1 SPECIFICATIONS FOR INSTRUMENTATION ERECTION & COMMISSIONING JOB PART 1: GENERAL SPECIFICATION OF INSTRUMENTATION 1. SCOPE 1.1. This specification covers the design of instruments & control system, complete with all accessories and materials along with special test equipment Vendor shall be fully responsible for design, material selection, sizing and selection of the proper instruments for their system All equipment supplied shall be of field proven quality both with respect to design and materials Vendor shall prepare & submit P&ID for the system within the scope of his supply, showing all the instruments and interlock / trip operations. Each instrument shall be given individual tag numbers. Symbols shall be as per ISA S The vendor s scope includes Erection, testing & calibration of all the instruments of the Rim Seal fire protection system. The scope includes laying of Cable trays and instrumentation & other cables (including erection of cable tray structural supports) and cable termination in the JB mounted field PLC as per the Refinery standards and practices. The scope also includes monsoon protection for all instruments and Junction Boxes. The scope of jobs to be carried out as a part of this contract includes but is not limited to the following: Calibration of all types of Instruments like Flow / Pressure / Temperature / Level Transmitters, I/P Converters, Pressure/Temperature Gauges, Pressure / Level switches, Control Valves, Thermo elements etc., Providing structural supports for cable trays wherever cables are running above ground along the cable route as marked in the drawing. Installation and supporting of cable trays. Laying & clamping of single pair cables / Multicore cables upto control room. Installation of Explosion proof Junction Boxes. Installation of all Instruments as per the field job specifications. Glanding and cable termination in Instruments, Junction Boxes & in Marshalling Panels. Laying & connection of Copper tubes. Laying of GI pipes for Instruments Air header. The tie point and the tentative route will be as given in the drawing. Impulse piping for instruments. Hydro-testing of impulse lines. Installation of stanchions / supports for instruments. Continuity checking of cables. 1

2 All these jobs are to be carried out as per the guidelines given in the subsequent sections. 2. DESIGN PHILOSOPHY 2.1. The design & installation of instruments shall be generally in accordance with ISA / API recommended practices and other applicable standards like ISI, IBR etc., Material specifications and practices shall, in general, conform to appropriate ASTM or equivalent standards. All standards, code of practices shall be of the latest edition All instruments and equipments shall be suitable for use in a hot, humid & tropical industrial climate in which corrosive gases and / or chemicals may be present. As a minimum, all instruments and enclosures in field shall be dust proof, weather proof to NEMA 4X (IP66). All external surfaces shall be suitably treated to provide anti-corrosion protection against plant atmosphere All instruments and equipments shall be suitable for area classification as per IEC / NEC codes. In hazardous area, in general, certified intrinsically safe equipment shall be used. In case where this is not possible, explosion proof enclosures may be considered. All intrinsically safe instruments shall be certified by the statutory bodies like CENELEC, BASEFA, FM, PTB etc Materials of construction of instruments shall be consistent with temperature, pressure, corrosion conditions and other process requirements Instrument power circuits shall be individually protected from fault with the help of fuses. Power supply to the individual instrument shall be disconnectable with the help of switch and protected with the help of fuse Ranges for instruments shall be selected, in general, such that in normal operation the indication on the indicator is between 40% to 60% of span for linear and 60% to 80% of span for square root The complete instrument system shall be designed for safe operation, by using normally closed contacts, which open on fault conditions Automatic trip circuits shall meet the following requirements All trips shall have a pre-warning alarm and alarm to indicate the trip condition All the solenoids and relays shall be normally energized Adequate alarms shall be provided to give audible & visual warning of malfunction Gauge glasses shall be provided for all level measurements requiring automatic control or monitoring. They shall have atleast the same pressure & temperature rating as that of equipment on which they are to be installed. They shall have ball check off-set valve All process switches shall be provided with DPDT switches with contact rating, as a minimum of 110V, 0.5 ADC. 2

3 2.12. Orifice plate calculations shall, in general, follow the procedure in Principles and Practices of flow meter engineering by L. K. Spink. Orifice diameter shall be selected so that d/d ratio is between 0.2 to 0.7 for gases and steam and upto 0.75 for liquids. Vendor shall submit the sizing calculations for orifice plates Zener barriers shall be used for isolating signals between hazardous area mounted intrinsically safe transducers and safe area mounted receivers All transmitters shall be provided with Output meter / output gauge at the transmitter end. 3. APPLICABLE NATIONAL / INTERNATIONAL STANDARDS 3.1. The installation work shall comply with the latest applicable standard and regulation, Electricity rules and safety codes of the locality where the installation is carried out. Nothing in this specification shall be construed to relieve the contractor of this responsibility Design & Terminology shall comply, as a minimum, with the latest edition of following codes & standard practices and publications: AGA ANSI American Gas Association, Gas Measurement Committee Report no. 3 American National Standard Institute B 2.1 Pipe threads B 16.5 Steel pipe flanges and flanged fittings. B Control Valve leakage classification MC 96.1 Temperature element / Thermocouple. API American Petroleum Institute RP 520 Recommended practices for design and installation of pressure relieving system in refineries RP 550 Manual on installation of Refinery instruments and control system. S 1101 Measurement of Petroleum liquid hydrocarbon by Positive Displacement meter. S 2534 Measurement of liquid hydrocarbons by turbine meter systems. ASTM American Society for testing and materials. BS British Standards Measurement of fluid flow in pipes. DIN Temperature V/s Resistance curves for RTDs. IEC International Electrotechnical Commission. BS codes for Instrument piping IS Indian Standards IS 5 Colours for ready mixed paints. All applicable Indian standards ISA Instrument Society of America Standards & Practices of Instrumentation. 3

4 NACE National Association of Corrosion Engineers NEC National Electric Code NEMA National Electrical Manufacturer s Association ICS6- Enclosure for Industrial Controls & Systems NFPA National Fire Protection Association NFPA 496 Purged and pressurised enclosures for electrical equipment. 4. GENERAL SPECIFICATIONS OF INSTRUMENTS 4.1. INSTRUMENT CONCEPT : Major instrumentation shall be electronic type but final control elements shall be pneumatic Electronic instruments shall generally operate on 24 V DC and shall have transmission and output signal generally of 4 to 20 ma DC. Transmitters shall be two wire and shall be capable of delivering rated current into external load of at least 600 ohms when powered with 24 V DC. All receivers shall be suitable for voltage input of 1 to 5 V or 0.25 to 1.25 V DC. Solenoid operates on 110VAC All electronic instruments shall be immune to radio frequency interference INSTRUMENT CONNECTION: Pneumatic connection for signal and air supply shall be ¼ NPTF Electrical connection shall be ½ NPTF Threaded end connection shall be to NPT as per ANSI B Flanged end connections shall be as per ANSI B PRESSURE INSTRUMENTS : Pressure gauges shall have an accuracy of +- 1 % of FSD. These shall be WP to IP 66 with dial size of 150 mm and shall have features like screwed bezels, externally adjustable zero, over range protection and blowout discs. Pressure gauge sensing element shall be minimum of SS 316 and movement of SS Pressure transmitters with local indicator shall be electronic balance / capacitance / strain gauge type with minimum of SS 316 element material with an over range protection of minimum 130% of range Direct mounted pressure switch shall have element either diaphragm or bellow of min SS 316 material with ½ NPT F connection. 4

5 Receiver pressure switches shall have bellows as measuring element with ¼ NPTF connection LEVEL INSTRUMENTS All gauge glasses shall be steel armoured reflex or transparent type with body and cover materials of carbon steel as a minimum and tempered borosilicate glass. Integral illuminators shall be provided for transparent gauges with 220 V 50 Hz supply suitable for electrical class. The minimum visible length of single gauge shall not exceed 1500 mm External displacer type instruments with rotatable head shall normally be used for level measurement upto 1219 mm. Displacer shall be of SS 316 with Inconel torque tube. Side side connections shall normally be used DP transmitters shall be used for level measurements above 1219 mm or for services requiring purge or where liquid might boil in external portion Level switches shall generally be external ball float type with flanged head FLOW MEASUREMENTS Flow measurement shall normally be done with thin plate square edge concentric orifice plate mounted between a pair of weld neck flanges of min 300# ANSI rating with flange taps. The material of orifice plate shall normally be SS 316. Metering orifices shall not be installed in lines less than 40 mm nominal dia. Meter runs shall be for a maximum d/d ratio of For larger size pipes actual d/d ratio shall govern the straight run. The recommended practice shall be as per API RP 550 and AGA Report no Flow nozzles, venturies, rotameters, target meters, vortex meters, magnetic flow meters, ultrasonic flowmeters etc., may be used wherever required depending on the service DP type flow transmitters with local indicator shall be electronic balance / capacitance / strain gauge type with minimum of SS 316 element material with over range protection of minimum 130% of range Isolators: Isolators Input / Output voltage and current shall be 24 VDC, 4-20 ma DC respectively with maximum fault voltage of 250 V rms on safe area side. Barrier end to end resistance shall be less than 250 ohms accuracy better than +-0.1%. 5

6 PART 2: SPECIFICATIONS FOR MATERIAL, INSTALLATION, TESTING AND COMMISSIONING FOR INSTRUMENTATION This section covers the scope, technical requirements and essential particulars for the erection, testing, calibration & commissioning of Instrumentation & control system and laying of instrumentation & other cables, cable termination etc. The scope also includes monsoon protection for all instruments and junction boxes. The scope of the jobs to be carried out as part of this contract includes but is not limited to the following. Calibration of all types of Instruments like Flow/Pressure/Temperature/Level Transmitters, I/P Converters, Pressure/Temperature Gauges, Pressure/Level switches, Control Valves, Thermo elements etc., Making of RCC cable trenches for laying cables. Installation and supporting of cable trays. Making opening in DCS control room and installing MCT Blocks, making trenches inside control room for cable laying. Laying & clamping of single pair cables / Multicore cables upto control room. Installation of Flame proof Junction Boxes. Installation of Instruments. Glanding and cable termination in Instruments, Junction Boxes & in Marshalling Panels. Laying & connection of Copper tubes. Laying of GI pipes for Instruments Air header. Impulse piping for instruments. Hydro-testing of impulse lines. Installation of stanchions / supports for instruments Continuity checking of cables. Loop checking of Instruments. 6

7 Stroke checking of control valves. Commissioning of Instruments. Laying of control cables from various substations to DCS Control room for indications of pumps, Fans and Amperage reading of motors. Preparation of As-Built documents. 1. ERECTION MATERIAL SUPPLY The vendor shall ensure and supply all erection hardware required for installation of all instrumentation, which form a part of the LSTK package. This includes items like cables, cable glands, junction boxes, instrument valves, mounting accessories, impulse piping, pipe fittings, pneumatic signal tubes, air line pipes, filter regulators, insulation materials, cable trays, identification tags, structural material required for instrument supports & trays etc., The above broadly covers the items, however vendor shall supply all necessary items including consumables to make the erection and commissioning work complete in all respects. Following are the minimum acceptable features of some of the erection materials PLC Hardware: 1.2. Cables : All the PLC hardware and software required for hooking up all instruments under Rim seal fire protection system are in vendor s scope All cables shall be PVC insulated and primary insulation shall be 105 deg C PVC. All cables shall be FRLS type as per standard IEEE 383 The insulation grade shall be 600 V / 1100 V as minimum All cables shall be twisted and armoured Signal Cables and control cable Refer attachment for detailed specification 1.4. Cable Glands 7

8 Vendor shall supply all cable glands required for Glanding the above mentioned cables both at field instrument and at control room. All cable glands shall be anodized aluminum alloy or of nickel plated brass and they shall be double compression type suitable for armoured cables. Explosion proof glands wherever required shall be supplied Junction Boxes Refer attachments for detailed specification 1.6. Instrument Valves Vendor shall supply instrument valves (miniature type) and valve manifolds wherever required. Body material and rating shall be as per piping class or SS whichever is better and shall be forged type. Valve trim shall be SS316 as minimum or superior as required by process conditions. Vendor shall supply a minimum of 10% of such instrument valves as spare Impulse Piping In general vendor shall supply seamless pipes of size ½ NB of required thickness with material as per piping class Pipe Fittings Socket weld type forged pipe fittings of suitable material and ratings shall be supplied for pipe fittings. The minimum rating shall be 3000# Copper Tubes Vendor shall supply 6mm OD * 1mm thick PVC covered annealed electrolytic grade copper tubes as per ASTM B 68.74A Cu.No.122 for copper tube. Vendor shall avoid use of intermediate connections and shall estimate single length for each location Instrument Airline fittings & valves. 8

9 Seamless galvanized inside & outside CS pipes used for instrument air distribution, shall be as per IS 1230 class heavy. Galvanized forged screwed carbon steel fittings 2000 # rating, shall be used. Isolation valves on instrument air service shall be packless gland type full bore ball / globe valve Air Filter regulator Instrument air filter regulator of suitable sizes shall be supplied for each pneumatic instrument. The body of filter shall be anodized aluminum. The filter shall have 25 micron sintered bronze / ceramic filter element and shall be provided with manual drain and 2 nominal size pressure gauge Cable trays Refer attachments for detailed specification Instrument Support / structural steel Vendor shall supply instrument stands (Stanchions for supporting field instruments made of 2 IS 1239 heavy steel pipe) and other structural steel material required for supporting the cable trays, impulse lines and instruments Consumables and General items The vendor scope also includes, but is not limited to All consumables like welding electrodes, PTFE tape, ferrules, lugs for termination, clamps for supporting the cables, impulse pipes, copper tubes etc. SS Tagging plates for fixing tags on the instruments, junction boxes. Vendor shall bring their calibration, hydro testing equipment. The calibration equipment shall be duly certified by any standard laboratory like IDEMI etc. Vendor shall bring their equipment necessary for transportation of instruments. 9

10 All scaffolding equipment necessary for working at elevation. Vendor shall bring their firefighting equipment like fire extinguishers, hose pipe etc. Vendor shall bring their safety equipment like safety helmets, safety belts, safety shoes, gloves, and visors for workmen. Any other item not mentioned, but required to complete the job as per the direction of Engineer in charge. 2. INSTALLATION Vendor shall be completely responsible for installation of all instruments, as per the installation standards. All direct mounted instruments shall be installed in such a way that they have better readability and accessibility. All pressure, differential pressure instruments shall be provided with block and bleed, by-pass, drain / vent valves etc., as per the installation standard and shall have accessibility. All primary piping (impulse lines) shall have a slope of 10% on horizontal run. All impulse connections, mounting nozzles etc., upto and including the first block valve shall be of the same specifications as the process lines to which they are connected. These will be shown in the process piping diagrams and are considered as part of process piping system connections. The first shut off valve shall be located as close to the line as possible. Impulse lines shall be firmly supported by bracketing from valves, instrument supports or stands. In no case shall the instruments serve to support the impulse line. Impulse line shall be fitted carefully and their configuration must be such that minimum stress is imposed on the instrument. All primary impulse piping shall be installed in the best workman like manner and shall be as per the installation standards. Impulse line shall be bent using pipe benders only and hot bending shall be totally avoided. 10

11 Impulse pipes shall be cut by using cutting device. Threaded joints shall be joined with Teflon tapes and no other jointing compound shall be used. All welding shall be carried out as per the relevant code with proper electrodes. Any testing (non destructive) like D.P. test on root weld and final weld shall be part of vendor s scope. All impulse lines shall be supported at regular interval. Single copper tubes shall be laid as per the standards on trays / angles. Copper tubes shall be clamped to the trays every 500 mm using 20 mm wide aluminum clamps. Trays shall be properly supported from either rigid steel structure or concrete members at regular intervals of 1000 mm. Copper tubes / fittings shall be installed with Teflon tapes. Identification tags plates shall be provided on either side of copper tubes. All cables shall be properly laid on cable trays which shall be properly supported at regular interval. At every vertical dropping to the JBs, they shall be clamped at an interval of 300 mm. Cable entry to DCS control room shall be through MCT Blocks. The scope involves breaking of RCC wall, making RCC trenches inside control room, supply installation of MCT blocks. The job involves making good of all civil work inside control room so as to bring to original shape and condition. At bends, minimum radius shall be maintained as per Manufacturer s standard. Physical separation shall be maintained between signal and control / power cables. Identification tags shall be provided on either end of the cables as per the cable / JB schedule. All brackets fastened to main supports for auxiliary type instruments such as I/P converters, AFR etc., shall be galvanized CS ¼ thick * 4 wide 11

12 minimum size and fastened to the support by a minimum of ¼ dia SS U bolts & nuts. Instruments supports located on concrete floors shall be installed with 3/8 concrete anchor and 3/8 stud with double nuts to level the supports. Each support to receive a 2 minimum thickness of epoxy concrete grout placed below the support. Painting (minimum one coat of red oxide zinc chromate primer as per IS 2074 and two coats of paints suitable for corrosive atmosphere.) of Impulse piping, cable trays, ducts, instrument supports, all structural supports as per the painting standards to be done before handing over / commissioning. 3. TESTING AND CALIBRATION 3.1. All impulse lines shall be properly flushed after isolating the instrument and vessel /piping. All impulse line shall be tested hydraulically at 1.5 times the maximum operating pressure. Ensure that instrument and vessel / piping are isolated during this test. In case of special conditions where hydro testing is not permitted due to service conditions, the impulse lines testing shall be carried out by using air or nitrogen. All external cage type level instruments shall be tested up to 1.5 times operating pressure by using nitrogen only. After pressure testing all these impulse lines shall be drained and with dry air to remove any moisture. Instruments air lines will be service tested only for any leak after pressurizing and isolating the main root valve, by soap solution. All instruments cables shall be tested for continuity and insulation. While megger is used for insulation testing All instruments supplied by the vendor shall be calibrated using proper test equipment. All instruments shall be calibrated for 0, 25%, 50%, 75%, and 100% and vice versa. All temperature gauges shall be calibrated using temperature baths. 12

13 All thermocouple-activated instruments shall be calibrated by generating millivolts by a potentiometer. All transmitters shall be calibrated as per instruments ranges. All displacer type level transmitters shall be calibrated with water or fluids and corrected for specific gravity. All alarm and trip switches shall be calibrated over the entire range and finally set and checked for alarm/trip points and reset points as per the alarm / trip set point schedule. After setting these shall be sealed. All control valve prior to stroke checking shall be externally cleaned thoroughly the all stroke of valve shall be checked for opening and closing. Any adjustments required for obtaining full stroke test and gland leak test. Solenoid valve shall be checked functionally for its operation. All electronics / pneumatic receiver instruments shall be calibrated as per the manufacturer s instruction. Controllers shall be aligned properly. All special instruments like analyzer shall be checked and calibrated as per manufacturer s instruction. Prior to testing, all analyzer sample lines shall be thoroughly cleaned by carbon tetra chloride or any other cleaning liquid. After cleaning, these lines shall be thoroughly purged with dry nitrogen. No oil should be used on oxygen service lines. The accuracy of overall loop shall be within +/-1% for electronic loops. After performing the calibration of the entire instrument, the entire loop shall be checked for proper operation. The entire shutdown scheme shall be simulated for the process trip switches and the scheme shall be tested for its proper operation, prior to commissioning. If no instrument air is available vendor shall provide necessary N2 cylinders to carry out the above activity. 4. Instrumentation commissioning 13

14 4.1. This activity shall be carried out in a systematic manner so as to avoid any accident to plant and operating personnel. During the plant start up all the instrument calibration, controller alignment, trip point setting shall be trimmed so as to meet the operation requirement. Prior to guarantee run, the vital instrument as required by vendor have to be recalibrated and the result recorded. 5. INSTRUCTIONS TO THE VENDOR 1. The vendor should make all arrangements to ensure that sufficient manpower is available to complete the job within the time stipulated in the tender. 2. The vendor should strictly follow all the safety rules & regulations in the refinery. 3. Vendor to ensure that no job is being carried out in the plant without a valid work permit. 4. The vendor shall employ qualified technician, instrument fitters and helpers to complete the job in a professional manner and ensure good workmanship to the satisfaction of HPCL. 5. The vendor shall follow HPCL s timing of work. However in case of requirement of working holidays or working beyond the normal working hours, the vendor shall make arrangements for obtaining necessary entry permits in advance. 6. Vendor shall arrange for the monthly gate passes for entry into Refinery. 7. Vendor shall supply all items, which are in his scope with necessary test certificates. 8. The vendor is responsible for proper storage of all his material. All instruments stored in open area shall be adequately protected. 9. All fabrication & prefabrication shall be done at one place. 10. Vendor to ensure that while mounting instruments, trays etc., other structures are not damaged. 11. Bends for trays shall be gradual & uniform. 12. Trays shall not be installed below drain valves, above vent valves or near hot surfaces. 13. The trays shall be joined with SS304 nuts & bolts. These nuts & bolts are to be supplied by the vendor. 14. Instrument impulse lines shall not be fastened to process lines. They shall not hang out when either the instrument or the process line is removed. 15. Clamping of Cables shall be done at every one meter interval. 16. Clamping of copper tubes shall be done at every 50 cm. 17. SS-304 bolts shall be used for clamping. 14

15 18. The tubes shall run in a streamlined way. The bends shall be minimum 4 times OD for copper tubes. 19. All impulse line bending shall be done by pipe bending machine. 20. Only wheel type tube cutters shall be used. 21. All instruments shall be tagged with a proper SS tag plate bearing the tag no. of the instrument. This shall be securely tied to the instruments. 22. All wires shall be properly tagged with sleeve type labels. 23. Instrument supports shall be either grouted or welded to the structures. 24. All instrument supports shall be of 1.5 m height and shall be of structural steel. They shall not be welded to process lines or vessels. 25. Instruments shall not be mounted below drain valves or above vent valves. They shall be mounted on such places where mechanical damage will not occur and will not cause disturbance for free movement of personnel. 26. All instruments shall be pre calibrated and installed. 27. All testing & calibration equipment shall have proper certificates from standard laboratory. 28. For calibration of pressure instruments, inclined tube manometer shall be used. Oil bath & calibration thermometer shall be used for calibration of temperature instruments. 29. All switches shall be set at the required setting by the vendor before installation. 30. Vendor shall have all the calibration / testing equipment like Multimeter, Voltage / current source, megger, manometers, deadweight tester etc., 31. All calibration shall be witnessed by HPCL engineer. The calibration certificates shall be submitted in duplicate to HPCL. 32. Loop checking shall be carried out by simulating input & output signal. 33. Vendor shall maintain good housekeeping in and around the work place on day to day basis. 34. Total job shall be carried out so as not to cause any hindrance to other agencies working / operating in the area. 35. If any damage is caused to HPCL property by any act of commission or omission or negligence of the vendor or their workers, the same shall be made good at no cost to HPCL. 36. Vendor shall be fully responsible for their workmen and HPCL shall have no responsibility for the vendor s workmen during or after the job. 37. All working permits will be arranged by HPCL. The job has to be carried out only during normal working hrs i.e am to 4.30 pm, Monday to Friday. However, if found necessary and subject to the availability, provisions of work permits during extended hours / holidays will be considered. 6. DOCUMENTS UNDER INSTRUMENTATION 15

16 After the completion of installation & commissioning of all the instruments, vendor shall hand over the following documents in 6 sets along with the soft copies for the entire documentation. A. As- Built documents for the following: P & Ids. Instrument Plot plans showing physical locations of all field instruments including the sensors, transmitters, Junction Boxes etc., Cable routing and tray layout. Cable schedule & JB wiring details. Instrument air header distribution drawing. DCS I/O list / Point Data base giving full details like signal type, Range, engineering units, source tag, location, Destination, Alarm settings, CV fail action, controller action etc., I/O assignments. Cause & Effect details. Control schemes. Interlock & Logic diagram Loop Diagram for all types of signals. DCS Wiring details. All test & calibration reports. B. Purchase Requisitions / Specifications of all the instrumentation items. C. Operation and Maintenance manuals for all the instrument items. D. Catalogues of all the instruments. E. All Warranty / Guarantee / statutory certificates. F. Spares list / spare parts list along with the cost. 16

SELECTION, APPLICATION AND MAINTENANCE

SELECTION, APPLICATION AND MAINTENANCE DIESEL PROTECTION SYSTEMS Automatic Diesel Engine Shut Down System for Safe Area Applications SELECTION, APPLICATION AND MAINTENANCE Series 300 Series 310 SYSTEM DESCRIPTION Suitable for attended engine

More information

Electronic Flow Switches

Electronic Flow Switches Industries Electronic Flow Switches Petrochemical Refining Oil Production Water Treatment Pharmaceutical Food and Beverage Pulp and Paper Power Production Gas Processing Mining Biotechnology Semiconductor

More information

In-Line Electronic Flow Switches

In-Line Electronic Flow Switches In-Line Electronic Flow Switches Industries Petrochemical Refining Oil Production Water Treatment Pharmaceutical Food and Beverage Pulp and Paper Power Production Gas Processing Mining Biotechnology Semiconductor

More information

MTI10 Insertion and MTL10 In-line Thermal Mass Flowmeter and Temperature Transmitter

MTI10 Insertion and MTL10 In-line Thermal Mass Flowmeter and Temperature Transmitter Thermal Mass meter and Temperature Transmitter Description The MTI10 insertion thermal mass flowmeter and the MTL10 in-line thermal mass flowmeter provide accurate mass flow measurement of clean, dry gases

More information

Outdoor 33.6W Dual Port Passive Power-over-Ethernet Midspan For External Security Cameras and Wireless Access Points

Outdoor 33.6W Dual Port Passive Power-over-Ethernet Midspan For External Security Cameras and Wireless Access Points Outdoor 33.6W Dual Port Passive Power-over-Ethernet Midspan For External Security Cameras and Wireless Access Points Features SELV Compliant No Detection Passive Injector Gigabit Compatible Full Protection

More information

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR)

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR) Heating, Ventilation, Air Conditioning and Refrigeration (HVACR) I. Demonstrate safety skills in typical HVACR work situations to NATE Core Installer Knowledge Areas for Technician Excellence for Safety

More information

33.6W Power over Ethernet Waterproof Adapter PoE Plus Single Port Injector for Outdoor Application

33.6W Power over Ethernet Waterproof Adapter PoE Plus Single Port Injector for Outdoor Application 33.6W Power over Ethernet Waterproof Adapter PoE Plus Single Port Injector for Outdoor Application Features Compliant with the IEEE802.3at Standard -40 to +60 C Temperature Range Diagnostic LEDs Full Protection

More information

James M. Pleasants Company

James M. Pleasants Company James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:

More information

Ve-Lock manufactures Needle Valves from Solid bar stock Materials & all parts details are as below:

Ve-Lock manufactures Needle Valves from Solid bar stock Materials & all parts details are as below: Needle Valves : - Needle valves have a slender, tapered point at the end of the valve stem that is lowered through the seat to restrict or block flow. Fluid flowing through the Needle valve turns 90 degrees

More information

Elektromotoren und Gerätebau Barleben GmbH

Elektromotoren und Gerätebau Barleben GmbH Elektromotoren und Gerätebau Barleben GmbH OPERATING INSTRUCTIONS Transformer Protection Relay NM Series (Buchholz principle) Elektromotoren und Gerätebau Barleben GmbH Table of contents Page 1. Safety

More information

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS PLEASE READ COMPLETE INSTRUCTIONS BEFORE YOU BEGIN LEAVE INSTALLATION INSTRUCTIONS AND USER'S GUIDE WITH OWNER ALL ELECTRIC WIRING AND PLUMBING MUST BE DONE

More information

The Unique Accelabar Flow Meter

The Unique Accelabar Flow Meter The Unique Accelabar Flow Meter The Accelabar is a new and unique flow meter that combines two differential pressure technologies to produce operating ranges never before attainable in a single flow meter.

More information

TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.)

TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.) TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.) 1. Requirement: Two (02) Nos. DC Type, 3 phase, 3 wire Projection Welding Machine is required for welding of ventilation M.S. / Stainless

More information

CONNECTOR AMPLIFIER FOR PROPORTIONAL VALVES (4-20 ma Input Version)

CONNECTOR AMPLIFIER FOR PROPORTIONAL VALVES (4-20 ma Input Version) TECHNICAL DATASHEET #TD1102AX CONNECTOR AMPLIFIER FOR PROPORTIONAL VALVES (4-20 ma Input Version) Part Number: Connector Amplifier CAPV-H-4-20MA-x complete with cable CAPV-4C-yM Where: x = current output

More information

Pressure monitoring equipment for oil-sf 6. bushings, type GOEK

Pressure monitoring equipment for oil-sf 6. bushings, type GOEK Pressure monitoring equipment for oil-sf 6 bushings, type GOEK Installation and maintenance guide 5693 827-6 en, Rev. 3, 2002-01-30 This document must not be copied without our written permission, and

More information

D Youville College July 31, 2008 New Academic Building Cannon Design Project No. 002935.00

D Youville College July 31, 2008 New Academic Building Cannon Design Project No. 002935.00 SECTION 22 6119 - COMPRESSED-AIR EQUIPMENT FOR LABORATORY AND HEALTHCARE PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged, oilless scroll air compressors. 1.2 DEFINITIONS A. Actual Air: Air

More information

INSTALLATION COMMISSIONING

INSTALLATION COMMISSIONING SPECIFICATION PREFACE SHEET DEPARTMENT: Engineering / Electrical SHEET 1 OF 13 AREA: Norðurál Grundartangi Reduction Plant SPEC No: REV: C2 STANDARD TECHNICAL SPECIFICATION FOR INSTRUMENTATION INSTALLATION

More information

TMS TANK MANAGEMENT SYSTEM

TMS TANK MANAGEMENT SYSTEM TMS TANK MANAGEMENT SYSTEM Page 1 of 9 Operating Instructions GENERAL The Tank Management System is a bespoke design to control, monitor and accommodate efficient storage and dispensing of TMS. FUNCTIONS

More information

Pipe threads for tubes and fittings where pressure-tight joints are not made on the threads. (requires PTFE sealing tape or liquid sealant).

Pipe threads for tubes and fittings where pressure-tight joints are not made on the threads. (requires PTFE sealing tape or liquid sealant). Fittings for CO 2 Pipe Threads Pipe thread references quoted in this catalogue conform with the requirements specified in the latest issue and amendments of the following ISO Standards: ISO 7-1 (BS21)

More information

Model 43AP Pneumatic Controller, Style B

Model 43AP Pneumatic Controller, Style B Instruction MI 011-476 January 1980 Model 43AP Pneumatic Controller, Style B Installation and Operation Model 43AP Controller continuously detects the difference between a process measurement and its set

More information

ENGINEERING SPECIFICATION. Engineering Specification SAPPHIRE 42 Bar

ENGINEERING SPECIFICATION. Engineering Specification SAPPHIRE 42 Bar Engineering Specification SAPPHIRE 42 Bar PART 1 GENERAL 1.1 DESCRIPTION OF WORK This specification outlines the requirements for a "Total Flood" SAPPHIRE Clean Agent Fire Suppression System. The work

More information

PIPING DRAWINGS BASICS N.P.TODKAR

PIPING DRAWINGS BASICS N.P.TODKAR PIPING DRAWINGS BASICS N.P.TODKAR There are two types of views used in the piping drawings: a) Orthographic- Plans and Elevations b) Pictorial - Isometric Views Piping layout is developed in both plan

More information

ENGINEERING SPECIFICATIONS FOR CO2 EXTINGUISHING AGENT PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS

ENGINEERING SPECIFICATIONS FOR CO2 EXTINGUISHING AGENT PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS ENGINEERING SPECIFICATIONS FOR CO2 EXTINGUISHING AGENT PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS SECTION 1 GENERAL SPECIFICATIONS I. SCOPE This specification outlines the requirements for a pre-engineered

More information

Sanitary Type Electronic Flow Switches

Sanitary Type Electronic Flow Switches Industries Pharmaceutical Sanitary Type Electronic Flow Switches Food and Beverage Biotechnology Semiconductor Water Treatment S Series Ameritrol, Inc. Instruments and Controls Features No Moving Parts

More information

OPL BASIC. Dosing System for Professional Laundry machines. Contents

OPL BASIC. Dosing System for Professional Laundry machines. Contents OPL BASIC Dosing System for Professional Laundry machines Contents 1 Getting Started. Page 2 2 Installation. Page 4 3 Set Up & Operation. Page 8 4 Maintenance & Accessories. Page 10 5 Troubleshooting Page

More information

Fire Pump Plan Review March 2010

Fire Pump Plan Review March 2010 Fire Pump Plan Review March 2010 Date of Review: / / Permit Number: Business/Building Name: Address of Project: Designer Name: Designer s Phone: Contractor: Contractor s Phone: Occupancy Classification:

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 44 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 REFERENCES

More information

Morrison Bros. Co. General Product Specifications

Morrison Bros. Co. General Product Specifications Morrison Bros. Co. General Product Specifications Tank Mounted Spillbox The spill containment device is manufactured to contain spills and drips that may occur at the fill point on aboveground storage

More information

ngenieros Ingenieros Asociados De Control S.L.

ngenieros Ingenieros Asociados De Control S.L. ngenieros sociados de ontrol 1 Company founded in 1985 to serve commercial and technical assistance in the fields of instrumentation, control and installation for all types of industries. We offer top

More information

TABLE OF CONTENTS. SECTION 1 General Information: Pg 2 Description of Operation

TABLE OF CONTENTS. SECTION 1 General Information: Pg 2 Description of Operation GTRDD SERIES HEATLESS DRYER INSTALLATION, OPERATION & MAINTENANCE MANUAL TABLE OF CONTENTS SECTION 1 General Information: Pg 2 Description of Operation SECTION 2 Safety Instructions: Pg 3 Installation

More information

CONTROL PANEL INSTALLATION INSTRUCTIONS. Single Phase Simplex Page 2-7. 3-Phase Simplex Page 8-13

CONTROL PANEL INSTALLATION INSTRUCTIONS. Single Phase Simplex Page 2-7. 3-Phase Simplex Page 8-13 CONTROL PANEL INSTALLATION INSTRUCTIONS Single Phase Simplex Page 2-7 3-Phase Simplex Page 8-13 Single Phase Simplex SXL21=3, SXL24=3, SXH21=3, and SXH24=3 Manufactured by SJE-Rhombus Installation Instructions

More information

Cooling system components, removing and installing

Cooling system components, removing and installing Page 1 of 34 19-1 Cooling system components, removing and installing WARNING! The cooling system is pressurized when the engine is warm. When opening the expansion tank, wear gloves and other appropriate

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 24 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia S TABLE OF CONTENT SCOPE 2 DEFINITIONS

More information

Elektromotoren und Gerätebau Barleben GmbH

Elektromotoren und Gerätebau Barleben GmbH Elektromotoren und Gerätebau Barleben GmbH OPERATING INSTRUCTIONS Transformer Protection Relay (Buchholz principle) Elektromotoren und Gerätebau Barleben GmbH Table of contents Page 1 Safety instructions

More information

valve solutions Chemical Cosmetic Cryogenic Food & Beverage Marine Mining Nuclear Oil & Gas Paint Pharmaceutical Pulp & Paper www.quilinox.

valve solutions Chemical Cosmetic Cryogenic Food & Beverage Marine Mining Nuclear Oil & Gas Paint Pharmaceutical Pulp & Paper www.quilinox. valve solutions www.quilinox.com Chemical Cosmetic Cryogenic Food & Beverage Marine Mining Nuclear Oil & Gas Paint Pharmaceutical Pulp & Paper valvulas esfera PBM.pdf (1753) 2015/01 1/10 D E SIGN F E A

More information

Mounting Instructions. Torque Transducer. A0329 3.2 en

Mounting Instructions. Torque Transducer. A0329 3.2 en Mounting Instructions Torque Transducer T5 T5 Contents 3 Page Safety instructions.............................................. 4 1 Measuring characteristics..................................... 7 2 Mounting.....................................................

More information

COATING & WRAPPING OF UNDERGROUND PIPING

COATING & WRAPPING OF UNDERGROUND PIPING CONSTRUCTION STANDARD SPECIFICATION DOCUMENT NO :SEC-PJ-000-SPC-PI-008 TOTAL PAGES : 8 Page 1 of 8 CONTENTS 1. SCOPE 2. DEFINITION 3. CODES AND STANDARDS 4. MATERIALS Page 2 of 8 1. SCOPE This specification

More information

NFPA 2001: Standard for Clean Agent Fire Extinguishing Systems NFPA 70: National Electrical Code (NEC) NFPA 72: National Fire Alarm Code

NFPA 2001: Standard for Clean Agent Fire Extinguishing Systems NFPA 70: National Electrical Code (NEC) NFPA 72: National Fire Alarm Code Part 1 - GENERAL 1.1 DESCRIPTION OF WORK A. Design and installation of an engineered Kidde ECS Advanced Delivery Systems (ADS), clean agent/waterless fire suppression system employing DuPont FM-200 agent,

More information

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2

More information

Hydraulic control unit series 0086-372-01

Hydraulic control unit series 0086-372-01 Technical Product Information No. 1290 EN Hydraulic control unit series 0086-372-01 Contents Page About this Technical Product Information (TPI) 2 The ORTLINGHAUS numbering system 2 About the product 3

More information

BB-18 Black Body High Vacuum System Technical Description

BB-18 Black Body High Vacuum System Technical Description BB-18 Black Body High Vacuum System Technical Description The BB-18 Black Body is versatile and is programmed for use as a fixed cold target at 80 K or variable target, at 80 K- 350 K no extra cost. The

More information

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification Number: 3503-11.2.610 Rev. 2 Rubber Lined Steel Pipe and Fittings Mechanically Coupled Plain End Type System Issued Revised Approved

More information

WE-350 Series ¼ Turn Electric Actuator

WE-350 Series ¼ Turn Electric Actuator WE-350 Series ¼ Turn Electric Actuator Operation and Installation Manual Pg 1 (Rev. 020113) Table of Contents 1.0 General 1.1 Pre-Installation Inspection 1.2 Storage 1.3 Features & General Information

More information

Stilling Well Recommendations

Stilling Well Recommendations White Paper June 24, 2009 Stilling Well Recommendations This document describes general requirements for stilling wells used for radar tank gauging applications. Automation solutions for oil & gas, defense

More information

Explosion-Proof Electric Unit Heaters

Explosion-Proof Electric Unit Heaters Type FX4 FX4 Explosion-Proof Electric Air Heaters FX4 heaters are UL listed and/or CSA certified for use in hazardous locations. They are designed for dry indoor industrial applications such as oil refineries,

More information

Your safety and the safety of others are very important.

Your safety and the safety of others are very important. NATURAL GAS TO PROPANE CONVERSION KIT 090 INSTALLATION INSTRUCTIONS FOR ALTITUDES 0 -,00 FT. ONLY PROPANE CONVERSION KIT SAFETY... INSTALLATION REQUIREMENTS... Tools and Parts... LP Gas Requirements...

More information

Oil and Coolant Circulating Heating System. Model - OCSM

Oil and Coolant Circulating Heating System. Model - OCSM Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine

More information

Grant Agreement No. 228296 SFERA. Solar Facilities for the European Research Area SEVENTH FRAMEWORK PROGRAMME. Capacities Specific Programme

Grant Agreement No. 228296 SFERA. Solar Facilities for the European Research Area SEVENTH FRAMEWORK PROGRAMME. Capacities Specific Programme Grant Agreement No. 228296 SFERA Solar Facilities for the European Research Area SEVENTH FRAMEWORK PROGRAMME Capacities Specific Programme Research Infrastructures Integrating Activity - Combination of

More information

FIREFINDER XLS ADDRESSABLE FIRE ALARM SYSTEM SECTION 13851

FIREFINDER XLS ADDRESSABLE FIRE ALARM SYSTEM SECTION 13851 FIREFINDER XLS ADDRESSABLE FIRE ALARM SYSTEM SECTION 13851 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

MONITOR SECTION INDEX

MONITOR SECTION INDEX MONITOR SECTION INDEX Daspit Tool... E2 Daspit Tool - Truck Mount... E3 Daspit Tool - Throw Down Model... E4 Alpha MA-HV4-4 Aluminum Tiller Bar Monitor... E5 Alpha-E Tiller Bar Montior - 3... E6 SharpShooter

More information

Improving Temperature Measurement to Optimize Inventory Control and Custody Transfer Systems

Improving Temperature Measurement to Optimize Inventory Control and Custody Transfer Systems Improving Temperature Measurement to Optimize Inventory Control and Custody Transfer Systems The measurement of temperature is critical in the determination of the true volume of product in a hydrocarbon

More information

Mechanical Installation

Mechanical Installation Page -1-1. INTRODUCTION AND PURPOSE 1.1. This specification covers the installation, testing and precommissioning of mechanical equipment. Work is to be performed in conjunction with the manufacturer s

More information

BERMAD Waterworks. Quick Active Check Valve. 700 Series. Model 740Q. Features and Benefits. Major Additional Features

BERMAD Waterworks. Quick Active Check Valve. 700 Series. Model 740Q. Features and Benefits. Major Additional Features Booster Pump Control Valve Quick Active Check Valve Isolates system from the effects of pump starts and stops for: Solitary single speed pumps Battery of single speed pumps (add & switch) Battery of variable

More information

WaterMAG. Electromagnetic Flowmeter for Water Applications. Model MCB10A OVERVIEW APPLICATIONS FEATURES. No. SS2-MCB100-0100

WaterMAG. Electromagnetic Flowmeter for Water Applications. Model MCB10A OVERVIEW APPLICATIONS FEATURES. No. SS2-MCB100-0100 WaterMAG Electromagnetic Flowmeter for Water Applications OVERVIEW The WaterMAG is an electromagnetic flowmeter for water measurement applications based on field proven Azbil Corporation's technologies.

More information

SECTION 16720 - FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines

SECTION 16720 - FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines PART 1 -- GENERAL 1.1 WORK OF THIS SECTION SECTION 16720 - City of San Diego, CWP Guidelines A. The WORK of this Section includes providing manual and automatic fire alarm and smoke detection systems meeting

More information

SECTION 15410 GROUND WATER STORAGE TANKS

SECTION 15410 GROUND WATER STORAGE TANKS SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design

More information

FLARE MONITORS FLARE MONITOR (FM) PILOT MONITOR (PM) FLAME INTENSITY (FI)

FLARE MONITORS FLARE MONITOR (FM) PILOT MONITOR (PM) FLAME INTENSITY (FI) FLARE MONITORS Infrared Sensors for Monitoring Smokeless Flares, Pilots, and Flame Intensity FMDS2014 FLARE MONITOR (FM) Monitor smokeless flare combustion efficiency to maximize destruction of hazardous

More information

Please also see 10 golden rules for correct Saniflo installation on www.saniflo.co.uk

Please also see 10 golden rules for correct Saniflo installation on www.saniflo.co.uk 1. Description Sanicom is a lifting pump for wastewater used in commercial applications (restaurants, hairdressing salons, the catering industry etc.). The unit operates automatically, has a high performance

More information

5.23.22 STEAM AND CONDENSATE PIPING AND PUMPS DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL. 1.01 Purpose:

5.23.22 STEAM AND CONDENSATE PIPING AND PUMPS DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL. 1.01 Purpose: PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Clear Glass Sensor. Ordering Information E3S-CR67/62. Optimum Sensor for Detecting Transparent Glass and Plastic Bottles

Clear Glass Sensor. Ordering Information E3S-CR67/62. Optimum Sensor for Detecting Transparent Glass and Plastic Bottles Clear Glass Sensor Optimum Sensor for Detecting Transparent Glass and Plastic Bottles E3S-CR67/62 Retroreflective Sensor smoothly detects 5-mm gaps. Detects transparent bottles that have a lens effect.

More information

Ferrostat Speed Sensor Series DSF Explosion Proof Versions EEx

Ferrostat Speed Sensor Series DSF Explosion Proof Versions EEx Ferrostat Speed Sensor Series DSF Explosion Proof Versions EEx DSF..10.**.HV Ex ATEX Operating Instructions 374E-64368 Valid from lot nr. 0103 General Function Use in potentially explosive environment

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 13 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 REFERENCES

More information

Volkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)

Volkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17) 17 Engine-Lubrication (Page GR-17) Lubrication system components, removing and installing Oil filter housing, disassembling and assembling Oil pan, removing and installing Oil pressure and oil pressure

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 13 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia ELECTIRAL GROUNDING TABLE OF CONTENT

More information

STAR PIPE Polska S.A ul. Gdyńska 51 62-004 Czerwonak tel. +48 61 667 41 20 fax +48 61 667 41 38

STAR PIPE Polska S.A ul. Gdyńska 51 62-004 Czerwonak tel. +48 61 667 41 20 fax +48 61 667 41 38 THE ALARM SYSTEM The base of the system consists of two non-insulated copper alarm wires with section equal to 1.5 mm2, located inside polyurethane foam parallel to the conduit pipe, offset in relation

More information

Art.S001-S002 SOLAR MODULE WITH DELIVERY AND RETURN CONNECTIONS

Art.S001-S002 SOLAR MODULE WITH DELIVERY AND RETURN CONNECTIONS Art.S001-S002 SOLAR MODULE WITH DELIVERY AND RETURN CONNECTIONS Technical Information sheet 0001/07/Rev01 ENG FUNCTION Series S001 and S002 circulation units are applied to the primary circuit of solar

More information

Check Valves & Actuated Valves

Check Valves & Actuated Valves heck Valves & ctuated Valves & U Series Piston non-return valves rated 6,000 psi & 10,000 psi X Series Piston non-return valves rated 20,000 psi Pneumatic ctuators Pneumatically actuated valves Electric

More information

BERMAD Fire Protection

BERMAD Fire Protection 400E-2M/700E-2M IOM Bermad Electrically Controlled Deluge Valve with EasyLock Manual Reset Model: 400E-2M/700E-2M INSTALLATION OPERATION MAINTENANCE Application Engineering BERMAD 400E-2M/700E-2M Bermad

More information

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES SECTION 15062 STEAM AND CONDENSATE PIPING PART 1 DESIGN DIRECTIVES 1.1 QUALITY ASSURANCE A. Comply with the provisions of the following: 1.2 DESIGN CRITERIA 1. ASME B 31.9 Building Services Piping : for

More information

SIMPLAIR PIPING. www.irtools.com 1-800-376-TOOL

SIMPLAIR PIPING. www.irtools.com 1-800-376-TOOL SIMPLAIR PIPING INGERSOLL-RAND SIMPLAIR PIPING With push-in fittings and lightweight anodized aluminum pipe, a SimplAir system provides ideal connection throughout your entire air distribution system.

More information

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Plan Review 2009 International Fire Code and NFPA 20 Date of Review / / BLD201 - Project Address: Project Name: Contractor s Business

More information

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT 1.1 General 1.1.1 These Special Conditions of Contract supplement the General Instructions.

More information

Utility Distribution Systems

Utility Distribution Systems Utility Distribution Systems 6/2012 A0011037 1 WARRANTY This equipment is warranted to be free from defects in materials and workmanship, under normal use and service, for a period of 12 months from date

More information

italtec PRINTED CIRCUITS EQUIPMENT PRINTED CIRCUITS EQUIPMENT Insulator machines Echting machines Special equipment and machines

italtec PRINTED CIRCUITS EQUIPMENT PRINTED CIRCUITS EQUIPMENT Insulator machines Echting machines Special equipment and machines PRINTED CIRCUITS EQUIPMENT PRINTED CIRCUITS EQUIPMENT Insulator machines Echting machines Special equipment and machines On customer request it is possible to supply: Benches for PCB Oven for PCB Chemicals

More information

NFPA31FuelOilPiping 1 Revised 3-1-11

NFPA31FuelOilPiping 1 Revised 3-1-11 NFPA 31 Fuel Oil Piping, Installation and Testing Chapter 8 Fuel Piping Systems and Components 8.1 Scope. This chapter shall apply to piping systems and their components used to transfer fuel oil from

More information

Technical Specification. Generating Set with Waukesha engine burning natural gas

Technical Specification. Generating Set with Waukesha engine burning natural gas Technical Specification Generating Set with Waukesha engine burning natural gas The following presents the Gas Engine Generating Set (GEGS) APG1000 type, based on Waukesha gas engine 16V150LTD. Using the

More information

ASME Packaged Indirect Fired Water Heater

ASME Packaged Indirect Fired Water Heater Utilizes Or HTHW To Heat Domestic Water, Semi-Instantaneous or Storage Type Model BW Features Reliable Only high grade materials used in construction to ensure long operating life Hydrastone cement lining

More information

KNC Model 3666 Automatic Pressure Calibration System

KNC Model 3666 Automatic Pressure Calibration System KNC Model 3666 Automatic Pressure Calibration System Product Description The Model 3666 Automatic Pressure Calibration (APC) System by King Nutronics Corporation is a portable secondary standards laboratory

More information

T U R B I N E G A S M E T E R

T U R B I N E G A S M E T E R TURBINE GAS METER TURBINE GAS METER CGT 1 2 3 4 5 6 7 Design and function page 2 General technical data page 3 Measurement outputs page 4 Dimensions and weights page 5 Performance page 7 Pressure loss

More information

Protection Systems. A UTC Fire & Security Company F-73-01. Linear Heat Detector FEATURES DESCRIPTION APPLICATIONS BENEFITS

Protection Systems. A UTC Fire & Security Company F-73-01. Linear Heat Detector FEATURES DESCRIPTION APPLICATIONS BENEFITS Effective: May 2007 AlarmLine TM R Protection Systems Linear Heat Detector A UTC Fire & Security Company F-73-01 FEATURES Integrating Type Linear Heat Detector Analog Sensing Field Adjustable Alarm Set

More information

HG600/HG800. Hydro-Power Unit. Installation and Operation Guide

HG600/HG800. Hydro-Power Unit. Installation and Operation Guide HG600/HG800 Hydro-Power Unit Installation and Operation Guide Copyright 04 HydroSpin, All rights reserved. The data contained in this document is proprietary to HydroSpin. It is disclosed to the receiving

More information

Series 510 Submersible Level Transmitters

Series 510 Submersible Level Transmitters Series 510 Submersible Level Transmitters The Series 510 Submersible Level Transmitters are solid state instruments designed for direct submergence into many types of liquid for quick, accurate and reliable

More information

2.12. page 223 2.12. Products for Explosion hazardous Environment

2.12. page 223 2.12. Products for Explosion hazardous Environment 2.12 page 223 2.12 Products for Explosion hazardous Environment Non-electric valves for explosion 2.12.1 page 224 hazardous environment The following manually and mechanically actuated valves are available

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

BLUE RIBBON CORP. BC001 Birdcage Installation Manual

BLUE RIBBON CORP. BC001 Birdcage Installation Manual Product Overview: This manual is applicable for the BC001 Birdcage Submersible Level Transmitters. If the product you have has a different prefix part number than listed above please contact the factory

More information

Medical Air Systems: Scroll

Medical Air Systems: Scroll GENERAL The Chemetron skid mount scroll medical air system is designed to provide medical breathing air for hospital and medical institutions. This system meets NFPA 99 requirements for Level 1 breathing

More information

understanding medium frequency induction melting furnace and its components

understanding medium frequency induction melting furnace and its components understanding medium frequency induction melting furnace and its components 9 Spruce Street, Jersey City, NJ 07306 USA sales@electroheatinduction.com INDUCTION MELTING FURNACE AND ITS COMPONENTS The purpose

More information

Thermatel Model TA1 Mass Flow Transmitter

Thermatel Model TA1 Mass Flow Transmitter Thermatel Model TA1 Mass Flow Transmitter D E S C R I P T I O N Thermatel Thermal Mass Flow Transmitter, Model TA1, provides a high level of performance in mass flow measurement of air and gases. Powerful

More information

Sentinel LCT. Panametrics Ultrasonic Flowmeter for Liquid Custody Transfer Measurement. GE Measurement & Control Solutions. Benefits.

Sentinel LCT. Panametrics Ultrasonic Flowmeter for Liquid Custody Transfer Measurement. GE Measurement & Control Solutions. Benefits. GE Measurement & Control Solutions Sentinel LCT Panametrics Ultrasonic Flowmeter for Liquid Custody Transfer Measurement Benefits Extremely reliable and highly accurate flowmeter, designed specifically

More information

HOW TO ORDER SAFETY PRODUCTS/SAFETY CONTROL SYSTEMS ELECTRICAL SAFETY CONTROLS

HOW TO ORDER SAFETY PRODUCTS/SAFETY CONTROL SYSTEMS ELECTRICAL SAFETY CONTROLS HOW TO ORDER SAFETY PRODUCTS/SAFETY CONTROL SYSTEMS PNEUMATIC SAFETY CONTROLS BASIC CONTROLS SC3000 - SELF CONTAINED 2 HAND CONTROL - STAND ALONE MODEL SC3300 - SELF CONTAINED 2 HAND CONTROL - PRESS READY

More information

Index 11.1. Page. Pumping Systems...11.2-11.4 Intensifiers...11.5 Gas Boosters...11.6-11.7 High Pressure Generators...11.8-11.9

Index 11.1. Page. Pumping Systems...11.2-11.4 Intensifiers...11.5 Gas Boosters...11.6-11.7 High Pressure Generators...11.8-11.9 Pumping Systems, Intensifiers, Gas Boosters and High Pressure Generators High Pressure Equipment Company produces a number of components and systems for general industrial, elevated pressure applications.

More information

Flanged and Butt-= Weld Type

Flanged and Butt-= Weld Type Document : PG00 Year : 09 Product Group 00 Flanged and Butt-= Weld Type (LNG and LPG) Page 09 Document : PG00 Year : 09 Product Group 00 Cryogenic Butterfly valves The Cryogenic Butterfly Valve Design

More information

Light Duty Commercial Electric Water Heater

Light Duty Commercial Electric Water Heater Features Heavy Duty Construction Hydrastone cement lining provides longer tank life Copper-silicon tappings cannot rust or corrode High impact composite jacket eliminates damage during installation and

More information

INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS FOR EXHEAT INDUSTRIAL IMMERSION HEATERS (INCLUDING FLAMEPROOF)

INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS FOR EXHEAT INDUSTRIAL IMMERSION HEATERS (INCLUDING FLAMEPROOF) INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS FOR EXHEAT INDUSTRIAL IMMERSION HEATERS (INCLUDING FLAMEPROOF) Please read these instructions thoroughly before installation and ensure they are passed

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 32 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia INSTALLATION, FLUSHING AND TABLE OF

More information

I nstallation. M100Q Series Proportional Actuator with R81Q Controller Board for Thermistor Sensor Applications. Tools Needed.

I nstallation. M100Q Series Proportional Actuator with R81Q Controller Board for Thermistor Sensor Applications. Tools Needed. FANs 268.1, 1628.3 Installation Bulletin M100Q Issue Date 1099 M100Q Series Proportional Actuator with R81Q Controller Board for Thermistor Sensor Applications I nstallation Parts Included M110QGA-1 and

More information

Ergo-Pro Single Line Solar Station Installation and Operating Instructions

Ergo-Pro Single Line Solar Station Installation and Operating Instructions Rp 3/4 Ergo-Pro Single Line Solar Station Installation and Operating Instructions Item No Pump type 677.21.70 WILO ST 15/6 13 2 4 11 Technical Specifications Max. operating pressure: 6 bar Max. operating

More information

For Multi-Parameter Meters see mvx

For Multi-Parameter Meters see mvx BULLETIN BULLETIN EM20607 VORTEX IN-LINE FLOW METERS Design Features For Multi-Parameter Meters see m Principles of Operation n No moving parts to wear or fail. n Electronics can be remotely mounted up

More information

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal Ontario Fire Code SECTION 5.13 DIP TANKS Illustrated Commentary Office of the Ontario Fire Marshal Dip Tanks Illustrated Commentary 1 5.13.1. Location 5.13.1.1. Dip tank operations involving flammable

More information