STANDARDS FOR TESTING AND RATING SCAFFOLD ASSEMBLIES AND COMPONENTS

Size: px
Start display at page:

Download "STANDARDS FOR TESTING AND RATING SCAFFOLD ASSEMBLIES AND COMPONENTS"

Transcription

1 American National Standard STANDARDS FOR TESTING AND RATING SCAFFOLD ASSEMBLIES AND COMPONENTS Scaffolding, Shoring & Forming Institute, Inc. Sponsor: Scaffolding, Shoring & Forming Institute, Inc Sumner Ave Cleveland, Ohio

2 SCAFFOLDING, SHORING & FORMING INSTITUTE AMERICAN NATIONAL STANDARD Standards for Testing and Rating Scaffold Assemblies and Components Sponsor Scaffolding, Shoring & Forming Institute, Inc. i

3 Scaffolding, Shoring & Forming Institute A Scaffolding, Shoring & Forming Institute (SSFI) standard or recommended procedure is intended as a guide to aid the manufacturer, the consumer, and the general public. The existence of an SSFI standard or recommended procedure does not in any respect preclude anyone, whether he has approved the standard or recommended procedure or not, from manufacturing, marketing, purchasing or using products, processes, or procedures not conforming to the standard or recommended procedure. Scaffolding, Shoring & Forming Institute standards and recommended procedures are subject to periodic review and users are cautioned to obtain the latest editions. NOTICE: Scaffolding, Shoring & Forming Institute standards and procedures may be revised or withdrawn at any time. The procedures of the SSFI require that action be taken to reaffirm, revise, or withdraw standards and recommended procedures no later than five years from the date of publication. Purchasers of Scaffolding, Shoring & Forming Institute standards and procedures may receive current information on all documents by calling or writing the Scaffolding, Shoring & Forming Institute. Sponsored and published by: SCAFFOLDING, SHORING & FORMING INSTITUTE 1300 Sumner Avenue Cleveland, OH Phn: 216/ Fax: 216/ ssfi@ssfi.org URL: Copyright 2002 by Scaffolding, Shoring & Forming Institute, Inc. All Rights Reserved No part of this publication may be reproduced in any form, in an electronic retrieval system or otherwise, without the prior written permission of the publisher. Suggestions for improvement of this standard will be welcome. They should be sent to the Scaffolding, Shoring & Forming Institute, Inc. Printed in the United States of America ii

4 CONTENTS PAGE Foreword...iv 1. Introduction Scope Definitions General Test Requirements Test Procedures Methods for Testing and Rating Tube and Coupler Scaffold Components Methods for Testing and Rating Welded Frame Scaffold Assemblies Methods for Testing and Rating System Scaffold Assemblies Methods for Testing and Rating Guardrail Scaffold Components Methods for Testing and Rating Screwjack Scaffold Components Methods for Testing and Rating Caster Scaffold Components Methods for Testing and Rating Putlog Scaffold Assemblies Methods for Testing and Rating Side and End Bracket Scaffold Components...15 Appendices Appendix A Tube & Coupler Scaffold Component Test Report Form Appendix B Welded Frame Scaffold Assembly Test Report Form, Series A B Appendix C System Scaffold Assembly Test Report Form, Series A C Appendix D Guardrail Scaffold Component Test Report Form...23 Appendix E Screwjack Scaffold Component Test Report Form...24 Appendix F Caster Scaffold Component Test Report Form Appendix G Putlog Scaffold Assembly Test Report Form...27 Appendix H Side and End Bracket Scaffold Component Test Report Form...28 Figures Figures 5.1A 5.1D Figures 5.2A 5.2B Figures 5.3A 5.3C Figures 5.4A 5.4C...37 Figure 5.5A...38 Figures 5.6A 5.6G Figure 5.7A...41 Figure 5.8A 5.8B iii

5 Foreword (This foreword is included for information only and is not part of SSFI SC100 Standard for Testing and Rating Scaffold Assemblies and Components.) This SSFI standard was developed by the Scaffolding Section and the Scaffold Standards Committee of the Scaffolding, Shoring & Forming Institute, Inc. as an assistance and guide to the manufacturers, purchasers, and users of scaffolding. It provides methods for testing and rating scaffold assemblies and components. The methods in this standard are intended to provide a means of comparison only. Due to the wide variety of situation specific factors involved in the use of scaffolds, it is not possible to develop a method that will apply to all possible situations while still providing useful information upon which comparisons can be made. The ratings derived from the methods in this standard apply to the specific conditions contained in the test procedures. The ratings are not intended to represent actual use conditions, but, rather, they are intended to provide a reference point at which a comparison can be made. Users, purchasers, specifiers, and other interested parties should contact the manufacturer for ratings of specific configurations. SSFI employed the canvass method to demonstrate consensus and to gain approval as an American National Standard. The ANSI Board of Standards Review granted approval as an American National Standard on May 24, SSFI recognizes the need to periodically review and update this standard. All questions or suggestions for improvement should be forwarded to the Scaffolding, Shoring & Forming Institute, Inc., 1300 Sumner Avenue, Cleveland, Ohio, All constructive suggestions for expansion and revision of this standard are welcome. The existence of a Scaffolding, Shoring & Forming Institute (SSFI) standard or recommended procedure does not in any respect preclude any member or non-member from manufacturing or selling products not conforming to the standard or recommended procedure and the SSFI is not responsible for the use of the standard or recommended procedure. At the time this standard was developed, the following were members of the SSFI Scaffold Section: A-1 Plank & Scaffold Manufacturing Inc. 500 Commerce Parkway Hays, KS Action Scaffold Manufacturing P. O. Box Phoenix, AZ Aluma Enterprises Inc North Loop West, Suite #700 Houston, TX bil-jax, inc. 125 Taylor Parkway Archbold, OH Layher Inc Fir Tree Drive Mississauga, Ontario Canada L5S 1G4 Patent Construction Systems/SGB U.S.A. One Mack Centre Drive Paramus, NJ Perry Manufacturing, Inc W. 18th St. Indianapolis, IN Safway Services Inc. N19 W24200 Riverwood Drive, Waukesha, WI Universal Manufacturing Corp. 550 West New Castle Street Zelienople, PA WACO Scaffolding & Equipment 4545 Spring Road P. O. Box Cleveland, OH iv

6 Standards for Testing and Rating Scaffold Assemblies and Components 1 Introduction This standard contains procedures for testing and rating scaffold components and assemblies. These procedures are intended to be used as a guide for industry testing practice and are not intended to supersede procedures set forth in any applicable Federal, State, or local regulations. The Institute believes that adherence to these procedures will yield reliable test results upon which comparisons can be made. It takes no responsibility for such results. The methods in this standard are intended to provide a means of comparison only. Due to the wide variety of situation specific factors involved in the use of scaffolds, it is not possible to develop a method that will apply to all possible situations while still providing useful information upon which comparisons can be made. The ratings derived from the methods in this standard apply to the specific conditions contained in the test procedures. The ratings are not intended to represent actual use conditions, but, rather, they are intended to provide a reference point at which a comparison can be made. Users, purchasers, specifiers, and other interested parties should contact the manufacturer for ratings of specific configurations. Normal shop safety practice and, when applicable, safety precautions described by OSHA, should be observed during the administration of these tests. 2 Scope This standard provides methods for testing and rating the performance of the following:! Tube and Coupler Scaffold Components! Welded Frame Scaffold Assemblies! System Scaffold Assemblies! Guardrail Scaffold Components! Screwjack Scaffold Components! Caster (with Lever Actuated Brake and Swivel Lead) Scaffold Components! Putlog Scaffold Assemblies! Side and End Bracket Scaffold Components 3 Definitions 3.1 Accessories Those items other than frames, braces, post shores, end frame access ladders and horizontal locking trusses used to facilitate the construction of scaffolds. 3.2 Adjustment Screw See Screwjack 3.3 Allowable Load or Rated Load* The ultimate load or the slip load divided by a factor of safety. 3.4 Base Plate A device used to distribute the vertical load. 3.5 Bay The space between two adjacent posts along the face of a system scaffold. 3.6 Caster Capacity The maximum recommended load per caster or wheel. Capacity is based on intermittent duty over smooth surfaces at speeds not exceeding 3 m.p.h., no shock loads or adverse environment conditions. 3.7 Caster A pivoting wheel, containing a wheel lock and a swivel lock which is attached to the base of a scaffold tower for manual movement of the scaffold. * These terms may be used synonymously. 1

7 3.8 Caster Size A method of classifying casters based on the nominal diameter of the wheel. 3.9 Castor See Caster Coupler Or Clamp* A device for locking together the component parts of a tubular metal scaffold Coupler, Right Angle Also known as a clamp - A device used to fasten scaffold tubes or pipes together at right angles Coupler, Swivel - Also known as an adjustable coupler or clamp - A device used to fasten scaffold bracing members together at angles other than right angles Coupling Pin Or Sprocket* An insert device used to connect lifts, tiers, or posts vertically 3.14 Cross Bracing A system of members which connect frames or panels of scaffolding laterally to make a tower or continuous structure Diagonals Fixed length members sized to fit with the appropriate horizontal members of the scaffold End Bracket See Side Bracket End Connector A device attached to the ends of scaffold tubing (pipe) used to fasten the tubes together end for end Extension Device Any device, other than an adjustment screw, used to obtain vertical adjustment of scaffolding equipment Factor of Safety The ratio of ultimate load to the allowable load. In the case of coupler slippage, the ratio of the slip load to the allowable load Flat Top A level mounting surface above the bearing plate of the caster Frame or Panel* The principal prefabricated, welded structural unit in a tower Guardrail A rail system erected along the open sides and ends of platforms. The rail system consists of a toprail and midrail and their supports Horizontals Fixed length members with a fitting built into each end for attaching to posts at locking cups or rings. Used as bearers, runners and guardrails Horn The part of the caster that comprises legs plus the horn base of a swivel caster or the mounting plate of a rigid caster Independent Testing Laboratory An organization or company which is not affiliated with a scaffold manufacturer and which conducts tests of scaffold assemblies and components. An Independent Testing Laboratory shall be designated as a Nationally Recognized Testing Laboratory (NRTL), or shall be accredited by the American Association for Laboratory Accreditation (A2LA), or shall be accredited by the National Voluntary Laboratory Accreditation Program (NVLAP), or shall be accredited or certified by an equivalent nationally or internationally recognized association or agency King Pin A rivet, stem stud or bolt with nut used to hold the mounting plate and horn assembly of a swivel caster together. * These terms may be used synonymously. 2

8 3.27 Leg Vertical load bearing component of frame or panel (see also, post) Lifts Or Tiers* In welded frame scaffolds, the number of frames erected one above another in a vertical direction. In other scaffolds, the assembly of bearers and runners forming each horizontal level of a scaffold Live Load The total weight of workers, equipment and other loads that will exist and move about on a scaffold Load Bearing Member Any component of a scaffold which is directly subjected to load Locking Device A device used to secure the cross brace to the frame or panel Mounting Plate The flat base, usually with 4 mounting holes, that forms the top of the caster. This permits attachment by bolting or welding to the scaffold Mudsill See Sill Offset The distance from the center of the kingpin to the center of the axle. Also called the swivel lead Overall Height (caster) The distance from the rolling surface to the top of the mounting plate Panel See Frame or End Frame Access Ladder 3.37 Post or Standard The vertical component of a system scaffold, with locking cups or rings located at fixed height increments for attaching horizontal bearers, runners, diagonals and accessories Putlog (truss) Horizontal load bearing component consisting of upper and lower chords supporting web members Qualified Engineer An engineer who, by possession of a recognized degree, certificate, or professional standing, and who by extensive knowledge, training, and experience, has successfully demonstrated the ability to solve or resolve problems relating to scaffolds, scaffold assemblies, and scaffold components Rated Load (See Allowable Load) Safe Leg Load The load that can be directly imposed, safely, on a scaffold post or leg. (See Allowable Load) 3.42 Scaffold Any temporary elevated platform (supported or suspended) and its supporting structure (including points of anchorage), used for supporting employees or materials or both Scaffold Layout A design diagram for scaffolding Screwjack A leveling device or jack composed of a threaded screw and an adjusting handle used for the vertical adjustment of scaffolding Shock Load Impact of material as it is released or dumped during placement Shore Heads Flat or formed metal pieces which are placed and centered on vertical members. * These terms may be used synonymously. 3

9 3.47 Side Bracket A cantilevered component attached to a leg or post to extend the platform Sill or Mud Sill* A footing (usually wood) which distributes the vertical loads to the ground or slab below Span The horizontal distance between posts, columns, or upright support members Standard See Post Static Load The load imposed upon a caster when it is stationary Stem A vertical round bar on top of the mounting plate that may be inserted into a scaffold leg Swivel Brake A device that clamps onto the mounting plate, brake plate, or mounting plate assembly to prevent the caster from turning Swivel Lead See Offset Testing Apparatus or Fixture A special purpose device fabricated for the express purpose of testing scaffolding and scaffolding components Testing Machine A device or apparatus used to apply a variable load to a component or assemblage of components. Often found in universities, colleges and reputable testing laboratories Tower A composite structure of posts, horizontals and diagonals, or in welded frame scaffolds, a composite structure of frames and cross bracing Truss See Putlog 3.59 Tube And Coupler Equipment - An assembly used as a load-carrying structure consisting of tubing or pipe which serves as posts, braces, and ties, a base supporting the posts, and special couplers which serve to connect the uprights and join the various members Ultimate Load The maximum load which may be applied to a component or structure just prior to failure. In the case of coupler slippage, the load required to move the coupler 1/4 of an inch along a tube Wheel Brake A device which prevents movement of the caster by clamping on to the wheel Yoke See Horn. * These terms may be used synonymously. 4

10 4 General Test Requirements 4.1 Calibration of Testing Devices Devices used to determine loads applied shall be calibrated and certified by a reputable testing laboratory during the preceding 12 month period Testing machines used for compression testing shall be calibrated in accordance with ASTM E4-99 Standard Practices for Force Verification of Testing Machines or latest revision or an equivalent standard during the preceding 12 month period Testing machines used for calibration in Part and above shall be calibrated in accordance with ASTM E74-95 Standard Practice for Calibration of Force-Measuring Instruments for Verifying the Force Indication of Testing Machines or latest revision or an equivalent standard during the preceding 12 month period. 4.2 Test Procedures Testing shall be according to the following procedures or an equivalent internationally recognized testing standard that meets or exceeds the SSFI criteria outlined in the following procedures Test Specimens: Specimens to be tested shall be selected at random and shall exhibit approximately the same variations in measurements as would be expected from random sampling, including mill tolerances on thickness of various members. Note the test specimens should never be placed in service, regardless of their condition after the test. The application of the test load has, by definition, failed the specimen Sample Size: For each individual loading condition, the minimum number of tests shall be carried out on each piece of equipment or accessory as follows: for metal equipment or accessories, a minimum of three tests shall be performed; for wooden equipment or accessories, a minimum of ten tests shall be performed Average of Test Results: The average of the valid test set shall be used to determine ratings as stated in 4.5. The valid test set shall comprise the following: For metal equipment and accessories, if three successive tests result in a maximum variation between the average of the three tests and each individual test result of 10%, the three tests shall be the valid test set For metal equipment and accessories, if three successive tests result in a maximum variation between the average of the three tests and each individual test greater than 10% but less than or equal to 15%, conduct a fourth test. If the four successive tests result in a maximum variation between the average of the four tests and each individual test result of 15%, the four tests shall be the valid test set For metal equipment and accessories, four tests out of a set of 5 tests as follows: Conduct four tests. If the maximum variation between the average of the four tests and three individual test results is 15%, with variation between the fourth individual test and the average being greater than 15%, a fifth test shall be performed Determine the average of the three test results identified in (those within the maximum 15% variation) and the fifth test. If the maximum variation between this average and each individual test result is 15%, the three tests identified in and the fifth test shall be the valid test set If the maximum variation between the average determined in and any individual test result is greater than 15%, another complete set of four tests shall be run and all nine tests shall be considered the valid test set. 5

11 For wood equipment and accessories, ten successive tests if the maximum variation between the average of the ten tests and each individual test result is 30% For wood equipment and accessories, 20 tests if the maximum variation between the average of the first ten successive tests and each individual test result is greater than 30%. 4.3 Determination of Rating: With the exception of Guardrail Scaffold Components, the average obtained as specified in 4.4 shall be divided by the appropriate factor of safety to determine ratings. The determination of Guardrail Scaffold Component ratings are included in Section 5.4 of this standard. 4.4 Published Ratings: All published ratings and load charts prepared by utilizing this standard shall reference this standard and, where applicable, shall clearly indicate the type of test conducted to determine the ratings. 4.5 Measurements: Thickness measurements, when required, shall be made with a suitable micrometer. All other dimensions shall be made with a commercially obtainable measuring tape. All dimensions shall be reported to the nearest 1/16 inch. 4.6 Certification of Tests: All tests shall be witnessed by a qualified engineer or independent testing laboratory which shall be designated as a Nationally Recognized Testing Laboratory (NRTL), or shall be accredited by the American Association for Laboratory Accreditation (A2LA), or shall be accredited by the National Voluntary Laboratory Accreditation Program (NVLAP), or shall be accredited or certified by an equivalent nationally or internationally recognized association or agency. The qualified engineer or a representative of the independent testing laboratory shall certify that the tests were performed in accordance with applicable provisions of this standard and that recorded results are factual. 5 Test Procedures 5.1 Methods for Testing and Rating Tube and Coupler Scaffold Components Scope: These procedures are intended to cover: A. The compression, tension and buckling testing of tube (pipe) end connectors when assembled into the ends of scaffold tube (pipe). B. The strength and slip capacity of both right angle and swivel couplers. C. Torque capacity of coupler bolt assembly (where applicable) Test Apparatus: The following apparatus shall be used to conduct tests of end connectors and right angle and swivel couplers End Connector Test A device constructed to apply both a tension or compression load to a tube (pipe) end connector as shown in figure 5.1A Right Angle and Swivel Coupler Test A device constructed to apply a slip load as shown in figure 5.1B or a strength test load as shown in figure 5.1C Methods for Testing and Rating Tube (Pipe) End Connectors Tension Test Using randomly selected production tubes or pipes with end connectors installed, assemble two sections as they would be assembled during a scaffold erection. Install the assemblies into a testing machine or apparatus. 6

12 Apply a tension load to the assembly (refer to figure 5.1A). Load shall be applied in 1,000 lb. increments. Load shall be allowed to stabilize until measuring device shows no movement after 1 minute before the next load increment is applied The ultimate tensile load is achieved when the following occurs: Compression Test a. Joint failure occurs; or b. The end connector slips a maximum of 1/4 inch from the tube end; or c. The tube ends separate 1/4 from each other, dependent on type of end-to-end connector being used Apply a compression load to a separate assembly (refer to figure 5.1A) Load shall be applied in 1,000 lb. increments. Load shall be allowed to stabilize until measuring device shows no movement after 1 minute before the next load increment is applied The ultimate compression load is reached when: Buckling Test a. The tube (pipe) splits or bends; or b. The joint assembly will no longer support the test load; or c. The tube ends separate 1/4 from each other, in the case of a parallel connector Install end connectors on 3 foot 3 inch sections of tube (pipe), connect tubes (pipes) together and install in a test apparatus Apply a compression load allowing end condition rotation as shown in figure 5.1A to assembly until tube buckling failure Load shall be applied in 1,000 lb. increments. Load shall be allowed to stabilize until measuring device shows no movement after 1 minute before the next load increment is applied After test, examine end connectors and attachments to tubes (pipes). Record the failure mode and load at point of failure Methods for Testing and Rating Right Angle Couplers and Swivel Couplers: Using randomly selected production couplers, install a coupler in test apparatus and test as follows: Slip test Fasten coupler around two, 1 foot min. long tubes (pipes) depending upon the coupler design. Tighten coupler in accordance with manufacturer s recommendations Install assembly in test apparatus and apply a load to the horizontal tube (pipe) in such a manner as to equally load the tube (pipe) on either side of the coupler (see figure 5.1B). Using a measuring device, monitor the coupler slip as load is applied Load shall be applied in steps of 500 lb. increments. Load shall be allowed to stabilize until measuring device shows no movement after 1 minute before the next load increment is applied. Couplers shall not be re-torqued during test. 7

13 The slip load capacity is reached when the following occurs: Strength test a. Ultimate load is reached; or b. Coupler slips 1/4 of an inch down tube Using solid bars, install a separate coupler into a test apparatus (see figure 5.1C) Tighten coupler in accordance with manufacturer s recommendations Apply a test load using a measuring device to monitor coupler elongation. Ultimate load is achieved when failure of assembly occurs - (graph results) Center Rivet Strength Test Using solid bars, install a separate swivel coupler into a test apparatus as shown in figure 5.1D. Tighten coupler in accordance with manufacturer s recommendations Apply a test load using a measuring device to monitor elongation. Ultimate load is achieved when failure of swivel rivet or assembly occurs - (graph results) Methods for Testing and Rating Bolt-Type Couplers Bolt-Test: Install coupler on a solid bar and torque nut to failure. Failure shall be any of the following: a. Bolt or nut threads strip b. Bolt or rivet shear c. Bolt fails in torsion d. Cap ends bend and release bolt. e. Load refusal Overtightening Test: Install coupler on a section of tube and clamp, pipe or tubing and tighten bolt. At least twice the clamp manufacturer s rated bolt/nut torque shall be achieved without permanent tube or coupler distortion, load refusal or failure Report of Test Results: Test results shall be reported on the SSFI Tube & Coupler Scaffold Component Test Report Form (See Appendix A) including a test set-up sketch, a list of components, a graph of results (Load vs. Movement) where applicable, mode of failure, rating determined through testing, and certification. 8

14 5.2 Methods for Testing and Rating Welded Frame Scaffold Assemblies Scope: This procedure is intended to cover the compression testing of welded frame scaffold assemblies Test Setup: The welded frame scaffold tower to be tested shall be erected in such a manner as to simulate field conditions and shall be aligned vertically so that it is not out of plumb more than 1/8" in three feet and no more than the diameter of the leg. No greater attempts should be made to adjust the components concentrically than would be expected in actual use Loads The load shall be applied directly on the load bearing members by use of load transfer beams or cross head of testing machine; or directly by hydraulic jacks in an appropriate testing apparatus or fixture The welded frame scaffold tower shall be subjected to increasing loads until the ultimate load is reached The allowable limits for rate of loading on welded frame scaffold towers shall not be less than 5,000 lbs. per minute nor more than 10,000 lbs. per minute The rate of loading in each test shall remain constant "A" Series Tests (Required) Welded frame scaffold assemblies shall be tested one frame wide and one cross brace length long by three frames high to arrive at an anticipated allowable leg load. The frame scaffold components shall be erected into the above configuration composed of four vertical legs with normal manufacturers' recommended bracing, freestanding, and with adjusting screws extended to 12 inches beyond the frame length on the bottom. (See figure 5.2A) The four legs of the test configuration shall be loaded until the ultimate load of the legs (P ult ) is reached. Determine the allowable leg load (P all ) for this configuration (and for use in the B series tests, if desired) by dividing the ultimate leg load by the appropriate factor of safety "B" Series Tests (Optional) After conducting "A" series tests, welded frame scaffold assemblies shall be tested one frame wide and two cross brace lengths long by three frames high. The frame scaffold components shall be erected into the above configuration composed of six vertical legs with normal manufacturers' recommended bracing freestanding, and with adjusting screws extended to 12 inches beyond the frame length on the bottom. (See figure 5.2B) The six legs of the test configuration are to be loaded to the scaffold's anticipated leg load (P all ), as determined by the "A" series test, and held at that value for one minute. Loading shall be continued on the two legs of the center frame until the ultimate load of these two legs is reached. The ultimate load of the center frame legs shall be the ultimate leg load for the welded frame system. Determine the allowable leg load for this configuration by dividing the ultimate leg load by the appropriate factor of safety Report of Test Results: Test results shall be reported on the SSFI Welded Frame Scaffold Assembly Test Report Form (See Appendix B) including drawing of test setup and list of components with the following: ultimate total test load, ultimate leg load, type of test, mode of failure, rating determined through testing, and certification. 9

15 5.3 Methods for Testing and Rating System Scaffold Assemblies Scope: This procedure is intended to cover the compression testing of system scaffold assemblies Test apparatus: The system scaffold tower to be tested shall be erected in such a manner as to simulate field conditions and aligned vertically so that it is not out of plumb more than 1/8" in three feet and no more than the diameter of the post. No greater attempts should be made to adjust the components concentrically than would be expected in actual use Loads The load shall be applied directly on the load bearing members by use of load transfer beams or cross head of testing machine; or directly by hydraulic jacks in an appropriate testing apparatus or fixture The system scaffold tower shall be subjected to increasing loads until the ultimate load is reached The allowable limits for rate of loading on system scaffold towers shall not be less than 5,000 lbs. per minute nor more than 10,000 lbs. per minute The rate of loading in each test shall remain constant "A" Series Tests (Required) Posts shall be tested one bay wide and one bay long, composed of 4 vertical posts, by three lifts high to arrive at an anticipated allowable post load. The system scaffold components shall be erected freestanding in the above configuration with adjusting screws extended to 12 inches beyond the post on the bottom and with horizontals and diagonals installed as shown in figure 5.3A The four posts of the test configuration shall be loaded simultaneously until the ultimate load of the posts (P ult ) is reached. Determine the allowable post load (P all ) for this configuration (and for use in the B and C series tests) by dividing the ultimate post load by the appropriate factor of safety "B" Series Tests (Optional) After conducting "A" series test, posts shall be tested one bay wide and two bays long, composed of 6 vertical posts, by three lifts high. The system scaffold components shall be erected in the above configuration with adjusting screws extended to 12 inches beyond the post on the bottom and with horizontals and diagonals installed as shown in figure 5.3B The six posts of the test configuration are to be loaded to the anticipated allowable post load (P all ), as determined in the "A" series test, and held at that value for one minute Loading shall be continued on the two posts in the center of the bays until the ultimate load of the posts is reached. The ultimate load of the center posts shall be the ultimate post load for the system scaffold used in this manner. Determine the allowable post load (P all ) for this configuration by dividing the ultimate post load by the appropriate factor of safety C" Series Tests (Optional) After conducting "A" series test, posts shall be tested two bays wide and two bays long, composed of 9 vertical posts, by three lifts high. The system scaffold components shall be erected in the above configuration with adjusting screws extended to 12 inches beyond the post on the bottom and with horizontals and diagonals installed as shown in figure 5.3C. 10

16 The nine posts of the test configuration are to be loaded to the anticipated allowable post load (P all ), as determined in the "A" series test, and held at that value for one minute Loading shall be continued on the post in the center of the bays until the ultimate load of the post is reached. The ultimate load of the center post shall be the ultimate post load for the system scaffold when used in this manner. Determine the allowable post load (P all ) for this configuration by dividing the ultimate post load by the appropriate factor of safety Report of Test Results: Test results shall be reported on the SSFI System Scaffold Assembly Test Report Form (See Appendix C) including drawing of test setup and list of components with the following: ultimate total test load, ultimate post load or component test load as applicable, type of test, mode of failure, rating determined through testing, and certification. 5.4 Methods for Testing Guardrail Scaffold Components Scope: This procedure is intended to cover the load testing of Guardrail Scaffold Components. Guardrail Scaffold Components covered in this section include Guardrail Posts, Guardrails and intermediate level Guardrail Panels Test Setup: Guardrail Post: Attach post to a socket secured to a test apparatus. The socket shall be of the same configuration and material as the standard attachment to a scaffold. Assembly shall be in accordance with manufacturer s recommendation. Post may be tested in either a vertical or horizontal position. Load shall be applied to the uppermost node of the post. Apply load at a right angle to the post. A measuring device shall be firmly attached that allows measurement of movement of the top of the guardrail post from its original preloaded position. (See Figure 5.4A) (Alternate method: Post may be tested attached to a scaffold setup either as a single post or the center post of a two bay setup. Scaffold shall be restrained from tipping. Assembly shall be in accordance with manufacturer s recommendation.) Guardrail: A scaffold structure or mock-up shall be erected that consists of the typical understructure necessary to support a minimum of two guardrail posts on the outboard side of a scaffold bay(s) with a top rail and mid rail between each pair of posts. If an intermediate level guardrail panel is to be tested, it shall be attached directly to a scaffold structure. The scaffold shall be restrained from tipping during testing. Assembly shall be in accordance with manufacturer s recommendation. Load shall be applied to the center point of the top rail. The device and apparatus used to apply the load shall be configured in such a manner that allows the load to be applied in an outward and inward direction at a right angle to the guardrail and in a downward (vertical) direction. A measuring device shall be firmly attached that allows measurement of movement of the guardrail from its original preloaded position. (See Figure 5.4B and 5.4C) Test Procedure Erect scaffold or test apparatus as described in and Apply load at a rate not to exceed 50 lbs. per minute Measure the deviation from original preloaded position with each approximately 50-pound increment of load applied Increase load until load refusal occurs Report of Test Results: Test results shall be reported on the SSFI Guardrail Scaffold Component Test Report Form (see Appendix D) including drawing of test set-up, list of components, mode of failure, and certification. 11

17 5.5 Methods for Testing and Rating Screwjack Scaffold Components Scope: This procedure is intended to cover the compression testing of screwjacks Test Apparatus: A device constructed to apply a compression load to a screwjack shall be used to conduct tests Test Procedure Using randomly selected production screwjacks, move the handle of the screwjack upward until it is placed at the manufacturer's maximum recommended extension, measured from the top of the base plate to the top of the nut, without removing it from the jack Place the screwjack in the test machine or apparatus. Position a thick-walled tube on top of the jack handle. The inside diameter of the thick-walled tube shall be the same inside diameter of the scaffold leg that would be placed on the screwjack. (See figure 5.5A) Apply a compressive load to the screwjack. The allowable limits for rate of loading on screwjacks shall not be less than 5,000 lbs. per minute nor more than 10,000 lbs. per minute Increase load until the ultimate vertical load is achieved. Ultimate vertical load is achieved when the following occurs: a. The jack handle slips; or b. The jack bends or buckles; or c. Load refusal Report of Test Results: Test results shall be reported on the SSFI Screwjack Scaffold Component Test Report Form (See Appendix E) including drawing of test setup list of components, mode of failure, rating determined through testing, and certification. 5.6 Methods for Testing and Rating Caster (with Lever Actuated Brakes and Swivel Lead) Scaffold Components Scope: This procedure is intended to cover: A. Radial torque testing of the caster stem/mounting plate. B. Torque test of the swivel brake. C. Torque test of the wheel brake. D. Vertical load test of the caster Test Apparatus: The following apparatus shall be used to conduct tests of caster scaffold components: Radial Torque Test: A device constructed to measure the rotational force. (See figures 5.6A and 5.6B) Swivel Brake Torque Test: A device constructed to measure the brake capacity to prevent caster swivel. (See figures 5.6C and 5.6D) Wheel Brake Torque Test: A device constructed to measure the capacity of the brake to prevent wheel rotation. (See figures 5.6E and 5.6F) Vertical Load Test: A device used to measure the capacity of the caster to support a vertical load. (See figure 5.6G). 12

18 5.6.3 Radial Torque Test Procedure: Using randomly selected production casters, install the caster into a testing machine or apparatus and test as follows (note: not applicable to over center locking casters): Place the caster in a device to secure the mounting plate and to prevent any movement in the testing apparatus Apply radial torque to the stem or top plate of the caster in a slow and steady manner so that torque can be measured. Increase load until the ultimate load is reached. The ultimate load is achieved when the caster stem or top plate rotates on the mounting plate. (See figures 5.6A and 5.6B) Swivel Brake Torque Test Procedure (note: not applicable to over center locking casters) : Using randomly selected production casters, install the caster into a testing machine or apparatus and test as follows: Mount the caster wheel in a fixed position in the test apparatus. Apply the brake until it is fully engaged Apply torque to the stem of the caster or the caster plate in a slow and steady manner so that torque can be measured. Increase load until the ultimate load is reached. The ultimate load is achieved when the caster stem or plate rotates. (See figures 5.6C and 5.6D) Wheel Brake Torque Test: Using randomly selected production casters, install the caster into a testing machine or apparatus and test as follows: Place the caster wheel in a fixed position and apply the brake until it is fully engaged. Apply torque radial to the axle bolt in the clockwise direction Apply torque in a slow and steady manner so that torque can be measured. Increase load until the ultimate load is reached. The ultimate load is achieved when the brake slips on the surface of the wheel. (See figures 5.6E and 5.6F) Repeat procedure, applying torque radial to the axle bolt in a counterclockwise direction until ultimate load is reached Vertical Load Test Procedure: Using randomly selected casters, install the caster into a testing machine or apparatus and test as follows: With the caster inversely mounted with the kingpin inserted in a rigid support with a 5 degree angle between the stem and the vertical plane, apply a load vertically to the caster wheel. Load shall be applied in increments of ¼ the manufacturer s rated load. Load shall be allowed to stabilize until measuring device shows no movement after 1 minute before the next load increment is applied The caster shall be removed at the manufacturer s rated load for a visual inspection. After the caster is placed back into the test apparatus, load shall be increased in increments of ¼ the manufacturer s rated load. The caster shall be removed and inspected at multiples of 2, 3, and 4 times the rated load Increase load until the ultimate load is reached. Ultimate load is reached when permanent deformation can be seen in the stem, body or wheel of the caster or it becomes functionally impaired. (See figure 5.6G) Report of Test Results: Test results shall be reported on the SSFI Caster Scaffold Component Test Report Form (See Appendix F) including drawing of test setup and list of components with the following: Ultimate Stem Radial Torque Load, Ultimate Swivel Brake Torque Load, Ultimate Wheel Brake Torque Load, Ultimate Vertical Load, Type of Test, mode of failure, rating determined through testing, and certification. 13

19 5.7 Methods for Testing and Rating Putlog Scaffold Assemblies Scope: This procedure is intended to cover distributed load testing for putlog scaffold assemblies Test Apparatus: Putlog assemblies shall be tested on a scaffold for which they were designed to be used, and in a configuration for which they are designed to be used Loads Loads shall be applied uniformly over the putlog scaffold assembly using a test machine with falsework designed to simulate uniform loading; or by application of load media. Load media shall be of a material that allows natural deflection of the putlog scaffold assembly The rate of loading, when using a test machine, shall not be greater than 1000 lbs. per minute When using load media, the load media shall be applied in layers with each new layer starting in the center of the putlog scaffold assembly and working towards the ends in both directions The rate of loading in each test shall remain constant Procedure for test Assemble the putlog assembly according to manufacturer s recommendation, including any and all bracing. Towers shall be restrained against movement during loading. The test configuration shall be comprised of two scaffold towers as high as necessary to accommodate recommended bracing, and one bay long. The putlog assemblies will span the void between the two towers. Prepare detailed illustration(s) of the test configuration Measure the free span of the putlog ( X in figure 5.7A). Record this value on the test report Measure the center deflection Weigh the platform materials. Record this value on the test report Place the platform uniformly along the putlog structure Begin loading the platform. If using a load media, the load media shall be applied in layers with each new layer starting in the center of the platform and working towards the ends in both directions If using a test machine, deflection readings are to be recorded at 200 lb. increments with the load held at the reading level until the reading has stabilized for 1 minute. If using a load media, note the deflection value upon completion of each layer of load media Continue to load until load refusal occurs. Record the reading on the test machine or the weight of the load media applied at the point of load refusal Report of Test Results: Test results shall be reported on the SSFI Putlog Scaffold Assembly Test Report Form (See Appendix G) Include a sketch of the setup, a list of components, and specify the member that failed, the mode of failure, ultimate load, allowable load, rating determined through testing, and certification. 14

20 5.8 Methods for Testing and Rating Side and End Bracket Scaffold Components Scope: This procedure is intended to cover distributed load testing procedures for scaffold side and end brackets Test Apparatus: Side and end brackets shall be tested on a scaffold for which they were designed to be used, and in a configuration for which they are designed to be used or on an equivalent test apparatus that allows simulation of actual loading conditions Procedure of Test Assemble the bracket according the manufacturer s recommendation. The test configuration shall be comprised of a one tier high scaffold, one bay long, counterweighted to avoid overturning or of apparatus to simulate actual load conditions. Prepare detailed illustration(s) of the test configuration Record on the test report the diameter of the tube on which the hanger of the bracket rests (See figures 5.8A and 5.8B) Measure the cantilever length of the bracket. ( X in figures 5.8A and 5.8B). Measure the depth of the bracket ( Y in figures 5.8A and 5.8B). Record these values on the test report Weigh the platform material, if used. Record this value on the test report Determine whether this is a test for a hooked platform or a simply supported platform, or a simulated uniform load. Record the appropriate entry in the test report Place the platform uniformly along the bracket ledger if used Begin loading the platform with load media. Load media shall be a material that allows natural deflection of the platform. The load media shall be applied in layers with each new layer starting in the center of the platform and working towards the ends in both directions, or apply load with test apparatus to simulate uniform load Continue to uniformly apply weight to the structure until load refusal occurs Determine the amount of load on the structure at the time of load refusal. Record that value in the test report Report of Test Results: Test results shall be reported on the SSFI Side and End Bracket Scaffold Component Test Report Form (See Appendix H) Include a sketch of the setup, a list of components, and specify the member that refuses the load, mode of failure, ultimate load, allowable load, rating determined through testing, and certification. 15

21 Appendix A TUBE & COUPLER SCAFFOLD COMPONENT TEST REPORT FORM (Page 1 of 2) Manufacturer: Model #/Product Identification: Test Date: Test #: Test Location: Factor of Safety (FS): End Connector Test 1 Test 2 Test 3 Tensile Load Note Failure Mode (Use Notes, if needed) Compression Load Note Failure Mode (Use Notes if needed) Buckling Load Note Failure Mode (Use Notes if needed) Test 4 (if needed) Test 5 (if needed) Average Maximum Variation Rating (Avg / FS) NA NA NA NA NA NA NA NA NA Right Angle Coupler Test 1 Test 2 Test 3 Slip Load Note Failure Mode (Use Notes if needed) Tensile Load Note Failure Mode (Use Notes if needed) Test 4 (if needed) Test 5 (if needed) Average Maximum Variation Rating (Avg / FS) NA NA NA NA NA NA Swivel Coupler Test 1 Test 2 Test 3 Slip Load Note Failure Mode (Use Notes for add l space if needed) Center Rivet Load Note Failure Mode (Use Notes for add l space, if needed) Test 4 (if needed) Test 5 (if needed) Average Maximum Variation Rating (Avg / FS) NA NA NA NA NA NA Bolt Type Coupler Test 1 Test 2 Test 3 Maximum Bolt Torque Note Failure Mode (Use Notes if needed) Overtightening Test Pass Pass Pass Test 4 (if needed) Pass Test 5 (if needed) Pass Average Maximum Variation Rating (Avg / FS) NA NA NA Enter Manufacturer s Recommended Torque: Or Fail Or Fail Or Fail Or Fail Or Fail NA NA NA COMPLETE and ATTACH PAGE 2 16

22 Appendix A TUBE & COUPLER SCAFFOLD COMPONENT TEST REPORT FORM (Page 2 of 2) Sketch: Attach Sketch of Test, Graphs (if applicable), and list of components Notes: Witnesses Name Company Signature Title Certification I certify that I am a qualified engineer or a representative of an independent testing laboratory as defined in the SC100 standard. I also certify that the above described tests were performed in accordance with the applicable provisions of the Methods for Testing and Rating Tube & Coupler Scaffold Components, as published by the Scaffolding, Shoring & Forming Institute in the SSFI SC100 standard, and that the stated results and values are accurate. (Name) (Signature) (Company) (Date) (Address/city/state/zip) (Phone) ( ) 17

Chapter 10 - Scaffolding Systems

Chapter 10 - Scaffolding Systems Chapter 10 - Scaffolding Systems Contents Chapter 10 - Scaffolding Systems... 10-1 Check and Oil the Pump Jacks... 10-4 Set Pump Jack Brackets... Error! Bookmark not defined. Set Pump Jack Poles... 10-5

More information

I BEAM TRACK INSTALLATION

I BEAM TRACK INSTALLATION PDQ 0/700 FESTOON SYSTEM INSTALLATION AND MAINTENANCE INSTRUCTIONS INTRODUCTION The PDQ Festoon System was designed to run on one of three sizes of I-beams: S x., S8 x 8. and S x.. System trolleys must

More information

STANDARD REQUIREMENTS AND TEST METHODS FOR TESTING AND RATING PORTABLE RIGGING DEVICES FOR SUSPENDED SCAFFOLDS

STANDARD REQUIREMENTS AND TEST METHODS FOR TESTING AND RATING PORTABLE RIGGING DEVICES FOR SUSPENDED SCAFFOLDS American National Standard STANDARD REQUIREMENTS AND TEST METHODS FOR TESTING AND RATING PORTABLE RIGGING DEVICES FOR SUSPENDED SCAFFOLDS Scaffolding, Shoring & Forming Institute, Inc. Sponsor: Scaffolding,

More information

PUMP JACK SYSTEM AND ACCESSORIES

PUMP JACK SYSTEM AND ACCESSORIES Pump Jack Model # 2200 A low cost, easy to operate, safe, portable scaffolding built of rugged steel. It's perfect for shingling, siding, sheathing, insulating, painting, building, roofing, home repair

More information

SELF-STEERING AXLE TABLE OF CONTENTS

SELF-STEERING AXLE TABLE OF CONTENTS SELF-STEERING AXLE TABLE OF CONTENTS Section 1 - Introduction Section 2 - Pre-Installation Check List Section 3 - Ride Height Adjustments Section 4 - Suspension Mount Section 5 - Axle Mount Section 6 -

More information

TEST REPORT. Rendered to: LMT-Mercer Group, Inc. For: PRODUCT: 4" x 4" and 5" x 5" PVC Porch Posts with Aluminum Reinforcing

TEST REPORT. Rendered to: LMT-Mercer Group, Inc. For: PRODUCT: 4 x 4 and 5 x 5 PVC Porch Posts with Aluminum Reinforcing TEST REPORT Rendered to: LMT-Mercer Group, Inc. For: PRODUCT: 4" x 4" and 5" x 5" PVC Porch Posts with Aluminum Reinforcing Report No.: Report Date: 01/28/14 Test Record Retention Date: 12/20/17 130 Derry

More information

OSHA Scaffold Standard for Construction. 29 CFR 1926 Subpart L

OSHA Scaffold Standard for Construction. 29 CFR 1926 Subpart L OSHA Scaffold Standard for Construction 29 CFR 1926 Subpart L EH&S Jim Walker What is the revised OSHA scaffold standard for construction? Issued on August 30, 1996 and became effective on November 29,

More information

Chapter 3: Fall Protection/ Scaffolding Safety

Chapter 3: Fall Protection/ Scaffolding Safety Chapter 3: Fall Protection/ Scaffolding Safety Learning Objectives In this chapter you will learn to: recognize the hazards commonly associated with work on or around scaffolds; be aware of common scaffold-related

More information

SCAFFOLDING PRODUCT TECHNICAL GUIDE. Scaffold Couplers General Technical and Application Manual. Genuine Safety. Outstanding Service.

SCAFFOLDING PRODUCT TECHNICAL GUIDE. Scaffold Couplers General Technical and Application Manual. Genuine Safety. Outstanding Service. SCAFFOLDING PRODUCT TECHNICAL GUIDE Scaffold Couplers Genuine Safety. Outstanding Service. Introduction Scaffold couplers are essentially the fundamental component that is used to assemble tube-and-coupler

More information

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES 101 Retrofits Required. Pursuant to Section 553.844 553.884, Florida Statutes, strengthening of existing site-built,

More information

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks Securitron Magnalock Corp. www.securitron.com ASSA ABLOY, the global leader Tel 800.624.5625 techsupport@securitron.com in door opening solutions INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate

More information

Scaffolding. The University of Tennessee Office of Environmental Health & Safety

Scaffolding. The University of Tennessee Office of Environmental Health & Safety Scaffolding The University of Tennessee Office of Environmental Health & Safety Do employees working on supported scaffolds need to be trained? Scaffolding: Three Main Groups: Suspended Supported Aerial

More information

TEST REPORT. Rendered to: HOMELAND VINYL PRODUCTS, INC. For:

TEST REPORT. Rendered to: HOMELAND VINYL PRODUCTS, INC. For: TEST REPORT Rendered to: HOMELAND VINYL PRODUCTS, INC. For: PRODUCT: Gorilla Column PVC Porch Post System with PVC Base / Cap Plates, PVC Bushings and 2-3/8 in Diameter and 3-1/2 in Diameter Galvanized

More information

Scaffold Industry Association of Canada

Scaffold Industry Association of Canada Scaffold Industry Association of Canada CODES OF SAFCE PRACTICE ONTARIO 2011 www.scaffoldaccess.ca 1 CODE OF SAFE PRACTICE GENERAL -- ONTARIO - The following are some common sense rules designed to promote

More information

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code LEGACY REPORT Reissued November 1, 2003 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900

More information

Wall braces with a swivel head are included to accommodate all roof pitches.

Wall braces with a swivel head are included to accommodate all roof pitches. ULTRA JACK MODEL # 2000 Wall braces with a swivel head are included to accommodate all roof pitches. Product Specifications Model # 2000 Description: Ultra Jack Unit Pack: Weight per Pack: 1 / Carton 32

More information

Owner s Manual Gantry Cranes

Owner s Manual Gantry Cranes Owner s Manual Gantry Cranes Fixed Height Gantry Crane MODEL NUMBER: SERIAL NUMBER: CAPACITY IN TONS: Telescoping Gantry Crane Bushman AvonTec 262-790-4200, 800338-7810, Fax 262-790-4200 www.bushmanavontec.com

More information

STANDARD FOR NON-FIRE RATED ROLLING DOORS

STANDARD FOR NON-FIRE RATED ROLLING DOORS ANSI/DASMA 203-2004 AMERICAN NATIONAL STANDARD STANDARD FOR NON-FIRE RATED ROLLING DOORS Door & Access Systems Manufacturers Association, International Sponsor: 1300 Sumner Ave Cleveland, Ohio 44115-2851

More information

Installation Instructions For Slider Casement Air Conditioners

Installation Instructions For Slider Casement Air Conditioners Installation Instructions For Slider Casement Air Conditioners NOTE: These instructions describe installation in a typical wood framed window with a wood SLIDE-BY sash, or installation in a metal CASEMENT

More information

Section A. GENERAL INFORMATION

Section A. GENERAL INFORMATION Section A. GENERAL INFORMATION I. Description The information and instructions for attaching the sidecar to the right-hand side of the motorcycle are contained in this handbook and must be carefully observed.

More information

One-third of all fatalities in the U.S. construction

One-third of all fatalities in the U.S. construction Guardrail systems: Fall prevention for floor and wall openings and open-sided floors One-third of all fatalities in the U.S. construction industry result from falls from elevations. Falls from elevations

More information

BRIO Modular scaffolding

BRIO Modular scaffolding BRIO Modular scaffolding // Versatile and multifunctional // Table of content Features Benefits Solutions Basic components 2 4 6 11 // Features BRIO Modular Scaffolding covers the different configurations

More information

Residential Deck Safety, Construction, and Repair

Residential Deck Safety, Construction, and Repair Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the

More information

Field Application Note

Field Application Note Field Application Note Reverse Dial Indicator Alignment RDIA Mis-alignment can be the most usual cause for unacceptable operation and high vibration levels. New facilities or new equipment installations

More information

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built

More information

PART 1 GENERAL 1.1 SECTION INCLUDES

PART 1 GENERAL 1.1 SECTION INCLUDES J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including

More information

SECTION 11014 WINDOW WASHING SYSTEMS

SECTION 11014 WINDOW WASHING SYSTEMS SECTION 11014 WINDOW WASHING SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes, but is not limited to, design and furnishing portable davits, davit sleeves, dvit bases, four (4) removable outriggers,

More information

PERFORMANCE TEST REPORT. Rendered to: FORMTECH ENTERPRISES, INC. SERIES/MODEL: Truline PRODUCT TYPE: PVC Seawall

PERFORMANCE TEST REPORT. Rendered to: FORMTECH ENTERPRISES, INC. SERIES/MODEL: Truline PRODUCT TYPE: PVC Seawall PERFORMANCE TEST REPORT Rendered to: FORMTECH ENTERPRISES, INC. SERIES/MODEL: Truline PRODUCT TYPE: PVC Seawall Report No.: Test Dates: 04/17/12 Through: 04/18/12 Report Date: 06/13/12 130 Derry Court

More information

Assembly Instructions for the InteliTrack 3000 Rail Tracking System

Assembly Instructions for the InteliTrack 3000 Rail Tracking System Assembly Instructions for the InteliTrack 3000 Rail Tracking System InteliTrack is a trademark of Sedona Solar Technology. Sedona Solar Technology 16 April 2013 1 1. Before you begin WARNING Safety equipment

More information

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13 STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13 (See Supplemental Instructions for trailers with heavy duty round footplates and/or Power Leveling Systems) PHONE SUPPORT

More information

FTC 2015-2016 DIY Mountain Build Guide

FTC 2015-2016 DIY Mountain Build Guide FTC 2015-2016 DIY Mountain Build Guide Assembly Instructions Check out the DIY2015-2016 Prints and BoM for individual part details. Release 1.0 9/10/15 Page 1 This guide and Bill of Materials are for constructing

More information

INSTALLATION. General. Important Note. Design. Transport

INSTALLATION. General. Important Note. Design. Transport General The roof trusses you are about to install have been manufactured to precise engineering standards. To ensure that the trusses perform as designed, it is essential that they be handled, erected

More information

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges 7.7 Truss bridges Fig. 7.21 some of the trusses that are used in steel bridges Truss Girders, lattice girders or open web girders are efficient and economical structural systems, since the members experience

More information

METHOD OF STATEMENT FOR STATIC LOADING TEST

METHOD OF STATEMENT FOR STATIC LOADING TEST Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents

More information

MONDOATHENS BASKETBALL SET (Reference PK110)

MONDOATHENS BASKETBALL SET (Reference PK110) MONDOATHENS BASKETBALL SET (Reference PK110) DESCRIPTION The MONDOATHENS backstop unit is mainly designed for multi-sports pavilions and installations where the highest-level basketball competitions are

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

Boom and fly capacities for this machine are listed by the following sections:

Boom and fly capacities for this machine are listed by the following sections: Lifting Capacities Telescopic Hydraulic Truck Crane HTC 8650 50 ton (45.36 metric ton) and fly capacities for this machine are listed by the following sections: Fully Extended Outriggers Working Range

More information

1-800-295-5510 uline.com SPECIFICATIONS

1-800-295-5510 uline.com SPECIFICATIONS H-1394, H-1395, H-1396 H-1397, H-3859, H-3860 π GRAVITY CONVEYOR 1-800-295-5510 uline.com SPECIFICATIONS Conveyor Bed Width In (mm) 18, 24, 30 (457, 610, 762) Load Capacity Per Linear Foot (305mm) Lbs

More information

BUILD A TABLETOP LOOM

BUILD A TABLETOP LOOM BUILD A TABLETOP LOOM From 1" x 2" stock (actual 3/4" x 1"1/2) cut: 4 pieces 15" long 4 pieces 5"1/2 long Use the above to make 2 frames for the front and back of the loom. From 1" x 4" stock (actual 3/4"

More information

Wisconsin Building Products Evaluation

Wisconsin Building Products Evaluation Safety & Buildings Division 201 West Washington Avenue P.O. Box 2658 Madison, WI 53701-2658 Evaluation # 200813-O Wisconsin Building Products Evaluation Material Best Management Standards for Foundation

More information

TEST REPORT. Rendered to: INTEX MILLWORK SOLUTIONS, LLC. For: Rigid Cellular PVC Guardrail System Hampton RS40

TEST REPORT. Rendered to: INTEX MILLWORK SOLUTIONS, LLC. For: Rigid Cellular PVC Guardrail System Hampton RS40 TEST REPORT Rendered to: INTEX MILLWORK SOLUTIONS, LLC For: Rigid Cellular PVC Guardrail System Hampton RS40 Report No: Report Date: 07/26/13 130 Derry Court York, PA 17406-8405 phone: 717-764-7700 fax:

More information

WARNING! Failure to follow these inspection procedures can cause personal injury and property damage.

WARNING! Failure to follow these inspection procedures can cause personal injury and property damage. GARDNER-DENVER TECHNICAL MANUAL CPTEN-136 07/03 Hoist Inspection and Maintenance Guide Inspection Record For: Hoist Model.: Hoist Serial.: WARNING! Failure to follow these inspection procedures can cause

More information

C O N V E Y O R C O M P O N E N T S C H A I N S B E L T S B E A R I N G S

C O N V E Y O R C O M P O N E N T S C H A I N S B E L T S B E A R I N G S C O N V E Y O R C O M P O N E N T S C H A I N S B E L T S B E A R I N G S January 2009 Issue 6 Valu Guide Brackets The Ultimate in Adjustability and Cost Savings Valu Guide brackets are part of a family

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

Wallace Tri-Adjustable Gantries Round Tube Assembly Instructions

Wallace Tri-Adjustable Gantries Round Tube Assembly Instructions Wallace Tri-Adjustable Gantries Round Tube Assembly Instructions For any additional information, Please call -800-55-LIFT. Before You Begin S. Read and understand instructions before using this gantry..

More information

SLACK PERFORMANCE KARTS

SLACK PERFORMANCE KARTS SLACK PERFORMANCE KARTS SET UP GUIDE Thank you for purchasing a 2013 Slack Axiom Chassis. Performance Mfg. strives to provide you with the very best chassis and components on the market today. Your satisfaction

More information

7. PRINCIPAL STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED CONTROLS

7. PRINCIPAL STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED CONTROLS ACTIVITY HAZARD ANALYSIS (AHA) 1. Contract Number: 2. Contractor Name: 3. Date prepared: 4. Title/Activity Performed: FIXED SCAFFOLDING 5. Location: 6. Estimated Date of Completion: 7. PRINCIPAL STEPS

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

Beginning on Friday, Jan 22, and on subsequent investigations, the following issues were identified:

Beginning on Friday, Jan 22, and on subsequent investigations, the following issues were identified: Date: 2/15/2016 Project: To: Middleton Public Library Roof Repair Pamela K. Westby Library Director Middleton Public Library 7425 Hubbard Avenue Middleton WI 53562 Pamela, Strategic Structural Design,

More information

Code of Standard Practice for Timber Frame Structures

Code of Standard Practice for Timber Frame Structures TFEC 2-2013 Code of Standard Practice for Timber Frame Structures August 2013 Preface This Code is intended to represent a reasonable consensus of what constitutes ordinary and acceptable practice within

More information

1000-LB. TRAILER JACK OWNER S MANUAL

1000-LB. TRAILER JACK OWNER S MANUAL 1000-LB. TRAILER JACK OWNER S MANUAL WARNING: Read carefully and understand all INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions may result in serious

More information

Detailing of Reinforcment in Concrete Structures

Detailing of Reinforcment in Concrete Structures Chapter 8 Detailing of Reinforcment in Concrete Structures 8.1 Scope Provisions of Sec. 8.1 and 8.2 of Chapter 8 shall apply for detailing of reinforcement in reinforced concrete members, in general. For

More information

Handling, Erection and Bracing of Wood Trusses

Handling, Erection and Bracing of Wood Trusses Handling, Erection and Bracing of Wood Trusses Follow these guidelines for safe installation of Wood Trusses. These guidelines should not be considered to be the only method for erecting and bracing of

More information

ECM-D70T / ECM-D70T1.5

ECM-D70T / ECM-D70T1.5 Elliptical Ceiling Dual Mount for 37 to 50 Flat Panels INSTALLATION INSTRUCTIONS CREATING POSITIVE CUSTOMER EXPERIENCES 9531-041-001-01 Contents ECM-D70T / ECM-D70T1.5 Installation Tools... 3 Parts List...

More information

Small Flat Panel Lift Arm FSA-1004 and KSA-1004

Small Flat Panel Lift Arm FSA-1004 and KSA-1004 I N S T A L L A T I O N I N S T R U C T I O N S Small Flat Panel Lift Arm FSA-1004 and KSA-1004 The Lift Arm is an accessory that can be used with a broad range of Small Flat Panel Displays. The allows

More information

WARNING! DO NOT ATTEMPT TO INSTALL THIS KIT IN A POWERED CONVEYOR.

WARNING! DO NOT ATTEMPT TO INSTALL THIS KIT IN A POWERED CONVEYOR. Model: Document Number: 64058111 Kit Number: 64058112 Revision: 02 Description: Release Date: 04/08 Introduction This kit allows a PS90 scale to be integrated into a standard gravity conveyor. The kit

More information

1993 SUSPENSION Volkswagen Front. EuroVan

1993 SUSPENSION Volkswagen Front. EuroVan Article Text ARTICLE BEGINNING 1993 SUSPENSION Volkswagen Front EuroVan DESCRIPTION FWD independent suspension is an double-wishbone type with torsion bars mounted on upper control arm. Wheel is supported

More information

Installation information. METTLER TOLEDO MultiRange Floor scales / Pit scales

Installation information. METTLER TOLEDO MultiRange Floor scales / Pit scales Installation information METTLER TOLEDO MultiRange Floor scales / Pit scales KC300/KCS300 KC600/KCS600 KD600/KD1500 KE1500/KE3000 KES1500/KES3000 KG3000/KG6000 KN1500 Floor scales / Pit scales Contents

More information

Rating when used as a weight carrying hitch without spring bars:

Rating when used as a weight carrying hitch without spring bars: BOLT-TOGETHER WEIGHT DISTRIBUTING HITCH SYSTEM Rating when used as a weight distributing hitch with spring bars: Part Number 48051 4805 48053 48054 Max Tongue Weight 550 Ibs. 750 Ibs. 1000 Ibs. 1400 lbs.

More information

MAT 75 STRUCTURAL SUPPORT SYSTEM

MAT 75 STRUCTURAL SUPPORT SYSTEM MAT 75 STRUCTURAL SUPPORT SYSTEM A GROUP COMPANY Structural Support Applications About the Mat 75 System For decades, Mabey Bridge & Shore has served the international construction community by providing

More information

6 inch A-Arm Lift Kit WARNING: 16-018/16-019. installation instructions. will fit CLUB CAR DS. included:

6 inch A-Arm Lift Kit WARNING: 16-018/16-019. installation instructions. will fit CLUB CAR DS. included: Revised May 205 6-08/6-09 6 inch A-Arm Lift Kit will fit CLUB CAR DS installation instructions included: Rear Lift Blocks Main Suspension Assembly Spindles A-Arms Rear Shock Mounting Plates U-Bolts WARNING:

More information

OVERALL CONVEYOR WIDTH STEEL ALUMINUM MODEL # PER FT. 10 FT. 5 FT. PER FT. 10 FT. 5 FT. PER FT. 10 FT. 5 FT. PER FT. 10 FT. 5 FT.

OVERALL CONVEYOR WIDTH STEEL ALUMINUM MODEL # PER FT. 10 FT. 5 FT. PER FT. 10 FT. 5 FT. PER FT. 10 FT. 5 FT. PER FT. 10 FT. 5 FT. Pick Smarter. Pick Better. Pick UNEX. Skatewheel (SW) Skatewheel Gravity Conveyor is ideally suited to convey lightweight packages and where operations require portable or temporary conveyor lines such

More information

INSTRUCTIONS THOROUGHLY BEFORE BEGINNING***************

INSTRUCTIONS THOROUGHLY BEFORE BEGINNING*************** Bill of Materials: RAC0012 Green Wing Aerodynamic Skirt Kit Item Part Number Description Quantity 1 RMC0218 Gen 2 Trailer Skirt Roadside 1 2 RMC0219 Gen 2 Trailer Skirt Curbside 1 3 RMC0041 Trailer Skirt

More information

EZ-48-3AB-125-35 Weather Station Mounting Tripod and Mast

EZ-48-3AB-125-35 Weather Station Mounting Tripod and Mast EZ-48-3AB-125-35 Weather Station Mounting Tripod and Mast EZ-125-35M 35 Mast Extension (Optional) EZ-125-SK Stake Kit (Optional) EZ-46-3 Tar Pad Kit (Optional) EZ-GWA Guy Wire Kit (Optional) Ambient Weather

More information

Structural Holding System

Structural Holding System Structural Holding System Users Manual November 2013 by Vehicle Service Group. All rights reserved. CO8812.1 502071 Rev. - 11/21/2013 CHIEF'S LIMITED ONE-YEAR WARRANTY & LIABILITY Chief Automotive Technologies

More information

SECTION 15140 - PIPE HANGERS AND SUPPORTS

SECTION 15140 - PIPE HANGERS AND SUPPORTS Part I - GENERAL 1.01 SECTION INCLUDES A. The work covered under this section consists of the furnishing of all necessary labor, supervision, materials, equipment, and services to completely execute the

More information

Pole Lathe and Shave Horse Design

Pole Lathe and Shave Horse Design Pole Lathe and Shave Horse Design These pictures and accompanying words are Copyright Michael Hughes February 2002. They are not to be re-produced, in part or whole, without permission from the author.

More information

USER INSTRUCTIONS AND SPECIFICATIONS for use of SAFE APPROACH STANDING SEAM ANCHOR & SAFE APPROACH METAL ROOF SCREW-DOWN ANCHOR

USER INSTRUCTIONS AND SPECIFICATIONS for use of SAFE APPROACH STANDING SEAM ANCHOR & SAFE APPROACH METAL ROOF SCREW-DOWN ANCHOR e) Allow the ring to slide over the end of the clevis pin and push the ring onto the clevis pin when it is centered. USER INSTRUCTIONS AND SPECIFICATIONS for use of SAFE APPROACH STANDING SEAM ANCHOR &

More information

Model No: VS4815 1. SAFETY INSTRUCTIONS VS4800 2. INTRODUCTION & APPLICATIONS VS4815 3. CONTENTS. 2.1 Introduction. 2.

Model No: VS4815 1. SAFETY INSTRUCTIONS VS4800 2. INTRODUCTION & APPLICATIONS VS4815 3. CONTENTS. 2.1 Introduction. 2. Instructions for: Petrol Engine Twin Camshaft Setting / Locking Tool Kit - (incorporating Vanos Alignment) - BMW N42 & N46 Engines Model No: VS4800 Associated kit: Camshaft/Carrier Bracket Remover & Installer

More information

MEASURING WHEEL ALIGNMENT

MEASURING WHEEL ALIGNMENT MEASURING WHEEL ALIGNMENT 2003-04 WHEEL ALIGNMENT Specifications & Procedures - Hummer - H2 Steering and vibration complaints are not always the result of improper alignment. One possible cause is wheel

More information

Lathe Milling Attachment

Lathe Milling Attachment Lathe Milling Attachment By L C. MASON BY CLEVERLY stacking cold-rolled flat stock together, T-slots and slide for this lathe milling attachment are made without costly machinery. In fact, only two tools,

More information

Speed-Mat Rectangle Cutter

Speed-Mat Rectangle Cutter Speed-Mat Rectangle Cutter 1 Honeycomb baseboard. 2 Left hold down. 14 3 Bottom hold down. 4 4 Left / right rule. 8 5 8 5 Left / right rule pointer. 1 6 Top / bottom rule. 7 Top / bottom rule pointer.

More information

RZ Guardrail System Installation Manual

RZ Guardrail System Installation Manual TM RZ Guardrail System Installation Manual RZ Guardrail System Compliance is based on OSHA standards: (Standards - 29 CFR) 1910.23 (e) and (Standards - 29 CFR) 1926.502 (b) Failure to read, understand

More information

INSTRUCTION MANUAL AND PARTS LIST MODEL 14-10

INSTRUCTION MANUAL AND PARTS LIST MODEL 14-10 VERTICAL BAND SAWS INSTRUCTION MANUAL AND PARTS LIST MODEL 1-10 DAKE/PARMA WHEN ORDERING PARTS GIVE COMPLETE SERIAL NUMBER OF MACHINE GIVE PART NUMBER AND NAME GIVE AMOUNT REQUIRED Unless the above data

More information

SECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS SECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes seismic restraints and other earthquake-damage-reduction measures for electrical

More information

Operating, Installation, and Maintenance Instructions

Operating, Installation, and Maintenance Instructions ELKHART BRASS MFG. CO., INC. 1302 WEST BEARDSLEY AVENUE P.O. BOX 1127 ELKHART IN 46515 (574) 295-8330 FAX (574) 293-9914 Operating, Installation, and Maintenance Instructions RAM Personal Portable Monitor

More information

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally

More information

MGB Chrome Bumper Conversion

MGB Chrome Bumper Conversion MGB Chrome Bumper Conversion Installation Instructions For 1974 1/2-1980 MGB This kit requires cutting, welding, and painting. Professional installation recommended. Note: Every MGB body is slightly different

More information

Micro Cart User's Guide

Micro Cart User's Guide Micro Cart User's Guide To take full advantage of the ergonomic features of your new Sun Mountain Micro Cart, please read the following information. SUN MOUNTAIN 1 Your Micro Cart has several innovative

More information

DE Frame with C Series Sidelight

DE Frame with C Series Sidelight TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Screw gun with clutch adjusted #2 phillips tip #3 phillips tip Screwdriver (used to adjust frame on will using oval slots) Pry Bar Powder

More information

Formwork for Concrete

Formwork for Concrete UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Formwork for Concrete Horizontal Formwork Design and Formwork Design

More information

2010 APPLICATION REFERENCE GUIDE

2010 APPLICATION REFERENCE GUIDE 2010 APPLICATION REFERENCE GUIDE INDEX QUALITY POLICY 2 ERGO ASSIST STANDARD 4-13 CUSTOM 14-18 END EFFECTORS 19-24 LIFT ASSIST 25-41 FIXTURED TOOLS 42-53 FIXTURES 54-63 ASSEMBLY TABLES 64-72 CARTS/ DUNNAGE

More information

MEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

MEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE MEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE This specification is intended to describe the general requirements applicable to a proper structural mezzanine design. In addition, it is to serve as

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

Pump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford

Pump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford Pump Skid Fabrication for Magnetic Coupling Rick Soltis Chief Mechanic City of Bedford Contents Magnetic Couplings What They Are, How They Work, Where They re Used Fabrication and Manufacturing of Pump

More information

Rack installation instructions

Rack installation instructions Rack installation instructions Review the documentation that comes with the rack cabinet for safety and cabling information. Before you install the server in a rack cabinet, review the following guidelines:

More information

Owner s Manual Read and keep this manual. Patents World Wide

Owner s Manual Read and keep this manual. Patents World Wide Owner s Manual Read and keep this manual. Patents World Wide S & S Industries, Inc., Sarasota, FL, USA www.trail-gator.com Copyright 2008 All Rights Reserved The following manual is provided to assist

More information

CONTENTS 1. INTRODUCTION...1 2. METHODOLOGY...2 3. RESULTS & FINDINGS...9 APPENDIX

CONTENTS 1. INTRODUCTION...1 2. METHODOLOGY...2 3. RESULTS & FINDINGS...9 APPENDIX Load Testing of Balustrade Systems Test Report No. S365 CONTENTS 1. INTRODUCTION...1 2. METHODOLOGY...2 2.1 BALUSTRADE LOAD ASSESSMENTS... 2 2.2 TEST SYSTEMS... 3 2.3 TEST PROCEDURE... 8 3. RESULTS & FINDINGS...9

More information

POST AND FRAME STRUCTURES (Pole Barns)

POST AND FRAME STRUCTURES (Pole Barns) POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:

More information

Scaffold Safety L O S S C O N T R O L A L E R T

Scaffold Safety L O S S C O N T R O L A L E R T L O S S C O N T R O L A L E R T Scaffold Safety Scaffolds are useful tools to access elevated work areas. Appearing more stable and providing a larger work platform than ladders, they seem to be even easier

More information

2100 AD 015 0009 Mirror Elevator Ball Nut Replacement Procedure

2100 AD 015 0009 Mirror Elevator Ball Nut Replacement Procedure 2100 AD 015 0009 Mirror Elevator Ball Nut Replacement Procedure Derek Guenther 1/28/2015 Rev. Purpose The purpose of this document is to describe the procedure necessary to replace one of the ball nuts

More information

4.3.5 - Breakaway Walls

4.3.5 - Breakaway Walls 4.3.5 - Breakaway Walls Elevation of a structure on a properly designed foundation reduces the potential for water damage from flooding. When the space below the lowest elevated floor is maintained free

More information

One and Two-piece Torque Rods and Replacement Bushings LIT NO: 45745-148

One and Two-piece Torque Rods and Replacement Bushings LIT NO: 45745-148 One and Two-piece Torque Rods and Replacement Bushings LIT NO: 45745-148 DATE: January 2008 REVISION: B HENDRICKSON ULTRA ROD PLUS Torque Rod Bonded Bushing Provides Longer Life Bonding makes a better

More information

Service Manual Rol-Lift

Service Manual Rol-Lift R 2000 Service Manual Rol-Lift Series: T and E Developed by Generic Parts Service This manual is intended for basic service and maintenance of the Rol-Lift pallet jack. The pallet jacks you are servicing

More information

RadianceRail Installation Guide

RadianceRail Installation Guide RadianceRail Installation Guide Installing RadianceRail with CableRail by Feeney... 2 Installing CableRail by Feeney for RadianceRail... 7 Installing RadianceRail Stairs with CableRail by Feeney... 10

More information

Architectural Specifications* MODEL HDE

Architectural Specifications* MODEL HDE MODEL HDE 200 Fairview Road, Unit #2, Barrie, Ontario L4N 8Z8 Tel: 866-792-9968 or 705-792-9968 Fax: 705-735-9564 www.tnrdoors.com email: info@tnrdoors.com TNR Model HDE Tech Specs September 4, 2012 Page

More information

POWERS Controls No. 4 Pneumatic Damper Actuator

POWERS Controls No. 4 Pneumatic Damper Actuator POWERS Controls No. 4 Pneumatic Damper Actuator Technical Instructions Document No. 155-032P25 AP 331-2 Actuator Assembly 331-2929 Typical Actuator Assembly 331-2904 Typical Actuator Assembly 331-3000

More information

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC) APPLICATIONS Process Industry Weak Acids Alkalies Compressed Air Pulp & Paper MODELS ASM - Flanged Connection OPTIONS Control Rods Oil & Gas Water & Waste Pump suction & discharge Sea water Chemical lines

More information

IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality

IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION Generated: Sergiy Papyshev Engineering Approved: Don Prysi Manufacturing Approved: Merzuk Ramic Quality Approved: Steven Barnett Administrative DATE DATE DATE

More information

High Strain Dynamic Load Testing of Drilled Shafts

High Strain Dynamic Load Testing of Drilled Shafts Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain

More information