1 The Corporation of the TOWN OF MILTON Report to: From: Mayor G. A. Krantz & Members of Council M. Paul Cripps, P. Eng., Director, Engineering Services Date: November 11, 2013 Report No. ENG Subject: Highway 401 Structural Rehabilitations RECOMMENDATION: THAT Staff Report ENG regarding the Ministry of Transportation s plans for the rehabilitation and replacement of structures crossing the 401 corridor in the Town of Milton be received; EXECUTIVE SUMMARY AND THAT the Ministry of Transportation be requested to work closely with Town and Regional staff to minimize the local traffic impacts associated with the implementation of their proposed plan. On October 22, 2013, Town staff attended a meeting with MTO representatives and their consulting team regarding the Ministry s plans for the rehabilitation and/or replacement of 13 structures that cross the 401 corridor within Halton (west of Trafalgar Road to the Halton Boundary). The project is tentatively scheduled to start in 2014 and would last approximately three years. ENG lays out the high level details associated with the project for Council s information. REPORT Background The MTO has undertaken structural surveys and life cycle cost analyses of 13 structures that either cross over or under the 401 within the Region of Halton. A list of the locations is identified below. In conjunction with the structural reviews, the MTO has also considered the future plans for widening the highway to develop a multi-year plan to address structural deficiencies and maintenance. The 13 locations (west to east) are (see Appendix 1):
2 The Corporation of the TOWN OF MILTON Report No.ENG Page No. 2 First Line Underpass CPR Overpass Campbell Ave. East Overpass Sixteen Mile Creek Bridge Appleby Line Overpass Tremaine Road Underpass Regional Road 25 Underpass CNR Overpass Steeles Avenue Underpass James Snow Parkway Underpass Fifth Line Overpass Oakville Creek West Branch Overpass Oakville Creek East Branch Overpass Discussion Upon review of the various structures, the MTO has derived three different strategies to address concerns related to the bridges: 1. Rehabilitation Addressing deck and abutment conditions along with railings as required. Replacement of these structures is not required at this time to facilitate 401 reconstruction/widening plans. 2. Replacement and widening (current project) Several of the structures are scheduled to be widened or replaced to address future widening work on the 401 corridor. 3. Replacement and widening (future project - beyond 2018) Two of the structures need to be widened and adjusted, but given the implications that work would have on the core lanes of the 401, it is more appropriate to do the work at the same time as the highway is widened. Appendix II lists all of the structures and categorizes them based on the strategies listed above. Of particular interest are several of the projects that could have a major impact in our urban area. These include the following; Tremaine Road The rehabilitation of this structure will be placed on hold pending the construction of the new Tremaine Road crossing by Halton Region. Regional Road 25 The complete replacement of this structure will be a multi-phased, multi-year project, as the existing structure is not wide enough to accept the proposed
3 The Corporation of the TOWN OF MILTON Report No.ENG Page No lane cross section for the 401, and also has to be widened for the future Regional expansion plans for Regional Road 25. Steeles Ave. and James Snow Parkway Work on these two structures will be part of the same contract and is scheduled for As part of this work, lane restrictions will be required which will impact traffic patterns. Regional and Town concerns have been expressed by staff and consideration is being given to adjusting the timing of these two projects to minimize local traffic impacts. Campbell Avenue, Appleby Line, Fifth Line These locations are scheduled for full closures during the MTO construction period. Appropriate detour routes will be established. The Campbell Avenue and Appleby Line structures will not be closed at the same time, as they will form part of the detour routes for each other. In regards to the Fifth Line structure, the MTO, Regional and Town staff are attempting to coordinate the closure with the reconstruction and underground servicing on Fifth Line (Main to Derry) scheduled for Further details of the traffic strategy and construction staging are contained in Appendix III. The MTO is currently preparing to present this information at a Public Information Centre on November 19, where the general public will be able to review the plans and make comment. Relationship to the Strategic Plan Report ENG supports Destiny Milton 2 through the goal of Well managed growth, well planned spaces Direction 2, Facilitate the safe movement of people and goods, and enhanced travel to, from and within the community. Financial Impact There are no financial impacts associated with the recommendations contained in report ENG
4 The Corporation of the TOWN OF MILTON Report No.ENG Page No. 4 Respectfully submitted, M. Paul Cripps, P. Eng. Director, Engineering Services If you have any questions on the content of this report: Paul Cripps, ext Attachments: Appendix I Study Area Appendix II Summary of Study Recommendations Appendix III Recommended Traffic Strategy and Construction Staging CAO Approval:
5 Study Area Appendix I 1. First Line Underpass 2. CPR Overpass 3. Campbell Avenue East Overpass 4. Sixteen Mile Creek Bridge 5. Appleby Line Overpass 6. Tremaine Road Underpass 7. Regional Road 25 Underpass 8. CNR Overpass 9. Steeles Avenue Underpass 10. James Snow Parkway Interchange Underpass 11. 5th Line Overpass 12. Oakville Creek West Branch Bridge 13. Oakville Creek East Branch Bridge Hwy 401 Bridge Rehabilitation, October 22, 2013 Page 2
6 Summary of Study Recommendations Appendix II Bridge Number / Name 1 First Line 2 CP Rail 3 Campbell Ave 4 Sixteen Mile Creek 5 Appleby Line 6 Tremaine Rd. 7 RR 25 8 CN Rail 9 Steeles Ave. 10 James Snow Pkwy 11 5 th Line 12 Oakville Creek W 13 Oakville Creek E Rehabilitate or Replace? Major widening to increase # of lanes (ultimate # of lanes)? Minor widening for traffic staging during construction? Rehab. Replace Replace Replace Replace Rehab (1) Replace Replace Rehab. Rehab. Replace Replace Replace (10) Refer to Halton Region ESR (10) (10) (10) (12) (12) (12) Documentation to be developed as part of this study? ESD ESD ESD ESD ESD ESR by Halton Region DCR DCR ESD ESD DCR DCR DCR Change in project classification (from B to C )? Tentative Construction Year(s) Beyond Beyond 2018 widening to accommodate recommendations of the Highway 401 Improvements from Trafalgar Road to Regional Road 25 Study existing structure can accommodate widening recommendations of the Highway 401 Improvements from Trafalgar Road to Regional Road 25 Study (1) Replacement of Tremaine Road bridge has been recommended as part of Region of Halton Class EA for a new interchange at this location which is scheduled for construction in 2016 Hwy 401 Bridge Rehabilitation, October 22, 2013 Page 13
7 Appendix III Recommended Traffic Strategy and Construction Staging The recommended strategy for accommodating traffic during construction is as follows: Maintain 6 lanes of traffic on Highway 401 during peak periods at all bridge sites; nightly lane closures will be required. Full closure of Campbell Avenue East, Appleby Line and 5 th Line (Sites 3, 5 and 11) at Hwy 401 to vehicular traffic for the duration of bridge construction. Provide single lane at First Line (Site 1) and Tremaine Road (Site 6) bridge crossings, with two way traffic movements controlled by temporary signals north and south of the bridge. Maintain existing lane configuration and north south traffic moves on Regional Road 25 (Site 7) until new structure is built. Maintain two way operation with reduced number of lanes at Steeles Avenue (Site 9) and James Snow Parkway (Site 10) bridge sites. Pedestrian / cyclist access across bridges will be maintained at all times, even where a full closure to vehicular traffic is proposed. Hwy 401 Bridge Rehabilitation, October 22, 2013 Page 9
8 Appendix III Recommended Traffic Strategy and Construction Staging First Line Underpass Provide single lane at bridge site, with two way traffic movements controlled by temporary signals Acceptable operations predicted for AM and PM peak hours; no queuing or delay expected Campbell Avenue East Overpass Full closure proposed, with formal traffic detour via Appleby Line Construction not to occur at same time as Appleby Line construction Low traffic volumes; diverted traffic can easily be accommodated via Appleby Line Appleby Line Overpass Full closure proposed, with formal traffic detour via Campbell Avenue East Construction not to occur at same time as Campbell Avenue East construction Low traffic volumes; diverted traffic can easily be accommodated via Campbell Avenue East Tremaine Road Provide single lane at bridge site, with two way traffic movements controlled by temporary signals Acceptable operations predicted for AM and PM peak hours; no significant queuing or delay expected Regional Road 25 North-south traffic will remain on the existing structure until the new structure is built Operates comparably to existing conditions as existing lane configurations maintained Hwy 401 Bridge Rehabilitation, October 22, 2013 Page 10
9 Appendix III Recommended Traffic Strategy and Construction Staging Steeles Avenue Underpass One northbound lane and one southbound lane will be maintained during construction Acceptable operations predicted for AM peak; significant queuing and delay predicted for PM peak James Snow Parkway Underpass One northbound lane and two southbound lanes will be maintained during construction Operates comparably to existing conditions as two SB lanes maintained 5th Line Overpass Full closure proposed, with formal traffic detour via 6th Line Low traffic volumes; diverted traffic can easily be accommodated via 6th Line Hwy 401 Bridge Rehabilitation, October 22, 2013 Page 11
The Corporation of the TOWN OF MILTON
The Corporation of the TOWN OF MILTON Report to: From: Mayor G.A. Krantz & Members of Council M.Paul Cripps, P.Eng., Director, Engineering Services Date: November 11, 2013 Report No. ENG-040-13 Subject:
More informationThe Corporation of the TOWN OF MILTON
Report to: From: Chair & Members of the Community Services Standing Committee M. Paul Cripps, P.Eng., Director, Engineering Services Date: November 12, 2012 Report No. ENG-028-12 Subject: Reserved Bus
More information5 ALTERNATIVE SOLUTIONS AND EVALUATION
Page 23 5 ALTERNATIVE SOLUTIONS AND EVALUATION The process used for the assessment and evaluation of the alternatives follows the procedures of the Municipal Class EA, as described below: Identify a reasonable
More informationThe Corporation of the TOWN OF MILTON
Report to: From: Mayor G. A. Krantz and Members of Council M. Paul Cripps, P. Eng., Director, Engineering Services Date: July 11, 2006 Report No. ENG-030-06 Subject: Rural Parking Prohibitions - Conservation
More informationNashville Area MPO Regional Freight Study fast action projects
Project #1 Beechcroft road (sr 247) at csx crossing Motor carrier survey location Maury County (Spring Hill, Tn) / City of Spring Hill Current at-grade railway crossing causes traffic delays as a result
More informationWelcome! Purpose of Tonight s Meeting. Informational Open House to discuss two City projects: Goal is to LISTEN TO YOU
Purpose of Tonight s Meeting Informational Open House to discuss two City projects: Fairchild Street Subway Phase I Engineering: Immediate need to replace subway Bowman Avenue Feasibility Study Future
More informationPhases 2 & 3, & Addendum Urban Structure Plan Options for West Whitby
7. 5 A d v a n t a g e s a n d D i s a d v a n t a g e s Table 22 summarizes the advantages and disadvantages of each option based on the evaluation of Table 16. Dillon Consulting Limited Page 75 Table
More information3 Tappan Zee Bridge Rehabilitation Options
3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:
More informationSection ALTERNATIVES. 3. Alternatives
Section 3 ALTERNATIVES 3. Alternatives 3.0 Alternatives The Springfield Rail Improvements Project Build Alternatives would utilize different routes. The No Build Alternative includes the continuation of
More informationWhy build the Silvertown Tunnel?
Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary
More informationTransportation Management Plan Template
DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County
More informationRailway Crossing Information System
Railway Crossing Information System ITS Canada Presentation June 2, 2014 Ian Steele, P.Eng Agenda Click to edit Master title style RBRC Program Project Background Concept of Operations Design Process Design
More informationSection 6 Traffic Analysis
Section 6 Traffic Analysis Traffic Operations of the Preferred Network Alternative After the Preferred Network was identified and confirmed by local policy makers and area residents, detailed traffic analysis
More informationWilmington to Newark Commuter Rail Improvement Project
Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion
More informationWORK ZONE SAFETY & MOBILITY GUIDANCE DOCUMENT
WORK ZONE SAFETY & MOBILITY GUIDANCE DOCUMENT August 2007 Prepared by: Vermont Agency of Transportation The following document was drafted in response to updates made to the work zone regulations at 23
More information8+ %!0"% 8+1!%"'$%,$"$
8+ 8+ %!0"% The next step in developing recommendations for improvements to Grand Avenue was to identify, develop and evaluate alternatives to address the issues and needs identified in the previous chapter.
More informationMajor Improvement Schemes in Basingstoke
Major Improvement Schemes in Basingstoke 1. Welcome Welcome to this exhibition, which provides information about the planned highway improvements being delivered in Basingstoke from 2015 2018. A30 Winchester
More informationAPPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must
More informationRoadway Cost Per Centerline Mile Revised June 2014
Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743
More informationProject Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -
Project Information Existing Conditions Cracked and settled pavement. Structural failure within the asphalt pavement section. Anticipated Project Elements Reconstruction of all asphalt pavement on US Route
More informationAppendix D. Public Information Centre Summary Report
Appendix D Public Information Centre Summary Report HIGHWAY 417 EXPANSION, OPERATIONAL IMPROVEMENTS AND INFRASTRUCTURE REHABILITATION From Nicholas Street to Ottawa Road 174 Detail Design G.W.P. 4091 07
More information3. FORECASTING TRAVEL DEMAND IN THE CORRIDOR
3. FORECASTING TRAVEL DEMAND IN THE CORRIDOR Travel demand forecasting was undertaken to assess future travel demands and to identify existing and future system congestion within the Study Area. A key
More informationAlternatives Evaluation Overview
Alternatives Evaluation Overview 124 Alternatives were analyzed against the evaluation criteria Criteria and criteria weighting were set by the Community Task Force Ratings were quantitative and qualitative
More informationBoston University Bridge Rehabilitation Project. June 30, 2009 6:30-8 p.m. Boston University Photonics Center
Boston University Bridge Rehabilitation Project June 30, 2009 6:30-8 p.m. Boston University Photonics Center Commonwealth of Massachusetts Governor Deval L. Patrick Lieutenant Governor Timothy Murray Energy
More informationFederal Funds Obligated in Chittenden County Federal Fiscal Year 2000
Federal Funds Obligated in Chittenden County Federal Fiscal Year 2000 CCMPO ID# Burlington IN001 Burlington Transit Center - Downtown Intermodal $1,196,128 $1,196,128 / / HC001E Champlain Parkway - Engineering
More informationAlternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011
Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for
More informationCITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile
More informationMaryland Invests $845 Million in New Highway and Bridge Projects
Maryland Invests $845 Million in New Highway and Bridge Projects Completing Widening of MD 404 Talbot And Caroline Counties Top Regional Priority Queen Anne s, Talbot, and Caroline Counties Widening MD
More informationLawson Outline Plan External Traffic Analysis Working Paper
Total Lawson Development ACTPLA 16 January 2009 Document No.: Prepared for ACTPLA Prepared by Maunsell Australia Pty Ltd Level 2, 60 Marcus Clarke Street, Canberra ACT 2600, Australia T +61 2 6201 3000
More informationARIZONA-SONORA BORDER MASTER PLAN
Introduction Travel between the State of Arizona in the United States and the State of Sonora in Mexico at the international border has increased over the last ten years. There are nine specific land ports
More informationM8 M73 M74 Motorway Improvements Project
M8 M73 M74 Motorway Improvements Project October 2013 Introduction This major transport infrastructure project will complete and upgrade the M8 and key sections of the M73 and M74 to finalise the motorway
More informationSix Points Interchange Reconfiguration Class Environmental Assessment Study
STAFF REPORT ACTION REQUIRED Six Points Interchange Reconfiguration Class Environmental Assessment Study Date: November 12, 2007 To: From: Wards: Reference Number: Planning and Growth Management Committee
More informationCaledon Transportation Needs Study. Study Report
Caledon Transportation Needs Study Study Report March 2009 PROJECT SUMMARY PROJECT NAME:...CALEDON TRANSPORTATION NEEDS STUDY UPDATE CLIENT:... THE TOWN OF CALEDON & THE REGIONAL MUNICIPALITY OF PEEL CALEDON
More informationAppendix J Transportation Management Plan Report. Traffic Operational Analysis Report
Appendix J Transportation Management Plan Report Traffic Operational Analysis Report Transportation Management Plan Report VIRGINIA AVENUE TUNNEL RECONSTRUCTION PROJECT WASHINGTON, DC PRELIMINARY TRANSPORTATION
More informationInformational Workshop Public Meeting Kanawha Falls Bridge Project
Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal
More informationStone Way N Rechannelization: Before and After Study. N 34th Street to N 50th Street
City of Seattle Department of Transportation Stone Way N Rechannelization: Before and After Study N 34th Street to N 50th Street May, 2010 INTRODUCTION Population density in Seattle is increasing within
More informationIH-635 MANAGED LANES PROJECT, SEG. 3.2
IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,
More information3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
More informationBruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road)
Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road) Industry Briefing - 13 February 2013 Bruce Highway Upgrade (Cooroy to Curra) The Bruce Highway Upgrade (Cooroy to
More informationMulti-Modal Corridor Degree of Complexity: High Cost/Benefit: High
Multi-Modal Corridor Degree of Complexity: Cost/Benefit: Maintain the same level of service for Ensures continuous flow through the Might impact other transportation Consider road diet and/or different
More informationMoving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements
Moving Ruston Forward City of Ruston Infrastructure Maintenance and Improvements MLK Extension Project will be done in conjunction with proposed water and sewer improvements Connect Martin Luther King
More informationGTA Cordon Count Program
Transportation Trends 2001-2011 Executive Summary Project No. TR12 0722 September 2013 1.0 Introduction The Cordon Count program was established to collect traffic data as a tool for measuring travel trends
More information1. RECOMMENDATIONS. It is recommended that:
Clause No. 7 in Report No. 3 of was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on February 20, 2014. (Mayor Hackson declared an interest in this
More informationAPPENDIX J TRAFFIC STUDY
APPENDIX J TRAFFIC STUDY May 7, 2014 Ms. Leianne Humble Denise Duffy and Associates, Inc. 947 Cass Street, Suite 5 Monterey, CA 93940 Re: Traffic Study for the Heritage Oaks Memorial Park in San Jose,
More informationChapter 13: Implementation Plan
Chapter 13: 13.1. INTRODUCTION The purpose of the implementation chapter of the Comprehensive Plan is to set forth the actions that the City will take to ensure that the plans, programs and policies set
More informationFor more information, visit: rethinkingstreets.com
For more information, visit: rethinkingstreets.com 37 Arterial Rehab Busy, multi-lane streets, often referred to as arterials, crisscross the landscape of our cities and suburbs. Alongside these wide thoroughfares,
More informationTRANSPORTATION MANAGEMENT PLAN
TRANSPORTATION MANAGEMENT PLAN EMPIRE/BURBANK AND RAILROAD TRACKS PROJECT 07-LA-05 PM 29.4/31.6 State of California Department of Transportation District 7 Contract Number: EA 1218w1 Prepared by: Daisy
More informationStouffville Corridor Rail Service Expansion
Stouffville Corridor Rail Service Expansion Stouffville Corridor Rail Service Expansion Class Environmental Assessment Study WELCOME PUBLIC INFORMATION CENTRE #2 Tuesday January 28, 2014 Agincourt Recreation
More informationMayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City
Mayors Welcome Strong Surrey Votes Yes Coalition Support Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City February 11, 2015 Vancouver, BC The Mayors Council on Regional Transportation
More informationBelmont Street Bridge Rehabilitation Project
Belmont Street Bridge Rehabilitation Project Christian Gospel Church Worcester 43 Belmont Street Worcester MA February 20, 2015 7:00PM Agenda Introductions Project site and overview Project history Construction
More informationGranger Bay Boulevard and Green Point Roundabout
Granger Bay Boulevard and Green Point Roundabout INTRODUCTION Aurecon was appointed for the design and construction supervision of the Granger Bay Boulevard and Green Point roundabout that provides access
More informationDoing a little can accomplish a lot. Proposed Change of Municipal Class Environmental Assessment from Schedule from B to A+
Doing a little can accomplish a lot. Proposed Change of Municipal Class Environmental Assessment from Schedule from B to A+ Erin Mills Parkway Intersections at Dundas Street and Burnhamthorpe Road Index
More informationI-25 / Rio Bravo Interchange
I-25 / Rio Bravo Interchange TONIGHT S MEETING SCHEDULE OPEN HOUSE 6:00 PM TO 6:30 PM PRESENTATION BEGINS AT 6:30 PM Q & A FOLLOWING PRESENTATION CN A300280 / PNA300280 I-25 / Rio Bravo Interchange SECOND
More information9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015
9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,
More informationCULVER LINE REHABILITATION PRESENTATION TO COMMUNITY BOARD 6 TRANSPORTATION COMMITTEE NOVEMBER 15, 2007
CULVER LINE REHABILITATION PRESENTATION TO COMMUNITY BOARD 6 TRANSPORTATION COMMITTEE NOVEMBER 15, 2007 Culver Line Background Line opened in 1933 Viaduct located between Carroll St. Station and 4 th Av
More informationAlternatives Design Report. Draft
Draft 3/4/2014 TABLE OF CONTENTS I Introduction... 1 A. HISTORY... 1 B. PROJECT BACKGROUND... 1 II. ALTERNATIVES DEVELOPMENT... 8 A. ALTERNATE 1 NO BUILD... 8 B. ALTERNATE 2 IMPROVE ROADWAY ON EXISTING
More informationRegional Municipality of Halton: Economic Development Strategy 2011-2021. Discussion Paper #3. Business Growth: Investment Attraction and Retention
Regional Municipality of Halton: Economic Development Strategy 2011-2021 Discussion Paper #3 Business Growth: Investment Attraction and Retention PREFACE This series of Discussion Papers was produced for
More informationMedian Bus Lane Design in Vancouver, BC: The #98 B-Line
Li 1 Median Bus Lane Design in Vancouver, BC: The #98 B-Line Simon Li, P.Eng. PTOE Acting Program Manager, Road and Bridge Projects TransLink (Greater Vancouver Transportation Authority) 1600 4720 Kingsway
More information4 SPADINA SUBWAY EXTENSION UPDATE
4 SPADINA SUBWAY EXTENSION UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the adoption of the recommendations contained in the following report June 13, 2006, from the
More informationAGENCY COORDINATION AND PUBLIC INVOLVEMENT
5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included
More informationINDOT 2000-2025 Long Range Plan
Chapter 9 INDOT 2000-2025 Long Range Plan Highway Needs Analysis Overview The statewide transportation planning process provides for the identification of highway needs through a comprehensive process
More informationEffect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain
Effect on structures Uniform settlement - no concerns Angular distortion - causes damage due to tensile strain 1/500 - safe limit for no cracking of buildings 1/150 - potential structural damage 36 37
More informationPERFORMANCE REPORT Quarter 2 2014/15
PERFORMANCE REPORT Quarter 2 2014/15 CONTENTS 1. RELIABILITY... 3 2. NETWORK DISRUPTION... 9 3. TRAFFIC VOLUMES... 15 4. TRAFFIC SPEEDS... 17 5. ROAD SAFETY... 18 6. ASSET AVAILABILITY... 19 7. STATE OF
More information11 p.m. to. Tuesday, June. will remain open. 14. closed
June 3, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 marcia.mcallister@dullesmetro.com Important Lane Closures June 5 11 Include Northbound Beltway Lanes, Eastbound Dulles Airport Access
More informationAIR QUALITY TECHNICAL MEMORANDUM
AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM GOLDEN GLADES INTERCHANGE PD&E STUDY Miami-Dade County, Florida Financial Management Number: 428358-1-22-01 Efficient Transportation Decision
More information1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):
Transportation Assessment and Management Study Guidelines for Consultants INTRODUCTION This document is intended to provide guidelines for transportation consultants who produce Transportation reports
More informationSEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS
UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line
More information7 th Street SW Cycle Track: Calgary s First Centre City Cycle Track
7 th Street SW Cycle Track: Calgary s First Centre City Cycle Track Nominated for: The City of Calgary Category: Sustainable Urban Transportation Award Contact: Surendra Mishra, P. Eng., Traffic Engineer,
More informationTERMINAL 91 2011 TRAFFIC MONITORING STUDY
DRAFT TERMINAL 91 2011 TRAFFIC MONITORING STUDY Prepared for: Port of Seattle Prepared by: 6544 NE 61st Street, Seattle, WA 98115 ph: (206) 523-3939 fx: (206) 523-4949 NOVEMBER 4, 2011 TABLE OF CONTENTS
More informationPublic Information & Public Scoping Meeting
Public Information & Public Scoping Meeting William F. Cribari Memorial Bridge Route 136 over the Saugatuck River Review of Rehabilitation Study Report Public Scoping for the gathering and analysis of
More informationBY-LAW NUMBER 284-94
BY-LAW NUMBER 284-94 A by-law to consolidate the by-laws that regulate traffic on roads under the jurisdiction of The Corporation of the City of Vaughan, and to repeal By-laws Numbered 281-90, 54-83, 299-86,
More informationRoute Optimisation / Traffic Signals Efficiency
Route Optimisation / Traffic Signals Efficiency Glossary Auckland Council Advanced Real-time Traffic Information System Auckland Transport Closed Circuit Television (Traffic cameras) Full Time Equivalent
More information2015 Update TRANSPORTATION PROJECTS
2015 Update TRANSPORTATION PROJECTS September 30, 2015 This document provides the status of the transportation work that is complete or on-going this year. A one-page summary of each project is enclosed
More informationMID-HUDSON SOUTH TRANSPORTATION COORDINATING COMMITTEE APRIL 6, 2011. TIP Public Review Meeting
MID-HUDSON SOUTH TRANSPORTATION COORDINATING COMMITTEE APRIL 6, 2011 TIP Public Review Meeting Meeting Agenda New York Metropolitan Transportation Council Major Products Transportation Improvement Program
More informationPurple Line Implementation Advisory Group Business Continuity During Construction July 30, 2014
Purple Line Implementation Advisory Group Business Continuity During Construction July 30, 2014 Economic Empowerment Program Scope of Work Providing advocacy for small and disadvantaged business capacity,
More informationTraffic Management During Construction
Traffic Management During Construction The construction of Dublin Port Tunnel couldn t begin until a traffic management plan had been developed and agreed to facilitate construction of the Tunnel and to
More informationTechnical note. 1. Background. 2. Document Purpose. Project: A350 Chippenham Dualling
Project: A350 Chippenham Dualling Subject: Benefits Realisation Plan & Monitoring and Evaluation Plan Date: 14 February 2013 1. Background Restrictions to the capacity of the A350 to the north of Chippenham
More informationAPPENDIX A FIVE YEAR GROUND TRANSPORT PLAN
A APPENDIX A APPENDIX A FIVE YEAR GROUND TRANSPORT PLAN 1.0 Airports Act 1996 S71(2)(ga) requirements This appendix provides details of the five year ground transport plan that is summarised in Chapter
More informationRed Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013
Red Wing Bridge Project PAC #5/TAC #8 Meeting July 18, 2013 Alternatives Analysis Agenda Overview of Past Progress Progress Since April PAC Bridge 9103 Rehabilitation Study Bridge 9040 Rehab vs. Replacement
More informationTMP reference: Contractor: Principal (Client): RCA:
TRAFFIC MANAGEMENT PLAN (TMP) FULL FORM Use this form for complex activities. Refer to the NZ Transport Agency s Traffic control devices manual, part 8 Code of practice for temporary traffic management
More informationDesign and Implementation of Slot Left-Turn Lanes on the Manitoba Highway Network
Design and Implementation of Slot Left-Turn Lanes on the Manitoba Highway Network Brent Hartmann, P. Eng., Project Design Engineer, Manitoba Infrastructure and Transportation Derek Durant, P. Eng., Senior
More informationSector Design Concepts
Section C Sector Design Concepts C7 Sector 7 Great North Road Underpass 6 6 6 C7. Existing situation Sector 7 refers to the cut and cover section of the project linking the northern end of the deep tunnels
More informationJurisdictional Scan of Traffic Management during Incidents on Bridges
Jurisdictional Scan of Traffic Management during Incidents on Bridges Discussion Paper Engineering Branch BC Ministry of Transportation and Infrastructure September 2008 1.0 Purpose Unplanned closures
More informationLEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS
For discussion on 2 April 2001 LC Paper No. CB(1)907/00-01(03) LEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS PWP Item No. 277CL Tseung Kwan O development, phase II, Remaining engineering works
More informationINFRASTRUCTURE POLICIES
PART 7 INFRASTRUCTURE POLICIES 7.1 INTRODUCTION This Section sets out policies related to the development of services and utilities which are essential to the proper functioning and well being of the municipality.
More informationSAFETEA-LU TECHNICAL CORRECTIONS BILL SUMMARY
SAFETEA-LU TECHNICAL CORRECTIONS BILL SUMMARY Draft 7/2/08 The SAFETEA-LU Technical Corrections Bill (HR 1195) was enacted on June 6, 2008 (P.L. 110-244). The Bill can be found at: http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=110_cong_bills&docid=f:h1195enr.txt.pdf
More informationThe Mersey Gateway Project
The Mersey Gateway Project The Mersey Gateway Project is a major scheme to build a new six-lane toll bridge over the River Mersey in the north west of England. It will link the towns of Runcorn and Widnes
More informationRoadway Congestion 139,600 135,300 134,700 NA 4,300 4,900. Table 7-2 Transportation Criteria - Roadway Congestion (2035)
7 Transportation Criteria 7.1 Introduction A goal of this project is to improve mobility in the corridor. To that end, all the major Project alternatives identified at this point in the study include significant
More informationTRANSPORTATION MODELLING IN CALGARY
TRANSPORTATION MODELLING IN CALGARY Why Do We Use Transportation Models? There are three approaches that can be used for proceeding to develop a transportation system for Calgary s future. One approach
More information21101 &?I I2 P 3: 2 I. kz COZY c:oi*;: iiss:en. DOCEET COEi1 f3.x..
I l1111111 I AI Il1 l1ul I 111l Il 1111 0000072925 Sta m RR-026358-07-0222 j7 i O lo: THE COMMISSION From: Safety Division Date: June 12,2007 21101 &?I I2 P 3: 2 I kz COZY c:oi*;: iiss:en DOCEET COEi1
More informationMajor and Minor Schemes
1 Major and Minor Schemes Peterborough City Council has identified a number of proposals for major transport schemes over the next five year period that will support the planned housing and employment
More informationCHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND)
Regional Transportation Plan 2035 28 CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND) The Cache Transportation Vision Plan shows roadway, bicycle, transit and pedestrian projects that attempt
More informationQ. What do you think the most important transportation issues are in this area with regard to east-west travel?
The following are the comments received in a survey of homeowner and neighborhood representatives conducted prior to the three Open Houses on August 2nd and 3rd, 2000. The opinions are presented as part
More informationSouth Greeley Highway Corridor: Main Street of South Cheyenne
South Greeley Highway Corridor: Main Street of South Cheyenne South Cheyenne Community Development Association Adopted by the Laramie County Board of Commissioners, June 18, 2013 The South Cheyenne Community
More informationREHABILITATION PACKAGE 1-a
1-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 1-a Rehab option 1-a is a rehabilitation package whereby all spans of the existing structure would be rehabilitated to the degree feasible and strengthened
More informationTRANSPORTATION MANAGEMENT PLAN NOTES
1//214 d152969a.dgn 4:54:45 PM MANAGER Brian Morrison TRANSPORTATION MANAGEMENT PLAN NOTES 9a Project Description This projects entails preventive maintenance repairs for I-395 Ramp AA & Ramp AD Bridge
More informationH-GAC 2015 Call for Projects - Selected Projects
APPROVED PROJECTS AND REGIONAL PROGRAMS N/A H-GAC Regional Freeway Incident Management N/A $8,000 Current TIP Surveillance and active response on all limited-access freeways. Includes Towing (e.g. SafeClear),
More informationMassDOT s Work Zone Transportation Management Procedures. By: Neil Boudreau, MassDOT and Michael Sutton, P.E., VHB
MassDOT s Work Zone Transportation Management Procedures By: Neil Boudreau, MassDOT and Michael Sutton, P.E., VHB What is the Work Zone Safety and Mobility Rule? 23 CFR 630 Subpart J, effective October
More informationAdvantages and Disadvantages of One Way Streets October 30, 2007
Advantages and Disadvantages of One Way Streets October 30, 2007 0 P age Background As the revitalization of the Central Waterfront area moves forward, one issue that might need closer analysis is the
More informationDraft Transportation Management Plan for Via Verdi Repair Project
for Via Verdi Repair Project prepared for City of Richmond This report was prepared by: This report was reviewed by: Ryan McClain, P.E. Fehr & Peers TABLE OF CONTENTS 1.0 INTRODUCTION & PROJECT DESCRIPTION...
More information