Water Mains and Services

Size: px
Start display at page:

Download "Water Mains and Services"

Transcription

1 Water Title Water Mains and Services WTitle

2 Water Table of Contents "CORRECTIVE PERIOD & INSPECTION FOR WATER MAINS & SERVICES" TERM OF CORRECTIVE PERIOD CONTRACTOR LICENSE AND PERMITS INSPECTION OF WATER MAINS & SERVICES ELEVATION DATUM PROJECT DESIGN CHANGES CERTIFICATE OF SUBSTANTIAL COMPLETION... 2 "MATERIAL SPECIFICATIONS FOR WATER MAINS & SERVICES" SCOPE OF WORK MATERIAL INSPECTION MATERIAL HANDLING & STORAGE AGGREGATE MATERIALS MATERIALS FURNISHED BY THE CITY & WATER/SEWER TAPPING FEES POLYVINYL CHLORIDE (PVC) PIPE, DR 18 (4"-48") HIGH DENSITY POLYETHYLENE (HDPE) PIPE, DR 9 (4-63 ) DUCTILE-IRON FITTINGS (4"-48") THRUST RESTRAINTS (4"-48") MECHANICAL JOINT ADAPTORS FASTENERS FOR WATER MAIN FITTINGS RESILIENT-SEATED GATE VALVES & VALVE BOXES (3"-48") DRY-BARREL FIRE HYDRANTS WET TAP UNDERGROUND SERVICE LINE VALVES AND FITTINGS COPPER TUBING (1"-2") CURB STOPS (1"-2") DOUBLE CHECK VALVE BACKFLOW PREVENTION ASSEMBLY (1/2-3 ) REDUCED-PRESSURE PRINCIPLE BACKFLOW PREVENTION ASSEMBLY (1"-2")... 9 "CONSTRUCTION SPECIFICATIONS FOR WATER MAINS & SERVICES" ALIGNMENT & GRADE UNDERGROUND INTERFERENCE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES WATER MAIN AND SEWER MAIN SEPARATION INTERRUPTION OF SERVICE JOB SITE AND WORK AREA CLEANUP: CASING PIPE UNDER HIGHWAYS, RAILROADS, ETC DEWATERING ABANDONED WATER MAIN TRENCH CONSTRUCTION PIPE INSTALLATION JOINT ASSEMBLY BACKFILLING VALVE AND FITTING INSTALLATION FLUSHING HYDRANT INSTALLATION THRUST RESTRAINT WATER SERVICES (1"-2") "WATER MAIN TESTING, CLORINATION AND INSPECTION" WATER MAIN HYDROSTATIC PRESSURE TESTING DISINFECTION WATER INSTALLATION DETAILS... WDetails-1 to 8 WTable

3 "CORRECTIVE PERIOD & INSPECTION FOR WATER MAINS & SERVICES" 1. TERM OF CORRECTIVE PERIOD a. Corrective Period: The corrective period shall cover the contract as to workmanship and materials for a period of five (5) years in compliance with the City of Brookings ordinance "Excavating & Backfilling on Public Right-of-Way". The corrective period of five (5) years shall commence from the BMU determined Substantial Completion date. b. Responsibility: The Contractor shall be held responsible for workmanship, materials, settling trenches or any other deficiencies in the water main system during the corrective period. The Contractor shall repair and/or replace all deficiencies in the water system during the five (5) year corrective period at no cost to the Owner. Any surface restoration costs incurred because of the repairing and/or replacing of deficiencies in the water system shall be borne by the Contractor. 2. CONTRACTOR LICENSE AND PERMITS a. License: The Contractor shall be required to have any required licenses (sewer and water installation contractor license or sewer and water installer license) for water/sewer installation or water/sewer repairing as stated in the South Dakota State Plumbing Code. b. Excavation Permit: The Contractor shall obtain an excavation permit issued at no charge from the Brookings City Engineering Office (520 Third Street) before any water/sewer installation or water/sewer repairing will be allowed. c. Dewatering Permit: The Contractor shall obtain any dewatering permits required from local, state or federal agencies. The Contractor shall submit a copy of the dewatering permit to BMU prior to dewatering. The discharge area must be prior approved by the Engineer before initiating the dewatering. 3. INSPECTION OF WATER MAINS & SERVICES a. Engineer Inspection: The Engineer or Engineers Representative shall have access at all times to all parts of the job and the Contractor must furnish all such facilities and materials which are necessary to make whatever tests and inspections that are deemed necessary. The Engineer reserves the right to inspect and/or reject any part of, or all unsatisfactory work performed by the Contractor. Rejected or unapproved work shall not be paid for. 4. ELEVATION DATUM a. Elevation Datum: The Project Designer shall utilize only a City Engineer approved NAVD 88 datum for elevation reference. The Project Designer shall bring elevation control to the project site, preferably a nearby fire hydrant. All elevations established on hydrants shall be on top of the O on open (facing nozzle) with a tolerance of 0.03 or less. The City Engineer approved NAVD 88 datum and all project site elevation controls are to be noted on the plan sheets. 5. PROJECT DESIGN CHANGES a. Project Design Changes: If the Owner or the Owners Designer make any project design changes after the water main, water apparatus or water services have been purchased or installed, the location or elevation changes required for the water main, water apparatus or water services shall be at the Owners expense. -1 of 25

4 6. CERTIFICATE OF SUBSTANTIAL COMPLETION DATE OF ISSUANCE: OWNER: CONTRACTOR: Project: BMU Project No: Contract Dated: Brookings Municipal Utilities BMU Work Order No: (applicable only to BMU funded projects) This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the following specified parts thereof: To: And To: Brookings Municipal Utilities OWNER CONTRACTOR The Work to which this Certificate applies has been inspected by authorized Representatives of OWNER and the CONTRACTOR, and that Work is hereby declared to be substantially complete in accordance with the Contract Documents on: BMU Determined Substantial Completion Date Five (5) Years Corrective Period in Years Corrective Period Expiration Date -2 of 25

5 The CONTRACTOR accepts this Certificate of Substantial Completion and accepts corrective period responsibilities. Date: (Contractor) (Company Name) Date: (Project Superintendent) Brookings Municipal Utilities (Company Name) Date: (Utility Operations Manager) Brookings Municipal Utilities (Company Name) SUBSTANTIAL COMPLETION APPROVED Date: (Executive Vice President & General Manager) Brookings Municipal Utilities (Company Name) -3 of 25

6 "MATERIAL SPECIFICATIONS FOR WATER MAINS & SERVICES" 7. SCOPE OF WORK The Contractor shall furnish all materials (except for Utility furnished materials), equipment and labor necessary to install water main as per plans and specifications. It is the intent of these specifications to install a complete water system; and the Contractor shall furnish everything necessary to do this, whether or not all items are specifically called for in these plans and/or specifications. 8. MATERIAL INSPECTION a. Material Inspection: All pipe and appurtenances are subject to inspection by the Engineer. Material found to be defective due to manufacture or damage in shipment shall be rejected and removed from the job site. b. Material Testing: The Engineer may perform tests as specified in the applicable AWWA standard to ensure conformance with the standard. In case of failure of the pipe or appurtenance to comply with such specifications, responsibility for replacement of the defective materials becomes that of the Contractor or Manufacturer, even if piping and appurtenance has already been installed. 9. MATERIAL HANDLING & STORAGE a. Material Handling: All pipe, fittings, valves, hydrants, and accessories shall be loaded and unloaded by a means to prevent shock or damage. Under no circumstances shall such material be dropped. b. Material Storage: Materials, if stored, shall be kept safe from damage. The interior of all pipe, fittings, and other appurtenances shall be kept free from dirt or foreign matter at all times. Valves and hydrants shall be drained and stored in a manner that will protect them from damage by freezing. c. Piping: Piping shall not be stacked higher than Manufacturers recommendations according to size. The bottom tier of piping shall be kept off the ground on timbers, rails, or concrete. Pipe in tiers shall be alternated: bell, plain end; plain end, bell. At least two rows of timbers shall be placed between tiers, and chocks shall be affixed to each timber in order to prevent movement. The timbers shall be large enough to prevent contact between the pipe in adjacent tiers. d. Gaskets: Gaskets for mechanical and push-on joints shall be stored in a cool location, out of direct sunlight. Gaskets shall not come in contact with petroleum products. Gaskets shall be used on a first-in, first-out basis. e. Mechanical-Joint Bolts: Mechanical-joint bolts shall be handled and stored in a dry location in a manner that will ensure proper use with respect to types and sizes. -4 of 25

7 10. AGGREGATE MATERIALS a. Trench Stabilization Material (#4 Ballast or 1½ x ¾ Rock): The Contractor shall be required to use a trench stabilization material, as directed by the Engineer, if the sub-grade is deemed unstable. The stabilization material, unless otherwise directed, shall conform to the following sieve analysis: #4 Ballast Percentage by weight sieve size passing through sieve 2 ½ inch 100% 2 inch 90% to 100% 1 ½ inch 50% to 80% 1 inch 10% to 35% ¾ inch 0% to 10% ½ inch 0% to 5% 1 ½ x ¾ Rock Percentage by weight sieve size passing through sieve 2 inch 100% 1 ½ inch 50% to 100% 1 inch 5% to 55% ¾ inch 0% to 15% b. Pipe Bedding Material (3/8 x 1/8 Pearock): The Contractor shall be required to use the following for pipe bedding. The pipe bedding to use, unless otherwise directed, shall conform to the following sieve analysis: 3/8 x 1/8 Pearock Percentage by weight sieve size passing through sieve 3/8 inch 95% to 100% #4 10% to 90% #8 0% to 30% #40 0% to 4% c. Road Topping or Trench Replacement Material (3/4 Crushed Gravel): Trench replacement in developed streets, or if there is a deficiency due to a rejection of a part thereof, shall be ¾ crushed gravel with a soil mortar or binder, unless otherwise directed. The crushed gravel shall conform to the South Dakota Department of Transportation Specifications, Section 882 Aggregates for Granular Bases and Surfacing. The ¾ crushed gravel, unless otherwise directed, shall conform to the following sieve analysis: 3/4 Crushed Gravel Percentage by weight sieve size passing through sieve 1 inch 100% ¾ inch 80% to 100% ½ inch 68% to 91% #4 46% to 70% #8 34% to 58% #40 13% to 35% #200 3% to 12% -5 of 25

8 11. MATERIALS FURNISHED BY THE CITY & WATER/SEWER TAPPING FEES a. City Furnished Items: The city shall furnish and the Contractor shall install the following items, unless otherwise stated in the "Bid Form": i. Hydrants: Hydrants, gaskets, and bolts will be furnished by the city and installed by the Contractor. All hydrant leads shall be installed with a valve for hydrant isolation. ii. Valves & Valve Boxes: Valves, gaskets, bolts, valve box adaptors, and valve boxes with metallic inserts which have a cast iron drop cover marked "WATER" will be furnished by the city and installed by the Contractor. The city shall furnish valves and valve boxes for the street valves and hydrant valves required for the operation of city water mains, but will not furnish private valves with valve boxes for private water services. b. Water Tapping Fees & Corporations: After the Contractor pays the water tapping fee, the city shall furnish & install all corporations with saddle up to and including 2" corporations. A water service 2" or larger shall require prior Utility approval. 1 water tapping fee: $ /2 water tapping fee: $ water tapping fee: $ c. Curb Stops: All curb stops with a 1.50 barrel and 4 PVC casing (for concrete and asphalt topping) shall be furnished and installed by the Contractor. (Copper rolls over 1 are 60 lengths, 100 lengths take +/-10 weeks to get, no splices allowed) d. Sewer Tapping Fees: After the Contractor pays the sewer tapping fee, the city shall furnish & install inserta tees or saddles for making sewer taps. If the Contractor installs an in-line wye, inserta tee, or a saddle, then a tapping fee would not be required. 4 & 6 sewer tapping fee: $ POLYVINYL CHLORIDE (PVC) PIPE, DR 18 (4"-48") a. PVC Water Pipe: Water main piping shall be PVC conforming to the latest revision of the AWWA C900 (4"-12") standard or the latest revision of the AWWA C905 (14"-48") standard. b. PVC Water Pipe Joints: PVC pipe shall have rubber-gasket joints which conform to the latest revision of the ANSI/AWWA C111/A21.11 standard. 13. HIGH DENSITY POLYETHYLENE (HDPE) PIPE, DR 9 (4-63 ) (for use in trenchless piping applications only) a. HDPE Water Pipe: Water main piping shall be HDPE conforming to the latest revision of the AWWA C906 (4"-63") standard. Pipe shall be PE 3408 HDPE with a Cell classification of PE:345464C and have a Ductile Iron Pipe (DIP) size. b. HDPE Water Pipe Fittings: Fittings, such as Butt Fusion or Electrofusion or Flanged and Mechanical Joint Adapters, shall be PE 3408 HDPE with a Cell classification of PE345464C and have a Ductile Iron Pipe (DIP) size. -6 of 25

9 14. DUCTILE-IRON FITTINGS (4"-48") a. Ductile-Iron Fittings: Fittings shall be ductile iron mechanical joint fittings and shall conform to the latest revision of the ANSI/AWWA C110/A21.10 (3"-48") standard or the latest revision of the ANSI/AWWA C153/A21.53 (3"-24" & ) standard for compact fittings. Fittings shall be cement-mortar lined conforming to the latest revision of the ANSI/AWWA C104/A21.4 standard. Rubber-gasket joints for fittings shall conform to the latest revision of the ANSI/AWWA C111/A21.11 standard. Any fitting, such as a bend or valve, which requires thrust restraint, shall include a mechanical joint thrust restraint. 15. THRUST RESTRAINTS (4"-48") a. Thrust Restraints: Any required thrust restraint shall be EBAA Iron, Inc. Megalug Flanges, Romac Industries, RomaGrip DI Grip Rings, ¾ (min) Core 10 steel rodding & hardware, or an approved equal. All thrust restraint shall be included on any fitting requiring thrust restraint. 16. MECHANICAL JOINT ADAPTORS a. Mechanical Joint Adaptors: Any mechanical joint adaptors required shall be a MJ Foster Adaptor with Accessory Pack, or an approved equal. 17. FASTENERS FOR WATER MAIN FITTINGS a. Bolts & Fasteners: The Contractor shall provide NSS Cor-Blue T bolts (Fluorocarbon Coated) and fasteners, or an approved equal, for all water main fittings, with the exception of the bonnet fasteners on valves and the boot fasteners on hydrants which shall be 304 stainless steel. 18. RESILIENT-SEATED GATE VALVES & VALVE BOXES (3"-48") a. Acceptable Manufactures: Acceptable manufactures of resilient-seated gate valves and valve boxes are as follows: American Darling, Clow, Kenedy, or Waterous. b. Resilient-Seated Gate Valves: Ductile cast iron-body resilient-seated gate valves (3"-48") with bronze parts & non-rising stems (NRS) shall be push-on joint or mechanical joint and shall conform to the latest revision of the ANSI/AWWA C509 standard. Ductile cast iron-body resilient-seated gate valves shall have a minimum Pressure Class of 200 and shall open by turning counterclockwise as viewed from the top. O-rings shall be used for stem sealing. Wrench nuts shall be 1 15/16" square at the top, 2" square at the base, and 1 3/4" high. c. Protective Interior Coatings: Protective interior coatings for gate valves shall conform to the latest revision of the AWWA C550 standard. d. Valve Box Adaptor: The Manufacturers recommended valve box adaptor shall be installed between the valve and valve box to eliminate improper keying of the valves due to settling or shifting of the valve box. e. Valve Boxes: Valve box shall be a 2 piece cast iron valve box for 4 to 12 gate valves. Valve box shall have a 5 ½ screw type shaft, adjustable from 62 to 82, and shall have a cast iron drop cover marked "WATER". -7 of 25

10 19. DRY-BARREL FIRE HYDRANTS a. Acceptable Manufactures: Acceptable manufactures of dry-barrel fire hydrants are as follows: American AVK 2700 series or WB-67 Pacer. b. Dry-Barrel Fire Hydrants: Dry-barrel fire hydrants shall be of an approved Manufacturer, conforming to the latest revision of the ANSI/AWWA C502 standard and must have a minimum pressure class of 150. All hydrants shall have O-ring seals, 6" M.J. inlet openings, 5" minimum valve opening, one (1) 4-1/2 inch pumper bronze outlet, two (2) 2-1/2 inch bronze hose outlets, national standard threads on outlets, 1-1/2" National Standard pentagon operating nut, painted red, compression type valve to close with water pressure and open left (counterclockwise). The hydrants shall have the breakable traffic flange and be painted red to the ground line (18" - 24" from nozzle to ground line). The hydrant valve is to seat against a bronze hydrant seat (bronze to bronze seating). Hydrant brands subject to approval by the city water department. c. Hydrant Valve: Fire hydrant leads shall require a valve so the hydrant can be isolated. If required to keep the hydrant valve in the street and out of the curb & valley gutter, the Contractor shall furnish & install a mechanical joint adaptor. d. Protective Interior Coatings: Protective interior coatings for hydrants shall conform to the latest revision of the ANSI/AWWA C550 standard. 20. WET TAP If the Engineer decides a water main can t be shut down to install a fitting, a wet tap shall be required in lieu of a tee. The wet tap shall consist of a Romac SST tapping sleeve with an American 2500 tapping valve, or approved equals. 21. UNDERGROUND SERVICE LINE VALVES AND FITTINGS Brass fittings and valves shall comply with the Safe Drinking Water Act, and the U.S.A. Environmental Protection Agency. All fittings and valves shall be manufactured in accordance with AWWA Standard C-800, latest revision, and as further specified in these technical specifications the following exception shall apply. Exception: Any brass part of the fitting or valve in contact with potable water shall be made of a No-Lead Brass, defined for this specification as UNS Copper Alloy C89520 or C89833 in accordance with the chemical and mechanical requirements of ASTM B584. This No-Lead Brass alloy shall not contain more than 0.09% (or less) of total lead content by weight. The NL (no lead) identifier shall be cast or stamped on the fitting or valve. 22. COPPER TUBING (1"-2") Seamless copper tubing shall be type "K" copper. All the copper tubing and its appurtenance shall conform to the Local, State or National Plumbing Code. Copper tubing shall conform to the latest revision of the ANSI/AWWA C800 standard for underground service line valves and fittings. -8 of 25

11 23. CURB STOPS (1"-2") Brass curb stops with a 1.50 barrel shall be an A.Y. McDonald 6104, Ford B-22, Mueller B-25154, or an approved equal and shall be Minneapolis pattern valves. Curb stops shall not be the drain back type. Curb stops which are installed where there is a concrete or asphalt topping will require a 4 PVC casing which shall be furnished and installed by the Contractor. 4 PVC curb stop casing shall be ASTM D3034 with an SDR 35 rating, and shall be cut longer than the concrete or asphalt topping thickness. Curb stops shall conform to the latest revision of the ANSI/AWWA C800 standard for underground service line valves and fittings. 24. DOUBLE CHECK VALVE BACKFLOW PREVENTION ASSEMBLY (1/2-3 ) Double check valve backflow-preventor assembly shall be a Watts #007 or an approved equal. Double check valve backflow prevention assemblies shall conform to the latest revision of the ANSI/AWWA C510 standard. 25. REDUCED-PRESSURE PRINCIPLE BACKFLOW PREVENTION ASSEMBLY (1"- 2") 1" to 2" reduced-pressure principle backflow-preventor assembly shall be a Watts #009 or an approved equal. Reduced-pressure principle backflow prevention assemblies shall conform to the latest revision of the ANSI/AWWA C511 standard. -9 of 25

12 "CONSTRUCTION SPECIFICATIONS FOR WATER MAINS & SERVICES" 26. ALIGNMENT & GRADE The Engineer shall furnish all the necessary alignment and grade stakes or other necessary control for installing the water main, fittings, valves and hydrants at the required locations. It is the responsibility of the Contractor to protect these grade stakes, and any replacement of these grade stakes shall be at the expense of the Contractor. The Contractor shall carry grade into the trench by means of a level & level rod. At no time shall the Contractor change the grade without the approval of the Engineer. If underground interferences are encountered at the assigned grade, the Contractor shall notify the Engineer and wait until a revised grade has been determined for the water main. 27. UNDERGROUND INTERFERENCE The location of underground public or private utilities may be shown on the plan sheets, as reported by the various utility companies and the Engineer, but this does not relieve the Contractor of the responsibility of determining the accuracy or completeness of these said locations. The Contractor shall determine the location of all underground ducts, conduits, pipes, cables or structures which will be affected by his excavation, and shall take steps necessary to support, protect, remove or relocate the said structures by any means suitable to the Owner and/or Engineer. The Contractor shall be responsible for notifying the various utility companies if his work will expose, affect or endanger any existing utility. The Contractor shall not begin construction until all utility companies have been contacted and their respective underground utilities have been located. In any instances arise where utility or structure relocation or reconstruction is impracticable, a deviation from alignment and grade may be requested by the Engineer. All cost of investigation and any necessary protection, support, removal or relocation of said structures shall be included in the contract bid price for laying pipe. The Contractor shall notify the SD 1-Call Notification Center at and the Brookings Municipal Utilities at for scheduling locates. 28. MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. The Contractor shall barricade & maintain traffic control according to the Manual on "Uniform Traffic Control Devices" for streets & highways whenever it is applicable. The Federal Highway Administrator approves this manual as the National Standard. -10 of 25

13 29. WATER MAIN AND SEWER MAIN SEPARATION. a. Horizontal Pipe Separation: Sanitary sewer mains shall be laid at least 10 feet horizontally from any existing or proposed water main. The distance shall be measured edge to edge. In cases where it is not practical to maintain a 10 foot pipe separation, the Department may allow deviation on a case-by-case basis, if supported by data from the Design Engineer. Such deviation may allow installation of the sanitary sewer main closer to a water main, provided that the water main is in a separate trench or on an undisturbed earth shelf located on one side of the sanitary sewer main and at an elevation so the bottom of the water main is at least 18 inches above the top of the sanitary sewer main. If it is impossible to obtain proper horizontal separation as described above, both the water main and sanitary sewer main shall be constructed of slipon or mechanical joint pipe complying with public water supply design standards of the Department and be pressure rated to 150 psi. b. Vertical Pipe Separation: i. Sanitary Sewer Mains Crossing Under Water Mains The sanitary sewer main shall be laid to provide a minimum of 18 from the top of the sanitary sewer main to the bottom of the water main. The crossing shall be arranged so the sanitary sewer joints will be equidistant and as far as possible from the water main. 1. In the event 18 of pipe separation cannot be maintained, adhere to one of the following: a. The Contractor may replace the sanitary sewer main piping with a 20 pipe section of BMU acceptable water main pipe (C900 with rubber end seals or Schedule 40 PVC with PVC couplers) pressure rated at 150 psi, 10 feet on each side of the water main, OR: b. Install an encasement pipe around the water main or sanitary sewer main. The encasement pipe shall be 20 minimum in length, centered where the pipes intersect, and sealed at both ends. ii. Sanitary Sewer Mains Crossing Over Water Mains: 1. Pipe separation of 18 or greater shall be maintained, and the Contractor shall adhere to one of the following: a. The Contractor may replace the sanitary sewer main piping with a 20 pipe section of BMU acceptable water main pipe (C900 with rubber end seals or Schedule 40 PVC with PVC couplers) pressure rated at 150 psi, 10 feet on each side of the water main, OR: b. Install an encasement pipe around the water main or sanitary sewer main. The encasement pipe shall be 20 minimum in length, centered where the pipes intersect, and sealed at both ends. c. Storm Sewer Crossing: i. A reinforced concrete pipe (RCP) storm sewer pipe may cross below a water main with a separation of less than 18 inches or at any height above a water main provided the joints on the RCP within 10 feet of either side of the water main are assembled with either: 1. A gasket that conforms to ASTM C443 specifications (generally available for round RCP pipe up to 72 inches), OR: 2. A watertight sealant meeting ASTM C990, AASHTO M 198, and Federal Specification #SS-S-210-A. -11 of 25

14 30. INTERRUPTION OF SERVICE No valve or other control on the existing water system shall be operated by the Contractor for any purpose. The Contractor shall contact the city water department for any valve operations and the Contractor shall notify all consumers affected by interruption of water service. 31. JOB SITE AND WORK AREA CLEANUP: The Contractor shall perform the work in a good workmanlike manner or to the satisfaction of the Owner/BMU. The Contractor is to clean up the job site, work area, public and private roads each day prior to leaving the project area. If the Contractor tracks mud, clay, aggregates, debris, etc., onto public roads, public right-of-ways, private roads, etc., all cleanup required shall be at the Contractors expense. It is up to the Contractor to provide whatever tracking control methods are necessary before accessing public and private roads with construction equipment. The Contractor can prevent tracking of soils and sediments onto public and private roads by constructing temporary graveled access roads and parking areas as needed at the construction site. 32. CASING PIPE UNDER HIGHWAYS, RAILROADS, ETC. 33. DEWATERING When casing pipe is specified for highway, railroad or any other crossings, the project shall be completed in accordance with applicable federal, state, and local regulations. The casing pipe shall be large enough to accommodate casing spacers on the carrier pipe to ensure the correct grade is established, proper centering within the casing pipe and to prevent damage during the installation. Ample amount of casing spacers shall be supplied to sustain a full carrier pipe. Care must be exercised in order to avoid any pvc to metal or metal to metal contact. In order to avoid the transfer of earth and live loads to the carrier pipe, the space between the carrier pipe and the casing pipe shall not be filled. The casing spacers shall be sized to allow 1/2 to 1 maximum of tolerance between the casing spacer runner and the casing inside diameter, this shall minimize the misalignment of the carrier pipe from the water table floating the pipe. a. Dry Trench: The trench is to be completely dry for pipe installation. b. Dewatering Methods: It is up to the Contractor to investigate soil conditions to determine what dewatering methods shall be required. Prior approval from the Engineer is required before boring soil samples. The discharge area must be prior approved by the Engineer before initiating the dewatering. Any dewatering permits required from local, state or federal agencies must be obtained by the Contractor. When this item is included in the Bid Form as a separate bid item, this item shall be included in the overall competitive bid. This item is to inform the Contractor that dewatering may be necessary and it is up to the Contractor to determine what dewatering methods are deemed necessary. If there is no separate bid item for dewatering, trench-dewatering shall be part of the trench excavation and pipe installation bid items. c. Pearock for the Dewatering Wells: If there is a bid item for pearock, the pearock required for the dewatering wells may be included in the bid item Pipe Bedding. -12 of 25

15 34. ABANDONED WATER MAIN a. Abandoned Water Main: Abandoned water mains or water services in the common trench area of the replacement water main or water service shall be removed and disposed of by the Contractor. No open pipes shall be allowed on abandoned water mains or water services, all open pipes shall be concrete capped to prevent soil & water migration into the abandoned pipe. 35. TRENCH CONSTRUCTION a. Open Cut Trench: All water mains shall be installed in open cut trenches. The Engineer may permit short tunneling if deemed necessary. b. Protection of Workers: Contractor shall be in conformance with all federal and state regulations for the protection of the workers. c. Alignment & Grade: All trenches shall be excavated on alignment and grades furnished by the Engineer, see "Alignment & Grade". The Contractor shall provide a level & level rod for maintaining grades. d. Trench-Dewatering: The trench is to be completely dry for pipe installation. Discharge from any trench-dewatering pumps shall be conducted to natural drainage channels, storm sewers, or as directed by applicable regulatory agencies. Unless otherwise specified, trench-dewatering shall be part of the trench excavation and pipe installation. e. Excavated Material: Excavated material shall be placed in a manner that will not obstruct the work nor endanger the workers or the public, or obstruct sidewalks, driveways, roadways, or other structures. Placement of excavated material shall be done in compliance with federal, state and local regulations. f. Salvage Gravel: Prior to beginning any excavation on graveled streets, the Contractor shall salvage all existing salvageable gravel and the same shall be relayed, shaped and graded into place upon completion of project. The Contractor is to avoid any mixing of clay or other foreign materials with the gravel. If the Contractor does not salvage the existing gravel, the Contractor shall be responsible for replacement of the wasted gravel at the Contractors expense. g. Street Surface Removal: Removal of asphalt, concrete, or other street surfacing shall be part of the trench excavation. Methods such as sawing, cutting, knifing, drilling or chipping shall be used to ensure the breakage of pavement along straight lines. The amount removed shall depend on the width of trench required for the installation of the pipe and the dimensions of the area into which fittings, valves, hydrants, specials or other structures will be installed. The dimensions of pavement removed shall not exceed the dimensions of the opening required for installation of pipe, fittings, valves, hydrants, specials and other structures by more than 8" in any direction, unless safety issues or safety equipment warrant more room. All extra width excavations are to be prior approved by the Engineer. h. Trench Width: The width of the trench for the pipe shall be the same as that afforded by the single-pass capabilities of normal available excavating equipment, and shall be ample to permit the pipe to be laid and joined properly and to allow the backfill to be placed as specified. The desired trench widths are 6" to 8" maximum on each side of the pipe for pipe sizes up to 33". For pipe larger than 33" the trench width should be the diameter of the pipe plus 24". Trenches shall be of such extra width, when required, to permit the placement of timber supports, sheeting, bracing, and appurtenances as required for safety requirements. All extra width excavations are to be prior approved by the Engineer. -13 of 25

16 i. Holes for Bells: Holes for the bells shall be provided at each joint, but shall be no larger than necessary to allow joint assembly and to ensure that the pipe barrel will lie flat on the trench bottom. Push-on type joints require only minimum depressions for bell holes. j. Rock Excavation: When excavation of rock in encountered, all rock shall be removed to provide a clearance below and on each side of all pipe, valves, and fittings of at least 6" for pipe sizes 24" or smaller and 9" for pipe sizes larger than 24". When excavation is completed, a layer of appropriate backfill material shall be placed on the bottom of the trench to the previously mentioned depths, leveled, and tamped. These clearances and bedding procedures shall also be observed for pieces of concrete or masonry and other debris or subterranean structures, such as masonry walls, piers, or foundations that may be encountered during excavation. This installation procedure shall also be followed when gravel formations containing loose boulders greater than approximately 8" in diameter are encountered. In all cases, the specified clearances shall be maintained between the bottom of all pipe and appurtenances and any part, projection, or point of rock, boulder, or stone of sufficient size and placement that, in the opinion of the Engineer, could cause a fulcrum point or point load. k. Crossing over Existing Trench: Should the trench pass over a water main or other previous excavation, the trench bottom shall be sufficiently compacted to provide support equal to that of the native soil or to conform to other regulatory requirements in a manner that will prevent damage to the existing installation. l. Private Property Protection: Trees, shrubs, sidewalks, fences, and all other property and surface structures shall be protected during construction, unless their removal is shown in the plans and specifications or approved by the Engineer. Any cutting of tree roots or branches shall be done only as approved by the Engineer. m. Utility & Structure Support/Protection: Temporary support, adequate protection, and maintenance of all underground and surface structures, drains, sewers, and other obstructions encountered in the progress of the work shall be provided in accordance with specifications or applicable regulations. n. Property Restoration: All properties that have been disturbed shall be restored as nearly as practical to their original condition. o. Unsuitable Sub-Grade: When the sub-grade is found to include ashes, cinders, refuse, organic material, or other unsuitable material, such material shall be removed to a minimum of at least 6" below the bottom of the pipe, or to the depth required by the Engineer. The removed material shall be replaced, under the direction of the Engineer, with clean, stable backfill material, such as 3/8 x 1/8 pearock or 1½ x ¾ rock, unless otherwise directed. The bedding shall be consolidated and leveled so that the pipe will lie flat on the trench bottom. When the bottom of the trench or the sub-grade is found to consist of material that is unstable to such a degree that, in the judgment of the Engineer, it cannot be removed, a foundation for the pipe and/or appurtenance shall be constructed using pilings, treated timber, concrete, or other materials, at the direction of the Engineer. p. Roadway & Site Cleanup: Contractor shall leave all work sites clear of excess debris at the end of each working day. Excess debris would include clay, black dirt, gravel, pea rock, construction materials, equipment, and etc. -14 of 25

17 q. Traffic-Control: Appropriate traffic-control devices shall be provided in accordance with federal, state, and local regulations to regulate, warn, and guide vehicular and pedestrian traffic at the work site. Barricades and signing shall be in conformance with the Manual of Uniform Traffic Control Devices. A guide to be used for signing is "Work Area Traffic Control Manual" published by the city of Sioux Falls and available through their Traffic Engineer, or Part VI, "Traffic Controls for Street and Highway Construction and Maintenance Operations" from the Manual of Uniform Traffic Control Devices, which is available from the Superintendent of Documents, US Government Printing Office, Washington, D.C The Contractor shall provide the appropriate signs, fencing and barricades surrounding the trench areas for vehicular and pedestrian protection. No street shall be closed unless written permission is obtained from the City Engineer or his designee. Permission to close a street shall be requested at the time an excavation permit is obtained. 36. PIPE INSTALLATION a. PVC Pipe & Fitting Installation: PVC pipe and fitting installation shall be done in accordance with the latest revision of ANSI/AWWA C605 Underground Installation of Polyvinyl Chloride (PVC) Pressure Pipe and Fittings for Water. b. DIP Pipe & Fitting Installation: DIP pipe and fitting installation shall be done in accordance with the latest revision of ANSI/AWWA C600 Installation of Ductile-Iron Water Mains and Their Appurtenances. c. Material Handling & Examination: Proper implements, tools, and facilities shall be provided and used for the safe and convenient performance of the work. All pipe, fittings, valves, specials and hydrants shall be lowered carefully into the trench by means of a derrick, ropes, or other suitable tools or equipment, in such a manner as to prevent damage to water main materials and protective coatings and linings. Under no circumstances shall water main materials be dropped or dumped into the trench. Where practical, the trench should be dewatered prior to installation of the pipe. All pipe, fittings, valves, hydrants, and other appurtenances shall be examined carefully for damage and other defects immediately before installation. Defective materials shall be replaced or marked and held for inspection by the Engineer, who may prescribe corrective repairs or reject the materials. All lumps, blisters, and excess coating shall be removed from the socket and plain ends of each pipe, and the outside of the plain end and the inside of the bell shall be wiped clean and dry and be free from dirt, sand, grit, or any foreign materials before the pipe is laid. Foreign material shall be prevented from entering the pipe while it is being placed in the trench. No debris, tools, clothing, or other materials shall be placed in the pipe at any time. d. Alignment & Grade: As each length of pipe is placed in the trench, the joint shall be assembled and the pipe brought to correct alignment and grade by checking against the grade stakes provided by the Engineer. The pipe shall be secured in place with approved backfill material. It is common practice to lay pipe with the bells facing the direction in which work is progressing; however, it is not mandatory. For example, when the main is being laid on a slope, the pipe is frequently laid with the bells facing uphill for ease of installation. The direction of the bells is not functionally related to the direction of flow within the main. -15 of 25

18 e. Minimum Cover for Water Pipe: The nominal cover over a water main is 6.50, unless a greater amount of cover is otherwise specified or indicated on the plan sheets. The minimum cover allowed over a water main is Any water main with less than 6.00 of cover shall require the Engineers approval prior to installation. f. Watertight & Vented Plug: At times when pipe-laying is not in progress, the open ends of pipe shall be closed by a watertight plug or other means approved by the Engineer. The plug shall be fitted with a means for venting. When practical, the plug shall remain in place until the trench is pumped completely dry. Care must be taken to prevent pipe flotation, should the trench fill with water. Prior to removal of the plug for extending the line or for any other reason, air and/or water pressure in the line shall be released. 37. JOINT ASSEMBLY a. Pipe Joint Deflection: Prior approval is required from the Engineer before any horizontal or vertical deflection is allowed in water mains. When it is necessary to deflect pipe from a straight line in either the horizontal or vertical plane, the amount of joint deflection shall not exceed 80% of the maximum deflection allowed by the pipe Manufacturer. b. Cutting Pipe: Cutting pipe for insertion of valves, fittings, or closure pieces shall be done in conformance with all safety recommendations of the Manufacturer of the cutting equipment. Cutting shall be done in a safe, workmanlike manner without creating damage to the pipe. Ductile-iron pipe may be cut using an abrasive pipe saw, rotary wheel cutter, guillotine pipe saw, milling wheel saw, or oxyacetylene torch if recommended by the pipe Manufacturer. Cut ends and rough edges shall be ground smooth, and for push-on joint connections the cut end shall be beveled by methods recommended by the Manufacturer and approved by the Engineer. 38. BACKFILLING a. Backfill: Backfill shall also be accomplished in accordance with the specified laying conditions as described under the pipe installations section. b. Backfill Material: The Contractor shall use previously excavated soil for trench backfill above the pipe bedding to maintain continuity of the soil type across the roadway section. All backfill material shall be free from debris, cinders, ashes, refuse, vegetable or organic material, boulders, rocks or stones, frozen soil, or other material that, in the opinion of the Engineer, is unsuitable. Backfill material shall not be installed in any trench which has standing water in the trench. Backfill material from four inches (4") below the bottom of the pipe to six inches (6") above the top of the pipe shall be 3/8 x1/8 pearock, unless otherwise specified. Stones larger than 3 in diameter shall not be placed within two feet (2 ) from the top of the pipe. From two feet (2 ) from the top of the pipe to the subgrade of the pavement, material containing stones up to 8" in their greatest dimension may be used, unless otherwise specified. When the type of backfill material is not indicated on the plans or is not specified, the excavated material may be used, provided that such material consists of loam, clay, sand, gravel, or other materials that, in the opinion of the Engineer, are suitable for backfilling. -16 of 25

19 If excavated material is indicated on the drawings or specified for backfill, and there is a deficiency due to a rejection of a part thereof, the required amount of Engineer approved material shall be provided by the Contractor. The Engineer shall compensate the Contractor for the replacement of the rejected backfill material under the appropriate bid item in the bid form. The Contractor shall be responsible for the removal and disposal of all rejected materials. For purposes of definition: (a) sand is material graded from fine to coarse, containing less than 10 percent, by weight, of loam and clay that passes a 3/4" sieve with no more than 5 percent, by weight, remaining on a no. 4 sieve; (b) gravel is a reasonably uniform combination, containing no boulders or stones larger than 2" and not containing excessive amounts of clay and loam; (c) crushed stone is limestone or dolomite ledge-rock material that all passes a 1/2" sieve with no more that 25 percent passing a no. 100 sieve. c. Backfill Compaction: Backfill in existing or future street locations shall be compacted in no more than two foot (2') lifts. The minimum allowable compaction shall be 95% of maximum dry density as determined by the latest version of ASTM D698 (Standard Proctor). If backfill soil moisture content is greater that the optimum moisture range that will allow the Contractor to meet the density requirements with a reasonable level of effort, the Contractor shall air dry the soil outside the trench to achieve the desired moisture range prior to backfill and compaction. If backfill soil moisture content is less than the optimum moisture range that will allow the Contractor to meet the density requirements with a reasonable level of effort, the Contractor shall add and mix water to the soil to achieve the desired moisture range for compaction. The Engineer may choose to hire a reputable firm to take random compaction tests of the backfilled trench material. If any of these tests indicate that the material has not been compacted to the required density, the Contractor shall re-compact the backfill material at no additional cost to the Owner. At all locations which the compaction tests have failed, an additional compaction test shall be conducted after re-compacting the trench at the Contractors expense. When special backfill compaction procedures are required, they shall be accomplished in accordance with project specifications of applicable federal, state or local regulations. d. Backfilling with Pipe Joints Accessible: Newly installed pipelines are normally tested after backfilling. When unusual conditions require that pressure and leakage testing be accomplished before completion of backfilling or with pipe joints accessible for examination, sufficient backfill material shall be placed over the pipe barrel between the joints to prevent movement, and due consideration shall be given to restraining thrust forces during the testing. In particular, restrained-joint systems which derive their stability from the interaction of the pipe and soil, should be backfilled prior to testing. 39. VALVE AND FITTING INSTALLATION a. Valve & Fitting Inspection: Prior to installation, valves shall be inspected by the Contractor for direction of opening, number of turns to open, freedom of operation, tightness of pressure-containing bolting and test plugs, cleanliness of valve ports and especially seating surfaces, handling damage, and cracks. Defective materials shall be held for inspection by the Engineer and/or replaced at no extra cost to the Owner. Valves shall be closed before being installed. -17 of 25

20 b. Valve & Fitting Installation: Valves, fittings, plugs, and caps shall be set and joined to the pipe in the manner specified in the pipe installation section for cleaning, laying and joining pipe, except that all valves should be provided with special support, such as a concrete pads, so that the pipe will not be required to support the weight of the valve. Valves shall be installed in the closed position. Valves requiring restraint shall include a restraint fitting, rodding to a fitting may also be required. Mains shall be drained through drainage branches, blow-offs or dead-end hydrants. Drainage branches, blow-offs, air vents, and any other required appurtenances shall be provided with control valves and shall be located and installed as shown on the plans. Drainage branches or blow-offs shall not be directly connected to any storm or sanitary sewer, submerged in any stream, or installed in any other manner that will permit siphonage back into the distribution system. c. Valve Box or Vault: A valve box or a vault shall be provided for every valve that has no gearing or operating mechanism or in which the gearing or operating mechanism is fully protected with a gear case. The valve box shall not transmit shock or stress to the valve. The valve box shall be centered over the operating nut of the valve and shall have a valve box adaptor installed between the valve box and the valve. The valve box cover shall be installed flush with the surface of the finished area or any other such level as may be directed by the Engineer. A valve vault designed to prevent settling on the pipe shall be provided for every valve that has exposed gearing or operating mechanisms. The operating nut shall be readily accessible for operation through the opening in the valve vault, which shall be set flush with the surface of the finished pavement or such other level as may be specified. Vaults shall be constructed to permit minor valve repairs and to protect the valve and pipe from impact where they pass thought the vault walls. d. Valve Stress & Pressure: In no case shall valves be used to bring misaligned pipe into alignment during installation. Pipe shall be supported in such a manner as to prevent stress on the valve. All dead ends on new mains shall be closed with plugs or caps that are suitably restrained to prevent blowing off under test pressure. If a blow-off valve precedes the plug or cap it shall have a joint restraint fitting included, and rodding to a fitting may also be required, to insure the valve does not blow off when extension of the water main resumes. All dead ends shall be equipped with suitable blow-off facilities. Additional information regarding installation of gate valves can be found in the appendices of ANSI/AWWA C500 and ANSI/AWWA C FLUSHING Foreign material left in the pipelines during installation often results in valve or hydrant seat leakage during pressure tests. Every effort shall be made to keep lines clean during installation. Thorough flushing is recommended prior to a pressure test; flushing should be accomplished by partially opening and closing valves and hydrants several times under expected line pressure, with flow velocities adequate to flush foreign material out of the valves and hydrants. -18 of 25

21 41. HYDRANT INSTALLATION a. Hydrant Inspection: Prior to installation, all hydrants shall be inspected for direction of opening, nozzle threading, operating-nut and cap-nut dimensions, tightness of pressure-containing bolting, cleanliness of inlet elbow, handling damage, and cracks. Defective hydrants shall be corrected or held for inspection by the Engineer. b. Hydrant Installation: All hydrants shall stand plumb and shall have their nozzles parallel with or at right angles to the curb, with the pumper nozzle facing the curb, except that hydrants having tow-hose nozzles 90 degrees apart shall be set with each nozzle facing the curb at an angle of 45 degrees. Hydrants shall be set to the established grade, with the centerline of the lowest nozzle at least 18" above the ground and not more than 24" above the ground. Traffic model hydrants shall be installed such that the breakaway flange shall be installed not less than 2" or more than 6" above established grade. Each hydrant shall be connected to the main with a 6" or larger diameter branch which may or may not be controlled by an independent valve. The valve shall include a restraint fitting, rodding to a fitting may also be required, to allow shutoff when the hydrant needs to be removed. When a dry-barrel hydrant is set in soil that is pervious, drainage shall be provided at the base of the hydrant by placing 1 1/2 x 3/4 rock from the bottom of the trench to at least 6" above the drain-port opening in the hydrant and to a distance of 1 ft. around the elbow. When a dry-barrel hydrant with an open drain port is set in clay or other impervious soil, a drainage pit 2'x 2' shall be excavated below each hydrant. The drainage pit shall be filled with 1 1/2 x 3/4 rock to a level of 6" above the drain port. The location of the hydrant shall be centered in the boulevard between the street side sidewalk edge and the back of curb. Hydrants installed by intersections shall be located a minimum of five feet from intersection sidewalk. In the case of hydrants that are intended to fail at the ground-line joint upon vehicle impact (traffic hydrants), specific care must be taken to provide adequate soil resistance to avoid transmitting shock moment to the lower barrel and inlet connection. In loose or poor load-bearing soil, this may be accomplished by pouring a concrete collar approximately 6" thick to a diameter of 2' at or near the ground line around the hydrant barrel. Additional information regarding installation of hydrants can be found in AWWA Manual M THRUST RESTRAINT a. Hydrant Thrust Restraint: The bowl of each hydrant shall be well braced against a sufficient area of unexcavated earth at the end of the trench with a thrust restrained joint, stone slabs or concrete thrust blocks, or it shall be tied to the pipe with suitable metal tie rods, clamps, as shown or directed by the Engineer. b. Fitting Thrust Restraint: All fittings requiring thrust restraint, such as valves, bends, etc., shall include a restrained joint fitting with the concrete thrust blocks, as shown or specified by the Engineer. c. Objective of Thrust Restraint: The design pressure is the maximum pressure to which the pipeline will be subjected, with consideration given to the vulnerability of the pipe-soil system when the pressure is expected to be applied. In most cases, this will be the test pressure of the pipe, applied shortly after installation, when the pipe-soil system is normally most vulnerable. -19 of 25

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

More information

Sanitary Sewer Mains and Services

Sanitary Sewer Mains and Services Sewer Title Sanitary Sewer Mains and Services STitle Sewer Table of Contents "CORRECTIVE PERIOD & INSPECTION FOR SANITARY SEWERS & SERVICES"... 1 1. TERM OF GUARANTEE... 1 2. CONTRACTOR LICENSE AND PERMITS...

More information

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees. The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS for (PVC) SANITARY SEWER MAIN CONSTRUCTION VI(A).1 General VI(A).2 Materials and Equipment VI(A).3 Installation of Sanitary Sewer Mains VI(A).4 Laying of

More information

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL 155 E. Front Street (rear) Lititz, PA 17543 Phone (717) 625-1930 Fax (717) 625-1931 Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL CONSTRUCTION SPECIFICATIONS AND DETAILS

More information

SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS

SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS PART 1: GENERAL 1.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of AW facilities. Closely coordinate construction work

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY Approved and adopted as Official Document Number 800576 this 10th day of December, 1980 Donald R. Boyd, P.E., Director Water

More information

SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE

SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE PART 1: GENERAL 1.01 SECTION INCLUDES PVC pressure pipe and fabricated fittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent

More information

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials

More information

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

EXHIBIT A. Technical Specifications for Water and Sewer Service Lines EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding

More information

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials. PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

SECTION 15105 DUCTILE IRON PIPE AND FITTINGS

SECTION 15105 DUCTILE IRON PIPE AND FITTINGS SECTION 15105 DUCTILE IRON PIPE AND FITTINGS PART 1 GENERAL.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of Owner facilities. Closely coordinate construction work and connections

More information

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors. SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11 Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

Section C-1 Pipes and Fittings

Section C-1 Pipes and Fittings Section C-1 Pipes and Fittings C1.00 Work Included The work under this Division of the Specifications shall include all labor, materials, and equipment necessary to furnish and install all piping, pipelines,

More information

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

1.3.2 Method of construction and restoration of existing water service connections. This shall include: 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

LS 2540 SEWER LATERALS AND INSPECTION TEES

LS 2540 SEWER LATERALS AND INSPECTION TEES LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal

More information

SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION

SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION PART 1 GENERAL.01 SECTION INCLUDES Furnishing and installing 4 inch through 16 inch high density

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains

More information

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions The purpose of this application example is to provide assistance to small and medium sized rural communities in the drafting of documents necessary for the efficient operation of water, wastewater, and

More information

Standard Specifications for Installation and Repairs of Water and Sewer Service Lines

Standard Specifications for Installation and Repairs of Water and Sewer Service Lines Standard Specifications for Installation and Repairs of Water and Sewer Service Lines Effective December 1, 2013 Approved /S/ Kyle Mathis Kyle Mathis City Engineer /S/ Robert Glenn Robert Glenn Water/Wastewater

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

DIVISION 4300 STORM DRAINAGE

DIVISION 4300 STORM DRAINAGE DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES

More information

Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer

Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer The user may choose to adopt part or all of this Model Specification; however, the user should ensure that all parts

More information

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...

More information

SECTION 15056 DUCTILE-IRON PIPE AND FITTINGS

SECTION 15056 DUCTILE-IRON PIPE AND FITTINGS SECTION 15056 PART 1 GENERAL 1.01 DESCRIPTION This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems. A written request to use Ductile

More information

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, Storm Drain Installation, of these Standard Provisions. SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and

More information

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL PART 1 - GENERAL 1.1 WORK INCLUDED IN THIS SECTION A. The WORK of this Section includes the repair, demolition, and disposal of asbestos

More information

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines: Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

TECHNICAL SPECIFICATIONS GRAVITY AND PRESSURE SEWER LINE AND MATERIALS

TECHNICAL SPECIFICATIONS GRAVITY AND PRESSURE SEWER LINE AND MATERIALS TECHNICAL SPECIFICATIONS GRAVITY AND PRESSURE SEWER LINE AND MATERIALS Scope of Work Work performed under this contract shall consist of furnishing and installing, complete and ready for service, the sewer

More information

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing

More information

SECTION 2 POTABLE WATER SYSTEMS 2.1 GENERAL 2.2 SYSTEM DESIGN

SECTION 2 POTABLE WATER SYSTEMS 2.1 GENERAL 2.2 SYSTEM DESIGN SECTION 2 POTABLE WATER SYSTEMS 2.1 GENERAL This section sets forth the general requirements for design, installation and testing of water distribution systems for potable service and fire protection.

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions

More information

Close-Out Documents... 9

Close-Out Documents... 9 Water and Sanitary Sewer Service Connection Requirements Service Connection Requirements... 1 Application for Services... 2 Water Meter Application... 2 Wet Tap/Tie-in Connection Requirements... 3 Meter

More information

SECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General

SECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General SECTION 15 AIR RELEASE VALVE ASSEMBLIES 15-1.01 Scope 15-1 General This section describes the requirements for furnishing and installing Air Release Valve Assemblies of the size and type shown on the plans,

More information

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent

More information

CHAPTER 6 - SANITARY SEWER

CHAPTER 6 - SANITARY SEWER CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings

More information

STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223

STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223 STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES PART 1 - GENERAL A. Description This section describes the installation of gravity sewer pipelines fabricated of vitrified

More information

SECTION 02732 BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers.

SECTION 02732 BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers. SECTION 02732 BUILDING SEWERS PART 1 GENERAL 1.01 SECTION INCLUDES A. Lateral piping, fittings, and accessories. B. Connection of building sanitary drainage system to municipal sewers. 1.02 REGULATORY

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

SECTION 603 SANITARY SEWER FORCE MAINS

SECTION 603 SANITARY SEWER FORCE MAINS SECTION 603 SANITARY SEWER FORCE MAINS 1. GENERAL Pipelines for sanitary sewer force main systems shall conform to the following specifications and shall be installed at the locations indicated on the

More information

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. 1.01 Testing - General

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. 1.01 Testing - General SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL 1.01 Testing - General Testing shall be of the type and frequency described in each section and summarized in Item 1 of this section. In addition to

More information

SECTION 02401 - SANITARY SEWER PIPE

SECTION 02401 - SANITARY SEWER PIPE PART 1 - GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for furnishing and installing sanitary sewer pipe, in accordance with

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by

More information

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions. SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings

More information

SECTION 33 12 19 FIRE HYDRANTS

SECTION 33 12 19 FIRE HYDRANTS SECTION 33 12 19 FIRE HYDRANTS PART 1: GENERAL 1.01 SCOPE A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 - Submittals.

More information

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene

More information

Section 402. STORM SEWERS

Section 402. STORM SEWERS 402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide

More information

STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES

STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES CITY OF PETALUMA STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES AUGUST 1999 Revised 10/98 City of Petaluma Petaluma, California STORM DRAIN INSTALLATION DETAIL

More information

Section 02702 SEWER PIPE INSTALLATION AND TESTING

Section 02702 SEWER PIPE INSTALLATION AND TESTING PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete

More information

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST NOTE: The following list shall only be used as a guide and shall not be used in lieu of the specifications found in the CITY OF ANN ARBOR PUBLIC

More information

SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE

SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes all labor, materials, equipment, and incidentals required and installation of Polyvinyl Chloride

More information

Beacon Hill Sewer District Standard Specifications

Beacon Hill Sewer District Standard Specifications Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions

More information

SECTION 02221 SELECTIVE DEMOLITION

SECTION 02221 SELECTIVE DEMOLITION SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on

More information

SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.)

SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.) CHAPTER 9 SEWER / STORM DRAIN / IRRIGATION LINES SECTION 9.01 GENERAL This section covers the requirements for piping materials and installation of Lehi City sewer, storm drainage and irrigation collection

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

SECTION 200: STORM SEWER CONSTRUCTION STANDARDS

SECTION 200: STORM SEWER CONSTRUCTION STANDARDS SECTION 200: STORM SEWER CONSTRUCTION STANDARDS Page No. Description 200-2 201 GENERAL 200-2 201.1 SPECIFICATIONS 200-2 201.2 CONNECTION TO EXISTING FACILITIES 200-3 202 MATERIALS 200-3 202.1 PIPES 200-4

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS 1001 SOUTH LEECHBURG HILL LEECHBURG, PA 15656 Phone: 724-845-9355 Fax: 724-845-1186 SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS 1. General

More information

MDWASD 8/1999 SECTION 02315 TRENCHING AND BACKFILLING FOR PIPING SYSTEMS

MDWASD 8/1999 SECTION 02315 TRENCHING AND BACKFILLING FOR PIPING SYSTEMS PART 1 - GENERAL 1.01 WORK INCLUDED SECTION 02315 TRENCHING AND BACKFILLING FOR PIPING SYSTEMS A. The work included under this Section consists of excavating, backfilling and compaction as required for

More information

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...

More information

08003-1 WATER SERVICE 2

08003-1 WATER SERVICE 2 08003_Mar08_2011.pdf Page 1 of 7 INDEX Page 08003-1 WATER SERVICE 2 1.1 Pipe 2 1.1.1 Copper 2 1.1.2 Polyethylene 2 1.2 Valves and Fittings 2 1.2.1 Main Stops 3 1.2.2 Curb Stops 3 1.2.3 Curb Box 3 1.2.4

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

CONSTRUCTION PERMIT REQUIREMENTS

CONSTRUCTION PERMIT REQUIREMENTS CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department

More information

SECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction)

SECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction) SECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction) 6001 SCOPE. This section covers excavation and trenching work and shall include the necessary clearing, grubbing, and preparation

More information

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS 1 SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS TABLE OF CONTENTS I. Introduction II. General Information and Requirements A. Applying for Sewer connection B. Excavation C. Cutting Concrete and Asphalt

More information

Part VII - Water Mains and Service Laterals

Part VII - Water Mains and Service Laterals ARTICLE 701 - GENERAL... 1 701.1 Definition.... 1 701.2 Description.... 1 701.3 Equipment.... 1 701.4 Tests.... 2 701.5 Finishing Work and Maintenance.... 2 701.6 Repairs and Replacement.... 2 701.7 Emergency

More information

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of

More information

STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200 STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES PART 1 - GENERAL A. Description This section includes materials, testing, and installation of precast concrete

More information

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection

More information

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or

More information

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines

More information

Town House 11265 Center Highway North Huntingdon, PA 15642

Town House 11265 Center Highway North Huntingdon, PA 15642 APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House

More information

TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER

TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER I. Scope of Work Work done under this item shall consist of the construction, reconstruction, or alteration of a one-course Portland

More information

SECTION 7- STORM SEWER

SECTION 7- STORM SEWER SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...

More information

2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS

2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS 2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS Water system improvements proposed for inclusion into Western s service area shall be designed in accordance with all appropriate AWWA standards, include

More information

SECTION 06000 WATER DISTRIBUTION SYSTEMS TABLE OF CONTENTS

SECTION 06000 WATER DISTRIBUTION SYSTEMS TABLE OF CONTENTS SECTION 06000 WATER DISTRIBUTION SYSTEMS TABLE OF CONTENTS 06010 WATER DISTRIBUTION PIPE A. Design B. Materials C. Installation 06020 FIRE PROTECTION A. Fire Hydrants B. Automatic Fire Sprinkler Systems

More information

2013 Edition. Flanged fittings 30"-64" NSF. industrial Applications, water & Wastewater. Certified to ANSI/NSF 61

2013 Edition. Flanged fittings 30-64 NSF. industrial Applications, water & Wastewater. Certified to ANSI/NSF 61 30"-64" Ductile Iron industrial Applications, water & Wastewater 2 Table of Contents Flanged Fittings for Water 3 Flange Details 5 Flanged Fittings 6 90º and 45º Bend 6 22-1/2º and 11-1/4º Bends 7 Tees

More information

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE 1.0 GENERAL 1.1 DESCRIPTION This section addresses the procedures to be employed for pipe bursting existing water/sewer pipelines, as identified on the drawings, and replacing with new Restrained Joint

More information

Specifications for Residential Property Owners Connection to New Public Sewer

Specifications for Residential Property Owners Connection to New Public Sewer Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the

More information

Section 3510: Reclaimed water Pipes, Valves, and Appurtenances February 11, 2011

Section 3510: Reclaimed water Pipes, Valves, and Appurtenances February 11, 2011 STANDARDS AND CONSTRUCTION MANUAL : Reclaimed water Pipes, Valves, and Appurtenances February 11, 2011 PART 1 - GENERAL 1.01 SCOPE OF WORK A. These specifications cover the pipes, fittings, and appurtenances