approved: 29 July 2015 Purpose: To outline necessary driving skills required to maximize driving safety. Overview:
SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE
PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland
3.1 Introduction. 3.1.1 General (AS 1.5 & 2.1)
Section 3 General procedures 3.1 Introduction 3.1.1 General (AS 1.5 & 2.1) Work shall be arranged so that workers are able to work safely and are separated from road users wherever possible. All personnel
INDIANA DEPARTMENT OF TRANSPORTATION OFFICE OF MATERIALS MANAGEMENT. MEASUREMENT OF RETRO-REFLECTIVE PAVEMENT MARKING MATERIALS ITM No.
Revised 3/14/14 INDIANA DEPARTMENT OF TRANSPORTATION OFFICE OF MATERIALS MANAGEMENT MEASUREMENT OF RETRO-REFLECTIVE PAVEMENT MARKING MATERIALS ITM No. 931-14T 1.0 SCOPE. 1.1 This test method covers the
Pavement Patching Repair for AC and PCC Pavement Surfaces. Vern Thompson www.crafco.com
Pavement Patching Repair for AC and PCC Pavement Surfaces Vern Thompson www.crafco.com Overview and Objective New Methods For Pavement Patching-Overview What are they How they are applied New Methods Secti