2 The syllabus provides a summary of the coverage of the qualification, the details are then found in the learning outcomes and assessment criteria. Both the syllabus and the learning outcomes and assessment criteria are, but the presentation of the content better reflects teaching approaches than the functional breakdown of the APM Body of Knowledge 6 th edition structure. Where curly brackets are employed {WBS}, these are used to indicate acronyms. Where standard brackets are employed (concept, definition ), these are used to indicate generic or specific topic coverage. Where italics are used these are for clarification of syllabus rather than specific content. APM Introductory Certificate syllabus aligned to APM Body of Knowledge 6 th edition v1.1 Page 2 of 7
3 Overview of syllabus coverage and Body of Knowledge 6 th edition references Coverage of Learning outcomes 1. Project and the operating environment definition project, project key purpose of project definition programme and portfolio relationship of programme and portfolio to project differences between project and business as usual benefits of effective project project environment PESTLE as a tool 2. Project life cycle definition phases reasons for structuring projects into phases handover and closure 3. Management structures by which projects operate roles and responsibilities project manager project sponsor project steering group/board project team members PMO end user 4. Project planning project plan - purpose of, benefits ownership and approval of project plan purpose of a business case role of the sponsor and project manager in relation to the business case purpose of benefits use of KPIs stakeholder, stakeholder analysis estimating & estimating funnel project success criteria success factors project reporting Body of Knowledge reference 1.1.1, 1.1.2, 1.1.3, 1.2.2, , 1.1.8, , 3.1.1, 3.1.3, 3.1.5, 3.1.6, Continued APM Introductory Certificate syllabus aligned to APM Body of Knowledge 6 th edition v1.1 Page 3 of 7
4 5. Scope definition scope product Breakdown Structure {PBS}, Work Breakdown Structure {WBS} definitions configuration definition change control links between configuration and change control change control process configuration process 6. Scheduling and resource total float, critical path, Gantt chart, baseline, milestone definition- resource types of resources resource smoothing/resource levelling procurement 7. Risk and issue definition - project risk and risk project risk process use of risk register definition- issue and issue use of issue log escalation process 8. Project quality definition - quality and quality definition quality planning, quality assurance, quality control, continual improvement differences between quality assurance and quality control project reviews - gate post, benefit, peer reviews 9. Communication definition - communication methods of communication barriers to communication effective communication communication plan (When the format is changed we need to ensure Topic areas are kept together 10. Leadership and teamwork definition - leadership role of project team leader definition - project team teamwork models 3.2, 3.2.2, ,3.3.2,3.3, , 3.5.1, 3.5.2, 3.6, , 2.17 APM Introductory Certificate syllabus aligned to APM Body of Knowledge 6 th edition v1.1 Page 4 of 7
5 Syllabus learning outcomes and assessment criteria Learning outcomes When awarded credit for this unit, a learner will: 1 Understand project and the operating environment 2 Understand the project lifecycle 3 Understand the structure by which projects operate Assessment criteria Assessment of this learning outcome will require a learner to demonstrate that they can: 1.1 define a project 1.2 identify the differences between a project and business as usual 1.3 define project 1.4 state the key purpose of project 1.5 list the core components of project 1.6 list the benefits to an organisation of effective project 1.7 define programme and portfolio and their relationship with project 1.8 define the term project environment 1.9 define the components of the PESTLE acronym 2.1 define the term project life cycle 2.2 state the phases of a typical project life cycle 2.3 identify reasons for structuring projects into phases 3.1 define the roles and responsibilities of project manager project sponsor project steering group/ board project team members project office end users Continued APM Introductory Certificate syllabus aligned to APM Body of Knowledge 6 th edition v1.1 Page 5 of 7
6 4. Understand project planning 5. Understand project scope 6. Understand scheduling and resource 4.1 state the main purpose of a project plan 4.2 define who is involved in the creation of the project plan 4.3 explain why the project plan needs to be approved, owned and shared 4.4 identify the purpose and the typical content of a business case 4.5 define the role of the sponsor and project manager in relation to the business case 4.6 define stakeholders and stakeholder and explain why stakeholder analysis is important. 4.7 define benefits 4.8 define the use of KPIs 4.9 identify typical estimating methods (including analytical, comparative, parametric) 4.10 describe the estimating funnel 4.11 define success criteria in the context of managing projects 4.12 identify typical success factors that may contribute to successful projects 4.13 define the purpose and benefits of project reporting 5.1 define project scope 5.2 describe how product breakdown structure {PBS} and work breakdown structure {WBS} are used to illustrate the scope of work required 5.3 define the uses of Cost Breakdown Structure {CBS} Organisational Breakdown Structure {OBS} Responsibility Assignment Matrix {RAM} 5.4 define the following in relation to scope configuration change control 5.5 explain the relationship between change control and configuration 5.6 list the steps involved in a typical change control process 5.7 list the activities in a typical configuration process 6.1 identify the purpose of scheduling 6.2 outline different approaches to scheduling (including critical path analysis, total float, Gantt(bar)charts, baseline, milestone) 6.3 define resource 6.4 define procurement within the context of project 6.5 list different categories and types of resources needed for projects Continued APM Introductory Certificate syllabus aligned to APM Body of Knowledge 6 th edition v1.1 Page 6 of 7
7 7. Understand risk and issue 8. Understand project quality 9. Understand communication in the project environment 7.1 define risk 7.2 define risk 7.3 explain the purpose of risk 7.4 outline a high level risk process 7.5 describe the use of a risk register 7.6 define an issue 7.7 define issue 7.8 explain the difference between an issue and a risk 7.9 describe the use of an issue log 8.1 define quality 8.2 define quality 8.3 define the following: quality planning, quality assurance, quality control and continual improvement 8.4 outline the difference between quality control and quality assurance 8.5 identify the purpose of: gate reviews post project reviews benefit reviews peer reviews project audits 9.1 define communication 9.2 outline different media of communication identify potential barriers to effective communication 9.3 identify ways to facilitate effective communication 9.4 define the contents of a communication plan 9.5 explain the benefits of a communication plan 10. Understand principles of leadership and teamwork 10.1 define leadership 10.2 outline how a project team leader can influence team performance 10.3 define what is meant by the term project team 10.4 outline the advantages and disadvantages of team models such as Belbin and Margerison McCann APM Introductory Certificate syllabus aligned to APM Body of Knowledge 6 th edition v1.1 Page 7 of 7
Introductory Certificate The APM Project Fundamentals Qualification
Introductory Certificate The APM Project Fundamentals Qualification Syllabus, learning outcomes and assessment criteria aligned to the APM Body of Knowledge 6th edition The syllabus provides a summary
Syllabus 2nd Edition
Syllabus 2nd Edition 2 Introductory Certificate Syllabus 2nd Edition 2nd Edition Introductory Certificate syllabus All of the syllabus elements should be taken within the context of a project and project.
APMP. The APM Project Management Qualification. Syllabus, learning outcomes and assessment criteria aligned to the APM Body of Knowledge 6 th edition
The syllabus provides a summary of the coverage of the qualification, the details are then found in the learning outcomes and assessment criteria. Both the syllabus and the learning outcomes and assessment
Do not open this paper until instructed by the invigilator. Please note: This question paper must not be removed from the examination room.
APM Introductory Certificate in Project Management Exam paper Candidate Reference Number Date of Exam Location of the Exam General Notes Time allowed 1 hour Answer all 60 multiple choice questions Use
General Notes Time allowed 1 hour. Answer all 60 multiple choice questions Use the proforma answer sheet provided.
Introductory Certificate The APM Project Fundamentals Qualification. Examination paper Candidate Number Date Location Examination Paper Sample Paper v1.4 General Notes Time allowed 1 hour. Answer all 60
OPERATIONAL PROJECT MANAGEMENT (USING MS PROJECT)
OPERATIONAL PROJECT MANAGEMENT (USING MS PROJECT) 3 DAY COURSE INTRODUCTION The principles of project management are generic and therefore can be applied to all projects regardless of business sector.
Demonstrate and apply knowledge of project management in
Demonstrate and apply knowledge of project management in mechanical engineering 22918 version 2 Page 1 of 5 Level 6 Credits 15 Purpose This unit standard is intended primarily for use in diploma courses
Learning Outcome 1 The learner will: Be able to initiate the preliminary stages of a project.
Unit Title: Project Management Guided Learning Hours: 210 Level: Level 6 Number of Credits: 25 Learning Outcome 1 The learner will: Be able to initiate the preliminary stages of a 1.1 Identify an appropriate
Assessment guide. Certificate IV in Project Management BSB41507
Assessment guide Certificate IV in Project Management BSB41507 First produced August 2010. Cayenne Resources. All rights reserved. All materials produced by Cayenne Resources, regardless of format, are
UNIT BR10: PROJECT MANAGEMENT FOR ENGINEERING. Engineering
Unit BR10: Project for Engineering Unit code: T/503/7221 QCF level: 6 Credit value: 15 Aim The aim of this unit is to give learners an understanding of the techniques and skills required for effective
PBL: Project Management. Competency: Project Definition
Competency: Project Definition 1. Define project management and the context of modern project management. 2. Describe how to manage projects throughout the five major process groups. 3. Define the characteristics
APMP Sample Examination Questions and Answers. Based on The APM Body of Knowledge 5 th Edition & The APMP Syllabus 3 rd Edition
APMP Sample Examination Questions and Answers Based on The APM Body of Knowledge 5 th Edition & The APMP Syllabus 3 rd Edition Document History Date October 2006 Version 1.0 December 2006 Version 2.0 December
Certification Exam Objectives: PK0-003
Certification Exam Objectives: PK0-003 INTRODUCTION The CompTIA Project + examination is designed for business professionals involved with projects. This exam will certify that the successful candidate
MNLARS Project Audit Checklist
Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?
www.aryanengineering.com Email: info@aryanengineering.com
What is PMP Certification exam? www.aryanengineering.com PMP stands for Project Management Professional certification exam. PMP, is one of the most respected and globally recognized certification is offered
Project Management Professional PMP PMBOK 5
Project Management Professional PMP PMBOK 5 What are the Course Objectives? By the end of this training you will: Acquire the relevant knowledge and skills required to clear the PMP certification exam
1. Background and business case
1. Background and business case This section explains the context and why the project is being undertaken. It provides the justification for investing the time and resources in the project. 1.1 Reasons
Practitioner Certificate Software Asset Management Syllabus. Version 2.0
Practitioner Certificate Software Asset Management Syllabus Version 2.0 June 2010 Practitioner Certificate in Software Asset Management The ISEB Practitioner Certificate in Software Asset Management (SAM)
GETTING DOWN TO BUSINESS WITH OUR
GETTING DOWN TO BUSINESS WITH OUR Advanced Project Management Programme (NQF 6) Gebruik wanneer die swoosh gebruik word NWU POTCHEFSTROOM Besigheidskool POTCHEFSTROOMKAMPUS NWU POTCHEFSTROOM Business School
Certificate In Project Management (CIPM)
Conceptualize Plan Plan & Deliver Organize Implement Control Change if Required Integrate Deliver & Closeout Knowledge Leverage Certificate In Project Management (CIPM) Course Overview The Certificate
Project Governance Or Is It Governance of Projects?
Project Governance Or Is It Governance of Projects? PMI SOC PDD 2013 v 2013.1 Presented by Darya Duma, PEng, PMP, PRINCE2 www.procept.com Procept Associates Ltd. 2013 Outline What is project governance?
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name
IT Project Management Methodology. Project Execution Support Guide. Version 0.3
NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA IT Project Management Methodology Project Execution Support Guide Version 0.3 Table of Contents 1 INTRODUCTION... 4 1.1 When should Project Execution
A checklist for project managers
A checklist for project managers The checklist presented below aims to help you decide what project documents are needed, approximately when you need to create them, and what other resources are available.
Project Management Plan for
Project Management Plan for [Project ID] Prepared by: Date: [Name], Project Manager Approved by: Date: [Name], Project Sponsor Approved by: Date: [Name], Executive Manager Table of Contents Project Summary...
IMCPM04 Project Scheduling and Cost Control. Course Outline
IMCPM04 Project Scheduling and Cost Control Course Outline January 2012 Project Scheduling and Cost Control Course Aim Project Scheduling and Cost Control is a five-day (5 day) course which provides participants
PPM Competency Profiling
PPM Competency Profiling 1 What we do... Our strength comes from the expertise of our people, the structure of our processes, the scale of our operation and our years of experience in providing learning
The contact workshop is a mix of instructor lead and self paced learning, designed as per the PMBOK Fifth edition of Project Management Institute.
PMP Bootcamp workshop Duration: 4 Days - 35 PDUs GRT Consulting LLP brings you their eminent PMP Boot camp workshop to address the requirements of delegates preparing for the Project Professional (PMP
PROJECT MANAGEMENT IN PRIMAVERA P6 WEB ACCESS REL 7
PROJECT MANAGEMENT IN PRIMAVERA P6 WEB ACCESS REL 7 Duration: 03 days INTRODUCTION This course provides hands-on training for Primavera s web-based solution. Participants will create a project, add activities
Skatteudvalget 2014-15 (2. samling) SAU Alm.del Bilag 48 Offentligt. Programme, Project & Service Management Analysis
Skatteudvalget 2014-15 (2. samling) SAU Alm.del Bilag 48 Offentligt Programme, Project & Service Management Analysis Table of Content 1 Executive Summary... 3 1.1 Scope of Work... 3 1.2 Methodology for
Certified Project Management Professional VS-1079
Certified Project Management Professional VS-1079 Certified Project Management Professional Certification Code VS-1079 Vskills certification for Project Management Professional assesses the candidate for
Process Improvement Plan
Doc ID: Date: Revision: Status: Abstract This document describes the process improvement plan for Company XXX. Approvals Approvals. Signed. Date. Author Page 2 of 19 Sample Process Improvement Plan.doc
Integrated Assurance & Approval Strategy and Integrated Assurance & Approval Plans
Integrated Assurance & Approval Strategy and Integrated Assurance & Approval Plans A guide to implementing integrated assurance and approvals Version 1.0 - May 2011 Contents Introduction 03 Integrated
Certification in Humanitarian Supply Chain Management (CHSCM) Competence Model. Final Version 2007
Certification in Humanitarian Supply Chain Management (CHSCM) Competence Model Final Version 2007 Contents Competence Model Context... 3 Functional Map... 6 UNIT 1 Supply Chain Planning... 7 UNIT 2 Supply
Project Management Guidelines
Project Management Guidelines 1. INTRODUCTION. This Appendix (Project Management Guidelines) sets forth the detailed Project Management Guidelines. 2. PROJECT MANAGEMENT PLAN POLICY AND GUIDELINES OVERVIEW.
Project Management Life Cycle (PMLC)
Project Management Life Cycle (PMLC) Page 2 Project Management Life Cycle (PMLC) Introduction PMLC Working Group IT Business Process Management(BPM) IT Project Management Office (PMO) Finance System Support
Level: 3 Credit value: 5 GLH: 28 Relationship to NOS:
Unit 341 Implement UAN: Level: 3 Credit value: 5 GLH: 28 Relationship to NOS: Assessment requirements specified by a sector or regulatory body: Aim: T/506/1929 Management & Leadership (2012) National Occupational
Association for Project Management Business Management System
Association for Project Management Business Management System December 2012 2 Association for Project Management About APM Formed in 1972, the Association for Project Management (APM) is committed to developing
MICROSOFT OFFICE PROJECT - SYLLABUS
MICROSOFT OFFICE PROJECT - SYLLABUS Sessions Session 1 Description 1. INTRODUCTION a. Introduction to CADFORUM and PPM b. Project c. Examples of project d. Project Triangle e. Project Management f. Life
Project Integration Management
Integration Initiating ning Executing Monitoring & Controlling Closing 4.1 Develop Charter Statement Of Work Business Case 4.2 Develop 4.3 Direct and Manage Work 4.4 Monitor and Control Work 4.5 Perform
CA PA for CA Clarity PPM 14.2: Project and Investment Management 200
CA PRODUCTIVITY ACCELERATOR CONTENT DESCRIPTION CA PA for CA Clarity PPM 14.2: Project and Investment Management Content Overview PRODUCT RELEASE CA Clarity PPM 14.2 DURATION & COURSE CODE Three (3) Hours
Effective Project Management. A well-constructed project management workshop should give people a solid foundation to build on.
Effective Project A well-constructed project management workshop should give people a solid foundation to build on. Bentley Borman KPMG Project Course outline 2012 Course Content: Introduction to Project
{Add company name} {Add geographical location} {Add/edit as required} Programme manager. {Add local information}
Job Description Portfolio or Programme Manager Organisation: Location: Reports to: Supervises: Working conditions: Last updated: {Add company name} {Add geographical location} {Add/edit as required} Programme
Program Title: Advanced Project Management Knowledge, Skills & Software Program ID: #1039168 Program Cost: $4,690 Duration: 52.
Program Title: Advanced Project Management Knowledge, Skills & Software Program ID: #1039168 Program Cost: $4,690 Duration: 52.5 hours Program Description The Advance Project Management Knowledge, Skills
THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT
THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT GERARD M. HILL CRC Press Taylor & Francis Group Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Croup, an informa business
Time Management. Herb Pollard III
Time Management A Small Business Perspective Herb Pollard III Project Manager for Time Management - Pollard PMI Slide 1 Introduction: Time Management - Pollard PMI Slide 2 Project Phases and the Areas
Making project management indispensable for business results. Project Management 101
Making project management indispensable for business results. Project Management 101 Donald E. Moore, MBA, PMP, President of PMI NB Kelly Barter, Chapter Manager of PMI NB AGM April 28, 2011 Topics of
Project Management Fundamentals. Office of the Senior Associate Vice President for Finance
Project Management Fundamentals Project Management Institute PMI is an aggregation of best practices from thousands of professional project managers Principles in this training are based on PMI methodologies,
Module 2: The Project Initiation Stage
Overview Initiation stage is highly instrumental in the life cycle of a project as it defines the boundaries of the project gives clarity to all participants about the objectives, scope, cost timescale
Stakeholder management and. communication PROJECT ADVISORY. Leadership Series 3
/01 PROJECT ADVISORY Stakeholder management and communication Leadership Series 3 kpmg.com/nz About the Leadership Series KPMG s Leadership Series is targeted towards owners of major capital programmes,
PROJECT AUDIT METHODOLOGY
PROJECT AUDIT METHODOLOGY 1 "Your career as a project manager begins here!" Content Introduction... 3 1. Definition of the project audit... 3 2. Objectives of the project audit... 3 3. Benefit of the audit
PgMP Credential. Christopher Talmont, PMP, PMI-RMP. February 23, 2011
PgMP Credential Christopher Talmont, PMP, PMI-RMP February 23, 2011 A b o u t M e 7 years of experience as an instructor and consultant of project scheduling software and best practices 4 years of experience
Input, Output and Tools of all Processes
1 CIS12-3 IT Project Management Input, Output and Tools of all Processes Marc Conrad D104 (Park Square Building) Marc.Conrad@luton.ac.uk 26/02/2013 18:22:06 Marc Conrad - University of Luton 1 2 Mgmt /
Program Title: Advanced Project Management Program ID: #1025924 Program Cost: $3,780 Duration: 37.5 hours. Program Description
Program Title: Advanced Project Management Program ID: #1025924 Program Cost: $3,780 Duration: 37.5 hours Program Description The Advance Project Management course is a training offering for professionals
Project Management Concepts
Project Management Concepts Day Workshop Course PM12 PM12 - Project Management Concepts Course ID: PM12 Credits: 21 PDUs Course Duration: 3 days Course Level: Basic 3 Days 21 PDUs Course Description: In
NFSA Project Management Guidelines
NFSA Project Management Guidelines Project Management Guide Purpose of this Guide This Guide outlines the NFSA Project Management Guidelines, and includes: NFSA Project Life Cycle Governance Roles and
Dallas IIA Chapter / ISACA N. Texas Chapter. January 7, 2010
Dallas IIA Chapter / ISACA N. Texas Chapter Auditing Tuesday, October Project 20, 2009 Management Controls January 7, 2010 Table of Contents Contents Page # Project Management Office Overview 3 Aligning
CMMI Asset Library: Maturity Level 2
CMMI Asset Library: Maturity Level 2 All items listed below are to assist in achieving CMMI Maturity Level 2; they may be purchased by the bundle. David Consulting Group will invoice you for your total
Incident Standard Service Request Information Request. IT Request. Minor/Low Impact Change to Existing Service. Capture and refine the idea
Incident Standard Service Request Information Request IT Request Idea Capture and refine the idea Determine the type of work Minor/Low Impact to Existing Service Mgmt. Work with customer, management to
AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)
AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP) Copyright: Australian Institute of Project Management Document Information Document
Project Management Fact Sheet:
Project Management Fact Sheet: Developing a Work Breakdown Structure Version: 1.2, November 2008 DISCLAIMER This material has been prepared for use by Tasmanian Government agencies and Instrumentalities.
Project Management Professional (Certified by PMI)
Project Management Professional (Certified by PMI) PMI certified Project Management Professional credential is the most important industryrecognized certification for project managers. This recognition
Maturity Model. March 2006. Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce
Maturity Model March 2006 Version 1.0 P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value Added product which is outside the scope of the HMSO
THE COMPLETE GUIDE TO PERFECT PROJECT MANAGEMENT
THE COMPLETE GUIDE TO PERFECT PROJECT MANAGEMENT 1 CONTENTS Introduction 3 Prince2 5 Every as a project tool 6 Major development and building work 7 Further reading and information..9 2 THE COMPLETE GUIDE
Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter
1 Mgmt / Initiating Process Group 4.1 Develop Project Charter Project statement of work Business case Agreements Facilitation techniques Project charter 26/02/2013 18:23:36 1 2 Mgmt / Planning Process
Department of Administration Portfolio Management System 1.3 June 30, 2010
E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2
ID Task Name Time Pred
0 UC Modernization Project Plan 1115 d 1 1 Phase I - Business Case Development and Competitive Procurement 205 d 2 1.1 Complete Initial Feasibility Study 55 d 3 1.2 Prepare and Issue LBR 30 d 2 4 1.3 Competitive
DPC - Strategy and Project Delivery Unit Project Management Methodology. Updated April 2010
DPC - Strategy and Project Delivery Unit Project Management Methodology Updated April 2010 This project management methodology is designed to help SPDU staff to plan, manage and measure a successful project
APPLYING PROJECT MANAGEMENT TECHNIQUES TO QEHS
APPLYING PROJECT MANAGEMENT TECHNIQUES TO QEHS Mary F. McDonald, CQA President/Principal Consultant Individual Solution Options/Quality Services (ISO/QS), Inc. Austin, TX 78739 Tel: (512) 282-0181 E-mail:
1 What does the 'Service V model' represent? a) A strategy for the successful completion of all service management projects
1 What does the 'Service V model' represent? a) A strategy for the successful completion of all service management projects b) The path to Service Delivery and Service Support for efficient and effective
For Articulation Purpose Only.
E328 Project Management (4 Modular Credits) This document addresses the content related abilities, with reference to the module. Abilities of thinking, learning, problem solving, team work, communication,
Roles & Grades Rate Cards and Applicable SFIA Skills
Roles & s Rate Cards and Applicable Consultant Day Rate Card Consultant Day Rate Lead 900.00 Senior 800.00 Junior 0.00 CLAS Consultant and Competencies Lead CLAS Consultant Lead CLAS Consultant IT Governance
Location including building: University wide (Lansdowne Campus/Talbot Campus)
Job Description Post/Job Title: Principal Test Analyst Post holder: Ref: School/Support Service: Group/Section: ITS62 IT Services IT Test Team - Governance Location including building: University wide
Program Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated
Project Management Plan Template
Abstract: This is the project management plan document for . This is a controlled document and should be maintained in a configuration environment. Project Management Plan Template Contents REVISION
Head, Office of Project Management Oversight
SUBJECT: FERMI RESEARCH ALLIANCE PROCEDURES PROJECT MANAGEMENT NUMBER: 12.PM-004 RESPONSIBILITY: Office of Project Management Oversight REVISION: 43 APPROVED BY: TITLE Head, Office of Project Management
Assessment guide. Diploma of Project Management BSB51407
Assessment guide Diploma of Project Management BSB51407 First produced September 2010. Cayenne Resources. All rights reserved. All materials produced by Cayenne Resources, regardless of format, are protected
10 Critical Steps to Create a Project Plan
10 Critical Steps to Create a Project Plan Elizabeth Larson, PMP, CBAP and Richard Larson, PMP, CBAP Principals, Watermark Learning, Inc. Industry Article Watermark Learning 7300 Metro Blvd, Suite 207
Fundamentals for EHR Success
Fundamentals for EHR Success Angie Chew Monksfield Principal of Portfolio Lim Shih Hsien Deputy Director, Information Security Knowing the Pain Points This material contains information that is confidential
Auditing the Software Development Lifecycle ISACA Geek Week. Mike Van Stone Sekou Kamara August 2014
Auditing the Software Development Lifecycle ISACA Geek Week Mike Van Stone Sekou Kamara August 2014 Agenda Introduction Audit Scope Project Initiation SDLC Processes Stakeholders Common Development Methodologies
ROLE PROFILE. Performance Consultant (Fixed Term) Assistant Director for Human Resources
ROLE PROFILE Job Title Reports to Service area No. of staff responsible for Budget responsibility ( ) Performance Consultant (Fixed Term) Assistant Director for Human Resources HR 0 None Purpose of Job
Project Management Certificate (IT Professionals)
Project Management Certificate (IT Professionals) Whether your field is architecture or information technology, successful planning involves a carefully crafted set of steps to planned and measurable goals.
ITS Project Management
ITS Project Management Policy Contents I. POLICY STATEMENT II. REASON FOR POLICY III. SCOPE IV. AUDIENCE V. POLICY TEXT VI. PROCEDURES VII. RELATED INFORMATION VIII. DEFINITIONS IX. FREQUENTLY ASKED QUESTIONS
The position reports directly to the Diversification Program Manager and indirectly to the Program Management Office (PMO)
Position Description Employee: Position title: Location: Grade: Organisation: Project Manager Diversification Head Office Management The position reports directly to the Diversification Program Manager
ORACLE PROJECT MANAGEMENT
ORACLE PROJECT MANAGEMENT KEY FEATURES Oracle Project Management provides project managers the WORK MANAGEMENT Define the workplan and associated resources; publish and maintain versions View your schedule,
Program Title: Advanced Project Management Program ID: #1025924 Program Cost: $3,780 Duration: 37.5 hours. Course Description
Program Title: Advanced Project Management Program ID: #1025924 Program Cost: $3,780 Duration: 37.5 hours Course Description This course is the flagship course for Project Management certifications including
Blank Project Management Templates. Saving Time! Saving Money! Saving Stress!
www.projectagency.co.uk Blank Project Management Templates Saving Time! Saving Money! Saving Stress! Please feel free to copy any of the attached documents. You can alter any of them to suit the needs
Methodical Notes for part-time BMCF TM study course M_SM / PROJECT MANAGEMENT
1 st session: INTRODUCTION TO PROJECT MANAGEMENT Objective of the thematic unit: To understand what is meant by Projects and to define Project Management. Students benefit by understanding the need to
OE PROJECT CHARTER TEMPLATE
PROJECT : PREPARED BY: DATE (MM/DD/YYYY): Project Name Typically the Project Manager Project Charter Last Modified Date PROJECT CHARTER VERSION HISTORY VERSION DATE (MM/DD/YYYY) COMMENTS (DRAFT, SIGNED,
Appeals Case Management System Project. Scope Management Plan. November 20, 2014
Appeals Case Management System Project Version 1.0 Health and Human Services Agency, Office of Systems Integration Template Revision History REVISION HISTORY REVISION # DATE OF RELEASE OWNER SUMMARY OF
PSPPM402B Manage simple projects
PSPPM402B Manage simple projects Unit descriptor Employability skills Competency field This unit covers management of generally low risk projects that may be small scale and managed by one person or a
White paper. Innate Resource Management Software. Introduction to Reports
White paper Innate Resource Management Software Introduction to Reports Presenting project, cost, time and resource information, across the organization Innate reports can significantly improve the visibility
Project Execution Guidelines for SESAR 2020 Exploratory Research
Project Execution Guidelines for SESAR 2020 Exploratory Research 04 June 2015 Edition 01.01.00 This document aims at providing guidance to consortia members on the way they are expected to fulfil the project
Project Management Office (PMO)
Contents I. Overview of Project Management...4 1. Project Management Guide (PMG)...4 1.1 Introduction...4 1.2 Scope...6 1.3 Project Types...6 2. Document Overview, Tailoring, and Guidance...7 3. The Project
Project Management Concepts, Methods, and Techniques
Project Management Concepts, Methods, and Techniques Claude H. Maley Uffi\ CRC Press Taylor & Francis Croup Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Croup, an Informa
Project Services. How do we do it?
Project Services Many organisations struggle with inconsistent or poor project management performance across their business. Sometimes the failure to deliver on time and on budget (or at all!) is simply
Program Management Professional (PgMP) Examination Content Outline
Program Management Professional (PgMP) Examination Content Outline Project Management Institute Program Management Professional (PgMP ) Examination Content Outline April 2011 Published by: Project Management
PROJECT MANAGEMENT PLAN <PROJECT NAME>
PROJECT MANAGEMENT PLAN TEMPLATE This Project Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome
Company Sponsored Competency Based Workplace Assessment
Company Sponsored Competency Based Workplace Assessment Recognition of prior learning Advanced Diploma of Project Management (Master Project Director) Diploma of Project Management (Registered Project