Managing Successful Projects
|
|
- Gordon Richards
- 8 years ago
- Views:
Transcription
1 2008 AGI-Information Management Consultants May be used for personal purporses only or by libraries associated to dandelon.com network. Managing Successful Projects with PRINCE2 Office of Government Commerce London:TSO
2 1.1 Why use a project management method? 1.2 Benefits of using PRINCE2 1.3 Support for PRINCE2 1.4 Structure of the manual 1.5 Using the manual 1.6 PRINCE2 terminology 2.1 What is a project? 2.2 The scope of PRINCE2 2.3 PRINCE2 in context 2.4 Overview of PRINCE2 2.5 The processes 2.6 The components 2.7 PRINCE2 techniques 2.8 Process and component links Management levels 3.2 Structure of each process description 3.3 Diagram notation VII
3 4.1 Fundamental principles 4.2 Context 4.3 Process description 4.4 Appointing a Project Board Executive and a Project Manager (5U1) 4.5 Designing a Project Management Team (SU2) 4.6 Appointing a Project Management Team (SU3) 4.7 Preparing a Project Brief (SU4) 4.8 Defining Project Approach (SU5) 4.9 Planning an Initiation Stage (SU6) Fundamental principles 5.2 Context 5.3 Process description 5.4 Planning Quality (IP1) 5.5 Planning a Project (IP2) 5.6 Refining the Business Case and Risks (IP3) 5.7 Setting up Project Controls (1P4) 5.8 Setting up Project Files (IP5) 5.9 Assembling a Project Initiation Document (IP6) Fundamental principles 6.2 Context 6.3 Process description 6.4 Authorising Initiation (DPI) 6.5 Authorising a Project (DP2) 6.6 Authorising a Stage or Exception Plan (DP3) 6.7 Giving Ad Hoc Direction (DP4) 6.8 Confirming Project Closure (DP5) VIII
4 7.1 Fundamental principles 7.2 Context 7.3 Process description 7.4 Authorising Work Package (CS1) 7.5 Assessing Progress (CS2) 7.6 Capturing Project Issues (CS3) 7.7 Examining Project Issues (CS4) 7.8 Reviewing Stage Status (CS5) 7.9 Reporting Highlights (CS6) 7.10 Taking Corrective Action (CS7) 7.11 Escalating Project Issues (CS8) 7.12 Receiving Completed Work Package (CS9) Fundamental principles 8.2 Context 8.3 Process description 8.4 Accepting a Work Package (MP1) 8.5 Executing a Work Package (MP2) 8.6 Delivering a Work Package (MP3) Fundamental principles 9.2 Context 9.3 Process description 9.4 Planning a Stage (SB1) 9.5 Updating a Project Plan (SB2) 9.6 Updating a Project Business Case (SB3) 9.7 Updating the Risk Log (SB4) 9.8 Reporting Stage End (SB5) 9.9 Producing an Exception Plan (SB6) IX
5 10 Closing a Project (m 10.1 Fundamental principles 10.2 Context 10.3 Process description 10.4 Decommissioning a Project (CP1) 10.5 Identifying Follow-on Actions (CP2) 10.6 Project Evaluation Review (CP3) Fundamental principles 11.2 Context 11.3 Process description 11.4 Designing a Plan (PL1) 11.5 Defining and Analysing Products (PL2) 11.6 Identifying Activities and Dependencies (PL3) 11.7 Estimating (PL4) 11.8 Scheduling (PL5) 11.9 Analysing Risks (PL6) Completing a Plan (PL7) What is a Business Case? 13.2 What should a Business Case contain? 13.3 Developing a Business Case 13.4 Development path of the Business Case Overview 14.2 The PRINCE2 project management team 14.3 Project Support
6 15.1 Benefits of planning 15.2 What is a plan? 15.3 What are the elements of a plan? 15.4 The PRINCE2 approach 15.5 Levels of plan Purpose of control 16.2 Controls overview 16.3 Project start-up 16.4 Controlled progress 16.5 Controlled close 16.6 Stages What is risk management? 17.2 Risk principles 17.3 The risk management cycle 17.4 Risk profile 17.5 Budgeting for risk management 17.6 Mapping the risk management process to the PRINCE2 processes 17.7 Interdependencies 17.8 Further risk management considerations Purpose 18.2 What is quality? 18.3 Quality management 18.4 The quality path 18.5 Making project quality work XI
7 19.1 Purpose 19.2 Definition 19.3 Baseline 19.4 Managing the configuration 19.5 Configuration management method 19.6 Configuration management and change control 19.7 Configuration management and a Project Support Office tm Purpose 20.2 Project Issue management 20.3 Authority levels 20.4 Integrity of change 20.5 Management of change and Configuration Management Product-based planning examples 22.2 Producing a Product Breakdown Structure (PBS) 22.3 Writing Product Descriptions 22.4 Producing a Product Flow Diagram (PFD) 22.5 Further examples Change control steps What is a quality review? 24.2 Quality review benefits 24.3 Context XII
8 24.4 Overview of the quality review technique 300 A.1 Acceptance Criteria A.2 Business Case A.3 Checkpoint Report A.4 Communication Plan A.5 Configuration Item Record A.6 Configuration Management Plan A.7 Daily Log A.8 End Project Report A.9 End Stage Report A. 10 Exception Report A.11 Follow-on Action Recommendations A.12 Highlight Report A. 13 Issue Log A.14 Lessons Learned Log A.15 Lessons Learned Report A. 16 Off-Specification A.17 Post-Project Review Plan A.18 Product Breakdown Structure A.19 Product Checklist A.20 Product Description A.21 Product Flow Diagram A.22 Project Approach A.23 Project Brief A.24 Project Initiation Document A.25 Project Issue A.26 Project Mandate A.27 Project Plan XIII
9 A.28 Project Quality Plan A.29 Quality Log A.30 Request for Change A.31 Risk Log A.32 Stage Plan (or Exception Plan) A.33 Work Package B.1 Project Board B.2 Executive B.3 Senior User B.4 Senior Supplier B.5 Project Manager B.6 Team Manager B.7 Project Assurance B.8 Project Support B.9 Configuration Librarian B.10 Project Support Office (PSO) E.1 Management files E.2 Specialist file(s) Index 339 XIV
Purpose: Content: Definition: Benefits: outputs outcomes benefits Business Case dis-benefit Key Responsibilities: Approach: Executive Developed
Key Learning Points The Swirl Logo is a trade mark of the AXELOS Limited. Is used by the Project Board throughout the project to verify its continued viability:- Is the investment in this project still
More informationPRINCE2 Practitioner - Instructor: Patrick von Schlag
PRINCE2 Practitioner - Instructor: Patrick von Schlag Time Clips Course Introduction Course Introduction 0:00:10 0:01:25 0:01:06 0:02:41 3 Chapter 01 - Course Introduction Lesson: Course Introduction 0:00:10
More informationBUY ONLINE AT: http://www.itgovernance.co.uk/products/1748
PRINCE2 FOR DUMMIES Introduction About This Book Foolish Assumptions How This Book is Organised Part I: How PRINCE Can Help You Part II: Working Through Your Project Part III: Help with PRINCE Project
More informationPrince 2 Health Check
Prince 2 Health Check Start-up Was there a Project Mandate? Was the Project Board designed/appointed before initiation was authorised? Was a Project Brief produced? Is the Project Brief to PRINCE standards?
More informationManaging a Successful Project Using Syllabus
Managing a Successful Project Using 2013 Version 1.5 (Status Live) Page 0 Ow ner Chief Examiner 1. Introduction The Managing Successful Projects w ith PRINCE2 manual provides guidance on the principles,
More informationWHAT IS PRINCE2? Benefits There are many benefits of using PRINCE2 but primarily it:
WHAT IS PRINCE2? Introduction PRINCE2 (Projects in a Controlled Environment) is a structured project management method that can be applied regardless of project scale, type, organisation, geography or
More informationQUESTION: 1 In PRINCE2 what product is used to define the information that justifies the setting up, continuation or termination of the project?
QUESTION: 1 In PRINCE2 what product is used to define the information that justifies the setting up, continuation or termination of the project? A. Project Initiation Document B. Business Case C. End Stage
More informationA COMPARISON OF PRINCE2 AGAINST PMBOK
Introduction This comparison takes each part of the PMBOK and gives an opinion on what match there is with elements of the PRINCE2 method. It can be used in any discussion of the respective merits of the
More informationProject Management Standards: A Review of Certifications/Certificates
Project Standards: A Review of Certifications/Certificates Standards for Project Supporting Certification and Certificates Certificate Certification The Project Body of Knowledge PMBOK Guide Projects in
More informationINTRODUCTION TO PROJECT MANAGEMENT FRAMEWORKS
Economic Cooperation Organisation and United Nations in Iran INTRODUCTION TO PROJECT MANAGEMENT FRAMEWORKS Ali Farzin - United Nations Project Management Workshop February 24-25, 2010 Tehran WORKSHOP
More informationWelcome to the Eastwood Harris Pty Ltd Introduction to PRINCE2 TM Revised 2009 and Microsoft Office Project. Page 1
Welcome to the Eastwood Harris Pty Ltd Introduction to PRINCE2 TM Revised 2009 and Microsoft Office Project Page 1 Purpose of the Presentation Present an overview of the changes to the PRINCE2 methodology
More informationThe Foundation Examination
The Foundation Examination Sample Paper 2 January 2013 Release Multiple Choice 1-hour paper Instructions 1. All 75 questions should be attempted. 2. 5 of the 75 questions are under trial and will not contribute
More informationAn Introduction to PRINCE2
Project Management Methodologies An Introduction to PRINCE2 Why use a Project Methodology and What Does PRINCE2 Enable? PRINCE - PRojects IN Controlled Environments - is a project management method covering
More informationMaturity Model. March 2006. Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce
Maturity Model March 2006 Version 1.0 P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value Added product which is outside the scope of the HMSO
More informationSchneps, Leila; Colmez, Coralie. Math on Trial : How Numbers Get Used and Abused in the Courtroom. New York, NY, USA: Basic Books, 2013. p i.
New York, NY, USA: Basic Books, 2013. p i. http://site.ebrary.com/lib/mcgill/doc?id=10665296&ppg=2 New York, NY, USA: Basic Books, 2013. p ii. http://site.ebrary.com/lib/mcgill/doc?id=10665296&ppg=3 New
More informationThe unclear relationship between change, release and project management
Processes 467 The unclear relationship between change, release and project management 7.7 The unclear relationship between change, release and project management Do you have a clear picture of the interfaces
More informationContents. 4. Current perceptions of relative positioning of PRINCE2 and PMBOK. Appendix - Comparing PRINCE2 to PMBoK by R.
Case Study PRINCE2 and PMI/PMBOK A Combined Approach at Getronics The APM Group Limited 7-8 Queen Square High Wycombe Buckinghamshire HP11 2BP Tel: + 44 (0) 1494 452450 Fax + 44 (0) 1494 459559 www.apmgroup.co.uk
More informationPRINCE2:2009 Glossary of Terms (English)
accept (risk response) acceptance acceptance criteria activity agile methods approval approver assumption assurance A risk response to a threat where a conscious and deliberate decision is taken to retain
More informationB.2.2. Project Management Principles
B.2.2. Project Management Principles Project management is the application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations
More informationPRINCE2. Topic Gateway Series No. 23
Topic Gateway Series No. 23 Prepared by Martin Farrar and Technical Information Service February 2007 1 About Topic Gateways Topic Gateways are intended as a refresher or introduction to topics of interest
More informationRetained Fire Fighters Union. Introduction to PRINCE2 Project Management
Retained Fire Fighters Union Introduction to PRINCE2 Project Management PRINCE2 PRINCE stands for: PRojects IN Controlled Environments and is a structured method which can be applied to any size or type
More informationPRINCE2 Introduction PRINCE2 Introduction
Managing Successful Projects with PRINCE2 PRINCE2 Introduction PRINCE2 Introduction A Summary of PRINCE2 Managing Successful Projects with PRINCE2 OGC/APM Group Accredited Event UKAS/APMG Certificate 001
More informationCONTENTS. Preface. Acknowledgements. 1. Introduction and Overview 1 Introduction 1 Whatis the CMMI"? 2 What the CMMI* is Not 3 What are Standards?
Preface Acknowledgements xi xiii 1. Introduction and Overview 1 Introduction 1 Whatis the CMMI"? 2 What the CMMI* is Not 3 What are Standards? 3 2. Summaryof CMMI-SW 5 The CMM*-SW 5 CMMI--SW Continuous
More information1. What is PRINCE2? Projects In a Controlled Environment. Structured project management method. Generic based on proven principles
1. What is PRINCE2? Projects In a Controlled Environment Structured project management method Generic based on proven principles Isolates the management from the specialist 2 1.1. What is a Project? Change
More informationTHE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT
THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT GERARD M. HILL CRC Press Taylor & Francis Group Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Croup, an informa business
More informationPRINCE2 PLANNING AND CONTROL USING MICROSOFT PROJECT UPDATED FOR MICROSOFT OFFICE PROJECT 2007 PAUL EASTWOOD HARRIS
PRINCE2 PLANNING AND CONTROL USING MICROSOFT PROJECT UPDATED FOR MICROSOFT OFFICE PROJECT 2007 BY PAUL EASTWOOD HARRIS Eastwood Harris Pty Ltd i Copyright 1999-2004 by Eastwood Harris Pty Ltd. No part
More informationUsing PRINCE2 to Manage US Federal Government IT Projects
For Portfolio, Programme, Project, Risk and Service Management Using PRINCE2 to Manage US Federal Government IT Projects Applying the PRINCE2 project management method to support Capital Planning and Investment
More informationProject Sizing Guide. Property & Campus Services
Purpose This document is intended to assist in deciding what sort of management overheads would be justified for a proposed project. Instructions for Use 1. Evaluate the proposed work against each of the
More informationInternational. How PRINCE2 Can Complement the PMBOK Guide and Your PMP. Jay M. Siegelaub Impact Strategies LLC
International How PRINCE2 Can Complement the PMBOK Guide and Your PMP Jay M. Siegelaub Impact Strategies LLC A Guide to the Project Management Body of Knowledge (PMBOK Guide) is the recognized (de facto)
More informationProject Management Guidelines
Project Management Guidelines 1. INTRODUCTION. This Appendix (Project Management Guidelines) sets forth the detailed Project Management Guidelines. 2. PROJECT MANAGEMENT PLAN POLICY AND GUIDELINES OVERVIEW.
More informationUNIVERSITY OF STRATHCLYDE GRADUATE SCHOOL OF BUSINESS. Master of Business Administration. Assignment for Project Management Elective, 2006-07
UNIVERSITY OF STRATHCLYDE GRADUATE SCHOOL OF BUSINESS Master of Business Administration Assignment for Project Management Elective, 2006-07 Would you use PMBOK or PRINCE2 for Project Management? Authors:
More information"Charting the Course... MOC 20409 B Server Virtualization with Windows Hyper-V and System Center. Course Summary
Description Course Summary This five day course will provide you with the knowledge and skills required to design and implement Microsoft Server solutions using Hyper-V and System. Objectives At the end
More informationTable of Contents Introduction to the Long-Term Care Ombudsman Program (LTCOP) Manual Intro - 1
Table of Contents Introduction to the Long-Term Care Ombudsman Program (LTCOP) Manual Intro - 1 I. Preface...... Intro-1 II. Maintaining and Using the LTCOP Manual as a Primary Reference Tool... Intro-1
More informationApple Pro Training Series. OS X Server. Essentials. Arek Dreyer. and Ben Greisler
Apple Pro Training Series OS X Server Essentials Arek Dreyer and Ben Greisler Table of Contents Configuring and Monitoring OS X Server Lesson 1 About This Guide 3 Learning Methodology 4 Lesson Structure
More informationPROJECT MANAGEMENT PROFESSIONAL CERTIFIED ASSOCIATE IN PROJECT MANAGEMENT (PMP & CAPM) EXAM PREPARATION WORKSHOP
TSE015 PROJECT MANAGEMENT PROFESSIONAL CERTIFIED ASSOCIATE IN PROJECT MANAGEMENT (PMP & CAPM) EXAM PREPARATION WORKSHOP Course Outline I. Introduction and Course Objectives A. About PMI B. PMP and CAPM
More informationB1 Project Management 100
Assignment of points B1 Project Management 100 Requirements for Design Presentation Meetings and Proposal Submissions for Key to Project Management Design Presentation Meeting and Proposal Submissions
More informationISSUING THE AIR OPERATOR CERTIFICATE, OPERATIONS SPECIFICATIONS, AND COMPLETING THE CERTIFICATION REPORT
ISSUING THE AIR OPERATOR CERTIFICATE, OPERATIONS SPECIFICATIONS, AND COMPLETING THE CERTIFICATION REPORT GUIDANCE MATERIAL FOR INSPECTORS CA AOC-017 AIR OPERATOR CERTIFICATION RECORD OF AMENDMENTS Amendment
More informationExecution and Control
Project Lifecycle Proposal and Initiation Design and Appraisal Execution and Control Finalisation & Follow-up Operation Project Excellence Operational Excellence PLAN Inputs Process Outputs Feedback &
More informationTABLE OF CONTENTS CHAPTER DESCRIPTION PAGE
vii TABLE OF CONTENTS CHAPTER DESCRIPTION PAGE TITLE DECLARATION DEDICATION ACKNOWLEDGEMENT ABSTRACT ABSTRAK LIST OF CONTENTS LIST OF FIGURES LIST OF TABLES LIST OF APPENDICES i ii iii iv v vi vii xii
More informationCopyright protected. Use is for Single Users only via a VHP Approved License. For information and printed versions please see www.vanharen.
Colofon Title: Author: Editor: Reviewers: (for the Best Practice User Group Nederland) Publisher: PRINCE2 2009 Edition Quick Reference Card Henny Portman Steve Newton Hans Schneider Ron Seegers (Projectmeester)
More informationHow PRINCE2 Can Complement PMBOK and Your PMP Jay M. Siegelaub Impact Strategies LLC. Abstract. About PRINCE2
How PRINCE2 Can Complement PMBOK and Your PMP Jay M. Siegelaub Impact Strategies LLC Abstract PMBOK is the recognized (de facto) standard of project management knowledge. In the UK and Europe, PRINCE2
More informationCopyright protected. Use is for Single Users only via a VHP Approved License. For information and printed versions please see www.vanharen.
Passing the PRINCE2 2009 Edition Foundation exam - A Study Guide Other publications by Van Haren Publishing Van Haren Publishing (VHP) specializes in titles on Best Practices, methods and standards within
More informationSan$Diego$Imperial$Counties$Region$of$Narcotics$Anonymous$ Western$Service$Learning$Days$$ XXX$Host$Committee!Guidelines$ $$
SanDiegoImperialCountiesRegionofNarcoticsAnonymous WesternServiceLearningDays XXXHostCommitteeGuidelines I. Purpose ThepurposeoftheWesternServiceLearningDays(WSLD)XXXHostCommittee(HostCommittee)isto organize,coordinateandproducethewsldxxxeventwithinthe6weekperiodof3weekspriortotheendof
More informationSERVICE ORIENTED ANALYSIS AND DESIGN OF PROJECT MANAGEMENT SOFTWARE
SERVICE ORIENTED ANALYSIS AND DESIGN OF PROJECT MANAGEMENT SOFTWARE Riyanarto Sarno 1, Rizky Januar Akbar 1, Nurul Fajrin Ariyani 1, Ratih N.E. Anggraini 1, Riska A. Pratistari 1, Ikti Oktavianty 1, I.G.M.
More informationHOW TO START WORKING WITH P2WARE PROJECT MANAGER 7?
HOW TO START WORKING WITH P2WARE PROJECT MANAGER 7? This document contains introduction to P2ware Project Manager 7 views (P2ware Project Manager 7 walkthrough) and shows how to create high quality plans
More informationIntroduction to Windchill PDMLink 10.0 for Heavy Users
Introduction to Windchill PDMLink 10.0 for Heavy Users Overview Course Code Course Length TRN-3146-T 2 Days In this course, you will learn how to complete the day-to-day functions that enable you to create
More informationSamples of Management Consulting Assignments. Performed by DCAG are. Provided in the following pages.
Samples of Management Consulting Assignments Performed by DCAG are Provided in the following pages. Thomas Bronack 15180 20 th Avenue Whitestone, NY 11357 Phone: (718) 591-5553 Cell: (917) 673-6992 Email:
More information2015 SPOCE Project Management Ltd Managing Successful Projects with PRINCE2
!!"! HO0462_1v0 Page 1 CONTENTS Contents... 1 Acknowledgements.... 2 Event Preparation Instructions Please Read And Follow Carefully... 3 Your On line PRINCE2 Event Preparation... 6 PRINCE2 Primer...
More informationHaving a Project Support Office
www.ronrosenhead.co.uk Having a Project Support Office The case for a (or programme) support office Produced by Ron Rosenhead Telephone: 020 8446 7766 www.ronrosenhead.co.uk www.agency.co.uk The case for
More informationSoftware Monthly Maintenance (Non Accounting Use) Quick Reference Guide
Software Monthly Maintenance (Non Accounting Use) Quick Reference Guide When not using the accounting within the software the system will build up information that will affect the performance and speed
More informationThe Project Management Life Cycle
The Project Management Life Cycle i ii This page intentionally left blank iii iv Publisher s note Every possible effort has been made to ensure that the information contained in this book is accurate at
More informationUnited States and European Union Auditor Independence Regulation
Christiane Strohm 2008 AGI-Information Management Consultants May be used for personal purporses only or by libraries associated to dandelon.com network. United States and European Union Auditor Independence
More informationProject Management Using Earned Value
Project Management Using Earned Value Third Edition Gary C. Humphreys Earned Value Management Consulting Training 2002, 2011, 2014 Gary C. Humphreys Humphreys & Associates, Inc. All rights reserved. No
More informationManagement. Project. Software. Ashfaque Ahmed. A Process-Driven Approach. CRC Press. Taylor Si Francis Group Boca Raton London New York
Software Project Management A Process-Driven Approach Ashfaque Ahmed CRC Press Taylor Si Francis Group Boca Raton London New York CRC Press is an imprint of the Taylor St Francis Croup, an Informa business
More informationSyllabus 2nd Edition
Syllabus 2nd Edition 2 Introductory Certificate Syllabus 2nd Edition 2nd Edition Introductory Certificate syllabus All of the syllabus elements should be taken within the context of a project and project.
More informationSouth Norfolk Council Project Management Handbook
South Norfolk Council Project Management Handbook Version 1.0 With special thanks and acknowledgement to the Manchester City Council in particular Kevin Fletcher, Bob Rutt, Julie Sprigg, Alan Holding &
More informationCopyright protected. Use is for Single Users only via a VHP Approved License. For information and printed versions please see www.vanharen.
Other publications by Van Haren Publishing Van Haren Publishing (VHP) specializes in titles on Best Practices, methods and standards within IT and business management. These publications are grouped in
More informationWorkflow Administration of Windchill 10.2
Workflow Administration of Windchill 10.2 Overview Course Code Course Length TRN-4339-T 2 Days In this course, you will learn about Windchill workflow features and how to design, configure, and test workflow
More information<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor
More informationIntroduction to Windchill Projectlink 10.2
Introduction to Windchill Projectlink 10.2 Overview Course Code Course Length TRN-4270 1 Day In this course, you will learn how to participate in and manage projects using Windchill ProjectLink 10.2. Emphasis
More informationDo not open this paper until instructed by the invigilator. Please note: This question paper must not be removed from the examination room.
APM Introductory Certificate in Project Management Exam paper Candidate Reference Number Date of Exam Location of the Exam General Notes Time allowed 1 hour Answer all 60 multiple choice questions Use
More informationLINCOLNSHIRE COUNTY COUNCIL. JEM Number: 3209
LINCOLNSHIRE COUNTY COUNCIL JOB DESCRIPTION DIRECTORATE: Resources Division/Section/Branch: Business Improvement Service/Sub-Division: Programme and Project Office JOB TITLE: Programme Manager JEM Number:
More information2010 MegaPath Inc. All rights reserved. Confidential and Proprietary 2
Polycom SIP Phones Base Configuration for MegaPath Duet Hosted Voice Service Contents Summary... 3 Configuration Settings Overview... 3 Restarting the Phone... 5 Rebooting the Phone... 6 Uploading Log
More informationLIST OF TABLES. 2.4 Variables Related to CRM Implementation 57. 2.11 Variables in Customer Retention at Commercial Banks 74
LIST OF TABLES Table 2.1 Steps in CRM Development at 51 2.2 CRM system at Commercial 53 2.3 Stages in CRM implementation 55 2.4 Variables Related to CRM Implementation 57 2.5 CRM Acceptance Among the Employees
More informationPMBOK Guide vs. PRINCE2. A High-level comparative note
PMBOK Guide vs. PRINCE2 A High-level comparative note PMBOK Guide vs. PRINCE2 Project Management Body of Knowledge (PMBOK ) Guide is the Standard brought out by the PMI, USA, for management of Individual
More informationITIL: Foundation (Revision 1.6) Course Overview. Course Outline
ITIL: Foundation (Revision 1.6) Course Overview The ITIL Foundation Certification Course introduces the new student to the fundamentals of IT Service Management as described in the IT Infrastructure Library
More informationEffective Methods for Software and Systems Integration
Effective Methods for Software and Systems Integration Boyd L. Summers CRC Press Taylor & Francis Group 6000 Broken Sound Parkway NW, Suite 300 Boca Raton, FL 33487-2742 CRC Press is an imprint of Taylor
More informationDesign and implementation of new ITIL Service Desk for insurance companies
Design and implementation of new ITIL Service Desk for insurance companies Anel Tanovic*, Asmir Butkovic **, Fahrudin Orucevic***, Nikos Mastorakis**** * American University in Bosnia and Herzegovina Mije
More informationGeneral Notes Time allowed 1 hour. Answer all 60 multiple choice questions Use the proforma answer sheet provided.
Introductory Certificate The APM Project Fundamentals Qualification. Examination paper Candidate Number Date Location Examination Paper Sample Paper v1.4 General Notes Time allowed 1 hour. Answer all 60
More informationWindchill Service Information Manager 10.2. Curriculum Guide
Windchill Service Information Manager 10.2 Curriculum Guide Live Classroom Curriculum Guide Introduction to Windchill Service Information Manager 10.2 Building Information Structures with Windchill Service
More informationCalREDIE Browser Requirements
CalREDIE Browser Requirements Table of Contents Section 1: Browser Settings... 2 Section 2: Windows Requirements... 11 Section 3: Troubleshooting... 12 1 Section 1: Browser Settings The following browser
More informationTHE PERFORMANCE MANAGEMENT GROUP LLC
THE PERFORMANCE MANAGEMENT GROUP LLC ONLINE TRAINING: LEAN SIX SIGMA SERVICE EXCELLENCE BLACK BELT CERTIFICATION Performance Improvement Training for Service Industries: Financial Services Telecommunications
More informationPro SQL Server 2012. Reporting Services. Third Edition. mm m. Brian McDonald. Shawn McGehee. Rodney Landrum. Apress*
Pro SQL Server 2012 Reporting Services Third Edition mm m Brian McDonald Shawn McGehee Rodney Landrum Apress* Contents About the Authors About the Technical Reviewers Acknowledgments m Introduction xvn
More informationThe Software. Audit Guide. ASQ Quality Press. Milwaukee, Wisconsin. John W. Helgeson
The Software Audit Guide John W. Helgeson ASQ Quality Press Milwaukee, Wisconsin Contents Preface Acknowledgments xv Xlx Part I Audit Fundamentals 1 Chapter 1 Introduction 3 1.1 Definitions 7 1.2 Process
More informationLearn AX: A Beginner s Guide to Microsoft Dynamics AX. Managing Users and Role Based Security in Microsoft Dynamics AX 2012. Dynamics101 ACADEMY
Learn AX: A Beginner s Guide to Microsoft Dynamics AX Managing Users and Role Based Security in Microsoft Dynamics AX 2012 About.com is a Rand Group Knowledge Center intended to provide our clients, and
More informationSOFTWARE TESTING AS A SERVICE
SOFTWARE TESTING AS A SERVICE ASHFAQUE AHMED (g) CRC Press Taylor & Francis Croup Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Group, an informa business AN AUERBACH BOOK
More informationGOVERNMENT OF BERMUDA Ministry of Education. Public School Reorganization: A Consultation
GOVERNMENT OF BERMUDA Ministry of Education Public School Reorganization: A Consultation March 2015 GOVERNMENT OF BERMUDA Ministry of Education 14 Waller s Point Road St. David s DD 03 Bermuda P.O. Box
More informationWe released this document in response to a Freedom of Information request. Over time it may become out of date. Department for Work and Pensions
We released this document in response to a Freedom of Information request. Over time it may become out of date. Department for Work and Pensions SCHEDULE 2 SERVICES 1 Purpose of this Schedule 1.1 This
More informationRecent Advances in Automatic Control, Information and Communications
Proposal of the improvement of actual ITIL version based on comparative IT Service Management methodologies and standards The implementation of IT Service Management frameworks and standards Anel Tanovic*,
More informationBusiness Administration of Windchill PDMLink 10.0
Business Administration of Windchill PDMLink 10.0 Overview Course Code Course Length TRN-3160-T 3 Days After completing this course, you will be well prepared to set up and manage a basic Windchill PDMLink
More informationAdvanced Project Management Incl. MS Projects 5 DAYS
Imsimbi Training proudly presents Advanced Project Management Incl. MS Projects 5 DAYS Imsimbi Training is a fully accredited training provider with the Services Seta, number 2147, as well as a Level 2
More informationTHE FIRST SCHEDULE (See rule 7) Table I - FEES PAYABLE
Number of entry On what payable Number of the relevant Form THE FIRST SCHEDULE (See rule 7) Table I - FEES PAYABLE Natural For e-filing Small entity, alone or with natural Others, alone or with natural
More informationInstalling Globodox Web Client on Windows Server 2012
Installing Globodox Web Client on Windows Server 2012 Make sure that the Globodox Desktop Client is installed. Make sure it is not running. Note: Please click on Allow or Continue for all required UAC
More informationPRINCE2, the PMBOK Guide and ISO 21500:2012. Klas Skogmar. AXELOS.com
PRINCE2, the PMBOK Guide and ISO 21500:2012 Klas Skogmar AXELOS.com White Paper September 2015 Contents Introduction 3 Relationships between PRINCE2, the PMBOK Guide and ISO 21500 4 Major differences between
More informationEncrypting with BitLocker for disk volumes under Windows 7
Encrypting with BitLocker for disk volumes under Windows 7 Summary of the contents 1 Introduction 2 Hardware requirements for BitLocker Driver Encryption 3 Encrypting drive 3.1 Operating System Drive 3.1.1
More informationPractical Android Projects Lucas Jordan Pieter Greyling
Practical Android Projects Lucas Jordan Pieter Greyling Apress s w«^* ; i - -i.. ; Contents at a Glance Contents --v About the Authors x About the Technical Reviewer xi PAcknowiedgments xii Preface xiii
More informationExternal Supplier Control Requirements
External Supplier Control s Cyber Security For Suppliers Categorised as Low Cyber Risk 1. Asset Protection and System Configuration Barclays Data and the assets or systems storing or processing it must
More informationITIL Foundation for IT Service Management 2011 Edition
ITIL Foundation for IT Service Management 2011 Edition ITIL Rev 03.12 3 days Description ITIL (IT Infrastructure Library) provides a practical, no-nonsense framework for identifying, planning, delivering
More informationTo define and explain different learning styles and learning strategies.
Medical Office Assistant Program Overview The Medical Office Assistant program prepares students for entry-level employment as a medical office assistant. It discusses the fundamentals of medical terminology,
More informationContents. Introduction and System Engineering 1. Introduction 2. Software Process and Methodology 16. System Engineering 53
Preface xvi Part I Introduction and System Engineering 1 Chapter 1 Introduction 2 1.1 What Is Software Engineering? 2 1.2 Why Software Engineering? 3 1.3 Software Life-Cycle Activities 4 1.3.1 Software
More informationProject Management Concepts, Methods, and Techniques
Project Management Concepts, Methods, and Techniques Claude H. Maley Uffi\ CRC Press Taylor & Francis Croup Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Croup, an Informa
More informationPMP Certification Exam Prep Bootcamp
Commitment / Vision / Results SM Toll Free (US): (800) 877-8129 Office: (919) 495-7371 Fax: (919) 556-0283 Email: info@cvr-it.com Web site: www.cvr-it.com Course Overview PMP Certification Exam Prep Bootcamp
More informationManaging and Maintaining Windows Server 2008 Servers
Managing and Maintaining Windows Server 2008 Servers Course Number: 6430A Length: 5 Day(s) Certification Exam There are no exams associated with this course. Course Overview This five day instructor led
More informationTABLE OF CONTENTS CHAPTER TITLE PAGE
viii TABLE OF CONTENTS CHAPTER TITLE PAGE TITLE PAGE DECLARATION DEDICATION ACKNOWLEDGEMENT ABSTRACT ABSTRAK TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES LIST OF APPENDICES I II III IV VI VII VIII
More informationProject Audit & Review Checklist. The following provides a detailed checklist to assist the PPO with reviewing the health of a project:
Project Audit & Review Checklist The following provides a detailed checklist to assist the PPO with reviewing the health of a project: Relevance (at this time) Theory & Practice (How relevant is this attribute
More informationIntroductory Certificate. The APM Project Fundamentals Qualification
The syllabus provides a summary of the coverage of the qualification, the details are then found in the learning outcomes and assessment criteria. Both the syllabus and the learning outcomes and assessment
More informationSAML Authentication within Secret Server
SAML Authentication within Secret Server Secret Server allows the use of SAML Identity Provider (IdP) authentication instead of the normal authentication process for single sign-on (SSO). To do this, Secret
More informationHow To Connect To Ecs.Org From A Pc Or Mac Or Ipad (For A Laptop) With A Network Connection (For Mac) With The Ipad Or Ipa (For Pc Or Ipac) With An Ipa Or Ip
1) Getting a Windows username and password... 2 2) Download VPN Client... 4 3) Installing VPN... 11 4) Configure VPN... 18 5) Firewall... 20 6) Connecting using VPN... 20 7) Setting up a default connection...
More informationOnline Recruiting and Selection
Online Recruiting and Selection Innovations in Talent Acquisition Douglas H. Reynolds and John A. Weiner ^WILEY-BLACKWELL A John Wiley &. Sons, Ltd., Publication Contents Series Editor's Preface About
More information