WORK MEASUREMENT APPROACH FOR PRODUCTIVITY IMPROVEMENT IN A HEAVY MACHINE SHOP
|
|
|
- Jeremy Arnold
- 10 years ago
- Views:
Transcription
1 5 th International & 26 th All India Manufacturing Technology, Design and Research Conference (AIMTDR 2014) December 12 th 14 th, 2014, IIT Guwahati, Assam, India WORK MEASUREMENT APPROACH FOR PRODUCTIVITY IMPROVEMENT IN A HEAVY MACHINE SHOP Ishwar Bhiradi 1, B.K.Singh 2* 1 Department of Mechatronics Engineering, Manipal Institute of Technology, Manipal, Manipal ,Karnataka. India. [email protected] 2* Department of Production Engineering, Birla Institute of Technology, Mesra, Ranchi , Jharkhand. India. [email protected] Abstract Productivity improvement is an everlasting continuous activity in manufacturing. Industries need to develop capability of coping up with customer demands to deliver quality products on time. Continuous improvement is the need of the hours which can be achieved by incorporating flexibility in layout, design and processes. This paper is aimed at improving productivity of mixed model production system of a medium scale manufacturing industry through work measurement approaches. The work measurement of various elements of the work cycle has been made on the basis of recommendations of ILO. The work cycles were divided into small measurable work elements. These elements were recorded on the observation sheet. Observations have been recorded for different trails to analyse the operation effectively for identification of value-added and non-value added element. Productivity improvement of 35% has been shown after elimination of non-value added elements. Keywords: Productivity, work measurement, machine shop, mixed model production. 1. Introduction Throughout the history of civilization, there has been a constant effort to improve the utilization of resources. A necessary requirement in this respect has been done to define appropriate measures of performance for systems. The concept of productivity provides us with one such measure. Operationalized as the ratio of output to input, the productivity measures aims at identifying how efficiently the resources in a system are used in producing the desired output. The objective of this section is to formalize the concept of Motion study and work measurement / Work study [1]. Work Study is the systematic examination of the methods of carrying out activities such as to improve the effective use of resources and to set up standards of performance for the activities being carried out. Method study and work measurement are two principal activities of work study which originated in the work of F. W. Taylor. Work measurement involves assessing the time; a job should take to do [5]. In the 1950's and 1960's the work study officer or O&M Person (organization and methods) gathered the data and gave an advice. In the 1970's the titles evolved e.g. to that of management services officer. The most modern application of some of the techniques of work study is the early 1990's managerial recipe; "business process re-engineering" i.e. re-designing business processes which have developed to the extent that they mismatch the needs of the situation today [5]. The scope for work study definition and evaluation is useful for operations managers in a general sense. Such roles require data on operational capacities and effectiveness and the use of time and resources. Methods need regular reevaluation. The study area includes three production lines namely Differential housing line, Rear cover housing line and Gear box housing line of a tractor. These production lines includes 7 numbers of vertical machining centers, 11 horizontal machining centers, 6 special purpose machines, 11 radial machines, 4 lathe machines, 3 duplex machines, at the end of all three lines there is 1 washing machine and 1 CMM machine for inspection. In differential housing, line production is lagging behind the target due to line imbalance. So time study technique has been decided to measure the work. Cycle times of all machines measured with element and their breakpoints wise. This paper illustrates one such example of eliminating non value added time in an operation. It shows the flow of counterstriking the problem and suggests the productive way to be carried out for work measurement
2 WORK MEASUREMENT APPROACH FOR PRODUCTIVITY IMPROVEMENT IN A HEAVY MACHINE SHOP 2. Differential Housing Line The study area Figure 1: Illustration of Differential Housing Production Line Layout Cycle Time (Min.) Cycle time of Differential Machines (Min.) Machine No. Figure 2: Cycle times of Individual Machines of Differential Housing Production Line Heavy machine shop under study is dedicated for a batch type of production of a differential housing component. Production line includes various CNC machines, lathe machines, boring machines and special purpose machines. For the study, the critical areas have been identified as Multiple Drilling Machine and Multiple Tapping Machine (make of BFW Bangalore). Initially work measurement study has been carried out on Multiple Drilling Machine because work in process was held up on this machine, hence affecting the production of differential housing from Heavy Machine Shop. Figure 2 illustrates the Cycle time of individual machines. As shown in Figure 2 Multi Spindle drilling and Multi spindle tapping Machines are selected for elemental study as they were creating bottleneck condition on the production line. Both machines were made by same company and they have same methods of setup and maintenance criteria. Hence it was decided to conduct elemental study on Multi spindle Drilling Machine. Multi Spindle drilling Machine was dedicated for drilling operation of Dia mm which are 19 in numbers and Dia. 6.8mm of 6 holes on both sides. Figure 3 showed the geometry of the differential housing. 3. Objectives of the study 3.1 To study the operation at elemental level through time study technique. 3.2 To eliminate the non-value added elements. 3.3 To optimize the cycle time to increase the production. 3.4 To evaluate the worker s performance
3 5 th International & 26 th All India Manufacturing Technology, Design and Research Conference (AIMTDR 2014) December 12 th 14 th, 2014, IIT Guwahati, Assam, India Figure 3: The geometry of the differential housing on Multi Spindle Drilling operation 4. Methodology The study illustrated in this paper does not only measure the work content and cycle times but also helps in analyzing the different elements consuming non value aided time in the whole operation. Initially the whole production line is studied for machine wise cycle times. Then the bottleneck stations were treated under elemental study using time study technique. Then the work cycles were broken into operations and operations were divided into measurable elements. For each elements cycle time has been noted down on observation sheets [2]. These times were analyzed and Illustrates the details of elements and breakpoints. Each elemental time has been noted down through stop-watch and recorded in a Time study sheet. Time study sheet includes all the information about the operation in the heading block at the top of the sheet and it should be filled before the start of actual time study. The same sheet can be continued for number of trails based on the set confidence and accuracy level. Figure 4 (b) illustrates the time study sheet. It includes rating which is the assessment of the worker s rate of completing the job according to observer s concept non-value added elements were eliminated to with corresponding to standard pace. Authors rated conclude for productivity improvement. For the above explained operation, the elements and breakpoints were listed at the time of work measurement was undertaken, and were then noted on study sheet prepared for the time study. Figure 4 (a) the operator based on British Standards which is the scale. 0 for No activity, 50 for very slow activity, 75 for steady activity, 100 for standard activity, 125 for very fast and 150 for exceptionally fast. In-between ratings are also given based on the observer s observation. Sheet No: 1 of 3 Part: Differential Housing Material: Cast iron Gr 25 Operation: SIDE FACE DRILLING OPERATION Machine: (BFW-1) Elements and Break Points a. Pickup casting from input conveyor, place it on Hydraulic.lifter. b. Increase hydraulic pressure, Hydraulic Lifter lifts the component and places it on fixture. Breakpoint: Hydraulic.. Oil not available. c. Dowell insert, Hydraulic Clamping of the casting and start the machine. Breakpoint: Difficulty in dowell insertion d. Drilling operation of Dia. 10.2mm & Dia. 6.8mm under machine auto time. Breakpoint: Tool change/machine breakdown e. Stop the machine. Move gauges towards casting, check and ensure for quality specifications, Keep gauges in their respective place. Breakpoint: Gauges not available ailable f. Pickup component from machine conveyor and place it on output conveyor. Figure4 (a) Elemental breakdown of operations 570-3
4 WORK MEASUREMENT APPROACH FOR PRODUCTIVITY IMPROVEMENT IN A HEAVY MACHINE SHOP Figure4(b) Time study observation sheet For constructing time study observation sheet, elemental time data has been collected by cumulative method of stop watch time study. Then observed time data has been converted to basic time by multiplying with the rating factor. Basic time is the time for carrying out an element of work at standard rating. Irrespective of workers speed or involvement basic time will give the timing according to standard rating [3]. Basic time can be calculated as the ratio of given rating to the standard rating and multiplied by subtracted time. Standard rating is taken as 100. Rating Basic Time=Substracted Time X Standard Rating (1) When final representatives of basic times have been calculated for each element, it is simple to calculate the basic time per operation. Table 1 illustrates the analysis for non-value aided time. This analysis helps for removing or modifying of either process parameters or design parameters. Elements/ Trail Nos. Table 1: Elements wise analysis of Basic times A B C D E F Sheet No: 3 of 3 Actual Cycle time(min.) Avg. time (Min.)
5 5 th International & 26 th All India Manufacturing Technology, Design and Research Conference (AIMTDR 2014) December 12 th 14 th, 2014, IIT Guwahati, Assam, India The data taken from time study technique has been analyzed by calculating average and standard deviation of all the trails by making modification in the machine set up. This is because element B consumes more time as compared to other elements. Although element D also taking more time but it is machine actual time i.e. this is fixed operational time. Hence it is decided to eliminate element B from the operation. As discussed in the Figure. 4(a) element B is describes the work to increase the hydraulic pressure. Hydraulic lifter lifts the component and places it in fixture. This activity consumes average of 2.43min and including this activity cycle time of this operation on multi spindle drilling machines was 6.78min. It is advised to the operator to place the component on fixture manually by eliminating hydraulic lifter setup. Input conveyor extended near the machine so that the operator movement to pick up the component should be reduced. After this setup change element B is totally eliminated from the list of elements. 5. Results and Implementations Operator starts the cycle with lifting the component from input conveyor and places it on hydraulic bed using tackle. When he increases the hydraulic pressure, the hydraulic bed starts moving from its ground level to machine fixture level. This hydraulic lifter designed by machine maker is used to lift the component and place it on fixture. After clamping the component he starts the machine for drilling operation of Dia mm and Dia. 6.8mm. Hydraulic lifting set was consuming about 2.43min of time on every cycle time increasing. There authors found the chances of reducing the cycle time of this operation. It was an external setup attached by manufacturers of that machine. The unit was easily removable according to maintenance team. After this time study analysis, authors decided to remove hydraulic setup to reduce the cycle time. Maintenance team in presence of machine makers removed the set up and also reduced the distance between input conveyor and the fixture. Initially input conveyor was at 2.3m distance from the hydraulic bed. After removing the hydraulic lifter setup, the distance got reduced by 1.6m. Operators are advised to lift the component and instead of hydraulic bed, place the component directly on the machine fixture. This practice is initially monitored for process disturbances, manual fatigue conditions and quality parameters. No changes are observed after change in machine setup. Again time elemental study has been carried out in 6 trails to ensure the smooth movement of operation. Figure.5 illustrates the new set of elements and breakpoints. The only difference is Element B activity was eliminated and is replaced by next activity. Hence number of activities also reduced for operator in completing the whole operation. Table 2 illustrates the changes in basic times and reduced cycle time after eliminating hydraulic setup. Part: Differential Housing Material: Cast iron Gr 25 Operation: SIDE FACE DRILLING OPERATION Machine: (BFW-1) Elements and Break Points a. Pickup casting from input conveyor, place it on Hydraulic Lifter. Sheet No: 1 of 3 b. Dowell insert, Hydraulic Clamping of the casting and start the machine. Breakpoint: Difficulty in dowell insertion c. Drilling operation of Dia. 10.2mm & Dia. 6.8mm under machine auto time. Breakpoint: Tool change/machine breakdown d. Stop the machine. Move gauges towards casting, check and ensure for quality specifications, Keep gauges in their respective place. Breakpoint: Gauges not available e. Pickup component from machine conveyor and place it on output conveyor. Figure5 Elemental breakdowns of operations after removing hydraulic setup 570-5
6 WORK MEASUREMENT APPROACH FOR PRODUCTIVITY IMPROVEMENT IN A HEAVY MACHINE SHOP Table 2: Element wise analysis after eliminating Hydraulic setup Elements/ Trail Nos. A B C D E Sheet no 3 of 3 Actual Cycle time(min.) Avg. time (Min.) Comparing Table 1 and Table 2, it can be concluded that the cycle time of the multi spindle drilling operation has been reduced from 6.78min to 4.16min. In the same way Hydraulic setup is eliminated from the next machine Multi spindle tapping machine. Horizontal deployment of the same idea benefitted in reducing the cycle time on tapping machine also. Hence production line counterstriked the bottleneck condition on these two machines. Cycle time in Min Reduction in Cycle time (Min) % reduction 4.16 Before ( ) After ( ) No. of components Increase in average per day production Dec'12 Feb'12 Figure6 Reduction in cycle time on multi spindle drilling machine 6. Conclusion Work measurement includes time study and motion study as well. Work measurement should be carried out by conducting both time and motion study in order to achieve reasonable results. Before conducting time study, it is very much necessary to consider the motion study also. Hence motion study can be considered as a basis for time study. As discussed earlier, time study measures the required time to perform the operation as per the specified process flow. Authors studied the time study on bottleneck stations to eliminate the unnecessary time to improve the production quantity on machine. Basic time has been calculated for each element and then analyzed the obtained data for changes to be implemented on machine. Then the new work method is developed by eliminating hydraulic setup and the change is horizontally deployed on the work station to get the tangible benefit of time study. To eliminate the observer s errors in collection of time data, one can implement the automation using handheld computers or video recorders. By this work measurement method productivity got improved 35% without investing extra resources. This approach explains the best way Figure7 Increase in average per day production of differential line of increasing productivity by eliminating the ineffective efforts by the operators and the machine shop as well. References Eok S.S., Lee H.G., Lee J.C.(2004),Efficient work measurement system of manufacturing cells using speech recognition and digital image processing technology. International Journal Manufacturing TechnologyVol. 29, pp International Labour Office, Geneva, (1991), Introduction to work study Indian adaption, Oxford & IBH publishing co. Pvt. Ltd. New Delhi. India. pp Kanthi M.N. Samuel H. (2006),A review of literature on manufacturing systems productivity, Int. J. Industrial and Systems Engineering, Vol. 1, No. 4, pp.467. Meyers F. E., and Stewart J. R.,(2001),Time and motion study: for lean manufacturing. 3rd ed. Upper Saddle River, NJ: Prentice Hall, p Pitt A.C. (1962), The principles of work study, with one or two applications in the laboratory, journal of the society of cosmetic chemists, Vol. 32. pp
LOCATION DEPENDENCY OF POSITIONING ERROR IN A 3-AXES CNC MILLING MACHINE
th International & 26 th All India Manufacturing Technology, Design and Research Conference (AIMTDR 214) December 12 th 14 th, 214, IIT Guwahati, Assam, India LOCATION DEPENDENCY OF POSITIONING ERROR IN
CNC and conventional high quality, large, powerful and heavy duty horizontal lathes and grinding machines
The World Wide partnership for ultimate turning technologies CNC and conventional high quality, large, powerful and heavy duty horizontal lathes and grinding machines a brief outline of vertical machines
DUGARD. Machine Tools Since 1939. Dugard 400 Slant Bed High Precision CNC Lathe. www.dugard.com
DUGARD Machine Tools Since 1939 Dugard 400 Slant Bed High Precision CNC Lathe www.dugard.com Superb Performance, Maximum Stability, Maximum Reliability Precision, Power and Capacity Make the Dugard 400
SprutCAM is a CAM system for NC program generation for machining using multi-axis milling, turning, turn/mill, Wire EDM numerically controlled
SprutCAM is a CAM system for NC program generation for machining using multi-axis milling, turning, turn/mill, Wire EDM numerically controlled machines and machining centers. The system enables the creation
CNC Applications. Introduction to Machining Centers
CNC Applications Introduction to Machining Centers Machining Centers A machining center is simply a CNC milling machine with an automatic tool changer and an enclosure. There are a number of different
Industrial Robotics. Training Objective
Training Objective After watching the program and reviewing this printed material, the viewer will learn the basics of industrial robot technology and how robots are used in a variety of manufacturing
DUGARD. Machine Tools Since 1939. Dugard ECO Series Driven Tool, Slant Bed CNC Lathes. www.dugard.com
DUGARD Machine Tools Since 1939 ECO Series Driven Tool, Slant Bed CNC Lathes www.dugard.com ECO Series - CNC Lathes Amazing speed, power, precision and durability all at an affordable price Rigid and Trustworthy
DUGARD. Machine Tools Since 1939. Dugard 700L Series Heavy Duty CNC Lathes. www.dugard.com
DUGARD Machine Tools Since 1939 Dugard 700L Series Heavy Duty CNC Lathes www.dugard.com Dugard 700L Heavy Duty CNC Lathe 2000, 3000 or 4000mm bed length Designed for easy and convenient operation The concave
SAMSUNG Machine Tools
SAMSUNG Machine Tools LCV 55 / 65 / 8 VERTICAL MACHINING CENTERS SMEC Co., Ltd. 6671, Gasulri, Daesanmyeon, Changwonsi Gyeongsangnamdo, Korea 641921 Tel +82 55 25 4832(48) Fax +82 55 25 491(492) http://www.esmec.com
Added Value Engineering
Added Value Engineering Profile Stephenson Engineering is a long established engineering company, operating from a seven acre site in Atherton near Manchester. We have extensive facilities for the manufacture
SC21 Manufacturing Excellence. Process Overview
SC21 Manufacturing Excellence Process Overview Prepared by:- The SC21 Performance, Development and Quality (PDQ) Special Interest Group (SIG) Acknowledgement The scoring methodology used in the Management
Gang Type CNC Turning Center. KIT Series
Gang Type CNC Turning Center KIT Series The Best Suitable for Automation Line Gang Type CNC Lathe BASIC STRUCTURE Bed Guide Way Spindle & Block Tool Gearless Type Spindle High Frequency Spindle Motor KIT
L I V E T O O L F O R O K U M A
L I V E T O O L F O R O K U M A The Way to Success [Heimatec headquarters-germany] Heimatec is an international manufacturing company headquartered in Renchen, Germany. Heimatec s 40,000 square foot facility,
REDUCTION OF WORK IN PROCESS INVENTORY AND PRODUCTION LEAD TIME IN A BEARING INDUSTRY USING VALUE STREAM MAPPING TOOL
REDUCTION OF WORK IN PROCESS INVENTORY AND PRODUCTION LEAD TIME IN A BEARING INDUSTRY USING VALUE STREAM MAPPING TOOL Praveen Saraswat 1, Deepak Kumar 2 and Manoj Kumar Sain 3 1 Senior Lecturer, 2,3 Associate
UNIT 1 INTRODUCTION TO NC MACHINE TOOLS
UNIT 1 INTRODUCTION TO NC MACHINE TOOLS Structure 1.1 Introduction Objectives 1.2 NC Machines 1.2.1 Types of NC Machine 1.2.2 Controlled Axes 1.2.3 Basic Components of NC Machines 1.2.4 Problems with Conventional
IBARMIA TECHNICAL SOLUTIONS JOURNAL // ibarmia.com //#03 OCT 2014 ZVH 58/L6000 MULTIPROCESS: PROBABLY, THE MOST FLEXIBLE MACHINE IN THE MARKET
IBARMIA TECHNICAL SOLUTIONS JOURNAL // ibarmia.com //#0 OCT 04 ZVH 58/L6000 MULTIPROCESS: PROBABLY, THE MOST FLEXIBLE MACHINE IN THE MARKET HTL 5 kw, 500 rpm 800 Nm 000 kg High production system Fixed
MECHANICAL ENGINEERING PLANT LAYOUT AND MATERIAL HANDLING UNIT I
MECHANICAL ENGINEERING PLANT LAYOUT AND MATERIAL HANDLING UNIT I 1. Which of the following is a strategic decision? [ B ] A. Facilitates location B. Plant location C. Plant layout D. Resources location
Machine tools. Milling- and boring machines
Milling- and boring machines Milling- and boring machines Our family owned company develops and manufactures customized machines and designs machine tools based on work piece requirements successfully
Module: TPM. Element: Quick Changeover (SMED) Training pack
Module: TPM Element: Quick Changeover (SMED) Training pack Aims & Objectives Target Audience : Aerotooling, operations, programme planning, engineering Purpose of Module : To provide participants with
RAPID DIAL TEST INDICATORS
RAPID DIAL TEST INDICATORS The Verdict Rapid presents the dial face inclined to the workpiece surface ensuring good visual accessibility obviating parallax error. Rapids incorporate a rear swivel spigot
Renishaw 2008. apply innovation TM. Calibrating 5-axis machines to improve part accuracy. 5Align
Calibrating 5-axis machines to improve part accuracy 5Align Productive Process Pyramid TM Understanding and tracking machine behaviour Process verification Thermal compensation In-cycle process control
SAMSUNG Machine Tools LINE-UP
SAMSUNG Machine Tools LINE-UP SMEC Co., Ltd. http://www.esmec.com SMEC 2014.04-NO.1 HISTORY IN BRIEF 1989 Started as Machine Tools Division of Samsung Heavy Industries, Ltd. Horizontal and vertical machining
a rotary transfer machine
OMNI-TURN-TRANSFER TRANSFER MACHINES INTEGRATING TURNING CENTERS BUFFOLI NORTH AMERICA (Booth #5630) takes pride in introducing the very new OMNI-TURN-TRANSFER, a patented mill-turning transfer machine
Introduction to JIGS AND FIXTURES
Introduction to JIGS AND FIXTURES Introduction The successful running of any mass production depends upon the interchangeability to facilitate easy assembly and reduction of unit cost. Mass production
RELATIONSHIP BETWEEN INVENTORY MANAGEMENT AND INDUSTRIES BECOMING SICK, ESPECIALLY IN THIRD WORLD COUNTRIES
Relationship between inventory management and industries becoming sick, especially in third world countries 7 RELATIONSHIP BETWEEN INVENTORY MANAGEMENT AND INDUSTRIES BECOMING SICK, ESPECIALLY IN THIRD
times, lower costs, improved quality, and increased customer satisfaction. ABSTRACT
Simulation of Lean Assembly Line for High Volume Manufacturing Hank Czarnecki and Nicholas Loyd Center for Automation and Robotics University of Alabama in Huntsville Huntsville, Alabama 35899 (256) 520-5326;
Analysis and Optimization of Investment Castings to Reduce Defects and Increase Yield
Analysis and Optimization of Investment Castings to Reduce Defects and Increase Yield Arunkumar P 1, Anand.S.Deshpande 2, Sangam Gunjati 3 1 Associate Professor, Mechanical Engineering, KLS Gogte Institute
6. Block and Tackle* Block and tackle
6. Block and Tackle* A block and tackle is a combination of pulleys and ropes often used for lifting. Pulleys grouped together in a single frame make up what is called a pulley block. The tackle refers
Tool Turrets and Tool Discs
Our other products Automatic Tool Changer Chucking Cylinders Tool Discs Indexing Tables Tool Turrets and Tool Discs Pragati Automation Pvt. Ltd. 1, IV Phase, 11th Cross, Peenya Industrial Area Bangalore
Overview. Milling Machine Fundamentals. Safety. Shop Etiquette. Vehicle Projects Machine Shop
Overview Milling Machine Fundamentals Wayne Staats, UW-Madison FSAE Safety Shop Etiquette Before Machining Indicating Calculating Feeds and Speeds Machining Maintenance Safety Respect the machines Common
PROCESS FLOW IMPROVEMENT PROPOSAL OF A BATCH MANUFACTURING SYSTEM USING ARENA SIMULATION MODELING
PROCESS FLOW IMPROVEMENT PROPOSAL OF A BATCH MANUFACTURING SYSTEM USING ARENA SIMULATION MODELING Chowdury M. L. RAHMAN 1 Shafayet Ullah SABUJ 2 Abstract: Simulation is frequently the technique of choice
METALWORKING PRODUCTS. Deep hole drilling Product catalogue and application guide
METALWORKING PRODUCTS Deep hole drilling Product catalogue and application guide AB Sandvik Coromant Not only a tool supplier Sandvik Coromant is the No.1 supplier of cutting tools for the metalworking
Factory Physics: The Key to Green Industries
Factory Physics: The Key to Green Industries College of Engineering and Architecture - College Days 2012 EXHIBIT: Greening Industries Student Chapter Philippine Institute of Industrial Engineers (PIIE)
TA-A BED TYPE MILLING CENTRE
TA-A BED TYPE MILLING CENTRE TA-A BED TYPE MILLING CENTRE MILLING CENTRE HIGH CAPACITY IN A COMPACT MACHINE High stock removal capacity TA-A BED TYPE MILLING CENTRE 2 TA-A The TA-A milling centre is a
ARTICLE IN PRESS. LeanThinking. journalhomepage:www.thinkinglean.com/ijlt. Redesinging an Automotive Assembly Line Through Lean Strategy
InternationalJournalofLeanThinkingVolume2,Isue2(December2011) LeanThinking journalhomepage:www.thinkinglean.com/ijlt Redesinging an Automotive Assembly Line Through Lean Strategy K. P. Paranitharan * Department
INTRODUCTION. Dear Business Partners,
INTRODUCTION Dear Business Partners, We are proud to issue the new catalogue of STROJFERR s.r.o. which was established in 1997 as a genuinely Czech company. In its activities and production programme,
DUGARD. Machine Tools Since 1939. Dugard 200HT / 200MC Slant Bed, High Precision CNC Lathes. www.dugard.com
DUGARD Machine Tools Since 1939 Dugard 00HT / 00MC Slant Bed, High Precision CNC Lathes www.dugard.com Dugard 00HT / 00MC Hydraulic Tailstock Quill can be controlled by programme or manually, auto sensing
Providing Answers For All Your Machine Tool Needs
Providing Answers For All Your Machine Tool Needs STANDARD FEATURES FANUC MXP-200FA CONTROL Spindle Features Body Structure POWERFUL 20 HP H / L SHIFTING SPINDLE MOTOR HARDENED & GROUND BOXWAY CONSTRUCTION
a) CNC turning center Jyoti DX100 Qty. = 6 Nos
LIST OF MACHINES 1) CNC VMC (milling) Total Qty = 1 Nos X axis Travel = 500 mm Y axis Travel = 450 mm Z axis Travel = 400 mm Accuracy Positioning = 0.005 mm Accuracy Repeability = 0.003 mm 2 ) CNC TURNING
AMADA MODULAR FLEXIBLE MANUFACTURING CELL ASL250 + VIPROS 358K + ASPR250-UL + SS12
AMADA MODULAR FLEXIBLE MANUFACTURING CELL ASL250 + VIPROS 358K + ASPR250-UL + SS12 As At 08/01/03 1. OVERVIEW Amada Modular Flexible Manufacturing Cell The proposal enclosed is for a fully Automated, flexible
CIM Computer Integrated Manufacturing
INDEX CIM IN BASIC CONFIGURATION CIM IN ADVANCED CONFIGURATION CIM IN COMPLETE CONFIGURATION DL CIM A DL CIM B DL CIM C DL CIM C DL CIM B DL CIM A Computer Integrated Manufacturing (CIM) is a method of
Lead time Reduction Using Lean Manufacturing Principles For Delivery Valve Production
Global Journal of Finance and Management. ISSN 0975-6477 Volume 6, Number 1 (2014), pp. 35-40 Research India Publications http://www.ripublication.com Lead time Reduction Using Lean Manufacturing Principles
YUASA MILLING MACHINE ACCESSORIES & TOOLS
97 HORIZONTAL / VERTICAL 5C COLLET INDEX 550 series 2 YEAR WARRANTY Spindle is manufactured with a taper seat in body frame. Rapid opening and closing is performed with a level collet closer with a leverage
Waterloo Agile Lean P2P Group
Waterloo Agile Lean P2P Group Lean Thoughtware Philip Kirby July 21, 2009 Waterloo Ontario Lean Thoughtware-The Thesis Adoption of a Lean Culture will Improve Financial Performance Improved Financial Performance
Automotive Applications of 3D Laser Scanning Introduction
Automotive Applications of 3D Laser Scanning Kyle Johnston, Ph.D., Metron Systems, Inc. 34935 SE Douglas Street, Suite 110, Snoqualmie, WA 98065 425-396-5577, www.metronsys.com 2002 Metron Systems, Inc
Lean and Green Manufacturing: Concept and its Implementation in Operations Management
International Journal of Advanced Mechanical Engineering. ISSN 2250-3234 Volume 4, Number 5 (2014), pp. 509-514 Research India Publications http://www.ripublication.com/ijame.htm Lean and Green Manufacturing:
DESIGN & PROJECT MANAGEMENT
AIM recognises that the success of any project depends upon the presence of a robust project management process and structure. In recent years the company has made considerable investment in personnel,
INVENTORY CONTROL BY TOYOTA PRODUCTION SYSTEM KANBAN METHODOLOGY A CASE STUDY
Int. J. Mech. Eng. & Rob. Res. 2013 V M Nistane and Srinivas Viswanath V, 2013 Research Paper ISSN 2278 0149 www.ijmerr.com Vol. 2, No. 1, January 2013 2013 IJMERR. All Rights Reserved INVENTORY CONTROL
Preamble To Schedule A
PRICE BID Page 1 of 6 Preamble To Schedule A 1) The quantities given in schedule A are purely for guidance of the contractor to enable him to quote the rates. The quantities can be varied to any extent,
Tool Holder Catalog INDEX ABC VDI 25 LL3602.30051-10.04.2014. 0414/Rö
Tool Holder Catalog INDEX ABC VDI 25 LL3602.30051-10.04.2014 0414/Rö Disclaimer The illustrations in this documents may deviate from the delivered product. We reserve the right to make changes due to errors
The Bonelle Tool and Cutter Grinder
The Bonelle Tool and Cutter Grinder The grinder was constructed about 1987 and exhibited at the 89th Model Engineering exhibition where it was awarded a bronze medal (see ME Vol164 No 3868 page 273). Subsequently
Vinod et al., ARPB, 2013; Vol 3 (II) ISSN 2250-0774
Vinod et al., ARPB, 2013; Vol 3 (II) ISSN 2250- (RESEARC ARTICLE) QUALIFICATION OF EQUIPMENT: SAIZONER MIXER GRANULATOR, COMPRESSION MACINE AND COATING PAN * J. Vinod and A. Chenthilnathan Department of
Optimized NC programming for machinery and heavy equipment. Summary NX CAM software redefines manufacturing productivity with a full range of NC
Siemens PLM Software NX CAM for machinery Optimized NC programming for machinery and heavy equipment Benefits Effectively program any type of machinery part Program faster Reduce air cutting Automate programming
Course outline. Know Your Machine From A Programmer s Viewpoint 11 If you ve had experience with conventional (non-cnc) machine tools 11
Course outline Know Your Machine From A Programmer s Viewpoint 11 If you ve had experience with conventional (non-cnc) machine tools 11 Machine Configurations 13 Vertical machining centers 13 C-frame style
CNC Vertical Machining Center V-Mill CNC Large box-way and linear guide way machines
CNC Vertical Machining Center Large box-way and linear guide way machines Technical Datasheet CNC Vertical Machining Center Large box-way and linear guide way machines Spindle gear drive (50-taper) for
Fettling the most ignored operation in Foundries
Fettling the most ignored operation in Foundries Prashant Mestry Mahindra & Mahindra, Automotive Division, Component Development & Materials Management, Special Process, Casting Commodity AD Annex Building,
Going Lean the ERP Way
Going Lean the ERP Way Somnath Majumdar Abstract: Lean concepts and techniques are widely used all over the world today to eliminate waste in all processes. These are applicable for all organizations,
Louisiana Tech University Lean Manufacturing Courses
Lean Course Objectives: Your Employees will be able to: Louisiana Tech University Lean Manufacturing Courses Understand the tools, terms, terminology, and most importantly the benefits of Lean Manufacturing.
plans based on actual cost, schedule and technical progress of work [1, 9].
An Analysis on Resource Planning, Estimation and Tracking of Project by Earned Value Management SHAIK MOHAMMAD MASOOD, DEVANAND.R, HARSHA H.N PG Student, Department of Civil Engineering, G.E.C, Hassan
Debunking the Myth of Parametrics Or How I learned to stop worrying and to love DFM
Debunking the Myth of Parametrics Or How I learned to stop worrying and to love DFM It is time to clear the air, to lay out some definitions, to flatly state what is going on behind the scenes, and finally,
Chapter 5 Supporting Facility and Process Flows
Chapter 5 Supporting Facility and Process Flows Process View of a Hospital Process Performance Inventory Turns Process Flow Structures 1 Definition of a Business Process A process is a set of activities
SAMSUNG Machine Tools PL60 CNC TURNING CENTER
SAMSUNG Machine Tools PL60 CNC TURNING CENTER SAMSUNG'S Advanced Engineering and Machine Design Cast iron structure for superior dampening characteristics and thermal displacement Rigid 45 degree slant
BED TYPE MILLING CENTRE
TR BED TYPE MILLING CENTRE TR BED TYPE MILLING CENTRE BED TYPE MILLING CENTRE HIGH PERFORMANCE IN A COMPACT MACHINE PROVIDING ACCURATE COMPLEX MILLING TR BED TYPE MILLING CENTRE The TR milling centre is
OPIM 631 Note on Process Analysis 1
The Wharton School Quarter II The University of Pennsylvania Fall 1999 OPIM 631 Operations Management: Quality and Productivity Note on Process Analysis Introduction 1 In this course, we look at organizations
METHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
Implementing Automation after Making Lean Improvements
Implementing Automation after Making Lean Improvements Frank C. Garcia, P.E., Director Business Solutions & Engineering Services Tom Lawton, President Advent Design Corporation Bristol, PA, USA December
[ means: Save time, money and space! MAXXMILL 500. Vertical milling center for 5-side machining
[ E[M]CONOMY] means: Save time, money and space! MAXXMILL 500 Vertical milling center for 5-side machining MAXXMILL 500 MAXXMILL 500 is the ideal vertical milling center for the for the 5-axis operation
Advanced solutions for 5 pieces or 5,ooo,ooo pieces and everything in between. T E C H N O L O G I E S. High Volume Hydromat.
MACHINING T E C H N O L O G I E S High Volume Hydromat CNC Milling CNC Swiss Machining CNC Turning Engraving Secondary Operations Advanced solutions for 5 pieces or 5,ooo,ooo pieces and everything in between.
Industrial Automation and Control Prof. S. Mukhopadhyay Department of Electrical Engineering Indian Institute of Technology, Kharagpur
(Refer Slide Time: 00:29) Industrial Automation and Control Prof. S. Mukhopadhyay Department of Electrical Engineering Indian Institute of Technology, Kharagpur Lecture - 1 Introduction Good morning, this
Unit 24: Applications of Pneumatics and Hydraulics
Unit 24: Applications of Pneumatics and Hydraulics Unit code: J/601/1496 QCF level: 4 Credit value: 15 OUTCOME 2 TUTORIAL 2 HYDRAULIC AND PNEUMATIC CYLINDERS The material needed for outcome 2 is very extensive
CircumSpect 360 Degree Imaging and Inspection Technology Overview
CircumSpect 360 Degree Imaging and Inspection Technology Overview Prepared by: Machine Vision Consulting, Inc. Contact: Joe Gugliotti 7 Old Towne Way Sturbridge, MA 01518 (978) 551-4160 [email protected]
Mouse Control using a Web Camera based on Colour Detection
Mouse Control using a Web Camera based on Colour Detection Abhik Banerjee 1, Abhirup Ghosh 2, Koustuvmoni Bharadwaj 3, Hemanta Saikia 4 1, 2, 3, 4 Department of Electronics & Communication Engineering,
Machining Center Equipped with Unparalleled Rigidity and Agility NHX6300
Press Release Mori Seiki Co., Ltd. Head Office: 2-35-16 Meieki, Nakamura-ku, Nagoya City 450-0002, Japan TEL: +81(0)52-587-1830 FAX: +81(0)52-587-1833 January 24, 2013 Machining Center Equipped with Unparalleled
Design of a Universal Robot End-effector for Straight-line Pick-up Motion
Session Design of a Universal Robot End-effector for Straight-line Pick-up Motion Gene Y. Liao Gregory J. Koshurba Wayne State University Abstract This paper describes a capstone design project in developing
VALUE STREAM MAPPING FOR SOFTWARE DEVELOPMENT PROCESS. Ganesh S Thummala. A Research Paper. Submitted in Partial Fulfillment of the
VALUE STREAM MAPPING FOR SOFTWARE DEVELOPMENT PROCESS by Ganesh S Thummala A Research Paper Submitted in Partial Fulfillment of the Requirements for the Master of Science Degree In Management Technology
Cash Flow of High Rise Residential Building
Cash Flow of High Rise Residential Building Dipti R. Shetye 1, Dr. S.S.Pimplikar 2 1 Scholar, Civil Department, M.I.T Pune 2 H.O.D, Civil Department, M.I.T Pune E-mail- [email protected] ABSTRACT-
AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS
Integrity, Reliability and Failure of Mechanical Systems Paper Ref: 3927 AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS Eric Costa 1(*), Rui Sousa 1, Sara Bragança 1,
UBM-W SERIES CNC HORIZONTAL BORING & MILLING MACHINE. http://www.uchine.com.tw. CNC Double Column Machining Center UDM series
CNC Double Column Machining Center UDM series CNC Horizontal Heavy Duty Milling Machine UMM series CNC Horizontal Machining Center UHM series Conventional Horizontal Boring & Milling Machine UBM series
PRODUCTIVITY IMPROVEMENT IN UNDERGROUND COAL MINES A CASE STUDY
Journal of Sustainable Mining ISSN 2300-3960 The English-language online version (primary, reference version of J. Sust. Min.) JOURNAL HOMEPAGE jsm.gig.eu J. Sust. Min. Vol. 12 (2013), No. 3, pp. 48 53
Paper F5. Performance Management. Monday 3 December 2012. Fundamentals Level Skills Module. The Association of Chartered Certified Accountants
Fundamentals Level Skills Module Performance Management Monday 3 December 2012 Time allowed Reading and planning: Writing: 15 minutes 3 hours ALL FIVE questions are compulsory and MUST be attempted. Formulae
VOLVO INDIA PVT. LTD.
VOLVO INDIA PVT. LTD. Background Volvo is a Latin word that means I roll and it has become synonymous with high-quality trucks and buses in several countries. Established in Sweden in 1927, Volvo has today
LOST FOAM PROTOTYPING METHODS
LOST FOAM PROTOTYPING METHODS A Comparison of Methods and Processes Copyright 2002 Austin Group, LLC. All rights reserved. INTRODUCTION TERRY AUSTIN PRESIDENT AUSTIN GROUP, LLC QUINCY, ILLINOIS INTRODUCTION
Quality. Tool Service, Inc. Advanced Tooling & Manufacturing Solutions
dvanced Tooling & Manufacturing Solutions Design & Engineering dvanced Tooling & Manufacturing Solutions Welding fixtures Stamping tools Robotic end of arm tooling Robotic work cell development and simulation
Steelworks Design Inc. Corporate Resume
Steelworks Design Inc. Corporate Resume Steelworks Design is a trusted partner to world-class manufacturers in the Nuclear, Pharmaceutical, Food & Beverage, Automotive and General Industry. Our specialties
Fabrication of Complex Circuit Using Electrochemical Micromachining on Printed Circuit Board (PCB)
5 th International & 26 th All India Manufacturing Technology, Design and Research Conference (AIMTDR 2014) December 12 th 14 th, 2014, IIT Guwahati, Assam, India Fabrication of Complex Circuit Using Electrochemical
APPLYING A STOCHASTIC LINEAR SCHEDULING METHOD TO PIPELINE CONSTRUCTION
APPLYING A STOCHASTIC LINEAR SCHEDULING METHOD TO PIPELINE CONSTRUCTION Fitria H. Rachmat 1, Lingguang Song 2, and Sang-Hoon Lee 2 1 Project Control Engineer, Bechtel Corporation, Houston, Texas, USA 2
3D SCANNING: A NEW APPROACH TOWARDS MODEL DEVELOPMENT IN ADVANCED MANUFACTURING SYSTEM
3D SCANNING: A NEW APPROACH TOWARDS MODEL DEVELOPMENT IN ADVANCED MANUFACTURING SYSTEM Dr. Trikal Shivshankar 1, Patil Chinmay 2, Patokar Pradeep 3 Professor, Mechanical Engineering Department, SSGM Engineering
Press Release. Turning/grinding center INDEX C200 Now also horizontal integration of grinding technology
Press Release Turning/grinding center INDEX Now also horizontal integration of grinding technology The is already one of the most successful machine series of INDEX in Esslingen, Germany. Its exceptionally
Top 5 Ways to Cut Machining Costs
Top 5 Ways to Cut Machining Costs Finding ways to cut your company s costs improves overall profits. If your company requires machining services, learning how to cut machining costs may offer significant
Turning Centres. MAX 5 From print to part to profit
Turning Centres MAX 5 From print to part to profit TMi and TMXi General purpose, heavy duty and high performance 2 axis lathes > TM6i > TM12i > TM8i > TM18i > TM10i > TM18Li > TMX8i > TMX10i Benefits of
Flexible Manufacturing System
Flexible Manufacturing System Introduction to FMS Features of FMS Operational problems in FMS Layout considerations Sequencing of Robot Moves FMS Scheduling and control Examples Deadlocking Flow system
Manufacturing process
Manufacturing process What is Manufacturing Process? A sequence of operations, often done on a machine or at a given area. Examples: welding, casting, cutting, assembling, etc. During a manufacturing process,
ŠKODA MACHINE TOOL HORIZONTAL MILLING AND BORING MACHINES ŠKODA HCW
ŠKODA MACHINE TOOL HORIZONTAL MILLING AND BORING MACHINES ŠKODA HCW KODA HCW TRADITION AND EXPERIENCE The ŠKODA machine tools of different types and design have been present in the world market since the
UTILIZAÇÃO DA LEAN METODOLOGIA. Desmistificando Aplicações Reais Para CME. Apresentado por John Kimsey
UTILIZAÇÃO DA METODOLOGIA LEAN Desmistificando Aplicações Reais Para CME Apresentado por John Kimsey STERIS LEAN CME SIMULATION SAO PAULO, RIO, PORTO ALEGRE 2 STERIS LEAN CME SIMULATION SAO PAULO, RIO,
SPECIAL FEATURES. Air- Electric Clutch Control. Extended Beds and Rams
, SPECIAL FEATURES Extended Beds and Rams Beds and rams can be extended at both ends or at one end only for closing or "homing" operations. Extensions at both ends of the machine provide greatly increased
SHOP NOTES METAL SHAPER FOR YOUR SHOP
SHOP NOTES METAL SHAPER FOR YOUR SHOP A METAL SHAPER is indispensable for certain machining operations where flat surfaces must be produced within very close limits, such as machining flats on castings,
