1 Route 1 Multimodal Alternatives Analysis Virginia APA Conference July 20, 2015

2 Topics 1. Study context and overview (Amy Inman, DRPT) 2. Stakeholder engagement and committee structure (Tim Roseboom, DRPT) 3. Multimodal transportation analysis (Jason Mumford, AECOM) 4. Transportation and land use (Meredith Judy, Rhodeside & Harwell) 5. Key considerations for implementation (Leonard Wolfenstein, Fairfax County DOT) 2

3 02 Study Corridor 1 Study Context and Overview 3

4 Project Corridor 16 mile section of Route 1 Extends from I 95/I 495 Beltway area, through Fairfax County, to Route 123 at Woodbridge in Prince William County Route 1 4

5 Existing Conditions 5 5

6 Previous Studies and Efforts Route 1 has been the subject of numerous roadway and transitrelated studies and efforts. Fairfax County Comprehensive Plan Mount Vernon District Long Range Visioning Report BRAC EIS / BRAC Existing Conditions Report VDOT Location Study / Corridor Study Fairfax Connector & PRTC TDP WMATA Regional Bus Study Richmond Highway Public Transportation Initiatives BRT Feasibility Study (Prince William County) Potomac Communities, Urban Land Use Institute Report North Woodbridge Study Area Long Range Plan WMATA US 1 Fort Belvoir to Huntington Metro Rail Station ~ Transit Improvement Study Prince William County BRAC Report NVTC ~ Route 1 Corridor Bus Study

7 Transit Related Recommendations Fairfax County Comprehensive Plan Implement enhanced transit service along Richmond Highway, such as Metro, Light Rail, Bus Rapid Transit Establish transit stations at North Kings Hwy; at Beacon Hill Road; near Fordson Lane; near Mohawk Lane; near Sacramento; near Railroad line on Fort Belvoir Base; and at Telegraph Road Fairfax County Transit Development Plan Modify schedule for Metrobus 11Y Mt. Vernon Express Line trips Restructure and Improve Metrobus REX service Increase service and revise routing on Connector 151/152 and 161/162 Prince William County Comprehensive Plan Identify and develop alternative transit concepts such as bus rapid transit, light rail transit, Potomac ferry service, Metro Rail extension (Blue Line) to Potomac Mills WMATA Transit Service Impacts of BRAC Report Extend PRTC s Route 1 OmniLInk Route from Prince William County to South Post entrance and improving connections to existing transit centers by extending the Metrobus REX line to Lorton VRE and improve local bus connections to the Franconia Springfield Station Prince William County / PRTC BRT Feasibility Study (2011) Implement two local BRT routes to service the PRTC Transit Center and the Route Commuter Lot as land use and ridership demand increase to support the investment To offset travel time due to traffic congestion implement queue jump lanes and transit signal priority 7 7

8 Transit Related Recommendations Continued Mount Vernon District Visioning Task Force (2010) Implement a peak period HOV/bus lane on Richmond Highway Encourage VDOT to install traffic responsive technology on all of the traffic signals in the Mount Vernon District Potomac and Rappahannock Transportation Commission TDP OmniLink Route 1 Extension to Ft. Belvoir (timeframe ) Improve weekday peak period service frequency from 30 minutes to 20 minutes, Improve weekday midday service frequency from 45 minutes to 30 minutes, Improve weekday night service frequency from 45 minutes to 30 minutes, Improve Saturday service frequency from 110 minutes to 60 minutes, and Add Sunday service at a frequency of 110 minutes VDOT Centerline Study (2009) Widen Route 1 from Capital Beltway to the Stafford County line with accommodations for trails and transit bus pullouts in key locations 8

9 Transit Related Recommendations Continued WMATA US 1 Ft. Belvoir to Huntington Metro Station Transit Improvement Study Three phases of recommendations: Phase one ( ) Streamline bus service and routes Add GPS and SmartCard payment technology to buses Implement signal priority in the corridor for buses Improve/enhance pedestrian and passenger facilities Phase two ( ) Implement Bus Rapid Transit Phase three (2025+) Implement light rail transit in the corridor as ridership demand and land use density and development will support the major capital investment 9

10 Roadway Infrastructure Recommendations Widen Route 1 from the Capital Beltway to the Stafford County line with accommodations for trails, right shoulder bus lane pull offs and shelters at high demand stops Encourage VDOT to install traffic responsive technology on all of traffic signals in the Mount Vernon District Procure and Deploy Traffic Signal Priority on Richmond Highway Improve pedestrian network along the corridor and passenger experience at bus stops (e.g., shelters) 10 10

11 Legislative Action Senate Joint Resolution (SJR 292) 2011 General Assembly Session Requesting the Department of Rail and Public Transportation to evaluate the level of study necessary to identify and advance potential public transportation services to Fort Belvoir in Fairfax County and the Marine Corps Base at Quantico in Prince William and Stafford Counties 11

12 SJR 292 Recommendations Near term Improve conditions for transit operations and riders: Conduct necessary study and analysis to implement BRT Conduct pedestrian facility and shelter assessment and develop a funding strategy to improve the existing conditions Focus redevelopment to the corridor Long term Plan for the future: Conduct land use analysis and develop a vision for economic development/redevelopment in the corridor Feasibility analysis to determine potential for extending metro or implementing light rail 12

13 Route 1 Multimodal Alternatives Analysis Study Outcomes Recommend a program of multimodal transportation improvements for adoption by Fairfax County and Prince William County Define transit, roadway,and bicycle/pedestrian projects that could be advanced for implementation. 13

14 Purpose and Need Needs: Attractive and competitive transit service Safe and accessible pedestrian and bicycle access Appropriate level of vehicle accommodation Support and accommodate more robust economic development Goals: GOAL 1: Expand attractive multimodal travel options to improve mobility GOAL 2: Improve safety; increase accessibility GOAL 3: Increase economic viability and vitality of the corridor GOAL 4: Support community health and minimize impacts on community resources 14

15 Evaluation Process Public Meeting #1 (Fall 2013) Screen 1: Initial Alternatives Public Meeting #2 (Spring 2014) Screen 2: Refined Alternatives Public Meeting #3 (Fall 2014) Screen 3: Detailed Evaluation Recommendations 15

16 2 Stakeholder Engagement and Committee Structure 16

17 What was the project schedule in June 2013? 17

18 Project Organization: Committee Roles Policy Guidance Technical Guidance Study Feedback Executive Steering Committee: Policy Guidance State and County elected officials Commonwealth Transportation Board Senior County staff Fort Belvoir Leadership Technical Advisory Committee: Technical Guidance County staff VDOT staff Federal agency staff (FTA, FHWA) Fort Belvoir Leadership Resource agency staff Transit providers Community Involvement Committee: Study Feedback Community and advocacy groups Individuals Business and land owners Project Management Team DRPT VDOT Fairfax County Prince William County OIPI 18

19 Committee Lists: Executive Steering Committee Name Organization/Agency Role/Title ELECTED OFFICIALS: FEDERAL Congressman Gerry Connolly U.S. House of Representatives 11th District of VA, Representative Congressman Jim Moran U.S. House of Representatives 8th District of VA, Representative ELECTED OFFICIALS: STATE Senator Adam Ebbin Virginia Senate 30th District, Senator Senator Toddy Puller Virginia Senate 36th District, Senator (Fairfax, Prince William, Stafford) Delegate Mark Sickles Virginia House of Delegates 43rd District, Delegate Delegate Scott Surovell Virginia House of Delegates 44th District, Delegate ELECTED OFFICIALS: LOCAL Supervisor Gerald Hyland Fairfax County Mt. Vernon District Supervisor Supervisor Jeff McKay Fairfax County Lee District Supervisor Catherine Hudgins WMATA Board of Directors Board Member (Also Fairfax County Supervisor, Hunter Mill District) Supervisor Frank Principi Prince William County Woodbridge District Supervisor Supervisor John Jenkins Prince William County Neabsco District Supervisor APPOINTED OFFICIALS Fran Fisher Commonwealth Transportation Board Member (Also President of Revenue Recovery Consultants, Inc.) Thelma Drake Virginia Department of Rail and Public Director Transportation Helen Cuervo Virginia Department of Transportation Northern Virginia VDOT Administrator Renee Hamilton Virginia Department of Transportation Northern Virginia VDOT Deputy Administrator STAFF Ryan Kelly Secretary's Office Special Assistant, VDOT Tom Biesiadny Fairfax County Director, Department of Transportation Noelle Dominguez (Alternate to T. Biesiadny) Fairfax County Legislative Liaison Tom Blaser Prince William County Director, Department of Transportation Christopher Landgraf Fort Belvoir Chief Facility Planning Garrison Commander 19 19

20 Outreach Methods Committee Meetings (technical, elected, community) Public Meetings Social Media News Ads and Press Release Flyers and Fact Sheets Metro Station and Bus Ads Community Event Booths Bilingual On Line and On Corridor Targeted Efforts to Engage Diverse Populations 20

21 Public Meetings Public Meeting #1 (Fall 2013) Study introduction Existing conditions Goals and objectives Public Meeting #2 (Spring 2014) Initial alternatives Evaluation measures Land use analysis Public Meeting #3 (Fall 2014) Evaluation of alternatives Study recommendations Phasing and implementation 21

22 Public Meeting #3: Key Themes and Survey Results Majority of residents generally support draft recommendation Want to expedite Metrorail extension Interested in learning more about County land use planning and transit modes Recognize project funding is biggest challenge 22

23 Study Schedule: October 9, 2014 We are here 23

24 Recommendation BRT in mixed traffic through Prince William County Widen roadway to six continuous lanes Continuous bicycle and pedestrian facilities Median running Bus Rapid Transit (BRT) in the near term would provide a cost effective transportation solution to support economic development plans. Metrorail extension to Hybla Valley in the longterm has potential to provide a higher level of local and regional mobility and support longterm corridor development, contingent upon increased future land use density. BRT median in dedicated lanes in Fairfax County Metrorail underground to Hybla Valley with supporting BRT in the long-term 1_signed resolution.pdf 24

25 02 Study Corridor 3 Multimodal Transportation Analysis 25

26 Evaluation Process Screen 1: Initial Alternatives Screen 2: Refined Alternatives Screen 3: Detailed Evaluation Recommendations 26

27 Bicycle/Pedestrian and Roadway Recommendations Recommendations: Roadway: Consistent, 6 vehicular lanes along the corridor Bike/Ped: 10 foot multiuse path (Note: implementation of recommended section varies along the corridor) Transit: Under evaluation! 27

28 Alternative 1: Bus Rapid Transit Curb Running BRT operates in dedicated curb lanes to Pohick Road North Huntington Penn Daw Beacon Hill Lockheed Blvd Hybla Valley BRT operates in mixed traffic from Pohick Road North to Woodbridge Woodbridge VRE BRT in Mixed Traffic BRT in Dedicated Lanes Proposed Park & Ride 28

29 Alternative 2: Bus Rapid Transit - Median BRT operates in median in dedicated lanes in Fairfax County; transitions to mixed traffic through Prince William County Huntington Penn Daw Beacon Hill Lockheed Blvd Hybla Valley BRT in Mixed Traffic BRT in Dedicated Lanes Woodbridge VRE Proposed Park & Ride 29

30 Alternative 3: Light Rail Transit Light Rail operates in median in dedicated lanes for entire corridor Huntington Penn Daw Beacon Hill Lockheed Blvd Hybla Valley Woodbridge VRE LRT in Dedicated Lanes Proposed Park & Ride 30

31 Alternative 4: Metrorail- BRT Hybrid Median Running BRT in the near term Huntington Beacon Hill Hybla Valley Metrorail underground to Hybla Valley with supporting BRT in the long term Woodbridge VRE BRT in Mixed Traffic BRT in Dedicated Lanes Metrorail (Underground) Proposed Park & Ride 31

32 Summary of Key Indicators Based on Scenario 1 Land Use (COG 2035 Forecast) Alt 1: BRT Curb Alt 2: BRT Median Alt 3: LRT Alt 4: Metro/BRT Hybrid Average Weekday Ridership (2035) 15,200 16,600 18,400 26,500 (BRT 10,600; Metro 22,900) Conceptual Capital Cost $832 M $1.01 B $1.56 B $2.46 B* (Metro $1.46B; BRT $1 B) Annual O&M Cost (Each Alternative includes $5 M annual cost for Ft. Belvoir shuttle service) $18 M (BRT $13M; Ft Belvoir Shuttle $5M) $17 M (BRT $12M; Ft Belvoir Shuttle $5M) $24 M (LRT $19M; Ft Belvoir Shuttle $5M) $31 M** (Metro $17M; BRT $8M; Ft Belvoir Shuttle $5M) Cost Effectiveness (Annualized capital + operating cost per rider) $19 $20 $27 $28** (Metrorail: $28; BRT: $29) * This figure represents full BRT construction between Huntington and Woodbridge, then Metrorail extension from Huntington to Hybla Valley ** These figures assume operation of Metrorail between Huntington and Hybla Valley, and BRT between Hybla Valley and Woodbridge 32

33 Evaluation of Alternatives Goals Goal 1: Local and Regional Mobility Goal 2: Safety and Accessibility Goal 3A: Economic Development Goal 3B: Cost Effectiveness Goal 4: Community Health and Resources Ridership Travel time savings Traffic Pedestrian access Example Measures Economic development effects Implementation Capital costs Operating costs Environmental impacts Change in Vehicle Miles Traveled (VMT) 33

34 Evaluation of Alternatives: Findings Check out Board 4 for full evaluation results! Slide in Progress 34

35 Recommendation Evaluation results suggest: Median running Bus Rapid Transit (BRT) in the near term would provide a cost effective transportation solution to support economic development plans. Metrorail extension to Hybla Valley in the longterm has potential to provide a higher level of local and regional mobility and support longterm corridor development, contingent upon increased future land use density. 35

36 Traffic Analysis Findings Scenario 1 (MWCOG 2035 Growth Forecast) Addition of median transit lanes: Improves transit travel time Incrementally increases automobile travel time Left turns impacted Does not significantly degrade overall intersection performance Segment Travel Time (min) Auto travel time Transit travel time Auto travel time No Build 2035 Build Transit travel time (Janna Lee Ave. to Huntington) 36

37 Traffic Analysis Conclusions Major growth is anticipated With project investment, need: Network of local streets Schools Parks Public safety Metrorail growth levels require significantly more infrastructure investment than BRT levels 37

38 4 Transportation and Land Use 38

39 Transportation investment supports economic viability and vitality of the corridor Population growth Employment growth Demand for new residential units and commercial space Land use planning Transportation investment Support high quality community development 39

40 Example: Arlington County 40

41 Example: Alexandria, VA 41

42 DRPT Multimodal System Design Guidelines Statewide resource for planners, engineers, designers, policy and decision makers Approaches to support integrated land use and multimodal transportation planning Guidelines to optimize transit investments and reduce reliance on cars 42

43 DRPT Multimodal System Design Guidelines Analyze population and employment density as a means to understand transit options Engage stakeholders in discussion about density, urban design, and high quality transit 43

44 Activity Unit Density Map (2035 COG Projections) 44

45 Population and Employment Growth Scenarios 45

46 Station Activity Levels (Population + Employment per Acre) P 6 (70+) P 5 (34 70) P 4 (14 34) (End of line station) (End of line station) P 3 (7 14) Ballston Rosslyn Norfolk LRT 46

47 Station Activity Levels (Population + Employment per Acre) 2010 Activity Levels P 6 (70+) P 5 (34 70) P 4 (14 34) P 3 (7 14) 47

48 Station Activity Levels (Population + Employment per Acre) Regional Projection (2035) P 6 (70+) P 5 (34 70) P 4 (14 34) 48

49 Station Activity Levels (Population + Employment per Acre) Comprehensive Plan Levels P 6 (70+) P 5 (34 70) 49

50 Station Activity Levels (Population + Employment per Acre) Scenario 2 = Growth of 15% to 25% over the regional forecast (scenario 1) P 6 (70+) P 5 (34 70) 50

51 Station Activity Levels (Population + Employment per Acre) Scenario 3 = Growth levels supportive of Metrorail (to Hybla) and BRT (south of Hybla) P 6 (70+) P 5 (34 70) 51

52 Beacon Hill Land Use Scenarios N 52

53 Beacon Hill Transit Oriented Development at BRT-supportive Activity Levels N 53

54 Beacon Hill Transit Oriented Development at Metrorail-supportive Activity Levels N 54

55 Woodlawn Transit Oriented Development at BRT-supportive Activity Levels N Artist s Rendering 55

56 Woodbridge Transit Oriented Development at BRT-supportive Activity Levels New Park& Ride N N 56

57 Hybla Valley with BRT N 57

58 Hybla Valley with BRT and Metrorail N 58

59 Lessons Learned Land use to support transit is complex, involving many elements. Stakeholders easily misunderstood the multimodal center types as a rule rather than a tool. Must be carefully communicated. Visuals (artist depictions, diagrams, infographics) are critical for communicating ideas about density and urban design, and the tradeoffs for creating high quality transit investments. N 59

60 02 Study Corridor 5 Key Considerations for Implementation 60

61 Implementation A. Phasing of BRT B. Roadway Widening Sequencing C. Environmental Assessment BRT, Road Widening D. Land Use Comprehensive Plan E. Timeline 61

62 Phasing and Implementation Approach Phase I: Huntington to Hybla Valley ($306 M) 3.1 mi Huntington Hybla Valley Fort Belvoir Woodbridge 62

63 Phasing and Implementation Approach Phase II: Hybla Valley to Fort Belvoir ($224 M) 7.3 mi Huntington Hybla Valley Fort Belvoir Woodbridge 63

64 Phasing and Implementation Approach Phase III: Fort Belvoir to Woodbridge ($472 M) 4.6 mi Huntington Hybla Valley Fort Belvoir Woodbridge 64

65 Phasing and Implementation Approach Phase IV: Metrorail Yellow Line Extension to Hybla Valley* ($1.46 B) 3.1 mi *Contingent upon future land use Huntington Hybla Valley Fort Belvoir Woodbridge 65

66 Phasing and Implementation Approaches Phase I III: Implement Multimodal Improvements and BRT (Median Running) Phase IV: Extend Metrorail to Hybla Valley 3.1 mi. 3.1 mi. 7.3 mi. 4.6 mi. 66

67 Roadway Widening CURRENT CONDITION 4 LANES IN SOUTHERN SECTION 4 LANES IN MIDDLE SECTION 6 LANES IN NORTHERN SECTION DISCONTINUOUS SIDEWALKS DESIRED CONDITION 6 LANES (3 NB; 3 SB) BRT IN MEDIAN CONTINUOUS PED/BIKE FACILITY 67

68 3 Segments of Route 1 Northern Section No existing median Commercial land uses Southern Section Widening to 6 Lanes Under Construction Part of BRAC Reserving median for transit Middle Section Planned Widening to 6 Lanes Bottleneck section next for construction Environmental Documentation

69 Route 1 Widening Southern Section BRAC Project 3.7 Miles $180 million Completion Feb 2016 Includes Median for Transit 69

70 Route 1 Southern Section 70

71 Route 1 Southern Section Cross Section 71

72 Route 1 Widening Middle Section 72

73 Route 1 Widening Northern Section 73

74 Environmental Assessment Ideal to do combined Environmental Assessment (For entire segment to be improved) Proceeding with EA for Road Widening Middle Segment with provision for BRT (VDOT) Subsequent EA for BRT Phases 1 and 2 (County) 74

75 Comprehensive Plan Key Issues: Metrorail/BRT Policy guidance Land use levels at stations Refining Location of BRT Stations Station Templates Cross Section/ROW Impacts Process: Advisory Group Public Outreach Timeline: 4 Year Timeline Proposed (Start July 2015) 75

76 Station Activity Levels (Population + Employment per Acre) Scenario 2 = Growth of 15% to 25% over the regional forecast (scenario 1) P 6 (70+) P 5 (34 70) 76

77 FUNDING Road Widening Southern Section $180 m funded Middle Section $90 m estimate $10 m funded BRT Phase I and II $530 m estimate $ 4 m funded for environmental documentation 77

78 Potential Implementation Timelines Phase I: Huntington to Hybla Valley + Roadway Widening Roadway Widening, Bike/Ped, BRT Phase I Comprehensive Plan Revisions Phase II: Hybla Valley to Fort Belvoir Bike/Ped, BRT Phase II Comprehensive Plan Revisions Phase III: Fort Belvoir to Woodbridge Improvements Roadway Widening, Bike/Ped, BRT Phase III Comprehensive Plan Revisions Phase IV: Huntington to Hybla Valley Metrorail Extension Metrorail Legend: General Project Development Sequence Comprehensive Plan Years ( ) Phase IV Comprehensive Plan Revisions Note: Timelines assume a funding stream to support projects implementation. *Contingent upon increased future land use density. Planning Scoping/ NEPA PE Typical New Starts Funding Steps/Sequence: FTA SMALL STARTS PROJECT DEVELOPMENT PROCESS * Final Design Right of Way Utilities Relocation Construction Operation FTA NEW STARTS PROJECT DEVELOPMENT PROCESS 78

79 Comments and Questions 79

80 Appendix 80

81 Committee Lists: Technical Advisory Committee Name Jurisdiction Jim Maslanka City of Alexandria Marti Reinfeld City of Alexandria Randy White Fairfax Connector Leonard Wolfenstein Fairfax County Liz Hagg Fairfax County Marianne Gardner Fairfax County Barbara Byron Fairfax County Noelle Dominguez Fairfax County Thomas Burke Fairfax County Fairfax County, Chief Special Projects Division (BRAC and Mark Canale Dulles Rail) John Simkins FHWA Irené Rico FHWA, Division Administrator Christopher Landgraf Fort Belvoir Melissa Barlow FTA Dan Koenig FTA Ryan Long FTA, Community Planner Claire Gron NVTC Tom Blaser Prince William County George Philips Prince William County Ray Utz Prince William County Tracy Gordon Prince William County Barbara Johnson Prince William County Name Eric Marx Alfred Harf Ryan Kelly Edythe Kelleher Thomas Faha Andrea Kampinen Angel Deem Kanti Srikanth Bud Siegel Maria Sinner Dironna Belton Christine Hoeffner Greg Potts Allison Davis Jurisdiction PRTC PRTC Secretary's Office Southeast Fairfax Development Corporation, Executive Director VDEQ (Regional Director, Northern VA) VDHR VDOT Central Office VDOT NOVA VDOT NOVA VDOT, NOVA District, Transportation and Land Use Director (PWC) Virginia OIPI VRE WMATA WMATA 81 81

82 Committee Lists: Project Management Team Name Amy Inman Tim Roseboom Leonard Wolfenstein Thomas Burke George Phillips Dironna Belton Kanti Srikanth Bud Siegel Ryan Kelly Jurisdiction/Agency DRPT DRPT Fairfax County Fairfax County Prince William County Virginia OIPI VDOT NOVA VDOT NOVA Secretary s Office 82 82

83 Community Involvement Committee Signatories of the June 12, 2013 letter to Thelma Drake, Jeff McKay and Gerald Hyland: o The Coalition for Smarter Growth o Sierra Club, Virginia Chapter o Fairfax Advocates for Better Bicycling o Northern Virginia Affordable Housing Alliance o Community Preservation and Development Corporation o Spring Bank Community Association o Friends of Quander Brook o United Community Ministries o Audubon Naturalist Society o Wesley Housing Development Corp. of Northern Virginia o Friends of Dyke Marsh o Good Shepherd Housing & Family Services Planning Commissioners (Fairfax County and Prince William County) Transportation Commissioners (Fairfax County) Fairfax County Federation of Citizens Organizations Mount Vernon Council of Citizens Associations Lee District Association of Civic Organizations Lee Land Use Committee South County Federation Mount Vernon Lee Chamber of Commerce South Fairfax Chamber of Commerce Alexandria Economic Development Partnership Other key community interest groups and community leaders Business and real estate leaders Major property owners along the corridor Neighborhood associations in the study area 83

84 Growth Scenarios Require Transportation and other Public Investment Major growth is anticipated in the Route 1 corridor in all growth scenarios including COG 2035 forecast In Comprehensive Plan updates, corridor infrastructure needs will be evaluated: Streets Schools Parks and public space Public safety Water and utilities Metrorail supportive growth levels require significantly more infrastructure investment than BRT levels Current analysis focuses on traffic capacity 84

85 Traffic Analysis Findings: Growth Scenarios 2 and 3 Street Infrastructure Required to Accommodate Growth For highest density proposed station areas: Beacon Hill and Hybla Valley Share of trips transit, Add street capacity to walk, bike, internal, supplement Route 1, and peak spreading equivalent to: Scenario 2 One new 20% 2 lane street One new 25% 2 lane street Scenario 3 25% 40% to 50% Six new 2 lane streets Three new 2 lane streets Population and employment Growth % over Scenario 1 Time % Population and employment growth up to 160% over Scenario 1 70 AD (+160%) 50 AD (+80%) Time 85

86 Phasing and Implementation Approach Phase IV: Metrorail Yellow Line Extension to Hybla Valley* ($1.46 B) 3.1 mi *Contingent upon future land use Huntington Hybla Valley Fort Belvoir Woodbridge 86

87 Phasing and Implementation Approaches Phase I III: Implement Multimodal Improvements and BRT (Median Running) Phase IV: Extend Metrorail to Hybla Valley 3.1 mi. 3.1 mi. 7.3 mi. 4.6 mi. 87

88 Transit Funding Assumptions by Geographic Segment Phase I+II: Huntington to Fort Belvoir Potentially competitive for federal New Starts/Small Starts funding Highest population and employment Highest ridership potential 7.3 mi Federal State Regional Local 8% 9% 33% 50% Phase III: Fort Belvoir to Woodbridge Less competitive for federal funding Lower population and employment Includes planned VDOT widening 15% 10% 22% 33% 20% Federal State Regional Local Unidentified 88

89 Funding by Geographic Segment Phase IV: Huntington to Hybla Valley Potentially competitive for federal New Starts funding in 2040 Contingent upon increased 7.3 mi future land use density Federal State Regional Local 8% 33% 9% 50% 89

90 Potential Implementation Timelines Approach: BRT and Long Term Metrorail Implementation (2040) Phase I: Huntington to Hybla Valley + Roadway Widening Roadway Widening, Bike/Ped, BRT Phase I Comprehensive Plan Revisions Phase II: Hybla Valley to Fort Belvoir Bike/Ped, BRT Phase II Comprehensive Plan Revisions Phase III: Fort Belvoir to Woodbridge Improvements Roadway Widening, Bike/Ped, BRT Phase III Comprehensive Plan Revisions Years ( ) Phase IV: Huntington to Hybla Valley Metrorail Extension* Metrorail Phase IV Comprehensive Plan Revisions Note: Timelines assume a funding stream to support projects implementation. *Contingent upon increased future land use density. Legend: General Project Development Sequence Comprehensive Plan Planning Scoping/ NEPA PE Final Design Right of Way Utilities Relocation Construction Operation 90

91 Potential Implementation Timelines Phase I: Huntington to Hybla Valley + Roadway Widening Roadway Widening, Bike/Ped, BRT Phase I Comprehensive Plan Revisions Phase II: Hybla Valley to Fort Belvoir Bike/Ped, BRT Phase II Comprehensive Plan Revisions Phase III: Fort Belvoir to Woodbridge Improvements Roadway Widening, Bike/Ped, BRT Phase III Comprehensive Plan Revisions Phase IV: Huntington to Hybla Valley Metrorail Extension Metrorail Legend: General Project Development Sequence Comprehensive Plan Years ( ) Phase IV Comprehensive Plan Revisions Note: Timelines assume a funding stream to support projects implementation. *Contingent upon increased future land use density. Planning Scoping/ NEPA PE Typical New Starts Funding Steps/Sequence: FTA SMALL STARTS PROJECT DEVELOPMENT PROCESS * Final Design Right of Way Utilities Relocation Construction Operation FTA NEW STARTS PROJECT DEVELOPMENT PROCESS 91

92 Combined Action Plan for Implementation 92

30 Years of Smart Growth

30 Years of Smart Growth 30 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor A Presentation by the Arlington County Department of Community Planning,

More information

VRE SYSTEM PLAN SUMMARY

VRE SYSTEM PLAN SUMMARY VRE System Plan Summary January 2014 VRE SYSTEM PLAN SUMMARY VRE A Cost-Effective Contributor to Regional Mobility During the last decade, VRE has demonstrated its ability to accommodate a rapid and substantial

More information

A Presentation by the Project Managers: Rick Canizales Prince William County. Jana Lynott, AICP Northern Virginia Transportation Commission

A Presentation by the Project Managers: Rick Canizales Prince William County. Jana Lynott, AICP Northern Virginia Transportation Commission A Presentation by the Project Managers: Rick Canizales Prince William County & Jana Lynott, AICP Northern Virginia Transportation Commission for the: Public Open House and Hearing December 6, 2005 George

More information

Washington Metropolitan Area Transit Authority Board Action/Information Summary

Washington Metropolitan Area Transit Authority Board Action/Information Summary Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 200212 Resolution: Yes No TITLE: Connecting Communities KPI PRESENTATION SUMMARY: This presentation

More information

Executive Director s Recommendation Commission Meeting: July 11, 2013

Executive Director s Recommendation Commission Meeting: July 11, 2013 Executive Director s Recommendation Commission Meeting: July 11, 2013 PROJECT Russell Road Widening Phase 2 United States Marine Corps Base Quantico Prince William County, Virginia SUBMITTED BY United

More information

Light Rail Transit in Phoenix

Light Rail Transit in Phoenix 4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February

More information

Florida Avenue Multimodal Transportation Study. June 19, 2013

Florida Avenue Multimodal Transportation Study. June 19, 2013 Florida Avenue Multimodal Transportation Study June 19, 2013 Today s Agenda Team & project introduction Project Timeline What you said Tools we use Mapped data and what clues it can provide Highlights

More information

Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects

Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects C2012-0684 ATTACHMENT 2 The RouteAhead draft 30-year rapid transit plan was developed in coordination with the Investing in

More information

Transitways and the RouteAhead for Calgary Transit

Transitways and the RouteAhead for Calgary Transit Transitways and the RouteAhead for Calgary Transit Chris Jordan, P.Eng., M.Sc., Manager, Strategic Planning, Calgary Transit, Transportation, City of Calgary Jen Malzer, P.Eng., M.Sc., Senior Transit Planner,

More information

12MAP-21, a funding and authorization bill to govern U.S. federal surface MONITORING IMPLEMENTATION AND PERFORMANCE

12MAP-21, a funding and authorization bill to govern U.S. federal surface MONITORING IMPLEMENTATION AND PERFORMANCE MONITORING IMPLEMENTATION AND PERFORMANCE 12MAP-21, a funding and authorization bill to govern U.S. federal surface transportation spending, creates a data-driven, performance-based multimodal program

More information

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile

More information

Questions and Answers about the Orange Bus/Rail Investment Plan

Questions and Answers about the Orange Bus/Rail Investment Plan Why are transit improvements needed? Questions and Answers about the Orange Bus/Rail Investment Plan The Triangle Region is now home to 1.5 million people. The U.S. Census and the 2035 Joint Long Range

More information

Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas

Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas Transportation Association of Canada Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas The transportation funding and governance frameworks of Canada s metropolitan regions

More information

Implementing the Transportation Alternatives Program for the National Capital Region

Implementing the Transportation Alternatives Program for the National Capital Region Implementing the Transportation Alternatives Program for the National Capital Region Safe Routes to School Regional Meeting October 29, 2013 Sarah Crawford National Capital Region Transportation Planning

More information

Introduction to Station Area Planning The Charlotte Story

Introduction to Station Area Planning The Charlotte Story Introduction to Station Area Planning The Charlotte Story Boston 2009 Steve Hamwey - Sasaki Associates, Inc. Troy Russ - Glatting Jackson, Inc. October 31 st, 2009 Station Area Planning October 15th History

More information

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan. 3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A ORANGE COUNTY TRANSPORTATION AUTHORITY Final Long-Range Transportation Plan - Destination 2035 Attachment A DESTINATION 2035 DESTINATION 2035 EXECUTIVE SUMMARY ATTACHMENT A Moving Toward a Greener Tomorrow

More information

TCRP Report 153: Guidelines for Providing Access to Public Transportation Stations. Part 2: Station Typology and Mode of Access Planning Tool

TCRP Report 153: Guidelines for Providing Access to Public Transportation Stations. Part 2: Station Typology and Mode of Access Planning Tool TCRP Report 153: Guidelines for Providing Access to Public Transportation Stations Part 2: Station Typology and Mode of Access Planning Tool Jamie Parks, AICP Kittelson & Associates, Inc. Acknowledgements

More information

Transportation Breakout Session. Curvie Hawkins Mark Rauscher Mike Sims Paul Moore

Transportation Breakout Session. Curvie Hawkins Mark Rauscher Mike Sims Paul Moore Transportation Breakout Session Curvie Hawkins Mark Rauscher Mike Sims Paul Moore Curvie Hawkins Director of Planning Fort Worth Transportation Authority Fort Worth Transportation Authority The T Presented

More information

Multi Modal Roadway Transportation Impact Fees and Asset Value

Multi Modal Roadway Transportation Impact Fees and Asset Value January 2010 SB 360 Article Series: Factors to be Considered in Transitioning from a Road Impact Fee to a Mobility Fee Contributing Authors: Steven A. Tindale, P.E., AICP Robert P. Wallace, P.E., AICP

More information

Downtown Tampa Transportation Vision

Downtown Tampa Transportation Vision Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org

More information

Performance Measures for a Sustainable Transportation Network Pasadena s Approach Frederick C. Dock, Ellen Greenberg, Mark Yamarone

Performance Measures for a Sustainable Transportation Network Pasadena s Approach Frederick C. Dock, Ellen Greenberg, Mark Yamarone Performance Measures for a Sustainable Transportation Network Pasadena s Approach Frederick C. Dock, Ellen Greenberg, Mark Yamarone Abstract. As California cities move into the second decade of the 21st

More information

Roadway Cost Per Centerline Mile Revised June 2014

Roadway Cost Per Centerline Mile Revised June 2014 Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743

More information

How To Plan A City Of Mason

How To Plan A City Of Mason Transportation Master Plan (TMP) for the City of Madison: Draft Scope of Work Briefing for Madison Area TPB/MPO June 6, 2012 TMP: Overview/Purpose Help Create Walkable, Bikeable, Livable City - Strengthen

More information

Best Practices in Bicycle and Pedestrian Wayfinding in the Washington Region Survey Results

Best Practices in Bicycle and Pedestrian Wayfinding in the Washington Region Survey Results Bike/Ped Subcommittee 03/20/07, Item 5 Best Practices in Bicycle and Pedestrian Wayfinding in the Washington Region Survey Results Michael J. Farrell COG/TPB 1 Background At the request of Jay Fisette,

More information

NEW BLUE LINE CONNECTIONS

NEW BLUE LINE CONNECTIONS Washington Metropolitan Area Transit Authority NEW BLUE LINE CONNECTIONS 3/31/2014 A Major Capital Project of Momentum s Metro 2025 Program In support of its new strategic plan, Metro has considered the

More information

City of Rockville Regional Development Impacts: Transportation Capacity Analysis. June, 2013

City of Rockville Regional Development Impacts: Transportation Capacity Analysis. June, 2013 City of Rockville Regional Development Impacts: Transportation Capacity Analysis June, 2013 Purpose and Need Response to Council and Public Evaluate use of more advanced traffic analysis methodology and

More information

TRANSIT DEVELOPMENT PLAN

TRANSIT DEVELOPMENT PLAN Arlington County Capital Bikeshare TRANSIT DEVELOPMENT PLAN Fiscal Years 2013 to 2018 executive summary Executive Summary ARLINGTON COUNTY CAPITAL BIKESHARE TRANSIT DEVELOPMENT PLAN Fiscal Years 2013 to

More information

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Transportation & Mobility projects that meet the following criteria: enhances regional mobility; supports public transit;

More information

CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND)

CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND) Regional Transportation Plan 2035 28 CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND) The Cache Transportation Vision Plan shows roadway, bicycle, transit and pedestrian projects that attempt

More information

Education. Chapter 3. Education Encouragement Enforcement Engineering & Facilities Evaluation & Planning. Education Chapter 3

Education. Chapter 3. Education Encouragement Enforcement Engineering & Facilities Evaluation & Planning. Education Chapter 3 Education Education Encouragement Enforcement Engineering & Facilities Evaluation & Planning Photo above: A woman and child ride on the road in Blackwater. Virginia Beach Bikeways and Trails Plan 2011

More information

R-06: Innovation and Technology Fund

R-06: Innovation and Technology Fund Project Number R-06 Subarea Systemwide Primary Mode Facility Type Length Version ST Board Workshop Date Last Modified 11-25-2015 PROJECT AREA AND REPRESENTATIVE ALIGNMENT SHORT PROJECT DESCRIPTION This

More information

Virginia's Transportation Performance Management System

Virginia's Transportation Performance Management System Virginia's Transportation Performance Management System Office of Intermodal Planning and Investment Commonwealth Transportation Board Presented by: David Tyeryar, Deputy Secretary of Transportation September

More information

Improving Access in Florida International University Biscayne Bay Campus Executive Summary

Improving Access in Florida International University Biscayne Bay Campus Executive Summary EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared

More information

Owner s Procurement Forum

Owner s Procurement Forum Washington Metropolitan Area Transit Authority Construction Management Association of America National Capitol Chapter Owner s Committee Owner s Procurement Forum February 24, 2015 OVERVIEW of WMATA INFRASTRUCTURE:

More information

Implementation Strategy

Implementation Strategy Implementation Strategy 6 The following implementation strategy defines strategic points of intervention for complete streets programming, including visioning, goal-setting, local agency plans, coordination

More information

How Virginia Is Using Transit and Transportation Demand Management Programs to Address Highway Congestion and Single Occupant Vehicle (SOV) Travel

How Virginia Is Using Transit and Transportation Demand Management Programs to Address Highway Congestion and Single Occupant Vehicle (SOV) Travel REPORT OF THE SECRETARY OF TRANSPORTATION How Virginia Is Using Transit and Transportation Demand Management Programs to Address Highway Congestion and Single Occupant Vehicle (SOV) Travel TO THE GOVERNOR

More information

Transit Service Design Guidelines. Department of Rail and Public Transportation November 2008

Transit Service Design Guidelines. Department of Rail and Public Transportation November 2008 Department of Rail and Public Transportation November 2008 Why were these guidelines for new transit service developed? In FY2008 alone, six communities in Virginia contacted the Virginia Department of

More information

Soapstone Connector Feasibility Study

Soapstone Connector Feasibility Study Technical Report Soapstone Connector Feasibility Study Prepared by ATCS, plc., 2553 Dulles View Drive, Herndon, VA 20171, (703) 430-7500 www.atcsplc.com In association with: Michael Baker Corporation,

More information

RESOLUTION NO. WHEREAS, the 2016-2017 City Budget Forecast estimates that housing

RESOLUTION NO. WHEREAS, the 2016-2017 City Budget Forecast estimates that housing RESOLUTION NO. WHEREAS, the 2016-2017 City Budget Forecast estimates that housing (21.6 percent) and transportation (14.9 percent) are the two largest expense categories for the typical Austin family;

More information

South Florida East Coast Corridor (SFECC) Projects. February 7, 2012

South Florida East Coast Corridor (SFECC) Projects. February 7, 2012 Project Update to City of Ft. Lauderdale Central lbroward deast West ttransit it& South Florida East Coast Corridor (SFECC) Projects February 7, 2012 Transit Studies Building a network of premium transit.

More information

2015 SOLICITATION FOR ENHANCED MOBILITY GRANT APPLICATIONS

2015 SOLICITATION FOR ENHANCED MOBILITY GRANT APPLICATIONS Item 6 Technical Committee MEMORANDUM TO: FROM: TPB Technical Committee Wendy Klancher, TPB Principal Planner Lynn Winchell-Mendy, TPB Planner SUBJECT: Status Report on the 2015 Solicitation for Section

More information

South Carolina Multimodal Transportation Plan Vision, Goals, Objectives, and Performance Measures

South Carolina Multimodal Transportation Plan Vision, Goals, Objectives, and Performance Measures South Carolina Multimodal Transportation Plan Vision, Goals, Objectives, and Performance Measures Prepared for: Prepared by: June 2013 TABLE OF CONTENTS 1. Introduction... 1 1.1 Baseline Understanding...

More information

Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013

Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013 Near Westside Neighborhood and University Avenue Corridor Transportation Study Public Workshop #2 September 12 and 23, 2013 Presentation Outline: Brief Review of Study Scope, Background, and Current Conditions

More information

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for

More information

Agenda. } Beltline Study Background } PEL Basics } UW Survey Results } Strategy Development and Results } Next Steps

Agenda. } Beltline Study Background } PEL Basics } UW Survey Results } Strategy Development and Results } Next Steps Fall 2014 1 Agenda } Beltline Study Background } PEL Basics } UW Survey Results } Strategy Development and Results } Next Steps 2 Study Limits (University Avenue/US 14 to County N) 3 } Motor vehicle congestion

More information

Virginia s Approach to Intercity Passenger Rail Development

Virginia s Approach to Intercity Passenger Rail Development Virginia s Approach to Intercity Passenger Rail Development Kevin B. Page Chief Operating Officer Virginia Department of Rail and Public Transportation June 14, 2013 www.drpt.virginia.gov High Speed Rail

More information

Master Transportation Plan Demand and System Management Element. Transportation Demand Management (TDM) Transportation System Management (TSM)

Master Transportation Plan Demand and System Management Element. Transportation Demand Management (TDM) Transportation System Management (TSM) Master Transportation Plan Demand and System Management Element Transportation Demand Management (TDM) Transportation System Management (TSM) Adopted December 13, 2008 Table of Contents I. Introduction

More information

When is BRT the Best Option? 1:30 2:40 p.m.

When is BRT the Best Option? 1:30 2:40 p.m. TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? 1:30 2:40 p.m. Paul Larrousse Director, National Transit Institute (NTI) (Moderator) TRB/APTA 2004 Bus Rapid Transit Conference Session

More information

Task 1 Project Management and Project Organization Work Plan

Task 1 Project Management and Project Organization Work Plan City of Palmdale Active Transportation Program Plan Scope of Work At their January 22, 2015 meeting, the California Transportation Commission (CTC) allocated funding for the above-referenced project as

More information

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City Mayors Welcome Strong Surrey Votes Yes Coalition Support Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City February 11, 2015 Vancouver, BC The Mayors Council on Regional Transportation

More information

WMATA Regional Benefits of Transit Executive Summary

WMATA Regional Benefits of Transit Executive Summary WMATA Executive Summary November 2011 Acknowledgements Lead Agency: Prepared By: Washington Metropolitan Area Transit Authority Office of Long Range Planning 600 5 th Street NW Washington, DC 20001 AECOM

More information

Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014)

Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014) Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 15.7 Miles, 17 Stations

More information

FAIRFAX CUE TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2011 2016

FAIRFAX CUE TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2011 2016 FAIRFAX CUE TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2011 2016 Updated October 2010 (Final) Prepared by: Under Sub Contract to: Under Contract to: Table of Contents 1.0 OVERVIEW OF FAIRFAX, VA TRANSIT SERVICES...

More information

Appendix E Transportation System and Demand Management Programs, and Emerging Technologies

Appendix E Transportation System and Demand Management Programs, and Emerging Technologies Appendix E Transportation System and Demand Management Programs, and Emerging Technologies Appendix Contents Transportation System Management Program Transportation Demand Management Program Regional Parking

More information

SEPTEMBER 2015 SCOPE OF WORK. MONTGOMERY COUNTY PLANNING DEPARTMENT M-NCPPC MontgomeryPlanning.org

SEPTEMBER 2015 SCOPE OF WORK. MONTGOMERY COUNTY PLANNING DEPARTMENT M-NCPPC MontgomeryPlanning.org SEPTEMBER 2015 SCOPE OF WORK MONTGOMERY COUNTY PLANNING DEPARTMENT M-NCPPC MontgomeryPlanning.org table of contents table of contents... 1 introduction... 2 planning context... 2 purpose of master plan...

More information

Evergreen Line Rapid Transit Project Business Case Executive Summary. February 2008. Reviewed by

Evergreen Line Rapid Transit Project Business Case Executive Summary. February 2008. Reviewed by Evergreen Line Rapid Transit Project Business Case Executive Summary February 2008 Reviewed by Recommendation and Executive Summary The business case for the Evergreen Line Rapid Transit Project (the Project)

More information

Commuter Choice Certificate Program

Commuter Choice Certificate Program Commuter Choice Certificate Program Current course offerings (subject to change) Core 1 Commuter Choice Toolbox Required Courses Rideshare Options Audience: This 2 credit required course is targeted to

More information

for the National Capital Transportation Element

for the National Capital Transportation Element for the National Capital Transportation Element N A T I O N A L C A P I T A L P L A N N I N G C O M M I S S I O N for the National Capital for the National Capital 77 Federal Elements Transportation contents

More information

Environmental Impact Statement for the Washington Union Station Expansion Project

Environmental Impact Statement for the Washington Union Station Expansion Project This document is scheduled to be published in the Federal Register on 11/04/2015 and available online at http://federalregister.gov/a/2015-28079, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION

More information

GOALS, OBJECTIVES, AND EVALUATION MEASURES

GOALS, OBJECTIVES, AND EVALUATION MEASURES GOALS, OBJECTIVES, AND EVALUATION MEASURES The Tallahassee-Leon County MPO is developing its first Bicycle and Pedestrian Master Plan, a 20- year plan that provides guidance for the development of facilities

More information

APPENDIX F:TRIPLE BOTTOM LINE ANALYSIS

APPENDIX F:TRIPLE BOTTOM LINE ANALYSIS APPENDIX F:TRIPLE BOTTOM LINE ANALYSIS Triple Bottom Line Analysis Map (TBLAM) Project or Decision: College Ave Corridor for FC Moves long range transportation plan for College Ave., for redevelopment

More information

Job Access and Reverse Commute (JARC) and New Freedom Funding Recommendations Item 7 June 19, 2013

Job Access and Reverse Commute (JARC) and New Freedom Funding Recommendations Item 7 June 19, 2013 National Capital Region Transportation Planning Board Job Access and Reverse Commute (JARC) and New Freedom Funding Recommendations Item 7 June 19, 2013 1 2013 Solicitation Details Solicitation Details

More information

Figure 4-21. L3: Level 2 SR 99 Elevated Light Rail Alternative Detail - 1 of 4

Figure 4-21. L3: Level 2 SR 99 Elevated Light Rail Alternative Detail - 1 of 4 4-34 SEE FIGURE 4-22 N 14TH ST ROOSEVELT WAY N 130th Street N 130TH ST NE NORTHGATE WAY N 0 1/4 Miles Elevated Light Rail At-Grade Light Rail Elevated Light Rail Station At-Grade Light Rail Station Figure

More information

Rappahannock- Rapidan Regional Commission

Rappahannock- Rapidan Regional Commission Rappahannock- Rapidan Regional Commission Last Updated January 2011 RAPPAHANNOCK-RAPIDAN REGIONAL The Virginia Department of Transportation (VDOT) and the Rappahannock-Rapidan are partnering to evaluate

More information

Mount Royal College Transit Service Plan

Mount Royal College Transit Service Plan Mount Royal College Transit Service Plan Background In 2007 November response to Council Report C2007-78 West LRT Alignment, Budget and Project Delivery, Council directed the Administration to report back

More information

Los Angeles Metro Rapid

Los Angeles Metro Rapid Los Angeles Metro Rapid Why BRT In Los Angeles Public dissatisfied with slow bus service Average bus speeds had declined by 10% since late- 1980s LADOT found that 50% of the time a bus is in service it

More information

College of Southern Maryland. Hughesville Transportation Study

College of Southern Maryland. Hughesville Transportation Study College of Southern Maryland Project Overview Existing Conditions Transit Service Land Use CSM Student Demographics Recommendations Methodology Transit Recommendations Transportation Demand Management

More information

THE COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS HIGHWAY DEPARTMENT PROJECT INITIATION FORM (PIF)

THE COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS HIGHWAY DEPARTMENT PROJECT INITIATION FORM (PIF) THE COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS HIGHWAY DEPARTMENT PROJECT INITIATION FORM (PIF) To: From: Contact Information: Roland Bartl, Planning, Town of Acton, 472 Main St. Acton MA 01440; 978-264-9639;

More information

Narrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22)

Narrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22) Narrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22) 2. For Bicycle and Pedestrian Projects: Clearly indicate the location, length, width, surface materials, and any

More information

How To Make A Bike/Pedestrian Advisory Committee Meeting A Success

How To Make A Bike/Pedestrian Advisory Committee Meeting A Success Meeting Notes Virginia Statewide Bicycle and Pedestrian Advisory Committee Summer Meeting 12th Floor North Conference Room 600 E. Main St Richmond, Virginia 23219 August 6th, 2014 10am 2:30pm Attendees:

More information

Joint Development and Real Estate Committee. Board Item I-A. March 25, 2010

Joint Development and Real Estate Committee. Board Item I-A. March 25, 2010 Joint Development and Real Estate Committee Board Item I-A March 25, 2010 Negotiate and Execute an Easement Agreement with the District of Columbia for the Metropolitan Branch Trail Bridge at Rhode Island

More information

Examples of Transportation Plan Goals, Objectives and Performance Measures

Examples of Transportation Plan Goals, Objectives and Performance Measures Examples of Transportation Plan Goals, Objectives and Performance Measures The next step in the Long Range Transportation Plan (LRTP) process is to develop goals, objectives, and performance measures.

More information

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES Background One of the most critical public services provided by a community is the community s transportation system. An effective

More information

Decision-Making Structure and Process

Decision-Making Structure and Process MEMORANDUM Decision-Making Structure and Process This memo, which was adopted by the Oversight Team during their September 27, 2006 meeting, describes the decision-making structure and process for delivering

More information

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.1 FINANCIAL ANALYSIS The cost of a transportation investment falls into two categories: capital costs, and operating and maintenance (O&M) costs.

More information

Technical Memorandum PERFORMANCE MEASURES. Prepared by:

Technical Memorandum PERFORMANCE MEASURES. Prepared by: Technical Memorandum PERFORMANCE MEASURES Prepared by: March 2014 TABLE OF CONTENTS Executive Summary... 1 1. Introduction... 2 1.1 Performance Measures and the Public Sector... 2 1.2 National Focus: MAP

More information

Florida s Transportation Visioning Summit Summary

Florida s Transportation Visioning Summit Summary Florida s Transportation Visioning Summit Summary Introduction The Florida Department of Transportation (FDOT) convened Florida s Transportation Visioning Summit on December 17, 2014 in Lake Buena Vista.

More information

Tier 1 Strategies. WV Route 14 Corridor Management Plan

Tier 1 Strategies. WV Route 14 Corridor Management Plan 1.1 1.2 1.3 1.4 Signal timing optimization system improvements. Improve geometry traffic control at high crash intersections. Construct intersection capacity improvement projects. Widen longer sections

More information

The Mount Vernon Council of Citizens Associations, Inc. P.O. Box 203, Mount Vernon, VA 22121-9998

The Mount Vernon Council of Citizens Associations, Inc. P.O. Box 203, Mount Vernon, VA 22121-9998 The Mount Vernon Council of Citizens Associations, Inc. P.O. Box 203, Mount Vernon, VA 22121-9998 Supervisor Gerald Hyland Mount Vernon Magisterial District 2511 Parkers Lane Mount Vernon, VA 22306 23

More information

Consulting Services. Safe Routes to School Technical assistance for school districts and municipalities seeking to improve walking/biking to school.

Consulting Services. Safe Routes to School Technical assistance for school districts and municipalities seeking to improve walking/biking to school. BikeWalkKC is the leader in improving walking and bicycling in greater Kansas City. Our educational, professional development, and consulting services empower citizens, communities, and professionals for

More information

Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections

Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections Phil Erickson Community Design + Architecture Mike Johnson HDR Engineering CTF Charrette Approach

More information

Bus Priority Measures in Calgary: Past, Present and Future. Chris Jordan, M.Sc., P.Eng., Coordinator, Strategic Transit Planning, Calgary Transit

Bus Priority Measures in Calgary: Past, Present and Future. Chris Jordan, M.Sc., P.Eng., Coordinator, Strategic Transit Planning, Calgary Transit Bus Priority Measures in Calgary: Past, Present and Future Chris Jordan, M.Sc., P.Eng., Coordinator, Strategic Transit Planning, Calgary Transit Nora Kajdy, P.Eng., Transit Priority Engineer, Calgary Transit

More information

Median Bus Lane Design in Vancouver, BC: The #98 B-Line

Median Bus Lane Design in Vancouver, BC: The #98 B-Line Li 1 Median Bus Lane Design in Vancouver, BC: The #98 B-Line Simon Li, P.Eng. PTOE Acting Program Manager, Road and Bridge Projects TransLink (Greater Vancouver Transportation Authority) 1600 4720 Kingsway

More information

INDOT 2000-2025 Long Range Plan

INDOT 2000-2025 Long Range Plan Chapter 9 INDOT 2000-2025 Long Range Plan Highway Needs Analysis Overview The statewide transportation planning process provides for the identification of highway needs through a comprehensive process

More information

The mission of the Division of Transit Services is to provide an effective mix of public transportation services in Montgomery County.

The mission of the Division of Transit Services is to provide an effective mix of public transportation services in Montgomery County. Transit Services MISSION STATEMENT The mission of the Division of Transit Services is to provide an effective mix of public transportation services in Montgomery County. BUDGET OVERVIEW The total approved

More information

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016 Rapid City Downtown Area Master Plan Draft Plan Concepts April 2016 CALL TO ACTION! A Thriving Downtown = Regional Economic Prosperity Rapid City is competing nationally for a limited supply of young skilled

More information

2012 Saskatoon Transit Services Annual Report

2012 Saskatoon Transit Services Annual Report 2012 Annual Report Saskatoon Transit provides a high quality of service for all citizens in our community, and is undertaking initiatives focused on building its ridership. Like most North American cities,

More information

01/31/13 ACHIEVING THE VISION FOR RESTON. Reston Master Plan Special Study Task Force

01/31/13 ACHIEVING THE VISION FOR RESTON. Reston Master Plan Special Study Task Force ACHIEVING THE VISION FOR RESTON Reston Master Plan Special Study Task Force The Reston Master Plan Special Study Task Force was appointed by Hunter Mill District Supervisor Catherine Hudgins to review

More information

Financial Plan Status Report

Financial Plan Status Report Financial Plan Status Report Broward MPO Board March 13, 2014 Financial Sub-Committee Membership SFRTA (lead agency) Broward MPO FDOT Miami-Dade MPO Palm Beach MPO South Florida Regional Planning Council

More information

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates SANTA MONICA TRAVEL DEMAND FORECASTING MODEL TRIP GENERATION RATES SUBMITTED BY: 201 Santa Monica Blvd., Suite 500 Santa Monica,

More information

Proposed Service Design Guidelines

Proposed Service Design Guidelines Proposed Service Design Guidelines July 2015 I. Introduction During Phase II of the Reimagining CityBus project, feedback from public outreach and data analysis conducted during Phase I of the project

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

Pedestrian & Bicycle Plan

Pedestrian & Bicycle Plan RAMSEY COMMUNITIES COUNTYWIDE Pedestrian & Bicycle Plan PRIMER: LEGAL FRAMEWORK PRIMER: LEGAL FRAMEWORK Walking and Biking for All e 2 CHAPTER 2: Walking and Biking for All This page intentionally left

More information

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total

More information

Lincoln Downtown Master Plan Update

Lincoln Downtown Master Plan Update Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating

More information

Commuter Benefits to Promote Cycling

Commuter Benefits to Promote Cycling Commuter Benefits to Promote Cycling Andrea Hamre PhD Student Research Assistant to Dr. Ralph Buehler Urban Affairs & Planning Virginia Tech National Capital Region The Role of Commuter Benefits in Shaping

More information

5-Year CIP Period: Projects by Function

5-Year CIP Period: Projects by Function s by Function Does not include specific non-county managed programs such as Northern Virginia Regional Park Authority and the Water Authority Community Development - Action Plan Review Team (APRT) - Amenity

More information

Doing a little can accomplish a lot. Proposed Change of Municipal Class Environmental Assessment from Schedule from B to A+

Doing a little can accomplish a lot. Proposed Change of Municipal Class Environmental Assessment from Schedule from B to A+ Doing a little can accomplish a lot. Proposed Change of Municipal Class Environmental Assessment from Schedule from B to A+ Erin Mills Parkway Intersections at Dundas Street and Burnhamthorpe Road Index

More information

PART II SCHEDULE. Scope of Services. Special Terms and Conditions. Virginia Railway Express

PART II SCHEDULE. Scope of Services. Special Terms and Conditions. Virginia Railway Express PART II SCHEDULE SECTION TITLE D E Scope of Services Special Terms and Conditions 11 SECTION D SCOPE OF SERVICES D.1 OVERVIEW A. The selected firm is referred to herein as either the Consultant or the

More information