The London 2012 Olympic Challenge
|
|
- Randall McLaughlin
- 7 years ago
- Views:
Transcription
1 The London 2012 Olympic Challenge
2 Paul Haskins General Manager, London Terminal Control Brian Wheeler Operations Supervisor, London Terminal Control
3 The Size of the Challenge?
4 Departures Heathrow
5 Departures Heathrow, Gatwick
6 Departures Heathrow, Gatwick, Stansted
7 Departures Heathrow, Gatwick, Stansted, Luton
8 Departures Heathrow, Gatwick, Stansted, Luton, London City
9 Arrivals Heathrow
10 Arrivals Heathrow, Gatwick
11 Arrivals Heathrow, Gatwick, Stansted
12 Arrivals Heathrow, Gatwick, Stansted, Luton
13 Arrivals Heathrow, Gatwick, Stansted, Luton, London City
14 Departures & Arrivals Heathrow, Gatwick, Stansted, Luton, London City
15 Half a million overseas spectators 70,000 overseas Olympics Family members; 150 Heads of State flights 700 extra commercial flights into London s main airports; 10,000 business jet movements.
16 Maintain and maximise capacity of London s core airports Create extra capacity to satisfy a significant expected increase in IFR movements to London s secondary airports
17 Departures & Arrivals Demand from 40 airports
18 Accommodating the biggest ever Military Operation during peacetime in the UK Multiple fixed wing and rotary fighter and surveillance aircraft
19 Adjacent ANSP Partners Co-ordination and agreements
20 Delivering the Solution
21 Building Critical Relationships; UK Ministry of Defence UK Department for Transport UK Home Office UK Civil Aviation Authority Business & General Aviation Community Commercial airlines IATA Airport operators Airport Coordination Ltd Eurocontrol UK and European Meteorological Offices LOCOG Media and politicians
22 Dealing with the risks; The UK Aviation Network faced risk of significant ATM delay throughout the Olympics Security restrictions/flights/interceptions affecting civil use of airspace Weather disruption and ability to recover from disruption Additional demand to secondary airfields and non adherence to allocated runway slots
23 Making the preparations; Creation of new temporary controlled airspace A bespoke Military command centre alongside the civil operation Business & General Aviation briefing and communications Media, political and customer communication programmes ATICCC live throughout
24 New Temporary Controlled Airspace; Three new areas of controlled airspace - designed, consulted and approved 4 new holds plus new arrival routes Additional contingency airspace Intensive simulator evaluation Consultation with leisure flying community, Military and local communities
25 Bespoke Military Solution; Temporary Ops Room, Procedures and equipment built and equipped by NATS Managed all flights operating outside CAS in the London area Managed all Flight Plans Statistics 34 Days of operation 18,575 flight plans processed 10,739 aircraft controlled
26 Business and GA Outreach; Presentations around the world to discuss the Olympics airspace Publicity material detailing the changes including leaflets, podcasts, articles and online tutorials. Telephone hotline and information hub, set up to help the business and GA communities understand the changes and the requirements regarding flight planning.
27 Stakeholder, Media and Political Engagement; A year of detailed preparatory work with more than 100 commercial airlines Media campaign to raise awareness of the Olympics and the changes to airspace. Briefings for UK and international print and broadcast journalists Briefings for UK Defence and Transport Ministers, Members of Parliament and senior Military Commanders
28 Air Traffic Incident Crisis Communications Cell (ATICCC); Value established during the Volcano Live throughout Olympics with up to 3 calls per day; text/ updates; ability to run operator liaison cell Single point of truth for UK ATM: Included NATS Centres, FMP, UK and European Met Office, DfT, CAA, Eurocontrol, IAA and Airports Airfield status map updated daily via live portal
29 The Results
30 NATS management of traffic across the entire UK network with delays substantially down versus last year, including special slot coordination across 40 airports without any major incidents and using the NATS coordination and communication cell, has led to a great success for the UK transport industry IATA
31 The Statistics London Airspace handled 6,000 flights per day. 3.5% - 4.5% increase in traffic 26 July = 59% increase in general aviation and business aviation flights 9,708 total Business Aviation slot bookings 11 infringements of NATS Controlled Airspace Three security launches with minimal impact on airline operation A number of significant weather days London Airspace handles 6,000 flights per day.
32 Service In one of the most challenging periods ever for UK air traffic, NATS generated just 0.1% of total European delay attributable to ATC, despite handling nearly 25% of Europe s traffic
33 Safety No risk bearing losses of separation attributed to the Olympics. No systems issues. Just 11 infringements of NATS controlled airspace by GA aircraft.
34 Communications Website had 126,308 visits by 82,411 unique visitors Olympics airspace guide distributed to 60,000 flying schools, aerodromes and events Reached over 8 Million people
35 What I experienced was one of the most professionally run ATM facilities I ve had the pleasure to visit Roberto Gonzalez, Senior FAA representative, London office
36 We have received glowing positive feedback from numerous sources regarding the work of the team and the outstanding support that they received from NATS Assistant Chief of the Air Staff, Royal Air Force
37 Summary Fours years in the planning, NATS is very proud it could play it s part in the success of London 2012, providing a safe and efficient operation despite the huge challenges faced when delivering a project of this size and importance. NATS is the UK based global provider of air traffic services and solutions.
38 NATS can be found in Exhibition Hall 9, Stand 890. Questions?
Case study: The Olympic Challenge
Performance through Innovation Case study: The Olympic Challenge Maintaining a seamless service during one of the UK's biggest aviation challenges. The NATS Olympics project was delivered seamlessly, and
More informationThe Mayor of London s Submission:
Inner Thames Estuary Feasibility Study Response to Airports Commission Call for Evidence The Mayor of London s Submission: Supporting technical documents 23 May 2014 Title: Runway utilisation Author: Atkins
More informationUK AIRSPACE Introduction
UK AIRSPACE Introduction The UK has now adopted the ICAO system for naming of airspace types from A to G. However in the UK there is at present no Class C airspace. Classes A to E are called Controlled
More informationFLIGHT PATH TO GROWTH THE CASE FOR INCREASING LONDON S AIR CAPACITY
FLIGHT PATH TO GROWTH THE CASE FOR INCREASING LONDON S AIR CAPACITY THE PROBLEM WHY DO WE NEED TO FLY? The UK is the world s second-largest exporter of services and the sixth-largest exporter of goods.
More information3-4 June 2014 Sywell Aerodrome www.heliukexpo.com
The UK Helicopter Trade Show 3-4 June 2014 Sywell Aerodrome www.heliukexpo.com Air-Med & Rescue: Rotor & Fixed Wing Fire Fighting Private, Commercial & Corporate Forestry & Survey Surveillance, Police,
More informationDiscussion Paper 01: Aviation Demand Forecasting
Airports Commission Discussion Paper 01: Aviation Demand Forecasting Response from Kent County Council and Medway Council Q1: To what extent do you consider that the DfT forecasts support or challenge
More informationLONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL. Executive Summary and About the Consultation Documents and Document Contents
LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL Introduction of Standard Instrument Departure Procedures to Routes in the London Terminal Control Area Sponsor Consultation 2016 Executive Summary and About
More informationBest Practice in Economic Regulation: Lessons from the UK
Best Practice in Economic Regulation: Lessons from the UK ICAO Global Aviation Cooperation Symposium 03 October 2014 1 Scope of Economic Regulation Airports Among the 60 airports in the UK, two are subject
More informationTraffic Flow Management. December 2010
Traffic Flow Management December 2010 TRAFFIC MANAGEMENT CENTERS 2 3 CFMU (EUROCONTROL) 4 CCFMEX 5 BOGOTA ATFM 6 BRAZIL ATFM 7 JAPAN ATFM 8 9 Evolution of Traffic Flow Management 1960 s Ground stop programs
More informationAdapting to air traffic growth in Europe
Comment volerons-nous en 2050?/ Flying in 2050 Conference Session VII Air Traffic Management Adapting to air traffic growth in Europe Pierre ANDRIBET EUROCONTROL SESAR and Research Deputy Director Comment
More informationUK SLOT ALLOCATION PROCESS AND CRITERIA
Introduction The IATA Worldwide Scheduling Guidelines (currently 18 th Edition) provide the framework for slot allocation for all coordinators world-wide and set the timetable of events in the scheduling
More informationCHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT
CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT 7.1.1 Definition of Resource Airspace management is defined as directing, controlling, and handling flight operations in the volume of air that overlies the
More informationPRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION
EUROPEAN COMMISSION PRESENTATION Patrick Ky Executive Director EUROPEAN COMMISSION WHY SESAR? EUROPEAN COMMISSION EUROPEAN CHALLENGES: Capacity: Air Traffic to double by 2030 Safety: Improvements linked
More informationAir Traffic Control Disruption 7th December 2013. A Report to the Civil Aviation Authority
Air Traffic Control Disruption 7th December 2013 A Report to the Civil Aviation Authority Version: Final 3 July 2014 Air Traffic Control Disruption on 7 th December 2013 Contents 1 Executive Summary...
More informationAircraft Noise Control at London Luton Airport. August 2015
Aircraft Noise Control at London Luton Airport August 2015 Aircraft Noise Control at London Luton Airport Foreword London Luton Airport (LLA) continues to place aircraft noise high on its agenda. We recognise
More informationOverview of NM and CDM
Overview of NM and CDM EUROMED ATM Kick-off Meeting Brussels, 5-6 September 2012 Joe Sultana Chief Operating Officer EUROCONTROL/Directorate Network Management European Organisation for the Safgety of
More informationThe future development of air transport in the UK Make your views known
The future development of air transport in the UK Make your views known Contents Introduction 1 Introduction..................................................... 2 How much airport capacity should be provided
More informationPricing Framework July 2012
Pricing Framework July 2012 Contact us: Service and Pricing Team Airways New Zealand PO Box 294 Wellington New Zealand servicefeedback@airways.co.nz www.airways.co.nz Contents 1 Introduction 4 1.1 The
More informationDGAC & Aviation crisis management
DGAC & Aviation crisis management DGAC Air transport Gendarmerie Flight control organisation Director General Patrick GANDIL Cabinet MALGH Light, general and helicopter aviation DSAC DSNA DTA SG Directorate
More informationLONDON SOUTHEND AIRPORT CLASS D CONTROLLED AIRSPACE GUIDE
CLASS D CONTROLLED AIRSPACE GUIDE Introduction From the 2 nd of April 2015 London Southend Airport (LSA) will be implementing Class D (CAS). This airspace is made up of a Control Zone (CTR) and Control
More informationLondon Gatwick Airport Noise Report
London Gatwick Airport Noise Report Noise Communication Solutions 1 Contents Introduction 03 Introduction 04 Management Summary 06 Context 07 Key Initiatives 12 Observations 16 A Case Study 18 Comparisons
More informationLondon Luton Airport Document PPO5 Procedures for Requesting Prior Permission to Operate Version 1.4 - issued 25 th February 2009
London Luton Airport Document PPO5 Procedures for Requesting Prior Permission to Operate Version 1.4 - issued 25 th February 2009 1. Introduction 1.1. All fixed wing aircraft flights at London Luton Airport
More informationGATWICK AIRPORT* RESULTS FOR THE PERIOD ENDED 30 SEPTEMBER 2015
GATWICK AIRPORT* RESULTS FOR THE PERIOD ENDED 30 SEPTEMBER 2015 * Consolidated results for Ivy Holdco Limited, the parent of Gatwick Airport Limited, representing the performance of the Gatwick Airport
More informationEquipping Our Human Resources to work in a regional framework Towards Global ATFM Delivering ATM Ops Performance via Regional Network Collaboration
Equipping Our Human Resources to Towards Global ATFM Delivering ATM Ops Performance via Regional Network Collaboration 18 September 2014 Beijing, China Piyawut Tantimekabut Engineering Manager Network
More informationCommunication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India
Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India CNS Officers Guild 1 Airports Authority of India (AAI) is entrusted with responsibility of providing
More informationHow SMS changes the way people travel
A guide for the Travel Industry INTRODUCTION The global travel industry has been one of the earliest adopters of text messaging technology implementing a range of mobile services for travelers across the
More informationA Second Runway for Gatwick Initial response to the Airports Commission s recommendation report
A Second Runway for Gatwick Initial response to the Airports Commission s recommendation report 14 July 2015 Airports Commission: London Gatwick 235 Table of Contents Gatwick s initial response to the
More informationAirspace Change Communications and Consultation Protocol Protocol
Airspace Change Communications and Consultation Protocol Protocol A voluntary protocol of the aviation industry June 2015 Preface The primary duty of the aviation industry in Canada is to ensure the safety
More informationCONTROLLING THE MISUSE OF SLOTS AT COORDINATED AIRPORTS IN THE UK MISUSE OF SLOTS ENFORCEMENT CODE
CONTROLLING THE MISUSE OF SLOTS AT COORDINATED AIRPORTS IN THE UK MISUSE OF SLOTS ENFORCEMENT CODE made by the Coordinator under Regulation 18 of The Airports Slot Allocation Regulations 2006 (SI 2006
More informationIntegrated surface management Herve Drevillon (DSNA) Airport safety support tools for pilots, vehicle drivers and controllers Nicolas Leon (DSNA)
Integrated surface management Herve Drevillon (DSNA) Airport safety support tools for pilots, vehicle drivers and controllers Nicolas Leon (DSNA) Integrated surface management Herve Drevillon (DSNA) Operational
More informationThe Total Economic Value. Its application to the Single European Sky 2nd Reference Period
The Total Economic Value Its application to the Single European Sky 2nd Reference Period 1. The idea of Total Economic Value. The Total Economic Value (TEV) is a term introduced officially into the Single
More informationAir Traffic Management Services Plan 2012-2017
Air Traffic Management Services Plan 2012-2017 Airservices Australia 2012 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process
More informationGATWICK AIRPORT LIMITED RESULTS FOR THE YEAR ENDED 31 MARCH 2015
GATWICK AIRPORT LIMITED RESULTS FOR THE YEAR ENDED 31 MARCH 2015 OPERATIONAL AND FINANCIAL PERFORMANCE HIGHLIGHTS TRAFFIC GROWTH EBITDA GROWTH PROFIT FOR THE YEAR CAPITAL EXPENDITURE SENIOR NET DEBT *
More informationSESAR BENEFITS: TOMORROW STARTS NOW
1 SESAR BENEFITS: TOMORROW STARTS NOW Integrating Rotorcraft into future European ATM Concepts Fabio Mangiaracina - SICTA (ENAV Group), Philippe Rollet - EHA The European Helicopter Association (EHA) The
More informationCDM@CDG 2010. User Forum EUROCONTROL s Brussels HQ. 18 January 2011 CDM@CDG
2010 CDM@CDG User Forum EUROCONTROL s Brussels HQ 18 January 2011 CDG AIRPORT OVERVIEW Surface area :3200 ha 4 RWYs : East / West 80 km Taxiways 8 ILS CAT 3 Statistic 2009 Airport trafic: 525 000 ops (ARR/DEP)
More informationWHICH AIR TRAFFIC CONTROLLER TO CONTACT
WHICH AIR TRAFFIC CONTROLLER TO CONTACT 1. Introduction This article is written in order to explain to all beginners in the IVAO network the basics for any pilot to contact the correct air traffic controller.
More informationyears in the community
Montréal-Trudeau, from the 70 past to the future years in the community The airport s beginnings Montréal Pierre Elliott Trudeau International Airport is 70 years old! It was on September 1, 1941, that
More informationThird Runway is Key to Hong Kong s Competitiveness. Professor Anthony Cheung Bing-leung Secretary for Transport and Housing
Third Runway is Key to Hong Kong s Competitiveness Professor Anthony Cheung Bing-leung Secretary for Transport and Housing Over the past decade, passenger number and cargo tonnage at the Hong Kong International
More informationATFM STATUS REPORT: SOUTH AFRICA
Central Airspace Management Unit ATFM STATUS REPORT: SOUTH AFRICA Presented by: Sandile L Maphanga Manager: Central Airspace management Unit SCOPE Company Profile Area of Responsibility South African Airspace
More informationTHE SESAR CONCEPT AND SWIM. David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking
THE SESAR CONCEPT AND SWIM David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking 1 Satellite based Communication & Navigation Advanced Flexible Use of Airspace Integrated Departure & Arrival
More informationEUROCONTROL. Paving the way towards UAS ATM integration. Mike Lissone
EUROCONTROL Paving the way towards UAS ATM integration Mike Lissone European Organisation for the Safety of Air Navigation: EUROCONTROL To harmonise and integrate Air Navigation Services in Europe, aiming
More informationBoletín nº5. Julio 2012
FAA mulling location of NorthEast US centre Publicado: http://www.airtrafficmanagement.net/2012/07/faa-mulling-location-of-new-yorkcentre/ 20/07/2012. The US Federal Aviation Administration (FAA) has yet
More informationEUROCONTROL WORKSHOP. Centralised Services: A closer look at the Flight Plan and Airport Slot Consistency Service (CS1) Andy Woollin
EUROCONTROL WORKSHOP Centralised Services: A closer look at the Flight Plan and Airport Slot Consistency Service (CS1) Andy Woollin CS1 Project Manager 11 March 2015, World ATM Congress Centralised Services
More informationPRESERVATION OF SLOTS FOR DOMESTIC SERVICES AT LONDON AIRPORTS
Agenda Item 4 PRESERVATION OF SLOTS FOR DOMESTIC SERVICES AT LONDON AIRPORTS What this paper is about To update the meeting on the current situation with respect to regional services to/from London airports,
More informationEASYJET TRADING STATEMENT FOR THE QUARTER ENDED 31 DECEMBER 2014
27 January 2015 easyjet Trading Statement Page 1 of 7 A. HIGHLIGHTS: EASYJET TRADING STATEMENT FOR THE QUARTER ENDED 31 DECEMBER 2014 Drive demand, conversion and yields across Europe Seats flown grew
More informationCOMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP)
International Civil Aviation Organization WORKING PAPER 26/1/10 English and Spanish only 1 COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP) EIGHTH MEETING Montréal, 1 to 12 February 2010 Agenda Item
More informationSafety and Airspace Regulation Group
Safety and Airspace Regulation Group 27 April 2016 Policy Statement Policy for ATS Provision Within Controlled Airspace by Units not Notified as the Controlling 1 Introduction 1.1 The purpose of this policy
More informationNorwegian UK set to takeoff as airline is granted UK Air Operating License
Norwegian UK set to takeoff as airline is granted UK Air Operating License New Norwegian UK subsidiary will open the door for further UK expansion and potential new routes to Asia, South America and South
More informationTrends in Aeronautical Information Management
Trends in Aeronautical Information Management AIXM 5 Public Design Review February 7-8, 2006 Washington DC 1 Our objective in this briefing is to tell you about an emerging standard for aeronautical data
More informationGATWICK - FREQUENTLY ASKED QUESTIONS February 2015
GATWICK - FREQUENTLY ASKED QUESTIONS February 2015 Gatwick Second Runway East Sussex View 1. What is the background? The Airports Commission published its Interim Report into airport capacity in December
More informationPLANNIN WORKING PAPER. International. Theme 1: WORK. (Presented by SUMMARY. in this paper. feasibility of. system in the future.
International Civil Aviation Organization HLSC/15-WP/3 21/11/14 WORKING PAPER SECOND HIGH-LEV VEL SAFETY CONFERENCE 2015 (HLSC 2015) PLANNIN G FOR GLOBAL AVIATION SAFETY IMPROVEMENT Montréal, 2 to 5 February
More informationA day in the life of an aircraft operator
A day in the life of an aircraft operator NETWORK MANAGER USER FORUM 2014 MARTIN SEDLÁČEK SENIOR FLIGHT PLANNER Established in 1995, HQ in London Luton 2 Air Operator Certificates - UK/EZY + Switzerland/EZS
More informationHeathrow, Gatwick and Stansted market power assessments
Civil Aviation Authority Heathrow, Gatwick and Stansted market power assessments Summary of the CAA s initial views January 2012 (page left intentionally blank) Civil Aviation Authority Airport market
More informationNetwork Manager Annual Report 2012
Network Manager Annual Report 2012 June 2013 Approved by the Network Management Board on 6 June 2013 I. Building the Network Manager The European Union established under the Single European Sky (SES)
More informationSESAR RPAS R&D ROADMAP DEVELOPMENT
SESAR RPAS R&D ROADMAP DEVELOPMENT Integration of RPAS into European ATM System R&D Definition Phase #SESAR @WorldATM_now INTRODUCTION & SETTING THE SCENE Michael Standar SESAR JU #SESAR @WorldATM_now
More informationAIRCRAFT NOISE ABATEMENT OPERATING PROCEDURES AND RESTRICTIONS
AIRCRAFT NOISE ABATEMENT OPERATING PROCEDURES AND RESTRICTIONS This section sets forth the Los Angeles World Airports (LAWA s) informal noise abatement traffic; flight and runway use procedures and includes
More informationCREDIT REPORT FOR PILOT LICENCES OBTAINED DURING MILITARY SERVICE. (according to Article 10 of Commission Regulation (EU) No 1178/2011)
CREDIT REPORT FOR PILOT LICENCES OBTAINED DURING MILITARY SERVICE (according to Article 10 of Commission Regulation (EU) No 1178/2011) 3 Contents Introduction... 6 1 National requirements for military
More informationHow To Know What Is Happening In European Air Transport
Issue N 136. 22/12/11 Industry Monitor The EUROCONTROL bulletin on air transport trends European flights down 1% in November, significantly lower than forecasted. The low-cost segment was down 3.8% on
More informationCommunications/Navigation/ Surveillance and Air Traffic Management in Africa
Communications/Navigation/ Surveillance and Air Traffic Management in Africa Presented to: 2015 AFI Safety Symposium - Maputo, Mozambique By: Rafael D. L. Quezada, International Programs Officer (FAA Air
More informationAGENCY: Federal Aviation Administration (FAA), Department of Transportation.
This document is scheduled to be published in the Federal Register on 05/11/2016 and available online at http://federalregister.gov/a/2016-11116, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION
More informationEUROPEAN CIVIL RPAS OPERATORS FORUM
EUROPEAN CIVIL RPAS OPERATORS FORUM REMOTELY PILOTED AIRCRAFT SYSTEMS CIVIL OPERATIONS EUROCONTROL RPAS regulatory status in Europe Edgar Reuber EUROCONTROL DSS/CM Current Status Civ UAS Regulation in
More informationEASYJET TRADING STATEMENT FOR THE QUARTER ENDED 30 JUNE 2015
22 July 2015 easyjet Trading Statement Page 1 of 6 A. HIGHLIGHTS: EASYJET TRADING STATEMENT FOR THE QUARTER ENDED 30 JUNE 2015 easyjet performance in the quarter Good commercial performance with revenue
More informationHEATHROW AIRPORT LIMITED REGULATORY ACCOUNTS FOR THE YEAR ENDED 31 MARCH 2006. Performance Report 1. Notes to the Performance Report 2
CONTENTS Page Performance Report 1 Notes to the Performance Report 2 PERFORMANCE REPORT Actual CAA forecast 000s 000s Terminal passengers 67,421 69,900 Revenue Net revenue from airport charges 2 532.2
More informationSpace Applications and Technologies Expo Rome, Italy February 4 6, 2010
Space Applications and Technologies Expo Rome, Italy February 4 6, 2010 Overview of the EUROCONTROL UAS Integration Activity Anders Hallgren EUROCONTROL Manager ATM Procedures 1 European Organisation for
More informationInternational Civil Aviation Organization. The Third Meeting of the Regional ATM Contingency Plan Task Force (RACP/TF/3)
International Civil Aviation Organization RACP/TF/3 WP06 12-15/11/2013 The Third Meeting of the Regional ATM Contingency Plan Task Force (RACP/TF/3) Bangkok, Thailand, 12 15 November 2013 Agenda Item 4:
More informationMEAUSE Customer Relationship Management Pilot Project Executive Summary
MEAUSE Customer Relationship Management Pilot Project Executive Summary civil air navigation services organisation Acknowledgement MEAUSE would like to thank CARC and HE Mohammed Amin Al Quran for the
More informationEuropean ADS-B Regulation
ADS-B Workshop SP/22 European ADS-B Regulation John Law Surveillance Programmes Manager EUROCONTROL Regulators Workshop Jakarta Aug 2010 European Regulation The European Organisation for the Safety of
More informationCIVIL AVIATION REQUIREMENTS SECTION 3 AIR TRANSPORT SERIES M PART IV ISSUE I, DATED 6 TH AUGUST, 2010 EFFECTIVE: 15.8.2010 No.
GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SECTION 3 AIR TRANSPORT SERIES M PART IV ISSUE I, DATED
More informationDiscussion Paper 01: Aviation Demand Forecasting
Discussion Paper 01: Aviation Demand Forecasting February 2013 An independent commission appointed by Government Airports Commission 6th Floor Sanctuary Buildings 20 Great Smith Street London SW1P 3BT
More information1.2 Some of the figures included in this publication may be provisional only and may be revised in later issues.
FOREWORD 1 CONTENT 1.1 UK Airports (Including Channel Islands and Isle of Man) - Monthly Statements of Movements, Passengers and Cargo is prepared by the Civil Aviation Authority with the co-operation
More informationTauranga, Bay of Plenty
19/12 720 NZZC Tauranga Aerodrome Airshow and Restricted Area NZR286 Effective: 28 to 29 JAN 12 PORTAVEX 2012 and CLAIC OF THE KY will be held at Tauranga AD during the period 27 to 29 JAN 12. This event
More informationArrival of an affected aircraft: Standard Operating Procedure
Arrival of an affected aircraft: Standard Operating Procedure Dr Anthony Evans Chief, Aviation Medicine ICAO 20 November 2013 Page 1 This presentation was prepared by UK CAA at the request of ICAO/CAPSCA
More informationEUROCONTROL AT THE WORLD ATM CONGRESS
EUROCONTROL EUROCONTROL AT THE WORLD ATM CONGRESS 8-10 March 2016, Madrid Driving excellence in ATM performance EUROCONTROL AT THE WORLD ATM CONGRESS EXHIBITION HALL 9 EUROCONTROL stand (#849) and the
More informationRemote Tower Solutions. BY SEARIDGE TECHNOLOGIES AND NAVCANatm. The cost-effective alternative for airport monitoring and control
Remote Tower Solutions BY SEARIDGE TECHNOLOGIES AND NAVCANatm The cost-effective alternative for airport monitoring and control Advancing Current Methods of Operations Geographic location, low air traffic
More informationFAA / NAA DISPATCHER CERTIFICATE TRAINING PROGRAM
FAA / NAA DISPATCHER CERTIFICATE TRAINING PROGRAM FAA Dispatcher Certificate Training Level 2 The primary objective of the Jeppesen Flight Operations Management - Level 2 program is to prepare applicants
More informationThe economic impact of London Luton Airport Oxford Economics
The economic impact of London Luton Airport Oxford Economics The Economic impact of Luton Luton Airport 2 Contents pg.01 Foreword pg.07 The sub-regional and local economic impact of London Luton Airport
More informationTraining program for S2 (TWR) rating
Training program for S2 (TWR) rating Introduction This is the official Vatsim Scandinavia training program for students training for the TWR (S2) Rating. Each mentor is expected to take his student through
More informationOur strategy and objectives
British Airways 2009/10 Annual Report and Accounts 27 Our strategy and objectives our business FOCUSED ON OUTSTANDING CUSTOMER SERVICE Meeting the rising expectations of our customers remains central to
More informationA-CDM from an airport perspective Oslo Airport
A-CDM from an airport perspective Oslo Airport Gro Jære Content Facts about Oslo Airport (OSL) A-CDM at OSL Implementation Experiences Future plans Q&A Summary of air traffic 2014 Oslo Airport 24,3 million
More informationPCP Active ECAC FCM05 REG ASP MIL APO USE INT IND NM
PCP Active ECAC FCM05 REG ASP MIL APO USE INT IND Subject matter and scope * The extension of the applicability area to non-eu ECAC States that have not signed an aviation agreement with EU, as well as
More informationAAIB Bulletin 3/2015 SPECIAL
Farnborough House Berkshire Copse Road Aldershot, Hants GU11 2HH Tel: 01252 510300 Fax: 01252 376999 www.aaib.gov.uk AAIB Air Accidents Investigation Branch AAIB Bulletin 3/2015 SPECIAL ACCIDENT Aircraft
More information1.231J/16.781J/ESD.224J Airport Systems Fall 2007. Demand Management. Amedeo R. Odoni. Massachusetts Institute of Technology.
1.231J/16.781J/ESD.224J Airport Systems Fall 2007 Demand Management Amedeo R. Odoni Massachusetts Institute of Technology Page 1 Demand Management Objective Review the characteristics, advantages and disadvantages
More informationAir Traffic Management
Air Traffic Management Transforming Air Traffic Management T rans f orming A ir Today s airspace users are grappling with the air traffic control system s inability to manage an ever-growing amount of
More informationRecognition of overseas flight crew licences and ratings
Recognition of overseas flight crew licences and ratings Introduction Introduction... 1 Background information... 1 Short term validation of overseas flight crew licences... 2 Flight crew licence issue
More informationFlySafe Final Presentation
FlySafe Final Presentation ESTEC, 29 May 2009 G. Garofalo ESA ESTEC IAP Activities on Bird Migration Awareness activities (Avian Alert) started in 2006 by ESA-IAP to: Identify and classify the user communities
More informationBEFORE YOU GET STARTED
is a small highly professional flight training organisation operating from the at Albion Park just 15 mins South of Wollongong City. is the Premier Flight Training Organisation on the NSW South Coast.
More informationAir Traffic Controllers Performance Objectives
Safety Regulation Group CAP 624 Air Traffic Controllers Performance Objectives Part 14 Initial Training Assessor www.caa.co.uk Safety Regulation Group CAP 624 Air Traffic Controllers Performance Objectives
More informationComparison of Air Traffic Management-Related Operational Performance: U.S./Europe
2013 Comparison of Air Traffic Management-Related Operational Performance: U.S./Europe Produced by: EUROCONTROL on behalf of the European Union FAA Air Traffic Organization System Operations Services June
More informationICASM 2015. Second Announcement. 20-24 September 2015. Oxford, UK. 63rd International Congress of Aviation and Space Medicine
ICASM 2015 Second Announcement 63rd International Congress of Aviation and Space Medicine 20-24 September 2015 Oxford, UK WELCOME The 63 rd International Congress of Aviation and Space Medicine will be
More informationDirect Approach Consulting Inc.
Direct Approach Consulting Inc. Flight Procedure Design Your best approach for: safety operational efficiency maximizing revenue Direct Approach Direct Approach is a Canadian based company providing instrument
More informationImagine a world class Heathrow London First policy conclusions
Imagine a world class Heathrow London First policy conclusions November 2008 London First has undertaken work in the last year to address the poor quality of service experienced by business passengers
More informationArea Navigation (RNAV) and Required Navigation Performance (RNP)
Area Navigation (RNAV) and Required Navigation Performance (RNP) Program Overview Presented to: CDA Workshop By: Bruce Tarbert RNAV and RNP Group Date: January 19,2006 Roadmap for Performance-Based Navigation
More informationPart 172 CAA Consolidation 1 February 2016 Air Traffic Service Organisations Certification
Part 172 CAA Consolidation 1 February 2016 Air Traffic Service Organisations Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 172 prescribes the certification and
More informationCentral Airspace Management Unit World Cup 2010 Experience (South Africa) Presented by: Armando de Olim Acting Pool Manager: ATFM
Central Airspace Management Unit World Cup 2010 Experience (South Africa) Presented by: Armando de Olim Acting Pool Manager: ATFM Scope Internal Planning Airport Slots Advance ATFM system Air Defence Performance
More informationOCCUPATIONAL AND ENVIRONMENTAL MEDICINE WING
OCCUPATIONAL AND ENVIRONMENTAL MEDICINE WING NOISE AND VIBRATION DIVISION Report: OEM/04/14 Dated January 2014 A REPORT ON AN ENVIRONMENTAL NOISE SURVEY OF AIRCRAFT ACTIVITY AT RAF BRIZE NORTON Approved
More informationBlock 0: Capabilities within our Grasp
Block 0: Capabilities within our Grasp 1 ICAO Block Upgrades Assumptions and Constraints Current ATM infrastructure and procedures will not support forecasted traffic growth Implementation of major ATM
More informationThe business of Gatwick Airport Limited
APPENDIX C The business of Gatwick Airport Limited C1 This appendix provides an overview of the current ownership and history of Gatwick and the business of Gatwick Airport Limited (GAL). In particular,
More informationEASYJET TRADING STATEMENT FOR THE QUARTER ENDED 31 DECEMBER 2015
26 January 2016 easyjet Trading Statement Page 1 of 6 EASYJET TRADING STATEMENT FOR THE QUARTER ENDED 31 DECEMBER 2015 Continued robust commercial performance and strong management action on cost delivers
More informationOur strategy and objectives
24 / British Airways 2008/09 Annual Report and Accounts Our strategy and objectives In an incredibly tough trading environment we have to focus hard on pulling ourselves through the immediate crisis, while
More information2015 Review and Outlook 13 January 2016 DG/ALB
PRESS RELEASE 2015 Review and Outlook 13 January 2016 DG/ALB At its annual press conference, Marseille Provence Airport unveiled its 2015 review and the main new developments taking place in 2016. 1% increase
More information