POSI-JOIST STANDARD DETAILS VERSION 2, 25/11/02.

Size: px
Start display at page:

Download "POSI-JOIST STANDARD DETAILS VERSION 2, 25/11/02."

Transcription

1 POSIJOIST STANDARD DETAILS VERSION 2, 25/11/02.

2 PSD27 Service Void Posiweb over bearing by min 15mm 100mm Mineral wool insulation quilt 23kg/m2. Floor Comprising: 22mm T & G Chipboard on 19mm Plasterboard Plank on 47x75mm Resilient floor batten at 600mm centres on 18mm T & G Chipboard. All T & G edges glued. 200 approx Mineral wool cavity barrier. First PosiJoist beam set back from wall by approx 200mm PosiJoists Parallel to wall. 47x 89 Continuous Pack Plasterboard noggins SERVICE VOID Ring Beams in solid timber or LVL. Ceiling (not shown) comprising: 2 Layers 15mm Gyproc Fireline Board on 16mm resilient bars at 400mm centres. First layer fixed with 38mm Gyproc screws at 230mm centres. Second layer fixed with 60mm Gyproc screws at 230mm centres. Staggered with first layer screws. Lay Firleline board in echelon pattern with staggered joints. 2 no 30 x 200mm GMS Straps at 1200mm centres. Bead of sealent applied to floor deck prior to fixing 19mm plasterboard plank. 47x 89 Packs between joists. PosiJoists Bearing on wall. CONTENTS PSD01 PosiJoist to girder. PSD02 Bottom chord fixing (with noggins). PSD03 Bottom chord fixing (with continuous estraint). PSD04 Top chord fixing to timber frame. PSD05 Masonry hanger (with noggins). PSD06 Masonry hanger ( with continuous ledger). PSD07 Bottom chord built into masonry. PSD08 Top chord built into masonry. PSD09 Continuous joist through masonry. PSD10 Top chord fixing to steel. PSD11 Internal bearing. PSD12 Partitions parallel to floor. PSD13 Partitions above and parallel to floor. PSD14 Maximum duct sizes. PSD15 Edge closure. PSD16 Staircase opening 1. PSD17 Staircase opening 2. PSD18 Narrow opening 1. PSD19 Narrow opening 2. PSD20 Strongback 1. PSD21 Strongback 2. PSD22 Strongback bridging. PSD23 Strongback splice. PSD24 Horizontal restraint fixed to strongback. PSD25 Horizontal restraint. PSD26 Timber frame compartment wall/party wall. PSD27 Timber frame compartment wall/party wall (with service void). TYPICAL TIMBER FRAME COMPARTMENT FLOOR / PARTY WALL DETAIL WITH SERVICE VOID

3 PSD01 100mm Mineral wool insulation quilt 23kg/m2. Posiweb over bearing by min 15mm PSD26 Simpson L70 angles or similar as specified by design Mineral wool cavity barrier. Floating Floor Comprising: 18mm T & G Chipboard on 19mm Plasterboard Plank on 25mm Fibreglass Slab on 18mm T & G Chipboard. All T & G edges glued, and 19mm plank bonded to chipboard with dabs of Gyproc sealant at 300mm centres. Joints between chipboard and plasterboard to be staggered and board direction reversed. 2 no 30 x 200mm GMS Straps at 1200mm centres. Bead of sealent applied to floor deck prior to fixing 19mm plasterboard plank. 47x 89 Continuous Pack Simpson LBV or Cullen OWF/ OWT hangers. 47x 89 Packs between joists. Bottom member of posi to be notched over bottom flange of hanger POSIJOIST TO GIRDER DETAIL 200 approx First PosiJoist beam set back from wall by approx 200mm PosiJoists Parallel to wall. Plasterboard noggins Ring Beams in solid timber or LVL. Ceiling (not shown) comprising: 2 Layers 15mm Gyproc Fireline Board on 16mm resilient bars at 400mm centres. First layer fixed with 38mm Gyproc screws at 230mm centres. Second layer fixed with 60mm Gyproc screws at 230mm centres. Staggered with first layer screws. Lay Firleline board in echelon pattern with staggered joints. PosiJoists Bearing on wall. TYPICAL TIMBER FRAME COMPARTMENT FLOOR / PARTY WALL DETAIL

4 PSD25 PSD02 35 x 97 C16 twice nailed to brace using 3.1 x 75mm long galvanised wire nails 47x72 top chord restraint fixed between beams Strap fixed with a minimum of four fixings of which at least one is to be over the third joist. Head binder HORIZONTAL RESTRAINT STRAP DETAIL BOTTOM CHORD FIXING TO TIMBER FRAME (with restraint noggins)

5 PSD03 PSD24 Continuous 47x72 top chord restraint fixed over ribbon block. Twice nailed to brace using 3.1 x 75mm long galvanised wire nails Strap fixed with a minimum of four fixings of which at least one is to be over the third joist. Head binder BOTTOM CHORD FIXING TO TIMBER FRAME (with continuous restraint) HORIZONTAL RESTRAINT STRAP FIXED TO STRONGBACK

6 PSD23 PSD04 38x75 (min) blocks twice nailed to top and bottom members and twice nailed to brace using 3.1 x 75mm long galvanised wire nails Posiweb over bearing by min 15 mm 47x89 Packing piece 35 x D x 1200mm long splice fixed with 10 no 3.1 x 75mm galvanised wire nails each side of splice, nailed through and clenched over on far side 35 x D strongback, see table for depths. Ring beam (size to suit) Max 6mm gap WEB SIZE PS8, PS9 & PS10 PS210, PS14 & PS16 STRONGBACK DEPTH STRONGBACK SPLICE 40x47 Continuous plasterboard noggin TOP CHORD FIXING TO TIMBER FRAME

7 PSD05 PSD22 47x72 top chord restraint fixed between beams Twice nailed to brace using 3.1 x 75mm long galvanised wire nails Position strongbacks tight to underside of top chord. Minimum bearing determined by design (choose correct hanger for load, bearing width and courswork level of hanger bearing flange) MASONRY HANGER DETAIL STRONGBACK BRIDGING (webs with built in verticals)

8 PSD21 PSD06 Continuous 47x72 ledger fixed over ribbon block. Twice nailed to brace using 3.1 x 75mm long galvanised wire nails Position strongbacks tight to underside of top chord. Minimum bearing determined by design (choose correct hanger for load, bearing width and courswork level of hanger bearing flange) INSERT STRONGBACK THROUGH JOISTS BEFORE FIXING JOISTS. IT CANNOT BE INSTALLED AFTER JOISTS HAVE BEEN FIXED. STRONGBACK DETAIL (webs with built in verticals) Fix at a maximum of 4.0 metre centres. MASONRY HANGER DETAIL (continuous ledger)

9 PSD07 PSD20 Blockwork to continue between beams to provide restraint 38x75 (min) blocks twice nailed to top and bottom members and twice nailed to brace using 3.1 x 75mm long galvanised wire nails Position strongbacks tight to the underside of top chord. 35mm x D strongback, see table for depth (DTLR Robust Detail For Thermal Bridging should be observed) WEB SIZE PS8, PS9 & PS10 PS210, PS14 & PS16 STRONGBACK DEPTH INSERT STRONGBACK THROUGH JOISTS BEFORE FIXING JOISTS. IT CANNOT BE INSTALLED AFTER JOISTS HAVE BEEN FIXED. BOTTOM CHORD BUILT INTO MASONRY STRONGBACK DETAIL Fix at a maximum of 4.0 metre centres.

10 PSD19 PSD08 Continuous 47x72 ledger fixed to wall. Simpson L70 angles or similar as specified by design Beam (depth to suit) slotted through girders Packing piece to pick up ceiling Max 6mm gap (DTLR Robust Detail For Thermal Bridging should be observed) NARROW OPENING TOP CHORD BUILT INTO MASONRY

11 PSD09 PSD18 Solid timber block with grain parallel to span Simpson L70 angles or similar as specified by design Simpson LBV or Cullen OWF / OWT hangers (DTLR Robust Detail For Thermal Bridging should be observed) Trimmer to be notched over bottom flange of hanger CONTINUOUS JOIST THROUGH MASONRY NARROW OPENING

12 PSD17 Posiweb over bearing by 15mm min Posiweb over bearing by 15mm min. PSD10 Simpson L70 angles or similar as specified by design Simpson LBV or Cullen OWF / OWT hangers 47x89 Noggins between top chords Timber plate fixed to top of steel Solid timber or LVL trimmer depth to suit Trimmer to be notched over bottom flange of hanger Max 6mm gap Timber pack fixed to beam (size to suit) STAIRCASE OPENING TOP CHORD FIXING TO STEEL

13 PSD11 PSD16 Simpson L70 angles or similar as specified by design Simpson LBV or Cullen OWF / OWT hangers Bottom member of posi to be notched over bottom flange of hanger INTERNAL BEARING STAIRCASE OPENING

14 PSD15 PSD12 35mm Prefabricated edge closure Prefaced with plywood with 20mm lap at the top edge. Wall panel skew nailed through onto noggin with a min of 2 no 3.35 dia galvanised wire nails, length to suit. Noggin nailed down onto wall panel as above. 50 min Simpson Z35N clips. Edge closure to be supplied to site 4.8m long and cut on site as required. EDGE CLOSURE DETAIL 38x89 C16 (min) noggins at max 600mm centres NONLOADBEARING PARTITIONS PARALLEL TO FLOOR BEAMS.

15 PSD13 PSD14 Purpose made noggins at max 600mm centers. Wall panels skew nailed through onto noggins with a min of 2 no 3.35 dia galvanised wire nails, length to suit. W POSI STRUT SIZE PS8 PS9 PS10 PS210 PS14 PS16 W CIRCLE DIA RECTANGLE DEPTH SQUARE RECTANGLE WIDTH NONLOADBEARING PARTITIONS ABOVE AND PARALLEL TO FLOOR BEAMS. INSERT LARGE SERVICES THROUGH JOISTS BEFORE FIXING JOISTS. IT MAY NOT BE POSSIBLE AFTER JOISTS HAVE BEEN FIXED. MAXIMUM DUCT SIZES

Good Craftsmanship Guide. Carpentry and Joinery- Carcassing

Good Craftsmanship Guide. Carpentry and Joinery- Carcassing Good Craftsmanship Guide Carpentry and Joinery- Carcassing Introduction This Good Craftsmanship Guide highlights key problems with the major elements of Carpentry and Joinery - Carcassing, and gives guidance

More information

Contents. APA Construction Details. Full fill cavity walls 2-13. Partial fill cavity walls 14-25. Solid externally insulated walls 26-37

Contents. APA Construction Details. Full fill cavity walls 2-13. Partial fill cavity walls 14-25. Solid externally insulated walls 26-37 Contents Pages Full fill cavity walls 2-13 Partial fill cavity walls 14-25 Solid externally insulated walls 26-37 Appendix (BRE confirmation of Ψ and y-values) 38-40 Page 1 of 40 APA Construction Details

More information

Rockwool Flexi Insulation Application Guide

Rockwool Flexi Insulation Application Guide Pitched roof Rafters InterMediate floors INTERNAL partitions external Framed walls separating floors Separating Walls Rockwool Flexi Insulation Application Guide Ground floor The perfect fit for any framed

More information

ENVIRONMENTAL INFORMATION APR 1200 products are made from glass mineral wool, one of the most environmentally friendly insulants available.

ENVIRONMENTAL INFORMATION APR 1200 products are made from glass mineral wool, one of the most environmentally friendly insulants available. APR 1200 Acoustic Partition Roll CI/Sfb Ref: APR002 Glass mineral wool roll designed to provide high levels of sound insulation in walls and floors to meet Part E (England & Wales) and Section 5 (Scotland)

More information

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION SIPS SCREWS WITH MINIMUM 1" PENETRATION IN WOOD MEMBER IN SIP WALL PANEL CONNECTED TO @ 24" O.C. MAXIMUM OUTSIDE SKIN EACH SIDE OF FRAMING TYP. AS RECOMMENDED BY FOAM CORE AS EACH SIDE OF FRAMING TYP.

More information

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in REV 1-12.12.11/TB002 Technical Bulletin Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in conjunction with TRADA Technology and is intended to provide the reader with introductory

More information

FireWall. High performance fireresistant. FireWall. www.british-gypsum.com

FireWall. High performance fireresistant. FireWall. www.british-gypsum.com FireWall FireWall High performance fireresistant wall system FireWall is a non-loadbearing wall which provides up to 240 minutes fire resistance. It is used in certain ground floor basement situations

More information

C05. S03. P02 P08 FireWall. Including C05. S01. P02 Specialist partitions introduction

C05. S03. P02 P08 FireWall. Including C05. S01. P02 Specialist partitions introduction C05. S03. P02 P08 Including C05. S01. P02 Specialist partitions introduction C05 Specialist partitions Introduction Specialist partitions This section details specialist lightweight systems where high-security,

More information

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details D Installation Details D1 General D2 Walls D3 Ceilings D4 Reference D Installation Details D Contents D1 General Installation and Fastening Sequence for Steel Studs D1.1 Fastener Selection D1.3 D2 Walls

More information

IRISH BUILDING CONTROL INSTITUTE HOTEL COURT HOTEL BALLYCONNELL CO CAVAN. 26 th MARCH 2009 TIMBER FRAME CONSTRUCTION

IRISH BUILDING CONTROL INSTITUTE HOTEL COURT HOTEL BALLYCONNELL CO CAVAN. 26 th MARCH 2009 TIMBER FRAME CONSTRUCTION IRISH BUILDING CONTROL INSTITUTE HOTEL COURT HOTEL BALLYCONNELL CO CAVAN 26 th MARCH 2009 TIMBER FRAME CONSTRUCTION Bill Robinson BSc. C. Eng. M. I. Struct. E. Timber Design Services 1 IS440 Timber frame

More information

Section A Roof Truss

Section A Roof Truss Section A Roof Truss Truss Types Wisconsin Truss, Inc. can build a variety of truss types, pictured below are some common examples. Common Bobtail Scissor Mono Studio Dual Slope Cathedral Tray Vault Parallel

More information

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035 Decra Plus Drawing no DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 Description Shown In Decra Brochure Most Commonly Used Detail t~êã=oççñ=b~îéë=aéí~áä=b~îéë=lîéêü~åö=táíü=fåëìä~íéç=c~ëåá~=~åç=pçññáí

More information

Multi-layer Insulation Blanket for Roofs

Multi-layer Insulation Blanket for Roofs Multilayer Insulation Blanket for Roofs Thermal Insulation in a 40mm thin, flexible, multilayer membrane Meets requirements of L1A, L1B 2010 In accordance with BR443 NHBC Acceptance Pitched & Flat roof

More information

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally

More information

Timber Frame Construction

Timber Frame Construction Timber Frame Construction Introduction Design and Detailing What is timber? Failure modes History of timber frame construction Forms of timber frame construction Live and dead loads Wind loads Roof construction

More information

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS Office and Production 126 New Pace Rd., PO Box 279 Newcomerstown, OH 43832 1-800-446-2188, Fax: 740-498-4184 www.buildwithsips.com CONSTRUCTION DETAILS & LOAD DESIGN CHARTS Table of Contents Description

More information

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................

More information

Section 3.1.2. Timber Frame Walls. Single layer between studs. Single layer between studs with service void. Between studs with insulated lining

Section 3.1.2. Timber Frame Walls. Single layer between studs. Single layer between studs with service void. Between studs with insulated lining Section Timber Frame Walls Single layer between studs Product: Earthwool FrameTherm Rolls and Slabs Tf01 Single layer between studs with service void Product: Earthwool FrameTherm Rolls and Slabs Tf02

More information

Module 3.7. Thermal bridging

Module 3.7. Thermal bridging Module 3.7 Thermal bridging Learning Outcomes On successful completion of this module learners will be able to - Describe construction details which influence thermal bridging. 2 Introduction to thermal

More information

Standard Technical Details

Standard Technical Details Standard Technical Details Construction Details Valley 2 Loose Hip 2 Hip End - Standard 3 Hip End - Multiple Girders 4 Barn Hip 5 Part/Bonnet Hip 5 Hip Corner 6 Scissors 8 Raised Tie 8 Dog Leg Intersection

More information

Section 4.3. Separating Floors. Timber frame floor with I-Beams. Upgrading existing timber floor with new ceiling. Timber frame floor with

Section 4.3. Separating Floors. Timber frame floor with I-Beams. Upgrading existing timber floor with new ceiling. Timber frame floor with Section Separating Floors Timber frame floor with I-Beams Product: Earthwool Acoustic Roll and Floorfoam Easy Edge Strip Timber frame floor with solid timber joists Product: Earthwool Acoustic Roll and

More information

The Pocket Guide To Insulation August 2013

The Pocket Guide To Insulation August 2013 The Pocket Guide To Insulation August 2013 Introduction Knauf Insulation is the UK s leading manufacturer of insulation products, including: Earthwool glass and rock mineral wool Polyfoam ECO extruded

More information

NRG 75 CRF NRG GREENBOARD WALL SYSTEM

NRG 75 CRF NRG GREENBOARD WALL SYSTEM NRG GREENBOARD WALL SYSTEM NRG Energy Efficient Building Systems is pleased to announce a revolution in lightweight cladding systems. NRG Building Systems is the first and only company to achieve CodeMark

More information

Timber Decks. Technical Note. March 2007

Timber Decks. Technical Note. March 2007 Timber Decks Technical Note. March 2007 This Technical Note contains general information for residential timber decks and floor frame structures for veranda s, patios etc which are exposed to the weather.

More information

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1 Top plate Stud Soffit lining 45mm min nog Fix scotia bead Building underlay/james Hardie rigid air barrier Soffit Detail Building underlay/james Hardie rigid air barrier Bottom plate 25mm wide cant strip.

More information

Superform Products Ltd.

Superform Products Ltd. TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000

More information

Partitioning & Ceiling Product Information

Partitioning & Ceiling Product Information Partitioning & Ceiling Product Information tel + 44 (0) 1384 412448 fax + 44 (0) 1384 4494 email enquiries@drywallsteelsections.co.uk web www.drywallsteelsections.co.uk tel + 44 (0) 1384 412448 fax + 44

More information

8/18/14. Introduction to. Framing. Terminology and Concepts

8/18/14. Introduction to. Framing. Terminology and Concepts 8/18/14 Introduction to Framing Terminology and Concepts Terminology: Framing Level Two points on exactly the same horizontal plane. Square Intersecting lines or faces that form an exact 90 angle. Plumb

More information

H-Stud Area Separation Wall System

H-Stud Area Separation Wall System 12 TH EDITION 09 21 16.33/NGC H-Stud Area Separation Wall System 09 21 16.33 139 H-STUD AREA SEPARATION WALL SYSTEM The fire-protection of gypsum-based Area Separation Walls is demonstrated in dramatic

More information

MUNICODE SERVICES LTD.

MUNICODE SERVICES LTD. The Preserved Wood Foundation Guide MUNICODE SERVICES LTD. Prepared by MuniCode Services Ltd. Outline and Restrictions of this Guide The following information required for the construction of Preserved

More information

CARPENTRY - HOUSING. This is the sloping length of a right-angled triangle.

CARPENTRY - HOUSING. This is the sloping length of a right-angled triangle. CARPENTRY - HOUSING PART 2: GABLE ROOFS The gable roof is classified as being double-pitched and one of the simplest roof forms, due to the fact that all rafters in the roof are exactly the same length

More information

Fire Barrier Systems. For inhibiting the spread of fire and smoke in concealed spaces

Fire Barrier Systems. For inhibiting the spread of fire and smoke in concealed spaces CI/SfB Km1 (K22) November 2006 (replaces July 2005 issue) Construction type Cavity Barriers Fire Barrier Systems For inhibiting the spread of fire and smoke in concealed spaces As part of the comprehensive

More information

PB301 July 2009. Lightweight Building Solutions. Bushfire Protection. www.boral.com.au/bushfireprotection

PB301 July 2009. Lightweight Building Solutions. Bushfire Protection. www.boral.com.au/bushfireprotection PB301 July 2009 Lightweight Building Solutions Bushfire Protection www.boral.com.au/bushfireprotection Attached or adjacent within 6m roofed structures such as garages, carports, verandas and the like,

More information

Residential Deck Safety, Construction, and Repair

Residential Deck Safety, Construction, and Repair Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the

More information

Post and Beam Construction

Post and Beam Construction Post and Beam Construction A Presentation By the Canadian Wood Council Canadian Conseil Wood canadien Council du bois Early settlers introduced the concept of post and beam construction in North America

More information

Report Number BTC 17755F

Report Number BTC 17755F Leics. LE NP Tel () 4 Fax () 4 Email btc.testing@saintgobain.com Report Number BTC 77F A FIRE RESISTANCE TEST ON A LOADBEARING TIMBER JOIST FLOOR INCORPORATING 4mm x 7mm x 47mm SOLID JOISTS PROTECTED BY

More information

FORM DESIGN. easy to work with, and generally available.

FORM DESIGN. easy to work with, and generally available. Forms play a major role in concrete construction. They give the plastic concrete its shape and hold it until it hardens. Forms protect the concrete, assist in curing it, and support any reinforcing rods

More information

Energy Company Obligation (ECO): Technical Monitoring Questions

Energy Company Obligation (ECO): Technical Monitoring Questions Energy Company Obligation (ECO) Technical Monitoring Questions v1 30/05/2013 Energy Company Obligation (ECO): Technical Monitoring Questions Under ECO suppliers are required to instruct suitably qualified

More information

PASSIVE FIRE PROTECTION SYSTEMS Application & Technical Manual: Ceilings & Floors

PASSIVE FIRE PROTECTION SYSTEMS Application & Technical Manual: Ceilings & Floors PASSIVE FIRE PROTECTION SYSTEMS Application & Technical Manual: Ceilings & Floors For distribution in Asia Pacific PASSIVE FIRE PROTECTION SYSTEMS Application & Technical Manual: Ceilings & Floors Contents

More information

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:

More information

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the Chapter 7 PLUMBING AND ELECTRICAL 7.1 Introduction to Plumbing and Electrical Consideration of support services such as plumbing and electrical systems from the preliminary schematics phase through final

More information

The better way to build TM. Installation Manual. EXTERIOR WALL SIPs

The better way to build TM. Installation Manual. EXTERIOR WALL SIPs The better way to build TM Installation Manual EXTERIOR WALL SIPs July 2015 EXTERIOR WALL SIPs Installation Manual Table of Contents Topics General Requirements................................... 3 Materials..............................................

More information

December 2013. J-Ply Roofing, Flooring and Decking

December 2013. J-Ply Roofing, Flooring and Decking December 2013 J-Ply Roofing, Flooring and Decking Introduction J-Ply plywood is manufactured in New Zealand by Juken New Zealand Limited (JNL) and marketed by New Zealand Wood Products Limited. The J-Ply

More information

June 2008. Posi-STRUT TRUSS SYSTEMS Manual. Posi-STRUT is available only through GANG-NAIL Fabricators throughout New Zealand

June 2008. Posi-STRUT TRUSS SYSTEMS Manual. Posi-STRUT is available only through GANG-NAIL Fabricators throughout New Zealand June 2008 Posi-STRUT TRUSS SYSTEMS Manual Posi-STRUT is available only through GANG-NAIL Fabricators throughout New Zealand Refer to the MiTek New Zealand website for up to date Posi-STRUT information

More information

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11 K. D. FRAME ASSEMBLY FOR MASONRY WALLS...........................Ins 2 FRAME INSTALLATION DETAILS FOR MASONRY WALLS......................Ins 3 INSTALLING EXISTING MASONRY WALL ANCHORS IN FRAME..................Ins

More information

PERGOLAS AND CARPORTS

PERGOLAS AND CARPORTS TECHNICAL DATA SHEET ISSUED BY TIMBER QUEENSLAND PERGOLAS AND CARPORTS RECOMMENDED PRACTICE // MARCH 2014 19 This data sheet contains Timber Queensland s recommendations for attached and detached timber

More information

The WANZ Guide to Window Installation

The WANZ Guide to Window Installation The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 Ver. 1.1 Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening Preparation Page 7 Step P1 Preliminary Check

More information

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES 101 Retrofits Required. Pursuant to Section 553.844 553.884, Florida Statutes, strengthening of existing site-built,

More information

How To Repair A Boat Landing Deck With A Boat Bed

How To Repair A Boat Landing Deck With A Boat Bed RESIDENTIAL INSULATED SHEATHING INSTALLATION GUIDE Residential Insulated Sheathing Installation Guide ROXUL COMFORTBOARD IS Table of Contents Slab-on-grade-to Above Grade Wall...1 Foundation Wall at Footing

More information

INSTALLATION. General. Important Note. Design. Transport

INSTALLATION. General. Important Note. Design. Transport General The roof trusses you are about to install have been manufactured to precise engineering standards. To ensure that the trusses perform as designed, it is essential that they be handled, erected

More information

Light Steel Modular Construction

Light Steel Modular Construction Technical Information Sheet ED014 Light Steel Modular Construction R M Lawson BSc PhD CEng MICE MIStructE MASCE ACGI This Information Sheet reviews the various forms of building modules constructed using

More information

GYPROCK PARTY WALL INTERTENANCY WALL SYSTEMS FOR CLASS 1 BUILDINGS

GYPROCK PARTY WALL INTERTENANCY WALL SYSTEMS FOR CLASS 1 BUILDINGS GYPROCK PARTY WALL INTERTENANCY WALL SYSTEMS FOR CLASS 1 BUILDINGS CONTENTS Introduction 2 Applications 3 Advantages 3 Components 3 6 Design Considerations 7 8 System Features 10 Typical installation Sequence

More information

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS The following guidelines are intended to assist with the permit acquisition process with regard to Plumbing Alterations. Not all information, or additional

More information

Building Construction. Lightweight construction. Conventional Construction

Building Construction. Lightweight construction. Conventional Construction Ventilation 53 Building Construction The firefighter s ability to safely and efficiently ventilate a building through its roof will depend to some degree on the firefighter s understanding of roof construction.

More information

Handling, Erection and Bracing of Wood Trusses

Handling, Erection and Bracing of Wood Trusses Handling, Erection and Bracing of Wood Trusses Follow these guidelines for safe installation of Wood Trusses. These guidelines should not be considered to be the only method for erecting and bracing of

More information

CHAPTER 6 CONSTRUCTION TYPES

CHAPTER 6 CONSTRUCTION TYPES CHAPTER 6 CONSTRUCTION TYPES SECTION 601 GENERAL 601.1 Scope. Provisions of this chapter shall govern the classification of construction type by materials and fire resistance of its elements and the use

More information

LIGHT FLOOR AND WALL FRAMING

LIGHT FLOOR AND WALL FRAMING CHAPTER 1 LIGHT FLOOR AND WALL FRAMING In the normal sequence of construction events, the floor and wall activities follow the completed foundation work. In this chapter, we ll examine established methods

More information

POST AND FRAME STRUCTURES (Pole Barns)

POST AND FRAME STRUCTURES (Pole Barns) POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:

More information

The WANZ Guide to Window Installation

The WANZ Guide to Window Installation The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 2 of 60 Contents Overview 5 Objective 5 Scope 5 Opening Preparation 7 Step P1 Preliminary Check 8 Step P2 Cut the Underlay 9 Step

More information

PRESTRESSED CONCRETE FLOORING BEAMS

PRESTRESSED CONCRETE FLOORING BEAMS PRESTRESSED CONCRETE FLOORING BEAMS TRIED & TRUSTED Introduction Established in 2001 TT Concrete Products Limited has become a prominent manufacturer of prestressed concrete flooring beams throughout the

More information

Ecojoist. Practical benefits of Ecojoist. www.eleco.com/gang-nail

Ecojoist. Practical benefits of Ecojoist. www.eleco.com/gang-nail Ecojoist Practical benefits of Ecojoist. www.eleco.com/gang-nail Gang-Nail Systems, an Eleco plc company, offer integrated solutions f the timber engineering industry which assist in reducing design, production

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information

TECHNICAL RECOMMENDATION

TECHNICAL RECOMMENDATION TECHNICAL RECOMMENDATION NO: 9 DESIGN OF LIGHT TIMBER FRAMED WALLS AND FLOORS FOR FIRE RESISTANCE Peter Collier Contents Design of Light Timber Framed Walls and Floors for Fire Resistance Relevance Acceptance

More information

These instructions will show you how to install an internal door into a non-loadbearing partition wall. The instructions are split into three parts.

These instructions will show you how to install an internal door into a non-loadbearing partition wall. The instructions are split into three parts. No 8 in the series of 'How to' brochures produced by PlaceMakers, New Zealand How to Frame and Hang a Door These instructions will show you how to install an internal door into a non-loadbearing partition

More information

PANELIZED HOME INSTALLATION GUIDELINE

PANELIZED HOME INSTALLATION GUIDELINE PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.

More information

Best Practice in Best Pra ctice in teel constr uction - onstr industrial B uildings esidential Buildings 01 Introduction 02 Key Design Factors

Best Practice in Best Pra ctice in teel constr uction - onstr industrial B uildings esidential Buildings 01 Introduction 02 Key Design Factors Best Practice in Steel Construction - Industrial Residential Buildings Contents The Steel Construction Institute (SCI) develops and promotes the effective use of steel in construction. It is an independent,

More information

Typical Deck Details

Typical Deck Details Fairfax County, Virginia Typical Deck Details Based on the 2012 Virginia Residential Code The design details in this document apply to residential, single-level decks only. Construction cannot deviate

More information

A Technical Guide for Floor & Roof Framing Construction

A Technical Guide for Floor & Roof Framing Construction A Technical Guide for Floor & Roof Framing Construction Nov 2006 The SIMPLE FRAMING SYSTEM TABLE OF CONTENTS The SIMPLE FRAMING SYSTEM............... 2 Boise and the Building Regulations............. 3

More information

How To Build A Gambrel Roof And A Gable End Roof

How To Build A Gambrel Roof And A Gable End Roof Dutch Gable or Gambrel Roof and The Scotch Valley The folowing pages are an extract from Carp 12 text TAFE NSW Construction and Transport Division 71 HIP and VALLEY ROOFING GAMBREL / DUTCH GABLE The effect

More information

HORIZONTAL INSTALLATION

HORIZONTAL INSTALLATION THERMO/SOLAR Žiar s.r.o. MANUAL FOR INSTALLATION PV SUPPORTING FRAMES HORIZONTAL INSTALLATION Technical alternation reserved A1410 1 12/2014 CONTENT ORD.NO. PAGE Mounting information 3 Mounting, flat roof

More information

Design No. P736 September 26, 2003. Restrained Assembly Ratings 1, 1-1/2 or 2 Hr. (See Items 3, 7 and 8A)

Design No. P736 September 26, 2003. Restrained Assembly Ratings 1, 1-1/2 or 2 Hr. (See Items 3, 7 and 8A) Design No. P736 September 26, 2003 Restrained Ratings 1, 1-1/2 or 2 Hr (See Items 3, 7 and 8A) Ratings 1, 1-1/2 or 2 Hr (See Items 3, 7 and 8A) Beam Ratings 1, 1-1/2 or 2 Hr (See Items 7 and 8A) 1. Beam

More information

Typical Finished Basement Details

Typical Finished Basement Details Fauquier County, Virginia Typical Finished Basement Details Based on the 2012 International Residential Code Finished basements must be constructed in conformance with this document. For requirements,

More information

Residential Decks. Planning and Development Services Department

Residential Decks. Planning and Development Services Department Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Planning and Development Services Department Residential Decks

More information

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed

More information

Rev 1-12.2013. Code of Practice. SIP Technology. www.uksips.org

Rev 1-12.2013. Code of Practice. SIP Technology. www.uksips.org Rev 1-12.2013 Code of Practice SIP Technology www.uksips.org What are Structural Insulated Panels (SIPS)? SIPS are prefabricated, high performance, lightweight, building panels that can be used in floors,

More information

Seismic Technical Guide

Seismic Technical Guide Technical Document Seismic Technical Guide Hanger Wire Attachment Code Requirements 1 The International Building Code (IBC) defines the requirement for hanger wire and their supports and attachment methods.

More information

Chapter. Restoration of Damaged Structures

Chapter. Restoration of Damaged Structures 5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.

More information

Window Installation Instructions

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for

More information

PDmB, Inc. Definitions

PDmB, Inc. Definitions Page 1 of 11 Definitions S Satisfactory Meets industry standards for proper material and installation NP Not Present Condition or item was not present at time of inspection NI Not Inspected Condition or

More information

Guidelines for Earthquake Bracing of Residential Water Heaters

Guidelines for Earthquake Bracing of Residential Water Heaters Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)

More information

Joist. Reinforcement. Draft 12/7/02

Joist. Reinforcement. Draft 12/7/02 Joist Reinforcement Draft 12/7/02 1 JOIST REINFORCING The purpose of this CSD Design Aid is to provide procedures and suggested details for the reinforcement of open web steel joists. There are three basic

More information

HOPLEYS OPENWEBSTEELJOISTS

HOPLEYS OPENWEBSTEELJOISTS Design Aid Manual Now also includes Letter of Certification & Bearer Span Table HOPLEYS OPENWEBSTEELJOISTS 2...has over 60 years experience and a respected reputation in Sheet Metal fabrication and associated

More information

Internal wall insulation in existing housing

Internal wall insulation in existing housing Energy Efficiency Best Practice in Housing Internal wall insulation in existing housing A guide for specifiers and contractors Cost-effective External wall appearance maintained Easier to install and maintain

More information

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges 7.7 Truss bridges Fig. 7.21 some of the trusses that are used in steel bridges Truss Girders, lattice girders or open web girders are efficient and economical structural systems, since the members experience

More information

CI/SfB 2- Rj7 December 2010

CI/SfB 2- Rj7 December 2010 Engineered Timber Systems CI/SfB 2- Rj7 December 2010 STANDARD DETAILS Contents Wall Details W1 Typical wall section. W2 a Sectional elevation through soleplate fixing detail. Ground bearing slab. W2 b

More information

Featuring TJ Rim Board and TimberStrand LSL

Featuring TJ Rim Board and TimberStrand LSL #TJ-8000 SPECIFIER S GUIDE TRUS JOIST RIM BOARD Featuring TJ Rim Board and TimberStrand LSL Multiple thicknesses, grades, and products to cover all your rim board needs 1¼" Thickness matches lateral load

More information

Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span

Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span formwork formwork Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span has grown to become one of the major players in the scaffolding and

More information

Additions and Alterations

Additions and Alterations Additions and Alterations Addition and alteration construction is a miscellaneous grouping of home improvement and renovation projects that are generally geared toward the enhancement of an existing principal

More information

Uncovered Decks & Porches

Uncovered Decks & Porches Uncovered Decks & Porches Building Guides for Homeowners Why Do I need a Permit? D I D Y O U K N O W? As owner-builder you are the responsible party of record on such a permit. If your work is being performed

More information

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE FITTING YOUR KITCHEN GUIDE How to mark out a kitchen PAGE 1 Before starting on the installation, measure 870mm from the lowest point of the floor and mark a datum line around the room to indicate where

More information

DEFAULT HEAT LOSS COEFFICIENTS

DEFAULT HEAT LOSS COEFFICIENTS DEFAULT HEAT LOSS COEFFICIENTS SECTION A101 GENERAL REQUIREMENTS A101.1 Scope. The following defaults shall apply to Chapter 4 of both the (RE) and (CE) sections of the IECC. This chapter includes tables

More information

rationel WINDOWS WITH VISION

rationel WINDOWS WITH VISION Brick / Blockwork 340mm Cavity Wall Interface Detail Cill BW-001A 5 x 50mm Woodscrews (Staggered) By Installer 20 x 90mm Standard Timber Packer With Upstand Bedded To Frame In Silicone By Installer Aluminium

More information

FIRE AND SMOKE PROTECTION FEATURES

FIRE AND SMOKE PROTECTION FEATURES CHAPTER 7 FIRE AND SMOKE PROTECTION FEATURES SECTION 70 GENERAL 70. Scope. The provisions of this chapter shall govern the materials, systems and assemblies used for structural fire resistance and fire-resistance-rated

More information

GYPSUM AREA SEPARATION FIREWALLS GA-620-2011

GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GA-620-2011 Copyright 2011 Gypsum Association All rights reserved. Printed in U.S.A. Characteristics, properties, or performance of materials or systems herein

More information

FIRE AND SMOKE PROTECTION FEATURES

FIRE AND SMOKE PROTECTION FEATURES CHAPTER 7 FIRE AND SMOKE PROTECTION FEATURES SECTION 70 GENERAL 70. Scope. The provisions of this chapter shall govern the materials, systems and assemblies used for structural fire resistance and fire-resistance-rated

More information

EAST LYME HIGH SCHOOL

EAST LYME HIGH SCHOOL Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed

More information

SIMPLE SAVER SYSTEM DESIGN MANUAL

SIMPLE SAVER SYSTEM DESIGN MANUAL SECTION 5: BAR JOIST CONSTRUCTION DETAILS SIMPLE SAVER SYSTEM DESIGN MANUAL Call Toll-free: 1-800-255-0776 Fax: 1-402-454-2708 E-mail us at: custserv@thermaldesign.com SIMPLE SAVER SYSTEM DESIGN MANUAL

More information

6 RETROFITTING POST & PIER HOUSES

6 RETROFITTING POST & PIER HOUSES Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This

More information

Guide to Assessment and Repair of Flood Damaged Timber and Timber Framed Houses

Guide to Assessment and Repair of Flood Damaged Timber and Timber Framed Houses Technical Guide Guide to Assessment and Repair of Flood Damaged Timber and Timber Framed Houses ASSESSMENT OF DAMAGE Prior to any assessments or repairs being commenced, a licensed electrician must undertake

More information