Size: px
Start display at page:

Download ""

Transcription

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31 DESIGNED BY: GENERAL NOTES: CSXT RIGHT-OF-WAY CONSTRUCTION SPECIFICATIONS: TREES VIRGINA DEPARTMENT OF TRANSPORTATION ROAD AND BRIDGE SPECIFICATIONS, 27 INCLUDING ALL SUPPLEMENTAL SPECIFICATIONS AND SPECIAL PROVISIONS INCLUDED IN THE CONTRACT DOCUMENTS. DESIGN SPECIFICATIONS: INSIDE FACE OF BACKWALL EXIST. END BENT NO '-3 " (FACE-TO-FACE EXIST. BACKWALLS INSIDE FACE OF BACKWALL EXIST. END BENT NO. 2 AMERICAN RAILWAY ENGINEERING AND MAINTENANCE-OF-WAY ASSOCIATION (AREMA) MANUAL FOR RAILWAY ENGINEERING, 214. CSX TRANSPORTATION CRITERIA FOR BALLAST DECK RAILROAD BRIDGES DATED OCTOBER 1, TO RICHMOND TO ALEXANDRIA DESIGN LOADING: C LEXIST. TRACK 3 & EXIST. BRIDGE COOPER E8 OR ALTERNATE LIVE LOAD WITH IMPACT PERCENTAGE FOR ROLLING EQUIPMENT WITHOUT HAMMER BLOW. MATERIALS: STRUCTURAL STEEL: ROCKS BOTTOM OF EXISTING GIRDER EL..14 STA STA STA STA (OUT-TO-OUT BRIDGE) C LEXIST. TRACK 2 & EXIST. BRIDGE C LPROP. TRACK & WETLAND BOUNDARY PROP. BRIDGE (WITHIN PROJECT AREA) 8'-8 " 17'-5" 12'-" INCREASING MILEPOSTS STRUCTURAL STEEL SHALL CONFORM TO ASTM A79, GRADE 5 THE TOUGHNESS SHALL BE T2 FOR NON-FRACTURE CRITICAL MEMBERS. ALL STEEL MATERIAL SHALL BE STRAIGHT AND FREE FROM SHARP KINKS AND BENDS. ANY STEEL MATERIAL EXHIBITING SUCH DEFICIENCIES SHALL BE CAUSE FOR THE REJECTION OF THE MATERIAL. STRAIGHTENING OF THE MATERIAL SHALL NOT BE ACCEPTABLE. CONCRETE: CONCRETE IN SUBSTRUCTURE INCLUDING CONCRETE IN STEEL PIPE PILES SHALL BE CLASS A4 HAVING A MINIMUM COMPRESSIVE CYLINDER STRENGTH AT 28 DAYS EQUAL TO 4, PSI. REINFORCING STEEL: ALL REINFORCING STEEL SHALL BE DEFORMED BARS OF NEW BILLET-STEEL CONFORMING TO ASTM A615, GRADE 6. VERTICAL DATUM ELEVATIONS ARE BASED ON NAVD WALKWAY GRATING 8'-8 " 54'-1" 54'-1" 54'-1" 11 INSIDE FACE OF BACKWALL PROP. END BENT NO '-3" (FACE-TO-FACE PROP. BACKWALLS INSIDE FACE OF BACKWALL PROP. END BENT NO. 2 CSXT RIGHT-OF-WAY APPROX. EDGE OF STREAM (MLW) APPROX. EDGE OF STREAM (MHW) APPROX. EDGE OF STREAM (MHW) APPROX. EDGE OF STREAM (MLW) PLAN INSIDE FACE OF BACKWALL PROP. END BENT NO. 1 54'-1" 162'-3" (FACE-TO-FACE PROP. BACKWALLS 54'-1" 54'-1" SPAN 1 SPAN 2 SPAN 3 C LPROP. INT. C LPROP. INT. BENT NO. 1 BENT NO. 2 INSIDE FACE OF BACKWALL PROP. END BENT NO. 2 AREA OF NEW CONSTRUCTION FOOTPRINT OVER STREAM CHANNEL = 2,9 S.F. PROP. T/R BOTTOM OF GIRDER EL..14 8'-6" MIN. BOTTOM OF GIRDER EL..16 AREA OF NEW CONSTRUCTION FOOTPRINT OVER NON-VEGETATED WETLANDS = 9 S.F. MLW EL..1 MHW EL. 1.6 APPROX. EXIST. GROUND LINE ELEVATION * ELEVATION AT 1.5 TIMES MEAN TIDE RANGE ABOVE M.L.W.. (LIMITS OF VEGETATED WETLANDS) DRAFT WORK IN PROGRESS DO NOT USE FOR CONSTRUCTION ENGINEER REVISIONS Rummel, Klepper & Kahl, LLP Consulting Engineers 81 Mosher Street Baltimore, Maryland STAFFORD COUNTY ENGINEERING DEPARTMENT DESIGN & CONSTRUCTION JACKSONVILLE, FLORIDA PRINCE WILLIAM COUNTY THIRD TRACK VIRGINIA ARKENDALE TO POWELLS CREEK CSXT BRIDGE AT M.P. CFP 76.9 OVER CHOPAWAMSIC CREEK PLAN AND ELEVATION CHECKED BY: DRAWN BY: SK JF EMT PROJECT # A42598 SCALE "=1'-" DATE /8/214 DRAWING NO. BR31 SHEET NO. 1 OF 2

32 DESIGNED BY: C LEXISTING TRACK 3 AND EXISTING BRIDGE C LEXISTING TRACK 2 AND EXISTING BRIDGE C LPROPOSED TRACK AND PROPOSED BRIDGE 13'-5Œ" 19'-6ƒ" 17'-5" 3'-" 8'-8 " 8'-8 " 2'-9" 2'-6" Wx45 (TYP.) " SIDE PLATE (TYP.) 18"x1 " PLATE (TYP.) 44"x " PLATE (TYP.) ƒ" STEEL DECK PLATE 1 " BALLAST MAT 11" 5 EQUAL SPACES = 15'-7" 11" TYPICAL SECTION DRAFT WORK IN PROGRESS DO NOT USE FOR CONSTRUCTION BR32 ENGINEER REVISIONS Rummel, Klepper & Kahl, LLP Consulting Engineers 81 Mosher Street Baltimore, Maryland STAFFORD COUNTY ENGINEERING DEPARTMENT DESIGN & CONSTRUCTION JACKSONVILLE, FLORIDA PRINCE WILLIAM COUNTY THIRD TRACK VIRGINIA ARKENDALE TO POWELLS CREEK CSXT BRIDGE AT M.P. CFP 76.9 OVER CHOPAWAMSIC CREEK TYPICAL SECTION CHECKED BY: DRAWN BY: SK JF EMT PROJECT # A42598 SCALE "=1'-" DATE /8/214 DRAWING NO. SHEET NO. 2 OF 2

33 $$FILE$$ $$DATE$$ $$TIME$$ A42598 DRAFT WORK IN PROGRESS DO NOT USE FOR CONSTRUCTION MARY CAREY KENDALL DN " PLANTATION PIPELINE Tele. Pedestal FO Witness Tele. Pedestal FO Witness EXISTING PLANTATION PIPE VERIZON O/H COMM. LINE 12" PLANTATION PIPELINE MARY CAREY KENDALL DN Power Pole #GH 28 FO Witness Culvert Under Arkendale Road Adjacent To Existing Structure Under Railroad Tracks. (Unknown) (Previous Survey) Tele. Pedestal RAILROAD COMMUNICATION CABLE RAILROAD COMMUNICATION CABLE T T T MARY CAREY KENDALL DN Fiber Optic Witness Post T Underground UitlityMarking Inv. In =9.46' Inv. Out =7.43' In Pl. 51' x 18"CMP Underground Telephone Marking POTOMAC RIVER -2 Ground Elev..8' Bore Hole # Wood Post Edge of Water -2 Ground Elev. 13.7' 13 Bore Hole # 1-3 Telephone Marking Underground 15-1 Gravel RailRoad Bed Underground Telephone Marking Fiber Optic Witness Post Edge of Water VEPCO F-9 Fiber Optic Witness Post Underground Telephone Marking Ground Elev. 17.7' -2 Bore Hole # RETAINING WALL #1 RW-1-2 RW-1-3 TURBIDITY CURTAIN RW-1-4 RW-1-5 RW-2-1 F C MARY CAREY KENDALL DN VEPCO POWERLINE Fiber Optic Witness Post B 19 2 CD Power Pole No # C F POTOMAC RIVER Ground Elev. 18.8' 2 Bore Hole # LF Fiber Optic Witness Post 9 PR-WUS19A WUS-R2UB Permanent Impact 13 Inv. In =2.57' Inv. Out =2.15' Stream w/endwal 15 In Pl. 68'x6"x3" Brick Arch Culvert DMT-RW TS DECK TURBIDITY CURTAIN, TYPE 2 PERMANENT RIPRAP CONSTRUCTION IMPACTS QUANTITIES NOTES: PROPOSED TRACK TEMPORARY CAUSEWAY CONSTRUCTION PERMANENT (RIPRAP) TEMPORARY (CAUSEWAY) CAUSEWAY TO BE CONSTRUCTED OF NON-ERODIBLE MATERIAL. TURBIDITY CURTAINS WILL BE USED TO MINIMIZE STREAM DISTURBANCE DURING CONSTRUCTION AND REMOVAL OF RW-1 MIN. 2.' ELEV. 7. ELEV. VARIES (3.6 MIN) NON-VEGETATED WETLANDS STREAM CHANNEL 2,751 S.F. 2,18 S.F. 21 S.F. 952 S.F. 3. CAUSEWAYS AND DURING FILL/RIPRAP PLACEMENT. CAUSEWAY SHALL BE COMPLETELY REMOVED IN SUCH A MANNER AS TO CAUSE MINIMAL DISTURBANCE OF THE STREAM AND SHALL BE HAULED FROM THE SITE TO BE USED WITHIN THE TRACK EMBANKMENT OR SHALL BE SALVAGED. EXISTING GROUND MIN. 12.' 2:1 1.5:1 M.H.W. EL 1.6 M.L.W. EL.1 NOTES: 1. NON-VEGETATED WETLAND IMPACT IS 4. ALL MATERIAL DISPOSED OF WITHIN THE TRACK EMBANKMENT WILL BE PREVENTED FROM RE-ENTRY INTO THE STREAM AND ITS FLOOD PLAINS. BETWEEN MLW AND MHW. MIN. 1.' 2. STREAM CHANNEL IMPACT IS TOTAL 5. RIPRAP TO BE INSTALLED AS SHOWN ON THE PLANS AND CROSS SECTIONS. BELOW MLW. CAUSEWAY TYPICAL SECTION (DATUM: NAVD 88) HORIZ: 5 2 SCALE IN FEET ENGINEER REVISIONS Rummel, Klepper & Kahl, LLP Consulting Engineers 81 Mosher Street Baltimore, Maryland STAFFORD COUNTY ENGINEERING DEPARTMENT DESIGN & CONSTRUCTION JACKSONVILLE, FLORIDA PRINCE WILLIAM COUNTY THIRD TRACK VIRGINIA ARKENDALE TO POWELLS CREEK DESIGNED BY: XXX PROJECT # SCALE DATE DRAWING NO. SHEET NO. CHECKED BY: XXX DRAWN BY: XXX A42598 X X X X PROPOSED RETAINING WALL #1 (BETWEEN STA AND STA. 4386) STAFFORD COUNTY 11/18/214 1 OF 5

34 \\balsrv1\v214\214\148_arkendale\perm its\local Tidal W etland\stafford County\xs3-1_csxt_RAR.dgn 11/19/214 3:43:56 PM PERMANENT RIPRAP CONSTRUCTION TEMPORARY CAUSEWAY CONSTRUCTION DRAFT WORK IN PROGRESS DO NOT USE FOR CONSTRUCTION P/P P/P -6-5 RR COMM -4 C/L EX.TRK.#3-3 C/L EX.TRK.#3 C/L EX.TRK.#2 C/L EX.TRK.#2 T/R 16.96' T/R 16.75' M.H.W. EL 1.6 M.L.W. EL P/P -6-5 RR COMM -4 C/L EX.TRK.#3-3 C/L EX.TRK.#3 C/L EX.TRK.#2 C/L EX.TRK.#2 T/R 17.41' T/R 17.18' M.H.W. EL 1.6 M.L.W. EL RR COMM M.H.W. EL 1.6 M.L.W. EL.1 P/P RR COMM M.H.W. EL 1.6 M.L.W. EL NOTE: ALL UTILITY LOCATIONS AND ELEVATIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL VERIFY UTILITY BEFORE CONSTRUCTION. ENGINEER REVISIONS ENGINEERING DEPARTMENT DESIGN & CONSTRUCTION JACKSONVILLE, FLORIDA CROSS SECTIONS STA. 432 TO STA Rummel, Klepper & Kahl, LLP STAFFORD COUNTY PRINCE WILLIAM COUNTY VIRGINIA Consulting Engineers 81 Mosher Street Baltimore, Maryland ARKENDALE TO POWELLS CREEK THIRD TRACK DESIGNED BY: CHECKED BY: DRAWN BY: WCC WAR WCC A42598 SCALE 1" = ' DATE PROJECT # SHEET NO. 11/19/214 DRAWING NO. OF 2 5

35 \\balsrv1\v214\214\148_arkendale\perm its\local Tidal W etland\stafford County\xs3-1_csxt_RAR.dgn 11/19/214 3:44:39 PM PERMANENT RIPRAP CONSTRUCTION TEMPORARY CAUSEWAY CONSTRUCTION DRAFT WORK IN PROGRESS DO NOT USE FOR CONSTRUCTION P/P RR COMM C/L EX.TRK.#3-3 C/L EX.TRK.#3 C/L EX.TRK.#2 C/L EX.TRK.#2 T/R 17.91' M.H.W. EL 1.6 M.L.W. EL P/P RR COMM C/L EX.TRK.#3-3 C/L EX.TRK.#3 C/L EX.TRK.#2 C/L EX.TRK.#2 T/R 18.45' M.H.W. EL 1.6 M.L.W. EL T/R 17.65' 2 2 T/R 18.17' 2 P/P RR COMM M.H.W. EL 1.6 P/P RR COMM M.H.W. EL 1.6 M.L.W. EL.1 M.L.W. EL NOTE: ALL UTILITY LOCATIONS AND ELEVATIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL VERIFY UTILITY BEFORE CONSTRUCTION. ENGINEER REVISIONS ENGINEERING DEPARTMENT DESIGN & CONSTRUCTION JACKSONVILLE, FLORIDA CROSS SECTIONS STA. 434 TO STA Rummel, Klepper & Kahl, LLP STAFFORD COUNTY PRINCE WILLIAM COUNTY VIRGINIA Consulting Engineers 81 Mosher Street Baltimore, Maryland ARKENDALE TO POWELLS CREEK THIRD TRACK DESIGNED BY: CHECKED BY: DRAWN BY: WCC WAR WCC A42598 SCALE 1" = ' DATE PROJECT # SHEET NO. 11/19/214 DRAWING NO. 3 OF 5

36 \\balsrv1\v214\214\148_arkendale\perm its\local Tidal W etland\stafford County\xs3-1_csxt_RAR.dgn 11/19/214 3:44:48 PM PERMANENT RIPRAP CONSTRUCTION TEMPORARY CAUSEWAY CONSTRUCTION DRAFT WORK IN PROGRESS DO NOT USE FOR CONSTRUCTION P/P RR COMM C/L EX.TRK.#3-3 C/L EX.TRK.#2 T/R 19.3' M.H.W. EL 1.6 M.L.W. EL P/P RR COMM C/L EX.TRK.#3-3 C/L EX.TRK.#2 T/R 19.66' M.H.W. EL 1.6 M.L.W. EL C/L EX.TRK.#3 C/L EX.TRK.#2 3 3 C/L EX.TRK.#3 C/L EX.TRK.#2 3 2 P/P RR COMM T/R 18.73' P/P M.H.W. EL 1.6 RR COMM T/R 19.34' 7. M.H.W. EL M.L.W. EL.1 M.L.W. EL NOTE: ALL UTILITY LOCATIONS AND ELEVATIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL VERIFY UTILITY BEFORE CONSTRUCTION. ENGINEER REVISIONS ENGINEERING DEPARTMENT DESIGN & CONSTRUCTION JACKSONVILLE, FLORIDA CROSS SECTIONS STA. 436 TO STA Rummel, Klepper & Kahl, LLP STAFFORD COUNTY PRINCE WILLIAM COUNTY VIRGINIA Consulting Engineers 81 Mosher Street Baltimore, Maryland ARKENDALE TO POWELLS CREEK THIRD TRACK DESIGNED BY: CHECKED BY: DRAWN BY: WCC WAR WCC A42598 SCALE 1" = ' DATE PROJECT # SHEET NO. 11/19/214 DRAWING NO. 4 OF 5

37 \\balsrv1\v214\214\148_arkendale\perm its\local Tidal W etland\stafford County\xs3-1_csxt_RAR.dgn 11/19/214 3:45:2 PM PERMANENT RIPRAP CONSTRUCTION TEMPORARY CAUSEWAY CONSTRUCTION DRAFT WORK IN PROGRESS DO NOT USE FOR CONSTRUCTION 4 3 C/L EX.TRK.#3 C/L EX.TRK.# P/P P/P -6-5 RR COMM -4 RR COMM -3 C/L EX.TRK.#3 C/L EX.TRK.#2 T/R 2.29' T/R 19.97' M.H.W. EL 1.6 M.L.W. EL.1 M.H.W. EL 1.6 M.L.W. EL P/P P/P -6-5 RR COMM -4 RR COMM C/L EX.TRK.#3-3 C/L EX.TRK.#3 C/L EX.TRK.#2 C/L EX.TRK.#2 T/R 2.93' T/R 2.61' EL 15.26' 2.:1 EL 15.38' NOTE: ALL UTILITY LOCATIONS AND ELEVATIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL VERIFY UTILITY BEFORE CONSTRUCTION. ENGINEER REVISIONS ENGINEERING DEPARTMENT DESIGN & CONSTRUCTION JACKSONVILLE, FLORIDA CROSS SECTIONS STA. 438 TO STA Rummel, Klepper & Kahl, LLP Consulting Engineers 81 Mosher Street Baltimore, Maryland STAFFORD COUNTY PRINCE WILLIAM COUNTY VIRGINIA ARKENDALE TO POWELLS CREEK THIRD TRACK DESIGNED BY: CHECKED BY: DRAWN BY: WCC WAR WCC A42598 SCALE 1" = ' DATE PROJECT # SHEET NO. 11/19/214 DRAWING NO. 5 OF 5

38

39

40

41

42

43

44

45

46

47

48

49

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge

More information

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com

More information

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

How To Check For Scour At A Bridge

How To Check For Scour At A Bridge Case Studies Bridge Scour Inspection and Repair Edward P. Foltyn, P.E. Senior Hydraulic Engineer ODOT Bridge Unit 2013 PNW Bridge Inspectors Conference April 2013 REFERENCES Stream Stability at Highway

More information

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...

More information

No allowance will be made for classification of different types of material encountered.

No allowance will be made for classification of different types of material encountered. PROJECT : Repair/ Maintenance of Flood Control and Drainage Structures Along Butuan City Cagayan de Oro City Iligan City Road LOCATION : San Antonio, Jasaan, Misamis Oriental SUBJECT : General Notes and

More information

BRIDGES ARE relatively expensive but often are

BRIDGES ARE relatively expensive but often are Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the

More information

Unit Price Averages Reports

Unit Price Averages Reports Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation

More information

US 51 Ohio River Bridge Engineering and Environmental Study

US 51 Ohio River Bridge Engineering and Environmental Study US 51 Ohio River Bridge Engineering and Environmental Study ITEM NOS. 1-100.00 & 1-1140.00 Prepared by: Michael Baker Jr., Inc. 9750 Ormsby Station Rd Louisville, KY 40223 August 16, 2013 Table of Contents

More information

SECTION 02200 SUPPORT OF EXCAVATION

SECTION 02200 SUPPORT OF EXCAVATION SECTION 02200 PART 1 GENERAL 1.01 DESCRIPTION A. Section including specifications for design and installation of excavation support. B. Section also includes specifications for excavation support systems

More information

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS 2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the

More information

CHAPTER 8 CIVIL DESIGN

CHAPTER 8 CIVIL DESIGN CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical

More information

PIPELINE / WIRE LINE PROCESS INSTRUCTIONS

PIPELINE / WIRE LINE PROCESS INSTRUCTIONS PIPELINE / WIRE LINE PROCESS INSTRUCTIONS Licensing Process: 1. Once the application package is received by Jones Lang LaSalle Brokerage, Inc. (JLL), the application and drawing will be forwarded to the

More information

CSXT Emergency Response for May 2010 Flood Repairs

CSXT Emergency Response for May 2010 Flood Repairs CSXT Emergency Response for May 2010 Flood Repairs 11 th Annual Geohazards Forum Chattanooga, Tennessee Christopher Ramsey, PE AMEC Project Overview Record rainfalls affecting greater Nashville. Some areas

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP

1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP 5 INDEX TO SHEETS. NOTES AND TYPICAL SECTIONS. H. R. SMITH RD.CULVERT.3 0/5 END BARRIER ACCESS ROAD REPAIR. KISSIMMEE RD. AT MORGAN HOLE CR. ROAD REPAIR.5 RANGE INFRASTRUCTURE REPAIR N 0 000' 3 0,000'

More information

Virginia Approach Spans

Virginia Approach Spans Virginia Concrete Conference 2009 Woodrow Virginia Approach Spans David Tackoor, HNTB Formerly of URS Corp for Potomac Crossing Consultants Woodrow 1 Second Severn Crossing 2 Medway Crossing (Channel Tunnel

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

Stone Arch Bridges of Washington County, MD

Stone Arch Bridges of Washington County, MD Stone Arch Bridges of Washington County, MD Presentation for the County Engineers Association of Maryland (CEAM) 2009 Spring Conference May 14, 2009 Scott Hobbs, P.E. Capital Projects Engineering John

More information

TABLE OF CONTENTS. Section / Article Page

TABLE OF CONTENTS. Section / Article Page TABLE OF CONTENTS Section / Article Page 1. INTRODUCTION 1.1 Purpose................ 6 1.2 Definitions................ 6 1.3 Guidelines and References............ 7 2. AGREEMENTS 2.1 Applicant and Contractor

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

Structural Failures Cost Lives and Time

Structural Failures Cost Lives and Time Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one

More information

RED RIVER DIVERSION FARGO MOORHEAD METRO FLOOD RISK MANAGEMENT PROJECT, FEASIBILITY STUDY, PHASE 4

RED RIVER DIVERSION FARGO MOORHEAD METRO FLOOD RISK MANAGEMENT PROJECT, FEASIBILITY STUDY, PHASE 4 RED RIVER DIVERSION FARGO MOORHEAD METRO FLOOD RISK MANAGEMENT PROJECT, FEASIBILITY STUDY, PHASE 4 APPENDIX G COST ESTIMATES EXHIBIT J RAILROAD BRIDGE QUANTITIES Report for the US Army Corps of Engineers,

More information

DIVISION 4300 STORM DRAINAGE

DIVISION 4300 STORM DRAINAGE DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES

More information

SECTION 5 DRAFTING STANDARDS

SECTION 5 DRAFTING STANDARDS SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.

More information

1-800-327-8276 www.jfcson.com

1-800-327-8276 www.jfcson.com Trenchless Cost Effective Internal Pipe Rehabilitation 101 East Broadway, Hackensack, N.J. 07601 Folsom, NJ Linden, NJ Beltsville, MD Sylmar, CA 1-800-327-8276 www.jfcson.com In-Weg Internal Joint Sealing

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

Chapter 22. Lump Sum Project Guidelines

Chapter 22. Lump Sum Project Guidelines Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11

More information

Bridge Office Policies and Procedures BOPP 2014

Bridge Office Policies and Procedures BOPP 2014 Bridge Office Policies and Procedures BOPP 2014 Nebraska Department of Roads Bridge Division Last updated: October 2014 Introduction Page I Purpose The BRIDGE OFFICE POLICIES AND PROCEDURES manual (BOPP)

More information

PART II SCHEDULE. Scope of Services. Special Terms and Conditions. Virginia Railway Express

PART II SCHEDULE. Scope of Services. Special Terms and Conditions. Virginia Railway Express PART II SCHEDULE SECTION TITLE D E Scope of Services Special Terms and Conditions 11 SECTION D SCOPE OF SERVICES D.1 OVERVIEW A. The selected firm is referred to herein as either the Consultant or the

More information

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11 Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;

More information

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or

More information

NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION BUREAU OF BRIDGE DESIGN BRIDGE DETAILS - REVISION HISTORY

NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION BUREAU OF BRIDGE DESIGN BRIDGE DETAILS - REVISION HISTORY 1 of 10 10/1/2015 Revised note #3 to: Joint (behind backwall, brush Expansion joint opening shall be adjusted to curb) temperature anticipated just prior to pouring deck blockout. Final setting in the

More information

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection

More information

Jurisdictional Boundaries. And. Establishment of Mean Low Water

Jurisdictional Boundaries. And. Establishment of Mean Low Water Jurisdictional Boundaries And Establishment of 28.2-1202. Rights of owners to extend to mean low-water mark. A. The limits or bounds of the tracts of land lying on the bays, rivers, creeks and shores within

More information

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Informational Workshop Public Meeting Kanawha Falls Bridge Project Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal

More information

Gas Meter Clearances and Service Installation Requirements

Gas Meter Clearances and Service Installation Requirements March 2016 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE's Customer Construction Services 1 888 321 7779 or visit PSE.com/CustomerConstruction

More information

Work Type Definition and Submittal Requirements

Work Type Definition and Submittal Requirements Work Type: Highway Materials Testing Geotechnical Laboratory Testing, Geotechnical Laboratory Testing, Standard Penetration (SPT) & Rock Coring, Cone Penetration Test, Solid Stem Auger Drilling, and Materials

More information

Homeowner s Guide to Drainage

Homeowner s Guide to Drainage Homeowner s Guide to Drainage a scottsdale homeowner s guide to drainage produced by the city of scottsdale s stormwater management division Transportation Department TABLE OF CONTENTS Introduction 2 Drainage

More information

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA STRUCTURAL ASSESSMENT FOR Full Metal Jacket Building 0 Prince Street, Prepared by: ALPHA CORPORATION (Alpha) 1850 S. Loudoun Street, Suite 200 Winchester, VA 22601 540-723-0704 September 22, 2010 J. Michael

More information

Appendix C. Project Opportunities. Middle Twisp River (RM 7.8 18.12)

Appendix C. Project Opportunities. Middle Twisp River (RM 7.8 18.12) Appendix C Project Opportunities Middle Twisp River (RM 7.8 18.12) This table describes project opportunities by project area. Locator maps of the project opportunities are included below the table. Reach

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements

More information

Historic Bridges of Frederick County. Frederick County, Maryland Division of Public Works Department of Highways and Transportation (301) 600-1687

Historic Bridges of Frederick County. Frederick County, Maryland Division of Public Works Department of Highways and Transportation (301) 600-1687 Historic Bridges of Frederick County Frederick County, Maryland Division of Public Works Department of Highways and Transportation (301) 600-1687 Frederick County s Bridges We have 212 bridges over 20

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE FORM A PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE The following suggested specifications are written as a guide to assist the specifier in writing his own specifications. Specific circumstances

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

CHAPTER 14: GUARDRAIL and BARRIERS

CHAPTER 14: GUARDRAIL and BARRIERS CHAPTER 14: GUARDRAIL and BARRIERS If you have any questions regarding guardrail, end treatments and/or pay items included in your plan, please contact the Project Design Services Unit or the Design Standards

More information

METHOD OF STATEMENT FOR STATIC LOADING TEST

METHOD OF STATEMENT FOR STATIC LOADING TEST Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

ADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT

ADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT ADDENDUM NO. 2 Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT Bridge No. 1460008 (existing) Bridge No. 06806 (new) TO ALL BIDDERS: Anchor Engineering

More information

Kingsbury Run Greenway Project

Kingsbury Run Greenway Project Kingsbury Run Greenway Project Slavic Village Development & Burton, Bell, Carr Project Goals Create Conceptual Plans and Cost Estimate. Coordinate with other ongoing and future projects in the area. Description

More information

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL 7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction

More information

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in

More information

CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES

CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES WATER RESOURCES MANAGEMENT DIVISION Water Investigations

More information

PLAN VIEW FOR LAKE OR MARSH FRONT VIEW FOR FLOTATION SILT CURTAIN

PLAN VIEW FOR LAKE OR MARSH FRONT VIEW FOR FLOTATION SILT CURTAIN OF WATERWAY PERIMETER CONTROL LESS THAN / THE STREAM/RIVER STEEL FENCE POST ANCHOR TO LAND (TYP.) / DEPTH OF WATER PLOTTED/REVISED:-OCT-0 WIDTH STREAM BANK TEMPORARY ROCK BERM BRIDGE ABUTMENT, CULVERT

More information

Gas Meter Clearances and Service Installation Requirements

Gas Meter Clearances and Service Installation Requirements March 2015 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE s Customer Construction Services 1-888-321-7779 or visit PSE.com/CustomerConstruction

More information

COMMERCIAL CONDUIT RULES AND REGULATION

COMMERCIAL CONDUIT RULES AND REGULATION Electric Engineering Division COMMERCIAL CONDUIT RULES AND REGULATION S:\COO_ACM_US_Electric_Telecommunications\COO_ET_Engineering\Conduit Policies\Residential 1805 NE 30th Ave., Bldg. 400 Ocala, FL 34470-4875

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

FIBER-OPTIC CABLE PLAN CHECK

FIBER-OPTIC CABLE PLAN CHECK Engineering Division 201 North Broadway, Escondido, CA 92025 (760) 839-4651, FAX (760) 839-4597 FIBER-OPTIC CABLE PLAN CHECK To: Date: Project: Project No. Address: Check No. Attn: Via: The attached plans

More information

PRE INSTALLATION MANUAL

PRE INSTALLATION MANUAL REINFORCED CONCRETE PIPE PRE INSTALLATION INSPECTION & REPAIR MANUAL Kentucky Transportation Cabinet Kentucky Department of Highways Division of Materials 1227 Wilkinson Boulevard Frankfort, KY 40601 (502)

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

High Strain Dynamic Load Testing of Drilled Shafts

High Strain Dynamic Load Testing of Drilled Shafts Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain

More information

Quality Control and Quality Assurance Guide

Quality Control and Quality Assurance Guide Quality Control and Quality Assurance Guide Bridge Division, Design Section October 2013 Table of Contents Chapter 1 About this Guide... 3 Chapter 2 Goals and Objectives... 5 Chapter 3 Participants...

More information

The unit costs are based on the trend line of the 3 low bids for the average quantity.

The unit costs are based on the trend line of the 3 low bids for the average quantity. Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally

More information

Vehicle Tracking Pad

Vehicle Tracking Pad Stormwater Quality Best Management Practices Construction Sites s When to use: Where construction vehicles leave active construction areas onto surfaces where runoff is not checked by sediment controls

More information

2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.

2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement. 2015 ODOT Bridge Design Conference May 12, 2014 DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement Mary Ann Triska 2015 HDR, all rights reserved. Presentation Outline Project

More information

MICROSTATION INFORMATION BRIDGE DEPARTMENT

MICROSTATION INFORMATION BRIDGE DEPARTMENT MICROSTATION INFORMATION BRIDGE DEPARTMENT CFLHD S FTP SITE ACCESS server name = ftp.cflhd.gov user name = cflhd password = fhwa-cflhd Feel free to tell the user name and password to anyone who needs it.

More information

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

Lower Breton Sound Sediment Diversion Conceptual Engineering Design Presentation

Lower Breton Sound Sediment Diversion Conceptual Engineering Design Presentation EXPERT PANEL ON DIVERSION PLANNING AND IMPLEMENTATION Lower Breton Sound Sediment Diversion Conceptual Engineering Design Presentation February 12, 2015 Topics I. Introduction II. Geotechnical Study III.

More information

Bridge Type Selection

Bridge Type Selection Bridge Type Selection The major consideration for bridge type selection for bridges on the State Aid system is initial cost. Future maintenance costs, construction time, and location are considered when

More information

Joist. Reinforcement. Draft 12/7/02

Joist. Reinforcement. Draft 12/7/02 Joist Reinforcement Draft 12/7/02 1 JOIST REINFORCING The purpose of this CSD Design Aid is to provide procedures and suggested details for the reinforcement of open web steel joists. There are three basic

More information

Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:

Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are: CHATTAHOOCHEE CORRIDOR PLAN Adopted 9/23/98 PART 1: GOALS. POLICY. COVERAGE. A. Goals The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are: 1. Preservation and protection

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

3.11 Utilities. 3.11.1 Affected Environment. 3.11.2 Environmental Consequences

3.11 Utilities. 3.11.1 Affected Environment. 3.11.2 Environmental Consequences 3 Affected Environment and Environmental Consequences 3.11 Utilities 3.11.1 Affected Environment Sterling Highway MP 45 60 Project Draft SEIS Cooper Landing and the surrounding area are rural and do not

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies. RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover

More information

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet City of Colleyville Community Development Department Site/Landscape Plan Application Packet Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning

More information

Value Engineering vs. Alternate Designs in Bridge Bidding

Value Engineering vs. Alternate Designs in Bridge Bidding Value Engineering vs. Alternate Designs in Bridge Bidding Compares the advantages and disadvantages of alternate designs and value engineering in bidding of bridges as experienced in the State of Florida.

More information

Underground Service Requirements and Instructions

Underground Service Requirements and Instructions This packet includes all FKEC underground service requirements, instructions, procedures and drawings. If you are considering underground power service please review this document in its entirety (3 page

More information

KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER

KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER The New York State Department of Transportation (NYSDOT) is preparing an Environmental Impact Statement (EIS) to evaluate alternatives for the rehabilitation or

More information

SECTION 03400 PRECAST CONCRETE STRUCTURES

SECTION 03400 PRECAST CONCRETE STRUCTURES PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, and equipment required to install precast concrete manholes, sanitary leaching rings, pump station, valve chamber, structures, frames,

More information

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 1.0 Background and Repair and Rehabilitation Recommendation Clay County has contracted Camp Dresser & McKee Inc. (CDM)

More information

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES Approved 6/26/01 HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES All new, modified and/or changed use access(es) onto county roads shall be subject to the access and corridor protection guidelines

More information

EPR Exempt Flood Risk Activities: descriptions and conditions

EPR Exempt Flood Risk Activities: descriptions and conditions EPR Exempt Flood Risk Activities: descriptions and conditions Version 1 April 2016 We are the Environment Agency. We protect and improve the environment. Acting to reduce the impacts of a changing climate

More information

Underground Injection Control Storm Water Information

Underground Injection Control Storm Water Information Underground Injection Control Storm Water Information Best Management Practices DEQ has reviewed the EPA definition of a subsurface fluid distribution system and the infiltration design best management

More information

SECTION 01 78 29 AS-BUILT DOCUMENTATION

SECTION 01 78 29 AS-BUILT DOCUMENTATION SECTION 01 78 29 AS-BUILT DOCUMENTATION PART 1: GENERAL 1.01 AS-BUILTS Where identified as a product of the Work, provide as-built drawings adhering to the criteria provided here and in the special conditions.

More information

Acceptance Codes APPENDIX - A. Acceptance Criteria

Acceptance Codes APPENDIX - A. Acceptance Criteria 1111 Receipt of a satisfactory Test Report from WSDOT Materials Laboratory is required indicating the lot (or lots) or batch of material meets the requirement of the specifications under which it is listed.

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information