2 Earthquake Risk Assessment Study Part 1 - Review of Risk Assessment Methodologies and Development of a Draft Risk Assessment Methodology for Christchurch Report No. U04 / 108 : Final

3 Earthquake Hazard and Risk Assessment Project Earthquake Risk Assessment Study Part 1 - Review of Risk Assessment Methodologies and Development of a Draft Risk Assessment Methodology for Christchurch Report No. U04 / 108 : Final Prepared by Opus International Consultants Limited Wellington Office P. Brabhaharan, Robert Davey, Level 9, Majestic Centre 100 Willis Street, PO Box Francis O Riley, and Leonard Wiles Wellington, New Zealand Reviewed by Telephone: Facsimile: Dr David Prentice Report No SPT 2004 / 28 Date: August 2005 Reference: Status: Final This document is the property of Opus International Consultants Limited. Any unauthorised employment or reproduction, in full or part is forbidden. Disclaimer Opus has used the best available information in preparing this report and has interpreted this information exercising all reasonable skill and care. Nevertheless, neither Environment Canterbury nor Opus accepts any liability, whether direct, indirect or consequential, arising out of the provision of information in this report. All rights reserved. This publication may not be reproduced or copied in any form without the permission of Environment Canterbury (the client). Such permission is to be given only in accordance with the terms of the client s contract with Opus. This copyright extends to all forms of copying and any storage of materials in any kind of information retrieval system. The copyright for the data, maps, figures, and tables contained in this report is held by Opus. Opus International Consultants Limited 2005

4 Contents Executive Summary... iii 1 Introduction Scope of Study Key Components of Earthquake Risk Assessment and Applications Objectives Risk Assessment Socio-economic Consequences Outcomes Applications Literature Review Scope of Review General Earthquake Risk Assessment Earthquake Hazards Damage and Loss Modelling Earthquake Risk Studies Undertaken for Christchurch and Canterbury Summary of Literature Review Inventory Data General Approach Buildings Roads Water Supply Networks Telecommunications Assets Electricity Assets Demographic Information Geographical Information Systems Data Format Summary of Asset Inventory Data Earthquake Hazard Information Review Introduction Earthquake Hazard Literature Discussion of Hazard Information Additional Hazard Information Development of Risk Assessment Methodology for Christchurch Objectives...45 August 2005: Final i

5 7.2 Risk Assessment Context Scenario and Probabilistic Approaches Spatial Assessment Approach Modelling Uncertainty Risk Assessment Model Risk Assessment Outputs Conclusions Recommendations Bibliography...63 List of Appendices Appendix A Appendix B Mesh Blocks and Statistical Area Units for Christchurch Example Risk Assessment Outputs for Lifelines August 2005: Final ii

6 Executive Summary Environment Canterbury (ECan) needs to know the likely impact and consequences of a major earthquake on Christchurch, to fulfil its hazard mitigation and emergency management functions. Opus International Consultants Limited (Opus) was commissioned by ECan to review risk assessment methodologies and develop a draft risk assessment methodology for Christchurch. A comprehensive review of literature relating to earthquake risk assessment has been completed. Key features of significant relevant literature are presented. Sources of asset data for the study have been explored by contacting the relevant Councils and organisations. This indicates that the information required for the risk assessment is generally available. The inventory would be collected from a variety of organisations, and would include information on critical facilities. There is good hazard information available from previous research and studies. Some additional microzoning information would need to be derived, including a map showing ground class to modify ground shaking, liquefaction ground damage hazards for the earthquake scenarios, and slope hazards for the Port Hills. These can be incorporated into the risk assessment. The tsunami risk could be considered in a separate study. A spatial approach should be used for the risk assessment using a geographical information system (GIS) platform, and the results of the study be presented as maps and accompanying tables and charts, so that the information can be readily used by stakeholders. A methodology has been developed to undertake an earthquake risk assessment for Christchurch. The approach has been based on generating risk information that meets the objectives of Environment Canterbury and provides a basis for organisations to undertake risk management actions. It is proposed that the risk assessment be carried out for four earthquake scenarios, rather than using probabilistic uniform hazard levels. This would provide information most suitable for emergency management and meeting functionality requirements for lifelines. Risk assessment has considerable uncertainty and loss estimates could be derived using probability distributions so that the uncertainty is explicitly presented. The risk assessed should focus on direct losses. The socio-economic consequences may be considered later in follow-on studies. August 2005: Final iii

7 1 Introduction Environment Canterbury (ECan) needs to know the likely impact and consequences of a major earthquake on Christchurch, to fulfil its hazard mitigation and emergency management functions. ECan considers that the earthquake hazard information currently available is generally of a standard and scale suitable for an earthquake risk assessment. The Resource Management Act 1991 (RMA) and more recently the Civil Defence Emergency Management Act 2002 require local authorities to identify, assess and mitigate the effects of natural hazards and other technological hazards. An assessment of the risk from earthquakes to Christchurch will assist with the management of the risk, through reduction, readiness, response and recovery planning. Opus International Consultants Limited (Opus) has been commissioned by ECan to review risk assessment methodologies and develop a draft risk assessment methodology for Christchurch as part of the Earthquake Risk Assessment Study: Part 1. This report presents the results of this study, and recommends a methodology for use in carrying out a risk assessment for Christchurch. August 2005: Final 1

8 2 Scope of Study The scope of the study required by ECan comprises the following steps: 1. Describe in detail the key components of earthquake risk assessment methodologies, and in particular the outputs and their applications. 2. Review in detail the available literature on (any) specific earthquake risk assessments carried out for Canterbury and/or Christchurch, and methodologies and approaches developed in New Zealand and internationally for assessing earthquake risk. This review will include: (a) A description of the approach used to complete the literature review. (b) A full bibliographic reference for each report, paper, map or other publication reviewed. (c) Details of where each report, paper, map or other publication can be obtained. (d) A detailed summary of the relevant details of each report, paper, map or publication. (e) A discussion on the implications of the literature review findings for the development of an earthquake risk assessment model for Christchurch. 3. Investigate the source, availability and nature of building (residential, industrial and commercial), engineering lifeline infrastructure (water supply, telecommunications, electricity distribution and roading only) and demographic information for Christchurch, and provide a summary of the information in the report. 4. Investigate the source, availability and nature of earthquake hazard information for Canterbury and Christchurch, and provide a summary of the information in the report. 5. Identify (if appropriate), the need for, and nature of, any additional earthquake hazard information and/or investigations for the purpose of better assessing the earthquake risk in Christchurch. 6. Based on the literature review findings and the nature of the existing earthquake hazard information available for Canterbury and Christchurch, and the existing available building, engineering lifeline infrastructure and demographic information, develop a draft risk assessment methodology for Christchurch. ECan required that this study include the lifelines of water supply, telecommunications, electricity distribution and roading only. However, this may be extended to include other key lifelines in the city such as wastewater, ports and rail infrastructure. August 2005: Final 2

9 3 Key Components of Earthquake Risk Assessment and Applications 3.1 Objectives Risk may be defined as the chance of something happening that will have an impact upon objectives. It is measured in terms of consequences and likelihood [AS/NZS 4360:2004]. The objective of an earthquake risk assessment is to quantify the potential damages and losses due to future earthquakes (the consequences) and their probabilities of occurrence in a given period (the likelihood). 3.2 Risk Assessment The basic steps in an earthquake risk assessment are: Hazard Analysis: Identification of earthquake sources. Modelling of the occurrence of earthquakes from these sources. Estimation of the attenuation of earthquake motions between these sources and the study area. Evaluation of the site effects of soil amplification, liquefaction, landslide and surface fault rupture. Inventory Collection: Identification of infrastructure (buildings and lifelines) that are exposed to damage. Classification of the buildings and lifelines according to their vulnerability to damage. Classification of the occupancy of the buildings and facilities. Damage Modelling : Modelling of the performance of the inventory classes under earthquake shaking and consequent effects such as ground damage. Development of damage functions (relationship between levels of damage and corresponding levels of shaking). Estimation of the damage to the inventory from the earthquake motion at the inventory locations. Estimation of the damage caused by post earthquake fires. Loss Estimation : Estimation of direct losses due to damage repair costs. Estimation of indirect losses due to loss of function of the inventory. Estimation of casualties caused by the damage. August 2005: Final 3

10 These steps are illustrated in Figure 1. Figure 1 - Basic Steps in Earthquake Risk Assessment [King and Kiremidjian, 1994] The regional risk assessment process is further illustrated in Figure 2, and the risk assessment process with the aid of a Geographical Information System (GIS) is illustrated in Figure 3. August 2005: Final 4

11 3.3 Socio-economic Consequences The social and economic consequences of earthquake damage are also important. However, the assessment of the social and economic effects is more complex and there isn t a well defined process to assess these outcomes. Usually these have been assessed as a multiplier of the direct losses to indicate an order of magnitude of such losses. A number of researchers have considered the economic impact of earthquakes (Cochrane, 1995). More research is continuing to assess such effects. For example, Gordon et al (1997) outlined a framework for assessing the total economic impact from the effect of earthquakes on transportation (bridges only considered), using input/output models. They included changes in traffic demand after the earthquake. However, the practical use of this model for risk assessment of a road network was not demonstrated (Brabhaharan et al, 2001). The Multi-disciplinary Center for Earthquake Engineering Research (MCEER) in the USA has an objective to develop a model for assessing the economic effects of damage to transportation networks. Research into the social impacts of earthquakes is currently being carried out by Opus International Consultants, under a 4 year research programme. It would be prudent to consider assessment of the socio economic effects of earthquakes as a future extension of the earthquake risk assessment. 3.4 Outcomes The primary outcomes of a risk study are summaries and maps highlighting the spatial distribution of damage and casualties. A typical summary for an asset would include an overall damage rating, the number of casualties, the number of people affected by the damage, timeframe for basic reinstatement and likely repair costs. Key assets covered by the summaries include: Commercial, industrial and residential buildings; Critical facilities including hospitals, police stations and fire stations; Lifelines, including: Electrical and communication lifelines including substations, telephone exchanges, underground and overhead lines; Roading network including bridges; Water assets including reservoirs, pump stations and key water mains. For lifelines, the consequential effects (such as availability / disruption to road users) would also be assessed. Maps are used to highlight the spatial distribution of damage to assets. August 2005: Final 5

12 3.5 Applications The outcomes from a risk assessment study have many applications. Such applications may include: Consider the impact of earthquakes and development of appropriate policy on earthquake risk reduction initiatives (for example Earthquake Risk Buildings Policy development); Earthquake risk reduction initiatives through a detailed understanding of the extent and distribution of damage, critical elements and redundancies; Prioritisation and justification for founding of earthquake risk, based on a detailed understanding of the damage and consequences; Understand and act on the interdependencies and relationships between various lifelines and emergency response and recovery; Emergency response planning by the Civil Defence Emergency Management Groups and Civil Defence Personnel; Understand the post-earthquake recovery resources requirements based on the understanding of the extent of damage to buildings and other infrastructure (including lifelines). Such a study was carried out for the Wellington Region and the results were published in a number of papers presented in Wellington After the Quake The Challenge of Rebuilding Cities (Earthquake Commission, 1995). An earthquake risk assessment for the Greater Wellington Area was undertaken by Works Consultancy Services (1995) for the Wellington Regional Council. This study has been used extensively in the understanding of the risks to the region, earthquake risk policy development, and planning for emergency preparedness. As illustrated above, it has also provided the basis for understanding the resource requirements for recovery after large events. An application of comprehensive assessment of the risk to lifelines, is the risk assessment of key roads in the Wellington City Road network and development of risk management strategy undertaken by Opus International Consultants for Wellington City Council (Brabhaharan, 2004), and this has provided the framework for prioritising, funding and implementation of key vulnerable roads in the Wellington City, starting with Ngaio Gorge Road. This illustrates the usefulness of the results of earthquake risk assessment studies for earthquake preparedness planning and for developing strategies to minimise the risk from earthquakes. August 2005: Final 6

13 4 Literature Review 4.1 Scope of Review A review has been undertaken of New Zealand and international literature on earthquake risk assessment and of specific earthquake risk assessments carried out for Canterbury or Christchurch. This literature review has involved: 1. A review and collation of earthquake hazard and risk reports held by ECan; 2. A search of library databases by Opus Information Centre; 3. Sourcing of literature from various sources; 4. Review of information collated. Search of relevant information for the study was carried out Opus Information Centre, which has access to a variety of databases and search facilities which allowed it to search a variety of papers and reports in journals, conference proceedings, research publications and studies. The seminal paper Engineering seismic risk analysis by Cornell [1986], set the scene for the considerable advances that have been made in earthquake risk assessment over the past two decades. Many thousands of papers and other publications have been published on the subject since that time. This review has therefore been limited to those publications that are particularly relevant to a regional earthquake risk assessment as proposed for Christchurch. The review is structured as follows: General Earthquake Risk Assessment. Earthquake Hazards. Damage and Loss Modelling. Earthquake Risk Studies undertaken for Christchurch and Canterbury. 4.2 General Earthquake Risk Assessment King SA and Kiremidjian, A (1994). geographic information systems. Regional seismic hazard and risk analysis through This report describes the development of a geographic information system (GIS) based methodology for a regional seismic hazard and risk analysis, and illustrates this with a case study. It is particularly useful as it provides a good framework for a GIS based risk assessment. A flow chart of the basic procedure that was developed for this risk assessment is shown in Figure 2. August 2005: Final 7

14 Figure 2 - Flowchart Showing the Basic Regional Risk Assessment Process [King and Kiremidjian. 1994] The data and models that are the fundamental building blocks of regional risk assessments referred to in Figure 2 are: Models Seismicity Bedrock motion (attenuation) Local site effects (amplification, liquefaction) Motion-damage (fragility) Repair cost Loss of use (repair time) Non-monetary loss (casualties) August 2005: Final 8

15 Inventory Data Facility (building, lifelines) structural characteristics Facility occupancy characteristics Regional population distribution The GIS mapping process for the seismic risk analysis is illustrated in Figure 3. Figure 3 - GIS Mapping Process for Regional Seismic Risk analysis [King and Kiremidjian, 1994] Maps representing regional geological and geographical data are overlaid and their attributes are combined to produce intermediate maps of regional seismic hazards. These hazard maps are then overlaid and combined with structural inventory maps to produce maps predicting regional damage distributions. Combining the map of damage distributions with a map of population distributions for the area results in final estimates of direct loss (damage repair costs, etc), indirect loss (business interruption costs, etc) and casualties. FEMA (2001). Earthquake loss estimation methodology, HAZUS99. HAZUS is a comprehensive earthquake loss estimation methodology that was developed for the US Federal Emergency Management Agency (FEMA). It is designed for use by state, regional and local governments in planning for earthquake loss mitigation, emergency preparedness planning and response and recovery. August 2005: Final 9

16 Use of the methodology will generate an estimate of the consequences to a city or region of a "scenario earthquake", i.e., an earthquake with a specified magnitude and location. The resulting "loss estimate" generally will describe the scale and extent of damage and disruption that may result from a potential earthquake. The following information can be obtained: Quantitative estimates of losses in terms of direct costs for repair and replacement of damaged buildings and lifeline system components; direct costs associated with loss of function (e.g., loss of business revenue, relocation costs); casualties; people displaced from residences; quantity of debris; and regional economic impacts. Functionality losses in terms of loss-of-function and restoration times for critical facilities such as hospitals, and components of transportation and utility lifeline systems and simplified analyses of loss-of-system-function for electrical distribution and potable water systems. Extent of induced hazards in terms of fire ignitions and fire spread, exposed population and building value due to potential flooding and locations of hazardous materials. To generate this information, the methodology includes: Classification systems used in assembling inventory and compiling information on the building stock, the components of highway and utility lifelines, and demographic and economic data. Methods for evaluating damage and calculating various losses. Databases containing information used as default (built-in) data that are useable in the calculation of losses. A flow chart illustrating this methodology is shown in Figure 4. These systems, methods, and data have been coded into user-friendly software based on a GIS platform. GIS technology facilitates the manipulation of data on building stock, population, and the regional economy. The software can be run under two different GIS platforms, MapInfo and ArcView. The software makes use of GIS technology for displaying and manipulating inventory, and permits losses and consequences to be portrayed on both spreadsheets and maps. Collecting the required information and entering it in an analysis program are the major tasks involved in generating a loss estimate. The HAZUS methodology permits estimates to be made at several levels of sophistication, based on the level of data input into the analysis (i.e., default data versus locally enhanced data). The better and more complete the inventory information, the more meaningful the results. A new version of the software, HAZUS-MH (i.e. HAZUS Multi-Hazard), includes losses from floods and hurricane winds as well as earthquakes. August 2005: Final 10

17 Potential Earth Science Hazards 4. Ground Motion 4. Ground Failure Direct Physical Damage 5. General Building Stock 6. Essential and High Potential Loss Facilities 7. Lifelines- Transportation Systems 8. Lifelines- Utility Systems Induced Physical Damage Direct Economic/ Social Losses 9. Inundation 10. Fire 11. HazMat 12. Debris 13. Casualities 14. Shelter 15. Economic 16. Indirect Economic Losses Figure 4 - Flow Chart of the HAZUS Loss Estimation Methodology Most of the models that form the basis of the HAZUS methodology are documented in detail in the HAZUS Technical Manual, which is freely available from the FEMA website ( These models can therefore be adopted and adapted for use in other methodologies. The GIS based HAZUS software is also freely available, but it can only be used for the geographical regions that the software has been customised for, i.e. the US and a few other countries. The HAZUS software has not been customised for New Zealand. August 2005: Final 11

18 In a simplified form, the steps in applying the methodology are: Select the area to be studied. This may be a city, a county or a group of municipalities. It is generally desirable to select an area that is under the jurisdiction of an existing regional planning group. Specify the magnitude and location of the scenario earthquake. In developing the scenario earthquake, consideration should be given to the potential fault locations. Provide additional information describing local soil and geological conditions, if available. Using formulas embedded in HAZUS, probability distributions are computed for damage to different classes of buildings, facilities, and lifeline system components and loss-of-function estimates are made. The damage and functionality information is used to compute estimates of direct economic loss, casualties and shelter needs. In addition, the indirect economic impacts on the regional economy are estimated for the years following the earthquake. An estimate of the number of ignitions and the extent of fire spread is computed. The amount and type of debris is estimated. If an inundation map is provided, exposure to flooding can also be estimated. The user plays a major role in selecting the scope and nature of the output of a loss estimation study. A variety of maps can be generated for visualising the extent of the losses. Numerical results may be examined at the level of the census tract (equivalent to statistical area unit / mesh block in New Zealand) or may be aggregated by county or region. McGuire, RK (2004). Seismic Hazard and Risk Analysis. McGuire is one of the pioneers of seismic risk analysis, and his monograph provides a general introduction to methods of seismic hazard and risk analysis. He pays particular attention to one of the most important aspects of seismic risk analysis, that is, how to deal with the associated large uncertainties. There are two types of uncertainty: 1. Aleatory (or random) uncertainty: uncertainty that is inherent in a random phenomenon and cannot be reduced by acquiring additional data: Examples include future earthquake locations, future earthquake magnitudes, ground motions at a site given the median value, damage state for a class of buildings given the median value. 2. Epistemic (or knowledge) uncertainty: the uncertainty that stems from lack of knowledge about some model or parameter. This type of uncertainty can be reduced (at least conceptually) by additional data. Examples include maximum magnitude for a source, median value of ground motion given the source properties, median damage state for a class of buildings given the ground motion. August 2005: Final 12

19 McGuire describes risk analysis methodologies that include allowance for uncertainty based on probability theory. The probabilistic seismic hazard assessment (PSHA) method is described, along with methods to convert seismic hazard into seismic risk or loss. 4.3 Earthquake Hazards General Approaches Reiter, Leon (1990). Earthquake Hazard Analysis. Reiter provides an introduction to the subject of identification of earthquake sources and modelling of the occurrence of earthquakes on these sources. Models for the occurrence of future earthquakes are based on historical seismicity, crustal geology and tectonic processes. There are two sources of earthquake: 1. Area sources are geographical areas within which an earthquake of a given magnitude is equally likely to occur at any time or location, where the local geological features that cause the earthquakes have not been identified. 2. Fault sources are usually individual faults where the tectonic and geological features causing earthquakes have been identified New Zealand Data Active fault and historic earthquake data for New Zealand are available in the following databases. Environment Canterbury Active Faults Database The Environment Canterbury database keeps an up to date record of the active faults in the Canterbury Region. Active Faults Database of New Zealand. The Active Faults Database of New Zealand is maintained by the Institute of Geological and Nuclear Sciences. It has been designed to hold all data collected from investigations of active faults. Along with the locations of active faults, the Active Faults Database contains the results from field measurements of offset features, trenching, and dating. It also stores interpretation of these results in the form of the fault recurrence interval, slip rate, single event displacement and date of last movement. National Earthquake Information Database August 2005: Final 13

20 The National Earthquake Information Database is maintained by the Institute of Geological and Nuclear Sciences. It contains summary information of New Zealand earthquakes including epicentres, depths, magnitudes, and felt information for more than 160,000 earthquakes. This includes pre-instrumental shocks, but not all information is available for all events. The database also contains over 1,000,000 analogue and digital seismograms recorded by the short-period National Seismograph Network, of which the digital archive is held on-line. Institute of Geological & Nuclear Sciences (2000). Probabilistic Seismic Hazard Assessment of New Zealand: New Active Fault Data, Seismicity Data, Attenuation Relationships and Methods This report provides details of the fault sources and area sources that were used for a probabilistic seismic hazard analysis (PSHA) for New Zealand. Seismological Society of America (1997). Seismological Research Letters, No. 68. Attenuation relationships are used to calculate the ground shaking at a site given the earthquake location and magnitude. They are derived from recorded earthquake ground motions. This publication provides a good state-of-the-art summary of the development of these relationships. McVerry GH, et al. (2000). Crustal and Subduction Zone Attenuation Relations for New Zealand Earthquakes. McVerry et al developed attenuation relationships from a dataset of New Zealand earthquake records, supplemented by overseas data. The attenuation model takes account of different tectonic types of earthquake (crustal and subduction zone) and their range of depths. The attenuation expressions for crustal earthquakes have further subdivisions for different types of fault rupture (strike-slip, normal, oblique reverse and reverse). The model takes account of site soil amplification through a range of site soil classes. The ground motions are given in terms of peak ground acceleration (PGA) and spectral acceleration. Dowrick D.J., Rhoades D.A. (1999). Attenuation of Modified Mercalli Intensity in New Zealand Earthquakes. Dowrick and Rhoades developed Modified Mercalli (MM) intensity attenuation relationships from observed intensities in New Zealand earthquakes. The MM intensity (MMI) scale measures the earthquake effects at a site in terms of the effect it has on the natural and built environment. The advantage of using the MMI scale as a measure of earthquake intensity is that there is more historical earthquake consequence data available that is correlated to MMI than there is to peak ground accelerations (PGA). August 2005: Final 14

21 4.4 Damage and Loss Modelling General Rojahn, C and Sharpe, R L (1985). Earthquake Damage Evaluation Data for California, ATC-13. In the mid-1980s, the US Federal Emergency Management Agency (FEMA) undertook a comprehensive programme to estimate the economic impacts of a major California earthquake. This included estimates of damages to all types of facilities, the associated losses and casualties. Because the required earthquake damage and loss data were not available in the literature, FEMA and Applied Technology Council (ATC) agreed that the best way to develop the required data was to draw on the experience and judgement of seasoned earthquake engineers. Accordingly a panel of senior level specialists in earthquake engineering was established to develop consensus damage and loss estimates. The expert panel estimated the probability of damage to a range of structure types. The standard damage descriptions used and the associated damage factors are shown in Table 1. The damage factor (also commonly known as damage ratio) is the ratio of the cost of repairing the damage to cost of replacing the structure. Table 1 - ATC-13 Damage States and Damage Factors (Rojahn and Sharpe, 1985) The outputs of the ATC-13 study included damage probability matrices, an example of which is shown in Table 2. By using such matrices, it is possible to estimate the probability of a structure being in a particular damage state for a given MMI ground shaking intensity, and to estimate the expected dollar loss by multiplying the damage factors for the structure by the estimated replacement value. Estimates were also made of the repair times for given damage states, and number of casualties for given damage states and occupancy rates. The data produced by this project remains the most comprehensive source of damage data, and form the basis of many subsequent loss studies and methodologies. August 2005: Final 15

22 Table 2 - ATC-13 Damage Probability Matrix FEMA (2001). Earthquake loss estimation methodology, HAZUS99 Damage models are provided in HAZUS for the full range of building types and other infrastructure. In HAZUS, damage models are in the form of lognormal fragility curves that relate the probability of being in, or exceeding, a damage state for a given earthquake demand parameter (e.g., response spectrum displacement, PGA). Northridge Earthquake Losses Studies have been carried out by Mary Comerio and others on loss ratios from the Northridge earthquake 1994 in California, USA. Some of these results may be of relevance to risk assessment for buildings in Christchurch. These studies also considered contents losses, and are based on insurance claims. In considering these results for New Zealand, care should be taken to recognise differences in insurance industry and the types of buildings Buildings and Casualties HAZUS Figure 5 provides an example of building fragility curves for the four damage states used in the HAZUS methodology. These have been derived by analysing the earthquake response of model building types. Descriptions of structural and non-structural damage states are provided for all of the model building types in HAZUS. Examples for one building type (reinforced concrete moment resisting frames) are given below : August 2005: Final 16

23 Slight Structural Damage : Flexural or shear type hairline cracks in some beams and columns near joints or within joints. Moderate Structural Damage : Most beams and columns exhibit hairline cracks. In ductile frames some of the frame elements have reached yield capacity indicated by larger flexural cracks and some concrete spalling. Non-ductile frames may exhibit larger shear cracks and spalling. Extensive Structural Damage : Some of the frame elements have reached their ultimate capacity indicated in ductile frames by large flexural cracks, spalled concrete and buckled main reinforcement; non-ductile frame elements may have suffered shear failures or bond failures at reinforcement splices, or broken ties or buckled main reinforcement in columns which may result in partial collapse. Complete Structural Damage : Structure has collapsed or is in imminent danger of collapse due to brittle failure of non-ductile frame elements or loss of frame stability. Approximately 20% (low-rise), 15% ( mid-rise) or 10% (high-rise) of the total area of the building with complete damage is expected to have collapsed. Figure 5 - Example HAZUS Fragility Curves for Reinforced Concrete Framed Buildings August 2005: Final 17

24 The estimated damage (i.e., damage state for model building type for a given level of ground shaking) is used in conjunction with other models that are provided in the methodology to estimate : 1. casualties due to structural damage, including fatalities; 2. monetary losses due to building damage (i.e. cost of repairing or replacing damaged buildings and their contents); 3. monetary losses resulting from building damage and closure (e.g., losses due to business interruption); 4. social impacts (e.g., loss of shelter); and 5. other economic and social impacts. The building damage predictions may also be used to study expected damage patterns in a given region for different scenario earthquakes (e.g., to identify the most vulnerable building types, or the areas expected to have the most damaged buildings). Dowrick, et al. Various Dowrick and his colleagues have analysed insurance claim records for the 1931 Hawkes Bay, 1942 Wairarapa, 1986 Inangahua and 1987 Edgecumbe earthquakes in New Zealand. They have used the data to calculate the damage ratio as a function of MM intensity for a range of building types and ground conditions. The damage ratio is the cost of damage to a building divided by the replacement value of the building. The data from these studies are very important as they provide the most robust empirically derived information from New Zealand data, as opposed to expert opinion (eg ATC-13) or theoretically (eg HAZUS) derived damage or loss models. However, the range of building types covered by the data is limited. Works Consultancy Services (1995). Earthquake Risk Assessment Studies Opus International Consultants (Works Consultancy Services, 1995) assessed the damage and losses to buildings in the Wellington Region, and estimated deaths and injuries, for selected earthquake scenarios. The methodology that was developed for the studies was in accordance with the state-of-the-art of the time including the forerunner of HAZUS (NIBS, 1994). The geographic models for the studies were built up from Valuation Roll Number areas. The analyses were done with spreadsheets, not GIS. The building damage models were specifically developed for New Zealand construction types, based on data from Dowrick, ATC-13 and other sources. The number of buildings, their floor areas and construction types were supplied by Quotable Value (QV) New Zealand (Valuation New Zealand). Replacement costs were calculated from construction August 2005: Final 18

25 cost rates. Drive past surveys were undertaken in a sample of suburbs to supplement the QV construction type data. Damages from fire following earthquake were included. Population data used as a basis of the casualty estimates were obtained from Department of Statistics census data. From this data, it was possible to directly calculate the night-time population in each roll area and the daytime population, for over 15 years old, in each area. The under 15years old population was estimated from consideration of the school populations. A table of casualty rates versus building construction type and damage state was developed from NIBS (1994) and University of Cambridge data (Spence, 1994), for estimating injuries, deaths and entrapments. The outputs of the studies were: Numbers of buildings in each damage state (none, light, moderate, extensive, complete). Costs of repairing earthquake damage to buildings. Expected damage to critical facilities (hospitals, police stations, fire stations, CDHQ). Number of casualties. Maps showing the geographical distribution of these damages and losses. The results of these studies have been used extensively, and in particular for earthquake preparedness planning. One limitation with the methodology used is that it produced nominally mean estimates of damage and losses, with only a general indication given of the likely variation from the mean in any particular event due to uncertainty. EQC Minerva Model The Earthquake Commission (EQC) had a computer model developed, to allow it to predict and plan for insurance losses for the portfolio of assets covered by the EQC scheme. The EQC model is known as Minerva, and combines a geographical information system, a hazard model and a dynamic financial analysis model (Middleton, 2002). An outline of the insurance loss model is given by Shephard et al (2002). The model uses an approach similar to that shown on Figure 1, and uses the Quotable Value Database, EQC Building Costs Database and an Aon Soils Database. The earthquake loss system derives losses based on earthquake sources, a variety of attenuation models, and building damage vulnerability models (comprising loss tables for different building types and earthquake intensities and statistical distribution of loss). It should be noted that this primarily covers residential buildings in New Zealand which are covered by EQC. August 2005: Final 19

26 Estimating Risks from Fire Following Earthquake (2002) The New Zealand Fire Service commissioned GNS to investigate the risk of post earthquake fires. A GIS model containing property and valuation data for Wellington was shown to be a useful platform for modelling the spread of post-earthquake fire in the urban setting. Two approaches were investigated, one static and one dynamic. The static approach relied on a simple buffering technique to define potential burn-zones that are sampled randomly to give estimates of losses. Repeated sampling was used to assess the probability of exceedance of various levels of loss as a function of the number of ignitions and the spacing between buildings. The dynamic approach used a cellular automaton technique for determining both the rate and extent of fire spread in response to a wide range of factors including wind, radiation, sparking, branding, and individual separations of buildings Lifelines Studies Lifelines studies have been carried out in a number of cities and regions in New Zealand starting with Wellington, to consider the potential for damage to lifelines in earthquakes and other hazards, and understand the interdependencies. These studies were carried out at a high level to understand the potential damage to lifelines largely based on the expert judgement of engineering professionals, based on their knowledge. These include studies for : Wellington (Centre for Advanced Engineering, 1991) Christchurch (Centre for Advanced Engineering, 1997) Auckland Hawkes Bay Invercargill These studies nevertheless provided the impetus for further assessment of the risk from earthquakes and other natural hazards, and implementation of mitigation measures Water Supply O Rourke and Liu (2001) O Rourke and Liu have considered the theoretical response of pipelines to ground deformation. However because of the complexities of the ground motions, the soil-pipe interaction and pipeline behaviour, it is not practicable to estimate network damage rates from these analyses. Damage rates are therefore based primarily on empirical evidence (earthquake damage data), tempered with engineering judgement and sometimes by analytical formulation. August 2005: Final 20

27 American Lifelines Alliance (2001). Seismic Fragility Formulations for Water Systems The American Lifelines Alliance has prepared fragility curves for buried pipelines, water tanks, tunnels and canals. These are based in part upon a large volume of earthquake damage data that was assembled for that study. These are the most comprehensive and soundly based models for water systems in particular and pipelines in general. Data are available from the 1995 Kobe, 1994 Northridge, 1989 Loma Prieta, 1983 Hihonkai- Chubu, 1971 San Fernando and 1906 San Francisco earthquakes principally. Even so there is not a great deal of data available, and even that has inconsistencies in the way that numbers of repairs and the demands (PGV and PGD) were recorded. Typically damage survey compilations are performed by third parties some time after the water system has been restored. Repair records by field crews are commonly used to ascertain damage counts. Since the main objective of the repair crews is to restore supply as rapidly as possible, documenting damage is of secondary importance. As a result, the damage estimates have some inaccuracies, including omitted repair records, vague damage descriptions, multiple repairs at a single site combined into one record and two visits (e.g. temporary and permanent repair) to one site counted as two repairs. Unfortunately, this inaccuracy is inherent in all damage surveys, is likely to vary significantly from earthquake to earthquake, and is impossible to quantify. These uncertainties need to be kept in mind when interpreting the results of loss analyses based on these data. The fragility curves developed by the American Lifelines Alliance and others take into consideration the data and lessons from these earthquake events. Opus International Consultants (2002). Earthquake Loss Assessment for Wellington Region Wholesale Water Pipelines A probabilistic assessment was made of the financial loss that the Wellington Regional Council is exposed to from damage to its wholesale water supply pipeline network caused by an earthquake on the Wellington Fault. The damage models for the buried pipe were expressed as a repair rate per unit length of pipe, as a function of wave passage (peak ground velocity) or ground failure (permanent ground deformation). These were derived from the American Lifelines Alliance data (ALA, 2001) Telecommunications Networks Schiff AJ (ed)(1998). Proceedings of the Workshop on Performance Criteria for Telecommunication Services Under Earthquake Conditions These proceedings provide useful data on the earthquake performance of telecommunications networks. They identify several measures to characterise communications systems performance in earthquakes. The performance of the overall system will depend on the performance of various sub-systems and components in the August 2005: Final 21

28 telecommunications network. The workshop also addressed the key issues to help improve earthquake performance. Work Consultancy Services (1996) Estimated Earthquake Damage to Telecom New Zealand s Outside Plant Opus (Works Consultancy Services) estimated the damage to the Telecom New Zealand s telecommunications network in the Wellington Region. These were based on damage models for buried and pole mounted cables that were developed from earthquake damage data. The damage assessment for the telecommunication cables were based on the expected ground shaking from earthquakes and more importantly the level of ground damage due to the earthquakes considered. Permanent ground deformation was assessed based on the potential for liquefaction and consequent lateral spreading as well as the potential for fault rupture and earthquake induced slope failures, which were derived from regional hazard maps and consideration of ground conditions in representative sub-areas. This then enabled the assessment of the damage to these assets by developing appropriate fragility relationships Road Networks International literature on road risk assessment was summarised by Brabhaharan et al (2001). Relevant and particularly recent literature are summarised below. Bridges The National Institute of Standards and Technology (1992) held a US-Japan workshop in 1991 on earthquake disaster prevention for lifeline systems. The section on transportation lifelines concentrated on bridges, with reports on Caltrans seismic retrofit program in the USA (Maroney and Gates, 1992), and the seismic inspection and strengthening program in Japan (Kawashima et al, 1992). There have also been several reports and papers published on bridge seismic screening, prioritisation and retrofit. Transit New Zealand (1998) published a seismic screening procedure for state highway bridges based on the methodology developed by Opus International Consultants (1998). The bridges along New Zealand s state highways have been screened systematically, and the bridges were prioritised by Opus for further assessment on the basis of the screening (Opus International Consultants, 2002). Following on from the screening programme, the seismic performance of some bridges has been assessed in further detail. Basoz and Kiremidjian (1995) proposed a more network based approach to the assessment of bridges and demonstrated the use of Geographical Information Systems (GIS) for bridge prioritisation. The use of GIS has facilitated the combination of seismicity, bridge vulnerability and traffic origin-destination information, to assess the risk. This allowed them to consider the effect of the seismic performance of bridges on the road network (Basoz and Kiremidjian, 1997). August 2005: Final 22

29 Road Network Nozaki and Sugita (2000) considered the traffic demand from post-earthquake emergency disaster recovery activities and the potential for damage to network links in assessing the network, using a parameter termed structural performance index. They illustrate the use of this model to assess the effectiveness of structural (retrofit) and non-structural (traffic control) measures. Chunguang and Huiying (2000) presented an assessment of the reliability of a road network by considering the probability of damage to various components of the network using a Monte Carlo simulation. They demonstrated the use of this approach in considering the location of emergency service resources, such as ambulances. Henrickson et al (1980) considered losses to users from earthquake damaged road networks. They assessed a net user benefit or the value of the transportation network to users as the difference between the total user benefit and the cost of the trip. The effect of disruption from an earthquake was assessed as a decrease in the total net user benefit. Hence the total loss from the earthquake was assessed as : total loss = repair or replacement cost + loss in user benefits This together with a component damage probability matrix (earthquake damaged road link capacity and the associated probability of damage states for different earthquake intensities) was used to derive total cost of earthquake damage. This was then compared with the retrofit cost for that component. Werner et al (1997) proposed seismic risk analysis of a highway system to estimate the loss from earthquakes. The use of GIS was suggested, with the following four modules : System module with network and traffic data. Hazards module with seismicity, topography and soils data. Component module with structural, functionality and loss / repair cost data. Socio-economic module with loss, emergency response and societal effects data. They demonstrated this model using a simplified deterministic analysis for four earthquake scenarios (considering only the ground shaking effects) for a section of the road network in Memphis, Tennessee, USA, and considering only bridges on the road network. MINUTP traffic forecasting software was used to assess traffic impact. Only direct losses (repair cost) and traffic disruption costs were considered. Gordon et al (1997) outlined a framework for assessing the total economic impact from the effect of earthquakes on transportation (bridges only considered), using input/output models. They included the change in traffic demand after the earthquake. August 2005: Final 23

Developing a hazard risk assessment Framework for the New Zealand State Highway Network

Developing a hazard risk assessment Framework for the New Zealand State Highway Network Developing a hazard risk assessment Framework for the New Zealand State Highway Network Erica Seville & Joseph Metcalfe University of Canterbury Land Transport New Zealand Research Report 276 ISBN 0-478-25387-7

More information

Recent Earthquakes: Implications for U.S. Water Utilities [Project #4408]

Recent Earthquakes: Implications for U.S. Water Utilities [Project #4408] Recent Earthquakes: Implications for U.S. Water Utilities [Project #4408] ORDER NUMBER: 4408 DATE AVAILABLE: July 2012 PRINCIPAL INVESTIGATORS: John Eidinger and Craig A. Davis PROJECT PURPOSE: The purpose

More information

Assessment of Interdependent Lifeline Networks Performance in Earthquake Disaster Management

Assessment of Interdependent Lifeline Networks Performance in Earthquake Disaster Management Performance in Earthquake Disaster Management Hüseyin Can Ünen Istanbul Technical University, Turkey unen@itu.edu.tr Muhammed Şahin Istanbul Technical University, Turkey sahin@itu.edu.tr Amr S. Elnashai

More information

OECD RECOMMENDATION CONCERNING GUIDELINES ON EARTHQUAKE SAFETY IN SCHOOLS

OECD RECOMMENDATION CONCERNING GUIDELINES ON EARTHQUAKE SAFETY IN SCHOOLS OECD RECOMMENDATION CONCERNING GUIDELINES ON EARTHQUAKE SAFETY IN SCHOOLS THE COUNCIL Having regard to article 5b) of the Convention establishing the Organisation for Economic Co-operation and Development

More information

AFAD DEPREM DAİRESİ BAŞKANLIĞI TÜRKİYE KUVVETLİ YER HAREKETİ ve ÖN HASAR TAHMİN SİSTEMLERİ ÇALIŞMA GRUBU. (Rapid Estimation Damage)

AFAD DEPREM DAİRESİ BAŞKANLIĞI TÜRKİYE KUVVETLİ YER HAREKETİ ve ÖN HASAR TAHMİN SİSTEMLERİ ÇALIŞMA GRUBU. (Rapid Estimation Damage) (Rapid Estimation Damage) AFAD-RED SYSTEM The technological advances in seismic instrumentation and telecommunication permit the development of rapid estimation of earthquake losses in order to enhance

More information

DECISION PROCESS AND OPTIMIZATION RULES FOR SEISMIC RETROFIT PROGRAMS. T. Zikas 1 and F. Gehbauer 2

DECISION PROCESS AND OPTIMIZATION RULES FOR SEISMIC RETROFIT PROGRAMS. T. Zikas 1 and F. Gehbauer 2 International Symposium on Strong Vrancea Earthquakes and Risk Mitigation Oct. 4-6, 2007, Bucharest, Romania DECISION PROCESS AND OPTIMIZATION RULES FOR SEISMIC RETROFIT PROGRAMS T. Zikas 1 and F. Gehbauer

More information

Cornell University LADWP SHORT COURSE & WORKSHOP

Cornell University LADWP SHORT COURSE & WORKSHOP CASE STUDY: LIFELINE RESILIENCE- LOS ANGELES DEPARTMENT OF WATER & POWER Tom O Rourke Cornell University 1200 km2 Los Angeles N 200 km 40 km Los Angeles Department of Water and Power (LADWP) Serves 4.0

More information

Seismic Risk Assessment Procedures for a System consisting of Distributed Facilities -Part three- Insurance Portfolio Analysis

Seismic Risk Assessment Procedures for a System consisting of Distributed Facilities -Part three- Insurance Portfolio Analysis Seismic Risk Assessment Procedures for a System consisting of Distributed Facilities -Part three- Insurance Portfolio Analysis M. Achiwa & M. Sato Yasuda Risk Engineering Co., Ltd., Tokyo, Japan M. Mizutani

More information

Earthquake Resistant Design and Risk Reduction. 2nd Edition

Earthquake Resistant Design and Risk Reduction. 2nd Edition Brochure More information from http://www.researchandmarkets.com/reports/2171210/ Earthquake Resistant Design and Risk Reduction. 2nd Edition Description: Earthquake Resistant Design and Risk Reduction,

More information

Building a Spatial Database for Earthquake Risk Assessment and Management in the Caribbean

Building a Spatial Database for Earthquake Risk Assessment and Management in the Caribbean Building a Spatial Database for Earthquake Risk Assessment and Management in the Caribbean Jacob Opadeyi and Rehanna Jadoo Department of Geomatics Engineering and Land Management, The University of the

More information

ENGINEERING-BASED EARTHQUAKE RISK MANAGEMENT

ENGINEERING-BASED EARTHQUAKE RISK MANAGEMENT ENGINEERING-BASED EARTHQUAKE RISK MANAGEMENT MRP Engineering Newsletter February 2012 The world recently experienced several major earthquakes, which caused severe local impacts and major worldwide repercussions.

More information

Using GIS for Assessing Earthquake Hazards of San Francisco Bay, California, USA

Using GIS for Assessing Earthquake Hazards of San Francisco Bay, California, USA Using GIS for Assessing Earthquake Hazards of San Francisco Bay, California, USA Marzieh Zeinali Department of Resource Analysis, Saint Mary s University of Minnesota, Minneapolis, MN 55404 Keywords: San

More information

A PROCEDURE FOR RISK MITIGATION OF WATER SUPPLY SYSTEM IN LARGE AND POPULATED CITIES

A PROCEDURE FOR RISK MITIGATION OF WATER SUPPLY SYSTEM IN LARGE AND POPULATED CITIES A PROCEDURE FOR RISK MITIGATION OF WATER SUPPLY SYSTEM IN LARGE AND POPULATED CITIES Mahmood Hosseini 1 and Hazhir Moshirvaziri 2 1 Associate Professor, Structural Engineering Research Center, International

More information

Prepared For San Francisco Community College District 33 Gough Street San Francisco, California 94103. Prepared By

Prepared For San Francisco Community College District 33 Gough Street San Francisco, California 94103. Prepared By Project Structural Conditions Survey and Seismic Vulnerability Assessment For SFCC Civic Center Campus 750 Eddy Street San Francisco, California 94109 Prepared For San Francisco Community College District

More information

Critical factors for restoration of water supply pipelines in the Hutt City, New Zealand after a magnitude 7.5 earthquake from the Wellington fault

Critical factors for restoration of water supply pipelines in the Hutt City, New Zealand after a magnitude 7.5 earthquake from the Wellington fault The th October -7, 008, Beijing, China Critical factors for restoration of water supply pipelines in the Hutt City, New Zealand after a magnitude 7.5 earthquake from the Wellington fault John X. Zhao,

More information

Earthquakes: Risk & Insurance Issues

Earthquakes: Risk & Insurance Issues Earthquakes: Risk & Insurance Issues An earthquake is a sudden and rapid shaking of the earth caused by the breaking and shifting of rock beneath the earth s surface. This shaking can sometimes trigger

More information

A New Paradigm in Urban Road Network Seismic Vulnerability: From a Link-by-link Structural Approach to an Integrated Functional Assessment

A New Paradigm in Urban Road Network Seismic Vulnerability: From a Link-by-link Structural Approach to an Integrated Functional Assessment A New Paradigm in Urban Road Network Seismic Vulnerability: From a Link-by-link Structural Approach to an Integrated Functional Assessment Gonçalo Caiado goncalo.caiado@ist.utl.pt Rosário Macário rosariomacario@civil.ist.utl.pt

More information

PACIFIC CATASTROPHE RISK ASSESSMENT AND FINANCING INITIATIVE

PACIFIC CATASTROPHE RISK ASSESSMENT AND FINANCING INITIATIVE PACIFIC CATASTROPHE RISK ASSESSMENT AND FINANCING INITIATIVE NIUE SEPTEMBER 11 COUNTRY RISK PROFILE: NIUE Niue is expected to incur, on average,.9 million USD per year in losses due to earthquakes and

More information

Contents. Specific and total risk. Definition of risk. How to express risk? Multi-hazard Risk Assessment. Risk types

Contents. Specific and total risk. Definition of risk. How to express risk? Multi-hazard Risk Assessment. Risk types Contents Multi-hazard Risk Assessment Cees van Westen United Nations University ITC School for Disaster Geo- Information Management International Institute for Geo-Information Science and Earth Observation

More information

Disaster Risk Assessment:

Disaster Risk Assessment: Disaster Risk Assessment: Disaster Risk Mapping Dr. Jianping Yan Disaster Risk Assessment Specialist Session Outline Essentials on Risk Mapping Map scale, grid size, aggregation unit Requirements for Risk

More information

Modeling earthquake impact on urban lifeline systems: advances and integration in loss estimation

Modeling earthquake impact on urban lifeline systems: advances and integration in loss estimation Modeling earthquake impact on urban lifeline systems: advances and integration in loss estimation S. E. Chang University of Washington A. Z. Rose Pennsylvania State University M. Shinozuka University of

More information

POST-EVENT DATA COLLECTION USING MOBILE GIS/GPS AND DEVELOPMENT OF SEISMIC EVALUATION TECHNIQUE FOR DAMAGE

POST-EVENT DATA COLLECTION USING MOBILE GIS/GPS AND DEVELOPMENT OF SEISMIC EVALUATION TECHNIQUE FOR DAMAGE POST-EVENT DATA COLLECTION USING MOBILE GIS/GPS AND DEVELOPMENT OF SEISMIC EVALUATION TECHNIQUE FOR DAMAGE Satoshi IWAI 1 And Hiroyuki KAMEDA 2 SUMMARY This paper presents mobile system for post-event

More information

Presentations. Session 1. Slide 1. Earthquake Risk Reduction. 1- Concepts & Terminology

Presentations. Session 1. Slide 1. Earthquake Risk Reduction. 1- Concepts & Terminology Earthquake Risk Reduction Presentations Session 1 Slide 1 Earthquake Risk Reduction 1- Concepts & Terminology Welcome to the World Bank Institute s (WBI) Distance Learning (DL) course on Earthquake Risk

More information

Disaster Risk Assessment:

Disaster Risk Assessment: Disaster Risk Assessment: Disaster Risk Modeling Dr. Jianping Yan Disaster Risk Assessment Specialist Session Outline Overview of Risk Modeling For insurance For public policy Conceptual Model Modeling

More information

D 8.2 DELIVERABLE PROJECT INFORMATION

D 8.2 DELIVERABLE PROJECT INFORMATION D 8.2 DELIVERABLE PROJECT INFORMATION Project Title: Acronym: Systemic Seismic Vulnerability and Risk Analysis for Buildings, Lifeline Networks and Infrastructures Safety Gain SYNER-G Project N : 244061

More information

CHAPTER SEISMIC RISK MITIGATION PRACTICES IN SCHOOL BUILDINGS IN ISTANBUL, TURKEY

CHAPTER SEISMIC RISK MITIGATION PRACTICES IN SCHOOL BUILDINGS IN ISTANBUL, TURKEY CHAPTER 13 SEISMIC RISK MITIGATION PRACTICES IN SCHOOL BUILDINGS IN ISTANBUL, TURKEY Özal Yüzügüllü, Gülay Barbarosoglu and Mustafa Erdik Kandilli Observatory and Earthquake Research Institute Bogaziçi

More information

Seismic Practices to Improve Water System Resilience

Seismic Practices to Improve Water System Resilience Seismic Practices to Improve Water System Resilience C.A. Davis 1 1 Geotechnical Engineering Manager, Department of Water and Power, Los Angeles, California. Email: Craig.Davis@ladwp.com ABSTRACT : The

More information

Objective 4: Enhanced community education, flood awareness and preparedness

Objective 4: Enhanced community education, flood awareness and preparedness Objective 4: Enhanced community education, flood awareness and preparedness Understanding the extent and full impacts of flooding is essential for planning for potential future pressures on the drainage

More information

Technical #2 Discussion

Technical #2 Discussion Technical #2 Breakdown of teams? Need a scenario to do lifeline work Lifelines and Transportation: ASCE took a lead role in Seattle working with public works and municipalities and DOT. Political topic

More information

Advanced GIS for Loss Estimation and Rapid Post-Earthquake Assessment of Building Damage

Advanced GIS for Loss Estimation and Rapid Post-Earthquake Assessment of Building Damage Advanced GIS for Loss Estimation and Rapid Post-Earthquake Assessment of Building Damage Thomas D. O Rourke and Sang-Soo Jeon, Cornell University and Ronald T. Eguchi and Charles K. Huyck, Image Cat, Inc.

More information

SEISMIC RETROFIT DESIGN CRITERIA

SEISMIC RETROFIT DESIGN CRITERIA SEISMIC RETROFIT DESIGN CRITERIA British Columbia Ministry of Transportation June 30, 2005 Prepared by: Recommended by: Approved by: Don Kennedy, P.Eng., Associated Engineering (BC) Sharlie Huffman, P.

More information

REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Merivale

REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Merivale REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual Report Merivale REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual Report Merivale Report

More information

American Society of Civil Engineers

American Society of Civil Engineers American Society of Civil Engineers Technical Council on Lifeline Earthquake Engineering Earthquake Investigation Committee Lifelines Water and Wastewater Electric Power and Communication Gas and Liquid

More information

RISK MANAGEMENT FOR INFRASTRUCTURE

RISK MANAGEMENT FOR INFRASTRUCTURE RISK MANAGEMENT FOR INFRASTRUCTURE CONTENTS 1.0 PURPOSE & SCOPE 2.0 DEFINITIONS 3.0 FLOWCHART 4.0 PROCEDURAL TEXT 5.0 REFERENCES 6.0 ATTACHMENTS This document is the property of Thiess Infraco and all

More information

Emergency Management Audit For Businesses

Emergency Management Audit For Businesses Emergency Management Audit For Businesses Sponsor Acknowledgement: This manual is sponsored by NZ Safety Limited and produced for the Ministry of Civil Defence Public Education Advisory Committee by Auckland

More information

Urban infrastructure systems such as water and electric power networks

Urban infrastructure systems such as water and electric power networks Assessing the Role of Lifeline Systems in Community Disaster Resilience by Stephanie E. Chang and Christopher Chamberlin Research Objectives The objective of this research is to advance the state-of-the-art

More information

HAZARD VULNERABILITY & RISK ASSESSMENT

HAZARD VULNERABILITY & RISK ASSESSMENT Hazard Vulnerability Analysis Purpose and Scope A Hazard Vulnerability Analysis (HVA) evaluates risk associated with a specific hazard. During this analysis, the hazard is evaluated for its probability

More information

SECTION 8 Industrial Facilities Field Investigation

SECTION 8 Industrial Facilities Field Investigation SECTION 8 Industrial Facilities Field Investigation Types of Data to Be Collected and Recorded Warehouses, manufacturing facilities, energy-producing facilities, and factories should be inspected for performance

More information

Estimating Flood Impacts: A Status Report

Estimating Flood Impacts: A Status Report : A Status Report Mark P. Berkman 1 and Toby Brown 2 1 The Brattle Group, San Francisco, California, United States; mark.berkman@brattle.com 2 The Brattle Group, San Francisco, California, United States;

More information

Let s Talk about Earthquakes: Wellington Edition

Let s Talk about Earthquakes: Wellington Edition Let s Talk about Earthquakes: Wellington Edition Dr. Rob Langridge Dr. Graham Leonard Russ Van Dissen Kim Wright GNS Science What is this presentation about? Who we are Why we study earthquakes Wellington

More information

APPLICATION OF EARTHQUAKE ENGINEERING INFORMATION IN HOSPITAL EMERGENCY RESPONSE AND RECOVERY

APPLICATION OF EARTHQUAKE ENGINEERING INFORMATION IN HOSPITAL EMERGENCY RESPONSE AND RECOVERY Workshop on Seismic Design and Retrofitting of Hospitals in Seismic Areas, October 21-22, 1999. APPLICATION OF EARTHQUAKE ENGINEERING INFORMATION IN HOSPITAL EMERGENCY RESPONSE AND RECOVERY Robert Reitherman

More information

NORSAR/International Center of Geohazards (ICG) Kjeller, Norway. International Conference on Open Risk Analysis Cambridge, UK 12-13 June 2009

NORSAR/International Center of Geohazards (ICG) Kjeller, Norway. International Conference on Open Risk Analysis Cambridge, UK 12-13 June 2009 The SELENA RISe Open Risk Package D.H. Lang, S. Molina, V. Gutiérrez, C.D. Lindholm, and F. Lingvall NORSAR/International Center of Geohazards (ICG) Kjeller, Norway International Conference on Open Risk

More information

APPLICATION OF EARTHQUAKE ENGINEERING INFORMATION IN HOSPITAL EMERGENCY RESPONSE AND RECOVERY

APPLICATION OF EARTHQUAKE ENGINEERING INFORMATION IN HOSPITAL EMERGENCY RESPONSE AND RECOVERY APPLICATION OF EARTHQUAKE ENGINEERING INFORMATION IN HOSPITAL EMERGENCY RESPONSE AND RECOVERY Robert Reitherman 1 1. Consortium of Universities for Research in Earthquake Engineering 1301 South 46 th Street,

More information

EARTHQUAKE MAGNITUDE

EARTHQUAKE MAGNITUDE EARTHQUAKE MAGNITUDE Earliest measure of earthquake size Dimensionless number measured various ways, including M L local magnitude m b body wave magnitude M s surface wave magnitude M w moment magnitude

More information

Disaster Preparedness and Safety Element

Disaster Preparedness and Safety Element Disaster Preparedness and Safety Element Element Objectives The policies and actions of the Disaster Preparation and Safety Element are intended to achieve the following six objectives: 1. Establish and

More information

Structural Retrofitting For Earthquake Resistance

Structural Retrofitting For Earthquake Resistance Structural Retrofitting For Earthquake Resistance Ruben Boroschek WHO Disaster Mitigation in Health Facilities University of Chile rborosch@ing.uchile.cl www.hospitalseguro.cl The following paper is part

More information

27 Ageing Behaviour of Structural Components for Integrated Lifetime Assessment & Asset Management

27 Ageing Behaviour of Structural Components for Integrated Lifetime Assessment & Asset Management 27 Ageing Behaviour of Structural Components for Integrated Lifetime Assessment & Asset Management Chapter 27-x Authors: Robert Veit-Egerer Helmut Wenzel Rui Lima Motivation Degradation of structural components

More information

Mapping landslides for the insurance industry lessons from earthquakes

Mapping landslides for the insurance industry lessons from earthquakes Mapping landslides for the insurance industry lessons from earthquakes J.R. Keaton MACTEC Engineering and Consulting, Inc., Los Angeles, CA, USA R.J. Roth, Jr. Consulting Insurance Actuary, Huntington

More information

Understanding the Seismic Vulnerability of Water Systems

Understanding the Seismic Vulnerability of Water Systems Understanding the Seismic Vulnerability of Water Systems Lessons Learned and What You Can Do Donald Ballantyne October 2, 2013 Regional Water Providers Consortium Board Overview Oregon Resilience Plan

More information

Scope of Insurance Premium for Residential Houses against Seismic Risk in Japan

Scope of Insurance Premium for Residential Houses against Seismic Risk in Japan Scope of Insurance Premium for Residential Houses against Seismic Risk in Japan J. Kanda a) and K. Nishijima b) a) University of Tokyo, Japan kandaj@k.u-tokyo.ac.jp b) ETH, Switzerland ABSTRACT The premium

More information

Chincha and Cañete, Peru, Based

Chincha and Cañete, Peru, Based Reconstruction of Ica, Pisco, Chincha and Cañete, Peru, Based on Updated Hazard Maps Julio Kuroiwa Professor emeritus National University of Engineering and UNDP Reconstruction Program/Sustainable Cities.

More information

Anchorage All-Hazard Mitigation Plan October 2004

Anchorage All-Hazard Mitigation Plan October 2004 EXECUTIVE SUMMARY The Municipality of Anchorage (MOA) is vulnerable to a wide range of natural, technological, and human/societal hazards including earthquakes, avalanches, and hazardous material accidents.

More information

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES August 2012 Dam Safety and Earthquakes Position Paper of International Commission on Large Dams (ICOLD) Prepared by ICOLD Committee on Seismic Aspects

More information

Post-Disaster Safety Assessment Program

Post-Disaster Safety Assessment Program Post-Disaster Safety Assessment Program Guideline to the Activation and Utilization of Program Resources June 2003 Dallas Jones Director Gray Davis Governor Introduction Preface With California s history

More information

Earthquakes and Data Centers

Earthquakes and Data Centers 7x24 Exchange Fall Symposium September 11, 2013 Hilton Bellevue Andrew W. Taylor, Ph.D., S.E., FACI Earthquake Hazards 2 September 11, 2013 1 Cascadia Earthquake Sources Figure Credit: Craig Weaver, Pacific

More information

SEISMIC DAMAGE ESTIMATION PROCEDURE FOR WATER SUPPLY PIPELINES

SEISMIC DAMAGE ESTIMATION PROCEDURE FOR WATER SUPPLY PIPELINES SEISMIC DAMAGE ESTIMATION PROCEDURE FOR WATER SUPPLY PIPELINES Ryoji ISOYAMA 1, Eisuke ISHIDA 2, Kiyoji YUNE 3 And Toru SHIROZU 4 SUMMARY This paper presents a practical procedure for estimating damage

More information

Keynote 2: What is Landslide Hazard? Inventory Maps, Uncertainty, and an Approach to Meeting Insurance Industry Needs

Keynote 2: What is Landslide Hazard? Inventory Maps, Uncertainty, and an Approach to Meeting Insurance Industry Needs Keynote 2: What is Landslide Hazard? Inventory Maps, Uncertainty, and an Approach to Meeting Insurance Industry Needs Jeffrey R Keaton Richard J Roth, Jr Amec Foster Wheeler Los Angeles, USA Consulting

More information

Minnesota State Plan Review Level 2 Hazus-MH 2.1 County Model for Flooding Dakota County Evaluation

Minnesota State Plan Review Level 2 Hazus-MH 2.1 County Model for Flooding Dakota County Evaluation Overview Minnesota State Plan Review Level 2 Hazus-MH 2.1 County Model for Flooding Dakota County Evaluation Minnesota Homeland Security and Emergency Management (HSEM) is responsible for supporting activities

More information

Overview. NRC Regulations for Seismic. Applied to San Onofre Nuclear Generating Station. NRC History. How we Regulate

Overview. NRC Regulations for Seismic. Applied to San Onofre Nuclear Generating Station. NRC History. How we Regulate Overview 1. NRC History and Overview NRC Regulations for Seismic Analysis and Design Applied to San Onofre Nuclear Generating Station Christie Hale Megan Williams 2. Regulations for Seismic Hazards 3.

More information

TELECOMMUNICATION SYSTEM HAZARD MITIGATION STRATEGIC PLANNING

TELECOMMUNICATION SYSTEM HAZARD MITIGATION STRATEGIC PLANNING TELECOMMUNICATION SYSTEM HAZARD MITIGATION STRATEGIC PLANNING A.K. Tang 1 1 President, L&T Engineering and Project Management Consultant, Mississauga. Canada Email: alexktang@mac.com ABSTRACT: Telecommunication

More information

WP 7: Build prototype software

WP 7: Build prototype software Systemic Seismic Vulnerability and Risk Analysis for Buildings, Lifeline Networks and Infrastructures Safety Gain WP 7: Build prototype software D. Schäfer, VCE A. Bosi, VCE T. Gruber, VCE H. Wenzel, VCE

More information

Date, Time and Place: Presented by: Presented to: 22 August 2013, 0900 hrs, Pier 1 The Embarcadero, San Francisco

Date, Time and Place: Presented by: Presented to: 22 August 2013, 0900 hrs, Pier 1 The Embarcadero, San Francisco Date, Time and Place: 22 August 2013, 0900 hrs, Pier 1 The Embarcadero, San Francisco Presented by: Nick Rogers, Mike Jacka, Kate Williams, Sjoerd van Ballegooy and Rick Wentz, Tonkin & Taylor International

More information

PERFORMANCE BASED SEISMIC EVALUATION AND RETROFITTING OF UNSYMMETRICAL MEDIUM RISE BUILDINGS- A CASE STUDY

PERFORMANCE BASED SEISMIC EVALUATION AND RETROFITTING OF UNSYMMETRICAL MEDIUM RISE BUILDINGS- A CASE STUDY Paper No. 682 PERFORMANCE BASED SEISMIC EVALUATION AND RETROFITTING OF UNSYMMETRICAL MEDIUM RISE BUILDINGS- A CASE STUDY Jimmy Chandra, Pennung Warnitchai, Deepak Rayamajhi, Naveed Anwar and Shuaib Ahmad

More information

Seismic Risk Study: Earthquake Scenario-Based Risk Assessment

Seismic Risk Study: Earthquake Scenario-Based Risk Assessment Review of Arup Report Seismic Risk Study: Earthquake Scenario-Based Risk Assessment Julian Bommer, Helen Crowley & Rui Pinho Scope This document presents a brief review of the report by Arup (REP/229746/SR001,

More information

Using Cost-Benefit Analysis to Evaluate Mitigation for Lifeline Systems Research Objectives Howard Kunreuther, Chris Cyr Patricia Grossi Wendy Tao

Using Cost-Benefit Analysis to Evaluate Mitigation for Lifeline Systems Research Objectives Howard Kunreuther, Chris Cyr Patricia Grossi Wendy Tao Using Cost-Benefit Analysis to Evaluate Mitigation for Lifeline Systems by Howard Kunreuther (coordinating author), Chris Cyr, Patricia Grossi and Wendy Tao Research Objectives The purpose of this research

More information

Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice

Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice M. R. Zare 1, S. Wilkinson 2, R. Potangaroa 3 1. PhD candidate, University of Auckland, Auckland, New

More information

ACUTE CARE HOSPITAL RESOURCE ALLOCATION PROBLEM UNDER SEISMICALLY DAMAGED TRANSPORTATION SYSTEMS

ACUTE CARE HOSPITAL RESOURCE ALLOCATION PROBLEM UNDER SEISMICALLY DAMAGED TRANSPORTATION SYSTEMS 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 1124 ACUTE CARE HOSPITAL RESOURCE ALLOCATION PROBLEM UNDER SEISMICALLY DAMAGED TRANSPORTATION SYSTEMS

More information

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date

More information

Preparedness in the Southwest

Preparedness in the Southwest Preparedness in the Southwest Risk Assessment and Hazard Vulnerability Developed by The Arizona Center for Public Health Preparedness Cover Art www.azcphp.publichealth.arizona.edu Chapter 1 Importance

More information

Client: Nederlandse Aardolie Maatschappij Arup Project Title: Groningen 2013 Seismic Risk Study - Earthquake Scenario-Based Risk Assessment

Client: Nederlandse Aardolie Maatschappij Arup Project Title: Groningen 2013 Seismic Risk Study - Earthquake Scenario-Based Risk Assessment Client: Nederlandse Aardolie Maatschappij Arup Project Title: Groningen 2013 Seismic Risk Study - Earthquake Scenario-Based Risk Assessment REP/229746/SR001 Issue 29 November 2013 This report was prepared

More information

Development of Seismic-induced Fire Risk Assessment Method for a Building

Development of Seismic-induced Fire Risk Assessment Method for a Building Development of Seismic-induced Fire Risk Assessment Method for a Building AI SEKIZAWA National Research Institute of Fire and Disaster 3-14-1, Nakahara, Mitaka, Tokyo 181-8633, Japan sekizawa@fri.go.jp

More information

Seismic Design and Performance Criteria for Large Storage Dams

Seismic Design and Performance Criteria for Large Storage Dams Seismic Design and Performance Criteria for Large Storage Dams Dr. Martin Wieland Chairman, ICOLD Committee on Seismic Aspects of Dam Design Poyry Switzerland Ltd., Zurich, Switzerland Integral Dam Safety

More information

Earthquakes. Earthquakes: Big Ideas. Earthquakes

Earthquakes. Earthquakes: Big Ideas. Earthquakes Earthquakes Earthquakes: Big Ideas Humans cannot eliminate natural hazards but can engage in activities that reduce their impacts by identifying high-risk locations, improving construction methods, and

More information

ELECTRICAL SUBSTATION EQUIPMENT DAMAGE DATABASE FOR UPDATING FRAGILITY ESTIMATES

ELECTRICAL SUBSTATION EQUIPMENT DAMAGE DATABASE FOR UPDATING FRAGILITY ESTIMATES ELECTRICAL SUBSTATION EQUIPMENT DAMAGE DATABASE FOR UPDATING FRAGILITY ESTIMATES Thalia ANAGNOS 1 And Dennis K OSTROM 2 SUMMARY A database has been created that contains data related to damaged and undamaged

More information

Integrated Earthquake Risk Assessment

Integrated Earthquake Risk Assessment Socio- Vulnerability Index for Risk Analysis Mohsen Ghafory-Ashtiany Affiliated Faculty: Disaster Management Research Institute of Shakhes Pajooh Professor: International Institute of Earthquake Engineering

More information

Seismic Risk Evaluation of a Building Stock and Retrofit Prioritization

Seismic Risk Evaluation of a Building Stock and Retrofit Prioritization Seismic Risk Evaluation of a Building Stock and Retrofit Prioritization Seismic risk assessment of large building stocks can be conducted at various s depending on the objectives, size of the building

More information

Current Status of Seismic Retrofitting Technology

Current Status of Seismic Retrofitting Technology CONTENTS Current Status of Seismic Retrofitting Technology Damages of Past Earthquakes Seismic Diagnosis Method Building Control Section Urban Building Division Bureau of Urban Development, TMG Seismic

More information

The Social Cost of Road Crashes and Injuries 2013 update

The Social Cost of Road Crashes and Injuries 2013 update The Social Cost of Road Crashes and Injuries 2013 update ANNUAL UPDATE NOVEMBER 2013 Prepared by Financial, Economic and Statistical Analysis Team, Ministry of Transport ISSN 1173-1370 Technical queries

More information

A multi-hazard risk assessment methodology, stress test framework and decision support tool for resilient critical infrastructure

A multi-hazard risk assessment methodology, stress test framework and decision support tool for resilient critical infrastructure Proceedings of 6th Transport Research Arena, April 18-21, 2016, Warsaw, Poland A multi-hazard risk assessment methodology, stress test framework and decision support tool for resilient critical infrastructure

More information

Disclaimer. Technical queries and comments on this report should be referred to:

Disclaimer. Technical queries and comments on this report should be referred to: Technical queries and comments on this report should be referred to: Financial, Economic and Statistical Analysis Team Ministry of Transport PO Box 3175 Wellington 6140 New Zealand Email: info@transport.govt.nz

More information

APPENDIX B Understanding the FEMA Benefit-Cost Analysis Process

APPENDIX B Understanding the FEMA Benefit-Cost Analysis Process ENGINEERING PRINCIPLES AND PRACTICES APPENDIX B Understanding the FEMA Benefit-Cost Analysis Process The Stafford Act authorizes the President to establish a program to provide technical and financial

More information

REAL-TIME EARTHQUAKE HAZARD ASSESSMENT IN CALIFORNIA: THE EARLY POST-EARTHQUAKE DAMAGE ASSESSMENT TOOL AND THE CALTECH-USGS BROADCAST OF EARTHQUAKES

REAL-TIME EARTHQUAKE HAZARD ASSESSMENT IN CALIFORNIA: THE EARLY POST-EARTHQUAKE DAMAGE ASSESSMENT TOOL AND THE CALTECH-USGS BROADCAST OF EARTHQUAKES REAL-TIME EARTHQUAKE HAZARD ASSESSMENT IN CALIFORNIA: THE EARLY POST-EARTHQUAKE DAMAGE ASSESSMENT TOOL AND THE CALTECH-USGS BROADCAST OF EARTHQUAKES Ronald T. Eguchil, James D. Goltz2, Hope A. Seligson3

More information

SEISMIC RETROFITTING OF STRUCTURES

SEISMIC RETROFITTING OF STRUCTURES SEISMIC RETROFITTING OF STRUCTURES RANJITH DISSANAYAKE DEPT. OF CIVIL ENGINEERING, FACULTY OF ENGINEERING, UNIVERSITY OF PERADENIYA, SRI LANKA ABSTRACT Many existing reinforced concrete structures in present

More information

SEISMIC DESIGN OF HIGHWAY BRIDGES

SEISMIC DESIGN OF HIGHWAY BRIDGES Journal of Japan Association for Earthquake Engineering, Vol.4, No.3 (Special Issue), 2004 SEISMIC DESIGN OF HIGHWAY BRIDGES Kazuhiko KAWASHIMA 1 and Shigeki UNJOH 2 1 Member of JAEE, Professor, Department

More information

Fire Following Earthquake:

Fire Following Earthquake: Fire Following Earthquake: Planning, Strategic, and Tactical Considerations Los Angeles County Fire Department Chief Deputy (Acting) David R. Richardson Jr. Fire Following Earthquake: An Overlooked Dilemma

More information

SEISMIC RETROFITTING STRATEGIES FOR BRIDGES IN MODERATE EARTHQUAKE REGIONS

SEISMIC RETROFITTING STRATEGIES FOR BRIDGES IN MODERATE EARTHQUAKE REGIONS SEISMIC RETROFITTING STRATEGIES FOR BRIDGES IN MODERATE EARTHQUAKE REGIONS ABSTRACT Ayaz H. Malik, P.E. Project Engineer New York State Department of Transportation Certain parts of the United States have

More information

Technical categories and your property

Technical categories and your property Technical categories and your property Information about residential green zone technical categories December 2011 Outline of land assessments Assessment of the land is undertaken by a range of organisations

More information

Insurance B.C. Construction Round Table Seminar. Order of Presentation. June 23, 2011. Lindsay Olson Vice-President BC, SK, MB

Insurance B.C. Construction Round Table Seminar. Order of Presentation. June 23, 2011. Lindsay Olson Vice-President BC, SK, MB Earthquake Risk and Insurance B.C. Construction Round Table Seminar June 23, 2011 Lindsay Olson Vice-President BC, SK, MB Order of Presentation Canada s P&C Insurance Industry Canadian Earthquake Risk

More information

32 Contingencies MAR/APR.06

32 Contingencies MAR/APR.06 32 Contingencies MAR/APR.06 New Catastrophe Models for Hard Times B Y P A T R I C I A G R O S S I A N D H O W A R D K U N R E U T H E R Driven by the increasing frequency and severity of natural disasters

More information

GIS Characterization of the Los Angeles Water Supply, Earthquake Effects, and Pipeline Damage

GIS Characterization of the Los Angeles Water Supply, Earthquake Effects, and Pipeline Damage GIS Characterization of the Los Angeles Water Supply, Earthquake Effects, and Pipeline Damage by Thomas D. O Rourke, Selcuk Toprak and Sang-Soo Jeon, Cornell University Research Objectives The objectives

More information

Load and Resistance Factor Geotechnical Design Code Development in Canada. by Gordon A. Fenton Dalhousie University, Halifax, Canada

Load and Resistance Factor Geotechnical Design Code Development in Canada. by Gordon A. Fenton Dalhousie University, Halifax, Canada Load and Resistance Factor Geotechnical Design Code Development in Canada by Gordon A. Fenton Dalhousie University, Halifax, Canada 1 Overview 1. Past: Where we ve been allowable stress design partial

More information

How To Prepare For A Natural Disaster

How To Prepare For A Natural Disaster Earthquake Preparedness Strategy Update Overview Background Current Response Capability Assessing the Risk Reducing the Risk & Preparing to Respond Council Motions (2011) Assess risks and redundancy in

More information

A Guide to Hazard Identification and Risk Assessment for Public Health Units. Public Health Emergency Preparedness Protocol

A Guide to Hazard Identification and Risk Assessment for Public Health Units. Public Health Emergency Preparedness Protocol A Guide to Hazard Identification and Risk Assessment for Public Health Units Public Health Emergency Preparedness Protocol Emergency Management Unit Public Health Division Ministry of Health and Long-Term

More information

Reinforced Concrete Design

Reinforced Concrete Design FALL 2013 C C Reinforced Concrete Design CIVL 4135 ii 1 Chapter 1. Introduction 1.1. Reading Assignment Chapter 1 Sections 1.1 through 1.8 of text. 1.2. Introduction In the design and analysis of reinforced

More information

Multi-Hazard Disaster Risk Assessment (v2)

Multi-Hazard Disaster Risk Assessment (v2) Multi-Hazard Disaster Risk Assessment (v2) This How to Note is part of a series of Guidance Notes designed to assist DFID Country Offices in embedding disaster resilience in their country programmes. This

More information

THE STUDY ON A DISASTER PREVENTION/MITIGATION BASIC PLAN IN ISTANBUL PART 2 - EVALUATION OF URBAN VULNERABILITY -

THE STUDY ON A DISASTER PREVENTION/MITIGATION BASIC PLAN IN ISTANBUL PART 2 - EVALUATION OF URBAN VULNERABILITY - 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 1361 THE STUDY ON A DISASTER PREVENTION/MITIGATION BASIC PLAN IN ISTANBUL PART 2 - EVALUATION OF URBAN

More information

Testimony of Mr. Robert J. Fenton, Jr. Assistant Administrator for Response, Office of Response and Recovery Federal Emergency Management Agency U.S. Department of Homeland Security Before House Committee

More information

Oregon Pre-Disaster Mitigation Program Plan Update Training Manual

Oregon Pre-Disaster Mitigation Program Plan Update Training Manual FEMA Oregon Pre-Disaster Mitigation Program Plan Update Training Manual Prepared by: Oregon Partnership for Disaster Resilience OPDR FEMA OPDR FEMA OPDR 2010, University of Oregon s Community Service Center

More information

EARTHQUAKE BASICS INSURANCE WHAT ARE THE PRINCIPLES OF INSURING NATURAL DISASTERS? Introduction

EARTHQUAKE BASICS INSURANCE WHAT ARE THE PRINCIPLES OF INSURING NATURAL DISASTERS? Introduction INSURANCE EARTHQUAKE BASICS INSURANCE WHAT ARE THE PRINCIPLES OF INSURING NATURAL DISASTERS? Introduction This volume of Earthquake Basics is intended to be an introduction to the business of insurance

More information

After the Shaking Stops: A Communitywide Approach to Managing Post-Quake Fires

After the Shaking Stops: A Communitywide Approach to Managing Post-Quake Fires After the Shaking Stops: A Communitywide Approach to Managing Post-Quake Fires By Rem Brown, P.E., IBHS Senior Engineering Manager, and Brent Henzi, IBHS Communications Associate Earthquakes are a destructive

More information