1 1 General NPARKS-0-DCS03 CHECKLIST FOR DC SUBMISSION - CONVENTIONAL HOUSING (a) The following plans are provided: Key and location plans of scale 1 : 10,000 or 1 : 5,000 showing access to the site from the street or road Site plan of scale 1 : 500, 1 : 200 or 1 : 100 Address, lot and/or plot number of the development site and neighbouring lots (b) (c) (d) Survey plan (survey done less than 2 years at the point of application and endorsed by a qualified surveyor) The registered architect will submit a completed NParks submission form, sign all layers of drawings digitally and enclose the letter of authorization from the developer The scale of all plans is correctly indicated The following are shown on site plan:- Development boundary verged in red Proposed development layout Existing and proposed road reserve line verged in red Width of proposed road reserve Length of roadside planting verges Category of existing and proposed roads Existing and proposed levels of the site including the open space Proposed open space location verged in red Area of open space Walking distance of the furthest house unit to the open space DC CH-LIST OS 01/09/2014 at 7:58 AM Page 1 of 7
2 2 Conservation Of Trees / Single Stem Palms in Development Site (only applicable if the development is within the gazetted Tree Conservation Area or on vacant land) 2.1 The site and survey plans show : Existing trees / single stem palms within the development boundary and up to 5m from the boundary a) species b) girth measured 0.5m from the ground c) height (if available) d) all trees / single stem palms should be uniquely numbered and consistent throughout the project 2.2 All existing trees / single stem palms indicated on the survey plan are reflected in the Tree Survey Information Form. 2.3 The colour code for existing trees / palms is as follow: Status of existing trees / palms Outlined in color a. to be retained b. to be removed c. removed without green yellow red d. removed with *yellow *yellow indicate the approved date in the tree schedule Non-existence after inspection indicate a cross on tree symbol 2.4 Clear photographs of trees / single stem palms proposed for conservation are attached. The photograph show the entire height of the tree(s) 2.5 The trees / single stem palms in the photographs are numbered according to the numbering shown on plan DC CH-LIST OS 01/09/2014 at 7:58 AM Page 2 of 7
3 2.6 Tree Protection Zone (TPZ) for retained tree/single-stem palm The minimum protection zone from centre of tree/single-stem palm is provided in accordance to the table below Girth a. 1.0m b. > 1.0m but 1.5m c. > 1.5m but 2.0m d. > 2.0m *Minimum protection zone 2.0m 3.0m 4.0m 5.0m Depending on the root spread, especially for tree with girth more than 2.0m, larger tree protection zone will be determined at site on case by case basis Hoarding is to be provided along the limits of the protection zone around the tree. There must be no excavation, raise/lower of soil level, compaction and any form of construction including temporary works within the hoarded area) No dumping of excavated materials and/or storage of construction materials is allowed within the Tree Protection Zone DC CH-LIST OS 01/09/2014 at 7:58 AM Page 3 of 7
4 3 Retention Of Roadside Trees / Palms / Shrubs 3.1 The site and survey plans show : Roadside trees / palms / shrubs abutting the development boundary and up to 10m on both sides of the boundary a) species b) girth (tree / single stem palm) measured 1.0m from the ground c) height (if available) and number of cluster palm / shrub d) all trees / palms should be uniquely numbered and consistent throughout the project 3.2 All existing trees / palms / shrubs indicated on the survey plan are reflected in the Tree Survey Information Form 3.3 The colour code for existing trees / palms / shrubs is as follow: Status of existing trees / palms / shrubs Outlined in color a. to be retained b. to be removed c. removed without green yellow red d. removed with *yellow *yellow indicate the approved date in the tree schedule Non-existence after inspection indicate a cross on tree symbol 3.4 The following proposed element is positioned at the minimum required distance from the centre of a tree: Splay corner of an entrance culvert (include access to bin centre, substation, MDF room and fire engine access): DC CH-LIST OS 01/09/2014 at 7:58 AM Page 4 of 7
5 Tree / Palm a. Palm b. Small to medium tree c. Large tree Distance 1.0m 1.5m 2.5m Cement crossing (e.g. pushcart ramp for bin centre) across roadside green verge and centre of an existing tree / palm is at least 2.0m Depending on the root spread, especially for tree with girth more than 2.0m, larger tree protection zone may be required on case by case basis 4 Proposed Open Space 4.1 Area of open space The area of open space is computed based on the formula stipulated by URA 4.2 Location The walking distance from the furthest unit to the proposed open space measured along the road centre, is not more than 250m The proposed open space does not abut a major road and/or park connector that is abutting a major road The open space does not abut an existing/proposed retaining wall The opens space is located such that at least 2 sides face the front of a house(s), and none face the rear of a house(s) If the proposed development is adjacent to a proposed or existing Park Connector, a. The open space is to abut the Park Connector provided the Park Connector is not abutting a major road and it complies with clause DC CH-LIST OS 01/09/2014 at 7:58 AM Page 5 of 7
6 4.3 Accessibility At least one of the boundaries of the open space abuts an existing minor road or a new local access road Proposed entrance or access path to the open space is at least 4.0m wide The open space is of a regular shape with a width of at least 30m 4.4 Terrain of the open space The open space should generally be flat (gradient 1: 40). If site situation does not permit the proposed slope should not be steeper than 1:2.5 and appropriate measures for slope stability should be carried out The gradient of all proposed slopes are shown The level of open space should be the same as that of adjacent road(s) and neighbouring lot Proper drainage system is provided to prevent water ponding. (Endorsed on plan). Details of the system will be commented at BP stage The open space is free from encumbrances above and below the ground level (Endorsed on plan) 4.5 Others The open space is not fragmented by any structures e.g. a canal, road, or infrastructure Proposed retaining walls are not located within open space 5 Proposed SWA Section 18 Roads 5.1 The length of planting island is at least 6.0m long. The proposed driveways to private lot abut each other 5.2 Planting island which is 6.0m long is indicated DC CH-LIST OS 01/09/2014 at 7:58 AM Page 6 of 7
7 5.3 The width of the roadside planting verges are provided in accordance with LTA standard road code 5.4 Clearance between proposed cement crossing (e.g. push cart ramp for bin centre) across roadside planting verge and the centre of an existing tree / palm is at least 2.0m. 5.5 No underground services are allowed to be laid within the roadside planting verges. Services that are required to transverse through a planting island into a proposed building plot are laid at least 2.0m away from the centre of a tree / palm. Depending on the root spread, especially for tree with girth more than 2.0m, larger tree protection zone may be required on case by case basis Footnote: 1. All building activities and construction materials are to be confined within the project site and not encroached onto the road sidetables. 2. Please apply to Streetscape Division of NParks regarding those roadside trees that require pruning of tree branches / roots (girth more than 200mm) to accommodate construction activities. Address: Streetscape Division Headquarters (Raffles Building) Singapore Botanic Gardens 1 Cluny Road Singapore Tel: (65) , Telefax: (65) DC CH-LIST OS 01/09/2014 at 7:58 AM Page 7 of 7
POLICY P350.5 Trees on Development Sites and Street Verges. Relevant Management Practice Nil Relevant Delegation Delegations DC 342 and DM 342
POLICY P350.5 Trees on Development Sites and Street Verges Strategic Plan Goal 3 Environmental Management Relevant Management Practice Nil Relevant Delegation Delegations DC 342 and DM 342 Rationale Trees
More informationQuick Guide to Application for Clearance for Drainage Works for issuance of Certificate of Statutory Completion (CSC) Minor Project
Quick Guide to Application for Clearance for Drainage Works for issuance of Certificate of Statutory Completion (CSC) Minor Project DOCUMENTS TO BE SUBMITTED FOR CSC All "As-built" or "As-constructed"
More informationWalsall Council Validation Guide for submitting a Householder Planning Application
Walsall Council Validation Guide for submitting a Householder Planning Application Householder Planning Application Guide Introduction This guide offers help to people who are submitting a Householder
More informationArchitectural Processing and Inspections for Home Mortgage Insurance
Page 1 of 5 [Text Only] Architectural Processing and Inspections for Home Mortgage Insurance Directive Number: 4145.1 SITE GRADING AND DRAINAGE GUIDELINES Construction complaints and structural defect
More informationStreet and Reserve Trees Policy
Street and Reserve Trees Policy Responsible Directorate Responsible Business Unit/s Responsible Officer Affected Business Unit/s Infrastructure Parks and Reserves Manager Parks and Reserves Approvals City
More informationCITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT
Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide
More informationPublic Landscape Aids And Protection Of Assets
Territory and Municipal Services Reference Document 4 LANDSCAPE MANAGEMENT AND PROTECTION PLANS (LMPP) Requirements for the Protection of Public Landscape Assets Adjacent to Development Works Issue 2 Revision
More informationGuidelines for Rights of Way
Guidelines for Rights of Way Guidelines for Statutory Rights of Way for Engineering and Public Works Infrastructure Rights of Way (Drainage, Sanitary, Water & Electrical Utilities) A Statutory Right of
More informationLANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL
LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL 1 Introduction It is to the advantage of the developer to treat the environmental aspects of development proposals seriously and take
More informationTree Management Policy
Kingston District Council WE002 Tree Management Policy Keywords: Reference Number: WE002 Strategic Plan: Classification: Works & Engineering Policy First Issued/Approved: 2011 Review Frequency: Every 4
More informationFormat for scrutinising the Hill Station Building Applications ( Current File No. 24911/2001-HSBA) The application shall be accompanied by
Format for scrutinising the Hill Station Building Applications ( Current File No. 24911/2001-HSBA) 1 2 3 4 5 I. Tamil Nadu Districts Municipalities (Hill Stations) Building Rules 1993. Rules Required Available
More informationORDINANCE NO. 2013 -
ORDINANCE NO. 2013 - AN ORDINANCE OF BREVARD COUNTY, FLORIDA AMENDING CHAPTER 62, LAND DEVELOPMENT REGULATIONS SECTION 62-2891, LOT DRAINAGE, AND CHAPTER 22 BUILDINGS AND BUILDING REGULATIONS, SECTION
More informationA guide to preventing structural damage
A guide to preventing structural damage Home owners guide to planning landscaping and maintenance of foundations Structural damage can result from movement in clay soils caused by varying moisture conditions
More informationARBORIST REPORT FOR DEVELOPMENT APPLICATIONS
ARBORIST REPORT FOR DEVELOPMENT APPLICATIONS City Planning / Parks, Forestry & Recreation The purpose of this form is to acquire preliminary information respecting trees on private and City property, in
More informationApplication for electricity connections Business premises. Electricity. Send your completed application form with supporting documentation to:
Electricity Thank you for considering for your electricity connections. We have put together these notes to help you fill out your and to ensure we receive all the correct information for your application
More informationElectronic Communication. 1/2. Applicant s And Agent s Names And Addresses. 3. Tree Location. 4. Tree Ownership
Application for Tree Works: Works to Trees Subject to a Tree Preservation Order (TPO) and/or Notification of Proposed Works to Trees in Conservation Areas (CA) Town and Country Planning Act 1990 Electronic
More informationApplication for Tree Works: Works to Trees Subject to a Tree Preservation Order (TPO)
Application for Tree Works: Works to Trees Subject to a Tree Preservation Order (TPO) and/or Notification of Proposed Works to Trees in Conservation Areas (CA) Town and Country Planning Act 1990 When to
More informationWaterleaf ARB Application
To: Waterleaf ARB Application Waterleaf Architectural Review Board c/o Property Management Systems, Inc. P.O. Box 1987 Yulee, FL 32097-1987 From: Name: Address: City, State, Zip: Phone: Fax: Lot Number:
More informationBond Release Process for New Subdivision Developments in Fairfax County
Bond Release Process for New Subdivision Developments in Fairfax County An Overview for Homeowners Associations A Fairfax County, Va., publication April 2009 For more information or to request this document
More informationAPPENDIX H7: POOL SPREAD AREAS FOR INSTANTANEOUS TANK FAILURE
APPENDIX H7: POOL SPREAD AREAS FOR INSTANTANEOUS TANK FAILURE H7.1 Introduction H7.1.1.1 The extent of flow of liquid from a instantaneous tank failure has been assessed based on the physical modelling
More informationThe Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08
The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are
More informationUnderground Commercial Electric Service
Underground Commercial Electric Service SCANA Corporation 2013 Revised: June 2013 Table of Contents SECTION PAGE I. Specification and Requirements 2 A. General B. Definition of Terms C. Company and Developer
More informationSITE IMPROVEMENT PLANS CHECKLIST
REVIEW SERVICES TEAM SITE IMPROVEMENT PLANS CHECKLIST (Also for SITE DEVELOPMENT PERMIT applications) GENERAL REQUIREMENTS This checklist applies to commercial building site work involving engineering,
More informationTHE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission
Civic Offices Havant Hampshire PO9 2AX Tel (023)9247 4174 Fax(023)9244 6588 DX50005 Havant www.havant.gov.uk To: ADP Architects Ltd Richmond Court 94 Botley Road Park Gate Southampton, Hants SO311BA For:
More informationTREE PERMIT APPLICATION Private Property- Section 10.52.120 MBMC COMMUNITY DEVELOPMENT DEPARTMENT
Permit No.: TREE PERMIT APPLICATION Private Property- Section 10.52.120 MBMC COMMUNITY DEVELOPMENT DEPARTMENT City Hall 1400 Highland Avenue Manhattan Beach, CA 90266-4795 Telephone (310) 802-5500 FAX
More informationNovember 2006. General Notes. Tree Protection. Tree Protection and New Development Guidance Note
Tree Protection and New Development Guidance Note November 2006 General Notes The retention and planting of trees within a development can add to the character and aesthetic value of a site whilst maintaining
More informationWESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24
Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge
More informationAppendix 6 Storage and Collection of Waste and Recycling
Appendix 6 Storage and Collection of Waste and Recycling Appendix 6 Storage and Collection of Waste and Recycling September 2008 (Version 2) 1 Appendix 6 Appendix 6 Design and Sustainability SPD Storage
More informationADA POST INSPECTION CHECKLIST. Job No. Route County Location
ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks
More informationSTATEMENT OF ENVIRONMENTAL EFFECTS AND NOTES IN SUPPORT OF DEVELOPMENT APPLICATION
CITY COUNCIL PROPOSED NEW RESIDENCE AT LOT XX, DP:55555 XXX Anon Drive, Somewhere FOR X. & Y Anonymous STATEMENT OF ENVIRONMENTAL EFFECTS AND NOTES IN SUPPORT OF DEVELOPMENT APPLICATION Angela Elliss Design
More informationCroft House Lodge Tree Removal and Building Relocation Mitigation Report. November 2010
Croft House Lodge Tree Removal and Building Relocation Mitigation Report November 2010 1 A site meeting was held on 24/05/2010 at the site of the proposed Croft House Lodge Respite Centre, Carleton Road,
More informationAPPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
More informationLand Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
More informationMinister s Guideline MG-12 Siting and Design of Single Dwellings
Minister s Guideline MG-12 Siting and Design of Single Dwellings This replaces previous Minister s Guideline MG/12 issued June 2005 Pursuant to section 188 A of the Building Act 1993 (the Act) I hereby
More informationapproval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013
Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a
More informationDevelopment Layout Design
Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose
More informationCONSENT, PURSUANT TO SECTIONS 34A, 88, 104, 104C, and 108 OF THE RESOURCE MANAGEMENT ACT, IS GRANTED. THE FULL DECISION IS SET OUT BELOW
A U C K L A N D C O U N C I L Decision following the hearing of an application for resource consent SUBJECT: Application for resource consent under section 88 of the Resource Management Act 1991 by D C
More informationPLANNING POLICY 3.3.5
PLANNING POLICY 3.3.5 CHILD CARE PREMISES 1. Introduction A Child Care Premises is used to provide a child care service within the meaning of the Child Care Services Act 2007, but does not include a Family
More informationK M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU
Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve
More informationBUILDING A NEW HOME THE RAW FACTS. Everything you need to know to avoid the price hike
BUILDING A NEW HOME THE RAW FACTS Everything you need to know to avoid the price hike CONTENTS 04 The Real Difference What others do; what we do 05 The base or package price Can your home be built for
More informationHousehold waste & recycling storage requirements
South Gloucestershire Council Guidance for Developers on Household waste & recycling storage requirements INTRODUCTION As part of the Council s aim to improve the quality of life for residents as well
More informationDevelopment Variance Permit Application Package
When do I need a Development Variance Permit? Development Variance Permit Application Package If my proposed development does not meet the standards set out in the Zoning Regulation Bylaw on matters that
More informationHouseholder Applications: Supplementary Planning Guidance GENERAL POINTS
Householder Applications: Supplementary Planning Guidance Environment Committee: 28 January 2004 Chief Planning Officer Town Hall The Parade Epsom Surrey KT18 5BY tel 01372 732000 web www.epsom-ewell.gov.uk
More informationBuildings Departmen t Lands Department Planning Department
Buildings Departmen t Lands Department Planning Department Joint Practice Note No. 3 Re-engineering of Approval Process for Land and Building Developments Introduction The processing of a building development
More informationbuilding on success Trees and Basements Partial Review of the Core Strategy February 2014
building on success Trees and Basements Partial Review of the Core Strategy February 2014 Regulation 19, Town and Country Planning (Local Planning) (England) Regulations 2012. 2 Contents 1. Introduction...
More informationVEHICLE CROSSOVER INFORMATION PACK
VEHICLE CROSSOVER INFORMATION PACK CONTENTS Introduction Section A Section B Section C Section D Section E Criteria for approving a vehicle crossover application (Diagrams to demonstrate measurement criteria)
More informationCouncil Policy for New Telecommunication Facilities
Council Policy for New Telecommunication Facilities 1. Purpose To establish policies and procedures for the installation of new telecommunication antennas, towers and related structures which emphasize
More informationTOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African
TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African Regional Office 01 CHAPTER ONE Checklist Page 2 of 8
More informationK M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU
Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve
More informationElectricity Gas. Application for utility connections Business premises. Section E PME (Protective Multiple Earthing)
Electricity Gas Send your completed application form with supporting documentation to: Thank you for considering Energy Services as your utility provider. In the East and West Midlands, electricity connections
More informationSECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
More information1161.01 CONFORMITY WITH PLANS; DRAINAGE.
CHAPTER 1161 Subdivision Requirements 1161.01 Conformity with plans; drainage 1161.07 Easements 1161.02 Trees 1161.08 Streets 1161.03 Subdivision name 1161.09 Blocks 1161.04 Street names 1161.10 Lots 1161.05
More informationDevelopment proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
More informationAUSTRALIAN HUMAN RIGHTS COMMISSION NOTICE OF DECISION ON APPLICATION FOR TEMPORARY EXEMPTIONS: AUSTRALASIAN RAILWAY ASSOCIATION
AUSTRALIAN HUMAN RIGHTS COMMISSION DISABILITY DISCRIMINATION ACT 1992 (Cth), Section 55 DISABILITY STANDARDS FOR ACCESSIBLE PUBLIC TRANSPORT 2002 (Cth), Section 33A.1 DISABILITY (ACCESS TO PREMISES BUILDINGS)
More informationFrequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE
Frequently-Asked Questions about Floodplains and Flood Insurance What is a floodplain? The floodplain is any area covered by water during normal water flows, and which could be inundated as a result of
More informationDesign Essentials. Stockland Residential Communities 1 st January 2014
Design Essentials Stockland Residential Communities 1 st January 2014 WELCOME TO THE DESIGN ESSENTIALS The Design Essentials form part of your Contract of Sale and assist when designing your home and landscape.
More informationOn Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing
On Site Sewage System Maintenance Inspections March 2011 Building and Development Branch Ministry of Municipal Affairs and Housing Introduction The Building Code Act, 1992 and Building Code (Ontario Regulation
More informationBuilding Control Charnwood Borough Council Southfield Road Loughborough LE11 2TN
Building Control Charnwood Borough Council Southfield Road Loughborough LE11 2TN BUILDING CONTROL GUIDANCE SHEET RAMPED & LEVEL APPROACH TO BUILDINGS Last updated 07/01/2011 Page 1 of 8 PURPOSE: This Guidance
More informationTown of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering
More informationDESIGNING YOUR LANDSCAPE
DESIGNING YOUR LANDSCAPE SITE AND NEEDS ASSESSMENT Examine all existing features of your site that could affect your landscape design and then identify the functions you want your landscape to serve. Site
More informationTownship of Georgian Bluffs POLICY USE OF UNOPENED ROAD ALLOWANCES
Township of Georgian Bluffs POLICY USE OF UNOPENED ROAD ALLOWANCES 1.0 Background An unopened road allowance as defined by the Municipal Act is a public highway that has not been opened and assumed for
More informationProposed Sports Hall at. Oldfield School. Kelston Road. Bath BA1 9AB. Construction Management Plan June 2011
Proposed Sports Hall at Oldfield School Kelston Road Bath BA1 9AB Construction Management Plan June 2011 CONTENTS 1.0 Introduction 2.0 Site Location 3.0 Proposed Development 4.0 Construction Management
More informationEPA Disclaimer Notice:
EPA Disclaimer Notice: This document has been provided as part of the U.S. Environmental Protection Agency Sustainable Materials Management Web Academy (formally RCC) Recycling and Solid Waste Management
More informationMAINTENANCE AND REMOVAL OF TREES ON VERGES
Residents and ratepayers are not permitted to prune or remove trees growing on land under the direct care, control and management of the City, including those growing on street verges. In accordance with
More informationpart 9 waste management
part 9 waste management 30m Hammerhead T-form 22m 21m Hammerhead Y-form 30m 18m Forward Side-Turn 25m 15m Reverse Side-Turn 30m Above: Recommended turning circles for waste collection vehicles 9 WASTE
More informationAGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace.
APPLICATION NO: 14/00168/FUL LOCATION: Land to the west of 19 Crow Wood Lane, Widnes. PROPOSAL: Proposed erection of 10 no. 1 bedroom apartments with individual access doors arranged in 2no. 2 storey height
More informationWaste & Recycling. Planning Guidance on Waste & Recycling Storage and Collection. Development & Enterprise FOR INTERNAL USE ONLY.
Waste & Recycling Planning Guidance on Waste & Recycling Storage and Collection October 2011 Development & Enterprise FOR INTERNAL USE ONLY Contents 01 Introduction 3 02 General guidelines 3 03 Individual
More informationConcept Design Synopsis
Washington Headquarters Services Facilities Services Directorate The Pentagon Electric Upgrade (Substation No. 2) Concept Design Synopsis September 4, 2014 Prepared for Consultations with VA SHPO, ACHP,
More informationLandscape Design Statement
17` Landscape Design Statement Housing Development, Princess Avenue, Poulton-le-Fylde for the Regenda Group ReLandscape l a n ds c ap e archi t ec t u r e + e n v i r o nm e ntal p l an n in g JANUARY
More information4 PLACE OF WORSHIP & INSTITUTIONAL DEVELOPMENTS
4 PLACE OF WORSHIP & INSTITUTIONAL DEVELOPMENTS OVERVIEW 1 Three main types of developments will be discussed in this section. They are: Place of Worship These include temples, churches and mosques. Civic
More informationParking On-street parking Front garden parking Off-street parking
Nae place mair braw A guide to placemaking in Perth and Kinross Whan I haik't up to Craigie Hill And lookit east and west; "In a' the world," said I to mysel', "My ain shire is the best." Parking On-street
More informationGREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH
GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH JULY 2015 BIOSWALE/HYBRID DITCH SCALABLE TOOL AND DESIGN TEMPLATE This tool and associated design files are one section of a larger toolkit: Green Infrastructure
More informationSchedule A. Civic Addressing Policy. of By-Law
Schedule A Civic Addressing Policy of By-Law 1. PURPOSE 1.1 This policy will guide the municipal staff, who have been given the responsibility by Council, in assigning property identification numbers,
More informationWaste Management. GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012)
Waste Management GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012) 1. Introduction The aim of this guide is to inform developers of
More informationLAND USE CODE CHAPTER 18.68 GENERAL REGULATIONS
CHAPTER 18.68 GENERAL REGULATIONS SECTIONS: 18.68.010 Fences. 18.68.020 Vision Clearance Area. 18.68.030 Access. 18.68.040 Yard Requirements. 18.68.050 Special Setback Requirements. 18.68.070 Land Surveys.
More informationPlease describe the proposal accurately and concisely. State the number of storeys proposed and the position of any extensions.
Householder Application for Planning Permission for Works or Extension to a Dwelling and for Relevant Demolition in a Conservation Area Town and Country Planning Act 1990 1. Applicant Name and Address
More information3D Drawing. Single Point Perspective with Diminishing Spaces
3D Drawing Single Point Perspective with Diminishing Spaces The following document helps describe the basic process for generating a 3D representation of a simple 2D plan. For this exercise we will be
More informationMillennium Quarter Public Realm Guidance Manual 2008
Millennium Quarter Public Realm Guidance Manual 2008 Table of Contents Introduction Purpose of guide How to use this guide Background and Vision Studies Conservation and Heritage Biodiversity Strategic
More information3D Drawing. Single Point Perspective with Diminishing Spaces
3D Drawing Single Point Perspective with Diminishing Spaces The following document helps describe the basic process for generating a 3D representation of a simple 2D plan. For this exercise we will be
More informationGuidelines for Fiber Optic Cable Permits
Guidelines for Fiber Optic Cable Permits NOVA District (Fairfax/Arlington) Permits www.virginiadot.org/business/fairfax-permits-main.asp Email: NOVAFairfaxPermits@VDOT.Virginia.gov 14685 Avion Parkway
More informationRepublic of Zambia Ministry of Works and Supply Roads Department Labor-based Routine Maintenance Contract Agreement. C. Kalangwa - Box 33545, Lusaka
August 2000 1) Parties to the Agreement Republic of Zambia Ministry of Works and Supply Roads Department Labor-based Routine Maintenance Contract Agreement 1.1 The Employer: The Roads Training School for
More informationCity of Colleyville Community Development Department. Site/Landscape Plan Application Packet
City of Colleyville Community Development Department Site/Landscape Plan Application Packet Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning
More informationIssue ID Description No. of Credits Available. Mandatory Elements Storage of Non-recyclable Waste and Recyclable Household Waste
150 Code for Sustainable Homes Category 5: te Issue ID Description No. of Credits Available Mandatory Elements 1 Storage of Non-recyclable te and Recyclable Household te 4 Yes Aim To provide adequate internal
More informationInterlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?
More informationDeveloper Guidance Note: Provision of Waste and Recycling Collection and Storage Facilities
NEWCASTLE CITY COUNCIL Developer Guidance Note: Provision of Waste and Recycling Collection and Storage Facilities This document addresses: 1. Refuse and recycling storage for residential developments
More informationBasic Elements of Reading Plans
Center for Land Use Education and Research at the University of Connecticut Basic Elements of Reading Plans University of Connecticut. The University of Connecticut supports all state and federal laws
More informationUrban Vehicle Crossing Application To be completed and fees paid for prior to approval
Urban Vehicle Crossing Application To be completed and fees paid for prior to approval Applicant Details Name: Postal Address: Telephone Home: Work: Signed: Date: Proposed Contractor: Proposed Start Date:
More informationGuidance on Householder permitted development rights
FORWARD CONTENTS CLOSE Guidance on Householder permitted development rights Circular 1/2012 CONTENTS BACK FORWARD CLOSE 1. INTRODUCTION 04 2. BEFORE STARTING 05 3. MAIN CONCEPTS 07 Principal elevation
More informationWASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS
WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS CONTENTS Page 1 Introduction 2 2 Planning Applications 3 3 Internal Segregation of Waste 3 4 Housing Developments 4 5 Apartment Developments 5-6
More informationEmergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
More information720 Contour Grading. General. References. Resources. Definitions
720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable
More informationGas Meter Clearances and Service Installation Requirements
March 2015 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE s Customer Construction Services 1-888-321-7779 or visit PSE.com/CustomerConstruction
More informationChapter 11 - Streets ARTICLE 1 COASTING AND SKATEBOARDING ARTICLE 11 SNOW REMOVAL ARTICLE 111 HORSES ARTICLE IV DISPLAYING GOODS AND WARES
Chapter 11 - Streets ARTICLE 1 COASTING AND SKATEBOARDING Section 11-101 Coasting or Sledding Regulated 11-102 Skateboarding Regulated ARTICLE 11 SNOW REMOVAL 11-201 Snow Removal on Sidewalks Required
More informationHomeowner s Guide to Drainage
Homeowner s Guide to Drainage a scottsdale homeowner s guide to drainage produced by the city of scottsdale s stormwater management division Transportation Department TABLE OF CONTENTS Introduction 2 Drainage
More informationMOBILE HOME LAW. Revised November 2001
MOBILE HOME LAW Revised November 2001 TABLE OF CONTENTS: SECTION 1: SECTION 2: SECTION 3: SECTION 4: SECTION 5: SECTION 6: SECTION 7: SECTION 8: SECTION 9: SECTION 10: SECTION 11: SECTION 12: INTENT DEFINITIONS
More informationHouseholder Application for Planning Permission for Works or Extension to a Dwelling Town and Country Planning Act 1990
Householder Application for Planning Permission for Works or Extension to a Dwelling Town and Country Planning Act 1990 1. Applicant Name and Address Please enter the Applicant Details, including full
More informationSection 19C 19C Education Centre 2 Zone (Faith Bible College - Sub-Zones A & B)
Section 19 19 Education entre 2 Zone (Faith Bible ollege SubZones A & B) All activities in the Education entre 2 Zone shall have the status identified in Table 19.1: Education entre Zones (Faith Bible
More informationDELIVERY & SERVICING PLAN. REDWOOD PARTNERSHIP Consulting Engineers Transportation Planners
Redwood Partnership Transportation Limited Maritime House Basin Road North Portslade Brighton BN41 1WR T: 01273 414515 F: 01273 376824 E: consult@redwoodpartnership.co.uk www.redwoodpartnership.co.uk REDWOOD
More informationTHE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows:
THE CORPORATION OF THE CITY OF GUELPH By-law (1993)-14515 A by-law respecting storm water disposal from private property in the City of Guelph, to amend By-law (1987)-12602 and to adopt Municipal Code
More informationTown of Beaumont. Lot Grading Guidelines
Town of Beaumont Lot Grading Guidelines LOT GRADING APPROVAL PROCESS Lot Grading Guidelines... 3 Introduction... 3 Purpose... 3 Definitions... 3 Lot Grading... 3 Lot Grading Plan... 3 Lot Grading Certificate...