REPLIES TO PRE BID REPLIES FOR REQUEST FOR PROPOSAL FOR SUPPLY, INSTALLATION AND MAINTENANCE OF SERVERS & STORAGE
|
|
|
- Ferdinand Cook
- 10 years ago
- Views:
Transcription
1 REPLIES TO PRE BID REPLIES FOR REQUEST FOR PROPOSAL FOR SUPPLY, INSTALLATION AND MAINTENANCE OF SERVERS & STORAGE NPCI/RFP/ /IT/012 dated S.No Document Reference Page No Clause No Description in RFP Clarification sought Additional Remarks (if any) NPCI Response 1 RFP Reference No: NPCI/RFP/ /IT/012 dated D AMC Hardware charges 4th & 5th year AMC charges are asked for 28 servers only, storages AMC is not asked for 4th & 5th year Please refer to Corrigendum 2 2 RFP Reference No: NPCI/RFP/ /IT/012 dated E) Resource Requirement Onsite Engineer for 6 days a week as per NPCI working hours during the entire contract period Whether 1 engineer required at DC or engineer required at DC as well as DR sites. Only 1 Engineer at Chennai 3 RFP Reference No: NPCI/RFP/ /IT/012 dated Payment terms: 20% payment against delivery & 80% against Installation & acceptance We request for 70% against delivery, 30% against installation, If there is any delay from customer end because of site not ready etc than customer should relese the full payment within 15 days of delivery. No change in RFP 4 RFP Reference No: NPCI/RFP/ /IT/012 dated Scope of work Scope of work is related to AMC only, we need the detail SOW regarding installation like hardware installation any OS installation any virtualisation installation, any cluster installation requirement etc??? Also we need to know detailed SOW of storage installation like creation of LUN, any clustering or replication software needs to be deployed Scope of work will be H/W,Storage installation, Configuration and OS installation & Cluster configuration including SQL Server Cluster 5 RFP Reference No: NPCI/RFP/ /IT/012 dated , 5.8 Earnest Money Deposit (EMD) Return of EMD We will submit BG with validity of 3 months or 4 months, since EMD will be returned either on submission of PBG or on declaration L1 so it will not take more than 3 months. Your below clause of valid for 6 months with claim period of 12 months contradict with clause 5.8 refer page No 11 of RFP. No change in RFP 6 NPCI/RFP/ /IT/ Payment Terms A. Supply of Hardware A. Supply of Hardware Please Modify this clause No change in RFP 7 NPCI/RFP/ /IT/ Payment Terms i) 20% payment shall be made to the Bidder against delivery of servers. i) 80% payment shall be made to the Bidder against delivery of servers. No change in RFP 8 NPCI/RFP/ /IT/ Payment Terms ii) 80% payment will be made after successful Installation and acceptance of hardware ii) 20% payment will be made after successful Installation and acceptance of hardware No change in RFP
2 9 NPCI/RFP/ /IT/ D) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location. Technical Specification Point No 8 The storage system should support RAID Levels 0, 5, 6, 10 or equivalent data protections. Multiple RAID configurations to be configured in the proposed solution. All the data to be written in RAID 10 and Read will be on RAID 5 How this expectation can be achived unless an application understands to read the data from a specific raid group which is running on a specifica raid level and write on a different raid group which is in a different raid level Please Clarify Storage need to to take care the Write in RAID 10 & Read in RAID 5 not the application 10 NPCI/RFP/ /IT/ D) Storage Qty. 1 for The storage should be configured PR and Qty. 1 for HA at with a total usable capacity of 17 Hyderabad location. TB using emlc - SSDs with single Technical Specification SSD not larger than 1.6TB. All the Point No 11 data to be written in RAID 5. can we use MLC SSD's Please Clarify 11 NPCI/RFP/ /IT/ D) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location. Technical Specification Point No 14 The storage array must support at least 180 disk drives behind the proposed pair of controllers. It must be a single or tightly clustered singly managed system rather than aggregate of multiple separate smaller boxes. The same should be upgradeable to minimum 500 drives by adding controllers / changing the controllers The scalablity expectation to 500 drives conflicts with the expectation the RFP Demands is a Mid range storage. Mid Range storage typical storage family will have support to min 450 drives from day one Please Clarify 12 NPCI/RFP/ /IT/ E) Storage Qty 1 for DR at Chennai location. Technical Specification Point No 7 The storage system should support RAID Levels 0, 5, 6, 10 or equivalent data protections. Multiple RAID configurations to be configured in the proposed solution. All the data to be written in RAID 10 and Read will be on RAID 5 How this expectation can be achived unless an application understands to read the data from a specific raid group which is running on a specifica raid level and write on a different raid group which is in a different raid level Please Clarify Storage need to to take care the Write in RAID 10 & Read in RAID 5 not the application 13 NPCI/RFP/ /IT/ The storage should be configured with a total usable capacity of 17 E) Storage Qty 1 for DR TB using emlc - SSDs with single at Chennai location. SSD not larger than 1.6TB & 3TB Technical Specification in SAS 10K with single SAS disk Point No 10 not larger than 900GB.All the data to be written in RAID 5. can we use MLC SSD's, 3TB Drives do not come with 10K RPM& RFP states that Single SAS disk should not be larger than 900 GB Please Clarify Need to use emlc SSD only. 3TB space in SAN need to given in SAS 10K RPM disk not larger than 900GB SAS Disks
3 14 NPCI/RFP/ /IT/ E) Storage Qty 1 for DR at Chennai location. Technical Specification Point No 13 The storage array must support at least 180 disk drives behind the proposed pair of controllers. It must be a single or tightly clustered singly managed system rather than aggregate of multiple separate smaller boxes. The same should be upgradeable to minimum 500 drives by adding controllers / changing the controllers The scalablity expectation to 500 drives conflicts with the expectation the RFP Demands is a Mid range storage. Mid Range storage typical storage facmily will have support to min 450 drives from day one Please Clarify No change in RFP 15 E) Storage Qty 1 for DR at Chennai location. Technical Specification 30 7 All the data to be written in RAID 10 and Read will be on RAID 5. This tiering feature is offered by only one OEM requiring 2 tiers of SSD (R1/0 for Read Intensive and R5 for Write Intensive). The RFP requires 17 TB usable capacity using emlc-ssds with <3msec response time which can be delivered without requiring tiering. Hence request NPCI remove the technical requirement as the required capacity and performance can be delivered without the two tiered SSD approach E) Storage Qty 1 for DR at Chennai location. Technical Specification E) Storage Qty 1 for DR at Chennai location. Technical Specification All the data to be written in RAID 10 and Read will be on RAID 5. The proposed System must be populated with the following ports Request you to include hardware based RAID controller Request you to include minimum 2 nos. of 6Gbps SAS physical ports per Controller for disk connectivity. All storage OEM support 6Gbps SAS or higher. Not Clear Minimum 2nos of 6GBPS SAS phisical Ports can be given for Disk Conectivity 18 E) Storage Qty 1 for DR at Chennai location. Technical Specification x 24-port SAN Switch with 18- ports active SAN switch ports are avaliable as multiple of 12 hence request you to include 24 active ports per SAN switch. Hence 24 x 8Gbps FC ports and 24 x 10M LC-LC cables. Minmum 18 port is Required if 18 ports is not Possible 24 Ports Licences can be Quoted 19 E) Storage Qty 1 for DR at Chennai location. Technical Specification Each Switch should be configured with minimum 18 x 8Gbps FC ports & 18 x 10M LC-LC Cables SAN switch ports are avaliable as multiple of 12 hence request you to include 24 x 8Gbps FC ports and 24 x 10M LC-LC cables for each SAN switch. Minmum 18 port is Required if 18 ports is not Possible 24 Ports Licences can be Quoted 20 E) Storage Qty 1 for DR at Chennai location. Technical Specification Replacement of disk drive would only be performed after degaussing faulty disk drive at NPCI Onsite location. Any such scenarios will be covered under the support period and contract. Request NPCI to consider Data At Rest Encryption using Controller based or Self Encrypting Drives. This will ensure the all data written to disk is protected against unauthorized drive removal (lost or stolen) and eliminate the need for degaussing on drive failure. 21 Section 9- Technical Specification: A) Application Server x128GB using 32GB DIMMS and scalable up to 576GB Please confirm that you need 256GB capacity using 32GB memory and Please modify the clause 256 GB Memory capacity using 32 GB DIMM Considered 256 GB Memory capacity 256 GB Memory 22 Section 9- Technical Specification: A) Application Server Microsoft Windows Server 2008 Request you to remove the OS as it is already End & Microsoft Windows HPC Server of Sale 2008 HPC feature is available in Microsoft Windows Server 2012 R2 Proposed Servers need to support minimim Windows 2008 or 2008 R2
4 23 Section 9- Technical Specification: B) DB server x128GB using 32GB DIMMS and scalable up to 576GB Please confirm that you need 256GB capacity using 32GB memory and Please modify the clause 256 GB Memory capacity using 32 GB DIMM Considered 256 GB Memory capacity 256 GB Memory 24 Section 9- Technical Specification: B) DB server Microsoft Windows Server 2008 Request you to remove the OS as it is already End & Microsoft Windows HPC Server of Sale 2008 HPC feature is available in Microsoft Windows Server 2012 R2 Proposed Servers need to support minimim Windows 2008 or 2008 R2 25 Section 9- Technical Specification: C) Development server Microsoft Windows Server 2008 Request you to remove the OS as it is already End & Microsoft Windows HPC Server of Sale 2008 HPC feature is available in Microsoft Windows Server 2012 R2 Proposed Servers need to support minimim Windows 2008 or 2008 R2 26 Table 9.2 Technical Specification of Servers and Storage is as under Page No 24 and 26 Point No 7 2x128GB using 32GB DIMMS and scalable up to 576GB 2x128Gb RAM to be read as 256GB RAM..This has been suggested for easy readibility 256 GB Memory 27 D) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location Pg No 28 Point No 8 The storage System should support RAID Levels 0, 5, 6, 10 or equivalent data protections. Multiple RAID configurations to be Kindly remove and Read will be on RAID 5" It is a configured in the proposed contraductory statement solution. All the data to be written in RAID 10 and Read will be on RAID D) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location Pg No 28 Point 11 The storage should be configured with a total usable capacity of 17 All the data to be written in RAID 10 Raid 10 Gives TB using emlc - SSDs with single Better Performance in Writing Compare to Raid 5 SSD not larger than 1.6TB. All the data to be written in RAID 5. All the data need to write in RAID 10 and data read will be on RAID 5 29 E) Storage Qty 1 for DR at Chennai location Pg No 30 Point 7 The Storage System should support RAID Levels 0, 5, 6, 10 or equivalent data protections. Multiple RAID configurations to be Kindly remove and Read will be on RAID 5" It is a configured in the proposed contraductory statement solution. All the data to be written in RAID 10 and Read will be on RAID E) Storage Qty 1 for DR at Chennai location Pg No 30 Point 10 The storage should be configured with a total usable capacity of 17 TB using emlc-ssds with single SSD not larger than 1.6TB & 3TB in SAS 10K with single SAS disk not larger than 900GB. All the data to be written in RAID 5 The storage should be configured with a total usable capacity of 17 TB using emlc-ssds with single SSD not larger than 1.6TB, data to be written in R10. 3TB in SAS 10K with single SAS disk not larger than 900GB data to be written in RAID 5 All the data need to write in RAID 10 and data read will be on RAID 5 31 General General General General General We propose OEM Bidders should be Vendors only from leaders quadrant from Gartner Magic Quadrant for both Servers & Storage No change in RFP
5 32 Table 9.2 Technical Specification of Servers and Storage is as under Page No 24 and 26 Point No 7 2x128GB using 32GB DIMMS and scalable up to 576GB 2x128Gb RAM to be read as 256GB RAM..This has been suggested for easy readibility 256GB RAM 33 D) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location Pg No 28 Point No 8 The storage System should support RAID Levels 0, 5, 6, 10 or equivalent data protections. Multiple RAID configurations to be Kindly remove and Read will be on RAID 5" It is a configured in the proposed contraductory statement solution. All the data to be written in RAID 10 and Read will be on RAID D) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location Pg No 28 Point 11 The storage should be configured with a total usable capacity of 17 All the data to be written in RAID 10 Raid 10 Gives TB using emlc - SSDs with single Better Performance in Writing Compare to Raid 5 SSD not larger than 1.6TB. All the data to be written in RAID 5. All the data need to write in RAID 10 and data read will be on RAID 5 35 E) Storage Qty 1 for DR at Chennai location Pg No 30 Point 7 The Storage System should support RAID Levels 0, 5, 6, 10 or equivalent data protections. Multiple RAID configurations to be Kindly remove and Read will be on RAID 5" It is a configured in the proposed contraductory statement solution. All the data to be written in RAID 10 and Read will be on RAID E) Storage Qty 1 for DR at Chennai location Pg No 30 Point 10 The storage should be configured The storage should be configured with a total with a total usable capacity of 17 usable capacity of 17 TB using emlc-ssds with TB using emlc-ssds with single single SSD not larger than 1.6TB, data to be SSD not larger than 1.6TB & 3TB written in R10. 3TB in SAS 10K with single SAS in SAS 10K with single SAS disk disk not larger than 900GB data to be written in not larger than 900GB. All the RAID 5 data to be written in RAID 5 All the data need to write in RAID 10 and data read will be on RAID 5 37 Eligibility Criteria Page No 9 Point 4.2 The bidder should be Authorized The bidder should be Authorized OEM partner for OEM partner for sales and service sales and service and should provide back to back and should provide back to back on site support from OEM during warranty and AMC on site support from OEM during period/oem to directly service and support warranty and AMC period. through warranty and AMC period. The bidder should be Authorized OEM partner for sales and service and should provide back to back on site support from OEM during warranty and AMC period/oem to directly service and support through warranty and AMC period. 38 General General General General We propose OEM Bidders should be Vendors only from leaders quadrant from Gartner Magic Quadrant for both Servers & Storage No change in RFP 39 RFP for Supply,Installation & Maintenance of Server& Storage 25 Technical Specification for Server & Storage- Avaliability Internal Dual SD Module(Failsafe Hypervisor) We would Request NPCI to consider Internal Single SD Module Most of the server vendors Provide Single SD Module except one or two server vendors Minimum Single Internal SD Module is Required
6 40 RFP for Supply,Installation & Maintenance of Server& Storage 26 Technical Specification for Server- Avaliability- Point No. 13 Internal Dual SD Module(Failsafe Hypervisor) We would Request NPCI to consider Internal Single SD Module Most of the server vendors Provide Single SD Module except one or two server vendors Minimum Single Internal SD Module is Required 41 RFP for Supply,Installation & Maintenance of Server& Storage 27 Development Server Internal Dual SD Module(Failsafe Technical Qualification- Hypervisor) Point No. 13 We would Request NPCI to consider Internal Single SD Module Most of the server vendors Provide Single SD Module except one or two server vendors Minimum Single Internal SD Module is Required 42 RFP for Supply,Installation & Maintenance of Server& Storage 44 Annexure J-Technical Evaluation Compliance- Internal Dual SD Module(Failsafe Avaliability-Point No. Hypervisor) 13 We would Request NPCI to consider Internal Single SD Module Most of the server vendors Provide Single SD Module except one or two server vendors Minimum Single Internal SD Module is Required 43 RFP for Supply,Installation & Maintenance of Server& Storage 46 Technical Evaluation Compliance- Avaliability-Point No. 13 Internal Dual SD Module(Failsafe Hypervisor) We would Request NPCI to consider Internal Single SD Module Most of the server vendors Provide Single SD Module except one or two server vendors Minimum Single Internal SD Module is Required 44 RFP for Supply,Installation & Maintenance of Server& Storage 48 Technical Evaluation Compliance- Avaliability-Point No. 13 Internal Dual SD Module(Failsafe Hypervisor) We would Request NPCI to consider Internal Single SD Module Most of the server vendors Provide Single SD Module except one or two server vendors Minimum Single Internal SD Module is Required 45 RFP for Supply,Installation & Maintenance of Server& Storage Payment Terms- Hardware 20% on delivery and remaining 80% against successful installation & acceptance of HW We would Request NPCI to consider 80% on delivery and remaining 20% against successful installation & acceptance of HW No change in RFP 46 Table 9.2 Technical Specification of Servers and Storage Table-A; Clause -7 Table-B; Clause -7 Memory: 2x128GB using 32GB DIMMS and scalable up to 576GB Please clarify whether this requirement is for 256GB RAM using 32GB DIMMs; or the specification of "2 x 128GB" has a different interpretation 256 GB RAM 47 Table 9.2 Technical Specification of Servers and Storage Table-A; Clause-12 Table-B; Clause-12 Table-C; Clause-12 OS & Hypervisor Support: Microsoft Windows HPC Server 2008 Microsoft Windows Server 2008, with Hyper-V Servers with specified processors support minimum Windows Server 2008 R2, and Windows HPC Server 2008 R2 Proposed servers need to support minimim Windows 2008 or 2008 R2 48 Table 9.2 Technical Specification of Servers and Storage Table-A; Clause-13 Table-B; Clause-13 Table-C; Clause-13 Internal Dual SD Module (Failsafe Hypervisor) "Failsafe Hypervisor" is a vendor specific term. Servers can be provisioned to support internal dual SD cards. Minimum Single Internal SD Module is Required 49 End of page 31 ** Red Hat Cluster Suite required for each pair of DB servers within a site both the servers within a site need to be clustered. NPCI had already purchased 1 yr. support for REHL from existing UPI vendor. The vendor should provide an onsite Engineer (minimum Engineering graduate) with minimum 5 years domain experience in Servers and Storage for 6 days a week as per NPCI working hours during the entire Contract period. Please specify whether hypervisor & operating system license / subscriptions are to be quoted for all servers. In that case, please specify the version / edition of each to be quoted. Please specify the number of cluster suite required at each site. RFP mentions 6 DB servers at Hyderabad and 3 nos. at Chennai. As we are using physical servers so we don t need hypervisor.we need 21 OS licenses that is 7 for each site (4 for Application Servers and 2 for OLTP DB Servers and 1 for Reporting DB Server). The OS cluster solution will be achieved through Resilient Storage Cluster that comes as an add-on with RHEL license. For each site, 2 of these RHEL + Resilient storage add-on licenses (i.e. total of 6) would be needed.
7 50 Table 9.1 Location wise server details, under D) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location. Technical Specification is as below 28 3 The storage system should be of Mid Range category and should Please specify the Block storage Capacity and File have unified capability i.e. should Storage Capacity support block (FC) and file access (CIFS, NFS). Please specify if PR & HA storages would be replicating to each other and distance between the same. Storage replication future need to be there in proposed storage. As of now not going to use. 51 Table 9.1 Location wise server details, under D) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location. Technical Specification is as below The storage should be configured with a total usable capacity of 17 TB using emlc - SSDs with single SSD not larger than 1.6TB. All the data to be written in RAID 5. Please confirm if Storage with MLC drive support will meet this criteria. Suggest to change this point from emlc to MLC or cmlc as it is a vendor specific & traditional specification. 52 Table 9.1 Location wise server details, under D) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location. Technical Specification is as below Proposed system must support all on-line data storage tiers in order Please confirm if Storage with MLC drive to maximize both system support will meet this criteria or Storage should performance and capacity support all three SLC/MLC/eMLC drives. cmlc scalability. It should support drives are preferred over SLC/MLC/eMLC drives following types of drives and meet both performance and cost SLC/ MLC / emlc SSD expectations. Suggest to remove SLC criteria as it 15K RPM 6Gbps SAS is a vendor specific & traditional requirement and 10K RPM 6Gbps SAS most storages will not qualify for same 7.2K RPM NL-SAS 53 Table 9.1 Location wise server details, under D) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location. Technical Specification is as below The storage array must support at least 180 disk drives behind the proposed pair of controllers. It must be a single or tightly clustered singly managed system rather than aggregate of multiple separate smaller boxes. The same should be upgradeable to minimum 500 drives by adding controllers / changing the controllers Could an "Online migration to a new storage with higher capacity meet this criteria of an upgradability" 54 Table 9.1 Location wise server details, under E) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location. Technical Specification is as below 30 3 The storage system should be of Mid Range category and should Please specify the Block storage Capacity and File have unified capability i.e. should Storage Capacity support block (FC) and file access (CIFS, NFS). Please specify if PR & DR storages would be replicating to each other. Storage replication future need to be there in proposed storage. As of now not going to use. 55 Table 9.1 Location wise server details, under E) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location. Technical Specification is as below The storage should be configured with a total usable capacity of 17 TB using emlc - SSDs with single SSD not larger than 1.6TB. All the data to be written in RAID 5. Please confirm if Storage with MLC drive support will meet this criteria. Suggest to change this point from emlc to MLC or cmlc as it is a vendor specific & traditional specification.
8 56 Table 9.1 Location wise server details, under E) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location. Technical Specification is as below 30 9 Proposed system must support all on-line data storage tiers in order Please confirm if Storage with MLC drive to maximize both system support will meet this criteria or Storage should performance and capacity support all three SLC/MLC/eMLC drives. cmlc scalability. It should support drives are preferred over SLC/MLC/eMLC drives following types of drives and meet both performance and cost SLC/ MLC / emlc SSD expectations. Suggest to remove SLC criteria as it 15K RPM 6Gbps SAS is a vendor specific & traditional requirement and 10K RPM 6Gbps SAS most storages will not qualify for same 7.2K RPM NL-SAS 57 Table 9.1 Location wise server details, under E) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location. Technical Specification is as below The storage array must support at least 180 disk drives behind the proposed pair of controllers. It must be a single or tightly clustered singly managed system rather than aggregate of multiple separate smaller boxes. The same should be upgradeable to minimum 500 drives by adding controllers / changing the controllers Could an "Online migration to a new storage with higher capacity meet this criteria of an upgradability" 58 Table 9.1 Location wise server details, under D) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location. Technical Specification is as below Page No 28 Point No 3 The storage system should be of Mid Range category and should Please specify the Block storage Capacity and File have unified capability i.e. should Storage Capacity support block (FC) and file access (CIFS, NFS). Please specify if PR & HA storages would be replicating to each other and distance between the same. Storage replication future need to be there in proposed storage. As of now not going to use. 59 Table 9.1 Location wise server details, under D) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location. Technical Specification is as below Page No 28 Point No 11 The storage should be configured with a total usable capacity of 17 TB using emlc - SSDs with single SSD not larger than 1.6TB. All the data to be written in RAID 5. Please confirm if Storage with MLC drive support will meet this criteria. Suggest to change this point from emlc to MLC or cmlc as it is a vendor specific & traditional requirement 60 Table 9.1 Location wise server details, under D) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location. Technical Specification is as below Page No 28 Point No 10 Proposed system must support all on-line data storage tiers in order Please confirm if Storage with MLC drive to maximize both system support will meet this criteria or Storage should performance and capacity support all three SLC/MLC/eMLC drives. cmlc scalability. It should support drives are preferred over SLC/MLC/eMLC drives following types of drives and meet both performance and cost SLC/ MLC / emlc SSD expectations. Suggest to remove SLC criteria as it 15K RPM 6Gbps SAS is a vendor specific & traditional requirement and 10K RPM 6Gbps SAS most storages will not qualify for same 7.2K RPM NL-SAS
9 61 Table 9.1 Location wise server details, under D) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location. Technical Specification is as below Page No 28 Point No 14 The storage array must support at least 180 disk drives behind the proposed pair of controllers. It must be a single or tightly clustered singly managed system rather than aggregate of multiple separate smaller boxes. The same should be upgradeable to minimum 500 drives by adding controllers / changing the controllers Could an "Online migration to a new storage with higher capacity meet this criteria of an upgradability" 62 Table 9.1 Location wise server details, under E) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location. Technical Specification is as below Page No 30 Point No 3 The storage system should be of Mid Range category and should Please specify the Block storage Capacity and File have unified capability i.e. should Storage Capacity support block (FC) and file access (CIFS, NFS). Please specify if PR & DR storages would be replicating to each other. 63 Table 9.1 Location wise server details, under E) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location. Technical Specification is as below Page No 30 Point No 10 The storage should be configured with a total usable capacity of 17 TB using emlc - SSDs with single SSD not larger than 1.6TB. All the data to be written in RAID 5. Please confirm if Storage with MLC drive support will meet this criteria. Suggest to change this point from emlc to MLC or cmlc as it is a vendor specific & traditional requirement 64 Table 9.1 Location wise server details, under E) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location. Technical Specification is as below Page No 30 Point No 9 Proposed system must support all on-line data storage tiers in order Please confirm if Storage with MLC drive to maximize both system support will meet this criteria or Storage should performance and capacity support all three SLC/MLC/eMLC drives. cmlc scalability. It should support drives are preferred over SLC/MLC/eMLC drives following types of drives and meet both performance and cost SLC/ MLC / emlc SSD expectations. Suggest to remove SLC criteria as it 15K RPM 6Gbps SAS is a vendor specific & traditional requirement and 10K RPM 6Gbps SAS most storages will not qualify for same 7.2K RPM NL-SAS 65 Table 9.1 Location wise server details, under E) Storage Qty. 1 for PR and Qty. 1 for HA at Hyderabad location. Technical Specification is as below Page No 31 Point No 13 The storage array must support at least 180 disk drives behind the proposed pair of controllers. It must be a single or tightly clustered singly managed system rather than aggregate of multiple separate smaller boxes. The same should be upgradeable to minimum 500 drives by adding controllers / changing the controllers Could an "Online migration to a new storage with higher capacity meet this criteria of an upgradability" 66 Table 9.2 Technical Specification of Servers and Storage Table-A; Clause -7 Table-B; Clause -7 Memory: 2x128GB using 32GB DIMMS and scalable up to 576GB Please clarify whether this requirement is for 256GB RAM using 32GB DIMMs; or the specification of "2 x 128GB" has a different interpretation 256 GB RAM
10 67 Table 9.2 Technical Specification of Servers and Storage Table-A; Clause-12 Table-B; Clause-12 Table-C; Clause-12 OS & Hypervisor Support: Microsoft Windows HPC Server 2008 Microsoft Windows Server 2008, with Hyper-V Servers with specified processors support minimum Windows Server 2008 R2, and Windows HPC Server 2008 R2 Proposed Servers need to support minimim Windows 2008 or 2008 R2 68 Table 9.2 Technical Specification of Servers and Storage Table-A; Clause-13 Table-B; Clause-13 Table-C; Clause-13 Internal Dual SD Module (Failsafe Hypervisor) "Failsafe Hypervisor" is a vendor specific term. Servers can be provisioned to support internal dual SD cards. Minimum Single Internal SD Module is Required 69 End of page 31 ** Red Hat Cluster Suite required for each pair of DB servers within a site both the servers within a site need to be clustered. NPCI had already purchased 1 yr. support for REHL from existing UPI vendor. The vendor should provide an onsite Engineer (minimum Engineering graduate) with minimum 5 years domain experience in Servers and Storage for 6 days a week as per NPCI working hours during the entire Contract period. Please specify whether hypervisor & operating system license / subscriptions are to be quoted for all servers. In that case, please specify the version / edition of each to be quoted. Please specify the number of cluster suite required at each site. RFP mentions 6 DB servers at Hyderabad and 3 nos. at Chennai. As we are using physical servers so we don t need hypervisor.we need 21 OS licenses that is 7 for each site (4 for Application Servers and 2 for OLTP DB Servers and 1 for Reporting DB Server). The OS cluster solution will be achieved through Resilient Storage Cluster that comes as an add-on with RHEL license. For each site, 2 of these RHEL + Resilient storage add-on licenses (i.e. total of 6) would be needed. 70 Scope of Work resolution time of 12 hours. 71 Scope of Work onsite Engineer 72 Prices for Rate Contract Payment Terms There shall be no increase in price for any reason whatsoever during the period of 12 months from the date of acceptance of the Purchase Order. 20% against delivery, 80% against implementation and acceptance Resolution time commitment adherence will depend on nature of problem. Required for both sites or only one site? If only one site, which site - Hyd or Chen? Kindly please allow to accommodate a price change for dollar fluctuation of more than +/- 3%. Kindly please also confirm that any change in Taxes will be as per actuals. Kindly please clarify whether this should be 80% against delivery and 20% against implementation and acceptance. Revised clause can possibly be as follows: resolution time of 12 hours on a best effort basis Revised clause can possibly be as follows: There shall be no increase in price for upto 3% C:\Users\Vgaikwad\ Documents\ Customer\NPCI\ Unified Payment Interface\NPCI Blade Server Specifications for UPI.xlsx increase in exchange rate during the period of 12 months from the date of acceptance of the Purchase Order. Any increase beyond 3% in Revised spec can possibly be as follows: 80% against delivery and 20% against implementation and acceptance. The OS cluster solution will be achieved through Resilient Storage Cluster that comes as an add-on with RHEL license. Only 1 Engineer is needed at Chennai No change in RFP No change in RFP
11 74 Servers - Application Servers A - 3 Processor - 2X Intel E5-2640v3 or higher This is a very low end processor and features 5th from bottom in Intel's list of 15 processors categorized for 2-socket Servers. Please refer page 4 this 5-page Intel document: /us/en/documents/product-briefs/xeon-e5- brief.pdf For NPCI's benefit of investment protection by way of investing in a CPU with longer shelf life, can NPCI standardize the Processor specification to atleast one from the top 3 CPUs? Revised spec can possibly be as follows: 2X Intel E5-2697v3 2.6GHz 14-core 35MB Cache 9.6GT/s 2133MHz DIMM support. The proposed server need to have Processor - 2X Intel E5-2640v3 or higher, vnder cam propose for higher procesor also. 75 Servers - Application Servers A - 7 Memory - 2x128GB using 32GB DIMMS and scalable up to 576GB This spec means NPCI wishes to have 256GB RAM using only 8 x 32GB DIMMs. NPCI may please note that DIMMs need to be populated and addressed by OS in pairs. One 32GB DIMM failure causes loss of 64GB Memory for NPCI's Application. For NPCI's better Memory availability along with scalability, can NPCI standardize the Memory to have more numbers of 16GB DIMMs and also ask bidders to quote Servers with 24 DIMM slots on the motherboard? Revised spec can possibly be as follows: 256GB using 16 x 16GB 2133MHz DIMMs with additional 8 Memory DIMM slots to be available for future expansion i.e. there should be total 24 DIMM slots on the Server. 256 GB Memory 76 Servers - Application Servers A - 8 Drive Bays - 2x600GB 10 K SAS drives NPCI wants only OS and Application instance space on Server in high availability RAID 1. For NPCI's better OS and Application performance, smaller capacity drives like 300GB with higher RPM of 15K in RAID 1 will be advisable. For much higher availability, NPCI can look to move this capacity from the Server to the high availability SAN Storage and have the OS and application boot from SAN. Revised spec can possibly be as follows: 2x300GB 15K SAS Drives in RAID 1 or alternatively same drives on SAN storage for each Server and no drives on Server. No change in RFP 77 Servers - Application Servers A - 9 NIC - 4x1Gbps For NPCI's better network-readiness as well workload performance, can NPCI standardize and ask for 10Gbps connectivity. Revised spec can possibly be as follows: Atleast 2x10Gbps, preferably 4x10Gbps. Minimum requirent is 1GBPS Nics, vender can quote higher also 78 Servers - Application Servers A - 10 Additional Cards - 2x single port FC HBA For NPCI's better network readiness as well as workload performance, can NPCI standardize and Revised spec can possibly be ask for 16Gbps FC connectivity. as follows: NPCI is also requested to accept a single dual-port Atleast 2x16Gbps FC Ports. FC HBA - which is also the standard even in mission critical Blade Servers. Minimum requirent is 1GBPS Nics, vender can quote higher also 79 Servers - Application Servers A - 11 Expansion Slots - Min 5 PCIe 3.0 slots If NPCI is not going to use any specific card apart from LAN NIC and SAN HBA, can NPCI please remove this spec? Removing this spec will enable NPCI to invest in Blade Servers - which offer higher availability, reduced carbon foot print and simplified single point manageability.
12 80 Servers - Application Servers A - 15 Form Factor - 2U If NPCI is not going to need more than 2 internal Revised spec can possibly be Drives and not more than 2 Cards for LAN and SAN, as follows: then NPCI will benefit by investing in the space Blade Chassis of 6U / 10U / saving, easy to manage, higher availability Blade 12U to accommodate 8 to Server form factor. Can NPCI standarize on Blade 16 Blade Servers per Blade Server form factor? Chassis. 81 Servers - Database Servers B - 3 Processor - 2X Intel E5-2698v3 or higher E5-2698v3 is a 2.3GHz 16 core processor. For Application Server, we have recommended to standardize on E5-2697v3 2.6GHz 14-core processor which is a higher clock speed processor. NPCI will benefit from having a standard asset base of same high-end processor across both Application & Database Servers. Can NPCI standarize this spec to E5-2697v3 CPU? Revised spec can possibly be as follows: 2X Intel E5-2697v3 2.6GHz 14-core 35MB Cache 9.6GT/s 2133MHz DIMM support. The proposed server need to have Processor - 2X Intel E5-2640v3 or higher. Vendor can propose for higher processor also. 82 Servers - Database Servers B - 7 Memory - 2x128GB using 32GB DIMMS and scalable up to 576GB This spec means NPCI wishes to have 256GB RAM using only 8 x 32GB DIMMs. NPCI may please note that DIMMs need to be populated and addressed by OS in pairs. One 32GB DIMM failure causes loss of 64GB Memory for NPCI's Application. For NPCI's better Memory availability along with scalability, can NPCI standardize the Memory to have more numbers of 16GB DIMMs and also ask bidders to quote Servers with 24 DIMM slots on the motherboard? Revised spec can possibly be as follows: 256GB using 16 x 16GB 2133MHz DIMMs with additional 8 Memory DIMM slots to be available for future expansion i.e. there should be total 24 DIMM slots on the Server. 83 Servers - Database Servers B - 8 Drive Bays - 2x600GB 10 K SAS drives This spec means NPCI wants only OS and Application instance space on Server in high availability RAID 1. For NPCI's better OS and Application performance, smaller capacity drives like 300GB with higher RPM of 15K in RAID 1 will be advisable. For much higher availability, NPCI can look to move this capacity from the Server to the high availability SAN Storage and have the OS and application boot from SAN. Revised spec can possibly be as follows: 2x300GB 15K SAS Drives in RAID 1 or alternatively same drives on SAN storage for each Server and no drives on Server. 84 Servers - Database Servers B - 9 NIC - 4x1Gbps For NPCI's better network-readiness as well workload performance, can NPCI standardize and ask for 10Gbps connectivity. Revised spec can possibly be as follows: Atleast 2x10Gbps, preferably 4x10Gbps. Minimum requirent is 1GBPS Nics, vender can quote higher also 85 Servers - Database Servers B - 10 Additional Cards - 2x single port FC HBA For NPCI's better network readiness as well as workload performance, can NPCI standardize and Revised spec can possibly be ask for 16Gbps FC connectivity. as follows: NPCI is also requested to accept a single dual-port Atleast 2x16Gbps FC Ports. FC HBA - which is also the standard even in mission critical Blade Servers.
13 86 Servers - Database Servers B - 11 Expansion Slots - Min 5 PCIe 3.0 slots If NPCI is not going to use any specific card apart from LAN NIC and SAN HBA, can NPCI please remove this spec? Removing this spec will enable NPCI to invest in Blade Servers - which offer higher availability, reduced carbon foot print and simplified single point manageability. 87 Servers - Database Servers B - 15 Form Factor - 2U If NPCI is not going to need more than 2 internal Revised spec can possibly be Drives and not more than 2 Cards for LAN and SAN, as follows: then NPCI will benefit by investing in the space Blade Chassis of 6U / 10U / saving, easy to manage, higher availability Blade 12U to accommodate 8 to Server form factor. Can NPCI standarize on Blade 16 Blade Servers per Blade Server form factor? Chassis. 88 Servers - Development Servers C - 3 Processor - 2X Intel E5-2640v3 or higher This is a very low end processor and features 5th from bottom in Intel's list of 15 processors categorized for 2-socket Servers. Please refer page 4 this 5-page Intel document: /us/en/documents/product-briefs/xeon-e5- brief.pdf For NPCI's benefit of investment protection by way of investing in a CPU with longer shelf life, can NPCI standardize the Processor specification to atleast one from the top 3 CPUs? Revised spec can possibly be as follows: 2X Intel E5-2697v3 2.6GHz 14-core 35MB Cache 9.6GT/s 2133MHz DIMM support. the proposed server need to have Processor - 2X Intel E5-2640v3 or higher, vnder cam propose for higher procesor also. 89 Servers - Development Servers C - 7 Memory - 2x128GB using 32GB DIMMS and scalable up to 576GB This spec means NPCI wishes to have 256GB RAM using only 8 x 32GB DIMMs. NPCI may please note that DIMMs need to be populated and addressed by OS in pairs. One 32GB DIMM failure causes loss of 64GB Memory for NPCI's Application. For NPCI's better Memory availability along with scalability, can NPCI standardize the Memory to have more numbers of 16GB DIMMs and also ask bidders to quote Servers with 24 DIMM slots on the motherboard? Revised spec can possibly be as follows: 256GB using 16 x 16GB 2133MHz DIMMs with additional 8 Memory DIMM slots to be available for future expansion i.e. there should be total 24 DIMM slots on the Server. 90 Servers - Development Servers C - 8 Drive Bays - 2x600GB 10 K SAS drives This spec means NPCI wants only OS and Application instance space on Server in high availability RAID 1. For NPCI's better OS and Application performance, smaller capacity drives like 300GB with higher RPM of 15K in RAID 1 will be advisable. For much higher availability, NPCI can look to move this capacity from the Server to the high availability SAN Storage and have the OS and application boot from SAN. Revised spec can possibly be as follows: 2x300GB 15K SAS Drives in RAID 1 or alternatively same drives on SAN storage for each Server and no drives on Server. 91 Servers - Development Servers C - 9 NIC - 4x1Gbps For NPCI's better network-readiness as well workload performance, can NPCI standardize and ask for 10Gbps connectivity. Revised spec can possibly be as follows: Atleast 2x10Gbps, preferably 4x10Gbps. Minimum requirent is 1GBPS Nics, vender can quote higher also
14 92 Servers - Development Servers C - 10 Additional Cards - 2x single port FC HBA For NPCI's better network readiness as well as workload performance, can NPCI standardize and Revised spec can possibly be ask for 16Gbps FC connectivity. as follows: NPCI is also requested to accept a single dual-port Atleast 2x16Gbps FC Ports. FC HBA - which is also the standard even in mission critical Blade Servers. 93 Servers - Development Servers C - 11 Expansion Slots - Min 5 PCIe 3.0 slots If NPCI is not going to use any specific card apart from LAN NIC and SAN HBA, can NPCI please remove this spec? NPCI is requested to remove this spec to be able to accept and technically qualify Blade Servers. 94 Servers - Development Servers C - 15 Form Factor - 2U If NPCI is not going to need more than 2 internal Revised spec can possibly be Drives and not more than 2 Cards for LAN and SAN, as follows: then NPCI will benefit by investing in the space Blade Chassis of 6U / 10U / saving, easy to manage, higher availability Blade 12U to accommodate 8 to Server form factor. Can NPCI standarize on Blade 16 Blade Servers per Blade Server form factor? Chassis. 95 Servers - Application, Database and Development Servers at both Hyderabad and Chennai If NPCI finds value proposition in our recommendation and request to invest in Blade Servers instead of Rack Servers, then NPCI would need standardized specifications to tender for Blade Chassis Enclosure (configured with separate dedicated redundant 1GbE/10GbE LAN and separate dedicated redundant 8GbFC SAN Switches) and Blade Servers. Please find enclosed herewith complete standard specifications for Blade Chassis and Blade Servers. Further, NPCI can protect its environment by asking bidders to separate Blade Chassis for Application, Database and Development Servers. 96 Storage - Hyderabad 28 & D - 11 The storage should be configured with a total usable capacity of 17 TB using emlc - SSDs with single SSD not larger than 1.6TB. All the data to be written in RAID 5. If NPCI has missed asking SAS capacity here, kindly please add. Further, can NPCI standarize to ask bidders to quote RAID 6 instead of RAID 5? This is because RAID 6 offers protection against dual disk failure instead of RAID 5 which offers protection against only one disk failure. Revised spec can possibly be as follows: 11. The storage should be configured with a total usable capacity of 17 TB using Flash / emlc-ssds with single Drive not larger than 1.6TB & usable capacity of 3TB using 600GB 15K RPM SAS. All the data to be written in RAID 6.
15 97 Storage - Hyderabad D - 12 Proposed storage should support less than 3 ms Response time with SSD. What is the Read:Write ratio and Total IOPS for SSD layer assumed to deliver 3ms Response Time? If NPCI has no specific requirement on this front, NPCI can look to standarize on a particular IOPS value. Revised spec can possibly be as follows: Proposed storage should support less than 3 ms Response time and deliver atleast IOPS from the required usable Flash / SSD Drive capacity for 100% random workload and 70:30 Read:Write ratio. 98 Storage - Hyderabad D - 14 The storage array must support at least 180 disk drives behind the proposed pair of controllers. It must be a single or tightly clustered singly managed system rather than aggregate of multiple separate smaller boxes. The same should be upgradeable to minimum 500 drives by adding controllers / changing the controllers. Minimum industry average of drive support is seen to be 260 drives per controller pair. Can NPCI standardize the specification to 260 disk drive support? Can NPCI standardize the specification to minimum 1200 drive upgradability? NPCI will get better investment protection by asking bidders to quote storage array that can support atleast 260 disk drives behind the proposed pair of controllers. Further, NPCI can increase its investment protection by asking bidders to quote for scalability to atleast 1200 drives. Revised spec can possibly be as follows: The storage array must support at least 260 disk drives behind the proposed pair of controllers. It must be a single or tightly clustered singly managed system rather than aggregate of multiple separate smaller boxes. The same should be upgradeable to minimum 1200 drives by adding controllers / changing the controllers. no Change in RFP By using Blade Servers as suggested by us in one of our query above, NPCI can fit the Server and Storage solution in 16 ports per SAN Switch. Additionally, if NPCI wants to connect Backup Master and Media Servers and Tape Libraries, NPCI will require additional 3 to 4 ports per SAN Switch. So, it will be suitable for NPCI to ask bidders to quote for all 24 ports per SAN Switch. 99 Storage - Hyderabad D x 24-port SAN Switch with 16- ports active However, if NPCI wants to use Rack Servers only as presently asked in the RFP, NPCI will require 25 ports per SAN Switch for Server, Storage and Backup connectivity. For this NPCI will require 48- port capable SAN switches activated with 36 ports initially. Minmum 16 port is Required if 16 ports is not Possible 24 Ports Licences can be Quoted NPCI to please confirm whether to quote for 2 x 24- port SAN switch with all 24 ports active per Switch OR to quote 2 x 48-port SAN switch with 36 ports active per Switch.
16 If NPCI agrees to change the Server form factor to Blade Servers, NPCI may please ask bidders to quote for 24 x 8Gbps FC Ports and 24 x 10M LC-LC Cables. 100 Storage - Hyderabad D - 22 Each Switch should be configured with minimum 16 x 8Gbps FC ports & 11 x 10M LC-LC Cables However, If NPCI has to retain the Server form factor to Rack Servers only, then NPCI may please ask bidders to quote for 48-port capable 8Gbps FC Switches with 36 ports activated and 36 x 10M LC- LC Cables. Minmum 16 port is Required if 16 ports is not Possible 24 Ports Licences can be Quoted Please confirm whether bidder should quote for 24 cables or 36 cables per switch. 101 Storage - Hyderabad D - 24 Replacement of disk drive would only be performed after degaussing faulty disk drive at NPCI Onsite location. Any such scenarios will be covered under the support period and contract. Instead of deguassing service, NPCI is requested to avail of Disk Retention Service or Keep Your HArd Drive Service option from OEMs whereby the faulty disk drive is retained by NPCI and destroyed / disposed or degaussed as per their convenient manner and timelines for complete peace of mind of data security. Revised spec can possibly be as follows: Bidders to include Disk Retention Option or Keep Your Hard Drive option in the price to allow NPCI to retain the faulty HDD. 102 Storage - Chennai E - 10 The storage should be configured with a total usable capacity of 17 TB using emlc-ssds with single SSD not larger than 1.6TB & 3TB in SAS 10K with single SAS disk not larger than 900GB. All the data to be written in RAID 5 can NPCI standarize to ask bidders to quote RAID 6 instead of RAID 5? This is because RAID 6 offers protection against dual disk failure instead of RAID 5 which offers protection against only one disk failure. Further, NPCI will get better performance on SAS capacity by standardizing on 600GB SAS 15K RPM for the 3TB usable capacity. Revised spec can possibly be as follows: The storage should be configured with a total usable capacity of 17 TB using Flash / emlc-ssds with single Drive not larger than 1.6TB & usable capacity of 3TB using 600GB 15K RPM SAS. All the data to be written in RAID 6. The storage should be configured with a total usable capacity of 17 TB using emlc-ssds with single SSD not larger than 1.6TB & 3TB in SAS 10K with single SAS disk not larger than 900GB. All the data to be write in RAID 10 and Read from RAID Storage - Chennai E - 11 Proposed storage should support less than 3 ms Response time with SSD. What is the Read:Write ratio and Total IOPS for SSD layer assumed to deliver 3ms Response Time? If NPCI has no specific requirement on this front, NPCI can look to standarize on a particular IOPS value. Revised spec can possibly be as follows: Proposed storage should support less than 3 ms Response time and deliver atleast IOPS from the required usable Flash / SSD Drive capacity for 100% random workload and 70:30 Read:Write ratio.
17 104 Storage - Chennai E - 13 The storage array must support at least 180 disk drives behind the proposed pair of controllers. It must be a single or tightly clustered singly managed system rather than aggregate of multiple separate smaller boxes. The same should be upgradeable to minimum 500 drives by adding controllers / changing the controllers. Minimum industry average of drive support is seen to be 260 drives per controller pair. Can NPCI standardize the specification to 260 disk drive support? Can NPCI standardize the specification to minimum 1200 drive upgradability? NPCI will get better investment protection by asking bidders to quote storage array that can support atleast 260 disk drives behind the proposed pair of controllers. Further, NPCI can increase its investment protection by asking bidders to quote for scalability to atleast 1200 drives. Revised spec can possibly be as follows: The storage array must support at least 260 disk drives behind the proposed pair of controllers. It must be a single or tightly clustered singly managed system rather than aggregate of multiple separate smaller boxes. The same should be upgradeable to minimum 1200 drives by adding controllers / changing the controllers. By using Blade Servers as suggested by us in one of our query above, NPCI can fit the Server and Storage solution in 12 ports per SAN Switch. Additionally, if NPCI wants to connect Backup Master and Media Servers and Tape Libraries, NPCI will require additional 3 to 4 ports per SAN Switch. So, NPCI's ask for 18 ports active per SAN Switch matches the solution requirement. 105 Storage - Chennai E x 24-port SAN Switch with 18- ports active However, if NPCI wants to use Rack Servers only as presently asked in the RFP, NPCI will require 25 ports per SAN Switch for Server, Storage and Backup connectivity. For this NPCI will require 48- port capable SAN switches activated with 36 ports initially. Minmum 18 port is Required if 18 ports is not Possible 24 Ports Licences can be Quoted NPCI to please confirm whether to quote for 2 x 24- port SAN switch with all 24 ports active per Switch OR to quote 2 x 48-port SAN switch with 36 ports active per Switch. If NPCI agrees to change the Server form factor to Blade Servers, NPCI's ask matches solution requirement. 106 Storage - Chennai E - 20 Each Switch should be configured with minimum 18 x 8Gbps FC ports & 18 x 10M LC-LC Cables However, If NPCI has to retain the Server form factor to Rack Servers only, then NPCI may please ask bidders to quote for 48-port capable 8Gbps FC Switches with 36 ports activated and 36 x 10M LC- LC Cables. Minmum 16 port is Required if 16 ports is not Possible 24 Ports Licences can be Quoted Please confirm whether bidder should quote for 18 cables or 36 cables per switch.
18 107 Storage - Chennai E - 22 Replacement of disk drive would only be performed after degaussing faulty disk drive at NPCI Onsite location. Any such scenarios will be covered under the support period and contract. Instead of deguassing service, NPCI is requested to avail of Disk Retention Service or Keep Your HArd Drive Service option from OEMs whereby the faulty disk drive is retained by NPCI and destroyed / disposed or degaussed as per their convenient manner and timelines for complete peace of mind of data security. Revised spec can possibly be as follows: Bidders to include Disk Retention Option or Keep Your Hard Drive option in the price to allow NPCI to retain the faulty HDD. 108 E) Storage Qty 1 for DR at Chennai location. Technical Specification 30 7 All the data to be written in RAID 10 and Read will be on RAID 5. This tiering feature is offered by only one OEM requiring 2 tiers of SSD (R1/0 for Read Intensive and R5 for Write Intensive). The RFP requires 17 TB usable capacity using emlc-ssds with <3msec response time which can be delivered without requiring tiering. Hence request NPCI remove the technical requirement as the required capacity and performance can be delivered without the two tiered SSD approach. 109 E) Storage Qty 1 for DR at Chennai location. Technical Specification 30 7 All the data to be written in RAID 10 and Read will be on RAID 5. Request you to include hardware based RAID controller Qurey not clear 110 E) Storage Qty 1 for DR at Chennai location. Technical Specification 30 8 The proposed System must be populated with the following ports Request you to include minimum 2 nos. of 6Gbps SAS physical ports per Controller for disk connectivity. All storage OEM support 6Gbps SAS or higher. 111 E) Storage Qty 1 for DR at Chennai location. Technical Specification x 24-port SAN Switch with 18- ports active SAN switch ports are avaliable as multiple of 12 hence request you to include 24 active ports per SAN switch. Hence 24 x 8Gbps FC ports and 24 x 10M LC-LC cables. Minmum 18 port is Required if 18 ports is not Possible 24 Ports Licences can be Quoted 112 E) Storage Qty 1 for DR at Chennai location. Technical Specification Each Switch should be configured with minimum 18 x 8Gbps FC ports & 18 x 10M LC-LC Cables SAN switch ports are avaliable as multiple of 12 hence request you to include 24 x 8Gbps FC ports and 24 x 10M LC-LC cables for each SAN switch. Please check the above and quote 113 E) Storage Qty 1 for DR at Chennai location. Technical Specification Replacement of disk drive would only be performed after degaussing faulty disk drive at NPCI Onsite location. Any such scenarios will be covered under the support period and contract. Request NPCI to consider Data At Rest Encryption using Controller based or Self Encrypting Drives. This will ensure the all data written to disk is protected against unauthorized drive removal (lost or stolen) and eliminate the need for degaussing on drive failure. 114 L) PR SAN Remote Replication 115 L) PR SAN Storage Virtualization Is replciation license required for DC/DR asynchronous replication. Request you to confirm the total capacity of existing storage at NPCI under single point of control. yes Qurey not clear 116 Section 9- Technical Specification: A) Application Server x128GB using 32GB DIMMS and scalable up to 576GB Please confirm that you need 256GB capacity using 32GB memory and Please modify the clause 256 GB Memory capacity using 32 GB DIMM Considered 256 GB Memory capacity 256 GB Memory 117 Section 9- Technical Specification: A) Application Server Microsoft Windows Server 2008 & Microsoft Windows HPC Server 2008 Request you to remove the OS as it is already End of Sale HPC feature is available in Microsoft Windows Server 2012 R2 proposed Servers need to support minimim Windows 2008 or 2008 R2
19 118 Section 9- Technical Specification: B) DB server x128GB using 32GB DIMMS and scalable up to 576GB Please confirm that you need 256GB capacity using 32GB memory and Please modify the clause 256 GB Memory capacity using 32 GB DIMM Considered 256 GB Memory capacity 256 GB Memory 119 Section 9- Technical Specification: B) DB server Microsoft Windows Server 2008 & Microsoft Windows HPC Server 2008 Request you to remove the OS as it is already End of Sale HPC feature is available in Microsoft Windows Server 2012 R2 proposed Servers need to support minimim Windows 2008 or 2008 R2 120 Section 9- Technical Specification: C) Development server Microsoft Windows Server 2008 & Microsoft Windows HPC Server 2008 Request you to remove the OS as it is already End of Sale HPC feature is available in Microsoft Windows Server 2012 R2 proposed Servers need to support minimim Windows 2008 or 2008 R2 121 Additional servers and storage specification -PR Site 2 3- Interconnect support Should support simultaneous housing of Ethernet (1GbE and 40 Request to share the requirement, Since in none GbE), FC, iscsi, IB interconnect of the requirements customer needs more than fabrics, offering Hot Pluggable & two type of Interconnects. Redundancy as a feature. For eg : 10G + FC and infiniband is predominantly Enclosure Should have minimum 6 used in HPC env. Interconnect Bays (Including redundancy) Enclosure Should have minimum 4 Interconnect Bays (Including redundancy) 122 Additional servers and storage specification -PR Site 3 2-Form Factor Half height Blade Half height terminology is vendor specific and this point doesn t have any bearing on the project, request to drop the clause 123 Additional servers and storage specification -PR Site 4 2-Form Factor Half height Blade Half height terminology is vendor specific and this point doesn t have any bearing on the project, request to drop the clause 124 Additional servers and storage specification -PR Site 5 2-Form Factor Full height Blade Full height terminology is vendor specific and this point doesn t have any bearing on the project, request to drop the clause 125 Additional servers and storage specification -PR Site 5 7- Internal Storage 4 * 300 GB 15K hot-plug SAS Drives In blade deployment scenario which is connected to external storage, the compute host hold the OS & application data only (max logs). Hence 300 GB capacity is sufficient, looking at scalability and flexibility we recommend 2 x K RPM HDD with RAID 1 and any additional capacity augumentation is recommenedated to be done from storage 2 * 600GB 15 K RPM hot-plug SAS Drives 126 Additional servers and storage specification -PR Site 6 2-Form Factor Full height Blade Full height terminology is vendor specific and this point doesn t have any bearing on the project, request to drop the clause 127 Additional servers and storage specification -PR Site 6 7- Internal Storage 4 * 300 GB 15K hot-plug SAS Drives In blade deployment scenario which is connected to external storage, the compute host hold the OS & application data only (max logs). Hence 300 GB capacity is sufficient, looking at scalability and flexibility we recommend 2 x K RPM HDD with RAID 1 and any additional capacity augumentation is recommenedated to be done from storage 2 * 600GB 15 K RPM hot-plug SAS Drives
20 128 Additional servers and storage specification -PR Site 7 2-Form Factor Full height Blade Full height terminology is vendor specific and this point doesn t have any bearing on the project, request to drop the clause 129 Additional servers and storage specification -PR Site 7 7- Internal Storage 4 * 300 GB 15K hot-plug SAS Drives In blade deployment scenario which is connected to external storage, the compute host hold the OS & application data only (max logs). Hence 300 GB capacity is sufficient, looking at scalability and flexibility we recommend 2 x K RPM HDD with RAID 1 and any additional capacity augumentation is recommenedated to be done from storage 2 * 600GB 15 K RPM hot-plug SAS Drives 130 Additional Servers and Storage Specifications-DR Site Interconnect support Should support simultaneous housing of Ethernet (1GbE and 40 Request to share the requirement, Since in none GbE), FC, iscsi, IB interconnect of the requirements customer needs more than fabrics, offering Hot Pluggable & two type of Interconnects. Redundancy as a feature. For eg : 10G + FC and infiniband is predominantly Enclosure Should have minimum 6 used in HPC env. Interconnect Bays (Including redundancy) Enclosure Should have minimum 4 Interconnect Bays (Including redundancy) Additional Servers and Storage Specifications-DR Site Additional Servers and Storage Specifications-DR Site Form Factor Half height Blade Form Factor Half height Blade Half height terminology is vendor specific and this point doesn t have any bearing on the project, request to drop the clause Half height terminology is vendor specific and this point doesn t have any bearing on the project, request to drop the clause 133 Additional Servers and Storage Specifications-DR Site 15 2-Form Factor Full height Blade Full height terminology is vendor specific and this point doesn t have any bearing on the project, request to drop the clause 134 Additional Servers and Storage Specifications-DR Site Internal Storage 4 * 300 GB 15K hot-plug SAS Drives In blade deployment scenario which is connected to external storage, the compute host hold the OS & application data only (max logs). Hence 300 GB capacity is sufficient, looking at scalability and flexibility we recommend 2 x K RPM HDD with RAID 1 and any additional capacity augumentation is recommenedated to be done from storage 2 * 600GB 15 K RPM hot-plug SAS Drives 135 Additional Servers and Storage Specifications-DR Site 16 2-Form Factor Full height Blade Full height terminology is vendor specific and this point doesn t have any bearing on the project, request to drop the clause 136 Additional Servers and Storage Specifications-DR Site Internal Storage 4 * 300 GB 15K hot-plug SAS Drives In blade deployment scenario which is connected to external storage, the compute host hold the OS & application data only (max logs). Hence 300 GB capacity is sufficient, looking at scalability and flexibility we recommend 2 x K RPM HDD with RAID 1 and any additional capacity augumentation is recommenedated to be done from storage 2 * 600GB 15 K RPM hot-plug SAS Drives
21 137 Additional Servers and Storage Specifications-DR Site 17 2-Form Factor Full height Blade Full height terminology is vendor specific and this point doesn t have any bearing on the project, request to drop the clause 138 Additional Servers and Storage Specifications-DR Site Internal Storage 4 * 300 GB 15K hot-plug SAS Drives In blade deployment scenario which is connected to external storage, the compute host hold the OS & application data only (max logs). Hence 300 GB capacity is sufficient, looking at scalability and flexibility we recommend 2 x K RPM HDD with RAID 1 and any additional capacity augumentation is recommenedated to be done from storage 2 * 600GB 15 K RPM hot-plug SAS Drives 139 Additional Servers and Storage Specifications-DR Site 18 2-Form Factor Full height Blade Full height terminology is vendor specific and this point doesn t have any bearing on the project, request to drop the clause 140 Additional Servers and Storage Specifications-DR Site Form Factor Half height Blade Half height terminology is vendor specific and this point doesn t have any bearing on the project, request to drop the clause 141 L) PR SAN 9 & 32 7 Capacity: The proposed storage must be provided with 34 TB of usable capacity using 800GB emlc NPCI may please be open to accept higher than SSD with RAID5, 6 TB of usable 800GB SSD / Flash Drive in the solution so that capacity using 300GB 15K SAS NPCI can avail of higher performance higher drives with RAID1/0, 56 TB of capacity Flash Drives available in industry. usable capacity using 600GB 10K drives with RAID5. Global hot spare additional. Revised spec can possibly be: The proposed storage must be provided with 34 TB of usable capacity using 800GB or higher SSD/Flash with RAID5, 6 TB of usable capacity using 300GB 15K SAS drives with RAID1/0, 56 TB of usable capacity using 600GB 10K drives with RAID5. Global hot spare additional. 142 L) PR SAN 11 & Remote Replication: The replication solution must support three-way zero data loss solution with functionality to provide delta-resync capability from surviving site in case of a disaster. NPCI wants the RGCS Storage at only 2 sites - namely Chennai and Hyderabad. So, please confirm that three way zero data loss solution is not required at this stage and that the storage model proposed should support three way zero data loss in future as and when required. Revised spec can possibly be: The proposed storage model should support three-way zero data loss replication solution with functionality to provide delta-resync capability from surviving site in case of a disaster - in future as and when needed and deployed. minimum two way replication required
22 143 I) DR SAN 21 & 45 7 Capacity: The proposed storage must be provided with 39 TB of usable capacity using 800GB emlc NPCI may please be open to accept higher than SSD with RAID5, 8 TB of usable 800GB SSD / Flash Drive in the solution so that capacity using 300GB 15K SAS NPCI can avail of higher performance higher drives with RAID1/0, 76 TB of capacity Flash Drives available in industry. usable capacity using 600GB 10K drives with RAID5. Global hot spare additional. Revised spec can possibly be: The proposed storage must be provided with 39 TB of usable capacity using 800GB or higher SSD/Flash with RAID5, 8 TB of usable capacity using 300GB 15K SAS drives with RAID1/0, 76 TB of usable capacity using 600GB 10K drives with RAID5. Global hot spare additional. no Change in RFP 144 I) DR SAN 22 & Remote Replication: The replication solution must support three-way zero data loss solution with functionality to provide delta-resync capability from surviving site in case of a disaster. NPCI wants the RGCS Storage at only 2 sites - namely Chennai and Hyderabad. So, please confirm that three way zero data loss solution is not required at this stage and that the storage model proposed should support three way zero data loss in future as and when required. Revised spec can possibly be: The proposed storage model should support three-way zero data loss replication solution with functionality to provide delta-resync capability from surviving site in case of a disaster - in future as and when needed and deployed. minimum two way replication required Huawei E9000 with 12U height - Justification. 145 Corrigendum-1 - Blade Chassis 2 2 Blade Chassis : The maximum height of the Chassis should be 10U The maximum height of the Chassis should be 12U 12U rack height as following advantages over 10U rack : 1) it can support upto next 7 to 10 years and all latest Intel CPU's. 2) 12U support 128 network port where in 10U support only max. 120 network port 3) 12U can control heat radiation more so that CPU performace is not degraded in any ways 4) 10U support only 14 blade but 12U support 16 blades so 12u support 2 more blades and aslo saves on the cost / future investment. 5) Also shortly 10U Chassis will be coming EOM and in near future all Chassis will be manufactured with 12U. Blade Chassis : The height of the Chassis should be 10U or higher so we request you to
23 Corrigendum-1 - Blade Chassis Request for Proposal for Supply, Installation & Maintenance of Servers & Storage Table 9.2 Should support stacking of up to 9 chassis Internal Dual SD Module (Failsafe Hypervisor) this is certain OEM specific, kindly delete said clause from the RFP. this is certain OEM specific, kindly delete said clause from the RFP vendor can quote more also Minimum Single Internal SD Module is Required 148 Servers and Storage is as under of corigendum Page No 8 of Corigendu m Point L -PR SAN point 1-storage architechture The proposed storage must be an enterprise class SAN storage supporting multiple controllers/directors, offering scale-out architecture for better availability, scalability and performance; whereby processor, global Cache, disk, ports can be scaled linearly by adding multiple Controllers / directors. The proposed storage must be scalable to minimum four SAN controllers/directors. This architecture is only available in Monolithic storage & limited to 1 or 2 Storage vendors. However the performance & scalability can be met with enterprise-class modular storage from Dell Bidder can propose the no of controllers as per the performance requirements provided by NPCI. If incase of any failure of the componets (Controller /Directors), the level of performance need to be maintained 149 Servers and Storage is as under of corigendum Page No 8 of Corigendu m Point L -PR SAN point 1-storage architechture The proposed SAN storage must be a single enterprise class storage product, and not a storage solution with multiple silo/groups of dual-controller storage in a clustered configuration proposed to meet the performance and scalability requirement. Dual-controller configuration supports 1024 drives & IOPS Bidder can propose the no of controllers as per the performance requirements provided by NPCI. If incase of any failure of the componets (Controller /Directors), the level of performance need to be maintained 150 Servers and Storage is as under of corigendum Page No 9 of Point L -PR SAN point Corigendu 3-Ports m The proposed storage should have minimum 16 nos. of 16Gbps FC ports for host connectivity and minimum 16 nos. of 6Gbps SAS links for disk connectivity. Additional ports for replication to be included. There are SAN Switches asked with the solution of 24-port each & so having so many FE-Ports is just an over-kill & consume ports on SAN Switch. Request to pl. change to "Proposed pair of Storage controllers will be configured with 12 x 16Gbps Front-End FC ports, 16 x 6Gbps Back-End SAS ports. Additional ports for replication to be included." Bidder can propose the no of controllers as per the performance requirements provided by NPCI. If incase of any failure of the componets (Controller /Directors), the level of performance need to be maintained 151 Servers and Storage is as under of corigendum Page No 9 of Point L -PR SAN point Corigendu 4-Cache m The proposed storage must provide dynamic cache allocation in line with the changing read/write workload. With features like Tiering & SSD Disks the dynamic performance requirement can be managed in much better & faster way. Asking this dynamic feature from Cache will have limited performance enhancement as there is limit to avaiability of Cache also, this kind of features are only available in Monolithic Storage Proposed architechture of the Storage cache should be in such a way that performance of the workload will not get impact. 152 Servers and Storage is as under of corigendum Page No 9 The proposed storage should be of Point L -PR SAN point provided with a minimum of Corigendu 4-Cache 512GB of global cache memory. m Pl. change it to 256GB across controllers Proposed architechture of the Storage cache should be in such a way that performance of the workload will not get impact.
24 153 Servers and Storage is as under of corigendum Page No 9 of Point L -PR SAN point Corigendu 4-Cache m The proposed storage should support cache coherancy. In the event of a controller failure write cache of the redundant controller of the pair should not be disabled, so as not to impact application performance. This feature is not required in Dell solution as in our architecture we disable write cache when data is written on SSDs. Request to pl. remove this point Proposed architechture of the Storage cache should be in such a way that performance of the workload will not get impact. 154 Servers and Storage is as under of corigendum Page No 9 The proposed storage must be of Point L -PR SAN point scalable to additional 1200 Corigendu 5 Disk Drive Support drives. m Proposed pair of Storage controllers are scalable to 1024 drives. Pl. change it to - "The proposed storage must be scalable to additional 800 drives." Proposed solution should have the scability upto 200 % additionally of the Current NPCI Capcity. 155 Servers and Storage is as under of corigendum Page No 9 of Corigendu m Point L -PR SAN point7 Capacity The proposed storage must be provided with 34 TB of usable capacity using 800GB emlc SSD with RAID5, 6 TB of usable capacity using 300GB 15K SAS drives with RAID1/0, 56 TB of usable capacity using 600GB 10K drives with RAID5. Global hot spare additional. The storage should provide minimum 50,000 IOPS with a block size of 8K and 70:30 Suggestion - If we need performance pl. increase the required useable capacity for SSD or 15K rpm disks. Since now emlc SSD are available in 1.6TB as well you can ask for the same. Also, you can also ask for both 6TB & 56TB useable using 600GB 15K drives with RAID5, for best & balanced performance. Bidder can propose 800GB / 1.6TB emcl SSD & 56 TB usable capacity 600GB 10K or higher 156 Servers and Storage is as under of corigendum The proposed storage should ensure end-to-end (from the host all the way to disk) data integrity Page No 10 of checking using the ANSI T10 data Point L -PR SAN point integrity field (DIF) standard or Corigendu m 12 Data Protection equivalent methods. The T10 data integrity standard or equivalent proprietary methods must be supported on all types of disks. Feature in the Roadmap & will come in next 6 months, will be available to existing customers with no extra charge Bidder should provide this on before implematations. 157 Servers and Storage is as under of corigendum The proposed SAN storage should support full copy Clones. The storage should support Page No 10 of incremental updates (delta resynchs) to minimum of 2 targets Point L -PR SAN point Corigendu m 14 Full copy Clone LUN's (clones) post the initial full sync. Provide all the necessary licenses for entire offered capacity of full copy Clones creation and restore. Partial - Supports full copy clone to 1 target Proposed Storage storage should support minmum of the 1 target
25 158 Servers and Storage is as under of corigendum The asynchronous replication in proposed solution should support incremental data update with Page No synchronization period less than 10 of Point L -PR SAN point 60 seconds to achieve RPO of less Corigendu 16 Remote application than four minute. Provide all the m necessary licenses for full capacity of asynchronous replication. The ask is only supported from 1 or 2 vendor using a proprietory appliance. Request to pl. change it to "The proposed solution should supports asynchronous replication with incremental data update of 15 mins." Proposed stroage should replicate LUNS parallely not in sequential manner. This is for the future scope. 159 SAN -Qty-1 L PR SAN Page No 8 L PR SAN Serial No 1 The proposed storage must be an enterprise class SAN storage supporting multiple controllers/directors, offering scale-out architecture for better This architecture is only available in Monolithic availability, scalability and storage & limited to 1 or 2 Storage vendors. performance; whereby processor, However the performance & scalability can be met global Cache, disk, ports can be with enterprise-class modular storage from Dell scaled linearly by adding multiple Controllers / directors. The proposed storage must be scalable to minimum four SAN controllers/directors. Bidder can proposed no of controller as per the performance asked by NPCI. Incase any componets (Controller /Directors) same perforamce need to be Maintained 160 SAN -Qty-1 L PR SAN Page No 8 L PR SAN Serial No 1 The proposed SAN storage must be a single enterprise class storage product, and not a storage solution with multiple silo/groups of dual-controller storage in a clustered configuration proposed to meet the performance and scalability requirement. Dual-controller configuration supports 1024 drives & IOPS Bidder can propose the no of controllers as per the performance requirements provided by NPCI. If incase of any failure of the componets (Controller /Directors), the level of performance need to be maintained 161 PORT Page No 9 PORT The proposed storage should have minimum 16 nos. of 16Gbps FC ports for host connectivity and minimum 16 nos. of 6Gbps SAS links for disk connectivity. Additional ports for replication to be included. There are SAN Switches asked with the solution of 24-port each & so having so many FE-Ports is just an over-kill & consume ports on SAN Switch. Request to pl. change to "Proposed pair of Storage controllers will be configured with 12 x 16Gbps Front-End FC ports, 16 x 6Gbps Back-End SAS ports. Additional ports for replication to be included." Bidder can proposed Number of Ports as per the NPCI Requirements and future Scaliblity and Performance. Incase any Critical componets failures also performance need to be Maintained 162 CACHE Page No 9 CACHE The proposed storage must provide dynamic cache allocation in line with the changing read/write workload. With features like Tiering & SSD Disks the dynamic performance requirement can be managed in much better & faster way. Asking this dynamic feature from Cache will have limited performance enhancement as there is limit to avaiability of Cache also, this kind of features are only available in Monolithic Storage Proposed architechture of the Storage cache should be in such a way that performance of the workload will not get impact. 163 CACHE Page No 9 CACHE The proposed storage should be provided with a minimum of 512GB of global cache memory. Pl. change it to 256GB across controllers Proposed architechture of the Storage cache should be in such a way that performance of the workload will not get impact.
26 164 CACHE Page No 9 CACHE The proposed storage should support cache coherancy. In the This feature is not required in Dell solution as in event of a controller failure write our architecture we disable write cache when data cache of the redundant controller is written on SSDs. Request to pl. remove this of the pair should not be point disabled, so as not to impact application performance. Proposed architechture of the Storage cache should be in such a way that performance of the workload will not get impact. 165 Disk Drive Support Page No 9 Disk Drive Support The proposed storage must be scalable to additional 1200 drives. Proposed solution should have the scability upto 200 % additionally of the Current NPCI Capcity. 166 Capacity Page No 9 Capacity The proposed storage must be provided with 34 TB of usable capacity using 800GB emlc SSD with RAID5, 6 TB of usable capacity using 300GB 15K SAS drives with RAID1/0, 56 TB of usable capacity using 600GB 10K drives with RAID5. Global hot spare additional. The storage should provide minimum 50,000 IOPS with a block size of 8K and 70:30 Suggestion - If we need performance pl. increase the required useable capacity for SSD or 15K rpm disks. Since now emlc SSD are available in 1.6TB as well you can ask for the same. Also, you can also ask for both 6TB & 56TB useable using 600GB 15K drives with RAID5, for best & balanced performance. Bidder can propose 800GB / 1.6TB emcl SSD & 56 TB usable capacity 600GB 10K or higher 167 Data Protection Page No 10 Capacity The proposed storage should ensure end-to-end (from the host all the way to disk) data integrity checking using the ANSI T10 data integrity field (DIF) standard or equivalent methods. The T10 data integrity standard or equivalent proprietary methods must be supported on all types of disks. Feature in the Roadmap & will come in next 6 months, will be available to existing customers with no extra charge Bidder should provide this on before implematations. 168 Full Copy Clone Page No 10 Full Copy Clone The proposed SAN storage should support full copy Clones. The storage should support incremental updates (delta resynchs) to minimum of 2 targets LUN's (clones) post the initial full sync. Provide all the necessary licenses for entire offered capacity of full copy Clones creation and restore. Supports full copy clone to 1 target Proposed Storage storage should support minmum of the 1 target need to clone
27 169 Remote replication Page No 10 Remote replication The asynchronous replication in proposed solution should support incremental data update with synchronization period less than 60 seconds to achieve RPO of less than four minute. Provide all the necessary licenses for full capacity of asynchronous replication. The ask is only supported from 1 or 2 vendor using a proprietory appliance. Request to pl. change it to "The proposed solution should supports asynchronous replication with incremental data update of 15 mins." Proposed stroage should replicate luns parallely not in sequential manner. This is for the future Scope. 170 Storage Virtualization Page No 11 Storage Virtualization The proposed storage solution should be able to virtualize existing storage arrays at NPCI from EMC, IBM, HP, Dell, Net App for provisioning providing a single management interface and hence single point of control. Not complied Optional
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
SAN TECHNICAL - DETAILS/ SPECIFICATIONS
SAN TECHNICAL - DETAILS/ SPECIFICATIONS Technical Details / Specifications for 25 -TB Usable capacity SAN Solution Item 1) SAN STORAGE HARDWARE : One No. S.N. Features Description Technical Compliance
All India Institute of Medical Sciences, Bhubaneswar Sijua, Bhubaneswar, Odisha-751 019
All India Institute of Medical Sciences, Bhubaneswar Sijua, Bhubaneswar, Odisha-75 09 Corrigendum II for Tender for Hospital Information System Date: 0/0/203 In reference to tender No.200(002)/203/S&P
Terms of Reference Microsoft Exchange and Domain Controller/ AD implementation
Terms of Reference Microsoft Exchange and Domain Controller/ AD implementation Overview Maldivian Red Crescent will implement it s first Microsoft Exchange server and replace it s current Domain Controller
Small Industries Development Bank of India Request for Proposal (RfP) For Purchase of Intel Servers for Various Locations
Small Industries Development Bank of India Request for Proposal (RfP) For Purchase of Intel Servers for Various Locations Tender : 400/2011/702/BYO/ISD dated February 25, 2011 PRE-BID CLARIFICATIONS Placed
Corrigendum 1 for Request for Proposal For Empanelment of Vendor for Supply, Installation and Maintenance of Servers, System Software and Peripherals
Tender Number: OBC/HO/DIT/RFP-SERVER/83/2016 Dated 14/03/2016 Date: 02.04.2016 Corrigendum 1 for Request for Proposal For Empanelment of Vendor for Supply, Installation and Maintenance of Servers, System
How To Create A Virtual Desktop In Gibidr
Virtual Desktop Infrastructure for IGIDR Sealed quotations are invited from authorized partners of OEM providing VDI solutions. The sealed quotations should be supplied in two parts Technical Bid (Part
RFP-MM-1213-11067 Enterprise Storage Addendum 1
Purchasing Department August 16, 2012 RFP-MM-1213-11067 Enterprise Storage Addendum 1 A. SPECIFICATION CLARIFICATIONS / REVISIONS NONE B. REQUESTS FOR INFORMATION Oracle: 1) What version of Oracle is in
QUESTIONS & ANSWERS. ItB tender 72-09: IT Equipment. Elections Project
QUESTIONS & ANSWERS ItB tender 72-09: IT Equipment. Elections Project In lot 1, position 1 - Server for Data Base 1. Q: You order Microsoft Windows Server 2008, 64 bit, Enterprise, License with 25 or more
Tender Document For Network Switch, Router, Network Management Software, Server, SAN Storage, SAN Switch and Virtualization Software
Tender Document For Network Switch, Router, Network Management Software, Server, SAN Storage, SAN Switch and Virtualization Software Ramanujan Computing Centre Anna University, Chennai - 600 025. REQUEST
præsentation oktober 2011
Johnny Olesen System X presale præsentation oktober 2011 2010 IBM Corporation 2 Hvem er jeg Dagens agenda Server overview System Director 3 4 Portfolio-wide Innovation with IBM System x and BladeCenter
REQUEST FOR QUOTE. All out of date servers contain approximately 1 TB of data that needs to be migrated to the new Windows domain environment.
REQUEST FOR QUOTE The Housing Authority of the City of Hartford is seeking quotations for the following project: Systems Department Enterprise Technology Enhancements The current infrastructure consists
2015 FRCA Installation and Supply of Data Center Infrastructure TENDER 11/2015. Requirement Specification Document
2015 FRCA Installation and Supply of Data Center Infrastructure TENDER 11/2015 Specification Document Tender Document Due Date: 25 September2015 Fiji Revenue and Customs Authority (FRCA) 2015 Installation
CORRIGENDUM TO TENDER FOR HIGH PERFORMANCE SERVER
CORRIGENDUM TO TENDER FOR HIGH PERFORMANCE SERVER Tender Notice No. 3/2014-15 dated 29.12.2014 (IIT/CE/ENQ/COM/HPC/2014-15/569) Tender Submission Deadline Last date for submission of sealed bids is extended
PSAM, NEC PCIe SSD Appliance for Microsoft SQL Server (Reference Architecture) September 11 th, 2014 NEC Corporation
PSAM, NEC PCIe SSD Appliance for Microsoft SQL Server (Reference Architecture) September 11 th, 2014 NEC Corporation 1. Overview of NEC PCIe SSD Appliance for Microsoft SQL Server Page 2 NEC Corporation
TENDER NO: REC/IT/93(S)/05/-ERP/SERVER/1 DATED 19th JANUARY, 2008
RURAL ELECTRIFICATION CORPORATION LIMITED IT Division CORPORATE OFFICE TENDER NO: REC/IT/93(S)/05/-ERP/SERVER/1 DATED 19th JANUARY, 2008 Supply, Installation, Configuration, Testing, Commissioning, Training,
Mit Soft- & Hardware zum Erfolg. Giuseppe Paletta
Mit Soft- & Hardware zum Erfolg IT-Transformation VCE Converged and Hyperconverged Infrastructure VCE VxRack EMC VSPEX Blue IT-Transformation IT has changed dramatically in last past years The requirements
HP reference configuration for entry-level SAS Grid Manager solutions
HP reference configuration for entry-level SAS Grid Manager solutions Up to 864 simultaneous SAS jobs and more than 3 GB/s I/O throughput Technical white paper Table of contents Executive summary... 2
INDIAN INSTITUTE OF TECHNOLOGY KANPUR Department of Mechanical Engineering
INDIAN INSTITUTE OF TECHNOLOGY KANPUR Department of Mechanical Engineering Enquiry No: Enq/IITK/ME/JB/02 Enquiry Date: 14/12/15 Last Date of Submission: 21/12/15 Formal quotations are invited for HPC cluster.
Dell Virtualization Solution for Microsoft SQL Server 2012 using PowerEdge R820
Dell Virtualization Solution for Microsoft SQL Server 2012 using PowerEdge R820 This white paper discusses the SQL server workload consolidation capabilities of Dell PowerEdge R820 using Virtualization.
RFP - Equipment for the Replication of Critical Systems at Bank of Mauritius Tower and at Disaster Recovery Site. 06 March 2014
RFP - Equipment for the Replication of Critical Systems at Bank of Mauritius Tower and at Disaster Recovery Site Response to Queries: 06 March 2014 (1) Please specify the number of drives required in the
ARMS Ltd. - Rack Server System TENDER FOR A RACK SERVER SYSTEM. Page 1 of 18
TENDER FOR A RACK SERVER SYSTEM Page 1 of 18 1.0 SCOPE OF TENDER These specifications and conditions detail the basic requirements for the supply and delivery of a Rack server system for ARMS Ltd. Tenderers
Cisco Prime Home 5.0 Minimum System Requirements (Standalone and High Availability)
White Paper Cisco Prime Home 5.0 Minimum System Requirements (Standalone and High Availability) White Paper July, 2012 2012 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public
ADDENDUM 1 September 22, 2015 Request for Proposals: Data Center Implementation
Following are the questions submitted on or before September 18, 2015, in accordance with RFP specifications. All questions are published verbatim as received, without regard to errors in spelling, punctuation,
How To Build A Cisco Ukcsob420 M3 Blade Server
Data Sheet Cisco UCS B420 M3 Blade Server Product Overview The Cisco Unified Computing System (Cisco UCS ) combines Cisco UCS B-Series Blade Servers and C-Series Rack Servers with networking and storage
HP high availability solutions for Microsoft SQL Server Fast Track Data Warehouse using SQL Server 2012 failover clustering
Technical white paper HP high availability solutions for Microsoft SQL Server Fast Track Data Warehouse using SQL Server 2012 failover clustering Table of contents Executive summary 2 Fast Track reference
Evaluation Report: HP Blade Server and HP MSA 16GFC Storage Evaluation
Evaluation Report: HP Blade Server and HP MSA 16GFC Storage Evaluation Evaluation report prepared under contract with HP Executive Summary The computing industry is experiencing an increasing demand for
Dell Virtual Remote Desktop Reference Architecture. Technical White Paper Version 1.0
Dell Virtual Remote Desktop Reference Architecture Technical White Paper Version 1.0 July 2010 THIS WHITE PAPER IS FOR INFORMATIONAL PURPOSES ONLY, AND MAY CONTAIN TYPOGRAPHICAL ERRORS AND TECHNICAL INACCURACIES.
The Technologies & Architectures. President, Demartek
Deep Dive on Solid State t Storage The Technologies & Architectures Dennis Martin Dennis Martin President, Demartek Demartek Company Overview Industry analysis with on-site test lab Lab includes servers,
Addendum No. 1 to Packet No. 28-13 Enterprise Data Storage Solution and Strategy for the Ingham County MIS Department
Addendum No. 1 to Packet No. 28-13 Enterprise Data Storage Solution and Strategy for the Ingham County MIS Department The following clarifications, modifications and/or revisions to the above project shall
Diablo and VMware TM powering SQL Server TM in Virtual SAN TM. A Diablo Technologies Whitepaper. May 2015
A Diablo Technologies Whitepaper Diablo and VMware TM powering SQL Server TM in Virtual SAN TM May 2015 Ricky Trigalo, Director for Virtualization Solutions Architecture, Diablo Technologies Daniel Beveridge,
Terms and Conditions
Terms and Conditions 1. The bidder must be an ISO certified organization. 2. The bidder should be Original Equipment Manufacturer (OEM) or authorized distributor of the OEM (attach documentary proof).
Optimizing SQL Server Storage Performance with the PowerEdge R720
Optimizing SQL Server Storage Performance with the PowerEdge R720 Choosing the best storage solution for optimal database performance Luis Acosta Solutions Performance Analysis Group Joe Noyola Advanced
HP 3PAR StoreServ 8000 Storage - what s new
HP 3PAR StoreServ 8000 Storage - what s new October 2015 Copyright 2014 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. HP 3PAR StoreServ
UCS M-Series Modular Servers
UCS M-Series Modular Servers The Next Wave of UCS Innovation Marian Klas Cisco Systems June 2015 Cisco UCS - Powering Applications at Every Scale Edge-Scale Computing Cloud-Scale Computing Seamlessly Extend
Improving IT Operational Efficiency with a VMware vsphere Private Cloud on Lenovo Servers and Lenovo Storage SAN S3200
Improving IT Operational Efficiency with a VMware vsphere Private Cloud on Lenovo Servers and Lenovo Storage SAN S3200 Most organizations routinely utilize a server virtualization infrastructure to benefit
VXRACK SYSTEM 1032. Product Overview DATA SHEET
vce.com DATA SHEET VXRACK SYSTEM 1032 Product Overview VCE adds rackscale hyper-converged offerings to the industry s broadest converged infrastructure system portfolio. The VxRack System 1000 series is
27 22 00 Data Communications Hardware 27 22 16 Data Communications Storage and Backup 27 22 19 Data Communications Servers
Pivot3 has over 1200 customers across the globe that rely on purpose-built Pivot3 appliances for highcapacity video surveillance and high-iop virtual desktop environments. The company is the leading supplier
UNIFIED HYBRID STORAGE. Performance, Availability and Scale for Any SAN and NAS Workload in Your Environment
DATASHEET TM NST6000 UNIFIED HYBRID STORAGE Performance, Availability and Scale for Any SAN and NAS Workload in Your Environment UNIFIED The Nexsan NST6000 unified hybrid storage appliance is ideal for
City Of Hammond Purchasing Department REQUEST FOR PROPOSALS RFP 15-07. Servers, Shared Storage & Backup Software
1 City Of Hammond Purchasing Department REQUEST FOR PROPOSALS Servers, Shared Storage & Backup Software Bids Shall Be Received by the Purchasing Department, 310 East Charles Street P.O. Box 2788 Hammond,
Deploying Microsoft Exchange Server 2010 on the Hitachi Virtual Storage Platform with Hitachi Dynamic Tiering
1 Deploying Microsoft Exchange Server 2010 on the Hitachi Virtual Storage Platform with Hitachi Dynamic Tiering Reference Architecture Guide By Jeff Chen May 2011 Month Year Feedback Hitachi Data Systems
SUN HARDWARE FROM ORACLE: PRICING FOR EDUCATION
SUN HARDWARE FROM ORACLE: PRICING FOR EDUCATION AFFORDABLE, RELIABLE, AND GREAT PRICES FOR EDUCATION Optimized Sun systems run Oracle and other leading operating and virtualization platforms with greater
Appendix 3. Specifications for e-portal
Appendix 3. Specifications for e-portal 1. e-portal H/W and S/W No Equipment Specification Unit Q'ty 1 Web Server for users and administrator 2 WAS Server 3 LMS Server 4 DB Server 4U Rack Type 8 Core Intel
Data Sheet FUJITSU Server PRIMERGY CX272 S1 Dual socket server node for PRIMERGY CX420 cluster server
Data Sheet FUJITSU Server PRIMERGY CX272 S1 Dual socket node for PRIMERGY CX420 cluster Data Sheet FUJITSU Server PRIMERGY CX272 S1 Dual socket node for PRIMERGY CX420 cluster Strong Performance and Cluster
NET ACCESS VOICE PRIVATE CLOUD
Page 0 2015 SOLUTION BRIEF NET ACCESS VOICE PRIVATE CLOUD A Cloud and Connectivity Solution for Hosted Voice Applications NET ACCESS LLC 9 Wing Drive Cedar Knolls, NJ 07927 www.nac.net Page 1 Table of
Remote/Branch Office IT Consolidation with Lenovo S2200 SAN and Microsoft Hyper-V
Remote/Branch Office IT Consolidation with Lenovo S2200 SAN and Microsoft Hyper-V Most data centers routinely utilize virtualization and cloud technology to benefit from the massive cost savings and resource
E-GOVERNANCE MISSION MODE PROJECT (MMP) CRIME & CRIMINAL TRACKING NETWORK & SYSTEMS (CCTNS) IMPLEMENTATION OF CCTNS IN GOA
E-GOVERNANCE MISSION MODE PROJECT (MMP) CRIME & CRIMINAL TRACKING NETWORK & SYSTEMS (CCTNS) IMPLEMENTATION OF CCTNS IN GOA RFP FOR SELECTION OF SYSTEM INTEGRATOR CORRIGENDUM RELEASED BY: Goa Police Government
Arrow ECS sp. z o.o. Oracle Partner Academy training environment with Oracle Virtualization. Oracle Partner HUB
Oracle Partner Academy training environment with Oracle Virtualization Technology Oracle Partner HUB Overview Description of technology The idea of creating new training centre was to attain light and
SAN RFP Questions and Answers
SAN RFP Questions and Answers Questions for week ending 10/4/13 Questions from Sterling Computers What is the snapshot retention policy is and percent of change for the primary SAN? a. Is it just a 1 day
NOTICE ADDENDUM NO. TWO (2) JULY 8, 2011 CITY OF RIVIERA BEACH BID NO 308-11 SERVER VIRTULIZATION/SAN PROJECT
NOTICE ADDENDUM NO. TWO (2) JULY 8, 2011 CITY OF RIVIERA BEACH BID NO 308-11 SERVER VIRTULIZATION/SAN PROJECT TO ALL PROPOSERS ON THE ABOVE PROJECT: PLEASE NOTE CONTENTS HEREIN AND AFFIX (PASTE OR STAPLE)
DD670, DD860, and DD890 Hardware Overview
DD670, DD860, and DD890 Hardware Overview Data Domain, Inc. 2421 Mission College Boulevard, Santa Clara, CA 95054 866-WE-DDUPE; 408-980-4800 775-0186-0001 Revision A July 14, 2010 Copyright 2010 EMC Corporation.
Converged storage architecture for Oracle RAC based on NVMe SSDs and standard x86 servers
Converged storage architecture for Oracle RAC based on NVMe SSDs and standard x86 servers White Paper rev. 2015-11-27 2015 FlashGrid Inc. 1 www.flashgrid.io Abstract Oracle Real Application Clusters (RAC)
MaxDeploy Ready. Hyper- Converged Virtualization Solution. With SanDisk Fusion iomemory products
MaxDeploy Ready Hyper- Converged Virtualization Solution With SanDisk Fusion iomemory products MaxDeploy Ready products are configured and tested for support with Maxta software- defined storage and with
Cost Efficient VDI. XenDesktop 7 on Commodity Hardware
Cost Efficient VDI XenDesktop 7 on Commodity Hardware 1 Introduction An increasing number of enterprises are looking towards desktop virtualization to help them respond to rising IT costs, security concerns,
Cisco MCS 7825-H3 Unified Communications Manager Appliance
Cisco MCS 7825-H3 Unified Communications Manager Appliance Cisco Unified Communications is a comprehensive IP communications system of voice, video, data, and mobility products and applications. It enables
Deploying Microsoft SQL Server 2008 R2 with Logical Partitioning on the Hitachi Virtual Storage Platform with Hitachi Dynamic Tiering
1 Deploying Microsoft SQL Server 2008 R2 with Logical Partitioning on the Hitachi Virtual Storage Platform with Hitachi Dynamic Tiering Reference Architecture Guide By Eduardo Freitas May 2011 Month Year
HP SN1000E 16 Gb Fibre Channel HBA Evaluation
HP SN1000E 16 Gb Fibre Channel HBA Evaluation Evaluation report prepared under contract with Emulex Executive Summary The computing industry is experiencing an increasing demand for storage performance
AirWave 7.7. Server Sizing Guide
AirWave 7.7 Server Sizing Guide Copyright 2013 Aruba Networks, Inc. Aruba Networks trademarks include, Aruba Networks, Aruba Wireless Networks, the registered Aruba the Mobile Edge Company logo, Aruba
Addendum to RFP for Supply, Installation and Maintenance of Server, Storage and Virtualization Solution
Addendum to RFP for Supply, Installation and Maintenance of Server, Storage and Virtualization Solution Ref No.: HO/DIT/Server, Storage and Virtualization /2015-16/01 Date: 13.04.2015 Addendum to RFP for
Modified Tender Document after Pre-bid Meeting MALAVIYA NATIONAL INSTITUTE OF TECHNOLOGY JAIPUR
MALAVIYA NATIONAL INSTITUTE OF TECHNOLOGY JAIPUR No.F5/St/MNIT/CC/2015 Phone:0141-2713312,2713352 Fax No. : 0141-2529078 E-mail:[email protected] :[email protected] :- [email protected]
INSTITUTE OF PUBLIC ENTERPRISE O.U.CAMPUS, HYDERABAD 500 007
INSTITUTE OF PUBLIC ENTERPRISE O.U.CAMPUS, HYDERABAD 500 007 Tender Notice No. IPE / IT / 2012-13/002 Date: 17 th May 2012 Supply of Hardware, Software under UGC Equipment Fund Tenders are invited under
EMC Unified Storage for Microsoft SQL Server 2008
EMC Unified Storage for Microsoft SQL Server 2008 Enabled by EMC CLARiiON and EMC FAST Cache Reference Copyright 2010 EMC Corporation. All rights reserved. Published October, 2010 EMC believes the information
1 of 10 12/29/2015 11:40 AM
PowerEdge T320 Tower Server Starting Price $4,101.99 Instant Savings $1,254.72 Subtotal $2,847.27 As low as $86.00 /month^ Dell Business Credit Apply Discount Details Ships in 2-4 Business Days My Selections
SUN/Oracle WSCA Price List. Please call (877) SUN-LATG (877) 786-5284 (504) 304-2505 Or Fax (504) 617 6670 Or e-mail [email protected]
SUN/Oracle WSCA Price List Please call (877) SUNLATG (877) 7865284 (504) 3042505 Or Fax (504) 617 6670 Or email [email protected] WSCA Price List Updated January Item Item Description Named Product List Price
REQUEST FOR PROPOSAL #347 SERVER VIRTUALIZATION QUESTIONS & ANSWERS
#347 QUESTIONS & ANSWERS Page 2 Question 1: Answer 1: Question 2: Answer 2: Question 3: Answer 3: Question 4: Answer 4: Question 5: Answer 5: Upon review of the RFP it is my impression that the Thames
Power Redundancy. I/O Connectivity Blade Compatibility KVM Support
1.Blade server Blade Chasis Specification Blade Chassis Form Factor 6U-10U rack mountable Chasis to House at least 6 or more Blade Servers Chasis Should be configured with 6 blades Network Redundancy I/O
Servers and Storage System for Digital Library
INVITATION FOR TENDER FOR SUPPLY OF EQUIPMENT Sealed tender offers are invited in two separate sealed covers (Technical and Commercial offers) from eligible manufacturers/suppliers or their direct Indian
Measuring Interface Latencies for SAS, Fibre Channel and iscsi
Measuring Interface Latencies for SAS, Fibre Channel and iscsi Dennis Martin Demartek President Santa Clara, CA 1 Demartek Company Overview Industry analysis with on-site test lab Lab includes servers,
SPC BENCHMARK 1 EXECUTIVE SUMMARY HITACHI DATA SYSTEMS CORPORATION HITACHI UNIFIED STORAGE 150 (WITH SSDS) SPC-1 V1.13
SPC BENCHMARK 1 EXECUTIVE SUMMARY HITACHI DATA SYSTEMS CORPORATION HITACHI UNIFIED STORAGE 150 (WITH SSDS) SPC-1 V1.13 Submitted for Review: March 26, 2013 Submission Identifier: A00129 EXECUTIVE SUMMARY
Microsoft SharePoint Server 2010
Microsoft SharePoint Server 2010 Small Farm Performance Study Dell SharePoint Solutions Ravikanth Chaganti and Quocdat Nguyen November 2010 THIS WHITE PAPER IS FOR INFORMATIONAL PURPOSES ONLY, AND MAY
Intel RAID SSD Cache Controller RCS25ZB040
SOLUTION Brief Intel RAID SSD Cache Controller RCS25ZB040 When Faster Matters Cost-Effective Intelligent RAID with Embedded High Performance Flash Intel RAID SSD Cache Controller RCS25ZB040 When Faster
HP ProLiant BL660c Gen9 and Microsoft SQL Server 2014 technical brief
Technical white paper HP ProLiant BL660c Gen9 and Microsoft SQL Server 2014 technical brief Scale-up your Microsoft SQL Server environment to new heights Table of contents Executive summary... 2 Introduction...
Unified Computing System When Delivering IT as a Service. Tomi Jalonen DC CSE 2015
Unified Computing System When Delivering IT as a Service Tomi Jalonen DC CSE 2015 Key Concepts 2 Unified Computing Product Innovation Manager Comprehensive Role-Based Management and Automation for Ease
Maximum performance, minimal risk for data warehousing
SYSTEM X SERVERS SOLUTION BRIEF Maximum performance, minimal risk for data warehousing Microsoft Data Warehouse Fast Track for SQL Server 2014 on System x3850 X6 (95TB) The rapid growth of technology has
DIABLO TECHNOLOGIES MEMORY CHANNEL STORAGE AND VMWARE VIRTUAL SAN : VDI ACCELERATION
DIABLO TECHNOLOGIES MEMORY CHANNEL STORAGE AND VMWARE VIRTUAL SAN : VDI ACCELERATION A DIABLO WHITE PAPER AUGUST 2014 Ricky Trigalo Director of Business Development Virtualization, Diablo Technologies
Microsoft Hybrid Cloud IaaS Platforms
IronPOD 400 Converged Systems Series Microsoft Hybrid Cloud IaaS Platforms IronPOD System 400 Series System Overview IRON Networks converged system products simplify Microsoft infrastructure deployments
The Hardware Dilemma. Stephanie Best, SGI Director Big Data Marketing Ray Morcos, SGI Big Data Engineering
The Hardware Dilemma Stephanie Best, SGI Director Big Data Marketing Ray Morcos, SGI Big Data Engineering April 9, 2013 The Blurring of the Lines Business Applications and High Performance Computing Are
Achieving a High Performance OLTP Database using SQL Server and Dell PowerEdge R720 with Internal PCIe SSD Storage
Achieving a High Performance OLTP Database using SQL Server and Dell PowerEdge R720 with This Dell Technical White Paper discusses the OLTP performance benefit achieved on a SQL Server database using a
Reference Architecture - Microsoft Exchange 2013 on Dell PowerEdge R730xd
Reference Architecture - Microsoft Exchange 2013 on Dell PowerEdge R730xd Reference Implementation for up to 8000 mailboxes Dell Global Solutions Engineering June 2015 A Dell Reference Architecture THIS
Scaling from Datacenter to Client
Scaling from Datacenter to Client KeunSoo Jo Sr. Manager Memory Product Planning Samsung Semiconductor Audio-Visual Sponsor Outline SSD Market Overview & Trends - Enterprise What brought us to NVMe Technology
Evaluation Report: Accelerating SQL Server Database Performance with the Lenovo Storage S3200 SAN Array
Evaluation Report: Accelerating SQL Server Database Performance with the Lenovo Storage S3200 SAN Array Evaluation report prepared under contract with Lenovo Executive Summary Even with the price of flash
Oracle Database Scalability in VMware ESX VMware ESX 3.5
Performance Study Oracle Database Scalability in VMware ESX VMware ESX 3.5 Database applications running on individual physical servers represent a large consolidation opportunity. However enterprises
Analyzing the Virtualization Deployment Advantages of Two- and Four-Socket Server Platforms
IT@Intel White Paper Intel IT IT Best Practices: Data Center Solutions Server Virtualization August 2010 Analyzing the Virtualization Deployment Advantages of Two- and Four-Socket Server Platforms Executive
Hyperscale Use Cases for Scaling Out with Flash. David Olszewski
Hyperscale Use Cases for Scaling Out with Flash David Olszewski Business challenges Performanc e Requireme nts Storage Budget Balance the IT requirements How can you get the best of both worlds? SLA Optimized
Cisco Unified Computing System and EMC VNXe3300 Unified Storage System
Cisco Unified Computing System and EMC VNXe3300 Unified Storage System An Ideal Solution for SMB Server Consolidation White Paper January 2011, Revision 1.0 Contents Cisco UCS C250 M2 Extended-Memory Rack-Mount
SMB Direct for SQL Server and Private Cloud
SMB Direct for SQL Server and Private Cloud Increased Performance, Higher Scalability and Extreme Resiliency June, 2014 Mellanox Overview Ticker: MLNX Leading provider of high-throughput, low-latency server
VTrak 15200 SATA RAID Storage System
Page 1 15-Drive Supports over 5 TB of reliable, low-cost, high performance storage 15200 Product Highlights First to deliver a full HW iscsi solution with SATA drives - Lower CPU utilization - Higher data
This Request for Proposal consists of providing the IT Server requirements outlined in this RFP.
August 25 th, 2015 Subject: Philadelphia Works To All Interested Vendors: Philadelphia Works ( Client ) has retained Watchdog Real Estate Project Managers ( Watchdog ) in connection with the construction/renovation
INVITATION FOR TENDER AND INSTRUCTIONS TO TENDERERS INSTRUCTIONS TO TENDERERS
INVITATION FOR TENDER AND INSTRUCTIONS TO TENDERERS INSTRUCTIONS TO TENDERERS Proposal for SERC Network Accessible Storage Tender No. SERC/2015/05 dt.29.1.2016 Supercomputer Education and Research Centre
UN 4013 V - Virtual Tape Libraries solutions update...
UN 4013 V - Virtual Tape Libraries solutions update... - a Unisys storage partner Key issues when considering virtual tape Connectivity is my platform supported by whom? (for Unisys environments, MCP,
IBM System x family brochure
IBM Systems and Technology System x IBM System x family brochure IBM System x rack and tower servers 2 IBM System x family brochure IBM System x servers Highlights IBM System x and BladeCenter servers
IOmark- VDI. Nimbus Data Gemini Test Report: VDI- 130906- a Test Report Date: 6, September 2013. www.iomark.org
IOmark- VDI Nimbus Data Gemini Test Report: VDI- 130906- a Test Copyright 2010-2013 Evaluator Group, Inc. All rights reserved. IOmark- VDI, IOmark- VDI, VDI- IOmark, and IOmark are trademarks of Evaluator
Dell Compellent Storage Center SAN & VMware View 1,000 Desktop Reference Architecture. Dell Compellent Product Specialist Team
Dell Compellent Storage Center SAN & VMware View 1,000 Desktop Reference Architecture Dell Compellent Product Specialist Team THIS WHITE PAPER IS FOR INFORMATIONAL PURPOSES ONLY, AND MAY CONTAIN TYPOGRAPHICAL
REQUEST FOR PROPOSAL. #9-11-13 Storage Solution RFP
REQUEST FOR PROPOSAL #9-11-13 Storage Solution RFP Issue Date: September 11, 2013 Due Date: Friday, October 11, 2013, 4:00pm Anticipated Award Date: January 1, 2014 Issued by Jackson County Information
Copyright 2013, Oracle and/or its affiliates. All rights reserved.
1 Oracle SPARC Server for Enterprise Computing Dr. Heiner Bauch Senior Account Architect 19. April 2013 2 The following is intended to outline our general product direction. It is intended for information
HP recommended configurations for Microsoft Exchange Server 2013 and HP ProLiant Gen8 with direct attached storage (DAS)
HP recommended configurations for Microsoft Exchange Server 2013 and HP ProLiant Gen8 with direct attached storage (DAS) Building blocks at 1000, 3000, and 5000 mailboxes Table of contents Executive summary...