1 Título ponencia: Guidance for GBAS Operations Implementation Organizado por:

2 Index Introduction Guidance for GBAS Operations implementation Decision Making Inception Phase case example

3 Introduction AmethodologyhasbeendefinedbyPildoLabsinordertosupportStakeholdersintheprocessof implementing GBAS operations Aligned with ICAO PBN Implementation Manual and RNP-APCH ICAO Guidelines Three main phases: Inception Phase(Decision& Analyse) Service provision(includes the GBAS system installation) Operational implementation Those three phases will be illustrated through real cases examples

4 Index Introduction Guidance for GBAS Operations implementation Decision Making Inception Phase case example

5 Inception Phase Malaga Case Bremen/Newark Cases

6 Index Introduction Guidance for GBAS Operations implementation Decision Making Inception Phase case example

7 Decision Making GBAS Inception Phase Implementing GBAS operations implies an important investment at ground infrastructure level In order to support decision makers on such investment a GBAS Inception Programme is recommended to: - Familiarize Stakeholder with GBAS concept and technology (National Team) - Provides initial assessment on future GBAS service and performance based on real local data - Develops a Cost Benefit Analysis from the Service Provision perspective GBAS Inception Programme developed by Pildo Labs includes five main tasks:

8 GBAS Inception Phase: GBAS Team Create GBAS Inception Programme Team

9 GBAS Inception Phase: GBAS Training GenericGBAStrainingisprovidedtotheGBASTeam: - GNSS and GBAS Overview - Up-to-date on GBAS activities worldwide - Training on sitting procedures - GBAS Procedure design training - PEGASUS data processing tool training - GBAS Data processing exercises -

10 GBAS Inception Phase: Scenario identification & siting A suitable airport is selected for the Programme: - Air Navigation Implementation Plan - Instrumental RWYs - Important traffic figures - ILS actual equippage -...etc Preliminary siting exercise for Reference Receivers is performed Select Candidate Airport Siting Survey Installation of RRS is performed Installation of RRS Scenario Identification

11 GBAS Inception Phase: Scenario identification & siting Example of Non-Satisfying Areas The red areas of this example are not feasible to allocate an RRS: 1. Outside 3 NM range from each supported runway end 2. Outside Airport Perimeter 3. Runway Protection Surfaces 4. Airport Obstacles Free Zones 5. Roads and taxiways 6. Equipment and shelters 7. Building edges and metallic fences Dakar Aerodrome Chart (ICAO)

12 GBAS Inception Phase: Scenario identification & siting Example of Satisfying Areas The green areas of this example are feasible to allocate an RRS for the following reasons: 1. Free obstacles zones 2. Power Supply access 3. Site access available 4. Equipment shelter available 5. Equipment Security 6. Multipath Free 7. No installation issues Dakar Aerodrome Chart (ICAO)

13 GBAS Inception Phase: Data Collection campaign A24hdata collectionisperformedto: - Validate correct installation - AssessqualityofGPSserviceinthearea(localeffectslike multipath, shadowing, etc.) - Position the antenna precisely - Preliminary assessment 24h Data Analysis Antenna precise positioning through phase processing techniques RRS Precise Positioning Launch data collection campaign in support to GBAS performance assessment Data campaign Data Collection Campaign

14 GBAS Inception Phase: Data Collection campaign Shadowing effect due to a wrong selection of antenna installation Red circle: Shadowing area Shadowing obstacle example. Blue star: Antenna position. Red circle: Tower.

15 GBAS Inception Phase: GBAS procedure design Procedure design can be performed through PRODAN Flight simulated throughout PLATERO flight inspection portable platform(rtca Doc 9906)

16 GBAS Inception Phase: GBAS performances simulation GBAS Performance Assessment is enhanced through PEGASUS EUROCONTROL Toolset: - Emulates on-ground and on-board equipment data processing in compliance with RTCA standards

17 GBAS Inception Phase: CBA Operational benefits and incurred costs are evaluated (total costs including maintenance, pay-back and rough estimated ROI(return on investment)) GBAS Performance CBA at Service Provision Airport level compared to actual scheme ILS based AirlinebasedCBAcanalsobeperformed Business Case Cost Benefits Analysis

18 Inception Phase Malaga Case Bremen/Newark Cases

19 Legal Notice No part of this material may be copied, reproduced and/or disclosed, in any form or by any means without the prior written permission of the Pildo Labs 2012 This material reflects only the author s views and the company is not liable for any use that may be made of the information contained herein.

20

Título ponencia: Towards the GBAS Operational Approval. Organizado por:

Título ponencia: Towards the GBAS Operational Approval. Organizado por: Título ponencia: Organizado por: Index Introduction Training Procedure design Safety case & System declaration Operational GBAS Cases Introduction The third and final step of the methodology contains those

More information

Título ponencia: RNP APCH Implementation

Título ponencia: RNP APCH Implementation Título ponencia: RNP APCH Implementation Organizado por: Index Introduction RNP APCH implementation process PBN Europe plans Introduction RNP APCH Without vertical guidance With vertical guidance LNAV

More information

Título ponencia: Helicopter IFP. Point-in-Space (PinS)

Título ponencia: Helicopter IFP. Point-in-Space (PinS) Título ponencia: Helicopter IFP. Point-in-Space (PinS) Organizado por: Index Introduction Helicopter IFP A/C Certification requirements GNSS Certified rotorcrafts Most relevant projects in Europe Introduction

More information

ICAO-ENAC PBN PROCEDURE DESIGN COURSE

ICAO-ENAC PBN PROCEDURE DESIGN COURSE ICAO-ENAC PBN PROCEDURE DESIGN COURSE REFERENCE AND TITLE Performance Based Navigation Concept : Procedure design course for PBN applications: RNAV1 SID and STAR, RNP APCH (Non Precision Approach and APV

More information

airsight Company Profile

airsight Company Profile airsight Company Profile Company Consulting Training Software Consulting Innovative consulting services based on in-depth knowledge for various aviation aspects Training Expert know-how on aviationspecific

More information

DFS Deutsche Flugsicherung GmbH

DFS Deutsche Flugsicherung GmbH International Symposium on Global Navigation Satellite Systems, Space-based and Ground-based Augmentation Systems and Applications Gabriele Zaki 14.11.2008 Seite 1 Outline Why GBAS How it works DFS Project

More information

Título ponencia: GBAS Concept

Título ponencia: GBAS Concept Título ponencia: Organizado por: Index Introduction GBAS Overview GBAS CAT-I Services GBAS Implementation Introduction Subject These slides presents a brief introduction to the Ground Based Augmentation

More information

CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS

CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS CNS/ATM/SG/1 Appendix C to the Report on Agenda Item 4 4C-1 APPENDIX C CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS First Edition Rev 2.0 TABLE OF CONTENTS Page 1. INTRODUCTION... 2 1.1

More information

SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014

SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014 SESAR Air Traffic Management Modernization Honeywell Aerospace Advanced Technology June 2014 Honeywell in NextGen and SESAR Honeywell active in multiple FAA NextGen projects ADS-B Surface Indicating and

More information

Monitoreo GNSS. Uso prác)co de sistemas GNSS Aplicaciones en el sector de la aviación

Monitoreo GNSS. Uso prác)co de sistemas GNSS Aplicaciones en el sector de la aviación Monitoreo GNSS Uso prác)co de sistemas GNSS Aplicaciones en el sector de la aviación Taller de capacitación técnica y operacional sobre sistemas globales de navegación por satélite 28 de Noviembre de 2013,

More information

WHICH AIR TRAFFIC CONTROLLER TO CONTACT

WHICH AIR TRAFFIC CONTROLLER TO CONTACT WHICH AIR TRAFFIC CONTROLLER TO CONTACT 1. Introduction This article is written in order to explain to all beginners in the IVAO network the basics for any pilot to contact the correct air traffic controller.

More information

CNS/ATM SYSTEMS IN INDIA

CNS/ATM SYSTEMS IN INDIA CNS/ATM SYSTEMS IN INDIA Presentation at ICG02 4 th Sept-7 th Sept 2007, Bangalore M.IRULAPPAN General Manager (GNSS) Over Indian Airspace (AAI) provides Air navigation services (ANS) infrastructure Air

More information

PRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION

PRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION EUROPEAN COMMISSION PRESENTATION Patrick Ky Executive Director EUROPEAN COMMISSION WHY SESAR? EUROPEAN COMMISSION EUROPEAN CHALLENGES: Capacity: Air Traffic to double by 2030 Safety: Improvements linked

More information

THE MASTER PLAN CAMPAIGN. Workshop RPAS (WS 03) 22 January 2015

THE MASTER PLAN CAMPAIGN. Workshop RPAS (WS 03) 22 January 2015 THE MASTER PLAN CAMPAIGN Workshop RPAS (WS 03) 22 January 2015 Back-up The objectives of the campaign 2 Campaign objectives Following the endorsement from the PC, SPP and ADB of the PC Tiger Team recommendations

More information

Performance-based Navigation and Data Quality

Performance-based Navigation and Data Quality ICAO APAC AAITF/8 Performance-based Navigation and Data Quality A Commercial Data Supplier View Bill Kellogg International Relations May 6-10, 2013 Ulaanbaatar, Mongolia Jeppesen Proprietary - Copyright

More information

DEBRECEN INTERNATIONAL AIRPORT. Prepared by Tamás Sápi Technical Director

DEBRECEN INTERNATIONAL AIRPORT. Prepared by Tamás Sápi Technical Director DEBRECEN INTERNATIONAL AIRPORT Prepared by Tamás Sápi Technical Director Location of the Debrecen Airport Debrecen International Airport Abandoned Russian military airport The Municipality took over the

More information

LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL. Executive Summary and About the Consultation Documents and Document Contents

LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL. Executive Summary and About the Consultation Documents and Document Contents LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL Introduction of Standard Instrument Departure Procedures to Routes in the London Terminal Control Area Sponsor Consultation 2016 Executive Summary and About

More information

PBN Aeronautical Charts and Procedure Design

PBN Aeronautical Charts and Procedure Design PBN Aeronautical Charts and Procedure Design Raúl A. Martínez Díaz RO/AIM rmartinez@icao.int ICAO NACC 05 May 2015 Topics 1. AIS/AIM 2. Data flow 3. ICAO PBN Documents 4. Procedures design 5. PBN Aeronautical

More information

Aerodrome Advisory Circular

Aerodrome Advisory Circular Aerodrome Advisory Circular AC(AD) NO-13 Integration of International Aviation Security (AVSEC) Measures into Designs and Constructions of New Facilities and alterations to Existing Facilities. CIVIL AVIATION

More information

How To Improve The Performance Of Anatm

How To Improve The Performance Of Anatm EXPLORATORY RESEARCH IN ATM David Bowen Chief ATM 4 th May 2015 1 ATM Research in Europe HORIZON Transport Challenges smart, green and integrated transport FlightPath 2050 five challenges to aviation beyond

More information

CIVIL AVIATION REQUIREMENTS SECTION 9 AIR SPACE AND AIR TRAFFIC MANAGEMENT SERIES 'D' PART VI

CIVIL AVIATION REQUIREMENTS SECTION 9 AIR SPACE AND AIR TRAFFIC MANAGEMENT SERIES 'D' PART VI GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJANG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SECTION 9 AIR SPACE AND AIR TRAFFIC MANAGEMENT SERIES 'D'

More information

Quality Assurance DOC 9906 Vol 1 Step 5&6: Apply Criteria & Document and Store

Quality Assurance DOC 9906 Vol 1 Step 5&6: Apply Criteria & Document and Store ICAO WACAF Workshop 1 st 4 th September 2015 Quality Assurance DOC 9906 Vol 1 Step 5&6: Apply Criteria & Document and Store Steps 5 & 6 Apply Criteria Document and Store Conclusion Apply Criteria Apply

More information

EPN, seminar AFIS, september 2013 Instrument approach procedures, PBN, GNSS

EPN, seminar AFIS, september 2013 Instrument approach procedures, PBN, GNSS EPN, seminar AFIS, september 2013 Instrument approach procedures, PBN, GNSS By Frédéric BOISARD, AFIS-O at Cholet LFOU Thanks to Mrs Morgane BARDIEUX (DGAC DSAC/O) and to Mrs Corinne BOUSQUET (DGAC - DSNA/DTI)

More information

Michael Harrison Aviation Management Associates Alternative PNT Public Meeting Stanford University August 10-11. Federal Aviation Administration

Michael Harrison Aviation Management Associates Alternative PNT Public Meeting Stanford University August 10-11. Federal Aviation Administration Michael Harrison Aviation Management Associates Alternative PNT Public Meeting Stanford University Suspending Current Belief Current practices for air traffic control, procedures and separation will not

More information

Paris, Issy Les Moulineaux, 29 Novembre Symposium 2007sur les Incursions sur Piste. Eric MIART, EUROCONTROL APR Manager

Paris, Issy Les Moulineaux, 29 Novembre Symposium 2007sur les Incursions sur Piste. Eric MIART, EUROCONTROL APR Manager Paris, Issy Les Moulineaux, 29 Novembre Symposium 2007sur les Incursions sur Piste 1 Eric MIART, EUROCONTROL APR Manager World War 1 picture 2 Runway Safety - Not a New Problem Preventing Runway Incursions

More information

International Civil Aviation Organization The Fourth Meeting of the APANPIRG ATM Sub-Group (ATM /SG/4) Bangkok, Thailand, 04-08 July 2016

International Civil Aviation Organization The Fourth Meeting of the APANPIRG ATM Sub-Group (ATM /SG/4) Bangkok, Thailand, 04-08 July 2016 International Civil Aviation Organization The Fourth Meeting of the APANPIRG ATM Sub-Group (ATM /SG/4) Bangkok, Thailand, 04-08 July 2016 DGCA/52 OUTCOMES (Presented by the Secretariat) SUMMARY This paper

More information

ESTB International Trials

ESTB International Trials ESTB International Trials 2 nd ESTB Workshop Nice, 12 November 2001 EDISA EGNOS Demonstration In South America: Wide scale EGNOS trial in the region covering between South West Europe, the South Atlantic,

More information

THE SESAR CONCEPT AND SWIM. David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking

THE SESAR CONCEPT AND SWIM. David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking THE SESAR CONCEPT AND SWIM David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking 1 Satellite based Communication & Navigation Advanced Flexible Use of Airspace Integrated Departure & Arrival

More information

Development and Validation of Procedures. ICAO PBN Seminar Development and Validation of Procedures

Development and Validation of Procedures. ICAO PBN Seminar Development and Validation of Procedures Development and Validation of Procedures 1 Overview From Procedure design to Database -The steps needed to ensure RNAV systems follow the procedure correctly Learning Objectives The translation of procedure

More information

Determination of ILS Critical and Sensitive Areas: A Comparison of Flight Measurement versus Simulation Techniques

Determination of ILS Critical and Sensitive Areas: A Comparison of Flight Measurement versus Simulation Techniques Determination of ILS Critical and Sensitive Areas: A Comparison of Flight Measurement versus Simulation Techniques S. Dale Courtney Senior Navigation Engineer US FAA, Air Traffic Organization Washington,

More information

ILS Replacement. ACI World Safety Seminar. 18 19 November 2008 Kempinski Hotel Beijing Lufthansa Centre

ILS Replacement. ACI World Safety Seminar. 18 19 November 2008 Kempinski Hotel Beijing Lufthansa Centre ILS Replacement Xiaosong Xiao, PhD Tetra Tech, Inc. Orlando, USA Contents: Ground-Based Navigation ILS Approach GNSS/SBAS Approach Comparisons between ILS and GNSS Example: Cost Analysis Between LAAS and

More information

12.0 SAFETY AND SECURITY

12.0 SAFETY AND SECURITY 12.0 SAFETY AND SECURITY 12.0 SAFETY AND SECURITY Key points The development plan within this Master Plan: Will improve airfield safety by reducing the towed aircraft runway crossings and other airfield

More information

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out White Paper Doc No.: WHTP-2013-14-05 Revised, October 2014 Safely guiding pilots and their passengers worldwide for

More information

IMPLEMENTATION OF PERFORMANCE BASED NAVIGATION (PBN)

IMPLEMENTATION OF PERFORMANCE BASED NAVIGATION (PBN) REPUBLIC OF CYPRUS MINISTRY OF COMMUNICATIONS AND WORKS CHARTING, OBSTACLES AND PROCEDURES UNIT DEPARTMENT OF CIVIL AVIATION NICOSIA 1429 IMPLEMENTATION OF PERFORMANCE BASED NAVIGATION (PBN) ROADMAP FOR

More information

Radio Communications in Class D Airspace by Russell Still, Master CFI

Radio Communications in Class D Airspace by Russell Still, Master CFI Radio Communications in Class D Airspace by Russell Still, Master CFI Class D airspace is one of the most common parts of the airspace system that requires specific radio communications. Although you can

More information

AVIATION INVESTIGATION REPORT A06F0014 MISALIGNED TAKE-OFF

AVIATION INVESTIGATION REPORT A06F0014 MISALIGNED TAKE-OFF AVIATION INVESTIGATION REPORT A06F0014 MISALIGNED TAKE-OFF AIR CANADA AIRBUS A319-114 C-FYKR LAS VEGAS, NEVADA 30 JANUARY 2006 The Transportation Safety Board of Canada (TSB) investigated this occurrence

More information

Direct Approach Consulting Inc.

Direct Approach Consulting Inc. Direct Approach Consulting Inc. Flight Procedure Design Your best approach for: safety operational efficiency maximizing revenue Direct Approach Direct Approach is a Canadian based company providing instrument

More information

13.0. Safety Management and Airspace Protection

13.0. Safety Management and Airspace Protection 13.0 Safety Management and Airspace Protection 13.1 Safety management 119 13.2 Security 119 13.3 Airspace protection 119 13.4 Airports (Protection of Airspace) Regulations 1996 120 13.5 Engine-out procedures

More information

Pavement Management Program

Pavement Management Program Pavement Management Program ALACPA Short Course on Pavements Maintenance Course Objective Pavement Management Program Benefits of a Pavement Management System Components of a Pavement Management System

More information

International Virtual Aviation Organization. Hong Kong. Division Report. 2014 Annual Report

International Virtual Aviation Organization. Hong Kong. Division Report. 2014 Annual Report International Virtual Aviation Organization Hong Kong Division Report 2014 Annual Report January 21, 2015 1 1. Mission, Vision, and Values Our Vision Committed to an Efficient, Sustainable and Friendly

More information

EUROCONTROL Training Activities 2013

EUROCONTROL Training Activities 2013 EUROCONTROL Training Activities 2013 Address: EUROCONTROL Institute of Air Navigation Services 12, rue Antoine de Saint Exupéry L-1432 Kirchberg Luxembourg LUXEMBOURG Telephone: + 352 43 60 611 Fax: +

More information

SESAR BENEFITS: TOMORROW STARTS NOW

SESAR BENEFITS: TOMORROW STARTS NOW 1 SESAR BENEFITS: TOMORROW STARTS NOW Integrating Rotorcraft into future European ATM Concepts Fabio Mangiaracina - SICTA (ENAV Group), Philippe Rollet - EHA The European Helicopter Association (EHA) The

More information

Flight Planning Using an Aeronautical Chart

Flight Planning Using an Aeronautical Chart Flight Planning Using an Aeronautical Chart By Laura Million INTRODUCTION When a driver in an automobile takes a trip, one hops in the car and drives. Signs along the highway will point the way to the

More information

Workpackages. This view provides the list of the SESAR Workpackages More information can be obtained by selecting a Workpackage.

Workpackages. This view provides the list of the SESAR Workpackages More information can be obtained by selecting a Workpackage. Workpackages This view provides the list of the SESAR Workpackages More information can be obtained by selecting a Workpackage. CODE TITLE 03.00 Global Co-ordination and Management 03.01 Validation Infrastructure

More information

CS5 EAIMS Call For Interest Technical annexe

CS5 EAIMS Call For Interest Technical annexe CS5 EAIMS Call For Interest Technical annexe 1. Purpose of the technical annexe This document provides information allowing the candidates who wish to express interest in the CS5 EAIMS (European ATM Information

More information

GENERAL INFORMATION ON GNSS AUGMENTATION SYSTEMS

GENERAL INFORMATION ON GNSS AUGMENTATION SYSTEMS GENERAL INFORMATION ON GNSS AUGMENTATION SYSTEMS 1. INTRODUCTION Navigation technologies with precision approach and landing systems, for civilian and military purposes, enable aircrafts to perform their

More information

Presentation to Morse Study Area Taskforce. Executive Airport Area Compatibility Plan and One-Mile Zoning Reviews March 1, 2011

Presentation to Morse Study Area Taskforce. Executive Airport Area Compatibility Plan and One-Mile Zoning Reviews March 1, 2011 Presentation to Morse Study Area Taskforce Executive Airport Area Compatibility Plan and One-Mile Zoning Reviews March 1, 2011 151st Street and Pflumm Road: In the cities of Olathe and Overland Park. Its

More information

OPERATING MINIMA FOR AEROPLANES AND HELICOPTER OPERATIONS PURPOSE REFERENCE 4.0 DEFINITION

OPERATING MINIMA FOR AEROPLANES AND HELICOPTER OPERATIONS PURPOSE REFERENCE 4.0 DEFINITION ORDER TCAA-O-OPS034A March 2013 OPERATING MINIMA FOR AEROPLANES AND HELICOPTER OPERATIONS PURPOSE 1. This Order gives guidance to the Authority s Operations Inspector on the procedures for approval of

More information

Central Route Charges Office

Central Route Charges Office European Organisation for the Safety of Air Navigation Central Route Charges Office PRINCIPLES FOR ESTABLISHING THE COST-BASE FOR EN ROUTE CHARGES AND THE CALCULATION OF THE UNIT RATES Doc. N 15.60.01

More information

DEMOCRATIC REPUBLIC OF EAST TIMOR GOVERNMENT. Decree Law 6/2006 REGIMEN FOR ACCESS TO RESTRICT AND RESERVED AREAS AT AIRPORTS

DEMOCRATIC REPUBLIC OF EAST TIMOR GOVERNMENT. Decree Law 6/2006 REGIMEN FOR ACCESS TO RESTRICT AND RESERVED AREAS AT AIRPORTS DEMOCRATIC REPUBLIC OF EAST TIMOR GOVERNMENT Decree Law 6/2006 REGIMEN FOR ACCESS TO RESTRICT AND RESERVED AREAS AT AIRPORTS The need to protect air transportation and aviation in general makes it indispensable

More information

EGHE SCILLY ISLES/ST MARYS

EGHE SCILLY ISLES/ST MARYS UNITED KINGDOM AIP AD 2.EGHE-1 EGHE SCILLY ISLES/ST MARYS EGHE AD 2.1 AERODROME LOCATION INDICATOR AND NAME EGHE SCILLY ISLES/ST MARYS EGHE AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates

More information

COMMUNICATIONS GROUND COMMUNICATIONS OUTLET (GCO)

COMMUNICATIONS GROUND COMMUNICATIONS OUTLET (GCO) 388 COMMUNICATIONS GROUND COMMUNICATIONS OUTLET (GCO) An automatic, remotely controlled, ground to ground communications device. Pilots at non-tower airports may contact the local Air Traffic Control (ATC)

More information

EUROCONTROL AT THE WORLD ATM CONGRESS

EUROCONTROL AT THE WORLD ATM CONGRESS EUROCONTROL EUROCONTROL AT THE WORLD ATM CONGRESS 8-10 March 2016, Madrid Driving excellence in ATM performance EUROCONTROL AT THE WORLD ATM CONGRESS EXHIBITION HALL 9 EUROCONTROL stand (#849) and the

More information

Trends in Aeronautical Information Management

Trends in Aeronautical Information Management Trends in Aeronautical Information Management AIXM 5 Public Design Review February 7-8, 2006 Washington DC 1 Our objective in this briefing is to tell you about an emerging standard for aeronautical data

More information

ACI Airport Statistics and Forecasting Workshop AVIATION STATISTICS & DATA: A VITAL TOOL FOR THE DECISION MAKING PROCESS Narjess Teyssier ICAO Chief Economic Analysis & Policy Section London, 3 rd March

More information

EUROCONTROL WORKSHOP. Centralised Services: A closer look at the Flight Plan and Airport Slot Consistency Service (CS1) Andy Woollin

EUROCONTROL WORKSHOP. Centralised Services: A closer look at the Flight Plan and Airport Slot Consistency Service (CS1) Andy Woollin EUROCONTROL WORKSHOP Centralised Services: A closer look at the Flight Plan and Airport Slot Consistency Service (CS1) Andy Woollin CS1 Project Manager 11 March 2015, World ATM Congress Centralised Services

More information

INITIAL TEST RESULTS OF PATHPROX A RUNWAY INCURSION ALERTING SYSTEM

INITIAL TEST RESULTS OF PATHPROX A RUNWAY INCURSION ALERTING SYSTEM INITIAL TEST RESULTS OF PATHPROX A RUNWAY INCURSION ALERTING SYSTEM Rick Cassell, Carl Evers, Ben Sleep and Jeff Esche Rannoch Corporation, 1800 Diagonal Rd. Suite 430, Alexandria, VA 22314 Abstract This

More information

Pricing Framework July 2012

Pricing Framework July 2012 Pricing Framework July 2012 Contact us: Service and Pricing Team Airways New Zealand PO Box 294 Wellington New Zealand servicefeedback@airways.co.nz www.airways.co.nz Contents 1 Introduction 4 1.1 The

More information

Area Navigation (RNAV) and Required Navigation Performance (RNP)

Area Navigation (RNAV) and Required Navigation Performance (RNP) Area Navigation (RNAV) and Required Navigation Performance (RNP) Program Overview Presented to: CDA Workshop By: Bruce Tarbert RNAV and RNP Group Date: January 19,2006 Roadmap for Performance-Based Navigation

More information

PBN Operational Approval Application and Documentation. ICAO PBN Operational Approval Course

PBN Operational Approval Application and Documentation. ICAO PBN Operational Approval Course PBN Operational Approval Application and Documentation ICAO PBN Operational Approval Course Application Phases Step 1 Step 2 Step 3 Step 4 Step 5 Pre-Application Formal Application Document Evaluation

More information

Block 0: Capabilities within our Grasp

Block 0: Capabilities within our Grasp Block 0: Capabilities within our Grasp 1 ICAO Block Upgrades Assumptions and Constraints Current ATM infrastructure and procedures will not support forecasted traffic growth Implementation of major ATM

More information

Software Development Process

Software Development Process 1 Software Development Process Development Process Document... 2 Symbols... 2 General Overview... 3 Initial Work... 4 Case study document... 5 Preliminary Vision Document... 5 Design... 6 Implementation...6

More information

NOTICE TO AERODROME CERTIFICATE HOLDERS (NOTAC) No. 02/2013

NOTICE TO AERODROME CERTIFICATE HOLDERS (NOTAC) No. 02/2013 NOTICE TO AERODROME CERTIFICATE HOLDERS (NOTAC) No. 02/2013 Effective Date: 14 July 2013 ANA Department Telephone: +971 0 2 4054507 General Civil Aviation Authority Telefax: +971 0 2 4054406 P.O. Box 6558

More information

ICAO State Safety Programme (SSP) Overview 4ta Jornada de Seguridad Operacional del INAC Caracas, Venezuela, 29 30 November 2011

ICAO State Safety Programme (SSP) Overview 4ta Jornada de Seguridad Operacional del INAC Caracas, Venezuela, 29 30 November 2011 International Civil Aviation Organization ICAO State Safety Programme (SSP) Overview 4ta Jornada de Seguridad Operacional del INAC Caracas, Venezuela, 29 30 November 2011 Eduardo Chacin Regional Officer

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 INTRODUCTION CHAPTER 3 ALTERNATIVES CONSIDERED The existing Afton Airport parallel taxiway, with its approximate 4,360 foot length, only accommodates one half of the runway s length, and is too short

More information

Paper presented at ISASI 2014 Seminar, October 2014, Adelaide, Australia. Safety Management; Reversing the False Glide Slope Myth

Paper presented at ISASI 2014 Seminar, October 2014, Adelaide, Australia. Safety Management; Reversing the False Glide Slope Myth Safety Management; Reversing the False Glide Slope Myth Kas Beumkes Senior Air Safety Investigator/Project Manager Michiel Schuurman Senior Air Safety Investigator/Technical Investigation Dutch Safety

More information

Interface Requirement Specifications of Vehicle Tracking Service Providers in Hong Kong International Airport

Interface Requirement Specifications of Vehicle Tracking Service Providers in Hong Kong International Airport in Hong Kong International Airport Issued by Airport Authority Hong Kong (Issue No. 2) It is the responsibility of all operators to ensure that relevant Guidelines are brought to the attention of their

More information

Operational Use of the English Language. ATM Safety around Europe

Operational Use of the English Language. ATM Safety around Europe 9 Dragica Stankovic Operational Use of the English Language ATM Safety around Europe 1 Introduction Aviation represents a domain which arguably more than any other, requires world-wide standardized and

More information

INTEGRITY AND CONTINUITY ANALYSIS OCTOBER TO DECEMBER 2013 QUARTERLY REPORT FROM GPS. Integrity and Continuity Analysis 08/01/14 08/01/14 08/01/14

INTEGRITY AND CONTINUITY ANALYSIS OCTOBER TO DECEMBER 2013 QUARTERLY REPORT FROM GPS. Integrity and Continuity Analysis 08/01/14 08/01/14 08/01/14 INTEGRITY AND CONTINUITY ANALYSIS FROM GPS OCTOBER TO DECEMBER 2013 QUARTERLY REPORT Prepared by: M Pattinson (NSL) 08/01/14 Checked by: L Banfield (NSL) 08/01/14 Approved by: M Dumville (NSL) 08/01/14

More information

TERMS OF REFERENCE. Decommissioning the Sept-Îles non-directional beacon (ZV NDB) Québec

TERMS OF REFERENCE. Decommissioning the Sept-Îles non-directional beacon (ZV NDB) Québec TERMS OF REFERENCE Decommissioning the Sept-Îles non-directional beacon (ZV NDB) Québec NAV CANADA Navigation and Airspace Level of Service 77 Metcalfe Street, 5th Floor Ottawa, Ontario K1P 5L6 January

More information

ICAO Safety Management Systems (SMS) Course Handout N 5 Cuzco International Airport operation

ICAO Safety Management Systems (SMS) Course Handout N 5 Cuzco International Airport operation ICAO Safety Management Systems (SMS) Course Handout N 5 Cuzco International Airport operation International Civil Aviation Organization Page left blank intentionally ICAO Safety management systems (SMS)

More information

How To Manage A Plane With A-Cdm

How To Manage A Plane With A-Cdm Business Intelligence & Situational Awareness UltraAPEX: What s in it for the Customer Have you ever asked yourself any of the following questions? How consistently is my operation performing? Can I proactively

More information

How To Design An Airspace Structure

How To Design An Airspace Structure Network Manager nominated by the European Commission EUROCONTROL European Route Network Improvement Plan PART 1 European Airspace Design Methodology - Guidelines European Network Operations Plan 2013-2015

More information

ILS-General. Localizer 06. General aspects. 5.4 Twente airbase assessment. Photos: Film No. 7. ILS classification T/Bil. Mixed Military/Civil use.

ILS-General. Localizer 06. General aspects. 5.4 Twente airbase assessment. Photos: Film No. 7. ILS classification T/Bil. Mixed Military/Civil use. Bijlage 4 NAVCOM NAVCOM Consult 10/98 Consult Report ILS Feasibility Study RNLAF Tssue 1 tnfafrep.doc Page 47 5.4 Twente airbase assessment Photos: Film No. 7 ILS-General ILS acc. Annex 10 ILS classification

More information

Air Traffic Management Services Plan 2012-2017

Air Traffic Management Services Plan 2012-2017 Air Traffic Management Services Plan 2012-2017 Airservices Australia 2012 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process

More information

Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India

Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India CNS Officers Guild 1 Airports Authority of India (AAI) is entrusted with responsibility of providing

More information

Air Traffic Service Providers Entry Control Procedures Manual 3. Approved Provider s Operations Manual

Air Traffic Service Providers Entry Control Procedures Manual 3. Approved Provider s Operations Manual 3.1 Operations Manual to Contain or Refer to Information 3.1.1 Content CASR 172.060 The content of an Operations Manual must meet the requirements specified in Subpart C of Civil Aviation Safety Regulations

More information

GHANA CIVIL AVIATION AUTHORITY EVALUATING AERONAUTICAL EFFECTS OF PROPOSED CONSTRUCTION ON AIR NAVIGATION & AIRSPACE PERMIT PROCEDURE

GHANA CIVIL AVIATION AUTHORITY EVALUATING AERONAUTICAL EFFECTS OF PROPOSED CONSTRUCTION ON AIR NAVIGATION & AIRSPACE PERMIT PROCEDURE GHANA CIVIL AVIATION AUTHORITY EVALUATING AERONAUTICAL EFFECTS OF PROPOSED CONSTRUCTION ON AIR NAVIGATION & AIRSPACE PERMIT PROCEDURE TABLE OF CONTENTS 1.0 INTRODUCTION 2.0 LEGISLATION AND REGULATORY FRAMEWORK

More information

COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP)

COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP) International Civil Aviation Organization WORKING PAPER 26/1/10 English and Spanish only 1 COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP) EIGHTH MEETING Montréal, 1 to 12 February 2010 Agenda Item

More information

PLANNIN WORKING PAPER. International. Theme 1: WORK. (Presented by SUMMARY. in this paper. feasibility of. system in the future.

PLANNIN WORKING PAPER. International. Theme 1: WORK. (Presented by SUMMARY. in this paper. feasibility of. system in the future. International Civil Aviation Organization HLSC/15-WP/3 21/11/14 WORKING PAPER SECOND HIGH-LEV VEL SAFETY CONFERENCE 2015 (HLSC 2015) PLANNIN G FOR GLOBAL AVIATION SAFETY IMPROVEMENT Montréal, 2 to 5 February

More information

Flight information that keeps pilots a step ahead.

Flight information that keeps pilots a step ahead. Integrated Flight Information system Flight information that keeps pilots a step ahead. At Rockwell Collins, we re ushering in the era of the truly paperless flight deck while providing a higher level

More information

Performance management Identification of metrics

Performance management Identification of metrics WKSP/ASBU/NAIROBI/2013-PPT/10 Performance management Identification of metrics Air Navigation Bureau WORKSHOP ON ASBU FRAMEWORK: ALIGNMENT OF REGIONAL AND NATIONAL PERFORMANCE PLANS, PLANNING, 14 October

More information

Safety Oversight Audit Section

Safety Oversight Audit Section Safety Oversight Audit Section Regional Seminar on the Preparation, Conduct and Reporting of an ICAO Safety Oversight Audit Beijing, China, 12 to 15 December 2006 Introduction to the Audit Protocols Module

More information

Doc 9849 AN/457. Approved by the Secretary General and published under his authority. First Edition 2005. International Civil Aviation Organization

Doc 9849 AN/457. Approved by the Secretary General and published under his authority. First Edition 2005. International Civil Aviation Organization Doc 9849 AN/457 Global Navigation Satellite System (GNSS) Manual Approved by the Secretary General and published under his authority First Edition 2005 International Civil Aviation Organization AMENDMENTS

More information

Project Management. On-Site Training and Facilitation Services. www.performanceweb.org. For more information, visit

Project Management. On-Site Training and Facilitation Services. www.performanceweb.org. For more information, visit Project Management On-Site Training and Facilitation Services For more information, visit www.performanceweb.org Benefits of On-Site Training The Performance Institute s proven consulting methodology is

More information

51 st CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS

51 st CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS DGCA 51/DP/3.3A/2 51 st CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS Hong Kong, China 24 27 November 2014 AGENDA ITEM 3.3A: EMERGING ISSUES IN AVIATION RECOGNIZING THE ROLE

More information

Civil Aviation Authority of Nepal Training Program

Civil Aviation Authority of Nepal Training Program Authority of Nepal Program December 2013 0 Technical Administration Authority of Nepal Program 1.1 program of Authority of Nepal (CAAN) is formulated to achieve the objectives to maintain safe, regular,

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft COMMISSION DECISION

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft COMMISSION DECISION EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Draft Brussels, C(2009) xxx 2009/xx/EC COMMISSION DECISION of [ ] on the detailed interpretation of the aviation activities listed in Annex I to Directive

More information

ACI GLOBAL TRAINING. The leading airport management and operations education provider. Better Education. Better Professionals. Better Airports.

ACI GLOBAL TRAINING. The leading airport management and operations education provider. Better Education. Better Professionals. Better Airports. ACI GLOBAL TRAINING The leading airport management and operations education provider Safety Leadership Management Operations Security Environment Economics Facilitation Better Education. Better Professionals.

More information

10 Aviation Element. 10.1 Introduction. 10.1.1 Purpose of Chapter

10 Aviation Element. 10.1 Introduction. 10.1.1 Purpose of Chapter 10 Aviation Element 10.1 Introduction 10.1.1 Purpose of Chapter This chapter provides the aviation element of the RFATS 2035 Long Range Transportation Plan. It describes the existing conditions and trends

More information

Potential Effects of Wind Turbine Generators on Pre-Existing RF Communication Networks SEAN YUN. June 2009. Software Solutions in Radiocommunications

Potential Effects of Wind Turbine Generators on Pre-Existing RF Communication Networks SEAN YUN. June 2009. Software Solutions in Radiocommunications Potential Effects of Wind Turbine Generators on Pre-Existing RF Communication Networks June 2009 SEAN YUN 2 2 Abstract In an effort to help preserve the ozone and the availability of diminishing natural

More information

AIXM Change Management Charter

AIXM Change Management Charter AIXM Change Management Charter Article 1 Objective 1.1. The evolution of the Aeronautical Information Exchange Model (AIXM) shall be managed in the interest of the largest number of AIXM stakeholders (

More information

Honeywell.com FMS Issues and In-Service Status

Honeywell.com FMS Issues and In-Service Status FMS Issues and In-Service Status C&PS Flight Technical Services This material was developed by: Customer & Product Support Flight Technical Services This material Honeywell was Aerospace developed by:

More information

LRSM AD 2.1 AERODROME LOCATION INDICATOR AND NAME LRSM - SATU MARE / Satu Mare

LRSM AD 2.1 AERODROME LOCATION INDICATOR AND NAME LRSM - SATU MARE / Satu Mare AIP AD 2.121 25 JUL 2013 LRSM AD 2.1 AERODROME LOCATION INDICATOR AND NAME LRSM SATU MARE / Satu Mare LRSM AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site at AD 474212N

More information

PRESENTATION SPACE MISSIONS

PRESENTATION SPACE MISSIONS GENERAL PRESENTATION SPACE MISSIONS CONTENTS 1. Who we are 2. What we do 3. Space main areas 4. Space missions Page 2 WHO WE ARE GENERAL Multinational conglomerate founded in 1984 Private capital Offices

More information

How to make Uber work in Hong Kong

How to make Uber work in Hong Kong Industry Report NOT RATED How to make work in Hong Kong Police Actions Sparked Controversial Topic On 11 th August, 2015, Hong Kong police had arrested 5 drivers and 3 office staffs allegedly for operating

More information

Safety Risk Impact Analysis of an ATC Runway Incursion Alert System. Sybert Stroeve, Henk Blom, Bert Bakker

Safety Risk Impact Analysis of an ATC Runway Incursion Alert System. Sybert Stroeve, Henk Blom, Bert Bakker Safety Risk Impact Analysis of an ATC Runway Incursion Alert System Sybert Stroeve, Henk Blom, Bert Bakker EUROCONTROL Safety R&D Seminar, Barcelona, Spain, 25-27 October 2006 Contents Motivation Example

More information

FIFTH MEETING OF THE AFI REGION AIS/MAP TASK FORCE

FIFTH MEETING OF THE AFI REGION AIS/MAP TASK FORCE International Civil Aviation Organization AIS-MAP-TF-IP/xx 30/04/09 INFORMATION PAPER FIFTH MEETING OF THE AFI REGION AIS/MAP TASK FORCE Agenda Item 3: etod Dakar, Senegal, 11 th May to 12 th May 2009

More information

AIRPORT PLANNING & DEVELOPMENT CONSULTING. Aviation and Airport Consultants With Global Reach & Perspective

AIRPORT PLANNING & DEVELOPMENT CONSULTING. Aviation and Airport Consultants With Global Reach & Perspective AIRPORT PLANNING & DEVELOPMENT CONSULTING Aviation and Airport Consultants With Global Reach & Perspective Aviotec International is a professional consulting services firm offering aviation and airport

More information

ANI Procedure Design Training Program and Concept

ANI Procedure Design Training Program and Concept ANI Procedure Design Training Program and Concept All ANI Procedure Design/PANS-OPS courses cope with ICAO document 9906 "Quality Assurance Manual For Flight Procedure Design", vol. II "Flight Procedure

More information