PEDESTRIAN PASSAGEWAY. Goal: Provide safe passageway for students to cross busy streets through Colorado College campus

Size: px
Start display at page:

Download "PEDESTRIAN PASSAGEWAY. Goal: Provide safe passageway for students to cross busy streets through Colorado College campus"

Transcription

1 PEDESTRIAN PASSAGEWAY Goal: Provide safe passageway for students to cross busy streets through Colorado College campus

2 OBJECTIVE Separate pedestrian-vehicle accident potential so as to minimally impact site s historic character and ensure student safety Provide a long term solution

3 OPTIONS CONSIDERED Temporary versus Permanent Existing at-grade crossings with beacons along Cascade has resulted in small number of student-vehicle accidents over past decade Current options considered [traffic calming to lane reduction] are temporary solution; they do not eliminate pedestrian-vehicle accident potential Rationale for options there have been past accidents, but it is not a big enough problem to warrant anything other that reducing vehicle speed or create choke point with single lane traffic Permanent solution pedestrian bridge or pedestrian underpass has been dismissed too quickly as viable option

4 PEDESTRIAN BRIDGE Permanent solution since it de-conflicts pedestrians and vehicles Could degrade historic character of the site unless carefully planned Needs to meet approval of local Historic Preservation Office & Colorado State Historical Preservation Office [SHPO]

5 PEDESTRIAN UNDERPASS Permanent solution because it de-conflicts pedestrian and vehicles Can permit traffic calming while not restricting traffic flow or causing traffic congestion Other concerns with underpass are: Student safety Drainage Historic character Constructability

6 STUDENT SAFETY Incorporate security system linked to campus police and security lighting Incorporate natural lighting in passageway design as accomplished in Unitah bridge design over Monument Creek

7 DRAINAGE Incorporate pump and underground storage for future use on campus and/or Incorporate lift pump system to channel water runoff to street drainage system

8 HISTORIC CHARACTER Incorporate architectural treatments into the design compatible with the historic content of the campus and surrounding area Treatments borrowed from historic structures on campus Include concrete paver walkways, cast stone elements, decorative balustrade walls, decorative fencing, ceramic tile, bronze hand railings

9 CONSTRUCTABILITY Small footprint approach using a compact structural design with traffic calming, but not impacting traffic flow Large footprint approach allowing easier access to passageway Designed to satisfy local Historic Preservation Office, SHPO and ADA standards Designed to accommodate small maintenance vehicular traffic safely

10 SMALL FOOTPRINT APPROACH Maintains 4-lane traffic flow Incorporate fence along median centerline Narrows median at passageway from 38 wide to 10 wide by moving both north and south bound lanes one lane toward the median centerline Permits use of outside lanes for ramp access to passageway Enhances traffic calming by slowing traffic at passageway location

11 SMALL AREA PLOT PLAN

12 LARGE FOOTPRINT APPROACH Maintains 4-lane traffic flow Incorporate fence along median centerline No change to existing median width Permits fan entry approaches [both sides of street], easing access to passageway Can protect existing large trees with islands in ramped fan entries [both sides of street]

13 EXAMPLES OF LARGE FOOTPRINT PLANS UCCS-North Nevada Shopping Passageway Briargate Blvd passageway in Cordera 30 TH Street passageway at Garden of Gods Visitor Center UC Bounder passageway

14 UCCS-NEVADA PASSAGEWAY

15 BRIARGATE BLVD PASSAGEWAY

16 GARDEN OF GODS PASSAGEWAY

17 UC BOULDER PASSAGEWAY

18 Summary Colorado College can solve the pedestrianvehicle conflict permanently with underground passageway: Without impacting the historic character of the surrounding communities Without restricting traffic flow destined to increase in the future

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project. Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation

More information

HIGHWAY DESIGN REPORT. Appendix 4. Proposed Design Principles for City Passings

HIGHWAY DESIGN REPORT. Appendix 4. Proposed Design Principles for City Passings HIGHWAY DESIGN REPORT Appendix 4 Proposed Design Principles for City Passings June 2000 Contents Page 1 Introduction 2 1.1 Purpose 2 1.2 Definition of city passing 2 1.3 Safety Problems 2 1.4 Planning

More information

VERTICAL SPEED CONTROL DEVICES

VERTICAL SPEED CONTROL DEVICES H-3.8 VERTICAL SPEED CONTROL DEVICES GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Vertical Speed Control Devices in the design and construction of elements

More information

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included

More information

Q. What do you think the most important transportation issues are in this area with regard to east-west travel?

Q. What do you think the most important transportation issues are in this area with regard to east-west travel? The following are the comments received in a survey of homeowner and neighborhood representatives conducted prior to the three Open Houses on August 2nd and 3rd, 2000. The opinions are presented as part

More information

12-002159-PA Savannah Gardens Public Art Project

12-002159-PA Savannah Gardens Public Art Project SAVANNAH-CHATHAM COUNTY HISTORIC SITE AND MONUMENT COMMISSION PART 1: THEME AND LOCATION PART 2: DESIGN AND FUNDING PUBLIC ART RECOMMENDATION PETITIONER: FILE No.: LOCATION: 915 Waters Avenue Savannah,

More information

Street Audit Tool: Web 2.0 Tools

Street Audit Tool: Web 2.0 Tools Name: Email: Instructions: Auditor Information (1) Use all three tools for your assessment (2) If the tool can not determine the criteria, check (3) Indicate the tools used (4) Rate the effectiveness of

More information

Welcome! Purpose of Tonight s Meeting. Informational Open House to discuss two City projects: Goal is to LISTEN TO YOU

Welcome! Purpose of Tonight s Meeting. Informational Open House to discuss two City projects: Goal is to LISTEN TO YOU Purpose of Tonight s Meeting Informational Open House to discuss two City projects: Fairchild Street Subway Phase I Engineering: Immediate need to replace subway Bowman Avenue Feasibility Study Future

More information

Sector Design Concepts

Sector Design Concepts Section C Sector Design Concepts C7 Sector 7 Great North Road Underpass 6 6 6 C7. Existing situation Sector 7 refers to the cut and cover section of the project linking the northern end of the deep tunnels

More information

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line

More information

"Saving Lives / Saving Time" Roadway Connections $ 21,548

Saving Lives / Saving Time Roadway Connections $ 21,548 A Project List $ 285,001 "Taking Care of What We've Got" Bridge Reconstruction $ 42,022 Academy over Cottonwood Creek Bridge Rehabilitation $ 1,280 Airport Rd. over Spring Creek Bridge Replacement $ 1,584

More information

Topic 2 11/28/2012 Blocks & Street Network

Topic 2 11/28/2012 Blocks & Street Network TOPIC 2 Blocks & Street Network Implementation Note: 1. Some recommendations are summarized in the tables herein. For complete recommendation language, please see the. 2. Recommendations referenced in

More information

OVERVIEW PROJECT SUMMARY

OVERVIEW PROJECT SUMMARY OVERVIEW Cesar Chavez showcases how to successfully redesign a primary arterial route into a neighborhood destination, improving modal share, water sensitive design, biodiversity and safety whilst maintaining

More information

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines A. Offices a. Office buildings should be built to the minimum required setback. b. Surface parking should be located towards the

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must

More information

Concept Design Synopsis

Concept Design Synopsis Washington Headquarters Services Facilities Services Directorate The Pentagon Electric Upgrade (Substation No. 2) Concept Design Synopsis September 4, 2014 Prepared for Consultations with VA SHPO, ACHP,

More information

Downtown Tampa Transportation Vision

Downtown Tampa Transportation Vision Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org

More information

Pearl Parkway Multiway Boulevard Innovative Features for Urban Streets City of Boulder, Colorado. Boulder Basics. C O L O R A D O

Pearl Parkway Multiway Boulevard Innovative Features for Urban Streets City of Boulder, Colorado. Boulder Basics. C O L O R A D O Innovative Features for Urban Streets City of Boulder, Colorado Project Contacts: Alex May, P.E. Transportation Project Manager City of Boulder Dept. of Public Works Transportation Division maya@bouldercolorado.gov

More information

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan Transportation Authority (Metro) 2009 Transportation Improvement Program Call for Projects APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan

More information

BANNER GUIDELINES FOR THE UCLA CAMPUS

BANNER GUIDELINES FOR THE UCLA CAMPUS BANNER GUIDELINES FOR THE UCLA CAMPUS I. PURPOSE AND SCOPE UCLA recognizes the value of banners in promoting educational, cultural and informational programs that support the academic mission of the University.

More information

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s. Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library

More information

Guidance Note on the Need for Planning Permission for the Development of Existing Houses and Flats (effective from 6 February 2012)

Guidance Note on the Need for Planning Permission for the Development of Existing Houses and Flats (effective from 6 February 2012) de Guidance Note on the Need for Planning Permission for the Development of Existing Houses and Flats (effective from 6 February 2012) Introduction The rules governing permitted development (that is, whether

More information

B. Improve the appearance and character of areas surrounding new development.

B. Improve the appearance and character of areas surrounding new development. Chapter 4.3: Landscape Regulations Sections: 4.301 Purposes 4.302 Applicability 4.303 General Provisions 4.304 Landscape Maintenance 4.301 Purposes The purposes of these regulations are to: A. Promote

More information

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile

More information

Residential Driveway Installation Requirements. Table of Contents

Residential Driveway Installation Requirements. Table of Contents Residential Driveway Installation Requirements Table of Contents Residential Driveway Requirements Sidewalk Construction Specifications for Residential Properties Hold Harmless Agreement for Residential

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

Gas Meter Clearances and Service Installation Requirements

Gas Meter Clearances and Service Installation Requirements March 2016 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE's Customer Construction Services 1 888 321 7779 or visit PSE.com/CustomerConstruction

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

Appendix C. Sign Design Guidelines. Sign Types and Placement

Appendix C. Sign Design Guidelines. Sign Types and Placement Appendix C Sign Design Guidelines Because signage is intended to be visible and attract attention, it has significant visual impact on the area in which it is placed, particularly in a community that is

More information

PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL

PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL CONTENT OF LECTURE a) Walking as a transport mode b) Walking in Sub Sahara Africa c) Policies for pedestrians d) Pedestrian characteristics e) Network planning

More information

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic

More information

8. EXTERIOR SITE LIGHTING

8. EXTERIOR SITE LIGHTING 8. EXTERIOR SITE LIGHTING Goal: Exterior lighting should be used to provide illumination for the security and safety of entry drives, parking, service and loading areas, pathways, courtyards and plazas,

More information

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High Multi-Modal Corridor Degree of Complexity: Cost/Benefit: Maintain the same level of service for Ensures continuous flow through the Might impact other transportation Consider road diet and/or different

More information

Guidelines for Rights of Way

Guidelines for Rights of Way Guidelines for Rights of Way Guidelines for Statutory Rights of Way for Engineering and Public Works Infrastructure Rights of Way (Drainage, Sanitary, Water & Electrical Utilities) A Statutory Right of

More information

REHABILITATION PACKAGE 1-a

REHABILITATION PACKAGE 1-a 1-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 1-a Rehab option 1-a is a rehabilitation package whereby all spans of the existing structure would be rehabilitated to the degree feasible and strengthened

More information

Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections

Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections Phil Erickson Community Design + Architecture Mike Johnson HDR Engineering CTF Charrette Approach

More information

Context Sensitive Design for Urban Transportation in West Philadelphia

Context Sensitive Design for Urban Transportation in West Philadelphia Context Sensitive Design for Urban Transportation in West Philadelphia Transportation Research Board 85 th Annual Meeting 24 January 2006 Jeffrey M. Casello University of Waterloo Robert Wright City of

More information

FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM

FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM CITYOFOBERLIN OHIO CITY OF OBERLIN, OHIO FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM Background In October, 2011, the City of Oberlin Planning

More information

CHAPTER 8 CIVIL DESIGN

CHAPTER 8 CIVIL DESIGN CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

Commercial Film and Still Photography Rules and Regulations Updated October 1, 2015

Commercial Film and Still Photography Rules and Regulations Updated October 1, 2015 Commercial Film and Still Photography Rules and Regulations Updated October 1, 2015 Thank you for choosing Vizcaya Museum and s for your film or still photography session. Vizcaya is a National Historic

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.

More information

Transportation Management Plan Template

Transportation Management Plan Template DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County

More information

Roadway Cost Per Centerline Mile Revised June 2014

Roadway Cost Per Centerline Mile Revised June 2014 Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743

More information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?

More information

LAKE SHORE DRIVE CTA RED LINE BROADWAY SHERIDAN FOSTER ARGYLE. Pedestrian Access Advisory Committee. April 25, 2014

LAKE SHORE DRIVE CTA RED LINE BROADWAY SHERIDAN FOSTER ARGYLE. Pedestrian Access Advisory Committee. April 25, 2014 FOSTER LAKE SHORE DRIVE CTA RED LINE BROADWAY SHERIDAN ARGYLE ARGYLE STREET STREETSCAPE - S-1-323 Pedestrian Access Advisory Committee BROADWAY ARGYLE CTA RED LINE WINTHROP KENMORE SHERIDAN Broadway -

More information

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY 3 VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY The overall planning strategy for the Bank Street CDP is to ensure that future development is undertaken in a coordinated and planned approach, supported

More information

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality

More information

Figure 5.6a Construction worksites and corridor access Note: Indicative only, subject to detailed design.

Figure 5.6a Construction worksites and corridor access Note: Indicative only, subject to detailed design. A 0 NORTH 200 metres George Lane worksite North Strathfield Station worksite Strath eld Triangle A B Existing rail corridor Proposed underpass approach New/extended bridge Worksites Existing track Proposed

More information

5 ALTERNATIVE SOLUTIONS AND EVALUATION

5 ALTERNATIVE SOLUTIONS AND EVALUATION Page 23 5 ALTERNATIVE SOLUTIONS AND EVALUATION The process used for the assessment and evaluation of the alternatives follows the procedures of the Municipal Class EA, as described below: Identify a reasonable

More information

APPENDIX F:TRIPLE BOTTOM LINE ANALYSIS

APPENDIX F:TRIPLE BOTTOM LINE ANALYSIS APPENDIX F:TRIPLE BOTTOM LINE ANALYSIS Triple Bottom Line Analysis Map (TBLAM) Project or Decision: College Ave Corridor for FC Moves long range transportation plan for College Ave., for redevelopment

More information

CITY COUNCIL PACKET MEMORANDUM

CITY COUNCIL PACKET MEMORANDUM CITY COUNCIL PACKET MEMORANDUM DOCUMENT: Final Plan and Final Plat SUBJECT: City Center Lenexa The Domain at City Center CONTACT PERSON: Beccy Yocham, Director of Community Development DATE: December 3,

More information

The Corporation of the TOWN OF MILTON

The Corporation of the TOWN OF MILTON The Corporation of the TOWN OF MILTON Report to: From: Mayor G. A. Krantz & Members of Council M. Paul Cripps, P. Eng., Director, Engineering Services Date: November 11, 2013 Report No. ENG-039-13 Subject:

More information

Spirit of Austin Lane; Cell Phone Waiting Area Artist Information Meeting FAQ s

Spirit of Austin Lane; Cell Phone Waiting Area Artist Information Meeting FAQ s Spirit of Austin Lane; Cell Phone Waiting Area FAQ s Art in Public Places, Cultural Arts Division Economic Growth & Redevelopment Services Office www.austincreates.com 1. Will artist be allowed to place

More information

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all

More information

OM-13: Transportation Management and Operations

OM-13: Transportation Management and Operations : Transportation and Operations 1-15 points Goal: Maximize the utility of the existing roadway network through use of technology and management of operations strategies. Sustainability Linkage Transportation

More information

City Streets as State Highways Maintenance Guidelines Briefing Summary March 21, 2013

City Streets as State Highways Maintenance Guidelines Briefing Summary March 21, 2013 Streets as Highways Maintenance Guidelines Briefing Summary March 21, 2013 Background Within the of Washington there are over 500 centerline miles of Streets that also function as Highways. Cities that

More information

UNEP recommendations to KURA on Improving Safety and Reducing Congestion on UN Avenue (7 October 2009; revised 23 November 2009)

UNEP recommendations to KURA on Improving Safety and Reducing Congestion on UN Avenue (7 October 2009; revised 23 November 2009) UNEP recommendations to KURA on Improving Safety and Reducing Congestion on UN Avenue (7 October 2009; revised 23 November 2009) UN Avenue extends for 2 km between Limuru Road and Ruaka Road (Runda Roundabout).

More information

Parking On-street parking Front garden parking Off-street parking

Parking On-street parking Front garden parking Off-street parking Nae place mair braw A guide to placemaking in Perth and Kinross Whan I haik't up to Craigie Hill And lookit east and west; "In a' the world," said I to mysel', "My ain shire is the best." Parking On-street

More information

Aqua-Bric PERMEABLE PAVERS

Aqua-Bric PERMEABLE PAVERS Aqua-Bric PERMEABLE PAVERS Essential Pavers for Plazas, Walkways, Entrances and Parking Lots Belden Brick Aqua-Bric Permeable Pavers PERMEABLE PAVING IS A DESIGNED APPLICATION TO MANAGE STORM WATER RUN-OFF

More information

Michael B. Hancock Mayor. October 31, 2014

Michael B. Hancock Mayor. October 31, 2014 Michael B. Hancock Mayor City and County of Denver OFFICE OF THE MAYOR CITY AND COUNTY BUILDING DENVER, CO 80202-5390 TELEPHONE: (720) 865-9090 FAX: (720) 865-8787 TTY/ TTD: (720) 865-9010 October 31,

More information

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk December 2014 FACT SHEET: TRANSPORT AND INFRASTRUCTURE Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk The Gold Coast Integrated Resort

More information

GUIDELINES FOR WORKING ON ROADS

GUIDELINES FOR WORKING ON ROADS GUIDELINES FOR WORKING ON ROADS Guide to the Safety, Health and Welfare at Work (Construction)(Amendment)(No. 2) Regulations 2008 (S.I. No. 423 of 2008) 7 CONTENTS Page Introduction.....................................................

More information

6 Streetscape character 6.1

6 Streetscape character 6.1 6 6.1 6 Streetscape character Introduction Transport interchanges The TLRN is the strategic road network for London and varies in character across the capital. The variation of the land use across London

More information

SCHOOL OF ARCHITECTURE & COMMUNITY DESIGN COLLEGE OF THE ARTS UNIVERSITY OF SOUTH FLORIDA

SCHOOL OF ARCHITECTURE & COMMUNITY DESIGN COLLEGE OF THE ARTS UNIVERSITY OF SOUTH FLORIDA SCHOOL OF ARCHITECTURE & COMMUNITY DESIGN COLLEGE OF THE ARTS UNIVERSITY OF SOUTH FLORIDA PROJECT OVERVIEW OVERVIEW The FCCD+R, in coordination with the FDOT District 7, are to facilitate numerous meetings

More information

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013 Red Wing Bridge Project PAC #5/TAC #8 Meeting July 18, 2013 Alternatives Analysis Agenda Overview of Past Progress Progress Since April PAC Bridge 9103 Rehabilitation Study Bridge 9040 Rehab vs. Replacement

More information

BEST PRACTICE FOR TRAFFIC ENGINEERING DEVICES & OPERATIONS IN SCHOOL AREAS

BEST PRACTICE FOR TRAFFIC ENGINEERING DEVICES & OPERATIONS IN SCHOOL AREAS C I T Y O F C O L O R A D O S P R I N G S E N G I N E E R I N G D I V I S I O N T R A F F I C E N G I N E E R I N G T E A M SCHOOL SAFETY PROGRAM POLICY MANUAL BEST PRACTICE FOR TRAFFIC ENGINEERING DEVICES

More information

I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015

I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015 I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA PSPE Presentation, December 3, 2015 Location Map N PROJECT LOCATION 22 nd 18 th Streets PHILADELPHIA, PA General

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

Friday, March 9, 2012 1800 Grant Street, 1st Floor conference room

Friday, March 9, 2012 1800 Grant Street, 1st Floor conference room Office of the Vice President for Finance 1800 Grant Street, Suite 800 Denver, Colorado 80203 (303) 860-5600 Fax: (303) 860-5640 University of Colorado Design Review Board Minutes Friday, March 9, 2012

More information

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

ADA POST INSPECTION CHECKLIST. Job No. Route County Location ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks

More information

"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T

Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T "Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T Gorzów Wielkopolski Gorzów Wielkopolski is an important regional city centre

More information

Christchurch Cycle Design Guidelines

Christchurch Cycle Design Guidelines Christchurch Cycle Design Guidelines 2013 Acknowledgements We would like to thank the contributions from ViaStrada and other contributors including Glen Koorey, Spokes, NZTA, Canterbury Public Health,

More information

DESIGN ASSISTANCE APPLICATION

DESIGN ASSISTANCE APPLICATION DESIGN ASSISTANCE APPLICATION for FY 2016 NEW RIVER MULTI USE PATH: PINNACLE PEAK ROAD TO HAPPY VALLEY ROAD CITY OF PEORIA APPLICATIONS ARE DUE VIA ONLINE SUBMITTAL BY 10:00 AM ON MONDAY, JUNE 29, 2015

More information

Collingwood Trails Network Management Guidelines. Parks, Recreation & Culture Department

Collingwood Trails Network Management Guidelines. Parks, Recreation & Culture Department Collingwood Trails Network Management Guidelines 2012 Parks, Recreation & Culture Department 1 SECTION 1: INTRODUCTION IN December 1998 the Town of Collingwood Parks, Recreation and Culture Department

More information

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES Background One of the most critical public services provided by a community is the community s transportation system. An effective

More information

STRATEGIC PLAN 2015 2020 2030

STRATEGIC PLAN 2015 2020 2030 STRATEGIC PLAN 2015 2020 2030 Boca Raton, Florida May 2015 Lyle Sumek Associates, Inc. Phone: (386) 246-6250 9 Flagship Court Fax: (386) 246-6252 Palm Coast, FL 32137 E-mail: sumekassoc@gmail.com Table

More information

How To Design A Crash Investigation Site

How To Design A Crash Investigation Site CHAPTER 7 CRASH INVESTIGATION SITES December, 2000 7. Crash Investigation Sites (CIS) 7.1. Introduction and Usage The idea of "crash investigation sites" or areas outside of the freeway mainline where

More information

RESOLUTION NO. 74443

RESOLUTION NO. 74443 RD:AGN:ERD RES. NO. 74443 5/27/08 RESOLUTION NO. 74443 A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN JOSE APPROVING A REVISED COUNCIL POLICY 5-6 ENTITLED TRAFFIC CALMING POLICY FOR RESIDENTIAL NEIGHBORHOODS

More information

Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s)

Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s) Permeable Pavers Permeable Interlocking Concrete Pavements (PICP s) CBC Title 24/ADA Compliant LEED Functional Optimum balance of surface infiltration and joint interlock Available in a 6 x 9 Quarry Stone

More information

Oregon City Clackamas County Red Soils Campus

Oregon City Clackamas County Red Soils Campus Oregon City Clackamas County Red Soils Campus Clackamas County Red Soils Campus Oregon City The Clackamas County Red Soils Campus focus area is located in the City of Oregon City. It is situated approximately

More information

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015 HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015 PROPOSED REDEVELOPMENT The project consists of demolishing

More information

1. The purpose of this report is to seek a formal response to each of the recommendations contained in the Peoples Panel Report.

1. The purpose of this report is to seek a formal response to each of the recommendations contained in the Peoples Panel Report. Committee report to Council Agenda item 5.1 Council Panel recommendations on the 10 Year Financial Plan 25 November 2014 Committee Future Melbourne (Finance) Presenter Phu Nguyen, Chief Financial Officer

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

SITE SAFETY LOGISTIC PLAN

SITE SAFETY LOGISTIC PLAN SITE SAFETY LOGISTIC PLAN SHEET #1 Title Sheet Site Safety Logistic Plan For Project name & Address as it appears on the NB permit Or as it appears in the BIS system, with Borough Also include the following;

More information

Gas Meter Clearances and Service Installation Requirements

Gas Meter Clearances and Service Installation Requirements March 2015 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE s Customer Construction Services 1-888-321-7779 or visit PSE.com/CustomerConstruction

More information

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements Presentation July 23, 2014 A. Morton Thomas and Associates, Inc. 800 King Farm Boulevard, 4 th Floor Rockville, Maryland 20850

More information

Sabino Canyon History

Sabino Canyon History History During the Great Depression of the 1930 s, the CCC (Civilian Conservation Corporation) and the WPA (Works Progress Administration) built the nine bridges that crossed Sabino Creek. They originally

More information

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Transportation & Mobility projects that meet the following criteria: enhances regional mobility; supports public transit;

More information

BIKE AND PEDESTRIAN CRASH SURVERY

BIKE AND PEDESTRIAN CRASH SURVERY This survey includes questions regarding biking activity, accidents, and injuries, as well as the answer options provided by the Nashville MPO. Introduction 1. Have you ridden a bicycle within the past

More information

CENTRAL BUSINESS DISTRICT STREETSCAPE AND IMPROVEMENT GUIDELINES

CENTRAL BUSINESS DISTRICT STREETSCAPE AND IMPROVEMENT GUIDELINES CENTRAL BUSINESS DISTRICT STREETSCAPE AND IMPROVEMENT GUIDELINES I. INTRODUCTION In May 1990, the Town Council accepted a report from the Commercial Plan Committee that included a recommendation to develop

More information

TABLE OF CONTENTS. Section / Article Page

TABLE OF CONTENTS. Section / Article Page TABLE OF CONTENTS Section / Article Page 1. INTRODUCTION 1.1 Purpose................ 6 1.2 Definitions................ 6 1.3 Guidelines and References............ 7 2. AGREEMENTS 2.1 Applicant and Contractor

More information

Parking consultants provide professional

Parking consultants provide professional The Benefits of Hiring a Parking Consultant: Part I By Gary Cudney, P.E. What are the benefits of hiring a parking consultant? This article answers this question. But first, we should consider the question,

More information

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are

More information

28.0 Development Permit Area #2 (Neighbourhood District)

28.0 Development Permit Area #2 (Neighbourhood District) 28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character

More information

DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008

DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008 DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008 INTRODUCTION The Department of Transport s Business Plan for the 2007/08 financial year stated the following: Government Aim: Quality Environment

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS Engineering Design Services for the Preliminary (Design) Engineering 1. Imlay City Road Imlay City Road at Wilder Road (signal modernization), Lapeer Township 2. Imlay City Road Imlay

More information