Capital Project Management and Construction
|
|
- Cory Wheeler
- 8 years ago
- Views:
Transcription
1 Capital Project Management and Construction Project Management is Tough: Most project managers are just thrust into the roles. College engineering programs don t cover practical construction. Project management classes are offered at very few colleges. Most companies do not have in-house project management or construction training. Until now there has been no single source for learning what you need to know about project management and construction. Now there is... CP Project Services offers three unique, one-day seminars that will teach you all you need to know to properly and efficiently manage capital projects.
2 Capital Project Selection, Justification, Estimation, Planning, Execution, and Control Seminar Objective To fuse seamlessly project management as taught by the Project Management Institute s PMBOK (the ANSI standard on project management) and capital project management in the CPI, Pharmaceutical, and Food and Beverage Industries. The PMBOK, though a thorough and powerful document, is general. It must be translated into specific action unique to a given field. This seminar translates the PMBOK into the lingo and documents used by capital project managers in the CPI, Pharmaceutical, and Food and Beverage Industries. It also goes beyond and delves into specifics of selected areas of project management especially helpful to its targeted audience. How can all this be done in one day? Quite simply, it s all beef. There is no fill here. CP Project Services realizes how busy project managers are and consequently has made every minute count. Still Not Sure if This Seminar is for You? Take the Test! Do your projects frequently have cost overruns? Do you put together a written project plan in accordance with the PMBOK (ANSI standard on project management) for every project? Can you name nine areas that must be covered in every project plan? Do you write a lot of AFE s that don t get approved? Do you know how to accurately predict project completion date and cost when only 15% of the budget has been spent? Do you know how to track your project with the simple but powerful tools of earned value? Do your issued for construction drawings frequently contain many errors? What is the best number of contractors to bid for a job? Can a 30% variance in contractor quotes be legitimate? Can you look at contractor work in the field and immediately tell if it s on schedule? If you are not satisfied with even one of your answers, this seminar is a must for you! It will save your projects money and time, and make your work life much easier. Some of What You Will Learn About Project Management How to manage your time. How to deal with difficult project team members. How to delegate work. How to create a project plan in accordance with the PMBOK. The basics of contract law How to completely scope any project How to write tight scopes of work for engineering and construction. How to make sure drawings are properly reviewed and fit for bidding with few errors. How contractors negotiate with you and how you should with them. How to analyze contractors quotes. How to use earned value to track your project How to find out early if you have cost or schedule problems and what to do about them. How to look at work in the field and tell immediately if it s on schedule or not. How to estimate task time duration, and costs for AFE s. How to either kill a project quickly or justify it properly to get AFE approval. Take-Homes Each attendee will be given A floppy disc with a project plan that can be used for any project with minor modification A floppy disc with a preliminary and detailed engineering scope of work that can be used to bid engineering for any project with minor modification. A manual that will make note taking unnecessary. 2
3 Capital Project Management is Primarily about Construction not Chemical Engineering Even after the proper project management tools have been mastered, they cannot be utilized to their fullest without the appropriate knowledge of construction. Unfortunately, most chemical and mechanical engineers who manage projects have had no training in the construction trades, the construction process, or even in the process control hardware used today. Unless an effort is made to fill in these gaps, the project manager will be supervising work that he doesn t understand and cannot critique, and will be dealing with people in a rather complicated realm, the construction process, that he doesn t understand either. And worst of all, this lack of understanding leads to increased costs, expanded schedules, and a compromise in quality. Two seminars address this knowledge need: What the Capital Project Manager Needs to Know about Soil, Foundations, Concrete, Welding, and Piping, and What the Capital Project Manager Needs to Know About Electrical Power and Control Systems. These two seminars provide the project manager with what he needs to know about construction and control to efficiently manage his projects. Each is a one-day seminar, kept concise to accommodate busy schedules. What the Capital Project Manager Needs to Know about Soil, Foundations, Concrete, Welding, and Piping Seminar Objective The capital project manager doesn t need to become an architect, but he does need to have a good, general understanding of the various trades, and the construction process. This seminar addresses those concerns and supplies the capital project manager with what he needs to know about soil, foundations, concrete, welding, and piping. The seminar is aimed only at the project manager. This unique approach cuts right to the chase and provides the information that he needs to know to manage his projects efficiently. Still Not Sure if This Seminar is for You? Take the Test! Soil Can soil be sharply classified as sand, gravel, clay, silt, or rock? If topsoil is compacted to 2000 psf of bearing capacity, is it possible for layers of soil below to be weaker? Is the water table an underground lake below which there is more dry soil? Does rock settle? Foundations Is placing the bottom of a concrete pad below the frost line the only way to avoid frost heave? Are piles immune to frost heave? Is removing a weight of soil equal to the weight of your new construction a guarantee that the ground below can provide proper support? Do all foundations settle? Concrete Is stating type, compressive strength, and slump enough to completely specify concrete? Is it OK to add water to concrete at the job site for extra workability? Does it matter when finishing begins? If your concrete samples test OK, does that mean the concrete in the field is fine too? Welding Can you read welding symbols? Why is heat treatment sometimes required after welding? When welding with a DC machine, does it matter if the electrode is made positive or negative? Why are root passes in SMAW (stick welding) butt welds commonly made with TIG? Piping When should a stress analysis be performed on a piping design? Is temperature the primary variable used to select pipe supports? When should a constant support hanger be used? When should a pump be aligned? Learn the answers to these questions and much, much more! 3
4 Some of What you Will Learn about Soil, Foundations, and Concrete: Soil types and strengths Soil testing methods Foundation types Concrete theory Types of concrete Common concrete maladies and how to prevent them Design of Concrete mixtures Transporting, testing, and placing concrete Finishing Hot and cold weather concrete placement How to protect your project against unscrupulous construction practices Some of What You Will Learn about Welding and Piping: How to read welding symbols Overview of welding processes SMAW (stick), TIG, and MIG Overview of piping systems How to select support types How to determine if a stress analysis is necessary Piping and pipe rack design fundamentals When to align pumps When vibration must be considered in design How to protect your project against unscrupulous construction practices Take-Homes Each attendee will be given A manual that will make note taking unnecessary. What the Capital Project Manager Needs to Know About Electrical Power and Control Systems Seminar Objective The capital project manager doesn t need to become an electrical engineer or a control engineer, but he does need to have a good, general understanding of electrical power and control systems, and the construction process. This seminar addresses those concerns and supplies the capital project manager with what he needs to know about electrical power and control systems. The seminar is aimed only at the project manager. This unique approach cuts right to the chase and provides the information he needs to know to manage his projects efficiently. Still Not Sure if This Seminar is for You? Take the Test! Electrical Power Generation How is electricity produced from coal, gas, water, and nuclear power? Why is electricity produced in three phases? Describe electricity s path from the generating station to the final user? What s the difference between a delta and a wye transformer? Plant Electrical Power Usage Is it possible to artificially reduce transformer power by over sizing circuit breakers? Can you calculate project power needs from scope documents? Can you determine if an existing transformer can carry your load? Can you read line diagrams? 4
5 Control System Basics What are the six main parts of a computer? Define operating system, application software, support software? Are there differences between a programmable logic controller and a computer? How are modems related to data highways? Process Control What is the distinguishing feature of a DCS? Can a single PLC control several processes? How do Foundation Fieldbus and HART differ from each other? Can a single bus have instruments from different processes on it? Can a single PLC accommodate dumb transmitters as well as HART and Foundation Fieldbus? Can PLC s from different manufacturers be linked with each other as well as with personal computers? Learn the answers to these questions and much, much more! Some of What You Will Learn about Electrical Power and Control Systems: Electric Power Power generation and transmission Apparent power, real power, power factor Single phase and three phase power calculations Calculating process kva needs Sizing conductors, conduit, and circuit breakers for motors, panelboards, and transformers Line diagrams How to protect your project against unscrupulous construction practices Your Presenter Glen Rosentrater has spent his career managing capital projects and has authored several papers dealing with project management. He earned his BS and MS in chemical engineering from the Univ. of Illinois at Chicago, and is a project management professional (PMP). Rosentrater is a member of AICHE and the Project Management Institute (PMI). Process Control Computer basics Main frames and PCs Industrial computers PLC program types Distributed Control systems Standards and protocols Hybrid control systems Smart transmitters HART Foundation Fieldbus Take-Homes Each attendee will be given A manual that will make note taking unnecessary. CP Project Services, inc., 4034 Wainwright, Oak Lawn, IL , tel (708) , fax (708) , cpprojserv@aol.com 5
6 Capital Project Management and Construction presented by CP Project Services, inc. Mail checks and registration forms to CP Project Services, inc., 4034 Wainwright, Oak Lawn, IL Please make sure your check is enclosed. Registration Form Name Position/Title: Phone: Fax: Company: Street Address: City: State Zip Code: Seminar Title: Seminar Location/Date: CP Project Services, inc Wainwright Oak Lawn, IL Capital Project Management and Construction Learn what you need to know about both!
Soils, Foundations & Moisture Control
Soils, Foundations & Moisture Control Soil The top loose layer mineral and/or organic material on the surface of the Earth that serves as a natural medium for the growth of plants and support for the foundations
More informationJUBILEE TECHNICAL TRAINING CENTRE TAKORADI POLYTECHNIC 2015 TRAINING PROGRAMMES
JUBILEE TECHNICAL TRAINING CENTRE TAKORADI POLYTECHNIC 2015 TRAINING PROGRAMMES Main Courses Duration: 26 weeks 1. NVQ Level 2 Performing Process Operation in Replicating Environment 2. NVQ Level 2 Performing
More informationQuick fix for frost heave:
Quick fix for frost heave: HELICAL PILES Megan Milbradt Civil Engineer Basin Electric Power Shane Vasbinder Civil Engineer Basin Electric Power Concrete piers were 6 inches to 2 feet out of the ground.
More informationCold Weather Concrete Practices
Cold Weather Concrete Practices The Information below is an outline of common practice for residential foundation placement and winter construction utilize Edmonton and surrounding Area. Conditions in
More informationMachine Foundation Design
Machine Foundation Design As the structural engineer who recently designed the machine foundation for one of the largest vertical turning and milling centers in the country, in addition to over 250 other
More informationPLC Based Liquid Filling and Mixing
PLC Based Liquid Filling and Mixing 1 Mihir Panchal, 2 Aashish Panaskar. 3 Prof. Lalit Kumar KJ College of Engineering and Management Research, Pune, India Abstract: The objective of this paper is to design,
More informationApplying For New or Revised Electric Service
Applying For New or Revised Electric Service Dear Customer: ComEd is happy to assist you in initiating new or revised electric service to your location. Please complete, sign and return the attached service
More informationMax. Length of HTS Cables in the Future
Max. Length of HTS Cables in the Future K. Schippl, Nexans Deutschland Industries, Hannover, Germany TOPICS: Limitation of the cable design: 1. Physical limitations 2. Shipping limitations 3. Maintenance
More informationNFPA 70E 2012 Rolls Out New Electrical Safety Requirements Affecting Data Centers
NFPA 70E 2012 Rolls Out New Electrical Safety Requirements Affecting Data Centers A market position paper from the experts in Business-Critical Continuity TM Executive Summary Electrocutions are the fourth
More information05-15-98 ELECTRICAL ENGINEERING ASSOCIATE, 7525
CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION POSTED JUNE 1999 05-15-98 ELECTRICAL ENGINEERING ASSOCIATE, 7525 Summary of Duties: Performs professional electrical engineering work in
More informationTHE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING
THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING Delton Short Course Programmes English Language Technical English Language English Language for the Oil Industry Oil
More informationChapter 3. The Project Management Framework. Objectives
Chapter 3 The Project Management Framework Objectives Understand the importance of the Project Management Institute and other professional societies Define the five process groups and understand how they
More informationDIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION
More informationPOLK STATE COLLEGE CHILLER PLANT EVALUATION WINTER HAVEN, FLORIDA APRIL 2, 2014. C arastro & A ssociates, C&A# 5747
POLK STATE COLLEGE WINTER HAVEN, FLORIDA CHILLER PLANT EVALUATION APRIL 2, 2014 C&A# 5747 C arastro & A ssociates, c o n s u l t i n g e n g i n e e r s inc. 2609 W. De Leon Street, Tampa, Florida 33609
More informationNorthEast Transportation Training and Certification Program (NETTCP) Course Registration Form
(NETTCP) Course Registration Form Interim Certification (Cost $300 members / $425 non-members) HMA Plant Technician* HMA Paving Inspector* Soils & Aggregate Inspector* Soils & Aggregate Lab Technician*
More informationFoundation Experts, LLC Specializes in Foundation Repair and Waterproofing
1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize
More informationThis is a Master s degree level apprenticeship which includes academic learning combined workplace learning and training.
Power Engineer Degree Apprenticeship The UK s energy sector is integral to the prosperity and stability of the UK economy as a whole, delivering an absolutely fundamental service for all its citizens.
More informationUniversity of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery
University of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery Yellow Alert for Mayflower Residence hall Peak at 31.5 feet Power Plant floods from steam tunnel and shuts down 1993 Flood
More informationORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat -
Doc. : 08C00031_e Date : 10.02.2009 Page : 1 / 9 ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric - (Preliminary) Doc. : 08C00031_e
More informationBackup Fuel Oil System Decommissioning & Restoration Plan
Backup Fuel Oil System Page 1 of 19 Overview of Physical Fuel Oil System and Decommissioning Steps The fuel oil system at Milford Power consists of a number of subsystems. These include the following:
More informationElectrical. This section applies to the design and installation of building power distribution systems.
Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions
More informationWET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION.
WET/DAMP BASEMENTS PROBLEM. IS THIS BASEMENT LEAKING OR COULD WE HAVE ANOTHER PROBLEM? Water line arching up on wall in corners of basement. Water collecting on concrete floor starting in corners. ANSWER:
More informationCandle Plant process automation based on ABB 800xA Distributed Control Systems
Candle Plant process automation based on ABB 800xA Distributed Control Systems Yousef Iskandarani and Karina Nohammer Department of Engineering University of Agder Jon Lilletuns vei 9, 4879 Grimstad Norway
More informationGrounding Practice at Data and Communications Centers. David Brender, P.E., CPQ National Program Manager Copper Development Association Inc.
Grounding Practice at Data and Communications Centers David Brender, P.E., CPQ National Program Manager Copper Development Association Inc. Overview of This Presentation Elements of building wiring and
More informationELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1
KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1
More informationThe rock cycle. Introduction. What are rocks?
The rock cycle This Revision looks at the three types of rock: sedimentary, igneous and metamorphic. It looks at how they are formed, the weathering of rocks and the way one form of rock turns into another,
More informationMechanical Engineer. Process Engineer. Civil Engineer. PFD 001 - Inlet works and screening 40.0 27. PFD 002 - Membrane Bioreactor 34.
1.00 Site Visit / Data Gathering Scope definition & design verification,inspection of the site, Collation of information, Condition report and priorities, Cost estimates and Preliminary programme 35.5
More informationQualification of Auditor and Lead Auditor to perform an assessment according NSQ-100
Page 1 / 11 ABSTRACT Qualification of Auditor and Lead Auditor to CONTENTS 0. GENERAL... 2 0.1. Purpose... 2 0.2. Scope of application... 2 0.3. References... 2 0.4. Terminology... 2 1. SECTIONS... 2 1.1.
More informationLS 2540 SEWER LATERALS AND INSPECTION TEES
LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal
More informationCity of San Diego Residential Photovoltaic Systems Inspection Guidelines
City of San Diego Residential Photovoltaic Systems Inspection Guidelines The purpose of inspections by DSD staff is to ensure compliance with the California Electrical Code (CEC), other applicable codes
More informationheat treatment equipment & accessories
heat treatment equipment & accessories INDUSTRIAL FURNACES Dear Customer, ElectroHeat Sweden AB is an innovative company based in Gothenburg, Sweden, and has been operating since 1975. We manufacture industrial
More informationSeries Six Plus Programmable Controller
Series Six Plus Programmable Controller Gl?K-0147B June 1989 Central Processor Unit 8-Slot Rack 1l-Slot Rack General Description The Central Processor Unit (CPU) for the Series Six Plus Programmable Logic
More informationEnergy savings in commercial refrigeration. Low pressure control
Energy savings in commercial refrigeration equipment : Low pressure control August 2011/White paper by Christophe Borlein AFF and l IIF-IIR member Make the most of your energy Summary Executive summary
More informationAgile Project Execution
ebook Agile Project Execution The future of Industrial Process Automation projects v1.4 EMK(VDS)-TR-EB-01 APEX ebook Table of Contents Intro Agile Project Execution Page 2. Chapter 1 Conventional Project
More informationDesigned and Engineered to Perform
History EARTH CONTACT PRODUCTS, L.L.C., is a family owned company, based in Olathe, Kansas. This company was built upon Don May s U.S. Patented fourth-generation Steel Piering System that has led to the
More informationAir Conditioner Water Heater Model ACWH18
Air Conditioner Water Heater Model ACWH18 Installation Guide IMPORTANT! READ THIS FIRST! Commissioning of this unit must be done by a licensed HVAC technician. Commissioning includes making the electrical
More informationSPECIAL SPECIFICATION 5757 Power Duct System
2004 Specifications CSJ 0353-04-088 SPECIAL SPECIFICATION 5757 Power Duct System 1. Description. This Item shall govern for the furnishing and installing of all materials, equipment, and labor listed in
More informationEffective: September 10, 2006 Vermont Attachment 1 to Rule 5.500 Public Service Board Page 1 of 6
Public Service Board Page 1 of 6 STANDARD APPLICATION FOR INTERCONNECTION OF GENERATION RESOURCES IN PARALLEL TO THE ELECTRIC SYSTEM OF: (Interconnecting Utility) Preamble and Instructions: An owner of
More informationCertain soils - Clay soils are particularly vulnerable to subsidence since they shrink and swell depending on their moisture content.
Subsidence - Dealing With The Problem Introduction It is the sight every homeowner dreads - cracks appearing in the walls of their home. But don t fear the worst - while there has been an increase in subsidence
More informationSTRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
More informationChapter 4 Forms of energy
Chapter 4 Forms of energy Introduction This chapter compromises a set of activities that focuses on the energy sources and conversion. The activities illustrate The concept and forms of energy; The different
More informationCustomer Low-Voltage Switchboards Service Cable Terminal Compartment Arrangements and Clearances
Page 50 of 100 Customer Low-Voltage Switchboards Service Cable Terminal Compartment Arrangements and Clearances (Replaces A-190556) THIS CUSTOMER REFERENCE SPECIFICATION (CRS) IS PART OF THE RULES FOR
More informationCHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1
CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 1 This Chapter of the FERC Engineering Guidelines has been prepared under contract with R & H Thomas, Inc. JANUARY 1993 Chapter VII Construction
More informationFLEXIBLE SOLUTIONS FOR FLUIDS AND GASES
FLEXIBLE SOLUTIONS FOR FLUIDS AND GASES www.amnitec.nl AmniTec B.V., Rotterdam, is part of a group of companies called United Flexible with an annual turnover of $ 70 Million and 5 operating facilities
More informationFreezer Floor Heaving and Solution
Freezer Floor Heaving and Solution Prepared By H. Charles Woolley and John Fountain For International Association for Cold Storage Contractors November 2-5, 2011 Introduction Mr. Charles Woolley -Vice
More informationCathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants
Cathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants PG&E Office San Francisco January 18, 2007 Craig K. Meier Corrosion Control Incorporated Corrosion process for tanks
More informationPROGRAM CRITERIA FOR ELECTRICAL ENGINEERING TECHNOLOGY
PROGRAM CRITERIA FOR ELECTRICAL ENGINEERING TECHNOLOGY Scope These program criteria apply to programs having titles involving Electrical Engineering Technology including: electrical engineering, electrical
More informationWhitepaper. Modular Substation Cable Termination Design. Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada
Whitepaper Modular Substation Cable Termination Design Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada Abstract The methods for cable penetrations into modular industrial substations are
More information1A PLANNING AND DEVELOPMENT SHERIDAN COLLEGE GOES DANISH IMPLEMENTING THEIR DISTRICT ENERGY
1A PLANNING AND DEVELOPMENT SHERIDAN COLLEGE GOES DANISH IMPLEMENTING THEIR DISTRICT ENERGY AGENDA 1. Background up till now 2. District Energy on two campuses current work 3. System optimisation and some
More informationRenovation instructions
1(13) Renovation instructions The purpose of these instructions is to inform you of the things to consider when renovating an apartment. You can avoid many possible problems and additional costs following
More informationMorris S. Stover, P.E. Sponsor, Transmission Area
Page 1 of 5 Job Function Morris has nearly 28 years in the power industry including design and construction of transmission line and substation facilities, He has extensive experience in contract development
More informationCyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0.
Innovation Park Charlotte. NC 28262 DRAFT V0.1 Page 2 CyberFortress Data Center at Innovation Park BECO South purchased Innovation Park in March 2010 and immediately launched a dramatic top-to-bottom $30M
More informationSpecifications for Residential Property Owners Connection to New Public Sewer
Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the
More informationStanford University Guest Lecturer, Professor s Assistant, 1999-2004 Advanced Construction Issues and Claims, Civil Engineering Department
Current Position PKR CONSULTING, INC. Founder and Chief Executive Officer, 2004 Present Provides construction consulting, dispute resolution and expert witness services to owners, contractors, subcontractors,
More informationPermeable Pavement Construction Guide
Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce
More informationELECTRONIC INFORMATION SECURITY A.R.
A.R. Number: 2.6 Effective Date: 2/1/2009 Page: 1 of 7 I. PURPOSE In recognition of the critical role that electronic information systems play in City of Richmond (COR) business activities, this policy
More informationCHAPTER 8- REDUCING THE MOISTURE
CHAPTER 8- REDUCING THE MOISTURE I ve learned many different ways to cut down on moisture and dampness over my many years of being a homeowner. All those tips I ve included right here for you so that you
More informationMTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS
Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT
More informationSUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
More informationServices. Three Phase Service
Services Primary Service vs Secondary Service Overhead vs Underground Common Service Types Three Phase Wye Closed Open Delta Corner Grounded Center Tapped Open Single Phase Three Phase Service Wye Delta
More informationSub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders
INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids
More informationSeptic Tank to Cistern Conversions. Saving Water & Saving Money
Florida Keys Aqueduct Authority 1100 Kennedy Drive Key West, Florida 33040 Septic Tank to Cistern Conversions Saving Water & Saving Money One of the benefits of connecting to the Central Wastewater System
More informationHOW TO SELECT A LOW VOLUME (L.V ) BOILER
HOW TO SELECT A LOW VOLUME (L.V ) BOILER FREQUENTLY ASKED QUESTIONS OR COMMENTS ON BOILERS Dear Potential Customer: Low Volume Operator Exempt boilers have been marketed in Ontario to eliminate the requirement
More informationAmendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling
Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 415 April 2013 Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation
More informationINDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION
INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION February 2013 NOTE: If conflict exists between St. Thomas Energy s Conditions of Service and this document, the Conditions
More information50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance
02/15 Labko GRP cesspools Instructions for installation, operation and maintenance Reliable solutions Wastewater treatment systems Contents 1 LABKO CESSPOOLS... 3 1.1 GENERAL... 3 1.2 IMPORTANT TO KNOW
More informationUse of Fly ash from KKAB, for sealing of landfills
Use of Fly ash from KKAB, for sealing of landfills Kristina Hargelius M.Sc. Civ. Eng. Kristina.hargelius@ramboll.se Abstract The paper must include an abstract, which should be no more than and 150 words.
More informationDUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD
DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD JOB DESCRIPTION POSITION TITLE: Air Conditioning Mechanic DEPARTMENT: Plant TITLE OF IMMEDIATE SUPERVISOR: Supervisor, Maintenance Services Position Summary
More informationLOST FOAM PROTOTYPING METHODS
LOST FOAM PROTOTYPING METHODS A Comparison of Methods and Processes Copyright 2002 Austin Group, LLC. All rights reserved. INTRODUCTION TERRY AUSTIN PRESIDENT AUSTIN GROUP, LLC QUINCY, ILLINOIS INTRODUCTION
More informationRAID systems within Industry
White Paper 01/2014 RAID systems within Industry Functioning, variants and fields of application of RAID systems. A white paper issued by: Siemens. Siemens AG 2014. All rights reserved Warranty and liability
More informationShort Form Catalogue. Alarm Systems. Reliable Supervision and Control
Short Form Catalogue Alarm Systems Reliable Supervision and Control Alarm Monitors and Indicators The SELCO product range includes a number of alarm monitors and indicator panels for use in numerous applications.
More informationUOP Career Development. Career development program for mechanical and civil engineers
UOP Career Development Career development program for mechanical and civil engineers MAKING OUR WORLD SAFER AND MORE SECURE, MORE COMFORTABLE AND ENERGY EFFICIENT, AND MORE INNOVATIVE AND PRODUCTIVE Our
More informationSECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
More informationA quick guide to our floodcare scheme
A quick guide to our floodcare scheme What to do in case of sewer flooding We re here to help We appreciate that dealing with the results of sewage flooding is always unpleasant and we know how upsetting
More informationdue to uncertainty. This, in turn, has a direct impact on equipment availability and maintenance costs. Unfortunately, due to misconceptions and
due to uncertainty. This, in turn, has a direct impact on equipment availability and maintenance costs. Unfortunately, due to misconceptions and pressure from plant operators to get "back on line", it
More informationModule 5 Cost Management PMP Exam Questions
Module 5 Cost Management PMP Exam Questions PMP, PMBOK and the Registered Education Provider logo are registered marks of the Project Management Institute, Inc Question 1 A company, which provides professional
More informationITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT
ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT Description: This work shall consist of furnishing all materials, equipment and labor necessary for conducting an Osterberg Cell (O-Cell) Load
More informationAlain Nifenecker - General Electric Manager Controls Engineering
GE Energy Benefits of Integrating a Single Plant-Wide Control System Into a Standard Plant Design Philosophy Authors: Luis Cerrada Duque - Empresarios Agrupados Director of I&C Department Charles Weidner
More informationPMP SAMPLE QUESTIONS BASED ON PMBOK 5TH EDITION
PMP SAMPLE QUESTIONS http://www.tutorialspoint.com/pmp-exams/pmp_sample_questions_set2.htm Copyright tutorialspoint.com BASED ON PMBOK 5TH EDITION Here are 200 more objective type sample questions and
More informationCLEANING IN PLACE AUTOMATION FOR PROCESS INDUSTRY USING PLC AND SCADA SOFTWARE
CLEANING IN PLACE AUTOMATION FOR PROCESS INDUSTRY USING PLC AND SCADA SOFTWARE Siddhesh Dhonde 1, Bhaskar Nadigatla 2, D.U. Dalavi 3 1,2, 3 ETC, SCSCOE, SPPU, (India), ABSTRACT In Process Industries, proper
More informationQuality Assurance Concepts. Outline
Quality Assurance Concepts Peter C. Taylor Outline What is quality? Who cares? How do we get it? What is the important stuff? 1 Defining Quality Simple Definition (Philip Crosby) Quality: Conformance to
More informationA guide to preventing structural damage
A guide to preventing structural damage Home owners guide to planning landscaping and maintenance of foundations Structural damage can result from movement in clay soils caused by varying moisture conditions
More informationPLATE HEAT EXCHANGER. Installation Manual. Customer Name: Serial number: Purchase order number: Project:
PLATE HEAT EXCHANGER Installation Manual Customer Name: Serial number: Purchase order number: Project: Table of Contents ----------------------------------------------------------------- Page: 2 3 Name
More informationA GROUNDWATER PROTECTION PLAN FOR HOME HEATING OIL TANKS
A GROUNDWATER PROTECTION PLAN FOR HOME HEATING OIL TANKS What is a groundwater protection plan? A groundwater protection plan identifies the activities being conducted that can pollute groundwater and
More information340 Skilled Trades Technologies. Associate of Applied Science Degree
340 Associate of Applied Science Degree Building Maintenance Major...242 Construction Trades Major...345 Electrical Major...346 Mechanical Major...348 Certificates Building Maintenance...343 Electrical...347
More informationQuestions and Answers for Heating and A/C Contractors
1. How do we accomplish grounding of furnaces and / or water heaters on two wire circuits? 250.134 Equipment Fastened in Place or Connected by Permanent Wiring Methods (Fixed) Grounding. Unless grounded
More informationEmbedded Parts Introduction - Anchors
In the plant construction or process plants such as chemical, petrochemical, gas or power plants various disciplines are brought into contact and built on each other. Civil, mechanical, electro technical
More informationENERGY MANAGEMENT. for INDUSTRY AND BUSINESS
ENERGY MANAGEMENT for INDUSTRY AND BUSINESS [Principles of Energy Management] Denis Cooke Denis Cooke & Associates Pty Limited Phone + 61 2 9871 6641 Fax +61 2 9614 1723 Email: denis@decoa.com.au Web Site
More informationA Real Time, Object Oriented Fieldbus Management System
A Real Time, Object Oriented Fieldbus Management System Mr. Ole Cramer Nielsen Managing Director PROCES-DATA Supervisor International P-NET User Organisation Navervej 8 8600 Silkeborg Denmark pd@post4.tele.dk
More informationCONTAMINANT REMOVAL FROM CENTRIFUGAL SYSTEMS
CONTAMINANT REMOVAL FROM CENTRIFUGAL SYSTEMS BULLETIN 240-10-3 June 2004 Supersedes June 1983 Many centrifugal systems get little maintenance. As a result they operate with the refrigerant highly contaminated
More informationSoils and Aggregates Division
Dan Sajedi, Division Chief 443-572-5162 George Hall, Assistant Division Chief Field Operations 443-572-5271 Eric Frempong, Assistant Division Chief Laboratory 443-572-5055 Aggregate Materials, Controlled
More informationBuilding Your Interlocking Concrete Pavement to Last a Lifetime
Building Your Interlocking Concrete Pavement to Last a Lifetime A Guide for Consumers Contents Building Your Interlocking Concrete Pavement to Last a Lifetime.... 3 What Does Installation Involve?....
More informationC hapter 15. Construction Scheduling
Objectives C hapter 1 Construction Scheduling After studying this chapter, you will be able to: Summarize three uses for schedules. Identify three scheduling methods commonly used in construction. Explain
More informationDegree programme in Automation Engineering
Degree programme in Automation Engineering Course descriptions of the courses for exchange students, 2014-2015 Autumn 2014 21727630 Application Programming Students know the basis of systems application
More informationMAINTENANCE INSTRUCTIONS. Thermia Robust heat pump
MAINTENANCE INSTRUCTIONS Thermia Robust heat pump 9 6 8 0-5 4 7 4 5 0 0 1 R e v. 3 Table of contents 1 Important information.................. 2 1.1 Product description....................... 2 1.2 General................................
More informationWater Heating and Heat Recovery 1
PID 113 (488) Water Heating and Heat Recovery 1 Florida Power Corporation 2 ENERGY-EFFICIENT WATER HEATING: IT S THE EASIEST WAY TO SAVE ENERGY DOLLARS Anywhere from 10% to 25% of the money you spend on
More informationInvestigations of a Long-Distance 1000 MW Heat Transport System with APROS Simulation Software
th International Conference on Structural Mechanics in Reactor Technology (SMiRT ) Espoo, Finland, August 9-4, 9 SMiRT -Division 3, Paper 56 Investigations of a Long-Distance MW Heat Transport System with
More informationElectricity to your property
Vattenfall Distribution AB Electricity to your property How an electrical connection is made and what you need to consider How electricity reaches your property 8 simple steps! 1. Please leave plenty of