1 BREEAM UK New Construction Scope of IMPACT Compliant (or equivalent) Tools and Data Submission Requirements This Guidance Note relates to complying with the exemplary level criteria for route 2, as defined under the Mat01 issue of the BREEAM New Construction 2011 version. It provides information about IMPACT and the level of detail (the Quality Requirements) and file transmission requirements for the Building Information Model (BIM) from IMPACT compliant (or equivalent) tools. It also outlines criteria for demonstrating the equivalence of a proposed alternative to IMPACT compliant tools for BRE Global approval. What is IMPACT? IMPACT (Integrated Material Profile And Costing Tool) is a specification and database for software developers to incorporate into their tools to enable consistent Life Cycle Assessment (LCA) and Life Cycle Costing (LCC). IMPACT compliant tools work by allowing the user to attribute environmental and cost information to drawn or scheduled items in the Building Information Model (BIM). IMPACT takes quantity information from the BIM and multiplies this by environmental impact and/or cost rates to produce an overall impact and cost for the whole (or a selected part) of the design. The results generated by IMPACT allow the user to: Analyse the design to optimise cost and environmental impacts. Compare whole-building results to a suitable benchmark to assess performance, which can be linked to building assessment schemes. The benefit of BIM enabled whole-building assessment is that the calculations are based on real design data and accurate quantities, rather than generic specifications for particular building elements. IMPACT compliant tools also allow users to accurately model the life cycle performance of primary structures and substructures, which are not covered by the Green Guide to Specification. IMPACT was developed by an industry consortium led by BRE. The work was funded by the UK s Technology Strategy Board. Further information about IMPACT and IMPACT compliant software tools (identified by the IMPACT compliant logo) is available from 1. Quality requirements To award the exemplary credits, the design team must submit via their assessor the Building Information Model (BIM) for the assessed building from IMPACT compliant software tools (or equivalent). The Model must have achieved/covered the following: Requirement Quality Issue Tools equivalent to IMPACT Compliant tools Impact Tool (see 2.2 ) Scope Include all the materials 1 that make-up the building elements 2 listed in Table 1. Material types To be similar to the actual 3 materials. Material quantities Installed For each layer 4, use actual values for the following parameters: Thickness, Density, Adjustment(s). Minor fixings (screws, nails etc.) should not be included. To be within +/- 5% of the actual quantities. Minor fixings (screws, nails etc.) should not be included. Material quantities site wastage Use a suitable Site Wastage value for each layer 5. To be within +/- 5% of the actual quantities. Material quantities Replace, Use a suitable Service Life value for each layer 6. To be based on the most likely In-Use scenario. repair, refurbish Material quantities End of Life to re-use, recycling or disposal (landfill, incineration) No further requirement. To be based on the most likely End of life scenario.

2 1.1. Scope requirements Key Must be included. Must be an independent building element. Must be included. May be aggregated into a broader building element. Not required/optional. References in parentheses = alternative categorisation (where tool will not permit). Table 1 Building Element requirements Note: Based on New Rules of Measurement (NRM) by Royal Institute of Chartered Surveyors (RICS) Level 1 Group element Level 2 Element Level 3 Sub-element 1 Substructure 1 Substructure 1 Standard foundations 2 Specialist foundation systems 3 Lowest floor construction 4 Basement excavation (fuel use only) 5 Basement retaining walls (2.5.2) 2 Superstructure 1 Frame (other than floors) 1 Steel frames 2 Space decks 3 Concrete casings to steel frames 4 Concrete fames 5 Timber frames 6 Other frame systems 2 Upper Floors 1 Floors 2 Balconies 3 Drainage to balconies 3 Roofs 1 Roof structure 2 Roof covering 3 Specialist roof systems 4 Roof drainage 5 Rooflights, skylights and openings (2.6.1) 6 Roof features 4 Stairs and ramps 1 Stair / Ramp structures 2 Stair / Ramp finishes 3 Stair / Ramp balustrades and handrails 4 Ladders / Chutes / Slides 5 External walls 1 External enclosing walls above ground floor level 2 External enclosing walls below ground level 3 Solar / Rain screening (2.5.1) 4 External soffits (1.1 for L2 then for L3) 5 Subsidiary walls, balustrades, handrails, railings and proprietary balconies 6 Façade access / cleaning systems

3 2 Superstructure 6 Windows and external doors 1 External Windows 2 External doors (2.8 for L2 and for L3) 7 Internal Walls and Partitions 1 Walls and partitions 2 Balustrades and handrails 3 Moveable room dividers 4 Cubicles 8 Internal Doors 1 Internal Doors 3 Internal Finishes 1 Wall Finishes 1 Finishes to walls (5 or 7) 4 Fittings, Furnishings and Equipment 2 Floor Finishes 1 Finishes to floors (1.3, 2.2.1) 2 Raised access floors (1.3, 2.2.1) 3 Ceiling Finishes 1 Finishes to ceilings (2.2.1, 2.3) 5 Services (note: category may be used for operational/in-use fuel and energy use) 2 False ceilings (2.2.1, 2.3) 3 Demountable suspended ceilings (2.2.1, 2.3) 8 External Works 2 Roads, Paths and Pavings 1 Roads, paths and pavings A5 3 Soft Landscaping, Planting and Irrigation Systems 2 Special surfacings and pavings 4 Fencing, Railings and Walls 1 Fencing and railings 5 External fixtures 6 External drainage 7 External services Construction Installations (may be based on a rate per m 2 NIA) 2. Data submission requirements 2 Walls and screens 3 Retaining walls 4 Barriers and guardrails BRE Global requires the submission of the Building Information Model (BIM) from the IMPACT compliant software tool (or equivalent) in order to: Facilitate the establishment of robust building level life cycle performance benchmarks in BREEAM. This will enable future BREEAM versions to recognise and reward those designs which achieve above average performance. Fulfil BREEAM Quality Assurance requirements. Conduct further research using data from real life projects. 2.1 IMPACT compliant tools The Assessor should submit quoting the relevant BREEAM registration number and project name a copy of the full IMPACT project/ building file to BRE Global fulfilling the following criteria: 1. Files should be transmitted in either of the following formats: 1.1. For 3D CAD/BIM based IMPACT compliant tools: In IFC OR the IMPACT Compliant tool s native format For spreadsheet based IMPACT compliant tools: IFC, MS Excel or CSV file format. 2. Building element categorisation to be according to Table 1.

4 The file must be submitted to BRE Global prior to submission of the project s assessment report for quality assurance and certification. BRE Global will acknowledge receipt of the file and data and this receipt can be used by the assessor as part of their evidence file for the project. 2.2 Tools equivalent to IMPACT Compliant tools Tools that are considered by BRE Global to be equivalent to an IMPACT Compliant tool (for the purpose of BREEAM compliance) will be eligible for the same exemplary credits. Equivalence will be determined by BRE Global based on suitability of the tool and information submitted for refining whole-building benchmarks. To apply for equivalent status, assessors must submit evidence that the tool can fulfil the data submission requirements stated below. From the point of submission, assessors should expect this process to take up to four weeks. Assessors are advised to contact BRE Global as soon as possible to discuss equivalence status. If successful, a statement in writing from BRE Global confirming equivalence status to IMPACT compliant tools will be issued to the assessor and subsequently communicated to the wider assessor network. This statement should be submitted as evidence along with the file for quality assurance and certification. The Assessor should submit an electronic data table or tables (suitably cross referenced) generated by the tool quoting the relevant BREEAM registration number and project name to BRE Global fulfilling the following criteria: 1. Total building results for year 0 (installation only) and year 60 study periods as follows: 1.1. To include individual results for all environmental issues/indicators that the tool/data permits, showing issue/indicator names and units used. As a minimum, climate change (Kg CO 2 eq.) is required. Where issues/indicators according to BS EN 15978: are available, these should be used To include individual results for each Life stage/module. As a minimum, stages A, B and C (see BS EN 15978:2011) are required. Where the tool permits or where complete measurement of aforementioned stages is not possible, more detail should be provided. For example, BS EN 15978:2011 modules should be used: A1, A2, A3 (or combined to A1to3), A4, A5, B1, B2, B3, B4, B5, B6, B7, C1, C2, C3, C4. Modules not assessed to be indicated MNA or N/A Where tool permits, the reporting format should be to BS EN 15978: Results for each element as follows: 2.1. Element impact per issue (as above), with unit(s) Element Kg CO 2 eq. per life stage and/or module (as above) Element quantity, with unit(s) Element category in accordance with Table For each material in the element: Installed quantities, with unit(s) Site wastage quantities, with unit(s) Replace, repair, refurbish quantities, with unit(s) Re-use, recycling or disposal (landfill, incineration) quantities, with unit(s). 3. Transmitted in IFC, MS Excel or CSV file format. 2.3 Data permissions Submission of information for the Exemplary Credit(s) will be deemed to grant permission for the BRE Group to use the information for: 1. BREEAM Quality Assurance. 2. Any research (using anonymised data), including improvements to the IMPACT benchmarks. Any data supplied to BRE Global will be treated in confidence and the use of BIM data for research purposes will ensure individual projects are unidentifiable. Footnotes: 1 Material means: The individual material(s) that make up a building element. 2 Building element means: A single material or collection of materials that perform a distinct function. For example, external walls, roofs or internal partitions.

5 3 Actual means: As will actually be constructed. 4 Layer refers to the method used in IMPACT compliant tools to specify and manage materials. Layers can comprise of a single material or products/components that comprise of more than one material but are specified as one item, e.g. insulated cladding panels. 5 For each layer review/edit the default Site Wastage values pre-defined in the tool to accurately reflect your design 6 For each layer review/ edit the default Service life values pre-defined in the tool to accurately reflect your design. 7 BS EN 15978:2011 Sustainability of construction works. Assessment of environmental performance of buildings. Calculation method, BSI, For Further Information : BRE Global Bucknalls Lane Watford WD25 9XX Tel. +44 (0) breeam@bre.co.uk Web.

Accurate data and the whole life costing culture. Kathryn Bourke Whole Life Ltd Kathryn.bourke@wholelifeltd.co.uk

Accurate data and the whole life costing culture. Kathryn Bourke Whole Life Ltd Kathryn.bourke@wholelifeltd.co.uk Accurate data and the whole life costing culture Kathryn Bourke Whole Life Ltd Kathryn.bourke@wholelifeltd.co.uk Overview Part 1 Why Bother about LCC? Standards - BS/ISO 15686-5 and UK Standardised Method

More information

Strategic approach to the selection and procurement of construction materials and products

Strategic approach to the selection and procurement of construction materials and products www.breeam.com Briefing Paper Strategic approach to the selection and procurement of construction materials and products Alan Yates 02 The selection and procurement of construction materials makes a major

More information

BREEAM Refurbishment and Fit-out 2014 Briefings. Part of the BRE Trust

BREEAM Refurbishment and Fit-out 2014 Briefings. Part of the BRE Trust BREEAM Refurbishment and Fit-out 2014 Briefings Part of the BRE Trust BREEAM for Refurbishment and Fit-out Follows 2 years of development Draft scheme published and consultation from 19 th July 2014 Launched

More information

Scope of EN 1090-1 Clarification Document

Scope of EN 1090-1 Clarification Document Scope of EN 1090-1 Clarification Document This document has been submitted to the European Commission as the UK view on the scope of EN 1090-1. After discussions, including with the European Technical

More information

Low Carbon Domestic Refurbishment

Low Carbon Domestic Refurbishment www.breeam.com Briefing Paper Low Carbon Domestic Refurbishment Kiruthiga Balson, Gavin Summerson and Steven Stenlund 2 BRE Global Ltd 2014 Permission is granted for this report to be distributed only

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

Code for Sustainable Homes Guidelines

Code for Sustainable Homes Guidelines Canoldir Penrhos Anglesey LL65 2TS Phone: 01407 860666 Email: saps@easonline.co.uk www.easonline.co.uk Code for Sustainable Homes Guidelines A CSH rating is the responsibility of the Developer/ Architect

More information

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE BUILDING SERVICES DEPARTMENT 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Telephone: 519 845-0801 Toll-free: 1-866-324-6912 Fax: 519

More information

IALN11006400 /05 01 19.06.13. FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF

IALN11006400 /05 01 19.06.13. FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF IALN11006400 /05 01 19.06.13 FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF Dear Sir / Madam Re: 12/02994 BCA Sports Hall Condition

More information

LPCB Red Book Listed Products and Passive Fire Protection Installer Schemes Answering the needs of the market

LPCB Red Book Listed Products and Passive Fire Protection Installer Schemes Answering the needs of the market LPCB Red Book Listed Products and Passive Fire Protection Installer Schemes Answering the needs of the market Ian Stewart Passive installer scheme manager September 2011 Introduction to BRE Global Research,

More information

Energy Company Obligation (ECO): Technical Monitoring Questions

Energy Company Obligation (ECO): Technical Monitoring Questions Energy Company Obligation (ECO) Technical Monitoring Questions v1 30/05/2013 Energy Company Obligation (ECO): Technical Monitoring Questions Under ECO suppliers are required to instruct suitably qualified

More information

Sample Drawing Package for One and Two Family Dwelling Applications

Sample Drawing Package for One and Two Family Dwelling Applications Sample Drawing Package for One and Two Family Dwelling Applications For a full list of submission requirements, refer to the relevant checklist for your application found on our website: http://vancouver.ca/home-property-development/application-forms-and-checklists.aspx

More information

QS 004 DEPARTMENT OF PUBLIC WORKS REPUBLIC OF SOUTH AFRICA BUILDING COST DATABASE

QS 004 DEPARTMENT OF PUBLIC WORKS REPUBLIC OF SOUTH AFRICA BUILDING COST DATABASE DEPATMENT OF PUBLIC WOKS EPUBLIC OF SOUTH AFICA BUILDING COST DATABASE AUGUST 2012 DEPATMENT OF PUBLIC WOKS EPUBLIC OF SOUTH AFICA BUILDING COST DATABASE POJECT DATA SHEET NOTE Bills of Quantities Stage

More information

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015 Stage 1 DA.01 Fencing and cameras deployed Baseline - 3-5 years for Stage 1 for purposes of this study costs are described for a 3 year period $45,000 $0 Stage 1 DA.02 Secure all building doors and access

More information

RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002

RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002 RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002 INDEX New Build Flat and Pitched Roofs Rainwater Goods Porches to Existing Buildings / Covered Links etc, Between Buildings Floors /

More information

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No. Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two

More information

Extracts from BUILDING REGULATIONS

Extracts from BUILDING REGULATIONS Page 1 of 3 UNotes on Building Regulations Please note that British building regulations are complex and that they may vary from area to area. It is your responsibility to ensure that your chosen stair

More information

A Guide to... Home Renovation Incentive (HRI)

A Guide to... Home Renovation Incentive (HRI) A Guide to... Home Renovation Incentive (HRI) About this guide This guide will tell you what you need to know if you are organising to have construction work done on your house and would like to avail

More information

PROPOSED NEW RICHARDS BAY CITY CAMPUS FOR THE UNIVERSITY OF ZULULAND

PROPOSED NEW RICHARDS BAY CITY CAMPUS FOR THE UNIVERSITY OF ZULULAND DATE: 1 NOVEMBER 2008 REVISION NO.: 0.1 REFERENCE: UNIZU/RBAY SPECIALIST SUB CONTRACTOR DATABASE INVITATION PROPOSED NEW RICHARDS BAY CITY CAMPUS FOR THE UNIVERSITY OF ZULULAND DATE: 1 NOVEMBER 2008 REVISION

More information

BRE, BRE Global, BREEAM, Smartwaste and the Green Guide are all trademarks owned by either BRE or BRE Global Limited and

BRE, BRE Global, BREEAM, Smartwaste and the Green Guide are all trademarks owned by either BRE or BRE Global Limited and blank page Terms & conditions Terms and conditions Disclaimer This scheme document is the property of BRE Global Limited and is made publicly available for information purposes only. Any testing, assessment,

More information

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses. The Townhouses Park View Place A A Compass House A T T T Royal Wharf Gardens Endeavour House T A A Thameside House T Sienna House A A A A T Apartments Townhouses River Thames Compass House Compass House

More information

Leaky Homes Financial Assistance Package (FAP) Repair plan example

Leaky Homes Financial Assistance Package (FAP) Repair plan example LEAKY HOMES FINANCIAL ASSISTANCE PACKAGE FACT SHEET Repair Plan Example - June 2014 Page 1 Leaky Homes Financial Assistance Package (FAP) Repair plan example Introduction This repair plan example is intended

More information

Standards Committee T echnical Technical Conference

Standards Committee T echnical Technical Conference Standards Committee Technical Conference Agenda Overview of claims costs Years 0 2 claims and resolutions Years 3 10 claims What are we commonly seeing now? An example of what we might see in future? Summary

More information

Approved Document Q: Security

Approved Document Q: Security Approved Document Q: Security Requirement Q1 Unauthorised access Consultation draft September 2014 1 The approved documents What is an approved document? The Secretary of State has approved a series of

More information

PROJECT COST ESTIMATES & FEASIBILITIES

PROJECT COST ESTIMATES & FEASIBILITIES PROJECT COST ESTIMATES & FEASIBILITIES Project Cost and budget management Project success elements Scope meet the scope defined for the project Budget It is within established budget Programme It is designed

More information

PRE-PURCHASE INSPECTION REPORT

PRE-PURCHASE INSPECTION REPORT PRE-PURCHASE INSPECTION REPORT PREPARED FOR: PROPERTY ADDRESS: Waiheke Island DATE: 21 November 2012 Page 1 of 13 (a) This is a report of a visual only, non-invasive inspection of the areas of the building

More information

BREEAM Europe. This presentation aims to give the reader a general overview of the operational and technical aspects of BREEAM Europe.

BREEAM Europe. This presentation aims to give the reader a general overview of the operational and technical aspects of BREEAM Europe. BREEAM Europe BREEAM Europe This presentation aims to give the reader a general overview of the operational and technical aspects of BREEAM Europe. Key objectives Provide consistency and comparability

More information

Building façade maintenance

Building façade maintenance Building façade maintenance Legal liability and damage limitation A guide for building owners and occupiers What is a façade? The façade forms the external weatherproof envelope of a building. In modern

More information

DRAPER ELEMENTARY SCHOOL

DRAPER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

The Recent Floods An Insurer s Perspective

The Recent Floods An Insurer s Perspective The Recent Floods An Insurer s Perspective Flooding in Surrey 2000/2007 2014 2 1 Flood - Actions Insurer s first priorities Get the people out (where necessary) and ensure safe Get the water out Dry the

More information

BREEAM Communities 2012 Bespoke International Process Guidance Note GN07 August 2014

BREEAM Communities 2012 Bespoke International Process Guidance Note GN07 August 2014 Introduction This document contains information and guidance for BREEAM Communities Assessors who are seeking to assess a project outside of the UK. The guidance provides an outline of the bespoke criteria

More information

Rockwool Flexi Insulation Application Guide

Rockwool Flexi Insulation Application Guide Pitched roof Rafters InterMediate floors INTERNAL partitions external Framed walls separating floors Separating Walls Rockwool Flexi Insulation Application Guide Ground floor The perfect fit for any framed

More information

Module 3.7. Thermal bridging

Module 3.7. Thermal bridging Module 3.7 Thermal bridging Learning Outcomes On successful completion of this module learners will be able to - Describe construction details which influence thermal bridging. 2 Introduction to thermal

More information

Site Survey Questionnaire

Site Survey Questionnaire Site Survey Questionnaire Site location:. Grid refereence.. Date:././. Name of company:... Address:........ Name and position of respondent:... Type of business, including specialisations:.... MCM land

More information

50 St Mary Axe London EC3

50 St Mary Axe London EC3 50 St Mary Axe London EC3 Letting specification 1.Structure and Envelope The main superstructure comprises of a braced steel fame (app 7m span / 90min fire rated) and the elevations are formed from a series

More information

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012 2012 Ontario Building Code Requirements for New Construction Bradford West Gwillimbury Building Division March 5, 2012 1 Ontario Building Code changes Applicable to permits applied for after December 31,

More information

Building Warrant Issues

Building Warrant Issues Building Warrant Issues Frequently Asked Questions Introduction This section is intended to help anyone who is unfamiliar with the building standards system in Scotland. The information contained in it

More information

HOME INSURANCE ASSESSMENT

HOME INSURANCE ASSESSMENT m pl e HOME INSURANCE ASSESSMENT Sa Street Address, Suburb File. 0000 Date. December 2014 Street Address, Suburb Page 1 of 8 File. 0000 Date. December 2014 Client Name Street Address Suburb HOME INSURANCE

More information

HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER 2015. May 2015

HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER 2015. May 2015 HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER 2015 May 2015 MAYOR OF LONDON Housing Standards: Transition Policy Statement. On 25 March 2015 through a written ministerial statement,

More information

Requirements for Building Application Submission

Requirements for Building Application Submission THE DEVELOPMENT CONTROL AND PLANNING BOARD P O Box 597 Phone: 869 465-2277 Bladen Commercial Development Fax: 869 465-5842 Basseterre, St. Kitts Email: phyplskb@caribsurf.com To: Architects, Designers

More information

Vertex BD. Leading Software Solution for Cold Formed Steel Construction

Vertex BD. Leading Software Solution for Cold Formed Steel Construction Vertex BD Leading Software Solution for Cold Formed Steel Construction Architectural Design Framing Engineering Detailing Production One Tool Does It All Leading Software for CFS Construction Vertex BD

More information

Building Control Guidance Note

Building Control Guidance Note Issued 01/01/13 Rev Page 1 of 5 If you intend to convert an existing loft space into additional rooms you will need to apply for Building Regulation Approval. You may also need Planning Permission if you

More information

Elaine Harvie & Jeremy Cruickshank Jan 10

Elaine Harvie & Jeremy Cruickshank Jan 10 Elaine Harvie & Jeremy Cruickshank Jan 10 3 Assembly Square, Cardiff - EXCELLENT BREEAM International Introduction Elaine Harvie Mechanical Engineer BREEAM Assessor Offices School/Education Industrial

More information

Siemens Gebze Location FIRST GREEN BUILDING IN TURKEY CERTIFICIED AS LEED GOLD

Siemens Gebze Location FIRST GREEN BUILDING IN TURKEY CERTIFICIED AS LEED GOLD FIRST GREEN BUILDING IN TURKEY CERTIFICIED AS LEED GOLD Slide 1 Energy Efficiency Workshop with KFW & TSKB Sep 28th, 2010 The LEED Green Building Rating System is a voluntary standard that defines high

More information

Product description NCC Data Center

Product description NCC Data Center Product description NCC Data Center Concept General As one of the largest actors in the Nordic construction industry, NCC Construction plays a leading role in shaping the future of our society. After building

More information

CONTE NT DESIGN PROCESS. Appendix. 01 First Issue. 02 Revision A. 03 Revision B. 04 Co-ordination. 05 Panel Thicknesses. 06 Panel Surface Quality

CONTE NT DESIGN PROCESS. Appendix. 01 First Issue. 02 Revision A. 03 Revision B. 04 Co-ordination. 05 Panel Thicknesses. 06 Panel Surface Quality CONTE NT DESIGN PROCESS First Issue 02 Revision A 03 Revision B 04 Co-ordination 05 Panel Thicknesses 06 Panel Surface Quality 07 CNC Timber Processing 08 Panel Standard Sizes 09 Glulam Standard Sizes

More information

Capital Expenditure. The common definition of capital expenditure is

Capital Expenditure. The common definition of capital expenditure is Capital Expenditure Under standard accounting practices local authorities are required to account for revenue expenditure and capital expenditure differently. Capital expenditure is defined in the Local

More information

Glossop Design & Place Making Strategy

Glossop Design & Place Making Strategy Supplementary Planning Document to the High Peak Local Plan June 2011 Design Brief for the Town Hall Complex GILLESPIES I GERALD EVE Reproduced from the Ordnance Survey map with the permission of Ordnance

More information

Name of course: Residential Construction Site Management (RCSM) Level 1

Name of course: Residential Construction Site Management (RCSM) Level 1 Name of course: Residential Construction Site Management (RCSM) Level 1 Core (required courses) or Optional (elective course): Required Delivery Method: This is an online course only with no classroom

More information

Services Enclosures and Protected Shafts - Maintaining Compartmentation

Services Enclosures and Protected Shafts - Maintaining Compartmentation Introduction When a fire resisting element is used to provide fire compartmentation, every opening that allows services to pass through the element must be adequately protected by sealing, or fire stopping

More information

EFA PSBP. Natural Ventilation Strategy. Introduction. 1.1 Relevant legislation. 1.1.1 The Building Regulations 2010

EFA PSBP. Natural Ventilation Strategy. Introduction. 1.1 Relevant legislation. 1.1.1 The Building Regulations 2010 EFA PSBP Natural Ventilation Strategy Introduction The Baseline Designs Project will provide scheme design details for a number of Primary and Secondary School Exemplars. For the purposes of setting a

More information

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town Hall Complete building restoration (state historic preservation award) High efficiency

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation

More information

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in REV 1-12.12.11/TB002 Technical Bulletin Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in conjunction with TRADA Technology and is intended to provide the reader with introductory

More information

14 October 2013. Home Ownership Services Islington Council Highbury House 4-5 Highbury Crescent London N5 1RN

14 October 2013. Home Ownership Services Islington Council Highbury House 4-5 Highbury Crescent London N5 1RN 14 October 2013 Leaseholder Islington Home Ownership Services 4-5 Highbury Crescent T 020 7527 7715 E homeownership@islington.gov.uk W www.islington.gov.uk Property reference: 000000 / ZZ Dear Leaseholder

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

Acceptance on the Approved List of contractors cannot however guarantee that any work orders will be issued to that contractor.

Acceptance on the Approved List of contractors cannot however guarantee that any work orders will be issued to that contractor. PROPERTY MANAGEMENT INTRODUCTORY GUIDANCE NOTES FOR THE APPLICATION TO THE APPROVED LIST OF CONTRACTORS CONTRACTORS GUIDANCE NOTES APPLICATION FORM ISSUED BY: PROPERTY MANAGEMENT UNIT WEST YORKSHIRE FIRE

More information

Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities

Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities At Macau International Airport (RFQ-198) Section 6 Bill of Quantities Bill Nr. 1 Preliminaries Bill Nr. 1 PRELIMINARIES NOTES : (1) The work shall be done during day time and night time according to CAM/ADA

More information

Glass and Building Regulations Impact Safety

Glass and Building Regulations Impact Safety Glass and Building Regulations Impact Safety England and Wales Approved Document N Scotland Part P Northern Ireland Part V Foreword For new buildings, and for buildings subject to major refurbishment,

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

MASTER BUILDERS ASSOCIATION

MASTER BUILDERS ASSOCIATION MASTER BUILDERS ASSOCIATION New South Wales 2015 EXCELLENCE IN HOUSING AWARDS ENTRY FORM Closing Date: Friday 20 March 2015 2015 EXCELLENCE IN HOUSING AWARDS AN ELECTRONIC VERSION OF THIS ENTRY FORM IS

More information

Workplace Health, Safety & Welfare

Workplace Health, Safety & Welfare Relevant Legislation Workplace (Health, Safety and Welfare) Regulations 1992 Construction (Design & Management) Regulations 2015 Provision & Use of Work Equipment Regulations 1998 (PUWER) Lifting Operations

More information

ROXUL Board Insulation Section 07 21 13 Master Guide Specification (CAVITYROCK ) Page 1 April 2016

ROXUL Board Insulation Section 07 21 13 Master Guide Specification (CAVITYROCK ) Page 1 April 2016 Master Guide Specification (CAVITYROCK ) Page 1 Click on the pilcrow in the MS Word Toolbar to toggle ROXUL GUIDE NOTES on and off. Delete this text before incorporating the section into a Project Manual.

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

Melbourne balcony Assessments

Melbourne balcony Assessments Balcony Assessment Melbourne balcony Assessments Address: SAMPLE Date: Assessor: Luke O Neill Registered Builder DBL-C 31305 Assessment Guidelines This is an assessment of balcony and elements as presented

More information

Braselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA 30548 LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room.

Braselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA 30548 LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room. 1.d 2.d 3.d 4.d 1.d 2.d 3.d 4.d REMOVE, REPAIR, & REPLACE EXISTING STOREFRONT SYSTEMS D.1 D.2 REMOVE, REPAIR, & REPLACE EXISTING STOREFRONT SYSTEMS D.1 D.2 REMOVE STAIR & INFILL WALL C.1 REMOVE DOOR &

More information

Archant London Environmental Awards

Archant London Environmental Awards Archant London Environmental Awards Environmental Business of the Year Big Yellow Self Storage PLC Barking Central, Hertford Road, Barking, IG11 8BL Introduction Big Yellow is a local business that has

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

Loss Prevention Standard

Loss Prevention Standard Loss Prevention Standard LPS 1581: Issue 2.1 Requirements and tests for LPCB approval of nonload This Loss Prevention Standard is the property of BRE Global Ltd. and is made publicly available for information

More information

The Guide To Waterproofing An Existing Basement

The Guide To Waterproofing An Existing Basement The Guide To Waterproofing An Existing Basement John Newton & Company is the leading independent supplier of basement waterproofing and damp proofing solutions in the UK. Newton System 500 is a maintainable

More information

Sika Sarnafil World Class Roofing and Waterproofing

Sika Sarnafil World Class Roofing and Waterproofing The following is a brief summary of the Leadership in Energy and Environmental Design program (LEED, Version 3) and the sections Sika Sarnafil s roofing systems can help contribute to obtaining LEED points.

More information

WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION

WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION WorkSafe Guidance Document Fall Protection in Residential Construction Table of Contents Executive Summary... 1 Introduction... 1

More information

Building Code Clarifications - 7. Fire Resistance

Building Code Clarifications - 7. Fire Resistance Building Code Clarifications - 7. Fire Resistance 7.1 (15-12-030) Use of combustibles in Type III construction roof assemblies Code Section (15-12-030) Use of Combustibles was revised on May 17, 2000,

More information

Scheme Document SD 5068

Scheme Document SD 5068 Scheme Document SD 5068 BREEAM Data Centres 2010 Uncontrolled copy if printed. Valid on day of printing only. SD 5068 Issue 1.0 25/05/2010 Page 1 of 325 BRE Global Limited (part of the BRE Group) is an

More information

SECTION XI OPINION OF PROBABLE COST

SECTION XI OPINION OF PROBABLE COST SECTION XI OPINION OF PROBABLE COST OPINION OF PROPABLE COSTS HARBOR ISLAND THE PAVILION 1) Provide a sprinkler system for the entire building. 8000 SF X $15/SF $120,000 2) Remove and replace existing

More information

1998 edition. Protection from falling. collision and impact ONLINE VERSION. The Building Regulations 2010. Stairs, ladders and ramps

1998 edition. Protection from falling. collision and impact ONLINE VERSION. The Building Regulations 2010. Stairs, ladders and ramps The Building Regulations 2010 Protection from falling, collision and impact APPROVED DOCUMENT K K1 K2 K3 K4 K5 Stairs, ladders and ramps Protection from falling Vehicle barriers and loading bays Protection

More information

BER Assessors Dwellings Technical Bulletin

BER Assessors Dwellings Technical Bulletin BER Assessors Dwellings Technical Bulletin Issue No. 2/12 April 2012 Contents: 1. SUPPLEMENTARY ELECTRIC WATER HEATING IN SUMMER... 2 2. PITCHED ROOF U-VALUE CALCULATIONS... 8 2.1. PITCHED ROOF, INSULATED

More information

Special Use Commercial Properties

Special Use Commercial Properties Contents Overview of Special Use Commercial Properties...3 Understanding Fast Food Restaurants...3 Understanding Gasoline Service Stations...4 Understanding Self-Service Cashier Booths...5 Understanding

More information

Ch. 58 DIVISION D-O 34 CHAPTER 58. DIVISION D-O ORDINARY COMMERCIAL, INDUSTRIAL, OFFICE OCCUPANCY GROUP CONSTRUCTION TYPE MAXIMUM STORY HEIGHT

Ch. 58 DIVISION D-O 34 CHAPTER 58. DIVISION D-O ORDINARY COMMERCIAL, INDUSTRIAL, OFFICE OCCUPANCY GROUP CONSTRUCTION TYPE MAXIMUM STORY HEIGHT Ch. 58 DIVISION D-O 34 CHAPTER 58. DIVISION D-O ORDINARY COMMERCIAL, INDUSTRIAL, OFFICE Sec. 58.1. Division D-O occupancies. 58.2. Separation and mixed occupancy. OCCUPANCY GROUP CONSTRUCTION TYPE MAXIMUM

More information

HHHHH Outstanding 85%

HHHHH Outstanding 85% Provinciehuis_Assessment_2040204_74,32%Final Score and Rating BREEAM Scheme: Europe 2009: Offices H Pass 30% Building Name: Provinciehuis Antwerpen HH Good 45% BREEAM Registration No.: BREEAM-0048-4626

More information

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST CITY OF BERKELEY DETAILED CHECKLIST This checklist will assist you in preparing plans for submittal with a building permit application. Alterations, additions and remodeling projects may not require all

More information

GREEN SCHOOLS CASE STUDY. West Wing Elementary

GREEN SCHOOLS CASE STUDY. West Wing Elementary GREEN SCHOOLS CASE STUDY School School name: School Deer Valley Union School District Address: 26716 N. High Desert Drive, Peoria, Arizona Contact: Jerry Cipriano Phone number: 602-467-5131 General location:

More information

Guidance on loft conversions in two-storey houses

Guidance on loft conversions in two-storey houses Guidance on loft conversions in two-storey houses Technical guidance for building control surveyors, designers and installers 01 Guidance on loft conversions in two-storey houses Technical guidance for

More information

A Homeowner s Guide to Building Permits

A Homeowner s Guide to Building Permits A Homeowner s Guide to Building Permits Building Division City of London 300 Dufferin Ave. P.O. Box 5035 London, ON N6A 4L9 Table of Contents What is a Building?... 3 Planning Your Project... 3 When is

More information

Scheme Document. How could it be used to assess a multi-tenanted asset?

Scheme Document. How could it be used to assess a multi-tenanted asset? Page: 1 of 21 1 DOCUMENT DETAILS Scope To formalise BREEAM In-Use operating procedures between BRE Global Ltd, BREEAM In- Use Clients and BREEAM In-Use Auditors. This document is applicable to UK and International

More information

Accounting For Tradespeople

Accounting For Tradespeople Accounting For Tradespeople Accounting For Trades People Being in the trades or building industry you need an accountant who understands your business. Here at McHenry Partners, we appreciate the unique

More information

Modular Accommodation Solutions. Flexibility, efficiency and quality in one complete package

Modular Accommodation Solutions. Flexibility, efficiency and quality in one complete package Modular Accommodation Solutions Flexibility, efficiency and quality in one complete package Welcome Our Services Providing Your Solutions The clients who work with SEDAC Accommodation Solutions are extremely

More information

Residential Decks. Planning and Development Services Department

Residential Decks. Planning and Development Services Department Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Planning and Development Services Department Residential Decks

More information

ELIGIBLE REPAIR PROJECT PARAMETERS

ELIGIBLE REPAIR PROJECT PARAMETERS THE DISTRICT MUNICIPALITY OF MUSKOKA ONTARIO RENOVATES PROGRAM FOR HOMEOWNERS ELIGIBLE REPAIR PROJECT PARAMETERS 1. To have your project considered and payment processed, all projects requiring a Building

More information

DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES

DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES WBCA 403 DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES A guide to assist those intending to install or who are involved in installing conservatories. Includes information about: conservatory and component

More information

Design Development Quality Management Phase Checklist Project Phase Checklist Series

Design Development Quality Management Phase Checklist Project Phase Checklist Series Best Practices Design Checklist Project Phase Checklist Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA

More information

Put us to the test. Construction testing and building investigations services from BRE. www.bre.co.uk

Put us to the test. Construction testing and building investigations services from BRE. www.bre.co.uk Put us to the test Construction testing and building investigations services from BRE www.bre.co.uk Backed by an extraordinary range of facilities BRE prides itself on being able to answer virtually any

More information

Partitioning & Ceiling Product Information

Partitioning & Ceiling Product Information Partitioning & Ceiling Product Information tel + 44 (0) 1384 412448 fax + 44 (0) 1384 4494 email enquiries@drywallsteelsections.co.uk web www.drywallsteelsections.co.uk tel + 44 (0) 1384 412448 fax + 44

More information

Proposal to achieve Code for Sustainable Homes Level 3 for a development of 7 detached dwellings

Proposal to achieve Code for Sustainable Homes Level 3 for a development of 7 detached dwellings Duchy Homes Site: Cantley Lane Doncaster Proposal to achieve Code for Sustainable Homes Level 3 for a development of 7 detached dwellings 22 nd February 2013 Leanne Brooksbank Accredited Energy & Code

More information

Exterior Elevated Elements Inspection Guidelines

Exterior Elevated Elements Inspection Guidelines Exterior Elevated Elements Inspection Guidelines Planning and Development 1. Guideline Purpose These guidelines are intended to assist practicing professionals in complying with Berkeley Municipal Code

More information

Structure Survey Findings:

Structure Survey Findings: Structure Survey Findings: Visible portions of the following were observed: foundations; structure to walls, columns, floors, roofs, overhang posts, and columns; attached or firmly abutting decks, balconies,

More information

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

More information

Estimating Database Checklist

Estimating Database Checklist Estimating Database Checklist If you are creating a new estimating database for projects, the following list offers a thorough listing of Main and Sub Categories. You can also use it as a checklist to

More information

Cost Estimating Simplified

Cost Estimating Simplified Cost Estimating Simplified Cost Estimating Simplified. 2003. This material has been created by Nick Butcher and Linda Demmers and provided through the Libris Design Project [http://www.librisdesign.org/],

More information

Preventing arson in buildings

Preventing arson in buildings Preventing arson in buildings More than half of fires in commercial buildings are started deliberately. These maliciously started fires can be particularly dangerous because they often develop quickly,

More information