Lead time Reduction Using Lean Manufacturing Principles For Delivery Valve Production
|
|
|
- Theodore Hall
- 10 years ago
- Views:
Transcription
1 Global Journal of Finance and Management. ISSN Volume 6, Number 1 (2014), pp Research India Publications Lead time Reduction Using Lean Manufacturing Principles For Delivery Valve Production Bharath R 1, Dr G S Prakash 2 1 Student, M Tech, Department of Industrial Engineering & Management M S Ramaiah Institute of Technology, Bangalore, Karnataka 2 Professor and Head of Department, Department of Industrial Engineering & Management, M S Ramaiah Institute of Technology, Bangalore, Karnataka 1 [email protected], 2 [email protected] Abstract Lead time is the time spent between the original customer order and final delivery of the product. Project work is being carried out at XYZ organization in Bangalore. Lean manufacturing is a production practice that considers expenditure of resources for any goal other than creation of value for the end customer to be wasteful and thus a target for elimination. Lead time is calculated by adding value added time and non-value added time. Delivery valve is a non-return valve between the high pressure for the fuel injection system and pump plunger. On observing the present system of delivery valve production the current lead time was calculated and was found to be days. The lean tools that are applied in this project are First-In-First-Out (FIFO), a method for organizing the component buffer where the oldest entry or bottom of the stack is processed first which eliminates inventory which in turn reduces the lead time and Value Stream Mapping (VSM) to map the present and the future state. Application of these lean tools has resulted in the reduction of lead time by one day i.e days. Keywords: Lead time, Value Stream Mapping, First-In-First-Out, Customer Takt Time 1. Introduction In today s competitive business world, companies require small lead times, low costs and high customer service levels to survive. Silver Et Al. [1] defined lead time as the time spent that elapses between the placement of an order and the receipt of the order into inventory, lead time may influence customer service and impact inventory costs.
2 36 Bharath R and Dr. G S Prakash In an attempt to reduce lead time, businesses and organizations found that in reality 90% of the existing activities are non-essential and could be eliminated. Harrington [2] proposes by eliminating the non-value adding activities from the processes and streamlining the information flow significant optimization results can be realized. 2. Methodology 1.) Value Stream Mapping- The ultimate goal of VSM is to identify all types of wastes in the value stream and to take step to try and eliminate these. Waste can be a part of a process that takes time and resources but adds no value to the product [3]. 2.) Takt time It can be defined as the time required for producing one unit of daily salable quantity. It helps with the synchronization of assembly, production and sales rhythm. 3.) FIFO It is a system of keeping track of the order in which information or materials are to be processed. The goal of FIFO is to prevent earlier orders from being delayed in favor of newer orders which would otherwise result in increased lead time and unhappy customers regarding the earlier orders. 3. Objectives 1.) To study the present lead time for delivery valve production. 2.) To analyze the factors responsible for non-value added time. 3.) To analyze the customer takt time for each process in the loop for F003 component. 4.) To implement First-In-First-Out (FIFO) between the component loop and the finish match grinding (assembly) loop. 5.) To prepare a detailed recommendation for new layout this reduces man and material movement. 6.) To reduce the inventory of F003 component and re calculating the lead time. 4. Value Stream Mapping Primary data was collected about the inventory, process time at each process for the delivery valve production and mapping was done for the entire value stream. [Fig 1] Value added time = process time / available time Non value added time = inventory / requirements Like this lead time for each process was calculated and finally the lead time was found to be days. There was too much of buffer stock between the component and the finish match grinding (FMG) loop.there are two main types of components produced- part no F003 which covers 20% of the total delivery valve production and part no 642 covers the rest. The total delivery valve requirements are parts per day out of which F003 requirement per day is 5500 parts.
3 Lead time reduction using lean manufacturing principles for delivery valve Takt time Takt time chart was drawn for F003 component based on the requirements and was indicating that FMG is the bottle neck process with the takt time of sec. Takt time chart : Fig 1: Value Stream Mapping Also the requirement of machine & equipment (MAE) and manpower were defined for producing F003 component. Overall Equipment Effectiveness (OEE) is a way to monitor and improve the efficiency of the manufacturing process. OEE has become an accepted management tool to measure and evaluate machine productivity [4].There
4 38 Bharath R and Dr. G S Prakash are three factors required to calculate i.e. OEE= availabilty*performance*quality. For each process OEE was calculated. Table 1: Requirement for F003 part production Process No. of MAE Manpower OEE in % Process No. of MAE Manpower OEE in % Honing Seatgrinding LHD Tschudin Cleaning Brush wash Visual Insp Rota Layout changes Earlier machines were at a distance of 30mtrs away from component loop and they were decoupled by supermarket. The assembly cells were shifted closer to the component loop to establish FIFO between those two loops. This resulted in migration from supermarket to FIFO eliminating the inventory storage between those two loops. There was reduction in man and material movement as well. 7. FIFO Calculations For F003 component FIFO calculation was done according to the organization s standards to determine the maximum number of parts to go into each cell at a time. Milkrun cyclical material transport with defined schedule. Table 2: Data for FIFO max calculation 1. Machines 8 no 6. Smallest no of parts in 100 pcs a tray 2. Cycle time 42 sec 7. Milkrun frequency 120 mins 3. Change over 0 8. Planned operating 1305 time time/ day mins 4. OEE 84% 9. Shifts 3 5. Delivery takt time 12 sec (as FMG is the bottle neck process) Calculations: 1.) Max loss of process 2.) Time loss for one change over 3.) Time to produce one SNP POT (1-OEE) =1305(1-0.84) = 209 sec.eq. 1 = 0 sec (not required to changeover).eq. 2 cycle time * SNP / 60 = 42 * 100 / 60 = 70 sec Eq. 3 4.) Total loss Eq.1 + Eq.2 + Eq.3 = = ) No of parts 279 * 60 / 42 = ) No of SNP 4 trays
5 Lead time reduction using lean manufacturing principles for delivery valve 39 As per the FIFO calculation maximum of 400 parts was defined and the production was started. There was a smooth flow of parts between the processes. Man and material movement was reduced. More importantly it resulted in complete elimination of buffer stock between the component and the FMG loop thereby reducing the lead time. 8. Conclusion and scope for future Finally recalculating the lead time after the establishment of FIFO for F003 component is days i.e. reduction in the lead time by one day. Further reduction in lead time can happen if the FIFO methodology is implemented for the other part 642 as well. References [1] Silver E.A, Pyke, D.F and Peterson R, Inventory Management and production planning and scheduling, New York, Wiley, [2] Harrington, The complete benchmarking implementation guide, New York, [3] International Journal of Mechanical and Industrial Engineering, Vol-1, Issue-3, [4] International Journal of Innovative Research in Science, Vol-2, Issue 5, 2013
6 40 Bharath R and Dr. G S Prakash
Value Stream Mapping
Value Stream Mapping 1 Value Stream Mapping Definition Value Stream Mapping (VSM): Special type of flow chart that uses symbols known as "the language of Lean" to depict and improve the flow of inventory
Integrating Assembly Lines based on Lean Line Design Concept Ms. Surekha. S 1, Dr. R. V Praveena Gowda 2, Mr. Manoj Kulkarni 3
Integrating Assembly Lines based on Lean Line Design Concept Ms. Surekha. S 1, Dr. R. V Praveena Gowda 2, Mr. Manoj Kulkarni 3 Abstract In today s competitive business scenario manufacturing industries
VALUE STREAM MAPPING FOR SOFTWARE DEVELOPMENT PROCESS. Ganesh S Thummala. A Research Paper. Submitted in Partial Fulfillment of the
VALUE STREAM MAPPING FOR SOFTWARE DEVELOPMENT PROCESS by Ganesh S Thummala A Research Paper Submitted in Partial Fulfillment of the Requirements for the Master of Science Degree In Management Technology
REDUCTION OF WORK IN PROCESS INVENTORY AND PRODUCTION LEAD TIME IN A BEARING INDUSTRY USING VALUE STREAM MAPPING TOOL
REDUCTION OF WORK IN PROCESS INVENTORY AND PRODUCTION LEAD TIME IN A BEARING INDUSTRY USING VALUE STREAM MAPPING TOOL Praveen Saraswat 1, Deepak Kumar 2 and Manoj Kumar Sain 3 1 Senior Lecturer, 2,3 Associate
Appendix Lean Glossary Page 1
Appendix Lean Glossary Page 1 Andon Board A visual control device in a work area giving the current status on performance to expectations and alerting team members to emerging issues. Batch-and- Queue
The Tools of Lean - Value Stream Mapping
ASQ Section 1302 Summer 2004 Series Mahoney State Park The Tools of Lean - Value Stream Mapping Stan Gidley Managing Director Institute of Business Excellence July 15, 2004 Outline Two Stories 1 English,
This can be done by simply counting pieces in the line or subtracting total number of pieces loaded to total number of pieces unloaded from the line.
Garment industry over the years has adopted various key performance measures from different industries and invented some of their own. In the 2nd of the three article series, Mausmi Ambastha, a budding
VALUE STREAM MAPPING ICONS
Material Material ASSEMBLY Process I 300 Pieces 1 Day Inventory MRP Control Center "Go-See" Scheduling XYZ Corporation Outside Source Takt = 50 sec. C/T = 45 sec. C/O = 30 min. Uptime = 95% Scrap = 2%
UTILIZAÇÃO DA LEAN METODOLOGIA. Desmistificando Aplicações Reais Para CME. Apresentado por John Kimsey
UTILIZAÇÃO DA METODOLOGIA LEAN Desmistificando Aplicações Reais Para CME Apresentado por John Kimsey STERIS LEAN CME SIMULATION SAO PAULO, RIO, PORTO ALEGRE 2 STERIS LEAN CME SIMULATION SAO PAULO, RIO,
TOOL FOR MAPPING MANUFACTURING CRTICAL-PATH TIME IN JOB SHOP ENVIRONMENT Chong Kuan Eng 1, How Whee Ching 2 1,2 Faculty of Manufacturing Engineering,
Sci.Int.(Lahore),26(4),1585-1589,2014 ISSN 1013-5316; CODEN: SINTE 8 1585 TOOL FOR MAPPING MANUFACTURING CRTICAL-PATH TIME IN JOB SHOP ENVIRONMENT Chong Kuan Eng 1, How Whee Ching 2 1,2 Faculty of Manufacturing
Introduction to Lean Healthcare
Introduction to Lean Healthcare Presented by: Steve Lockwood, CITEC Business Advisor / Lean June 2013 1 What is Lean Lean Enterprise is a systematic approach to identifying and eliminating waste (non-value-added
Chapter 11. Lean synchronization
Chapter 11 Lean synchronization Slack et al s model of operations management Direct Design Operations Management Deliver Develop Supply network management Capacity management Inventory management Planning
SC21 Manufacturing Excellence. Process Overview
SC21 Manufacturing Excellence Process Overview Prepared by:- The SC21 Performance, Development and Quality (PDQ) Special Interest Group (SIG) Acknowledgement The scoring methodology used in the Management
ARTICLE IN PRESS. LeanThinking. journalhomepage:www.thinkinglean.com/ijlt. Redesinging an Automotive Assembly Line Through Lean Strategy
InternationalJournalofLeanThinkingVolume2,Isue2(December2011) LeanThinking journalhomepage:www.thinkinglean.com/ijlt Redesinging an Automotive Assembly Line Through Lean Strategy K. P. Paranitharan * Department
times, lower costs, improved quality, and increased customer satisfaction. ABSTRACT
Simulation of Lean Assembly Line for High Volume Manufacturing Hank Czarnecki and Nicholas Loyd Center for Automation and Robotics University of Alabama in Huntsville Huntsville, Alabama 35899 (256) 520-5326;
Journal of Applied Science and Agriculture
AENSI Journals Journal of Applied Science and Agriculture ISSN 1816-9112 Journal home page: www.aensiweb.com/jasa Optimization Assembly Process base on Motion Time Study in Manufacturing Industry: Study
INVENTORY CONTROL BY TOYOTA PRODUCTION SYSTEM KANBAN METHODOLOGY A CASE STUDY
Int. J. Mech. Eng. & Rob. Res. 2013 V M Nistane and Srinivas Viswanath V, 2013 Research Paper ISSN 2278 0149 www.ijmerr.com Vol. 2, No. 1, January 2013 2013 IJMERR. All Rights Reserved INVENTORY CONTROL
Map the Value Stream
1 Map the Value Stream Objectives Create and format a value stream map Add data to a value stream map Compare a current-state value stream map and future-state value stream map 1-1 Contents Contents Examples
Performance Optimization of MTP Stack
Performance Optimization of MTP Stack Greeshma Prakash 1, Dr.B.K.Sujatha 2 1 MSRIT, 2 MSRIT, Bangalore, India [email protected], [email protected] Abstract The paper deals with the steps proposed
Using the Lean Model for Performance Improvement
Using the Lean Model for Performance Improvement Presented by Content Expert: Cindy Mand Director, Lean Enterprise BloodCenter of Wisconsin, Milwaukee, WI Learning Objectives 1. History of Lean and it
VALUE STREAM ANALYSIS ON A PRINTED CIRCUIT BOARD (PCB) PRODUCTION LINE
VALUE STREAM ANALYSIS ON A PRINTED CIRCUIT BOARD (PCB) PRODUCTION LINE Arvind S, Syari S Nair, Department of Industrial Engineering & Management, M.G University, Kerala Email: [email protected], [email protected]
ESTABLISHING CONTROL ON CONSUMABLES INVENTORY IN A PRESSURE VESSEL MANUFACTURING INDUSTRY USING MICROSOFT EXCEL (A CASE STUDY)
ESTABLISHING CONTROL ON CONSUMABLES INVENTORY IN A PRESSURE VESSEL MANUFACTURING INDUSTRY USING MICROSOFT EXCEL (A CASE STUDY) Vignesh Ravichandran 1, N.Ganesh Kumar 2 1 UG Scholar, Dept. of Mechanical
Going Lean the ERP Way
Going Lean the ERP Way Somnath Majumdar Abstract: Lean concepts and techniques are widely used all over the world today to eliminate waste in all processes. These are applicable for all organizations,
APPLICATION OF KANBAN SYSTEM FOR IMPLEMENTING LEAN MANUFACTURING (A CASE STUDY)
ALICATION OF KANBAN SYSTEM FOR IMLEMENTING LEAN MANUFACTURING (A CASE STUDY) 1 B.Vijaya Ramnath, 2 C. Elanchezhian and 3 R. Kesavan Research Article Address for Correspondence 1,2 Research Scholar, 3 Asst.
Energy Conservation for a Paint Company Using Lean Manufacturing Technique
Universal Journal of Industrial and Business Management 1(3): 83-89, 2013 DOI: 10.13189/ujibm.2013.010302 http://www.hrpub.org Energy Conservation for a Paint Company Using Lean Manufacturing Technique
USE OF THE VALUE STREAM MAPPING TOOL FOR WASTE REDUCTION IN MANUFACTURING. CASE STUDY FOR BREAD MANUFACTURING IN ZIMBABWE.
Proceedings of the 2011 International Conference on Industrial Engineering and Operations Management Kuala Lumpur, Malaysia, January 22 24, 2011 USE OF THE VALUE STREAM MAPPING TOOL FOR WASTE REDUCTION
Hessel Visser NCOI Les 6 A P 373. Operations Management, 7E: Chapter 14 en15
1 Lecture Planning and Control 14 Enterprise Resource Planning (ERP) 15 Lean synchronization 16 Project Management (zie andere sheets) 17 Quality Management (zie andere sheets) Hessel Visser NCOI Les 6
Lean Manufacturing and Six Sigma
Lean Manufacturing and Six Sigma Research Questions What have we done in the past? What must we do in the future? How do we know these are the correct actions? 1 Lean Definitions Key concepts of lean:
BSH Production System
BSH Production System Festo Didactic 2. März 29 1. Kolloquium Nachhaltige Kapazitätssteigerungen in manuellen Montagesystemen festo didactic_exh_932 Das Ziel war 27... 2. Ebene der Leistungs - Steigerung
Predictive Analytics Tools and Techniques
Global Journal of Finance and Management. ISSN 0975-6477 Volume 6, Number 1 (2014), pp. 59-66 Research India Publications http://www.ripublication.com Predictive Analytics Tools and Techniques Mr. Chandrashekar
Technology Trends in MRO Inventory Management
June 2012 Technology Trends in MRO Inventory Management Technological Advances Technological advances are changing the dynamics in level of MRO inventory management and data management has a distinct focus
Component Based Modeling and Simulation of Value Stream Mapping for Lean Production Systems
Component Based Modeling and Simulation of Value Stream Mapping for Lean Production Systems Mohamed A. Shararah 1, Khaled S. El-Kilany, and Aziz E. El-Sayed Department of Industrial and Management Engineering
Software Development and Testing: A System Dynamics Simulation and Modeling Approach
Software Development and Testing: A System Dynamics Simulation and Modeling Approach KUMAR SAURABH IBM India Pvt. Ltd. SA-2, Bannerghatta Road, Bangalore. Pin- 560078 INDIA. Email: [email protected],
Achieving Lean Transformation in High-Variation Environments
Achieving Lean Transformation in High-Variation Environments MAKING LEAN MANUFACTURING WORK IN A COMPLEX ENVIRONMENT While lean manufacturing is a proven best practice in high volume manufacturing such
Waters Corporation. Waters 2690/5 USER & TROUBLESHOOTING GUIDE
Waters Corporation Waters 2690/5 USER & TROUBLESHOOTING GUIDE Contents 2690/5 Theory Setup procedures. Troubleshooting the 2690/5 User maintenance of the 2690/5 Spare Parts 2 2690/5 Theory 2690/5 Solvent
TARGET TARGET PROGRESS PROGRESS REPORT REPORT
BASIC KAIZEN TOOLS 1. 1. TARGET PROGRESS REPORT 2. 2. STANDARDIZED WORK SHEET 3. 3. TIME OBSERVATION SHEET 4. 4. CYCLE TIME // TAKT TIME BAR BAR CHART 5. 5. YAMAZUMI (STACK) CHART 6. 6. STANDARDIZED WORK
Using BPMN for Modeling Manufacturing Processes
Using BPMN for Modeling Manufacturing Processes S. Zor 1, 2, K. Görlach 1,3, F. Leymann 1 1 Institute of Architecture of Application Systems, University of Stuttgart, Universitätsstraße 38, 70569 Stuttgart,
APPLICATION OF KANBAN SYSTEM FOR MANAGING INVENTORY
Bulletin of the Transilvania University of Braşov Vol. 3 (52) - 2010 Series I: Engineering Sciences APPLICATION OF KANBAN SYSTEM FOR MANAGING INVENTORY M. APREUTESEI 1 I.R. ARVINTE 1 E. SUCIU 2 D. MUNTEANU
WORK MEASUREMENT APPROACH FOR PRODUCTIVITY IMPROVEMENT IN A HEAVY MACHINE SHOP
5 th International & 26 th All India Manufacturing Technology, Design and Research Conference (AIMTDR 2014) December 12 th 14 th, 2014, IIT Guwahati, Assam, India WORK MEASUREMENT APPROACH FOR PRODUCTIVITY
Lean Six Sigma Lean 201 Introduction. TECH 50800 QUALITY and PRODUCTIVITY in INDUSTRY and TECHNOLOGY
TECH 50800 QUALITY and PRODUCTIVITY in INDUSTRY and TECHNOLOGY Before we begin: Turn on the sound on your computer. There is audio to accompany this presentation. Audio will accompany most of the online
The Principles of the Lean Business System: #5 Prevention. Lean in the 21 st Century Series Professor Peter Hines
The Principles of the Lean Business System: #5 Prevention Lean in the 21 st Century Series Professor Peter Hines Our Webinar Welcome Webinar will last about 1 hour We will invite you to complete a few
Time is Money! Multi Project Management and Takt Oriented Sequencing
Time is Money! Multi Project Management and Takt Oriented Sequencing Klaus Broichhausen Project results of the Schuh group as well as studies and benchmarks of the Laboratory for Machine Tools and Production
HUMANIZING TAKT TIME AND PRODUCTIVITY IN THE LABOR- INTENSIVE MANUFACTURING SYSTEMS
HUMANIZING TAKT TIME AND PRODUCTIVITY IN THE LABOR- INTENSIVE MANUFACTURING SYSTEMS Milan Fekete Comenius University in Bratislava, Slovak Republic [email protected] Jaroslav Hulvej Comenius University
Tolerance Charts. Dr. Pulak M. Pandey. http://paniit.iitd.ac.in/~pmpandey
Tolerance Charts Dr. Pulak M. Pandey http://paniit.iitd.ac.in/~pmpandey Introduction A tolerance chart is a graphical method for presenting the manufacturing dimensions of a workpiece or assembly at all
LeanThinking. journalhomepage:www.thinkinglean.com/ijlt
InternationalJournalofLeanThinkingVolume2,Isue1(June2011) LeanThinking journalhomepage:www.thinkinglean.com/ijlt Process Cycle Efficiency Improvement Through Lean: A Case Study D. Rajenthirakumar* Department
Louisiana Tech University Lean Manufacturing Courses
Lean Course Objectives: Your Employees will be able to: Louisiana Tech University Lean Manufacturing Courses Understand the tools, terms, terminology, and most importantly the benefits of Lean Manufacturing.
Leaning a Training Process for a Leading Irish Retail Bank
Lean Financial Services Value Stream Mapping Leaning a Training Process for a Leading Irish Retail Bank Lean Financial Services Value Stream Mapping Gerry Silke Lean Financial Services Consultant Leading
IJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 10, 2015 ISSN (online): 2321-0613
IJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 10, 2015 ISSN (online): 2321-0613 Planning, Scheduling and Resource Optimization for A Villa by using Ms-Project 2010 Mr.
Lean Silver Certification Blueprint
The Lean Certification Blueprint provides additional useful information beyond the Body of Knowledge. The Body of Knowledge specifies the competencies, topics, and subtopics required by different types
Inventory Management in Small and Medium-Sized Manufacturing Companies and Its Main Dilemmas
Proceedings of the 2014 International Conference on Industrial Engineering and Operations Management Bali, Indonesia, January 7 9, 2014 Inventory Management in Small and Medium-Sized Manufacturing Companies
THE BEGINNER S GUIDE TO LEAN
THE BEGINNER S GUIDE TO LEAN Professor Daniel T Jones Lean Enterprise Academy Who am I? Writer Machine and Lean Thinking books Researcher on how to do lean everywhere! Founder of the non-profit Lean Enterprise
Does enterprise resource planning software support lean? ERP goes 44 TARGET AME.ORG/TARGET
Does enterprise resource planning software support lean? ERP goes 44 TARGET AME.ORG/TARGET BY HARRY F. LANDSBURG AND SHELDON NEEDLE lean WINTER 2014 TARGET 45 Many articles have been written about how
INVENTORY SYSTEMS (LIVE) 30 APRIL 2015 Section A: Summary Content Notes
INVENTY SYSTEMS (LIVE) 30 APRIL 2015 Section A: Summary Content Notes Stock Systems Remember that there are two stock systems generally in use the periodic system and the perpetual system You will need
Machining Operations- Cycle Time
Machining Operations- Cycle Time Module 8.2 Tamboura Gaskins, LFM 06 Sean Holly, LFM 06 Mentor: Professor Tim Gutowski Professor and Associate Head of Mechanical Engineering, MIT Brian Bowers, LFM 03 Presentation
Lean and Green Manufacturing: Concept and its Implementation in Operations Management
International Journal of Advanced Mechanical Engineering. ISSN 2250-3234 Volume 4, Number 5 (2014), pp. 509-514 Research India Publications http://www.ripublication.com/ijame.htm Lean and Green Manufacturing:
APPLICATION OF LEAN MANUFACTURING TO IMPROVE THE PERFORMANCE OF HEALTH CARE SECTOR IN LIBYA
International Journal of Engineering & Technology IJET-IJENS Vol: 10 No: 06 117 APPLICATION OF LEAN MANUFACTURING TO IMPROVE THE PERFORMANCE OF HEALTH CARE SECTOR IN LIBYA OSAMA M. ERFAN Department of
ERP Support for Pull Production
Trends in Production Control ERP Support for Pull Production Daryl Powell, Researcher & PhD Candidate Department of Production and Quality Engineering, Norwegian University of Science and Technology SINTEF
Journal of Emerging Trends in Engineering and Applied Sciences (JETEAS) 4(1):115-120 (ISSN: 2141-7016)
Journal of Emerging Trends in Engineering and Applied Sciences (JETEAS) 4(1):115-120 Scholarlink Research Institute Journals, 2013 (ISSN: 2141-7016) jeteas.scholarlinkresearch.org Journal of Emerging Trends
PROJECT OF RATIONALIZATION IN THE INVENTORY MANAGMENT OF MANUFACTURING ENTERPRISE. Slavomíra Szentiványi 1
The International Journal of TRANSPORT & LOGISTICS Medzinárodný časopis DOPRAVA A LOGISTIKA ISSN 1451-107X PROJECT OF RATIONALIZATION IN THE INVENTORY MANAGMENT OF MANUFACTURING ENTERPRISE Slavomíra Szentiványi
QAD Enterprise Applications Standard and Enterprise Edition. Training Guide Lean Manufacturing
QAD Enterprise Applications Standard and Enterprise Edition Training Guide Lean Manufacturing 70-3217-2012.1SE_EE QAD 2012.1 Enterprise Edition and 2012 Standard Edition September 2012 This document contains
Integrating A3 Reports and the House of Quality: Improving Workflow in the Recovery Room Using Information Technology
416 Medical Informatics in a United and Healthy Europe K.-P. Adlassnig et al. (Eds.) IOS Press, 2009 2009 European Federation for Medical Informatics. All rights reserved. doi:10.3233/978-1-60750-044-5-416
Process Layout Chapter 8
Process Layout Chapter 8 L L M M D D L L M M D D L L M M G G L L A A G G A A G G How Process Layout fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project
GETTING STARTED WITH LABVIEW POINT-BY-POINT VIS
USER GUIDE GETTING STARTED WITH LABVIEW POINT-BY-POINT VIS Contents Using the LabVIEW Point-By-Point VI Libraries... 2 Initializing Point-By-Point VIs... 3 Frequently Asked Questions... 5 What Are the
OPTIMIZING PRODUCTION
REAL WORLD SCENARIOS Volume 2 Cases 7-12 OPTIMIZING PRODUCTION SQUEEZE MORE OUT OF PRODUCTION OPTIMIZING SCHEDULING PRODUCTION FLOW IMPROVEMENTS INTEGRATED MAINTENANCE PLANNING INTEGRATED PROJECT MANAGEMENT
Residential Plumbing BCN 1058
Residential Plumbing BCN 1058 CHAPTER 7 Plumbing Fixtures and Sizing the Drain, Waste, and Vent System MICHAEL KNOTEK 74 Plumbing Fixtures and Sizing the Drain, Waste, and Vent System PLUMBING FIXTURES
Toyota Production System. Lecturer: Stanley B. Gershwin
Toyota Production System Lecturer: Stanley B. Gershwin Primary source: Toyota Production System by Yasuhiro Monden See also: Decoding the DNA of the Toyota Production System by Steven Spear and H. Kent
A Study of Theory of Constraints Supply Chain Replenishment System
Vol. 3, No.3, July 2013, pp. 78 88 ISSN: 2225-8329 2013 HRMARS www.hrmars.com A Study of Theory of Constraints Supply Chain Replenishment System Horng-Huei Wu 1 Mao-Yuan Liao 2 Chih-Hung Tsai 3 Shih-Chieh
JOURNAL OF INTERNATIONAL ACADEMIC RESEARCH FOR MULTIDISCIPLINARY Impact Factor 1.393, ISSN: 2320-5083, Volume 2, Issue 1, February 2014
ANALYSIS OF DRUGS IN HOSPITAL PHARMACY BY INVENTORY MANAGEMENT G D MISHRA* RANU PANDEY** *Dept. of Mathematics, Amity Institute of Applied Sciences, Amity University, Noida, India **Dept. of Mathematics,
Welcome to the topic on valuation methods.
Welcome to the topic on valuation methods. In this topic, we will look at the three valuation methods used in perpetual inventory in SAP Business One We describe how each valuation method works. Additionally,
MSc in Lean Operations. Module Descriptions
MSc in Lean Operations Module Descriptions 2010 BSP320 Lean Thinking & Practice To establish the roots, underlying philosophy and development of the lean thinking approach. By the end of the module, the
WORKING CAPITAL MANAGEMENT AND PROFITABILITY: A CASE OF CEMTAC CEMENTS PVT LTD KASHMIR
Inno Space (SJIF) Impact Factor : 4.618(Morocco) e-issn : 2347-9671, p- ISSN : 2349-0187 Vol - 3, Issue- 12, December 2015 ISI Impact Factor : 1.259 (Dubai, UAE) WORKING CAPITAL MANAGEMENT AND PROFITABILITY:
The Theory of Constraints & Lean Manufacturing
The Theory of Constraints & Lean Manufacturing Don Guild Synchronous Management, Milford, CT P: 3-877-1287 E: [email protected] Reproduction or use of these materials, in whole or in part, is prohibited
Getting Started with Lean Process Management
Getting Started with Lean Process Management Hi-Tec Exchange Conference San Francisco July 25, 2011 Missions To team with Organizational Leaders, Managers, & Employees to focus on customers & improve competitiveness,
Process Improvement: Integrating Lean Six Sigma Ergonomics
Process Improvement: Integrating Lean Six Sigma Ergonomics Anand Subramanian, PhD, CPE, CSSBB Email: anands@jfa inc.com Brandy Farris Ware, PhD, CPE, CSSBB Email: bw@jfa inc.com September 22, 2015 Agenda
QM5091 2 SCHEDULE AND DISPATCH PETROLEUM PIPELINE OPERATIONS
SUBCOURSE EDITION QM5091 2 SCHEDULE AND DISPATCH PETROLEUM PIPELINE OPERATIONS SCHEDULE AND DISPATCH PETROLEUM PIPELINE OPERATIONS Subcourse QM 5091 Edition 2 Unites States Army Combined Arms Support Command
ACC 471 WINTER 2007 In-class Exercise: Inventory Systems and Inventory Costing Methods
ACC 471 WINTER 2007 In-class Exercise: Inventory Systems and Inventory Costing Methods Objective At the end of the exercise, students should be able to account for cost of goods sold and ending inventory
Greening Our Future By Educating Tomorrow s Workforce. Module 2: Lean Manufacturing and the Environment
Greening Our Future By Educating Tomorrow s Workforce Module 2: Lean Manufacturing and the Environment 11/16/2011 Module 2: Lean Manufacturing and the Environment What You Will Learn From This Module:
Appendix O MANUFACTURING YOUTH APPRENTICESHIP PRODUCTION OPERATIONS MANAGEMENT PATHWAY PRODUCTION OPERATIONS MANAGEMENT (UNIT 8)
Appendix O MANUFACTURING YOUTH APPRENTICESHIP PRODUCTION OPERATIONS MANAGEMENT PATHWAY PRODUCTION OPERATIONS MANAGEMENT (UNIT 8) Pathway: (Unit 8) PAGE 1 OF 17 Unit 8: Pathway 1. Assist to purchase materials
Lean Kitting: A Case Study
Lean Kitting: A Case Study Ranko Vujosevic, Ph.D. Optimal Electronics Corporation Jose A. Ramirez, Larry Hausman-Cohen, and Srinivasan Venkataraman The University of Texas at Austin Department of Mechanical
Lean and Six Sigma Healthcare Fad or Reality. Vince D Mello President
Lean and Six Sigma Healthcare Fad or Reality Vince D Mello President TODAY S DISCUSSION About Lean Methodologies Application benefits and outcomes About Six Sigma Key learning's QUALITY FUNDAMENTALS Function
Process Flow Analysis of Diesel Engine Crankshaft Machining Line Layout
Process Flow Analysis of Diesel Engine Crankshaft Machining Line Layout Mahesh R Kale 1, Prof. V.S. Jadhav 2 PG Student, Department of Mechanical Engineering, Government College of Engineering, Karad,
Lean Production with Work Process Management
GE Fanuc Intelligent Platforms Lean Production with Work Process Management Enabling Standard Work to Increase Cost Savings and Maintain Lean Momentum When there is no standard, there can be no kaizen.
ELA Standards of Competence on the Supervisory/Operational Management Level
ELA Standards of Competence on the Supervisory/Operational Management Level 2.0 Basic Supply Chain Concepts 2.0.01 Explain the scope and role of component activities within the supply chain 2.0.02 Map
Production Planning Process in a Flexible Manufacturing Cell
ISBN 978-1-84626-xxx-x Proceedings of 2011 International Conference on Optimization of the Robots and Manipulators (OPTIROB 2011) Sinaia, Romania, 26-28 Mai, 2011, pp. xxx-xxx Production Planning Process
Atkins China Asset Management. Alan Wilson. Strategy Development
Atkins China Asset Management Alan Wilson Strategy Development " # " $%& & & ' ( ) * ) + + $,- & &. / 0, * ) + + 12 3 ) 4 ' 5 * 3 6 4 3 7 8 7 7 8 8 8 8 7 0 :3 ; / * 6 9 ) 8 ' * 6 0* 6 3 /9 < 9 = 3 10*
Achieving Basic Stability By Art Smalley
Achieving Basic Stability By Art Smalley Introduction Lean production has dramatically lifted the competitiveness of many manufacturing companies and the value they deliver to customers. What s more, encouraging
Implementation of Lean Six Sigma Principles: Making Data Cleansing Lean
Implementation of Lean Six Sigma Principles: Making Data Cleansing Lean Nityanand Wachche B.E in Computer Engineering University of Mumbai Mumbai, India ABSTRACT Data cleansing is required before performing
Factory Physics: The Key to Green Industries
Factory Physics: The Key to Green Industries College of Engineering and Architecture - College Days 2012 EXHIBIT: Greening Industries Student Chapter Philippine Institute of Industrial Engineers (PIIE)
Implementation of Lean six sigma For Improving Supply Chain processes in a Pharmaceutical Industry
519 Implementation of Lean six sigma For Improving Supply Chain processes in a Pharmaceutical Industry M. F. Elbermawy, Abbott Laboratories Egypt affiliate Arab Academy for Science and Technology & Maritime
China Center for Operations Excellence
China Center for Operations Excellence McKinsey China Leadership Institute A McKinsey Capability Center An innovative and lasting capability building program using the Beijing model factory set up jointly
The Application of Lean Production Control Methods within a Process-Type Industry: The Case of Hydro Automotive Structures
The Application of Lean Production Control Methods within a Process-Type Industry: The Case of Hydro Automotive Structures Daryl Powell 1, Erlend Alfnes 1 and Marco Semini 2 1 Department of Production
Chapter 11. MRP and JIT
Chapter 11 MRP and JIT (Material Resources Planning and Just In Time) 11.1. MRP Even if MRP can be applied among several production environments, it has been chosen here as a preferential tool for the
AAT LEVEL 3 LESSON 7. Association of Accounting Technicians (AAT) Example Course Materials
LESSON 7 Account for the Valuation of Inventory On completing this lesson you should be able to: Identify categories of inventory as referred to within the accounting standard IAS 2 (Inventories) Explain
15. How would you show your understanding of the term system perspective? BTL 3
Year and Semester FIRST YEAR II SEMESTER (EVEN) Subject Code and Name BA7201 OPERATIONS MANAGEMENT Faculty Name 1) Mrs.L.SUJATHA ASST.PROF (S.G) 2) Mr. K.GURU ASST.PROF (OG) Q.No Unit I Part A BT Level
A Review of Assembly Line Changes for Lean Manufacturing
IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) ISSN: 2278-1684, PP: 01-05 www.iosrjournals.org A Review of Assembly Line Changes for Lean Manufacturing Awasare Anant Dattatray 1, M.V.Kavade
AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS
Integrity, Reliability and Failure of Mechanical Systems Paper Ref: 3927 AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS Eric Costa 1(*), Rui Sousa 1, Sara Bragança 1,