1 A PRIMER: ASSET MANAGEMENT AND BUILDING ONTARIO PROVINCIAL FUNDING REQUIREMENTS Technology to Support Asset Management Daryush Esmaili, M.A.Sc Infrastructure Technologist City of Brantford

2 Agenda 1. Provide an overview of the practices and processes required for asset management planning in support of technology and tools 2. Outline policies and techniques used in the development of the City of Brantford s asset management program What this is not: A discussion of any particular asset management software

3 Fundamental Truths Effective infrastructure planning does not always require software. No easy buttons or one size fits all solutions currently on the market! Software and data facilitate making, they do not make decisions. Mature asset management requires Ongoing commitment Business processes in place Knowledge and understanding

4 The Asset Management Plan Corporate and Strategic Planning Strategic Objectives / Plans Organizational Policies, Strategies and Goals Information Management & Data Improvement Review and Collate Asset Information Understand the Current State of Infrastructure Establish / Manage Service Levels Asset Management Strategy Financial Planning and Modeling Project Implementation and Delivery Condition Assessment and Performance Data Asset Inventory and GIS PSAB Register Infrastructure Report Card Asset Valuation and Replacement Costs Establish goals, standards and objectives Develop measurement framework and benchmarks Lifecycle Strategies (Service Delivery, O&M, Rehab and Replacement) Condition Assessment and Performance Monitoring Growth and Demand forecasting Lifecycle Analysis and Financial Forecasting Asset Valuation Funding Management Scheduling and Project Management Planned Operations, Maintenance, Rehab and Replacement Scope of Asset Management Plan

5 The Answers We Seek Information Management & Data Improvement Review and Collate Asset Information Understand the Current State of Infrastructure Establish / Manage Service Levels Asset Management Strategy Financial Planning and Modeling What do we have and where is it? What is it worth? What condition is it in and how is it performing? What do we need to do? When do we need to do it? How much money do we need? How will we fund it?

6 Review and Collate Asset Information Decisions are only as good as the information they are based on. Data is only as good as the decisions that can be made with it. Quantity Location Condition Size Material Type Performance Physical Time Installation, Rehab. and Replacement Dates Estimated Service Life (ESL) Cost Salient Historical Cost Replacement Cost Book Value Description (where required) Functional Information (Risk)

7 Review and Collate Asset Information

8 Review and Collate Asset Information Standard Data Collection forms by Construction Inspectors and Operators Excel data dumps; Maps etc. Condition Inspection Data GIS Department LADR and Other Databases Data Exports and Visualization Analysis and Recommend -ations Operation and Maintenance Data Information Management and Data Improvement LADR data is linked to GIS through unique feature ID s

9 Understand the Current State of Infrastructure What do we have and where is it? What is it worth?

10 Understand the Current State of Infrastructure What condition is it in and how is it performing? Summarize asset condition In the absence of condition data, remaining service life (RSL) can be used as a proxy. Rating Category Estimated RSL Assets with increased probability of failure

11 Establish / Manage Levels of Service

12 Establish / Manage Levels of Service Understand the expectations of service receivers Internal Operations and Field Staff Management Departments External Business Industry Commercial Residential Performance Related # of water main breaks / 100 km Length O&M Cost / km Length Service Related # Water Quality Issues # Water Pressure Issues # Unplanned Service Interruptions

13 Establish / Manage Levels of Service Track levels of service and understand the drivers

14 Establish / Manage Levels of Service Communicate results

15 Establish / Manage Levels of Service 100% 80% System Reliability Chart Water Distribution 2010 City Results 2009 City Results Group Median 60% 40% 20% 0% 74.7% 96.8% 26.4% 100.0% 71.0% 86.0% 79.5% Main breaks Leaking Hydrants Reinvestment Rate Non-Revenue Water Inoperable or Leaking Valves Emergency Service Connection Repairs Unplanned System Interruptions

16 Asset Management Strategy What do we need to do? When do we need to do it? Identify project needs for the next 5 10 years

17 Asset Management Strategy Group identified projects by program area Informative project descriptions (boundaries, drivers etc.) Gross Cost Road and Wate r 4,509,000 3,147,000 1,133,000 2,971,000 1,010,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 17,770,000 Marlborough Rd (Fourth Ave to Park Rd N) 326, ,000 West St (Edmondson St to Fairview Drive) 741, ,000 St. Paul Ave. (St. Paul Ave. to Charing Cross St) 279, ,000 Hillcrest Ave (Straw berry Lane to Shellard Lane) 226, ,000 Patterson Ave (Colborne St to Grey St) 537, ,000 Brantw ood Park Rd. (Dunsdon St. to Lynden Rd.) 2,400, ,400,000 St. Paul Ave. (Elmw ood St to Wood St) - 377, ,000 Margaret Drive (West St to Morton St) - 251, ,000 North Park St (St. George St to Highw ay 403) - 2,159, ,159,000 Dale St (Mount Pleasant St to Barry Drive) - 92, ,000 Barry Drive (Bell Ln to Dead-End) - 268, ,000 Hampton St (Morley Ave to Row anw ood Ave) , ,000 Morley Ave (Hampton St to Avondale Cr) , ,000 Pontiac St (Marie Ave to Salisbury) , ,000 Nelson St (Stanley St to Park Rd N) , ,000 Graham Ave (Tuxedo Ave to Catharine Ave) , ,000 Wellington St (Pulleston Ave to Second Ave) , ,000 Ada Ave (Brant Ave to St. Paul St) , ,000 Russel St (Grand St to North Park Rd) , ,000 West St (Charing Cross St to Highw ay 403) ,063, ,063,000 Beverly Rd (Colborne St to Chatham St) , ,000 The Homestead Pl (Ashgrove Rd to Dead-End) , ,000 Southglen Rd (Greenfield Rd to Dead-End) , ,000 Clara Cr (Colborne St to Colborne St) , ,000 Unspecified Watermain Improvements ,000,000 1,000,000 1,000,000 1,000,000 1,000,000 5,000,000 Buildings / Facilities 1,967,000 1,640,000 2,100,000 2,925,000 1,412,000 3,000,000 2,176,000 2,189,000 2,100,000 2,163,000 21,672,000 Energy Conservation Initiatives Implementation (Green Energy Act Compliance) - 100, , , ,000 John Noble Home Refrigeration System Replacement 95, ,000 John Noble Home S3 air conditioner replacement 125, ,000 Sanderson Centre Auditorium Roof Rehabilitation and Repairs 125, ,000 Sanderson Centre Auditorium Compressor and Cooling Coil Replacement 137, ,000

18 Asset Management Strategy Required to Meet Legislated Standards Does the project satisfy Prov. or Fed. mandates? Is the project required for regulatory reasons? Consequence of Failure Service Levels O&M Impact Improved Efficiency Expansion and Growth Health and Safety Coordinated Project What is the consequence of failure of the asset (high, medium, low) Does the project maintain level of service standards? Does the project affect all customers in a neighborhood or facility? Does the project affect all customers within the City? After completion, will the project increase O&M cost and time? Will the project decrease O&M budgets? Does the project require the hiring of new staff? Will the project increase the efficiency of existing processes? Does the project preserve or extend the life of an existing asset? Does the project use innovative solutions? Does the project increase capacity to meet existing deficiencies? Does the project increase capacity to meet future growth needs? Will the project attract new economies? Does the project eliminate a risk or hazard to public health? Does the project reduce hazards or risks to users of the facility? Will failure to complete the project delay or impact other programs? Is the project required to be coordinated with other projects?

19 Asset Management Strategy

20 Financial Planning and Modeling How much do we need? How will we fund it? Tie project plan to the available funding sources.

21 Financial Planning and Modeling Evaluate the long term sustainability

22 Financial Planning and Modeling Evaluate investment scenarios

23 Summary Software and data facilitate decision making and do not make decisions. Decisions are only as good as the information they are based on. Periodically review data, performance measures and software for costs and benefits.

24 Daryush Esmaili Infrastructure Technologist City of Brantford QUESTIONS?

The City of Owen Sound Asset Management Plan

The City of Owen Sound Asset Management Plan The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to

More information

Asset Management Plan Public Works and Social Housing Infrastructure City of Brantford, Ontario

Asset Management Plan Public Works and Social Housing Infrastructure City of Brantford, Ontario 2013 Asset Management Plan Asset Management Plan City of Brantford, Ontario November 29, 2013 Prepared by: Capital Planning Facilities and Asset Management, Public Works Corporation of the City of Brantford

More information

Township of Amaranth. Asset Management Plan Report

Township of Amaranth. Asset Management Plan Report Township of Amaranth Prepared By: R.J. Burnside & Associates Limited 15 Townline Orangeville ON L9W 3R4 Prepared for: Township of Amaranth File No: 300033404 The material in this report reflects best judgement

More information

The Corporation of the Municipality of Callander. Asset Management Plan

The Corporation of the Municipality of Callander. Asset Management Plan The Corporation of the Municipality of Callander Asset Management Plan April 2014 1 Index A) Executive Summary P. 3 B) Introduction P. 4 C) State of Local Infrastructure P. 7 D) Expected Levels of Service

More information

Houston Asset Management In The Fast Lane: Final Report

Houston Asset Management In The Fast Lane: Final Report City of Houston Asset Management In The Fast Lane: Final Report Sandeep Aggarwal PE, Managing Engineer, City of Houston Yvonne W. Forrest, Senior Assistant Director, City of Houston Paul Schumi, Director,

More information

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN TOWN OF GRIMSBY ASSET MANAGEMENT PLAN August 20, 2014 DFA Infrastructure International Inc. Executive Summary ES1 Background The Town of Grimsby (Town) with a population of approximately 25,325 is located

More information

Bridges & Culverts Condition by Quantity

Bridges & Culverts Condition by Quantity 3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received

More information

Asset Management and Industry Solutions - A Municipal Perspective

Asset Management and Industry Solutions - A Municipal Perspective Asset Management and Industry Solutions - A Municipal Perspective Saidur Rahman, Ph.D., P. Eng. Senior Infrastructure Project Manager Town of Oakville Highlights Municipal Infrastructure in Canada Scope

More information

LIFECYCLE MANAGEMENT OF UTILITY ASSETS A PRACTICAL APPROACH

LIFECYCLE MANAGEMENT OF UTILITY ASSETS A PRACTICAL APPROACH LIFECYCLE MANAGEMENT OF UTILITY ASSETS A PRACTICAL APPROACH Dr. Petros Kolovopoulos (Hydro-Comp Enterprises Ltd, Cyprus), Dr Dinos Constantinides (Hydro-Comp Enterprises Ltd, Cyprus) Key words: Asset Management,

More information

Asset Management Plan

Asset Management Plan Corporation of the Town of Innisfil Asset Management Plan Prepared by: AECOM 55 Cedar Pointe Drive, Suite 620 705 721 9222 tel Barrie, ON, Canada L4N 5R7 705 734 0764 fax www.aecom.com Project Number:

More information

Asset Management Centre (AMC)

Asset Management Centre (AMC) Asset Management Centre (AMC) Greening Asset Management Niagara Provider Forum March 2009 1 Asset Management Centre (AMC) Overview of the Asset Management Centre Building Blocks of Green Asset Management

More information

Infrastructure Asset Management

Infrastructure Asset Management Infrastructure Asset Management IAM and P3 Projects Martin Gordon Senior Vice President Opus North America Opus North America Delivering Services Municipalities provide services to citizens Some are infrastructure

More information

Asset Management is not a system nor a collection of data nor is it a GIS

Asset Management is not a system nor a collection of data nor is it a GIS Relationship of PSAB 3150 and Asset Management David Watt Senior Asset Management Specialist Associated Engineering Quote for the day We have more information now than we can use, and less knowledge and

More information

Water Utility Strategic Planning From Concept to Implementation

Water Utility Strategic Planning From Concept to Implementation Water Utility Strategic Planning From Concept to Implementation May 7, 2009 HDR Engineering, Inc. Presentation Overview Why Bother? Topics Administration, Customer Service, and Intradepartmental Master

More information

Business Unit Asset Management Plan Framework & Guidelines

Business Unit Asset Management Plan Framework & Guidelines Draft Report Business Unit Asset Management Plan Framework & Guidelines Prepared for March 2014 Contents Section Page Contents... i Background... 1 Asset Management Plans... 1 The AMP Framework... 1 About

More information

Ohio RCAP Methodology for Asset Management / CMOM Demonstration Projects

Ohio RCAP Methodology for Asset Management / CMOM Demonstration Projects Ohio RCAP Methodology for Asset Management / CMOM Demonstration Projects December 10, 2014 from 2:00-3:00 p.m. Presented by Wayne Cannon Ohio RCAP Rural Development Specialist, hwcannon@wsos.org Why Asset

More information

Operations, Maintenance and Monitoring Branch Status Update

Operations, Maintenance and Monitoring Branch Status Update Operations, Maintenance and Monitoring Branch Status Update Presentation to Committee of the Whole Brett Bloxam Director, Operations, Maintenance and Monitoring March 20, 2014 #5405920 Agenda Overview

More information

cugog TOWNSHIP OF Ian

cugog TOWNSHIP OF Ian TOWNSHIP OF cugog EDUCATION AND TRAINING SESSION AGENDA MONDAY, OCTOBER 28, 2013 AT 9:00 A.M. IN COUNCIL CHAMBERS Road and Bridge Asset Management Plan The What and the How 9:00 a.m. The What Ian Roger

More information

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

Township of Terrace Bay Drinking Water System Financial Plan

Township of Terrace Bay Drinking Water System Financial Plan Township of Terrace Bay Drinking Water System Financial Plan August 2014 Introduction Municipalities in Ontario recently adopted a full accrual accounting approach to tangible municipal assets in accordance

More information

RE: 2014 Asset Management Plan. OBJECTIVE: To present Council with an Asset Management Plan and recommended implementation strategy moving forward.

RE: 2014 Asset Management Plan. OBJECTIVE: To present Council with an Asset Management Plan and recommended implementation strategy moving forward. HALDIMAND COUNTY Report PW-GM-01-2014 of the General Manager of Public Works For Consideration by RE: 2014 Asset Management Plan OBJECTIVE: To present Council with an Asset Management Plan and recommended

More information

Asset Management Plan 2015 Facilities and Transit

Asset Management Plan 2015 Facilities and Transit Asset Management Plan 2015 Facilities and Transit Prepared for Submitted by October 2015 Asset Management Plan Contents Section 1 Executive Summary Table of Content Section 2 Introduction Section 3 State

More information

STRATEGIC FINANCIAL PLAN 2007 to 2010

STRATEGIC FINANCIAL PLAN 2007 to 2010 STRATEGIC FINANCIAL PLAN 2007 to 2010 January 2008 Table of Contents 1.0 Introduction Page 3 2.0 Linkage Long Term Financial Planning and the City s Community Strategic Plan Page 4 3.0 Why is Long Term

More information

IN FOCUS COMPLIANCE AUDIT PROGRAM RECYCLER QUALIFICATION OFFICE

IN FOCUS COMPLIANCE AUDIT PROGRAM RECYCLER QUALIFICATION OFFICE IN FOCUS COMPLIANCE AUDIT PROGRAM RECYCLER QUALIFICATION OFFICE MARCH 2014 Electronics Recycling Standard, Section 8.1.5: Recyclers shall maintain a detailed program to schedule and conduct regulatory

More information

Asset Management: A Best Practices Guide

Asset Management: A Best Practices Guide Asset Management: A Best Practices Guide Introduction This guide will help you understand: What asset management means. Purpose The benefits of asset management. Best practices in asset management. How

More information

THE ASSET MANAGEMENT PLAN FOR THE TOWNSHIP OF ASHFIELD-COLBORNE-WAWANOSH

THE ASSET MANAGEMENT PLAN FOR THE TOWNSHIP OF ASHFIELD-COLBORNE-WAWANOSH THE ASSET MANAGEMENT PLAN FOR THE TOWNSHIP OF ASHFIELD-COLBORNE-WAWANOSH 2013 SUBMITTED DECEMBER 2013 BY PUBLIC SECTOR DIGEST 148 FULLARTON STREET, SUITE 1410 LONDON, ONTARIO, N6A 5P3 State of the Infrastructure

More information

Infrastructure Asset Management. CEAM Conference January 25, 2012 Jim Engfer Stantec 651-604-4819 James.engfer@stantec.com

Infrastructure Asset Management. CEAM Conference January 25, 2012 Jim Engfer Stantec 651-604-4819 James.engfer@stantec.com Infrastructure Asset Management CEAM Conference January 25, 2012 Jim Engfer Stantec 651-604-4819 James.engfer@stantec.com Infrastructure Asset Management You can t afford not to do it Description of Geographic

More information

Municipality of Strathroy-Caradoc

Municipality of Strathroy-Caradoc Municipality of Strathroy-Caradoc Drinking Water Quality Management Standard OPERATIONAL PLAN Version 3 November 15, 2013 DRINKING WATER QUALITY MANAGEMENT STANDARD OPERATIONAL PLAN Table Of Contents PART

More information

Community and Economic Development

Community and Economic Development Business Center Index Organizational Chart 12 2 Business Center Summary 12 3 Permits and Inspections 12 4 Economic Development 12 5 Planning 12 6 Willett Hall 12 7 Community Planning and Development Program

More information

Glossary. means the asset valuation module of Municipal DataWorks. means Geographic Information System

Glossary. means the asset valuation module of Municipal DataWorks. means Geographic Information System Getting Started The Prerequisites for Asset Management July 2009 Glossary Asset... means public infrastructure or a component thereof that has a tangible value, enables services to be provided and has

More information

County of Oxford Asset Management Plan 2014. 1.0 Executive Summary... 2. 2.0 Introduction... 7. 3.0 Purpose and Methodology... 10

County of Oxford Asset Management Plan 2014. 1.0 Executive Summary... 2. 2.0 Introduction... 7. 3.0 Purpose and Methodology... 10 Asset Management Plan AUGUST 2014 County of Oxford Asset Management Plan 2014 Table of Contents 1.0 Executive Summary... 2 2.0 Introduction... 7 3.0 Purpose and Methodology... 10 4.0 State of Infrastructure...

More information

Enterprise Asset Management Program

Enterprise Asset Management Program Purpose: The City of Red Deer 2009 2011 Strategic Plan identifies the implementation of an as one of The City s strategies to achieve medium and long term financial sustainability of the organization.

More information

WHAT DO YOU KNOW? HOW TO GET THE BEST INFORMATION OUT OF YOUR SYSTEM AND THE FOLKS THAT RUN IT.

WHAT DO YOU KNOW? HOW TO GET THE BEST INFORMATION OUT OF YOUR SYSTEM AND THE FOLKS THAT RUN IT. WHAT DO YOU KNOW? HOW TO GET THE BEST INFORMATION OUT OF YOUR SYSTEM AND THE FOLKS THAT RUN IT. ABSTRACT Steve Shoaf, City Of Asheville Nicholas Dierkes, Brown and Caldwell Understanding how well our Utilities

More information

Asset Management Plan

Asset Management Plan Example Transportation Asset Management Plan Outline This outline was created using the Transportation Asset Management Plan (TAMP) Builder ( www.tamptemplate.org ), a product of NCHRP Project 8-36/116.

More information

City of Aspen. Electric Utility Revenue and Rate Structure Study. December 8, 2008. Todd Cristiano Senior Consultant. Pathways to Lasting Solutions

City of Aspen. Electric Utility Revenue and Rate Structure Study. December 8, 2008. Todd Cristiano Senior Consultant. Pathways to Lasting Solutions City of Aspen Electric Utility Revenue and Rate Structure Study December 8, 2008 Todd Cristiano Senior Consultant Agenda Draft For Discussion Purposes Only Service rate revenue requirements Existing rate

More information

REPORT CITY OF WATERLOO ASSET MANAGEMENT PLAN OCTOBER 2014

REPORT CITY OF WATERLOO ASSET MANAGEMENT PLAN OCTOBER 2014 REPORT CITY OF WATERLOO ASSET MANAGEMENT PLAN OCTOBER 2014 City of Waterloo Asset Management Plan EXECUTIVE SUMMARY The City of Waterloo has prepared this asset management plan in accordance with the Ministry

More information

Water Rate Study & O.Reg.453/07 Water Financial Plan No.103-301A

Water Rate Study & O.Reg.453/07 Water Financial Plan No.103-301A March 2, 2012 dfa DFA Infrastructure International Inc. dfa DFA Infrastructure International Inc. 33 Raymond Street St. Catharines Ontario Canada L2R 2T3 Telephone: (905) 938-0965 Fax: (905) 937-6568 March

More information

COMPREHENSIVE ASSET MANAGEMENT STRATEGY

COMPREHENSIVE ASSET MANAGEMENT STRATEGY COMPREHENSIVE ASSET MANAGEMENT STRATEGY APPROVED BY SENIOR MANAGEMENT COMMITTEE ON AUGUST 23, 2012 (TO BE FINALIZED AFTER APPROVAL OF CAM POLICY BY COUNCIL) August 2012 Contents CONTENTS EXECUTIVE SUMMARY

More information

Prepared for the Federation of Canadian Municipalities

Prepared for the Federation of Canadian Municipalities Prepared for the Federation of Canadian Municipalities September 2002 A GUIDE TO SUSTAINABLE ASSET MANAGEMENT FOR CANADIAN MUNICIPALITIES Prepared for the Federation of Canadian Municipalities September

More information

The Redwood City Public Works Services (PWS) Department is comprised of four operating divisions:

The Redwood City Public Works Services (PWS) Department is comprised of four operating divisions: City of Redwood City, Public Works Services (PWS) Work Process Needs Assessment By: Russell Narahara, Management Analyst II The purpose of this document is to provide an overview of how field work is currently

More information

Prepared by. Tamer E. El-Diraby, PhD., PEng. Associate Professor, Sherif N. Kinawy, MSc., EP, Research Assistant. Department of Civil Engineering,

Prepared by. Tamer E. El-Diraby, PhD., PEng. Associate Professor, Sherif N. Kinawy, MSc., EP, Research Assistant. Department of Civil Engineering, Analyzing Approaches Used by Ontario Municipalities to Develop Road Asset Management Plans: Initial Insights Report Prepared by Tamer E. El-Diraby, PhD., PEng. Associate Professor, Sherif N. Kinawy, MSc.,

More information

Inspection Data for Bridge Asset Management

Inspection Data for Bridge Asset Management Inspection Data for Bridge Asset Management New York State DOT approach and Practice George A. Christian, P.E. New York State Department of Transportation Vermont AOT Bridge Maintenance and Preservation

More information

SECTION A... 3 SECTION B... 7

SECTION A... 3 SECTION B... 7 BRITISH COLUMBIA SAFETY AUTHORITY Manual for Owners and Operators of Special Status Plants Risk Assessed and General Supervision Date: March 12, 2012 Controlled Document: MAN -4000-03 I TABLE OF CONTENTS

More information

The Economic Impacts of Reducing. Natural Gas and Electricity Use in Ontario

The Economic Impacts of Reducing. Natural Gas and Electricity Use in Ontario The Economic Impacts of Reducing Natural Gas and Electricity Use in Ontario Prepared for Blue Green Canada July 2013 Table of Contents Executive Summary... i Key Findings... i Introduction...1 Secondary

More information

and Wastewater Infrastructure

and Wastewater Infrastructure Predicting Financial Planning the Life for Cycle the Rehabilitation Financing / Requirements Replacement of for Water and Wastewater Infrastructure 32005 rd International APWA International Geoengineering

More information

Business Intelligence. Using business intelligence for proactive decision making

Business Intelligence. Using business intelligence for proactive decision making Business Intelligence Using business intelligence for proactive decision making Table of Contents What is Business Intelligence? Why Business Intelligence? Strategy and Approach Case Study WHAT IS BUSINESS

More information

Chapter 2 Asset Management

Chapter 2 Asset Management Chapter 2 Asset Management Effectively Managing the City s Infrastructure Systems In 2013, the replacement value of the City of Portland s built infrastructure was estimated at $31.3 billion. 2 Providing,

More information

Road Asset Management vs Pavement Management A new Paradigm. Arthur Taute Stewart Russell

Road Asset Management vs Pavement Management A new Paradigm. Arthur Taute Stewart Russell Road Asset Management vs Pavement Management A new Paradigm Arthur Taute Stewart Russell Contents Background Definitions Improvements over PMS TMH22 elements Conclusions BACKGROUND Municipal AMS GRAP17

More information

Asset Management Decision Support Tools. Omar Smadi CTRE, Iowa State University November 14th, 2000

Asset Management Decision Support Tools. Omar Smadi CTRE, Iowa State University November 14th, 2000 Asset Management Decision Support Tools Omar Smadi CTRE, Iowa State University November 14th, 2000 Asset Management System (Roads and Bridges) Pavement Management System: Inventory History Current Condition

More information

BEYOND THE STORM: Toronto s Climate Change Adaptation Program. Its about Risk and Cost Management. David MacLeod Toronto Environment Office

BEYOND THE STORM: Toronto s Climate Change Adaptation Program. Its about Risk and Cost Management. David MacLeod Toronto Environment Office BEYOND THE STORM: Toronto s Climate Change Adaptation Program Its about Risk and Cost Management David MacLeod Toronto Environment Office June 16, 2011 Agenda Mitigation & Adaptation: Both are needed Impacts

More information

City of Glendale Water Services Department Urban Irrigation

City of Glendale Water Services Department Urban Irrigation City of Glendale Water Services Department Urban Irrigation Introduction The Water Services Department was asked by the Water Services Advisory Commission to provide historical information to include operational

More information

Corporation of the County of Renfrew

Corporation of the County of Renfrew Corporation of the County of Renfrew Asset Management Plan November 26, 2014 TABLE OF CONTENTS 1.0 Executive Summary Page 3 2.0 Introduction Page 5 3.0 State of Infrastructure Page 15 Buildings Page 20

More information

Drinking Water Quality Management System Financial Plan Number 047-101 O.Reg. 453/07

Drinking Water Quality Management System Financial Plan Number 047-101 O.Reg. 453/07 Drinking Water Quality Management System Financial Plan Number 047-101 O.Reg. 453/07 TABLE OF CONTENTS TABLE OF Contents... 2 1. INTRODUCTION... 4 1.1 MUNICIPAL DRINKING WATER LICENSING PROGRAM... 4 1.2

More information

provided for improvements for each structure during these timeframes. Rehabilitation and Investment Strategies:

provided for improvements for each structure during these timeframes. Rehabilitation and Investment Strategies: ASSET MANAGEMENT STRATEGY BRIDGES AND LARGE CULVERTS (>3m Span) Inventory Anticipated Asset Life Cycle Fifteen (15) bridges and eleven (11) large culverts with a span greater than 3m (refer to PSAB 3150

More information

Asset Management Primer. the Canadian Infrastructure Report Card

Asset Management Primer. the Canadian Infrastructure Report Card Canadian Infrastructure Report Card Asset Management Primer the Canadian Infrastructure Report Card For more information on this Report Card, or the project, please contact info@canadainfrastructure.ca.

More information

Asset Management B.C.

Asset Management B.C. Asset Management BC Roadmap Project Guide for using the Asset Management BC Roadmap Asset Management B.C. ROADMAP MAY 2011 Asset Management BC ROADMAP PROJECT Guide for using the Asset Management BC Roadmap

More information

Campbelltown City Council Asset Management Strategy 2012-2022

Campbelltown City Council Asset Management Strategy 2012-2022 Campbelltown City Council Asset Management Strategy 2012-2022 Disclaimer This document was first published on 1 July 2012. The information contained in this document is to be considered general in nature

More information

10.1.2 Corporate Asset Management Corporate, Operational & Council Services

10.1.2 Corporate Asset Management Corporate, Operational & Council Services HOW DOES THIS SERVICE CONTRIBUTE TO THE QUALITY OF LIFE IN THE CITY OF LONDON? The desired population results in the City of London s Strategic Plan: A Strong Economy, A Vibrant and Diverse Community,

More information

Village of Newbury Asset Management Plan

Village of Newbury Asset Management Plan Village of Newbury Asset Management Plan 7 Candle Crescent, Kitchener Ontario, N2P 2K7 www.4roads.ca 7 Candle Crescent, Kitchener Ontario, N2P 2K7 May 14, 2014 Village of Newbury 22910 Hagerty Road, PO

More information

Facilities Maintenance Standards rev 9-1-2015

Facilities Maintenance Standards rev 9-1-2015 Facilities Maintenance Standards rev 9-1-2015 Purpose The purpose of these standards is to outline the minimum requirements for maintaining state owned facilities and infrastructures in a manner that will

More information

Education Program for Civil Infrastructure Professionals

Education Program for Civil Infrastructure Professionals The (epcip) is a diploma offered by CATT and University of Waterloo. It is aimed at the professionals working with buried urban infrastructure (water and wastewater) planning, design, construction, management,

More information

2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate

2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate 2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate Toronto City Council February 1 5, 2007 Multi-Year Toronto Water Business Plan was approved by Council February

More information

Program: Facilities and Construction Management. Program Based Budget 2016-2018. Facilities and Construction Management. Page 81

Program: Facilities and Construction Management. Program Based Budget 2016-2018. Facilities and Construction Management. Page 81 Program: Program Based Budget 2016-2018 Page 81 Program: Vision: To develop and maintain town buildings which are safe, comfortable and welcoming to all. Mission Statement: To provide technical expertise

More information

2012-2016 Business Plan Summary

2012-2016 Business Plan Summary Owner: 2012-2016 Business Plan Summary Program Corporate, Operational & Council Services Service grouping Corporate Services Service Type Internal Service Tom Johnson, Managing Director - Corporate Assets,

More information

Elements Elements describe the essential outcomes.

Elements Elements describe the essential outcomes. Application Competency Field Unit Sector Elements Elements describe the essential outcomes. This unit describes the performance outcomes required to service air conditioning systems, including heating,

More information

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction EXECUTIVE SUMMARY Introduction The Asset Management Plan demonstrates sound stewardship of the Region s existing assets to support services at desired levels and to ensure the support of the Region s infrastructure

More information

BELA-BELA LOCAL MUNICIPALITY

BELA-BELA LOCAL MUNICIPALITY BELA-BELA LOCAL MUNICIPALITY POLICY ON LONG TERM FINANCIAL PLANNING 2014/2015 1 Policy 1. Policy Title POLICY ON LONG TERM FINANCIAL PLANNING 2. Main Purpose The Policy on is aimed at ensuring that the

More information

Ontario s s Water and Wastewater Energy Management Best Practices

Ontario s s Water and Wastewater Energy Management Best Practices Ontario s s Water and Wastewater Energy Management Best Practices Erin Cain February 27 th, 2007 AWWA/WEF Joint Management Conference February 25-28, 2007 Introduction What can I take back and apply? Energy

More information

ONTARIO'S DRINKING WATER QUALITY MANAGEMENT STANDARD

ONTARIO'S DRINKING WATER QUALITY MANAGEMENT STANDARD July 2007 ONTARIO'S DRINKING WATER QUALITY MANAGEMENT STANDARD POCKET GUIDE PIBS 6278e The Drinking Water Quality Management Standard (DWQMS) was developed in partnership between the Ministry of the Environment

More information

Asset Management Plan

Asset Management Plan Asset Management Plan (DRAFT) 2014 The Town of Aurora Asset Management Plan T own of Aurora Asset Management Plan (DRAFT) 2014 TABLE OF CONTENTS Executive Summary... 1 Introduction... 2 Town of Aurora

More information

Asset Management Plan Overview

Asset Management Plan Overview Council Strategy Asset Management Plan Overview City of Albany 2013 File Ref: CM.STD.6 Synergy Ref: NMP1331749 102 North Road, Yakamia WA 6330 Version: 25/06/2013 PO Box 484, ALBANY WA 6331 Tel: (08) 9841

More information

COMPREHENSIVE PLAN HOUSING ELEMENT

COMPREHENSIVE PLAN HOUSING ELEMENT COMPREHENSIVE PLAN HOUSING ELEMENT Policy Document CHAPTER 3: HOUSING ELEMENT TABLE OF CONTENTS Chapter 3: HOUSING ELEMENT... 1 INTRODUCTION... 2 GOALS, OBJECTIVES AND POLICIES... 3 Goal: Housing... 3

More information

How To Manage The County Of Simcoe'S Infrastructure

How To Manage The County Of Simcoe'S Infrastructure Asset Management Plan Asset Management Plan Table of Contents 1.0 Executive Summary... 2 2.0 Introduction... 4 3.0 State of County of Simcoe s Infrastructure... 7 4.0 Levels of Service... 14 5.0 Asset

More information

Asset Management For Small Municipalities Presented to: Infrastructure AM Alberta,

Asset Management For Small Municipalities Presented to: Infrastructure AM Alberta, Asset Management For Small Municipalities Presented to: Infrastructure AM Alberta, Steve Wyton, City of Calgary Manager, Corp. Project & Asset Mgmt October 08, 2014 Organization policy, objectives, values

More information

Appendix J: Pipe Evaluation and Replacement Options and Costs

Appendix J: Pipe Evaluation and Replacement Options and Costs Appendix J: Pipe Evaluation and Replacement Options and Costs STORMWATER SYSTEM INVENTORY The City of Olympia has an extensive stormwater conveyance system. As a matter prudent management of the Stormwater

More information

Residential Rehabilitation Assistance Program (RRAP)

Residential Rehabilitation Assistance Program (RRAP) Residential Rehabilitation Assistance Program (RRAP) Financial Assistance Program for Rental Properties LOCATION MAXIMUM AVAILABLE AMOUNT FAMILY INCOME RENT LENGTH OF LOAN QUALIFIER Available to the entire

More information

REQUEST FOR QUALIFICATIONS for SURREY PRETRIAL SERVICES CENTRE EXPANSION PROJECT RFQ #3225 VOLUME 1 PROJECT BRIEF

REQUEST FOR QUALIFICATIONS for SURREY PRETRIAL SERVICES CENTRE EXPANSION PROJECT RFQ #3225 VOLUME 1 PROJECT BRIEF Ministry of Public Safety and Solicitor General Ministry of Citizens Services Shared Services BC REQUEST FOR QUALIFICATIONS for SURREY PRETRIAL SERVICES CENTRE EXPANSION PROJECT RFQ #3225 VOLUME 1 PROJECT

More information

2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation

2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation 2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation Version 1 Table of Contents Executive Summary... 5 1.1 Background... 5 1.2 State of Local Infrastructure... 5 1.3 Desired Levels

More information

City of Champaign Neighborhood Services Department Neighborhood Programs Division 102 N. Neil St. Champaign, Illinois 61820 (217) 403-7070

City of Champaign Neighborhood Services Department Neighborhood Programs Division 102 N. Neil St. Champaign, Illinois 61820 (217) 403-7070 City of Champaign Neighborhood Services Department Neighborhood Programs Division 102 N. Neil St. Champaign, Illinois 61820 (217) 403-7070 Acquisition-Rehabilitation Program SCOPE INCOME LIMIT The program

More information

Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective

Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective Building the Foundation for an Effective Asset Management Program Scott D. Kelly, P.E. Assistant City Administrator

More information

Connecting asset management processes. Paul McKeon

Connecting asset management processes. Paul McKeon Connecting asset management processes Paul McKeon 1 Agenda Asset Management processes What does good look like? and here is the reality Drivers for connecting Asset Management processes Real-life challenges

More information

EMERGENCY REPAIR PROGRAM

EMERGENCY REPAIR PROGRAM City of New Bedford Office of Housing & Community Development 608 Pleasant Street, New Bedford, Massachusetts 02740 Telephone: (508) 979.1500 & (508) 979.1581 Fax: (508) 979.1575 PATRICK J. SULLIVAN DIRECTOR

More information

Real Property Portfolio Optimization

Real Property Portfolio Optimization Real Property Portfolio Optimization Improving and Modernizing Management of the Federal Real Property Portfolio to Optimize Space, Financial Resources and Energy Impact www.pwc.com/publicsector Contents

More information

HOMEOWNER REHABILITATION

HOMEOWNER REHABILITATION Department of Community Development P.O. Box 550 Brunswick, GA 31521 (912)267 5530 www.brunswick ga.gov HOMEOWNER REHABILITATION ASSISTANCE PROGRAM (CHIP) Community HOME Investment Program The intent of

More information

Finance: Capital Planning and Budgeting for Small Water Systems

Finance: Capital Planning and Budgeting for Small Water Systems Finance: Capital Planning and Budgeting for Small Water Systems Shadi Eskaf eskaf@sog.unc.edu 919-962-2785 Environmental Finance Center at UNC School of Government Water System Management and Operations

More information

COMPREHENSIVE DRINKING WATER SOURCE-TO-TAP ASSESSMENT GUIDELINE

COMPREHENSIVE DRINKING WATER SOURCE-TO-TAP ASSESSMENT GUIDELINE COMPREHENSIVE DRINKING WATER SOURCE-TO-TAP ASSESSMENT GUIDELINE MODULE 4 EVALUATE WATER SYSTEM MANAGEMENT, OPERATION AND MAINTENANCE PRACTICES Source Protection Emergency Response Training Treatment Multiple

More information

Scorecard MD&A - General Overview

Scorecard MD&A - General Overview Scorecard MD&A - General Overview In 2014, Essex Powerlines Corporation has exceeded all performance targets except for the Net Annual Peak Demand Savings. Essex has seen improvement in some areas from

More information

Building Energy Management: Using Data as a Tool

Building Energy Management: Using Data as a Tool Building Energy Management: Using Data as a Tool Issue Brief Melissa Donnelly Program Analyst, Institute for Building Efficiency, Johnson Controls October 2012 1 http://www.energystar. gov/index.cfm?c=comm_

More information

Glenorchy City Council Asset Management Strategy for Infrastructure Assets

Glenorchy City Council Asset Management Strategy for Infrastructure Assets Glenorchy City Council Asset Strategy for Infrastructure Assets 2014/15 to 2017/18 Version 1.3 June 2014 Glenorchy City Council Asset Strategy for Infrastructure Assets Document Control Document Control

More information

DRAFT. Town of Erin Position Description DIRECTOR OF INFRASTRUCTURE & OPERATIONS

DRAFT. Town of Erin Position Description DIRECTOR OF INFRASTRUCTURE & OPERATIONS DRAFT Town of Erin Position Description DIRECTOR OF INFRASTRUCTURE & OPERATIONS Department: Position Title Reports To: Public Works Director of Infrastructure & Operations CAO/Town Manager PURPOSE OF POSITION

More information

Biomedical Engineering Technologist II. Total Points Rating 5 4 3 5 5 4 4 5 4 Points 233 67 19 24 150 87 83 107 43 813

Biomedical Engineering Technologist II. Total Points Rating 5 4 3 5 5 4 4 5 4 Points 233 67 19 24 150 87 83 107 43 813 Job Class Profile: Biomedical Engineering Technologist II Pay Level: CG-36 Pay Band: 790-813 Accountability & Decision Making Development and Leadership Environmental Working Conditions Factor Knowledge

More information

Asset Management 101: Where do you start?

Asset Management 101: Where do you start? What s the worst that could happen? Asset : Where do you start? David Dunn Department of Ecology IACC conference October 20, 2015 You know you need an asset management system. Everyone keeps telling you

More information

FACILITIES MAINTENANCE

FACILITIES MAINTENANCE Program Direction and Accountability 1. The district s maintenance and operations department has a mission statement and goals and objectives that are established in writing. a. The maintenance department

More information

Adapting to Climate Change Through Asset Management Planning. Tiffany Batac David Rose, PhD Parsons Brinckerhoff

Adapting to Climate Change Through Asset Management Planning. Tiffany Batac David Rose, PhD Parsons Brinckerhoff Adapting to Climate Change Through Asset Management Planning Tiffany Batac David Rose, PhD Parsons Brinckerhoff 1 2 Agenda FTA Transit Climate Change Adaptation Assessment Pilots: MARTA Study Framework

More information

Asset Management and the Preservation of Buildings

Asset Management and the Preservation of Buildings Asset Management and the Preservation of Buildings Presented by: Lora Grgich, SEH, Inc. Laura Malwitz, CR-Building Performance Specialists Tony Mancuso and Erik Birkeland, St. Louis County Asset Management

More information

Asset Management Plan

Asset Management Plan Asset Management Plan Table of Contents Executive Summary... 5 Asset Management Plan... 6 Introduction... 6 Financial Overview... 10 Conclusion... 10 Attached Appendices... 10 Asset Management Strategy...

More information

Executive Summary Introduction Five Year Goals Performance Measure Types Performance Plan Logic Model Benchmarking, Strategic Planning, Performance

Executive Summary Introduction Five Year Goals Performance Measure Types Performance Plan Logic Model Benchmarking, Strategic Planning, Performance Table of Contents Section Page Executive Summary i Introduction iii Five Year Goals iii Performance Measure Types iv Performance Plan Logic Model v Benchmarking, Strategic Planning, Performance Accountability

More information

Atlanta 2015 Infrastructure Bond

Atlanta 2015 Infrastructure Bond Investing in a commitment today to meet the infrastructure challenges of the future. Richard Mendoza, Public Works James Shelby, Planning & Community Development July 2014 Key Events June 2014: Public

More information

Kansas City s Overflow Control Program

Kansas City s Overflow Control Program Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater

More information

The Corporation of the Town of Tecumseh Public Works & Environmental Services

The Corporation of the Town of Tecumseh Public Works & Environmental Services Quality Management Systems A QMS is a system to: establish policy and objectives and achieve those objectives, and direct and control an organization with regard to quality. Quality management for Ontario

More information