Fixing Instructions for the Rafter Gasket System (50mm Wide Rafter)
|
|
- Andra Long
- 7 years ago
- Views:
Transcription
1 Fixing Instructions for the Rafter Gasket System (50mm Wide Rafter) Tools you will need to construct your Rafter Gasket System Roof:- Tape Measure Screwdriver Spirit Level Hacksaw Drill Hammer
2 System Description The Rafter Gasket System is designed for installing Multiwall polycarbonate glazing onto 50mm wide rafters. It consists of a 50mm wide Rafter Gasket, and a screw-down Aluminium Capping Bar, which clamps the Multiwall glazing firmly and securely in place. Design Detail Multiwall polycarbonate is normally used on a roof with a gentle slope, which will allow rainwater to drain into guttering. A minimum slope of 5 Degrees is recommended. Sheets of polycarbonate will expand and contract as temperatures change, and room should always be left to accommodate expansion when joining sheets on glazing bars (Fig.1) Sheet widths should be reduced by 10mm to allow for expansion. For example, if you are installing 10mm sheets and your glazing bars are 700mm apart (centre to centre), use a 690mm wide sheet. Sheet Thickness 10mm Glazing Bar Centres 700mm When measuring up for your roof sheets, remember your sheet should be 10mm shorter than your glazing bars to allow for the fitting of aluminium U profile end closures. It is not recommended glazing 16mm and 25mm thick Multiwall on 50mm wide rafters. Should thicker glazing be required you could fix a quadrant either side of the existing rafter (Fig.2) thereby bulking it up to 60mm and use the Rafter Gasket Glazing System for 60mm wide rafters.
3 Step 1: Measure and set out where the rafters, and if applicable purlins, are going to lie. Rafters should be at 50mm wide when installing this System. As per the table on the last page, 10mm sheets should be accommodated at centres no more than 700mm apart (Fig.3). Step 2: Nail the Rafter Gasket to the rafters through the central channel with galvanised nails (not supplied) placed 300mm apart. Step 3: If installing on a roof over a room with enclosed sides, fix the Aluminium Eaves Filler across the structure at the eaves end (Fig.4). This solves the problem of filling the gap between the underside of the sheet and the top of the support structure. Step 4: Cut the Capping Bar to the required lengths and drill the cap at regular intervals with holes no more than 300mm apart, ensuring the holes will line up uniformly with the holes on each of the other bars once on the roof. The drill holes should be of a size to accommodate a 10swg screw. You can now start to fix the roof sheets; starting at one side of the roof and working across, fixing and dressing down flashings as you go. Please note, the multiwall sheets are UV coated on one side only. The sheet has a protective film on both sides, but only one side is printed. This is the side that should face outwards towards the sun. Do not forget to remove the masking film on both sides of the sheet. The ridge end of the sheet is sealed with solid Aluminium tape and the gutter end with anti-dust breather tape. Step 5: Having already fitted the Rafter Gasket to the rafters, fix a Side Trim Profile over the Rafter Gasket to the side of the fascia or building (Fig.5)
4 Step 6: If butting the glazing bar up to a wall face simply upturn the Side Trim Profile, fix to the wall and flash over (Fig.6) Step 7: Place an adjoining sheet with the Aluminium U Profile already fitted at the ridge end into position of the Rafter Gasket remembering to leave 5mm at either side for expansion. Fix through the Capping Bar and through the Rafter Gasket by using 62mm x 10swg stainless steel wood screws. Ensure that the screws are not over tightened as this will undulate the Glazing Bar Cap, limit the expansion and compress the sheet (Fig.7). Finally press down the screw cover caps. Step 8: Repeat this procedure for the remaining panels and on the last panel, repeat Step 5 or 6 to finish off. Step 9: Push fit the Plastic End Plate onto the end of the Roof Bar (Fig.8) Step 10: Measure and accurately cut the Aluminium U Profile End Closure to the exact length and fix over the anti-dust breather tape at eaves end of the sheet between the end of the plates. A small bead of silicone sealant can be applied to the upper side of the sheet along the line where it meets the U profile. Smooth this out to give a neat finish (Fig.9). Only use silicone sealant that is compatible with polycarbonate. Step 11: Finally dress down the Butyl Flashing.
5 As our policy is one of continuous improvement, we reserve the right to change specifications without prior notice. All information, recommendations or advice, written or verbal, is given in good faith and to the best of our knowledge
Installation Instructions
Installation Instructions 1. Position the unit onto bridging packers. These keep the unit away from any water sitting inside the frame. 2. Centralise the unit within the frame and pack the edges with appropriate
More informationmajestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base
majestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base These Instructions are for a left and right handed unit. The diagrams show a left
More information!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035
Decra Plus Drawing no DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 Description Shown In Decra Brochure Most Commonly Used Detail t~êã=oççñ=b~îéë=aéí~áä=b~îéë=lîéêü~åö=táíü=fåëìä~íéç=c~ëåá~=~åç=pçññáí
More informationIN00419 (rev A) Aqua 6 Glide Quadrant and Off-set Quadrant Enclosure
IN00419 (rev A) Aqua 6 Glide Quadrant and Off-set Quadrant Enclosure Instruction suitable for both Quadrant & Off-set Quadrant variations. Instruction suitable for both Right and Left Hand fixing variations
More informationNRG 75 CRF NRG GREENBOARD WALL SYSTEM
NRG GREENBOARD WALL SYSTEM NRG Energy Efficient Building Systems is pleased to announce a revolution in lightweight cladding systems. NRG Building Systems is the first and only company to achieve CodeMark
More informationSUNPAL Multiwall Polycarbonate Standing-Seam Architectural System
SUNPAL Multiwall Polycarbonate Standing-Seam Architectural System Technical Guide Creating New Solutions for over 40 Years www.palram.com Contents Page Introduction 3 Panel Specification 4 Colors and Solar
More informationSECTION 07 61 13 STANDING SEAM METAL ROOFING
SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced
More informationTable of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..
Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3
More informationWindow Installation Instructions
Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for
More informationINSTALLATION MANUAL For Grand Rib-3 / Multi Purpose / & Classic Rib Roofing Panels
INSTALLATION MANUAL For Grand Rib-3 / Multi Purpose / & Classic Rib Roofing Panels Grand Rib-3 / Multi-Purpose / Classic Rib Grand Rib-3 / Multi-Purpose / & Classic Rib Grand Rib 3 panels are a strong,
More informationScrew Patterns Roof & Walls 403-279-2766 TR-36 MD-36 TSM-32. PBR-Panel
Screw Patterns Roof & Walls Overlap Underlap ¾ 9 TR-36 36 5/8 6 MD-36 36 ½ 8 TSM-32 32 1¼ 12 PBR-Panel 36 Bottom Edge Screw Pattern apply to every profile except for MD36 (1 screw beside every rib) High
More informationIN00378 (rev A) Corner Entry
IN00378 (rev A) Corner Entry Before You Start Check that the tray has been installed correctly and that it is level (Fig. A), tiled down onto and sealed to the manufacturer s guidelines. Please Note: All
More informationCurved Quadrant Instruction Manual
Curved Quadrant Instruction Manual Consumer Guarantee - Please make sure the purchaser/end user completes and returns the Guarantee card which is enclosed with this product. Failure to validate the Guarantee
More informationINSTALLATION OF A BAY WINDOW
INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening
More informationKITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE
FITTING YOUR KITCHEN GUIDE How to mark out a kitchen PAGE 1 Before starting on the installation, measure 870mm from the lowest point of the floor and mark a datum line around the room to indicate where
More informationImportant Information
Single Door Quadrant Instruction Manual ESQ Important Information Toughened glass is completely safe for use in our shower enclosures and bath screens; providing our products are installed according to
More informationSTANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS
ROOFING APPLICATION STANDARD (RAS) No. 133 STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS 1. Scope 1.1 This application standard has been developed to provide consistent information for the
More informationBeautifully Traditional
Arcade 800mm Single Sliding Door Quadrant - nickel Arcade 900mm Single Sliding Door Quadrant - nickel ARC48 ARC49 INSTALLATION INSTRUCTIONS A www.arcadebathrooms.com IMPORTANT - Please read before installation
More informationHoliday Inn Express & Suites Covington (Newton County) 1. Standing-seam metal roofing, custom fabricated.
PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standing-seam metal roofing, custom fabricated. 1.2 SUBMITTALS A. Product Data: For each type of product indicated. B. Shop Drawings: Show installation
More informationBrick Veneer Construction
Brick Veneer Construction Check list of suggested tools & support items Claw hammer Tape measure 3/4" [19 or 20] Wood chisel Wood or plastic shims Pry bar Utility knife Caulking and caulking gun Power
More informationIMPORTANT INFORMATION
Curved Quadrant Instruction Manual CQ IMPORTANT INFORMATION Toughened glass is completely safe for use in our shower enclosures and bath screens; providing our products are installed according to our guidelines.
More informationLinea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1
Top plate Stud Soffit lining 45mm min nog Fix scotia bead Building underlay/james Hardie rigid air barrier Soffit Detail Building underlay/james Hardie rigid air barrier Bottom plate 25mm wide cant strip.
More informationRESIDENTIAL METAL BUILDING COMPONENTS
3 3 BASIC EAVE UNIVERSAL TRIM * RT - 100 10 6.7500 4.47 2" VALLEY RT - 100 10 6.7500 4.47 8 3 1 8 3 WALL - ROOF & Open/ RT - 100 10 6.7500 4.47 3 Open TRANSITION & Open/ RT - 100 10 6.7500 4.47 3 9 1 Hilco
More informationInstallation Manual for STANDING SEAM ROOFING
Installation Manual for STANDING SEAM ROOFING Absolute Steel Toll Free 877-833-3237 / Phone 480-768-1618 / Fax 480-768-1514 www.metalroofingsource.com Standing Seam features approximately one-inch high
More informationInsulView Window Installation Instructions
InsulView Window Installation Instructions 1. The entire building is normally sheeted with the 2" 2 ½ OR 3 wall panel and the windows installed at a later time. A window retrofit of an existing building
More informationINSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions
More informationRAIL FREE SOLAR ROOF MOUNT
RAIL FREE SOLAR ROOF MOUNT Utilizes EcoFasten Solar s patented technology Rock-it system Designed with the installer in mind. EcoFasten Solar specializes in solar roof attachments that are the easiest
More informationEpdm Flat Roofing Systems
Epdm Flat Roofing Systems EDPM can be fully bonded, loose laid and ballasted or mechanically attached depending on the existing roof and its proposed usage. This applies to roofs to be refurbished and
More informationDrexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood
Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood Section 07411 Metal Roof Panels Part 1 General 1.1 Summary A. This section includes the following: a. Factory-formed
More informationBefore you start 3. Base & frames - Setting out the conservatory 4-6. Doors & windows - Glazing & 7
Selfbuild Guide ontents efore you start 3 ase & frames - Setting out the conservatory 4-6 Doors & windows - Glazing & 7 This enturion ssembly Guide has been produced as an aid to assemble the enturion
More informationUbiflex. Non-lead flashing system
Ubiflex Non-lead flashing system Ubiflex non-lead flashing Ubiflex is a non-lead waterproof flashing material which can be used in most applications where lead is traditionally used to provide a weatherproof
More informationFolding Bath Screen Instruction Manual
Folding Bath Screen Instruction Manual Consumer Guarantee - Please make sure the purchaser/end user completes and returns the Guarantee card which is enclosed with this product. Failure to validate the
More informationSTEEL BUILDINGS RECOMMENDED INSTALLATION GUIDE
STEEL BUILDINGS RECOMMENDED INSTALLATION GUIDE 3 TO 30 METRE SPAN TILT UP METHOD SUPPLIED BY: Last update 8 December 2010 2010 FBHS (Aust) Pty Limited FBHS (Aust) Pty Limited ABN 83 126 232 504 trading
More informationBUILD A CARPORT. 2 - Planning the carport. 3 - Designing the carport
BUILD A CARPORT You only need basic DIY and woodworking skills to build a carport. The most important part of the job is setting the supporting posts truly vertical - a job for which another pair of hands
More informationTable of Contents. Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide
Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3
More informationFig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION
SIPS SCREWS WITH MINIMUM 1" PENETRATION IN WOOD MEMBER IN SIP WALL PANEL CONNECTED TO @ 24" O.C. MAXIMUM OUTSIDE SKIN EACH SIDE OF FRAMING TYP. AS RECOMMENDED BY FOAM CORE AS EACH SIDE OF FRAMING TYP.
More informationBRIDGE & SUPPLY COMPANY. Installation Guide. Ultra 2000. Includes:
BRIDGE & SUPPLY COMPANY Installation Guide Ultra 2000 Includes: Ultra 2000 Installation Guide Stock Trim Profiles Ultra 2000 Trim Installation Guide Page 2 Table of Contents Ultra 2000 Profile, Colors
More information7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME
7. Installation Window involves the fixing of window frame at an earlier construction stage and subsequent of the window sashes. This is a highly workmanship dependent process. Only trained and approved
More informationMinimizing Water Intrusion Through Roof Vents in High-Wind Regions
Minimizing Water Intrusion Through Roof Vents in High-Wind Regions http://www.fema.gov HURRICANE IKE RECOVERY ADVISORY Purpose: To recommend practices for minimizing water intrusion through roof vent systems
More informationDiscount Direct Metal Roofing Plus Rib Roofing Panels Installation Instructions
Discount Direct Metal Roofing Plus Rib Roofing Panels Installation Instructions All questions and concerns please call 904-696-9700 Discount Direct Metal Roofing Plus Rib metal roofing panels are a strong,
More informationfoot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.
Skylight Installation Instructions This document provides instruction and guidelines for installation of both curb mount (CM) and self flashing (SF) unit skylights on flat, pitched (> or equal to 3/12
More informationMulti-layer Insulation Blanket for Roofs
Multilayer Insulation Blanket for Roofs Thermal Insulation in a 40mm thin, flexible, multilayer membrane Meets requirements of L1A, L1B 2010 In accordance with BR443 NHBC Acceptance Pitched & Flat roof
More informationAfter reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE
86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is
More informationPreformed Metal Roofing and Siding
Page -1-1. GENERAL 1.1. Description This specification along with the drawings covers the furnishing of all material, products, equipment, accessories, tools, services, transportation, labor and supervision
More informationHeavy Glass Frameless Shower Door With Return Panel
202 Anderson Ave., elvue, KS 66407 Phone: 800-669-9867 Fax: 800-393-6699 www.onyxcollection.com Heavy Glass Frameless Shower Door With Return Panel Full Showers with Return ench Seat with Return FRLSDRPL-0116
More informationReplacement Installation Instructions
Sliding Door Replacement Installation Instructions Please make sure you have: Fixed 1 - Operating (X) Panel (Glazing Bead Inside, Roller Adjustment Holes Outside) 1 - Fixed (O) Panel (For 3-Panel doors,
More informationMetal Building Systems Installation and Flashings & Details Guide. Table of Contents
Table of Contents Section Page Notes to Designer/User..................1-2 Map of Typical Roof Conditions............3 Fastener Placement.......................4 Fastener Selection........................5
More informationVM ZINC : standing seam Guidelines for specification and installation
VM ZINC : standing seam Guidelines for specification and installation Junglim Architecture - QUARTZ-ZINC Roofing and cladding system in VM ZINC Roofs from a 3 pitch and facades Freedom with shape and appearance
More informationInstallation Guide for Andersen Architectural Wood Inswing Entry Doors
Installation Guide for Andersen Architectural Wood Inswing Entry Doors Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance are
More informationTechnical data sheet PVC Bi-fold doors
Standard Specifications White internally beaded, Deceuninck 3000 series profile 28mm Low-e toughened sealed units with argon gas Open in doors with white handles and hinges Tracks are fitted to the top
More informationConservatory Roof Assembly Guide
Conservatory Roof Assembly Guide Effective from August 2007 Contents Section Subsection Page 1. Before you start 3 2. Box gutter 2.1 Fixing & sealing the box gutter 4 2.2 Joining the box gutter 5 3. Eaves
More informationImportant Information for Installer & Homeowner
Important Information for Installer & Homeowner Homeowner: Please keep this information for your records, do not discard! Installation Instructions for Wood Frame Construction Replacement (See other side
More informationSection Page Section Page
Western States Western Rib Panel Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer / Installers..1 Fastener Placement and Selection.2-3 Key
More informationPremier & Deluxe 3-Season Room Sliding Glass Door
DTSSGD-11 Premier & Deluxe 3-Season Room Sliding Glass Door Installation Instructions Screen Door Seal Left Side Track Top Track Assembly Right Side Track Right Side Trim Sliding Glass Door Sliding Screen
More informationClad Direct Glaze Window Installation Instructions
Clad Direct Glaze Window Installation Instructions Sill flashing and sealing: 2. An overview of the proper flashing sequence is shown in figure 1. Please read entire installation instructions carefully
More informationWetroom Panel (Concealed Fix)
Wetroom Panel (Concealed Fix) Instruction Manual DXFCPCF Important Information Toughened glass is completely safe for use in our shower enclosures and bath screens; providing our products are installed
More informationPANELIZED HOME INSTALLATION GUIDELINE
PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.
More informationInstallation Instructions
Installation Instructions READ BEFORE INSTALLING UNIT For Low Profile Window Air Conditioner INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Follow each step
More informationGreenhouse Assembly Instructions
Greenhouse Assembly Instructions 6 x 1.93m) 6 x 8 GREENHOUSE 01 ASSEMBLY INSTRUCTIONS 6 x 6 GREENHOUSE 02 ASSEMBLY INSTRUCTIONS 6 x 4 GREENHOUSE 03 ASSEMBLY INSTRUCTIONS 6ft (1.93m x 1.9 Introduction Safety
More informationAKRAPLAST Sistemi S.p.A. - I - 20026 Novate Milanese (Mi) - via Cascina del Sole, 70 Tel: (+39) 02 35 13 91 1 - Fax: (+39) 02 35 13 91 50 - E-mail:
Choose between alternatives marked by SPECIFICATION TEXT Wall; Northlight; realised with modular system type AKRAPAN by Akraplast Sistemi, composed of: 1) UV protected multi-wall polycarbonate panels with
More informationIsola Steel Gutters Strength and design for extreme climate!
Isola Steel Gutters Strength and design for extreme climate! Dry and healthy buildings Isola Steel Gutters Steeled against wind and weath The four seasons Wide temperature variations and highly variable
More informationMETAL ROOFING INSTALLATION GUIDE
METAL ROOFING INSTALLATION GUIDE MIGHTY-RIB PBR (R-Panel) Regardless of whether your roofing project is a new installation or a re-roof, and whether your building is residential, commercial or agricultural,
More informationREDLAND DRY BONDING GUTTER. Installation Instructions for Redland Dry Bonding Gutter
REDLAND DRY BONDING GUTTER Installation Instructions for Redland Dry Bonding Gutter 1 Introduction 1.1 TECHNICAL DATA Dimensions: 3 m long x 210 mm wide Material: Glass-fibre/polyester composite. Pitch
More informationWe urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.
Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden
More informationI-Line - Snap-On Feature
Oct 2012 I-Line - Snap-On Feature DATA SHEET Snap-On features - Guaranteed truelines every time Bailey I-Line Snap-On is an architectural cladding feature offering creative possibilities for architects
More informationInstallation Instructions
Installation Instructions CR2500ACH CR5000ACH Portable Heating and Air Conditioning Unit Version 04 INSTALLATION INSTRUCTIONS REQUIRED TOOLS (NOT SUPPLIED) Electric Drill Pencil Tape Measure 3-1/2 Bi-Metal
More informationCOASTLINE QUADRANT ENCLOSURE. Installation / Maintenance Instructions Rev 05.12 05.14
COASTLINE QUADRANT ENCLOSURE Installation / Maintenance Instructions Rev 05.12 05.14 IMPORTANT NOTES : Please Read Carefully & retain these instructions for Future Reference. 1. For ease & safety we advise
More informationILLUSION FRAMELESS SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS
PREPARATION Approximate Installation Time: Tools Required for Installation: 60 minutes Hacksaw Electric Drill 3/16 Masonry Bit Pencil/Felt tip pen Safety Glasses Measuring Tape Masking Tape Standard Screw
More information6mm Two Door Offset Quadrant
Installation Guide 6mm Two Door Offset Quadrant 226MBJ 0914RN Offset Quadrant 226MBJ.indd 1 07/08/2015 14:03 Cu w Before you Start Please read this Installation Guide fully. Although these instructions
More informationClassic Products, Inc. ClickLock Standing Seam Installation Manual
Classic Products, Inc. ClickLock Standing Seam Installation Manual Classic Products, Inc. 8510 Industry Park Drive Piqua, OH 45356 800.543.8938 Table of Contents page Introduction 1. 1 Starter. 2. 1 Panels.
More informationSTEP-BY-STEP. construction guide. Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet.
STEP-BY-STEP construction guide Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet. Welcome to our CONSERVATORY AND SUNROOM CONSTRUCTION GUIDE What is the specification
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised November 27, 2013 the Easton - R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
More informationInstallation Instructions
LIFETIME UNIVERSAL DRAIN OVER THE RIM DRAIN AND STANDARD DRAIN BATH WASTE AND OVERFLOW WITH TOE TAPPER Installation Instructions 99.00.XXX Thank you for selecting American-Standard...the benchmark of fine
More informationAlthough we do a fair amount of residential roofing, my family s breadand-butter. Installing a. Sealants aren t universal
Installing a Low-Slope Exposed EPDM for roof transition Exposed EPDM for resistance to ice damming Sidewall flashing Done with care, a flat roof can provide 0 years or more of leak-free service Gravel
More informationResidential Roofing Guide
Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...
More informationHow to Install UnderDeck The Original.
How to Install UnderDeck The Original. TOOLS: Chalk Line Caulk Gun Garden hose or water bucket Gloves Hammer or Screw Gun Power Mitre Saw with OSB Blade Pencil Pliers Safety Glasses Straight Edge / Carpenter
More informationWe urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.
Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden
More informationDETAIL MANUAL. for Standing Seam. 2308 East 23rd Street Chattanooga, TN 37407. 1652 South Lee Hwy. Cleveland, TN 37311
DETAIL MANUAL for Standing Seam 1652 South Lee Hwy. Cleveland, TN 37311 2308 East 23rd Street Chattanooga, TN 37407 Best Buy Metals Standing Seam Roofing Panels Fig. 2 Standing Seam Panel Has 1 high nail-strip
More informationHow To Build A Gambrel Roof And A Gable End Roof
Dutch Gable or Gambrel Roof and The Scotch Valley The folowing pages are an extract from Carp 12 text TAFE NSW Construction and Transport Division 71 HIP and VALLEY ROOFING GAMBREL / DUTCH GABLE The effect
More informationSTANDING SEAM SHEET METAL ROOFING
STANDING SEAM SHEET METAL ROOFING GENERAL INFORMATION 1.1 For all standing seam metal roofing work consult Columbia University Facilities Exteriors and Historic Preservation group. 1.2 Fabricator is responsible
More informationInstallation Manual. Toilet Partitions, Dressing Compartments & Shower Stalls
Installation Manual Toilet Partitions, Dressing Compartments & Shower Stalls Metpar Corp 95 State Street, Westbury, New York, USA, 11590 Tel: 516-333-2600 Fax: 516-333-2618 Internet: http://www.metpar.com
More informationUNIVERSAL INSTALLATION INSTRUCTIONS. Section 1 - Flat Roof Section 2 - Pitched Roof Section 3 - Square and Conservation
Section 1 - Flat Roof Section 2 - Pitched Roof Section 3 - Square and Conservation UNIVERSAL INSTALLATION INSTRUCTIONS Flat Roof Instructions Section 4 - Fireproof Ceiling Diffusers Section 5 - Light Kits
More informationInstalling Shutters using Fasteners
Installing Shutters using Fasteners Electric drill, ¼" drill bit, 3 8" drill bit, hammer, and shutter fasteners. (¼" carbide drill bit is required for stucco, hardboard, fiber cement, brick or masonry.)
More informationInstallation instructions of the MIDI-Heki roof light with operating bar, with crank or electrical version
Installation instructions of the MIDI-Heki roof light with operating bar, with crank or electrical version with operating bar with crank electrical version 1. Prerequisite for a correct installation of
More informationDow Corning PROPRIETARY. Dow Corning. A Thermal Modelling Comparison of Typical Curtain Wall Systems
Dow Corning A Thermal Modelling Comparison of Typical Curtain Wall Systems Introduction Today s Aim To understand the meaning of a U value and window energy ratings Discuss the drivers for energy efficiency
More informationFLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL
FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction... 2 Components... 3 Step 1 Marking out the Perimeter of the Carport... 3 Step 2a Footing Set-Out for Concrete Block Pad
More informationThe Butler MR-24 Standing Seam Roof Difference. A comparison between metal roof systems
The Butler MR-24 Standing Seam Roof Difference A comparison between metal roof systems Roof Systems Necessities Weathertight (don t leak!) Low maintenance Weathertightness Roof clips, seams, panel alignment
More informationProduct Catalog. Extreme Roofing, Inc. 2680 Rt. 982 Mammoth, PA 724.838.7695 www.extremeroofinginc.com
2012 Product Catalog Extreme Roofing, Inc. 2680 Rt. 982 Mammoth, PA 724.838.7695 www.extremeroofinginc.com 2 PH. 724.838.7695 Email. sales@extremeroofinginc.com Website. www.extremeroofinginc.com Fax.
More informationInstallation Guide for Andersen Architectural Clad Outswing Commercial Doors
Installation Guide for Andersen Architectural Clad Outswing Commercial Doors Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance
More informationPERIMETER FLASHING. Table of Contents
FM Global Property Loss Prevention Data Sheets 1-49 February 1985 Revised September 2000 Page1of25 PERIMETER FLASHING Table of Contents Page 1.0 SCOPE... 3 1.1 Changes... 3 2.0 LOSS PREVENTION RECOMMENDATIONS...
More informationSuperform Products Ltd.
TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000
More informationGeneral Instructions and Guidelines
General Instructions and Guidelines Building Design and Construction To ensure adequate performance and longevity, protect metal panels from potentially corrosive situations and materials. When treated
More informationAND MEMBRANES ROOFING UNDERLAYS. www.fakro.com
AND MEMBRANES 010 ROOFING UNDERLAYS 1 HO DOES YOUR ROOF BREATHe? MEMBRANES THE WAY to A WARM AND DRY ROOF HO HO HO HO HO HO WATERTIGHTNESS The FAKRO Company offers a wide range of membranes and underlays
More informationHORIZONTAL INSTALLATION
THERMO/SOLAR Žiar s.r.o. MANUAL FOR INSTALLATION PV SUPPORTING FRAMES HORIZONTAL INSTALLATION Technical alternation reserved A1410 1 12/2014 CONTENT ORD.NO. PAGE Mounting information 3 Mounting, flat roof
More informationInstallation Instructions
Installation Instructions One-Piece Deep Wall Sleeve For Use with Packaged Terminal Units Please read these instructions completely before attempting installation. NOTE: Ensure that the unit is only installed
More informationKAHU RESIDENTIAL ROOFING RRKA DETAIL LIST
KAHU DETAIL LIST 00 / 24 COVER SHEET 01 / 24 ROOF RIDGE 02 / 24 SAWTOOTH RIDGE 03 / 24 SAWTOOTH EAVE 04 / 24 ROOF VALLEY 05 / 24 ROOF - CHANGE PITCH 06 / 24 EAVE WITH METALLINE FASCIA 07 / 24 EAVE WITH
More informationINSTALLATION INSTRUCTIONS AIRCOMMAND IBIS ROOFTOP AIRCONDITIONER
\ INSTALLATION INSTRUCTIONS AIRCOMMAND IBIS ROOFTOP AIRCONDITIONER Suitability: The IBIS caravan rooftop aircondioner is suitable for installation on caravans and motorhomes provided the roof structure
More informationSpecifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023
Specifications Preformed Metal Wall and Roof Panels Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023 Section 07410 Preformed Metal Wall and Roof Panels Structural
More informationRESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
More informationMarch 14, 2007. Installation of Bay, Bow and Garden Windows
March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed
More information