CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND)
|
|
- Adelia Rose Lindsey
- 5 years ago
- Views:
Transcription
1 Regional Transportation Plan CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND) The Cache Transportation Vision Plan shows roadway, bicycle, transit and pedestrian projects that attempt to address the needs identified in the previous sections. The plan attempts to define what is needed and also what we can afford to build given the anticipated future revenues. This exercise is necessary to produce a fiscally constrained plan as required by the federal government. This also helps local jurisdictions understand the resources available and what funding gaps might exist. The Transportation Vision Plans also attempts to implement the recommendations from the Cache Valley Vision recommendation that was the result of the Envision Cache Valley process. Collectively these plans constitute the CMPO s long term vision of the future as it relates to Cache County s transportation system. In most cases the improvements described in the plans are consistent with the planning documents of participating local jurisdictions. The contents of the CMPO Vision Plans constitute recommendations and become official only as recognized by the individual jurisdiction s planning documents TRANSPORTATION FUNDING They do not suggest endorsement of any particular tax or transportation funding solution on the part of the CMPO or the Executive Council. This effort is also not intended to craft optimal public taxing policy to fund transportation infrastructure. Rather it is a statewide attempt to develop a reasonable set of funding assumptions that are based, at least in part on the history of the Federal Government and the Utah State Legislature as it relates to funding transportation infrastructure. The amount and identified funding mechanisms in all likelihood will end up different than what is described. Increased statewide economic growth that results in greater than expected increase in revenue from existing funding sources would also eliminate the need to even consider additional funding sources STATEWIDE FUNDING ASSUMPTIONS The following statewide assumptions regarding longterm funding for transportation projects in Utah are drawn collectively from all concurrent transportation plans (part of Utah s Unified Plan) and included in the CMPO Regional Transportation Plan. Funding assumptions for the 2011 update to the 2035 Cache Regional Transportation Plan are based on coordination between the four Utah MPOs (Cache, Dixie, Wasatch Front, and Mountainland) and UDOT. Utah follows an advanced practice in the development of a Unified Transportation Plan, encompassing a summary of the Regional Transportation Plan of each of the four MPOs as well as the rural areas planned by UDOT. In order to ensure consistency for this Unified Plan, each individual Regional Transportation Plan followed a common set of demographic, financial, cost estimating, and related assumptions. Therefore, the cost assumptions included in the CMPO Regional Transportation Plan Update are consistent with those made statewide. This section is a response to the Federal requirement to produce a financially constrained Regional Transportation Plan. Future transportation funding assumptions are developed for planning purposes only. Federal funds and programs are projected to increase at a rate of two percent per year. State B&C program are projected to continue at present 30 percent of total fuel tax revenue. All financial assumptions are presented in future year dollar values including inflation. Currently 50% of all auto related sales tax statewide goes to dedicated funding sources for transportation. The remainder goes to the Utah State general fund. For planning purposes, it is assumed that by 2015, 75% of auto related sales tax statewide is dedicated to transportation with that increasing to 100% by This does not represent any new tax, rather a reallocation of how the existing tax revenue is allocated. For planning purposes, the revenue projections generated for this report assumes a 5 cent increase in statewide fuel tax (or some other equivalent) in 2014, 2024 and For planning purposes, this report assumes a $10 statewide increase in vehicle registration fees in 2018, 2028 and 2038.
2 Regional Transportation Plan LOCAL TRANSPORTATION FUNDING ASSUMPTIONS Voter approved, additional ¼ cent local option sales tax for transportation sometime before ESTIMATED HIGHWAY FUNDING FOR CACHE COUNTY After applying the funding assumptions as described, Cache County s total 2035 estimated available roadway capacity funding is $712 million. This includes all anticipated Federal ($53 million), State ($497 million) and local funds ($166 million). However, it should be noted that this assumes an even distribution of state s capacity transportation improvement funds based on Cache County s share of the state s population (currently 4%). Based on this approach (state Unified Plan method) state funds are the largest source of available roadway capacity funding anticipated for Cache County. While this is a reasonable approach for long term planning purposes, it does pose somewhat of a challenge for Cache County. Unless there is a change in state policy, state appropriated capacity funds can only be applied on state (UDOT) roads. Also, in practice the state appropriated funds are not distributed based on improvements, Cache County has not historically been allocated (on average) 4% of the state s transportation capacity funding. In addition to lacking eligible state roads, this is also largely because Cache County must compete for state (UDOT) funding with bigger urban areas in the state with higher levels of congestion and in some cases faster population growth rates. For purposes of this plan, the CMPO assumption is that Cache County will receive 2% of the statewide highway capacity increasing funds in all years of the plan (see Figure 9 & Table 3). Under this assumption, just over $712 million in total funds are anticipated between 2011 and Figure 9: Cache 2035 Highway Funding Sources State 71% Local 23% Federal 6% If history is any indicator (over the last 20 years), while representing 4% of the state s population, Cache County has received (on average) only 1% of the state s funds allocated for transportation capacity improvements. any geographic equity formula using the county s population. The Utah Transportation Commission allocates these funds based largely on statewide transportation and traffic congestion need. Lacking an interstate freeway and also being somewhat underserved by existing state routes that are well positioned and therefore attractive for UDOT Table 3: 2035 TOTAL HIGHWAY FUNDING BY PHASE Phase I Phase II Phase III Federal $21,196,824 $20,545,448 $11,902,959 State $130,255,971 $202,126,479 $165,216,323 Local $43,681,449 $71,152,477 $50,916,323 $195,134,243 $293,824,404 $228,036,280 Total Funds Available all Phases $712 Million 2035 ESTIMATED TRANSIT FUNDING FOR CACHE COUNTY The majority of the funds used by the Cache Valley Transit District (CVTD) are from a local option sales tax. This has been approved by a number of communities that make up the CVTD service area. A mixture of local
3 Regional Transportation Plan sales tax funds and federal funds help provide the operational revenue needed to run the CVTD bus system. This includes staffing (bus drivers and support staff) as well as ongoing maintenance and fuel. Federal funds are used largely to help pay capital expenditures (e.g. purchase of replacement or expansion buses) as well as the cost of providing service support facilities (e.g Transit and operation/maintenance center). Some of the federal funds received by CVTD are distributed based on a formula applied by the Federal Transit Administration (FTA 5311, FTA 5307). However, unlike highway funds, much of the federal funding for capital transit expenditures comes from discretionary grants or earmarks. In the past CVTD has been successful in securing grants for the purchase of new and replacement buses as well as to construct facilities such as the transit center and the current operation/maintenance facility. However, due to the discretionary nature of some of this funding; it is difficult to estimate future revenues for the next 30 years. Table 4 shows the total expected transit funding to the year It should be noted this is the total revenue available for both system operation and capital. With transit service operational expenses represent the largest category of expenses. Table 4: 2035 TOTAL TRANSIT FUNDING BY PHASE Phase I Phase II Phase III Federal $17,994,611 $21,460,112 $12,260,683 State Local $72,267,990 $141,991,772 $101,608,535 $134,197,661 $235,388,730 $113,869,218 Total Funds Available all Phases $367 Million 2035 ESTIMATED BICYCLE & PEDESTRIAN FUNDING FOR CACHE COUNTY Many of the anticipated bicycle and pedestrian improvements (e.g. bike lanes, sidewalks and in some cases shared-use pathways or trails) to the year 2035 will be completed either as part future roadway improvement projects or required of developers as new development occurs (required by most city ordinances). However, there will still be significant needs in terms of completing missing linkages and retrofitting bicycle and pedestrian facilities in already developed areas. There also will be a need to provide system-wide improvements. In Cache County, there is not a consistent annual funding source for bicycle and pedestrian type improvements (however various communities will often budget a small portion of their general funds or impact fee revenues to these types of improvements). Typically, most of the funding sources that have been used for non-motorized types of improvements in Cache County have come from competitive grants. From the federal government these have included Transportation Enhancement Grants (TE) and a newer source called Congestion Mitigation & Air Quality (CMAQ). These sources are allocated based on project merit (and programmatic intent) either locally or at a statewide level. The State of Utah also funds some non-motorized trail projects based on a competitive selection process. A major source of additional local funding is the countywide Restaurant and Recreation, Arts, Parks and Zoos (RAPZ) tax. Jurisdictions with trails and pathways projects that have some recreational benefit (often with duel transportation use) are eligible to apply. Table 5 shows the estimated 2035 available funding for eligible bicycle and pedestrian related projects. Since all of these funds are dependent on project merit and successfully earning funding through competitive applications, some assumptions were necessary based on the county s past history.
4 Regional Transportation Plan For purposes of planning, the following 2035 assumptions were used for bicycle and pedestrian related projects revenue: Cache County receives $500,000 in Transportation Enhancement Grants about every 4 years (along with some funds already programmed for 2011 & 2013). 25% of the anticipated revenue from CMAQ for Cache County will be used for bicycle and pedestrian related projects. Cache County will receive a $50,000 Non-motorized State Trails grant about once every 5 years. 25% of the anticipated revenue from RAPZ tax for Cache County will go to bicycle and pedestrian related projects. Local jurisdictions will contribute or match a combined $20,000 per year (that grows annually by 2%) for bicycle and pedestrian projects. Table 5: 2035 TOTAL BICYCLE AND PEDESTRIAN FUNDING BY PHASE Phase I Phase II Phase III Federal $3,209,281 $2,591,130 $1,921,817 State $100,000 $100,000 $50,000 Local $3,520,691 $5,645,069 $4,003,209 $6,829,972 $8,336,199 $5,975,027 Total Funds Available all Phases $21 Million ENVIRONMENTAL CONSIDERATIONS Environmental impacts and trade-offs were analyzed and considered as part of developing this plan and ultimate project selection. Potential particulate matter (PM 2.5) air quality impacts were evaluated to establish that this plan meets the EPA interim air quality conformity test (See appendix 1). The EPA requires an detailed analysis to document that mobile source PM 2.5 emissions resulting from projected growth in vehicle miles traveled in the last year of this plan is less than 2008 levels. For the various Cache Valley growth scenarios developed as part of Envision Cache Valley process (see appendix 9), information was provided to the public and community officials comparing the relative environmental impacts of each of the described futures. Environmental factors considered by the Envision Cache Valley process included the impact of growth on water quality (and quantity), residential energy consumption, prime agricultural, wetlands and air quality. Additionally, to the extent practicable, transportation improvements have been situated in the more developed core areas to be supportive of increased land use densities and minimize urban sprawl. This is consistent with the recommendations of Envision Cache Valley to accommodated most of the growth in the incorporated cities. Finally, the CMPO utilized a new environmental planning tool provided by UDOT. Uplan is a web based mapping and analysis tool that delivers relevant and up-to-date geographic environmental map data. The tool allowed draft CMPO projects to be evaluated relative to proximity to environmentally sensitive locations. The system also was able to produce a number of project specific environmental summary reports. These reports were used to evaluate the merits of various projects. It should also be noted that all federally funded projects will need to meet the requirements of the National Environmental Policy Act (NEPA). This law requires extensive environmental resource evaluation and analysis as well as significant public involvement for any federally funded project. The State of Utah has a similar process for state funded projects. It is the intent of the CMPO to integrate long range planning and NEPA by attempting to utilize quality environmental resource information as early as possible in the planning process.
5 Regional Transportation Plan CMPO HIGHWAY VISION PLAN The 2035 CMPO Roadway Vision Plan shows those projects that are needed to provide a reasonable level of mobility (based on computer based travel demand modeling) for future years (see Figure 10). Table 6 shows what can be afforded with anticipated federal, state and local roadway eligible funds to the year Table 7 shows the projects that are considered unfunded (based on future revenue estimates) however they should be considered for future inclusion as funding becomes available. Table 8 shows potential maintenance or operational roadway improvements. These are generally not capacity motivated improvements (such as adding additional lanes). These are important roadway improvements that are needed to correct some sort of roadway deficiency and may include such things as pavement rehabilitation, shoulder widening or corrections of roadway or intersection deficiency (such as poor roadway or intersection geometry). Funding for these projects has not been specifically identified. The reason these projects have been acknowledged is because they represent a serious and growing problem that will only get worse with time. This is largely because State category B and C road maintenance funds received by Cache County Corporation and each individual city have not been keeping pace with the need. This funding challenge is not unique to Cache County and will need to be addressed at the state and local levels. Figure 11 shows the year 2035 peak hour traffic congestion (modeling estimates) that would likely result if all of the financially constrained projects were built. This should be compared with Figure 6 in the needs section of this plan.
6 Regional Transportation Plan Figure 10: Cache 2035 Highway Vision Plan (Financially Constrained Projects)
7 Regional Transportation Plan Phase Project # TABLE 6: 2035 Highway Capacity Projects Length (Miles) Project Name Description Lanes 2010 Cost Inflated Cost th West US 89/91 to 2500 N & portion of 2500 N 4 Lanes, Median $56,000,000 $56,000, SR 30 ~1400 West to Main Street, Logan 4 Lanes, Median $36,000,000 $41,760, East So #1 300 South to Center Street, Logan 2 Lanes, Median $10,115,510 $11,733, East Logan Center Street to 1400 North, Logan Operational & Safety to 10th $7,740,000 $8,978,400 4 Lanes, Median 10th to 14th West South Hwy 89/91 to 400 North, Logan 2 Lanes, Median $14,440,232 $16,750, W Logan so 600 South to Hwy 165, Logan 2 Lanes, Median $6,982,445 $8,099, East North 2200 North to 2500 North, No Logan 2 Lanes, Median South Hwy 89/91 to Hwy Lanes, Median $4,392,427 $5,095, South Hwy 89/91 to 1600 West, Nibley 2 Lanes, Median $2,031,800 $2,356, East So # South to 100 East Intersect, Logan 2 Lanes, Median $4,383,724 $6,838, Western Art Hwy 89/91 to Hwy 218, Logan to Smithfield 4 Lanes, Median $100,684,944 $157,068, SR 101 Hyrum Hwy 89/91 to 200 West, Hyrum 4 Lanes, Median $24,443,994 $38,132, Canyon Rd 300 South to 400 North, Logan 4 Lanes, Median $14,713,733 $22,953, East North 1400 North to 1800 North, Logan 4 Lanes, Median East North 2500 North to Hyde Park Lane, Hyde Park 2 Lanes, Median $10,500,107 $16,380, UDOT SR 30 Rural UDOT Cache County line to 1900 W. 4 Lanes, Median $106,000, Hwy 89/ South to Y Intersection, Logan 6 Lanes, Median $40,659,202 $63,428, East Hwy 89 to 300 North, Hyde Park 2 Lanes, Median $25,141,505 $39,220, W. Prov 100 North to 2300 So, Providence 2 Lanes, Median $7,742,495 $14,246, W Nibley 300 North Hyrum to Hwy 89/91 Logan 2 Lanes, Median $28,475,795 $52,395, Mendon Road 10th West to 100 East, Mendon 4 Lanes, Median $62,465,175 $114,935, Hwy 91 North 2500 North to Hyde Park Lane, Hyde Park 6 Lanes, Median $43,687,940 $80,385,809 Phase Project # TABLE 7: Unfunded Highway Capacity Projects (To be Considered for future Inclusion) Length (Miles) Project Name Description Lanes 2010 Cost Inflated Cost East Logan 300 South to 400 North, Logan 2 Lanes, Median $6,412,646 $10,003, Old North to 200 South, Millville 2 Lanes, Median $15,601,424 $24,338, N Wells Hwy 89/91 to Center, Wellsville 2 Lanes, Median $8,265,681 $12,894, Center HP Hwy 91 to 400 East, Hyde Park 2 Lanes, Median $7,298,601 $11,385, S. Smith 800 West to East Smithfield 2 Lanes, Median $8,258,261 $12,882, N No 1200 East to Hwy 91, North Logan 2 Lanes, Median $10,653,786 $16,619,906 Logan Airport Rd 1000 West to 3400 North, Logan 4 Lanes, Median $18,022,332 $28,114, W Logan 500 North to 2500 North, Logan 2 Lanes, Median $18,908,868 $29,497, West North 400 North to 2500 North, Logan 2 Lanes, Median $18,879,096 $29,451, E Logan 400 North to 2500 North, Logan 2 Lanes, Median $19,051,735 $29,720, N Prov Hwy 165 to 300 East, Providence 2 Lanes, Median $9,898,031 $15,440, W No Lo 2500 North Logan to 600 South, Smithfield 4 Lanes, Median $18,589,306 $28,999, East North 1800 North to 2200 North, No Logan 4 Lanes, Median East North 2200 North to 2500 North, No Logan 4 Lanes, Median $3,305,690 $5,156, W. Prov 2300 So. To Mill Road, Millville 2 Lanes, Median $5,530,205 $8,627,120 TABLE 8: Unfunded Highway Maintenance Projects (Need Pavement, geometric or operational improvments) Phase Project # Length (Miles) Project Name Description Lanes 2010 Cost 2400 West, Amalga Pavement Rehab, Shoulder 2 Lanes, Median $600, East, Hyrum Pavement Rehab, Shoulder, Intersections 2 Lanes, Median $808, Inflated Cost
8 Regional Transportation Plan Figure 11: 2035 Estimated Peak Hour Traffic Congestion (with Highway Vision Plan Projects)
9 Regional Transportation Plan TRANSIT VISION PLAN With steady population growth in Cache County and increasing levels of projected traffic congestion, demand for public transit service is expected to increase. To accommodate this expected demand for additional service, the following elements of service expansion are included as part of the CMPO s Transit Vision Plan (see figure 12). Separated (bus only) right-of-way lanes (can operate portions in mixed traffic if needed) Rapid boarding from enhanced loading platforms Special branded or styilized bus vehicles Fast, frequent and reliable (bus frequency less than every ½ hour) YEARS 2011 TO 2020 This period is marked by substantial expansion in the levels of service offered mostly to the existing service areas. This would include: Increased bus frequency for all CVTD routes during peak times. Expand Countywide Para-transit Extended service hours Additional major destination route Study the appropriate bus service on Sundays Main Street Service (e.g. bus trolley connecting Logan downtown with Utah State University) Construction of a new transit maintenance and operations service center Add Automated Vehicle Location service for all routes (e.g. real time texting of bus arrival time) YEARS 2021 TO 2035 This period is characterized by internal expansion as well as making external transit connections to include: All-day express connector service to Brigham City/Ogden (UTA Frontrunner) Introduce bus circulator shuttles to Smithfield, North Logan & Hyrum. Introduce elements of Bus Rapid Transit BEYOND 2035 BUS RAPID TRANSIT (BRT) Bus Rapid Transit (BRT) is a premium form of rapid transit that provides similar levels of service as traditional light rail. However, for most applications, BRT can be implemented much cheaper than traditional light rail. BRT also allows for more flexibility in terms of the operational design. Some characteristics of optimal BRT include: BRT is proposed as part of the Cache Transit Vision Plan (See Figure 12) roughly on the main street corridor from Hyrum to Smithfield along with a spur to Utah State University. The largely linear north-south development pattern of Cache County makes BRT attractive as a possible enhanced transit solution. Planning and right-of-way preservation activities for BRT should begin now in Cache County. Because specific funding has not been identified, BRT was not used for any of the traffic analysis or air quality conformity modeling in this plan. BRT is presented for planning purposes only. However, since the technology can be implemented incrementally (fixed route bus change to express bus and eventually bus rapid transit), elements of BRT may begin during the life of this plan. CACHE COUNTY PASSENGER RAIL As a longer term option, heavy rail or commuter passenger rail for Cache County should be explored. This likely would include evaluating options for future rail construction adjacent to the current Union Pacific Cache Valley rail spur to connect to Union Pacific s main line. It is not at all clear when or if this type of transportation facility would be justified in terms of ridership or cost effectiveness. However, in order to potentially preserve opportunities and to reduce future right-of-way or construction costs, the region should begin to explore the feasibility and cost effectiveness of this type of service and begin to plan accordingly.
10 Regional Transportation Plan ROADWAY BUILDOUT VISION PLAN (BEYOND 2035) In the long term (beyond 2035), additional roadway improvements will be needed to accommodate Cache County s growth. The Cache Buildout Roadway Vision Plan (See Figure 13) assumes a rough buildout of the current land use plans for all communities in the valley. It proposes a version of the future roadway network that will be needed. This plan is for illustrative purposes only. Improvements identified have not been financially constrained nor have they been evaluated for air quality conformity purposes. This plan attempts to incorporate the longer term transportation master plans of communities to the extent possible. The plan should be used as a joint tool used by the CMPO and local communities and Cache County to ensure planning consistency. Local officials should exercise caution when using the plan to require right-of-way dedications. In many cases, the alignments listed might need more detailed attention and study before they are incorporated into local planning documents. Whenever proposing solutions that are more than 30 years in the future it should be noted that many of the assumptions used will likely change. Assumptions that are subject to long term change include things like car ownership rates, vehicle fleet characteristics, fuel prices, changes in land use patterns and shifts in Cache County s employment types. Nonetheless, it is important to attempt to evaluate and plan for longer term transportation facilities to ensure preservation of rights of way and evaluate possible impacts. Over time, this plan will need continual adjustment and refinement as land use policies and development trends change.
11 Regional Transportation Plan Figure 12: Cache 2035 Transit Vision Plan
12 Regional Transportation Plan Figure 13: Cache Buildout Roadway Vision Plan (2035 and Beyond)
13 Regional Transportation Plan BICYCLE AND PEDESTRIAN VISION PLAN This section is intended to identify short and long term bicycle and pedestrian needs and appropriate solutions to increase transportation choice in Cache County. The plan focuses primarily on the needs of these modes as they relate to transportation. This means not only the commuter, but also the student or shopper, or anyone who makes a trip by walking or cycling instead of by automobile. These two modes do overlap into recreation and the proposed solutions will certainly be a benefit to the recreational cyclist and walker. TRAILS, PATHWAYS AND BIKE ROUTES Communities in Cache County have proposed over 240 miles of new trails and pathways. Another 196 miles have been proposed in the unincorporated portions of the county (See Figure 14). In some cases these identified pathways might be recreational single track (unpaved) trails or urban (paved) shared use paths (at least 10 feet wide paths to accommodate both pedestrians and bicyclist) or in some cases sidewalks (at least 10 feet wide). The proposed plan is largely a mapped assemblage of the trail plans of most of the communities in Cache County. Some added consideration was given for providing regional linkages were necessary. Figure 15 shows the proposed on-road Bike Route Vision Plan for Cache County. These routes are generally located on existing roads (shoulders or mixed traffic) and usually distinguished by road signage (and in some cases pavement markings). A portion of the proposed regional bike route has been completed with signage (shown in blue). This plan makes no attempt to prioritize implementation or construction scheduling for the trails, pathways or bike routes identified. With the uncertainty of funding (allocated largely through competitive grants) and the difficulty of assigning costs to projects (each project is unique with vastly different right-of-way and construction costs) no attempt was made to constrain the plan financially. However, future efforts should be directed toward prioritizing trail and pathway projects and linkages. Priorities should be based on a project s ability to serve the largest population, provide safe linkages to high use activity centers and its ability to accommodate the needs of a concentrated special needs populations (e.g. children or those without a car). Also, since trips on public transit often begins and ends via walking or biking, priority should be given to those projects that are positioned to support transit stops and connections. Priorities should also be given to facilities that support schools (Safe Routes to School) or other educational institutions. ADDITIONAL 2035 BIKE AND PEDESTRIAN PROJECTS In addition to the trails, pathways and bike routes identified in figures 14 & 15, the following bicycle and pedestrian related projects or programs have been identified through public involvement and the CMPO s Bicycle and Pedestrian Advisory Committee (BPAC). Upper Boulevard Trail Completion- (Short Dugway aka 600 East, Logan): roadway crossing solution (e.g. overpass) Close Gaps in Sidewalk Connectivity -(all urban or urbanizing communities): identify network gaps and install sidewalks as necessary Accelerate Repair/Replacements of Deteriorated Sidewalks-(all urban or urbanizing communities) Lower Boulevard Trail Bicycle/Pedestrian Underpass crossings-(center Street and 200 East, Logan near Merlin Olsen Park): Construct street crossing underpasses (both are included as part of 200 East roadway improvement project Environmental Assessment) South Logan Highway 89/91 Crossing-(near Y Intersection, Logan): enhanced roadway pedestrian & bicycle crossing solution (e.g. underpass) Install High Visibility Pedestrian Flags -(appropriate high pedestrian use non-signalized intersections in all communities) Non-signalized Crosswalk Enhancements- (200 North between 100 W. & 600 W. & Logan Downtown mid-block store back walkway from 300 North to 100 South and other busy roads that have heavy foot crossing traffic based on an inventory): provide pavement markings, traffic calming and adequate lighting Create Trail, Pathway and Bikeway User Map- (countywide): Hardcopy and web based version On-street Pavement Markings-(Countywide where appropriate): Provide shared lane sharrow or bike lane striping
14 Regional Transportation Plan Figure 14: Cache Bicycle and Pedestrian Vision Plan (Trails and Shared Use Pathways)
15 Figure 15: Cache On-road Bike Routes Vision Plan Regional Transportation Plan
Examples of Transportation Plan Goals, Objectives and Performance Measures
Examples of Transportation Plan Goals, Objectives and Performance Measures The next step in the Long Range Transportation Plan (LRTP) process is to develop goals, objectives, and performance measures.
ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A
ORANGE COUNTY TRANSPORTATION AUTHORITY Final Long-Range Transportation Plan - Destination 2035 Attachment A DESTINATION 2035 DESTINATION 2035 EXECUTIVE SUMMARY ATTACHMENT A Moving Toward a Greener Tomorrow
Implementation Strategy
Implementation Strategy 6 The following implementation strategy defines strategic points of intervention for complete streets programming, including visioning, goal-setting, local agency plans, coordination
KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs
KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality
Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011
Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for
Executive Summary. Transportation Needs CHAPTER. Existing Conditions
CHAPTER 1 Executive Summary The City of Forest Grove Transportation System Plan (TSP) was updated to keep it consistent with recent growth trends in the city and other transportation planning efforts in
Florida s Transportation Visioning Summit Summary
Florida s Transportation Visioning Summit Summary Introduction The Florida Department of Transportation (FDOT) convened Florida s Transportation Visioning Summit on December 17, 2014 in Lake Buena Vista.
South Carolina Multimodal Transportation Plan Vision, Goals, Objectives, and Performance Measures
South Carolina Multimodal Transportation Plan Vision, Goals, Objectives, and Performance Measures Prepared for: Prepared by: June 2013 TABLE OF CONTENTS 1. Introduction... 1 1.1 Baseline Understanding...
12MAP-21, a funding and authorization bill to govern U.S. federal surface MONITORING IMPLEMENTATION AND PERFORMANCE
MONITORING IMPLEMENTATION AND PERFORMANCE 12MAP-21, a funding and authorization bill to govern U.S. federal surface transportation spending, creates a data-driven, performance-based multimodal program
Pedestrian & Bicycle Plan
RAMSEY COMMUNITIES COUNTYWIDE Pedestrian & Bicycle Plan PRIMER: LEGAL FRAMEWORK PRIMER: LEGAL FRAMEWORK Walking and Biking for All e 2 CHAPTER 2: Walking and Biking for All This page intentionally left
Lincoln Downtown Master Plan Update
Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating
REGIONAL NON-MOTORIZED TRANSPORTATION NETWORK
Chapter 10 Bicycle and Pedestrian SAFETEA-LU legislation requires that non-motorized users be considered in the LRTP. The legislation allows for bicycle and pedestrian safety to be incorporated into the
The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.
3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation
Light Rail Transit in Phoenix
4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February
Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis
Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Transportation & Mobility projects that meet the following criteria: enhances regional mobility; supports public transit;
Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City
Mayors Welcome Strong Surrey Votes Yes Coalition Support Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City February 11, 2015 Vancouver, BC The Mayors Council on Regional Transportation
5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES
5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.1 FINANCIAL ANALYSIS The cost of a transportation investment falls into two categories: capital costs, and operating and maintenance (O&M) costs.
Downtown Tampa Transportation Vision
Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org
INDOT 2000-2025 Long Range Plan
Chapter 9 INDOT 2000-2025 Long Range Plan Highway Needs Analysis Overview The statewide transportation planning process provides for the identification of highway needs through a comprehensive process
Tier 1 Strategies. WV Route 14 Corridor Management Plan
1.1 1.2 1.3 1.4 Signal timing optimization system improvements. Improve geometry traffic control at high crash intersections. Construct intersection capacity improvement projects. Widen longer sections
HOW WILL PROGRESS BE MONITORED? POLICY AREA. 1. Implement the 2040 Growth Concept and local adopted land use and transportation plans
PERFORMANCE MONITORING APPROACH OAR 660-044-0040(3)(e) directs Metro to identify performance measures and targets to monitor and guide implementation of the Climate Smart Strategy. The purpose of performance
Multi Modal Roadway Transportation Impact Fees and Asset Value
January 2010 SB 360 Article Series: Factors to be Considered in Transitioning from a Road Impact Fee to a Mobility Fee Contributing Authors: Steven A. Tindale, P.E., AICP Robert P. Wallace, P.E., AICP
Comprehensive Plan Policies that support Infill and Mixed Use
Comprehensive Plan Policies that support Infill and Mixed Use Introduction A comprehensive plan provides a broad vision for the future growth of a community. It is often formulated using community visioning
APPENDIX B: THE PORTLAND METROPOLITAN REGION S CASE FOR ACTIVE TRANSPORTATION
APPENDIX B: THE PORTLAND METROPOLITAN REGION S CASE FOR ACTIVE TRANSPORTATION Prepared by Alta Planning & Design May 2009 Call for Active transportation demonstration projects Metro invites partners to
Chapter VIII: Long-Term Outlook and the Financial Plan
A. Long-Term Outlook Chapter VIII: Long-Term Outlook and the Financial Plan When examining the long-term outlook for transportation planning and programming over the foreseeable future, there are several
STREETS -- BICYCLES -- PATHS
STREETS -- BICYCLES -- PATHS RCW 35.75.050 Bicycle road fund -- Sources -- Use. The city or town council shall by ordinance provide that the whole amount or any amount not less than seventy-five percent
Overview of the Travel Demand Forecasting Methodology
Overview of the Travel Demand Forecasting Methodology Prepared by the Central Transportation Planning Staff (CTPS) Authors: Scott A. Peterson, Manager Ian Harrington, Chief Planner March 29, 2008 1 OVERVIEW
Chapter 5 Financial Plan
The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA_LU) requires that the MTP incorporate a financial plan for the planning period. The MTP is required to
Goals & Objectives. Chapter 9. Transportation
Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system
Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps
Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects
Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects C2012-0684 ATTACHMENT 2 The RouteAhead draft 30-year rapid transit plan was developed in coordination with the Investing in
Improving Access in Florida International University Biscayne Bay Campus Executive Summary
EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared
CHAPTER 4 SURFACE TRANSPORTATION PROGRAM (STP)
Local Assistance Program Guidelines Chapter 4 CHAPTER 4 SURFACE TRANSPORTATION PROGRAM (STP) CONTENTS Section Subject Page Number 4.1 INTRODUCTION... 4-1 4.2 ELIGIBILITY CRITERIA... 4-1 General... 4-1
EPA Technical Assistance for Sustainable Communities Building Blocks
EPA Technical Assistance for Sustainable Communities Technical Assistance Tool: Complete Streets Deerfield Beach, Florida February 16, 2012 To: CC: Amanda Martinez, City of Deerfield Beach Roger Millar,
Stone Way N Rechannelization: Before and After Study. N 34th Street to N 50th Street
City of Seattle Department of Transportation Stone Way N Rechannelization: Before and After Study N 34th Street to N 50th Street May, 2010 INTRODUCTION Population density in Seattle is increasing within
GOALS, OBJECTIVES, AND EVALUATION MEASURES
GOALS, OBJECTIVES, AND EVALUATION MEASURES The Tallahassee-Leon County MPO is developing its first Bicycle and Pedestrian Master Plan, a 20- year plan that provides guidance for the development of facilities
Chapter 8 Funding Considerations
Chapter 8 Funding Considerations Expanding transit services into El Dorado Hills under any of the service alternatives has associated operating and capital costs. This chapter considers the funding sources
School-related traffic congestion is a problem in
SCHOOL TRANSPORTATION Automated Vehicle Location for School Buses Can the Benefits Influence Choice of Mode for School Trips? TORI D. RHOULAC The author is Assistant Professor, Department of Civil Engineering,
SEPTEMBER 2015 SCOPE OF WORK. MONTGOMERY COUNTY PLANNING DEPARTMENT M-NCPPC MontgomeryPlanning.org
SEPTEMBER 2015 SCOPE OF WORK MONTGOMERY COUNTY PLANNING DEPARTMENT M-NCPPC MontgomeryPlanning.org table of contents table of contents... 1 introduction... 2 planning context... 2 purpose of master plan...
RESOLUTION NO. WHEREAS, the 2016-2017 City Budget Forecast estimates that housing
RESOLUTION NO. WHEREAS, the 2016-2017 City Budget Forecast estimates that housing (21.6 percent) and transportation (14.9 percent) are the two largest expense categories for the typical Austin family;
CAPACITY AND LEVEL-OF-SERVICE CONCEPTS
CHAPTER 2 CAPACITY AND LEVEL-OF-SERVICE CONCEPTS CONTENTS I. INTRODUCTION...2-1 II. CAPACITY...2-2 III. DEMAND...2-2 IV. QUALITY AND LEVELS OF SERVICE...2-2 Service Flow Rates...2-3 Performance Measures...2-3
Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015)
Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total Capital
Federal Guidelines for STP-U Funding
MPC 5.f Attachment 1 STP-U Eligibility Guidelines Page 1 of 5 Federal Guidelines for STP-U Funding SURFACE TRANSPORTATION PROGRAM (STP) ELIGIBLE EXPENDITURES PERIOD AVAILABLE: FY + 3 Years FUND: Highway
Summary of MAP-21 Matrix
Summary of MAP-21 Matrix Overview On July 6, 2012, President Obama signed into law P.L. 112-141, the Moving Ahead for Progress in the 21st Century Act (MAP-21). Funding surface transportation programs
Moving Ahead for Progress in the 21st Century. 2014 Performance Report
MAP 21 Moving Ahead for Progress in the 21st Century 2014 Performance Report A report to Florida s Congressional Delegation March 2014 Overview: Because life is precious, FDOT has set the highway safety
Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections
Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections Phil Erickson Community Design + Architecture Mike Johnson HDR Engineering CTF Charrette Approach
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must
Technical Memorandum PERFORMANCE MEASURES. Prepared by:
Technical Memorandum PERFORMANCE MEASURES Prepared by: March 2014 TABLE OF CONTENTS Executive Summary... 1 1. Introduction... 2 1.1 Performance Measures and the Public Sector... 2 1.2 National Focus: MAP
2009-3. The Preservation of Local Truck Routes: A Primary Connection between Commerce and the Regional Freight Network
2009-3 The Preservation of Local Truck Routes: A Primary Connection between Commerce and the Regional Freight Network July 2009 This Goods Movement Challenges and Opportunities Report was prepared jointly
Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)
Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total
A Tides Center Project
June 29, 2015 A Tides Center Project Delivered via email to Matt.fell@mcagov.org Matt Fell, Transportation Manager Merced County Association of Governments 369 West 18 th Street Merced, CA 95340 RE: Comments
TRANSPORTATION Carson Howell, Analyst
State of Utah FY 2008 Budget Recommendations Carson Howell, Analyst AGENCY BUDGET OVERVIEW Mission: Build and maintain the State s transportation system, plan and implement new highway projects, improve
Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013
Near Westside Neighborhood and University Avenue Corridor Transportation Study Public Workshop #2 September 12 and 23, 2013 Presentation Outline: Brief Review of Study Scope, Background, and Current Conditions
SALT LAKE AND OGDEN/ LAYTON URBAN AREA. Federal Transit Administration (FTA)
SALT LAKE AND OGDEN/ LAYTON URBAN AREA Public Transit Program Federal Transit Administration (FTA) Section 5307 Urbanized Area Formula Section 5309 Capital Investment Program New Starts Section 5309 Capital
A Bicycle Accident Study Using GIS Mapping and Analysis
A Bicycle Accident Study Using GIS Mapping and Analysis Petra Staats, Graduate Assistant, Transportation Policy Institute, Rutgers University, New Brunswick, NJ, USA pstaats@eden.rutgers.edu Summary Surveys
How To Teach A College Course On The History Of Transportation In Utah
UDOT University College of Systems Planning and Programming Academic Business Plan Vision UDOT College of Planning and Programming will be the place for advancing careers and developing an appreciation
3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
2012-2013 Transition from SAFETEA-LU to the new MAP-21 Federal Transportation Act
C h a p t e r 9 - F i n a n c i a l P l a n a n d R e c o m m e n d a t i o n s f o r T r a n s p o r t a t i o n S y s t e m I m p r o v e m e n t P r o j e c t s A major component of the Plan (T2040)
Mount Royal College Transit Service Plan
Mount Royal College Transit Service Plan Background In 2007 November response to Council Report C2007-78 West LRT Alignment, Budget and Project Delivery, Council directed the Administration to report back
Overview of Transportation Planning
Chapter 7: Transportation Overview of Transportation Planning Transportation planning deals with the movement of people and goods throughout a city or a region and is not limited to automobiles and streets
Chapter 9: Transportation
Chapter 9: Transportation What is this chapter about? The goals and policies in this chapter convey the City s intent to: Create a coordinated, efficient, and more affordable multimodal transportation
How To Plan A City Of Mason
Transportation Master Plan (TMP) for the City of Madison: Draft Scope of Work Briefing for Madison Area TPB/MPO June 6, 2012 TMP: Overview/Purpose Help Create Walkable, Bikeable, Livable City - Strengthen
SAN DIEGO - A BICYCLE FRIENDLY CITY
SAN DIEGO - A BICYCLE FRIENDLY CITY MANY OPPORTUNITIES FOR IMPROVEMENT SUMMARY The designated bicycle paths and lanes in the City of San Diego (City) are often substandard because of their location and
ARC Bike/Ped Plan Equity Discussion. Presented to ARC Bike/Ped Plan Equity Advisory Group July 29 th, 2015
ARC Bike/Ped Plan Equity Discussion Presented to ARC Bike/Ped Plan Equity Advisory Group July 29 th, 2015 The Bicycle 1973 ARC A Plan & Program for Its Use as a Mode of Transportation & Recreation The
Los Angeles Metro Rapid
Los Angeles Metro Rapid Why BRT In Los Angeles Public dissatisfied with slow bus service Average bus speeds had declined by 10% since late- 1980s LADOT found that 50% of the time a bus is in service it
2035 FINANCIAL RESOURCES FORECAST
2035 FINANCIAL RESOURCES FORECAST AKRON METROPOLITAN AREA TRANSPORTATION STUDY 806 CITICENTER BUILDING 146 SOUTH HIGH STREET AKRON, OHIO 44308 December 2012 This report was prepared by the Akron Metropolitan
TABLE OF CONTENTS. EXECUTIVE SUMMARY...iv
Final Report, July 2004 i TABLE OF CONTENTS EXECUTIVE SUMMARY...iv Page 1.0 INTRODUCTION...1 1.1 Purpose...1 1.2 Background to the KTMP...1 1.3 Master Plans and the Municipal Class Environmental Assessment
For more information, visit: rethinkingstreets.com
For more information, visit: rethinkingstreets.com 37 Arterial Rehab Busy, multi-lane streets, often referred to as arterials, crisscross the landscape of our cities and suburbs. Alongside these wide thoroughfares,
and the statewide and metropolitan transportation planning and programming process in California:
Financial constraint... and the statewide and metropolitan transportation planning and programming process in California: A GUIDE TO FEDERAL AND STATE FINANCIAL PLANNING REQUIREMENTS Prepared by: Federal
NEVADA TRANSPORTATION BY THE NUMBERS:
NEVADA TRANSPORTATION BY THE NUMBERS: Meeting the State s Need for Safe and Efficient Mobility APRIL 2013 202-466-6706 www.tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit organization
PENNSYLVANIA TRANSPORTATION BY THE NUMBERS:
PENNSYLVANIA TRANSPORTATION BY THE NUMBERS: Meeting the State s Need for Safe and Efficient Mobility MAY 2013 202-466-6706 www.tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit organization
Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey
Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey In its second meeting, the Infrastructure and Growth Leadership Advisory Group expanded and refined the list of approaches/ideas
VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY
3 VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY The overall planning strategy for the Bank Street CDP is to ensure that future development is undertaken in a coordinated and planned approach, supported
Questions and Answers about the Orange Bus/Rail Investment Plan
Why are transit improvements needed? Questions and Answers about the Orange Bus/Rail Investment Plan The Triangle Region is now home to 1.5 million people. The U.S. Census and the 2035 Joint Long Range
Florida Avenue Multimodal Transportation Study. June 19, 2013
Florida Avenue Multimodal Transportation Study June 19, 2013 Today s Agenda Team & project introduction Project Timeline What you said Tools we use Mapped data and what clues it can provide Highlights
Surface Transportation Program (STP) Projects
Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile
In 2005, the City of Pasadena, CA, USA, with the support of consultants,
Creating a Citywide Safe Routes to School Program: Pasadena, CA, USA s Step-by-Step Approach In 2005, the City of Pasadena, CA, USA, initiated development of a comprehensive Safe Routes to School Program.
Growth Management and Transportation. By Mark Hallenbeck Director, TRAC-UW
Growth Management and Transportation By Mark Hallenbeck Director, TRAC-UW Seattle Transportation Urban Planning Truism Growth is good Urban Planning Truisms There are two bad words in Urban Planning: Sprawl
Corridor Goals and Objectives
Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty
A Presentation by the Project Managers: Rick Canizales Prince William County. Jana Lynott, AICP Northern Virginia Transportation Commission
A Presentation by the Project Managers: Rick Canizales Prince William County & Jana Lynott, AICP Northern Virginia Transportation Commission for the: Public Open House and Hearing December 6, 2005 George
Transportation Element
Transportation Element Goal: To maintain and enhance mobility for residents and businesses through the creation and maintenance of a balanced system of transportation alternatives that: Provides a wide
South Waterfront Area Dave Unsworth
South Waterfront Area Dave Unsworth TriMet Capital Projects September 14, 2011 Presentation outline Background Partnering Agreements Project descriptions OHSU Portland Aerial Tram New Campus Portland Streetcar
This section summarizes the relevant transportation policies, laws, and regulations that apply to the proposed project.
6. Transportation 6.1 OVERVIEW This chapter describes the existing transportation conditions in the Southwest Fresno Specific Plan Area. This includes the existing roadway, transit, bicycle, and pedestrian
Arizona State Transportation Board Policies
Arizona State Transportation Board Policies Revised December 18, 2015 The Arizona State Transportation Board approved the following policies at their December 18, 2015 board meeting with no changes from
TRAFFIC IMPACT ANALYSIS (TIA)
GUIDELINES FOR TRAFFIC IMPACT ANALYSIS (TIA) FOR REZONING APPLICATIONS AND OTHER DEVELOPMENT APPROVALS REQUIRING TRANSPORTATION IMPACT ANALYSIS IN SUMTER COUNTY, FLORIDA July 17, 2007 PURPOSE AND APPLICABILITY
14-97. 14-97.002 Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise:
14-97 14-97.001 Purpose. This rule chapter sets forth an access control classification system and access management standards to implement the State Highway System Access Management Act of 1988. The implementation
9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015
9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,
Performance Measures for a Sustainable Transportation Network Pasadena s Approach Frederick C. Dock, Ellen Greenberg, Mark Yamarone
Performance Measures for a Sustainable Transportation Network Pasadena s Approach Frederick C. Dock, Ellen Greenberg, Mark Yamarone Abstract. As California cities move into the second decade of the 21st
ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES
How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all
28 CHAPTER 4 TRANSPORTATION. Chapter 4 Transportation
28 CHAPTER 4 TRANSPORTATION Chapter 4 Transportation Introduction An efficient, safe, and connected transportation system is a key component to a vibrant, healthy city. Convenient access to jobs, schools,
Needs Analysis. Long Beach Bicycle Master Plan. Bicycle Commuter Needs. LONG BEACH BICYCLE MASTER PLAN Needs Analysis
Long Beach Bicycle Master Plan Needs Analysis The purpose of reviewing the needs of commuter and recreational bicyclists is twofold: (1) it is instrumental when planning a system which must serve both
Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates
Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates SANTA MONICA TRAVEL DEMAND FORECASTING MODEL TRIP GENERATION RATES SUBMITTED BY: 201 Santa Monica Blvd., Suite 500 Santa Monica,
for the National Capital Transportation Element
for the National Capital Transportation Element N A T I O N A L C A P I T A L P L A N N I N G C O M M I S S I O N for the National Capital for the National Capital 77 Federal Elements Transportation contents
AGENCY COORDINATION AND PUBLIC INVOLVEMENT
5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included
CONNECTICUT S TOP TRANSPORTATION ISSUES:
CONNECTICUT S TOP TRANSPORTATION ISSUES: Meeting the State s Need for Safe, Smooth and Efficient Mobility NOVEMBER 2015 202-466-6706 tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit
2013 QUALITY/ LEVEL OF SERVICE HANDBOOK
2013 QUALITY/ LEVEL OF SERVICE HANDBOOK STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 2013 TABLE OF CONTENTS 1 Executive Summary... 1 2 Q/LOS Handbook Purpose and Scope... 3 2.1. Levels of Analysis...4
Transportation Policy and Design Strategies. Freight Intensive. Level of Freight Presence
Appendix G Transportation Policy and Design Strategies CONTEXT SENSITIVE SOLUTIONS To address the need to describe freight systems which account for the population distress which may result, an analysis
Transportation Improvement Program FY 2006-2008
Transportation Improvement Program FY 2006-2008 Hidalgo County Metropolitan Planning Organization Adopted By Policy Committee: March 24, 2005 Public Meeting Date: March 1, 2005 Public Meeting Date: April
Ne w J e r s e y Tr a f f i c Co n g e s t i o n :
Ne w J e r s e y Tr a f f i c Co n g e s t i o n : A Growing Crisis January 2008 Cover photo : Route 3, Passaic County introduction A rising tide of traffic congestion threatens to increase roadway gridlock,