CITY OF ORANGE DESIGN REVIEW COMMITTEE MINUTES FINAL
|
|
- Vincent Parrish
- 7 years ago
- Views:
Transcription
1 CITY OF ORANGE DESIGN REVIEW COMMITTEE MINUTES FINAL Committee Members Present: Tim McCormack - Chair Carol Fox Vice Chair Robert Imboden Craig Wheeler March 18, 2015 Staff in Attendance: Jennifer Le, Acting Principal Planner Robert Garcia, Senior Planner Kelly Christensen Ribuffo, Associate Planner Jeff Borchardt, Assistant Planner Sharon Penttila, Recording Secretary Administrative Session 5:00 Chair McCormack opened the Administrative Session at 5:16 p.m. Chair McCormack inquired if there was any Policy or Procedural information. Jennifer Le, Acting Principal Planner, made two agenda corrections regarding the project numbers for item #4 which should read DRC No and item #5 should read DRC No She also stated the minutes from the last meeting are taking longer due to the in-depth study session discussion on the City s demolition review process for historic resources, and they should be available for review at the next meeting. Ms. Le announced that the City Council appointed a new DRC member by the name of Anne McDermott and she most likely will be joining the Committee the second meeting in April. Marissa Moshier, Associate Planner, had additional information on the Pizza Press located at 155 N. Glassell which was before the DRC last fall. She explained the painted sign that was uncovered during renovation was damaged. The applicant has offered to have a sign painter restore the sign and Ms. Moshier is working with the painter performing the restoration. Committee Member Wheeler made a motion to close the Administrative Session of the Design Review Committee meeting. Carol Fox Administrative Session adjourned at 5:20 p.m.
2 Page 2 of 11 Regular Session 5:30 p.m. ROLL CALL: All Committee Members were present. PUBLIC PARTICIPATION: Opportunity for members of the public to address the Design Review Committee on matters not listed on the Agenda. There were no speakers. CONSENT ITEMS: (1) APPROVAL OF MINUTES:
3 Page 3 of 11 AGENDA ITEMS Continued Items: New Agenda Items: (2) DRC No TUSTIN STREET CENTER Façade remodel and site improvements of an existing center within the former Tustin Redevelopment Area N. Tustin Street Staff Contact: Robert Garcia, , rgarcia@cityoforange.org DRC Action: Final Determination Committee Member Imboden made a motion to move this item to the end of the agenda due to the absence of the applicant: Craig Wheeler
4 Page 4 of 11 (3) MNSP No /DRC No CHAPMAN UNIVERSITY HILBERT MUSEUM A proposal to renovate an existing 10,000 SF industrial building into an art museum with an accessory dance studio. 166 N. Cypress Street Staff Contact: Kelly Ribuffo, , kribuffo@cityoforange.org DRC Action: Recommendation to the Community Development Director Kelly Christensen Ribuffo, Associate Planner, presented a project overview consistent with the Staff Report. Ken Ryan, from KTGY, introduced Kris Olson, Troy Aday, Megan Penn, and Robert Curley who were available for questions on this project. Mr. Ryan gave a brief overview of the project. He explained that this temporary museum would be housing the Hilbert Collection art collection, and it would be open to the public. Mr. Olson stated they have requested a change of address from Cypress Street to Atchison Street. Public Comments: Chair McCormack opened the item to the Public for comments. Jason Ferrar, address on file, was concerned with potential traffic issues on Atchison Street, since it is a one-way street. Committee Member Imboden did clarify that the purpose of the DRC was to review the aesthetics of the project and suggested that Mr. Ferrar could follow up with City staff about traffic issues. Chair McCormack opened the item to the Committee for discussion. The Committee had the following questions and comments: Asked whether finish material on canopies will be the same as the existing canopies on the dance center. Applicant clarified it will match Digital Media and Art Center finishes. Type of cap being used on the brick veneer Type of cap being used at the top of the furred out wall sections on the East elevation Existing Orchid tree near the driveway on the northwest corner should be transplanted to the new location on the southwest corner of the property Vertical edge with thin brick veneer appears to be a weak transition of materials and prefer the transition align with the panel joint Location of electrical meters and panels Long term use of the building Curb could be along the same line as the wheel stops which would increase the planter width Landscape concept Use of the London Plane tree and the existing Magnolia trees Awning approval by Public Works
5 Page 5 of 11 Committee Member Imboden asked staff if a project coming to the DRC could include language in the staff reports that provide background on previous reviews of any Chapman Specific Plan EIR associated projects, and specifically how they fit into it. Committee Member Imboden made a motion to recommend approval of MNSP No and DRC No to the Community Development Director based on the findings and conditions listed in the Staff Report and with the additional conditions: 1. The transition and height of the brick veneer at the north façade shall be located to align with the existing concrete panel joint. 2. The existing bottlebrush street tree on the southeast corner of the property shall be replaced with a London Plane. 3. Should the proposed canopies on the east façade not be permitted by Public Works, drawings for that elevation shall return to the DRC for further review. With the following recommendations: 1. Relocation of the existing Orchid tree to the southern location as shown on the drawings, if deemed feasible by the project landscape architect. 2. Instead of using wheel stops, as indicated in the plans, work with City staff to determine if the walkway curb can be extended 24 inches out from the building, with the curb acting as the wheel stop. Carol Fox
6 Page 6 of 11 4) MNSP No /DRC No CHAPMAN UNIVERSITY HASHINGER TEMPORARY LABORATORY A proposal to install a temporary modular chemistry laboratory in an existing parking lot next to the Hashinger Science Center. 346 N. Center Street Staff Contact: Kelly Ribuffo, , kribuffo@cityoforange.org DRC Action: Recommendation to the Community Development Director Kelly Christensen Ribuffo, Associate Planner, presented a project overview consistent with the Staff Report. Public Comments: Chair McCormack opened the item to the Public for comments. There were none. Chair McCormack opened the item to the Committee for discussion. The Committee had the following questions and comments: Length of extension Community Development Director can approve Reconstruction of the parking lot after removal of temporary laboratory Need for more screening from the public right away Extension of planter on the North elevation Siding placed on the modular in the field or does it come from the factory Trim of the roofline Corner trim Horizontal seam between the building s siding and the skirting Parapet around the building Roof drainage Material of the steps and ramp Handrail/guards for the steps and ramp Type of curb to be used Plant height and maintenance Rationale for irrigation type Drainage Sprinkler spacing Temporary nature of the structure, and what the Specific Plan permits Committee Member Imboden made a motion to recommend approval of MNSP No and DRC No to the Community Development Director, based on the findings and conditions listed in the Staff Report, and with the additional conditions:
7 Page 7 of The existing parking lot shall be resurfaced with slurry coat and restriping upon removal of the temporary structure. 2. Screening landscape planter along the north side at the ramp location shall be extended to the greatest extent possible. 3. T1-11 skirt facing shall be provided at the exposed outer edges of the ramps and stairs. 4. Building shall be field sided to avoid horizontal joints. 5. Ligustrum screening shall be maintained at half the height of the proposed building. 6. Planter sprinkler emitters shall be provided at 2 units per shrub. 7. Solid wood corner boards shall be provided for the building. 8. A fabric layer over 3 gravel shall be added at the base of the planter beds. With the following recommendation: 1. The DRC recommends to the Community Development Director that should an extension to continue use of the building be requested, that it be extended no more than six months following the occupancy of the Center for Science and Technology. Craig Wheeler
8 (5) DRC No TUSKATELLA EL POLLO LOCO REMODEL City of Orange Design Review Committee Page 8 of 11 A proposal to remodel the façade of the existing El Pollo Loco E. Katella Ave. Staff Contact: Jeff Borchardt, , jborchardt@cityoforange.org DRC Action: Final Determination Jeff Borchardt, Assistant Planner, presented a project overview consistent with the Staff Report. Steve Shaw, architect, explained the paint palette and the proposed façade. Public Comments: Chair McCormack opened the item to the Public for comments. There were none. Chair McCormack opened the item to the Committee for discussion. The Committee had the following questions and comments: Lighting behind the grill Existing lights on the roof Grill location Signage under separate approval by staff Committee Member Fox made a motion to approve DRC No based on the findings and conditions listed in the Staff Report, and with the additional condition: 1. The light packs that are roof mounted and facing upward on the tile roof shall be removed. Craig Wheeler
9 Page 9 of 11 (2) DRC No TUSTIN STREET CENTER Façade remodel and site improvements of an existing center within the former Tustin Redevelopment Area N. Tustin Street Staff Contact: Robert Garcia, , rgarcia@cityoforange.org DRC Action: Final Determination Robert Garcia, Senior Planner, presented a project overview consistent with the Staff Report. James Cunnings, applicant, explained the enhancements being proposed on the building, including paint color and lights. Public Comments: Chair McCormack opened the item to the Public for comments. Youssef Ibrahim, owner, stated he bought the Center last September with the intention of remodeling it to complement Tustin Street. Chair McCormack opened the item to the Committee for discussion. The Committee had the following questions and comments: Existing parapet height and the new facade Door material and framing treatment, dimensions, and direction of door swings Colored rendered elevations (what are the white gaps?) Number of items are not called out in the plans including the surfaces, finishes, material, heights, dimensions, exterior lighting on the side and rear of the building and unclear on the existing store front conditions Concern with the proposal to add tall parapet elements on the edge of a cantilever element which adds visual weight without support. Suggestion to either add columns to support the weight, or reduce the parapet mass. Bracing for the new parapet Suggested the curved parapet on north and south elevation be thickened Suggested painting downspouts on the rear elevation Suggested hiding the wires on rear elevation Need for a roof plan that shows the parapet returns and the offset distance between the different parapets on the front Signage location and size Patching of former doors on the back elevation Landscaping and the box size or brown trunk height of the king palm When the applicant returns, the Committee would like to see the following: 1. The heights of all parapets 2. Dimensioned roof plan to show parapets and returns 3. Material callout 4. Whether canopy on the north side is existing, and will it be painted or surfaced in metal
10 5. Label all finish material 6. Whether the finish is to match existing finish 7. Detail on the lighting plans including wall packs and under lighting City of Orange Design Review Committee Page 10 of 11 Committee Member Fox made a motion to continue DRC No based on the comments made during the meeting requesting more information on the plans, rethinking the parapet heights at the ends, lighting, landscaping and location of proposed signage to a date uncertain: Craig Wheeler
11 Page 11 of 11 ADJOURNMENT: Committee Member Imboden made a motion to adjourn to the next regularly scheduled Design Review Committee meeting on April 1, Carol Fox Meeting adjourned at 7:52 p.m.
DESIGN REVIEW COMMITTEE AGENDA ITEM
DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: MARCH 6, 2013 TO: THRU: FROM: SUBJECT: Chair Fox and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Doris Nguyen, Associate
More informationIndustrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations
16.20.110 - Industrial Suburban District ( IS ) Figure REFERENCE Typical Buildings in the IS District Figure REFERENCE Site Plan of a typical development in the IS District Sections: 16.20.110.1 Composition
More informationMINUTES. Date: March 24, 2010 LPC 50/10 Location: 728 St. Helens, Tacoma Municipal Bldg North, Room 16
Members Mark McIntire, Chair Ross Buffington, Vice Chair Edward Echtle Ken House Imad Al Janabi, PhD. Fred King Megan Luce Bret Maddox, S.E. Ha Pham Pamela Sundell Kathryn Longwell, North Slope Ex-Officio
More informationArchitectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE
Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE Commercial, Professional Office, and Public Facility Developments Purpose This Guide offers examples to clarify and explain the
More informationSTRUCTURAL ASSESSMENT
STRUCTURAL ASSESSMENT Project: 1432-1434 East Commerce St. Job. No: 122200 Location: San Antonio, TX Date: Dec. 10, 2012 Weather: Sunny, Windy,60 deg Performed by: Jeff Haughton and Frank Lamas, Alpha
More informationCOMMUNITY APPEARANCE STANDARDS
Article 25 COMMUNITY APPEARANCE STANDARDS 25.01 Applicability 25.01.01 This Article is applicable to the publicly visible portions of building elements, as defined herein. A. An element of a building shall
More informationArchitectural Condition Survey
Architectural Condition Survey Santa Fe Railroad / AMTRAK Depot, Lawrence. Kansas for the City of Lawrence, 2002 Survey: (student) PI: William Carswell, Associate Dean, School of Architecture, University
More informationHarris Hydraulics Laboratory Pumphouse Fall Guard Addendum to the Historic Resources Addendum
Harris Hydraulics Laboratory Pumphouse Fall Guard Addendum to the Historic Resources Addendum University of Washington James Cary, Architect pc 8 May 2013 1. INTRODUCTION Background The University of Washington
More informationGUIDELINES FOR REHABILITATION OF TRADITIONAL COMMERCIAL BUILDINGS DESIGN GUIDELINES
GUIDELINES FOR REHABILITATION OF TRADITIONAL COMMERCIAL BUILDINGS DESIGN GUIDELINES PAGE 13 DESIGN GUIDELINES The following design guidelines have been developed to guide appropriate design in the Downtown
More informationRegular Public Meeting-Study Session June 23, 2011
Regular Public Meeting-Study Session June 23, 2011 Dr. Ruth Ann Marston presided over the PESD No. 1 Governing Board Meeting in the Phoenix Elementary School District Governing Board Room Other Board Members
More informationHISTORIC PRESERVATION COMMISSION ADMINISTRATIVE APPROVAL ISSUED JULY - SEPTEMBER 2014 DATE PROJECT ADDRESS PROJECT DESCRIPTION
HISTORIC PRESERVATION COMMISSION ADMINISTRATIVE APPROVAL ISSUED JULY - SEPTEMBER 2014 DATE PROJECT ADDRESS PROJECT DESCRIPTION 07/02/14 212A King George Street Remove existing picket fence from side yard
More informationPUBLIC RESTROOMS, DESIGN INTENT
PUBLIC RESTROOMS, DESIGN INTENT 1.01 STRUCTURAL A. Where feasible, metal stud partitions will be constructed on a 6 high concrete curb. 1.02 MECHANICAL A. Restrooms will have a minimum of 15 air changes
More informationPRESERVATION PLANNING ASSOCIATES 519 Fig Avenue, Santa Barbara, CA 93101 Telephone (805) 450-6658 Email: accole5@yahoo.com
PRESERVATION PLANNING ASSOCIATES 519 Fig Avenue, Santa Barbara, CA 93101 Telephone (805) 450-6658 Email: accole5@yahoo.com June 17, 2015 Ms. Kimberley Heaton McCarthy Supervising Planner Building and Safety
More informationGas Meter Clearances and Service Installation Requirements
March 2016 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE's Customer Construction Services 1 888 321 7779 or visit PSE.com/CustomerConstruction
More information9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.
Section 9.8. Stairs, Ramps, Handrails and Guards 9.8.1. Application 9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and
More informationSHARP. Focus. AESS serves as the focal point of a small eye-care office in Austin. BY BRIAN SAYRE, P.E., AND K. MARK MERRYMAN, P.E.
SHARP Focus BY BRIAN SAYRE, P.E., AND K. MARK MERRYMAN, P.E. AESS serves as the focal point of a small eye-care office in Austin. YOU COULD SAY THAT Eye Physicians of Austin had a clear vision for its
More informationMarch 19, 2014. Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202
Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202 Re: Prospector s Point Walkway/Façade Repairs Martin/Martin, Inc Project No.: 13.0358.S.02 Ms. McDonald: Per your request
More informationFast Track A Successful Redevelopment: The Palm Beach Outlets Story
Fast Track A Successful Redevelopment: The Palm Beach Outlets Story SPEAKERS Rick Greene, AICP City of West Palm Beach Brian Seymour, Esq. Gunster Ken Tuma, PE UDKS Josh Long, AICP Gunster Grand Opening
More informationFacility Assessment for. 11801 East Main Street, Huntley, IL
Facility Assessment for 11801 East Main Street, Huntley, IL July 12, 2012 Prepared by: Dewberry Architects Inc. 25 S. Grove Avenue, Suite 500 Elgin, IL 60120 (847) 695-5840 The Village of Huntley requested
More informationDesign and Access Statement. 141-145 Earls Court Road London SW5 9RH
J U L I A N A R E N D T A S S O C I A T E S 1 7 a P i n d o c k M e w s L i t t l e V e n i c e L o n d o n W 9 2 P Y F + 4 4 2 0 7 2 8 6 9 9 0 1 Design and Access Statement T + 4 4 2 0 7 2 8 6 9 9 9 1
More informationLAYING BLOCK AND BRICK
LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct
More information17,280 square feet Overview:
CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The
More informationTHIRD LAGUNA HILLS MUTUAL
THIRD LAGUNA HILLS MUTUAL SECTION 34 WINDOWS & WINDOW ATTACHMENTS MAY 1996, RESOLUTION M3-96-28 SEPTEMBER 2002, RESOLUTION M3-02-47 NOVEMBER 2002, RESOLUTION M3-02-62 OCTOBER 2004, RESOLUTION 03-04-27
More informationOPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY
Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic
More information201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE
STRUCTURAL INSPECTION REPORT DRAFT 201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE TOWN OF PRESCOTT Date: November 2013 GENIVAR No.: 131-20617-00 2611 Queensview Drive, Suite 300, Ottawa,
More informationCertification: Building Plans Examiner. Exam ID: B3
Certification: Building Plans Examiner Exam ID: B3 Scope: A Building Plans Examiner will be responsible for reviewing submitted plans to determine if they meet the requirements of the various Building
More informationPROFESSIONAL ENGINEERING INSPECTIONS, INC.
PROFESSIONAL ENGINEERING INSPECTIONS, INC. P. O. BOX 271492 HOUSTON, TEXAS 77277 Registered Engineering Firm #1503 http://www.profengineering.com (713) 664-1264 July 8, 2004 Mr. Simple Samson 2831 Octoberfest
More information2.1. Architectural Character. Mountain. Agrarian. Craftsman. Gold Rush
2 A r c h i t e c t u r a l C h a r a c t e r 2.1 Introduction Development within the corridor is not required to be any one architectural style but should incorporate elements from one of the following
More informationNumber of Sides Required to Have a Handrail
Excerpt from 2012 B.C. Building Code HANDRAILS & GUARDS 9.8.7. Handrails 9.8.7.1. Required Handrails 1) Except as provided in Sentences (2) to (4), handrails shall be installed on stairs and ramps in accordance
More informationBLOCK 400 PLANNED COMMUNITY DISTRICT
BLOCK 400 PLANNED COMMUNITY DISTRICT Newport Center December 1983 Newport Beach, California Ordinance 88-119 Adopted December 12, 1988 Amendment No. 672 Resolution No. 95-115 Adopted October 9, 1995 Amendment
More informationCITY OF BEVERLY HILLS 455. N. Rexford Drive Beverly Hills, California 90210
BEVERLY CITY OF BEVERLY HILLS 455. N. Rexford Drive Beverly Hills, California 90210 ARHlTECURAL REVIEW COMMISSION REGULAR MEETING MINUTES August 15,2012 1:00 PM MEETING CALLED TO ORDER Date I Time: August
More informationExterior Elevated Elements Inspection Guidelines
Exterior Elevated Elements Inspection Guidelines Planning and Development 1. Guideline Purpose These guidelines are intended to assist practicing professionals in complying with Berkeley Municipal Code
More informationjohn jay college of criminal justice
AIA NEW YORK CHAPTER 2013 DESIGN AWARDS ARCHITECTURE john jay college of criminal justice NEW YORK, NEW YORK FULL PROJECT NARRATIVE John Jay College of Criminal Justice s new building provides all the
More informationArchitectural Inspection Site Structures
0141 Freestanding Shelters Open air shelters not attached to the building. Bike rack shelter with bike racks: This 8'x30' structure is located on the north east side of the building on the wooded landscape
More informationEnvelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit
R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed
More informationThe Florida Club Property Owners Association. Architectural Standards Guidelines
The Florida Club Property Owners Association Architectural Standards Guidelines Revised May 27, 2010 TABLE OF CONTENTS Architectural Change Application Process... 3 Architectural Standards Guidelines...
More informationwww.citiesinspection.com October 5, 2015 Dear Client,
www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.
More informationPoint Auditorium Design Narrative PROJECT NAME: Point Auditorium DATE: 06/25/15 TO: Lance Francis FROM: Leslie Ellsworth
INTRODUCTION: Kronberg Wall Architects is pleased to present the Design Narrative for the Point University Auditorium conversion from the existing warehouse space. General Project Description: This project
More informationDESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines
DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines A. Offices a. Office buildings should be built to the minimum required setback. b. Surface parking should be located towards the
More informationREQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:
REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY: THE COMMUNITY DEVELOPMENT AGENCY OF THE CITY OF ORD JULY 2014 A. STATEMENT
More informationORDINANCE NO. 21-2014 (As Amended)
ORDINANCE NO. 21-2014 (As Amended) To Amend the Official Zoning Map of the City of Worthington, Ohio, to Change Zoning of Certain Land from C-3, Institutions and Offices to PUD, Planned Unit Development
More informationHistoric Preservation Certification Application Part 2 343-345 Main Street West South Haven, Vermont NPS Project No. 12345
Exterior Features 1 site and drainage 2 foundation 3 wood siding and trim 4 exterior doors 5 windows / storm windows 6 porches front and rear 7 chimneys 8 roofing Interior Features 9 frame 10 basement
More informationComment Form on Proposed Gut Rehabilitation Alternatives
Comment Form on Gut Rehabilitation Alternatives Name: Organization: Email: Instructions Submission: Please submit this form to energystarhomes@energystar.gov by October 10 th, 2012 with the subject line
More informationSCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM
Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and
More informationMarch 14, 2007. Installation of Bay, Bow and Garden Windows
March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed
More informationVILLAS OF TRADITIONS AT GREY OAKS
Report of Turnover Survey VILLAS OF TRADITIONS AT GREY OAKS Grey Oaks Development Naples, Collier County, Florida Forge Engineering Project Number 2907-001.01 March 2015 Richard P..Lundberg, P.E cn=richard
More informationWaterleaf ARB Application
To: Waterleaf ARB Application Waterleaf Architectural Review Board c/o Property Management Systems, Inc. P.O. Box 1987 Yulee, FL 32097-1987 From: Name: Address: City, State, Zip: Phone: Fax: Lot Number:
More informationSUPER SHED. Indoor shelter for your outdoor tools.
SUPER SHED Indoor shelter for your outdoor tools. Not everyone needs a garden shed. But, if you've no more space on your garage wall for that new leaf rake, if you can't find your potting trowel because
More informationOXFORD HISTORIC DISTRICT COMMISSION MINUTES JUNE 8, 2015
OXFORD HISTORIC DISTRICT COMMISSION MINUTES JUNE 8, 2015 The regular monthly meeting of the Oxford Historic District Commission was called to order by the chairman, Thomas Costigan, on Monday,, at 5:00
More information3D Drawing. Single Point Perspective with Diminishing Spaces
3D Drawing Single Point Perspective with Diminishing Spaces The following document helps describe the basic process for generating a 3D representation of a simple 2D plan. For this exercise we will be
More informationNew Home Construction Packet
New Home Construction Packet Congratulations! You are building a new home in Meyerland. This packet of information was assembled to assist you with the process. It contains all the forms that you will
More informationMTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS
Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT
More informationAn ordinance pertaining to the Maya Angelou Birthplace, located at 3130 Hickory Street (the
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 BOARD BILL NO. 76 INTRODUCED BY ALDERWOMAN MARLENE DAVIS, ALDERMAN TERRY KENNEDY ALDERMAN MARLENE DAVIS, ALDERMAN TERRY KENEDY, ALDERMAN FREEMAN
More informationResidential Decks. Planning and Development Services Department
Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Planning and Development Services Department Residential Decks
More informationCOMMUNITY REDEVELOPMENT AGENCY FAÇADE IMPROVEMENT PROGRAM GUIDELINES
COMMUNITY REDEVELOPMENT AGENCY FAÇADE IMPROVEMENT PROGRAM GUIDELINES SEPTEMBER 2007 PURPOSE Clearwater s tropical environment provides many opportunities for festive activities and amenities for the downtown
More informationApplication for Certificate of Appropriateness. 1194 Villa Drive, Atlanta, GA 30306. Owner: Mary T Farms LLC (404-550-3390) 3/25/16
Application for Certificate of Appropriateness 1194 Villa Drive, Atlanta, GA 30306 Owner: Mary T Farms LLC (404-550-3390) 3/25/16 Proposed work is as follows: 1) Roof: Roof Section#1: Proposed work shall
More informationStreet Audit Tool: Web 2.0 Tools
Name: Email: Instructions: Auditor Information (1) Use all three tools for your assessment (2) If the tool can not determine the criteria, check (3) Indicate the tools used (4) Rate the effectiveness of
More informationArchitectural Control Guidelines
Architectural Control Guidelines The following Architectural Control Guidelines have been customized for 386 Beaverbrook and are intended to maintain a minimum standard of new construction within the development.
More informationLighthouse Engineering, L.L.C.
Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering
More informationMark Cramer Inspection Services, Inc.
Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction
More informationMANAGEMENT PLAN STONE BAY RIFLE RANGE HISTORIC DISTRICT MCB CAMP LEJEUNE
MANAGEMENT PLAN STONE BAY RIFLE RANGE HISTORIC DISTRICT MCB CAMP LEJEUNE This management plan is to be used in association with procedures outlined in Chapter of the Historic Buildings Management Handbook.
More information29 Broadway- 14 th Fl Tel: 212.888.8334 New York NY 10006 Fax: 212.419.1939. Due Diligence Report. New York, New York
Due Diligence Report New York, New York Prepared for Mr. On February 8, 2010 P a g e 1 Table of Contents PAGE 3.. GENERAL INFORMATION PAGE 4 FILINGS PERMITS AND ENCUMBRANCES PAGE 6. CORE AND SHELL PAGE
More informationEvanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions
Evanston Main Street Station TOD Plan and Study Appendix A.1: Station Area Existing Conditions EvanstonMainStreetStation TODPlanandStudy A 1 AppendixA.1: ExistingConditions Table of Contents Station Locations
More informationMOBILE HOME LAW. Revised November 2001
MOBILE HOME LAW Revised November 2001 TABLE OF CONTENTS: SECTION 1: SECTION 2: SECTION 3: SECTION 4: SECTION 5: SECTION 6: SECTION 7: SECTION 8: SECTION 9: SECTION 10: SECTION 11: SECTION 12: INTENT DEFINITIONS
More informationR 1 Design Review Application
City of Beverly Hills Planning Division 455 N. Rexford Drive Beverly Hills, CA 90210 Tel. (310) 285 1141 Fax. (310) 858 5966 R 1 Design Review Application Design Review Overview Beverly Hills residential
More informationThe City of Basehor, Kansas
The City of Basehor, Kansas Residential and Miscellaneous Permits This list provides general information regarding permit requirements for various residential construction and maintenance activities. The
More informationSaint Cloud Business Center
Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception area with
More informationBuilding Condition Assessment: 215-219 West Lexington Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
More informationSECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS
SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word
More informationCity of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address
City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address July 005 Prepared by DMCG Disability Management Consulting Group L.L.C. 801 Jonquil Place Columbia, MO 650 In
More informationWASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST
0 RIVERSIDE DRIVE, OTTAWA, ON A0.0 COVER SHEET / DRAWING LIST A0. LEGEND AND GENERAL NOTES A0. GENERAL NOTES A0. GENERAL NOTES A0. TYPICAL WASHROOM WALL/SINK SECTION A0. DETAIL - CONTROL JOINT A0. DETAIL
More informationHEDDERMAN ENGINEERING, INC. www.heddermanengineering.com Office 281-355-9911, Fax 281-355-9903 office@heddermanengineering.com
HEDDERMAN ENGINEERING, INC. www.heddermanengineering.com Office 281-355-9911, Fax 281-355-9903 office@heddermanengineering.com, 2011 TO: Mr. REF: CONDITION OF PROPERTY SURVEY Dear Mr. : At your request,
More informationLighthouse Engineering, L.L.C.
Monday, May 07, 2012 Lighthouse Engineering, L.L.C. Michael Gandy, P.E. Registered Professional Engineer (TX: 95672) Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website:
More informationCertificate of Appropriateness Applications
Certificate of Appropriateness Applications Huntsville Historic Preservation Commission August 10, 2015 Applicant: Philip Buzzetta Submission Date: 07/07/15 Architectural Style: Dutch Colonial Status:
More informationFlorida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS
Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS 1009.1 Stairway width. The width of stairways shall be determined as specified in Section 1005.1, but such width shall not be less than 44
More informationEAST LYME HIGH SCHOOL
Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed
More informationBENICIA HISTORIC PRESERVATION REVIEW COMMISSION REGULAR MEETINGMINUTES. City Hall Commission Room Thursday, September 18, 2014 6:30 P.M.
DRAFT BENICIA HISTORIC PRESERVATION REVIEW COMMISSION REGULAR MEETINGMINUTES City Hall Commission Room Thursday, September 18, 2014 6:30 P.M. I. OPENING OF MEETING A. Pledge of Allegiance B. Roll Call
More informationBoard of Directors Meeting February 26, 2015 2:00 PM
Board of Directors Meeting February 26, 2015 2:00 PM Board Member(s) Present: Also Present: CALL TO ORDER Richard Moore, President Russ Long, Vice President Wayne LeBlang, Treasurer Paula Turner, Secretary
More informationPresentation: Proposed Plan Amendments
Epstein s Rehabilitation Plan Presentation: Proposed Plan Amendments MORRISTOWN REDEVELOPMENT ENTITY March 14, 2013 Epstein s Rehabilitation Plan Presentation Part 1: Morristown Planning Division Neighborhood
More informationFriends Seminary Presentation to NYC Landmarks Preservation Commission 21 April 2015 Kliment Halsband Architects
Presentation to NYC Landmarks Preservation Commission 21 April 2015 Kliment Halsband Architects FRIENDS SEMINARY RE-DEVELOPMENT PROJECT NYC LPC SUBMISSION 16 APRIL 2015 INDEX 1 Project Description 2 Stuyvesant
More informationSun Windows General Information Sun New Construction Window Installation Instructions
Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten
More informationBROWNSVILLE STRUCTURES STUDY. July 2012. Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208
BROWNSVILLE STRUCTURES STUDY July 2012 Prepared by LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208 TABLE OF CONTENTS I. SUMMARY OF BUILDING ANALYSIS.. 1 II. INDIVIDUAL BUILDING
More informationCLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.
CLIENT Inspection Report 271 Front St. Alert Bay, B.C. Island Building Inspections 2013 V ANCOUVER I SLAND B. C. Elevation Photos For the Property at 271 Front Street Alert Bay, BC ELEVATION PICTURES Front
More informationKatharine Teats House HABS No. CA-2162 3560 Seventh Avenue San Diego San Diego County /J/Vf# <? California /WtO
Katharine Teats House 3560 Seventh Avenue San Diego San Diego County /J/Vf#
More informationHartsfield-Jackson Atlanta International Airport s
Hartsfield-Jackson Atlanta International Airport s 2008-09 Closed Projects (Posted 1/6/2009) FC-3007000038C: MISCELLANEOUS BUILT-UP ROOF AND SINGLE PLY ROOF REPAIRS AT H-JAIA Furnish all labor, equipment,
More informationCommercial And Industrial Steel Buildings
Commercial And Industrial Steel Buildings Arco Building Systems, Inc. Since 1979 Arco has been providing the highest quality steel buildings to contractors and owners throughout the United States. Leadership
More informationFacility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components
Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development
More informationPhysical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone:
Choctaw Date Recorded: Permit # RESIDENTIAL - BUILDING Permit APPLICATION Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone: YES NO Sec., Township, Range/Subdivision: Acres/Block:
More informationHow To Find Out What Happened To Slave Housing
Slave Housing Data Base Building Name: Presquisle Brick Duplex 2 (northern building) Evidence Type: Extant Site ID: Historical Site Name: City or Vicinity: County: Culpeper State: Virginia UTM: Easting:
More informationROLL CALL: Allen present, Doss present, Johnson absent, Sarrio present, Lesnick present, McCarty present, Compeau- present. Quorum present.
A worksession of the Design Review Commission was held on April 9, 2015, at 5:00 pm in the Development Conference Room of Town Hall, 500 Poplar View Parkway. The following staff members were present: Town
More informationGas Meter Clearances and Service Installation Requirements
March 2015 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE s Customer Construction Services 1-888-321-7779 or visit PSE.com/CustomerConstruction
More informationCity of Springboro 320 West Central Avenue, Springboro, Ohio. Planning Commission Regular Meeting. Wednesday, June 25, 2014
City of Springboro 320 West Central Avenue, Springboro, Ohio Wednesday, I. Call to Order and Roll Call Chairperson Hans Landefeld called the Springboro Planning Commission Meeting to order at the Springboro
More informationPOST AND FRAME STRUCTURES (Pole Barns)
POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:
More informationAt the completion of this guide you should be comfortable with the following:
This guide provides instructions and best practices for deployment of the Yealink W52P IP DECT phones and repeaters RT10, which is intended for qualified technicians (or administrator) who will deploy
More informationRoof Tutorial. Chapter 3:
Chapter 3: Roof Tutorial The majority of Roof Tutorial describes some common roof styles that can be created using settings in the Wall Specification dialog and can be completed independent of the other
More informationFriday, March 9, 2012 1800 Grant Street, 1st Floor conference room
Office of the Vice President for Finance 1800 Grant Street, Suite 800 Denver, Colorado 80203 (303) 860-5600 Fax: (303) 860-5640 University of Colorado Design Review Board Minutes Friday, March 9, 2012
More informationA0 SHEET 1 OF 5 400 LOCUST STREET FRANKFORT, KANSAS 66427 FRANKFORT, KANSAS 66427 ROOF REPAIR OF THE 400 LOCUST STREET
POYNTZ AVENUE, STE 9 MANHATTAN, KS 0..0..9 FAX WEST th STREET JUNCTION CITY, KS.... FAX 0, Bruce McMillan AIA, Architects, P.A. HERITAGE TRUST FUND GRANT PROJECT NO. 0-0 ROOF REPAIR OF THE 00 LOCUST STREET
More information3. HERITAGE GRANT APPROVAL 192 MOORHOUSE AVENUE, CHRISTCHURCH
3. HERITAGE GRANT APPROVAL 192 MOORHOUSE AVENUE, CHRISTCHURCH General Manager responsible: General Manager, Strategy and Planning Group, DDI: 941-8281 Officer responsible: Author: PURPOSE OF REPORT Programme
More informationHISTORIC PRESERVATION REVIEW BOARD STAFF REPORT AND RECOMMENDATION. 1050 21 st Street, NW Thaddeus Stevens School
HISTORIC PRESERVATION REVIEW BOARD STAFF REPORT AND RECOMMENDATION Property Address: Landmark/District: Meeting Date: H.P.A. Number: Staff Reviewer: 1050 21 st Street, NW Thaddeus Stevens School April
More informationHow To Get A Street Permit In Seattle
APPLICATION FOR CERTIFICATE OF APPROVAL Date Submitted: Business Name: Business Address: Building Name: Applicant/Owner'sName: Phone # Mailing Address: City/Zip Code: Applicant Representative: Phone #
More information