NASHVILLE DISTRICT JETS SAME
|
|
- Doreen Knight
- 8 years ago
- Views:
Transcription
1 NASHVILLE DISTRICT JETS SAME Regional Program Review Savannah, GA 26 June 2014 US Army Corps of Engineers
2 Agenda District Boundaries Cumberland & TN River Systems Major Construction Projects Hydropower/Navigation Mission A/E and Contract Award Opportunities Questions
3 Nashville District Cumberland and TN River Basins & Boundaries
4 Wolf Creek Dam DSAC I Classification - Karst foundation seepage $594M Cost, $572M Obligated, 96% Complete Barrier Wall Completed March 2013 Onsite Project Physical Completion Summer 2015 Gallery Grouting Complete Switchyard Wall Complete Barrier Wall Complete Barrier Wall - $423M Award Jul % Complete Contractor: Treviicos & Soletanche Grouting - $70M Completed Oct 2008 Contractor: ACT Gallery Grouting - $11.0M Completed July 2012 Contractor: Judy Company Duskytail Darter Listed End. Species -Discovered Fall 2013 in drawdown zone - Return to normal operations spring/summer 2014 Halcomb s Landing - $9.5M Completed Oct 2007 Contractor: VCI-Doyon JV as of 13 Jun 14 4
5 Center Hill Dam Project as of 11Jun 14 DSAC I Classification- Karst foundation seepage $364M Cost, $217M Obligated, 47% Complete Project Completion 2018 Saddle Dam Embankment Appropriate Treatment TBD Main Embankment & Left Rim Grouting - complete Barrier Wall Widened Platform, Guide wall, Slurry Plant Saddle Dam Work - $50M-75M Award Scheduled Summer 2015 Contractor: TBD RCC Berm RCC at Saddle Dam Concept Existing Saddle Dam 5 Left Rim & Main Embankment Grouting - $87M Completed Dec 2010 Contractor: Kiewit & ACT, JV Barrier Wall - $119M Awarded Sep 2011 Contractor: Bauer Foundation Legend Grout Curtain Barrier Wall
6 IIS-DOE-Site Readiness & Preparation 11 Jun 2014 $4.2B to $6.5B Bear Creek Road & Waterline Relocation Haul Road Sediment Basin #6 Site Readiness ($30M) Bear Creek Road & Waterlines Portal 10 Sediment Basin #6 Haul Road Extension Wetlands Mitigation Stream Mitigation 9107 Excavation SB#6 Sediment Basin #4 HEUMF Portal 10 Site Preparation ($21M) UPF Excavation Sediment Basin # Hill Excavation O&M West 6 Soils Area UPF Excavation
7 Kentucky and Chickamauga Locks Kentucky Lock Chickamauga Lock
8 Kentucky Lock Addition as of 11 Jun 2014 New Lock Twice Size of Existing Lock $862M Cost, $409M Obligated, 47% Complete Completion Depends on IWTF Fix Bridges Substructures - $44M Completed Mar 2006 Contractor: C.J. Mahan Lock - $ TBD Award scheduled - TBD Contractor: TBD Bridges Superstructures - $103M Physically Complete Contractor: American Bridge Upstream Miter Gate - $5.5M Awarded Sep 2013, 7% Comp Contractor: Steward Machine Lock & Associated Facilities $652M TVA Transmission Towers 13M P & L Railroad 97M Hwy 62 and other roadways 100M Total $862M $409M Obl thru May 2014 = 47% complete BCR = 1.8 & RBRCR = 3.9 7%) Upstream Cofferdam - $17M Completed Nov 2006 Contractor: C.J. Mahan Upstream Lock - $97M Awarded Jan 2010, 56% Comp Contractor: Thalle Const
9 KY Lock Future Contract Work Project is well positioned to configure future construction contracts to fund available: D/S cofferdam shells D/S cofferdam D/S excavation D/S monoliths D/S miter gates Lock Backfill Lock bridges Lock Electrical and Mechanical components Lock buildings and site Approach Walls Small amount left in design efforts for approach walls and lock contract configurations.
10 Chickamauga Lock Replacement Existing Lock Alkali Aggregate Reaction $1,225M Cost, $185M Obligated, 15% Complete Completion Depends on IWTF Solution 110 x 600 Lock: TBD Award scheduled: TBD Contractor: TBD Lock & Associated Facilities $1,219M Road and Bridges 6M Total $1,225M $185M Obl thru 1 st Qtr FY 14 = 15% complete BCR = 1.7 & RBRCR = 2.7 7%) Road & Bridges - $6M Completed Feb 2007 Contractor: Lakeshore Engineering Bridge Fabrication - $400K Completed June 2011 Contractor: Bob Smith Const. Gates & Valves - $17M Completed October 2013 Contractor: Steward Machine Cofferdam - $86M Completed October 2013 Contractor: C.J. Mahan Approach Beams - $14M Physically Complete Contractor: C.J. Mahan
11 Chickamauga Lock $86M Cofferdam is Complete
12 Chickamauga Lock Future Contract Work Future Work $600M+ construction work remaining Secant Pile Wall, Cofferdam Grouting and Anchors Lock Excavation Monolith Construction Installation of Electrical / Mechanical Components Lock Operations Building
13 Hydropower Rehabilitation Program
14 Hydropower Major Rehabs 9 Projects in operation with 28 units Installed Capacity of 914 Megawatts 3.4 B Kilowatt-Hours produced annually $44M/year returned to the U.S. Treasury Section 212 Activities Legacy MOAs $45.0M L-T MOA $25M to $50M/Year 20+ Year program > $1 Billion Typical Work Items: Rewind Generator Replace Turbines Switchyard Repair 14
15 Nashville FY14 Forecast W912P5 Project Description Advertisement Date Estimated Award Amount Anticipated Contracting Method Wolf Creek Dam Site Stabilization 3 rd Qtr Between $1M - $5M SB Set-Aside (In Progress) Dale Hollow Dam Operations & Maintenance 3 rd Qtr Between $1M - $5M SB Set-Aside (In-Progress) River Mile 466 Bank Stabilization, Tennessee River, Tennessee River 4 th Qtr Between $500K- $1M IFB, Set-Aside 15
16 Nashville FY14 Forecast W912P5 Project Description Old Hickory Dam Cooling Water Piping Barkley Powerhouse Overhead Crane Rehab Center Hill Dam Long Branch Campsite Station Electrical Service Advertisement Date Estimated Award Amount Anticipated Contracting Method 4 th Qtr Between $1M - $5M SB Set-Aside 4 th Qtr Between $1M - $5M 4 th Qtr Between $1M - $5M SB Set-Aside SB Set-Aside 8(a) MATOC District Wide Construction Contract 4 th Qtr Between $10M or more (ceiling) 8(a) IDIQ Set-Aside *Possibly up to 4-5 vendors District Wide Surveying Contract IDIQ (A & E Services) 4 th Qtr Between $5M and $10M 1 Large Business and 1 Small Business 16
17 Nashville FY15 Forecast W912P5 Project Description Advertisement Date Estimated Award Amount Anticipated Contracting Method J Percy Priest Dam Greenway TBD FY 15 Between $1M - $5M SB Set-Aside Center Hill Dam Roller Compacted (RCC) Saddle Dam Rehab 1 St Qtr FY 15 $10M or more Full and Open Competition District Wide Hydropower Construction (Section 212) MATOC 3 rd Qtr FY 15 $10M or more SB-Set-Aside 17
18 Contracting Links Nashville District Web Page: Small Business Utilization: Federal Business Opportunity: S.A.M.E. Activities:
19 Nashville District Contacts Small Business: Roy Rossignol Contracting (General) Valerie Carlton Project Management: Fred Ragan Engineering: Jimmy Waddle Construction: Eric Pagoria
20 Nashville District Homepage
Nashville District Workload for Nashville SAME Professional Development Workshop
Nashville District Workload for Nashville SAME Professional Development Workshop Thomas Cayce, PE Chief, Programs and Project Delivery Branch Nashville District 17 August 2011 US Army Corps of Engineers
More informationNashville District Update for Tennessee Tombigbee Waterway Opportunities Conference
Nashville District Update for Tennessee Tombigbee Waterway Opportunities Conference Mike Wilson, P.E. Deputy District Engineer for Project Management Planning, Programs and Project Management Division
More informationSeattle District Overview
Seattle District Overview LTC Andrew Park Seattle District Deputy Commander June 2015 US Army Corps of Engineers Agenda Brief overview of the Seattle District Past program and future funding outlook Current
More informationUS Army Corps of Engineers. Vision Statement. Be the premier stewards of entrusted hydropower resources
Vision Statement Be the premier stewards of entrusted hydropower resources Mission Statement Provide reliable hydroelectric power services at the lowest possible cost, consistent with sound business principles,
More informationLockport Pool Chicago Sanitary & Ship Canal Illinois Waterway
Presentation to the Inland Waterways Users Board Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway by Gary Loss, P.E. Rock Island District July 13, 2006 Chicago Sanitary and Ship Canal A
More informationHow to Become a Navy Engineer For $78,000 in USD
Presentation to Associated General Contractors COL Mark Deschenes Commander US Army Corps of Engineers Rock Island District February 2014 US Army Corps of Engineers Rock Island District 78,000 Square Miles
More informationU.S. Army Corps of Engineers Tulsa District
U.S. Army Corps of Engineers Tulsa District Mike Abate, PMP. Chief, Civil Works Branch, PPMD April 17, 2015 US Army Corps of Engineers Civil Works Mission Water Supply 50% of Corps water supply contracts
More informationAT&T Global Network Client for Windows Product Support Matrix January 29, 2015
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network
More informationARMY CORPS OF ENGINEERS. Actions Needed to Improve Cost Sharing for Dam Safety Repairs
United States Government Accountability Office Report to Congressional Requesters December 2015 ARMY CORPS OF ENGINEERS Actions Needed to Improve Cost Sharing for Dam Safety Repairs GAO-16-106 December
More informationSAME Mobile Post Industry Day
SAME Mobile Post Industry Day Col lalan M. Dodd District Commander US Army Corps of Engineers, Jacksonville District November 13, 2014 US Army Corps of Engineers AGENDA Introduction to Jacksonville District
More information14. ENGINEERING AND CONSTRUCTION SCHEDULES. 14.1. Preparation of Schedules ALASKA ENERGY AUTHORITY AEA11-022 ENGINEERING FEASIBILITY REPORT
14. ENGINEERING AND CONSTRUCTION SCHEDULES The project procurement strategy and contract strategy based on the project risk profile have not yet been formulated. For the purposes of completing the construction
More informationPresentation for SAME Industry Day
Presentation for SAME Industry Day COL Mark Deschenes Commander US Army Corps of Engineers Rock Island District April 16, 2014 US Army Corps of Engineers Rock Island District 78,000 Square Miles Operate
More informationNW/SW Joint Engineer Training Symposium
NW/SW Joint Engineer Training Symposium COL Mike Farrell Sacramento District Commander November 6, 2014 US Army Corps of Engineers Agenda Sacramento District overview Civil Works and Military Programs
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
More informationAnalysis One Code Desc. Transaction Amount. Fiscal Period
Analysis One Code Desc Transaction Amount Fiscal Period 57.63 Oct-12 12.13 Oct-12-38.90 Oct-12-773.00 Oct-12-800.00 Oct-12-187.00 Oct-12-82.00 Oct-12-82.00 Oct-12-110.00 Oct-12-1115.25 Oct-12-71.00 Oct-12-41.00
More informationEnhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017
From -JAN- To -JUN- -JAN- VIRP Page Period Period Period -JAN- 8 -JAN- 8 9 -JAN- 8 8 -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -FEB- : days
More informationCHICAGO SANITARY AND SHIP CANAL AT LOCKPORT REHABILITATION CASE STUDY. Brant Jones, P.E. 1 Thomas Mack, P.E. 2 Amy Moore, P.E.
CHICAGO SANITARY AND SHIP CANAL AT LOCKPORT REHABILITATION CASE STUDY Brant Jones, P.E. 1 Thomas Mack, P.E. 2 Amy Moore, P.E. 3 ABSTRACT This paper will discuss the unique history and techniques for restoring
More informationWolf Creek Hydropower Rehabilitation Analysis Report
Wolf Creek Hydropower Rehabilitation Analysis Report David Bishop Kris Atanassov Team Cumberland, September 16, 2015 US Army Corps of Engineers Agenda Overview Water Availability Energy Modeling Preliminary
More information59742 Federal Register / Vol. 80, No. 191 / Friday, October 2, 2015 / Notices
59742 Federal Register / Vol. 80, No. 191 / Friday, October 2, 2015 / Notices 408 mgd from the Chattahoochee River for Metro Atlanta and would reallocate storage in Lake Lanier of 189,497 acrefeet to satisfy
More informationUS Army Corps of Engineers. Little Rock District
US Army Corps of Engineers Little Rock District COL Ed Jackson District Commander Little Rock District 2 September 2009 US Army Corps of Engineers Little Rock District DeQueen Beaver Gillham Ozark Blue
More informationUS Army Corps of Engineers BUILDING STRONG
Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,
More informationSociety of American Military Engineers Omaha District
Society of American Military Engineers Omaha District Kim Thomas Deputy Chief, Plans, Programs, and Project Management Division Omaha District July 21, 2015 US Army Corps of Engineers Omaha District Spotlight
More informationCivil Works - FY 2015 CROmnibus & FY 2016 Budget
Civil Works - FY 2015 CROmnibus & FY 2016 Budget Mark L. Mazzanti Chief, Programs Integration Division Civil Works Directorate, HQUSACE US Army Corps of Engineers BUILDING STRONG 1 BUILDING STRONG USACE
More informationSouth Atlantic Division Industry Day US Army Corps of Engineers BUILDING STRONG
Col Steven Baker Commander USACE Wilmington District April 15, 2014 South Atlantic Division Industry Day US Army Corps of Engineers Wilmington District Boundaries Huntington District Roanoke Norfolk District
More informationCase 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138 Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 2 of 138 Domain Name: CELLULARVERISON.COM Updated Date: 12-dec-2007
More informationGold Ray Dam Interagency Technical Team Meeting
Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,
More informationGreater Los Angeles County Region
Attachment 5 Greater Los Angeles County Region IRWM Implementation Grant Proposal Attachment 5: of the Greater Los Angeles County IRWM 2015 Solicitation Implementation Grant Proposal (Proposal) is divided
More informationWatershed Rehabilitation Program in Texas
Watershed Rehabilitation Program in Texas 1 Dams Constructed by Year (nationwide) 700 600 500 PL-566 Pilot/RC&D PL-534 400 300 200 100 0 48 51 54 57 60 63 66 69 72 75 78 81 84 87 90 93 96 99 Year 2 Number
More informationSwannanoa River Flood Risk Management Study
Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River
More informationSims Bayou Federal Flood Damage Reduction Project
Sims Bayou Federal Flood Damage Reduction Project A. Gene Rushing, Jr., P.E., PMP HCFCD Project Manager January 15, 2014 Harris County s Watersheds Historical Flooding in Harris County 1929 1935 HCFCD
More informationRehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.
Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir Presented By: Doug Stachler, P.E. Project Organization Owner Delaware County Engineers Office Design Consultant CH2M HILL Contractor Double
More informationPresented by: William R. Miles, PE Director of Civil Works Bergmann Associates, DPC Jacksonville, FL & Rochester, NY. www.bergmannpc.
our people and our passion in every project Presented by: William R. Miles, PE Director of Civil Works Bergmann Associates, DPC Jacksonville, FL & Rochester, NY Presentation Agenda Facility History Inspections
More informationU.S. Army Corps of Engineers
U.S. Army Corps of Engineers New York District The Society of American Military Engineers New Jersey Post Federal Contracting Opportunities November 19, 2009 Joseph J. Seebode, Deputy District Engineer
More informationASSET MANAGEMENT PLAN Published January 2009
San Diego County Water Authority 2 0 1 1 ASSET MANAGEMENT PLAN Published January 2009 4677 Overland Avenue San Diego, CA 92123 858-522-6600 www.sdcwa.org This page intentionally left blank. Table of Contents
More informationWelcome to our open house. Thanks for coming. Please sign in and help yourself to refreshments. Energizing your community. www.fortisbc.
Welcome to our open house Thanks for coming Please sign in and help yourself to refreshments Integrated System Plan (ISP) Looks ahead 20 years to identify the energy and infrastructure needs of our customers
More informationTAKING ENERGY IMPROVEMENTS TO THE NEXT LEVEL: MICRO-HYDRO
DRINKING WATER ENERGY MANAGEMENT WORKSHOP SERIES TAKING ENERGY IMPROVEMENTS TO THE NEXT LEVEL: MICRO-HYDRO Steven Jones, M.S., P.E. September 4, 2013 Outline Micro Hydro Power Basics Hydro Power Equipment
More informationUSACE Civil Works Infrastructure Investment Trends: Glide-Path to Benign Neglect?
USACE Civil Works Infrastructure Investment Trends: Glide-Path to Benign Neglect? National Waterways Conference Legislative Summit Steven L. Stockton, P.E. Director of Civil Works, U.S. Army Corps of Engineers
More informationMission Creek Flood Control & Restoration Project. City of Fremont, Alameda County
Mission Creek Flood Control & Restoration Project City of Fremont, Alameda County Agenda Background Why are proposed improvements necessary? Proposed project components Challenges Construction schedule/phasing
More informationORANGE COUNTY SANITIATION DISTRICT CAPITAL IMPROVEMENT PROGRAM PERFORMANCE REPORTS
ORANGE COUNTY SANITIATION DISTRICT CAPITAL IMPROVEMENT PROGRAM PERFORMANCE REPORTS CONTENTS: Construction Change Order Summary Report Design Consultant PSA Amendment Summary Report Contractors Active Projects
More informationP/T 2B: 2 nd Half of Term (8 weeks) Start: 26-AUG-2013 End: 20-OCT-2013 Start: 21-OCT-2013 End: 15-DEC-2013
2013-2014 SPECIAL TERM ACADEMIC CALENDAR FOR SCRANTON EDUCATION ONLINE (SEOL), MBA ONLINE, HUMAN RESOURCES ONLINE, NURSE ANESTHESIA and ERP PROGRAMS SPECIAL FALL 2013 TERM Key: P/T = Part of Term P/T Description
More informationP/T 2B: 2 nd Half of Term (8 weeks) Start: 25-AUG-2014 End: 19-OCT-2014 Start: 20-OCT-2014 End: 14-DEC-2014
2014-2015 SPECIAL TERM ACADEMIC CALENDAR FOR SCRANTON EDUCATION ONLINE (SEOL), MBA ONLINE, HUMAN RESOURCES ONLINE, NURSE ANESTHESIA and ERP PROGRAMS SPECIAL FALL 2014 TERM Key: P/T = Part of Term P/T Description
More informationP/T 2B: 2 nd Half of Term (8 weeks) Start: 24-AUG-2015 End: 18-OCT-2015 Start: 19-OCT-2015 End: 13-DEC-2015
2015-2016 SPECIAL TERM ACADEMIC CALENDAR For Scranton Education Online (SEOL), Masters of Business Administration Online, Masters of Accountancy Online, Health Administration Online, Health Informatics
More informationSecond Place: Industrial Facilities or Processes, New
Second Place: Industrial Facilities or Processes, New Photo: Paul Howell Texas Medical Center in Houston is the largest medical center in North America. It has a chilled water system of 160,000 tons. Big
More informationHow To Build A Powerhouse
Ozark and Webbers Falls Powerhouse Major Rehabilitation Lee Beverly- SWL Project Manager Dan Brueggenjohann SWT Project Manager Byron Floyd Resident Engineer 12 June 2013 US Army Corps of Engineers Ozark
More informationInland Marine Transportation System Capital Investment Strategy
Inland Marine Transportation System Capital Investment Strategy Jeanine Hoey, PE, PMP Program Manager 13 April 2010 US Army Corps of Engineers 1 Inland Marine Transportation System (IMTS) Capital Investment
More informationFacing The Challenges In Houston s Water System: Past, Present, and Future
Facing The Challenges In Houston s Water System: Past, Present, and Future Jun Chang, P.E. D.WRE Deputy Director Department of Public Works and Engineering Presented to HCEC February 17, 2012 Past Regulatory
More informationManaging Our Water Retention Systems
Managing Our Water Retention Systems 29th Annual USSD Conference Nashville, Tennessee, April 20-24, 2009 Hosted by Corps of Engineers On the Cover Wolf Creek Dam is on the Cumberland River in South Central
More informationOverview of Program Management Services and Proposed CIP FY2012-17
Finance & Administration Committee Item III-A January 13, 2010 Overview of Program Management Services and Proposed CIP FY2012-17 Page 3 of 64 Washington Metropolitan Area Transit Authority Board Action/Information
More information2015-16 BCOE Payroll Calendar. Monday Tuesday Wednesday Thursday Friday Jun 29 30 Jul 1 2 3. Full Force Calc
July 2015 CM Period 1501075 July 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 August 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
More informationREPORTS & PRESENTATIONS AGENDA ITEM #III-3 CORTEZ BRIDGE PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDY
NOTES REPORTS & PRESENTATIONS AGENDA ITEM #III-3 CORTEZ BRIDGE PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDY Presenter: Summary: Tony Sherrad, FDOT Project Manager The Cortez Bridge in Manatee County,
More information2010-2011 Contractor of the Year
U.S. Army Corps of Engineers: Little Calumet River Stage VII Steel Sheet Piling Installation Hammond, Indiana Thatcher worked two rigs concurrently one on the north side and one on the south. The United
More informationRESUME Lee A. Knuppel, P.E.
RESUME Lee A. Knuppel, P.E. OFFICE: EDUCATION: LEE A. KNUPPEL AND ASSOCIATES, Inc. 7770 Cooper Road, Suite 7 Montgomery, Ohio 45242 (513) 793-4222 Graduate: UCLA, Los Angeles, CA M.S. in Civil Engineering,
More informationRehabilitation of Locks on the Kentucky River
Rehabilitation of Locks on the Kentucky River Joshua M. Repp, PE Bergmann Associates Presentation Overview River System History Evolution of Lock and Dams Structures Existing Condition of Structures Lock
More informationFlood Risk Management
Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment
More informationFlood Risk Management
Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting
More informationNATIONAL CREDIT UNION SHARE INSURANCE FUND
NATIONAL CREDIT UNION SHARE INSURANCE FUND PRELIMINARY & UNAUDITED FINANCIAL HIGHLIGHTS RENDELL L. JONES CHIEF FINANCIAL OFFICER MANAGEMENT OVERVIEW Balance Sheet Other - Insurance and Guarantee Program
More informationInfrastructure Cost Data
Hewitt Estimating Consultants a Division of International Project Estimating Limited Infrastructure Cost Data www.infrastructurecost.com The Chief Estimator Software 150 Couling Crescent, Guelph Ontario,
More informationNRCS Overview. National Dam Safety Program Technical Workshop #19 February 22-23, 2012
NRCS Overview National Dam Safety Program Technical Workshop #19 February 22-23, 2012 Thomas Brown National Design, Construction, and Soil Mechanics Center (NDCSMC) Fort Worth, Texas NRCS Dam Inventory
More informationChaudière Crossing Bridge Rehabilitation
Chaudière Crossing Bridge Rehabilitation Douglas K. Lowry P. Eng., Armtec Infrastructure Incorporated David Delicate, P.Eng. Public Works and Government Services Canada (Retired) Prepared for presentation
More informationCity & County of San Francisco Permit & Project Tracking System
City & County of San Francisco Permit & Project Tracking System PPTS Sneak Preview March 20, 2013 Welcome & Opening Statements AGENDA 1. Opening Statements Department Directors 2. Project Background 3.
More informationUSACE Dam Safety Program Current Approach & Methodology
USACE Dam Safety Program Current Approach & Methodology Siamac Vaghar, PE, MASCE Chief, Geotechnical Engineering Section Dam Safety Program Manager US Army Corps of Engineers New England District Corps
More information2015 SAME Small Business Conference and Industry Day 22 23 April 2015
2015 SAME Conference and Industry Day 22 23 April 2015 Norfolk District 2015 Program Review Tracey J. Hughes, Chief, Programs US Army Corps of Engineers Agenda Missions and Vision Statements Areas of Responsibility
More informationMoving Small Mountains Vesuvius Dam Rehab
Moving Small Mountains Vesuvius Dam Rehab Susan L. Peterson, P.E., regional dams engineer, Eastern Region, Bedford, IN Note: The following article, Moving Small Mountains Vesuvius Dam Rehab, by Sue Peterson,
More informationNatural Gas Wholesale Prices at PG&E Citygate as of November 7, 2006
QUARTERLY GAS ISSUES UPDATE December 26 I. Supply Issues Wholesale Natural Gas Prices Above normal temperatures and a lack of hurricane activity caused market prices to decrease in October. By November,
More informationAPPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan
APPENDIX F Baker County Mason Dam Hydroelectric Project FERC No. P-12686 Turbidity Monitoring Plan April 2011 857 Table of Contents 1.0 Introduction 1 2.0 Purpose and Scope 2 3.0 Turbidity Monitoring and
More informationSafe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
More informationNatural Gas Diversification Strategy for PREPA GOVERNMENT DEVELOPMENT BANK FOR PUERTO RICO
Natural Gas Diversification Strategy for PREPA GOVERNMENT DEVELOPMENT BANK FOR PUERTO RICO Agenda 1 Importance of Diversifying to Natural Gas 2 Natural Gas Diversification Strategy 2 Currently, Puerto
More informationCLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
More informationArdessie Hydro Electric Project
Ardessie Hydro Electric Project Appendix T - Traffic Management Plan 13 th December 2014 V1.0 Jacinta MacDermot DHG Hydro Ltd 7 St James s Gardens London W11 4RB Jacinta.macdermot@dhghydro.com 077 888
More informationAshley Institute of Training Schedule of VET Tuition Fees 2015
Ashley Institute of Training Schedule of VET Fees Year of Study Group ID:DECE15G1 Total Course Fees $ 12,000 29-Aug- 17-Oct- 50 14-Sep- 0.167 blended various $2,000 CHC02 Best practice 24-Oct- 12-Dec-
More informationSRS Maps. Site Sampling Locations Doses Groundwater
SRS Maps Site Sampling Locations Doses Groundwater Savannah River Site Environmental Report for 2003 SRTC Map Figure 1 The Savannah River Site SRS is located in South Carolina, about 12 miles south of
More informationA New Framework for Multi-Reservoir Operations and Management
A New Framework for Multi-Reservoir Operations and Management Robert Annear, Senior Engineer, Ph.D., P.E. Marcus Quigley, Principal, P.E., CPESC, D.WRE Outline The Internet of Things What are Decision
More informationCITY OF TRAIL MEMORANDUM
0 C CITY OF TRAIL MEMORANDUM DATE: TO: FROM: SUBJECT: March 24, 2011 FILE NO. 5400-02 DAVID PEREHJJDOFF, CHIEF ADM1NTSTRATIVE OFFICER WARREN PROULX, ENGINEERING TECHMCIAN OLD TRAIL BRIDGE With the interest
More information100018-MEC-C-S-1980 Mechanical Superintendent PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS CHRONOLOGICAL EXPERIENCE RECORD
100018-MEC-C-S-1980 Mechanical Superintendent Holds a Mechanical Diploma and has more than 28 years hands-on experience in erection of boilers and different power plant systems, machines, piping, fans,
More informationApril 30, 2013 E M. Environmental Management. www.em.doe.gov. safety performance cleanup closure
April 30, 2013 1 Facility Stabilization and Deactivation C.1.3 - (Period 3) After facilities are turned over by USEC and accepted by DOE: Perform minimal stabilization and deactivation activities for facilities
More informationJeff Haby, P.E. Director Sewer System Improvements. September 15, 2015. Agenda
SAWS Sanitary Sewer Overflow Reduction Program Jeff Haby, P.E. Director Sewer System Improvements SA Military Engineers Meeting Agenda SAWS Overview Consent Decree CD Compliance Programs Program Transition
More informationMicropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com
More informationFlood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún
Flood mitigation program for Gatun lake Programa de mitigación de inundaciones del lago Gatún Moffatt & Nichol Engineers 10 de febrero de 2005 Contrato No. 126161 Introducción y Recomendaciones 1 INTRODUCTION
More informationWaterway Technote Planning
Waterway Technote Planning Contents Benefits to planning your waterway management 1 Prioritising waterway management where to start? 1 What are your priorities? 1 Start with the best areas or those at
More informationPTC Creo 2.0 Hardware Support Dell
PTC Creo 2.0 Hardware Support Dell Last updated: February 2, 2016 The Desktop Virtualization Environment Support Dell table displays at the end of this document, after the standard Creo certification table.
More informationCLIFTY CREEK PLANT MADISON, INDIANA
2015 DAM AND DIKE INSPECTION REPORT GERS-15-018 CLIFTY CREEK PLANT MADISON, INDIANA PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Annual Dam and Dike Inspection
More informationHarlan County PRIDE Projects
Harlan County PRIDE Projects June 13, 2006 Area Development District: Cumberland Valley U.S Senator State Senator County Judge Executive Mitch McConnell Ed Miller Joseph Grieshop 30 th District U.S. Senator
More informationSMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN
SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN Facility Name: Address: QUALIFIED PERSONNEL All tasks shall be completed by a person that is qualified to that task (see operators qualification of individuals
More informationConsumer ID Theft Total Costs
Billions Consumer and Business Identity Theft Statistics Business identity (ID) theft is a growing crime and is a growing concern for state filing offices. Similar to consumer ID theft, after initially
More informationAZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA
AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA GÁBOR KEVE 1, GÉZA HAJNAL 2, KATALIN BENE 3, PÉTER TORMA 4 EXTRAPOLATING
More informationThe Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
More informationBuildings Construction Procurement Strategy
Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides
More informationIH-635 MANAGED LANES PROJECT, SEG. 3.2
IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,
More informationEmergency Streambank Restoration/Stabilization. Kentucky Division of Water Water Quality Certification May 2010 Educational Assistance
Emergency Streambank Restoration/Stabilization Kentucky Division of Water Water Quality Certification May 2010 Educational Assistance Due to the severity of the recent rains and flooding occurrences, the
More informationCapabilities Statement for Project Management Oversight Services. Presented to:
Capabilities Statement for Project Management Oversight Services Presented to: Department of Transportation Federal Transit Administration December 20, 2007 December 20, 2007 Mr. John Bardwell Contracting
More informationSanitary Sewer Overflow (SSO) Reduction Program. Division of Water Quality State Water Resources Control Board
Sanitary Sewer Overflow (SSO) Reduction Program Division of Water Quality State Water Resources Control Board Overview Background on Statewide SSO Reduction Program Roles and Responsibilities Monitoring
More informationSTORMWATER MANAGEMENT CHECKLIST
STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative
More informationMONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5
Rendering Provided by McKissick Associates MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5 Additions and Alterations to Williamsport Area Middle School Williamsport Area School District 17 July 2012 Geo-Thermal
More information2015 Ohio MemberSource Newsletter Targeted Production Schedule (Laura Huff/Courtney Stewart)
2015 Ohio MemberSource Newsletter (Laura Huff/Courtney Stewart) 2015 Newsletter Production Schedule 1st Quarter (Spring) Dec. 1, 2014 Dec. 5, 2014 Dec. 17, 2014 Dec. 26, 2014 Jan. 23 Jan. 30 Feb. 20 March
More informationUSING PROBABILISTIC FORECASTS TO IMPROVE PLANNING AND OPERATIONS FOR WATER RESOURCES SYSTEMS
USING PROBABILISTIC FORECASTS TO IMPROVE PLANNING AND OPERATIONS FOR WATER RESOURCES SYSTEMS W. JOSH WEISS, PH.D., P.E. jweiss@hazenandsawyer.com 2013 Susquehanna Water Science Forum October 7, 2013 OUTLINE
More informationB O A R D M E E T I N G N a s h v i l l e, T e n n e s s e e November 6, 2014
B O A R D M E E T I N G Nashville, Tennessee November 6, 2014 PRESIDENT S REPORT B i l l J o h n s o n President & CEO Energy Environment Economic Development FY 2014 Overall Performance Safety Record
More informationEmergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
More informationDOE LHC Quarterly Review. Magnet Production Cable Testing Cost to Complete issues. Mike Harrison, BNL July 26, 2004
DOE LHC Quarterly Review Magnet Production Cable Testing Cost to Complete issues Mike Harrison, BNL July 26, 2004 1 BNL Production Status Magnet production complete The last series of dipoles (D3 s) is
More informationEmergency repair of Bridge B421
Emergency repair of Bridge B421 over the Olifants River after fl ood damage INTRODUCTION AND BACKGROUND Bridge B421 is located on the R555 at km 5.03 on Section 01E between Witbank (now known as emalahleni)
More information