1 PUBLIC WORKS CAPITAL PROJECTS UPDATE July 2016 ACTIVE CITY CONSTRUCTION PROJECTS Brumlow Avenue Improvements The Brumlow Ave improvement project will widen approximately 1400 linear feet of Brumlow by expanding the existing road to five lanes undivided in order to accommodate the TxDOT construction of dual left turns for SH 26 to north bound Brumlow. The design is at 100%. A future project, currently unfunded, will widen the remainder of Brumlow Avenue extending north to the existing roundabout at Continental Blvd. This project is under construction and anticipated to be completed Summer Citywide Pavement Rehabilitation (PMA) The PMA is an on-going program which consists of the major repair and/or rehabilitation of local streets throughout the City of Southlake to improve pavement condition and rideability after the completion of neighborhood utility projects. Onethird of the City s streets are surveyed annually with the Pavement Management Application (PMA) software designed by Stantec, which generates a pavement quality report. The PMA scores each street on the surface condition of the road (SDI), the riding quality of pavement (RCI), and the structural adequacy of the pavement (SAI). These scores are then averaged to calculate the Pavement Quality Index (PQI) for the roadway. The overall PQI for the City is the average of all the road s PQIs. The Department has established a minimum overall PQI of 7.8 out of a possible The current score is 8.2. FM1938 The FM1938 project involves paving, utility, and drainage improvements along the existing Randol Mill Road from FM1709 to SH114 to four lanes divided. Construction of FM1938 will be completed in two phases. Construction of Phase I from the bend in Randol Mill Road to SH114 through Westlake is complete. The Public Hearing on the entire project was held November 6, 2008 at the Cross Timbers Community Church in Keller, TX. Phase II right of way and easement acquisition by Tarrant County is complete. TxDOT construction is underway north of the FM 1709 intersection. The project is expected to be complete in late FM1938 Drainage Relief for Phase II This project will benefit those areas and drainage structures that are in need of rehabilitation in order to alleviate reported flooding and potential flooding due to undersized culverts or inadequate drainage. These improvements are included in the FM 1938 construction plans which are now underway.
2 PUBLIC WORKS Kirkwood Blvd Stockton to Tyler Drive The widening of Kirkwood Blvd is in preparation for the increased traffic flow due to the recent and upcoming construction projects in the surrounding area. The widened road will reduce traffic and improve ingress and egress from the surrounding developments. The project is in design and is 65% complete. NCTCOG-FEMA Flood Risk Identification Project The City of Southlake is working in conjunction with the North Central Texas Council of Governments (NCTCOG) and the Federal Emergency Management Agency (FEMA) in an effort to update drainage studies for several creeks within the City. The purpose of updating the studies is to accurately assess water surface elevations along the creeks during heavy rain events. The seven (7) creeks being studied are in the southern drainage basin of Southlake. These creeks eventually reach Big Bear Creek. Final report is undergoing review. Nolen Drive Connector This project will complete the roadway connection of Nolen Dr. between Exchange Blvd. and Industrial Blvd. in Grapevine. This project is a joint project between the City of Southlake and the City of Grapevine. Grapevine has obtained the necessary ROW. The project is anticipated to begin Winter N. White Chapel from Emerald to SH114 This project involves paving, utility, and drainage improvements for the widening of N. White Chapel Blvd. from Emerald Blvd. to SH114 to its ultimate pavement section of four lanes divided. This project has been divided into two phases. Phase I extends from Emerald Blvd. to Highland St. and is currently at 95% design. Phase II is the continuation of the widening from Highland St. to SH114 including a dual-lane roundabout at the N. White Chapel Blvd/Highland St. intersection, and the design is currently 95% complete. Right of way acquisition is currently underway. Utility relocations from Highland to SH114 nearly complete. The construction project will bid in Fall of 2016 for Phase II. N. White Chapel at Ascot and Dragon Dr Traffic Signal The widening of White Chapel Blvd has facilitated the addition of a traffic signal at Ascot Drive and Dragon Drive. The signal will reduce delays and improve ingress and egress to Carroll High School and the Chapel Downs development. The project is undergoing design. Pearson Road 16-inch Waterline Improvements This project consists of constructing a 16 waterline from the Pearson Pump Lift Station to Johnson Rd. These improvements to the water distribution system will alleviate a bottleneck in the system when pumping into the upper pressure plane. Project is currently under design. Sanitary Sewer System Rehabilitation Program This project was the result of a three year Sanitary Sewer Evaluation Study conducted by RJN from FY2008 to FY2010. The final report from the SSES
3 recommended the rehabilitation of 358 sewer manholes including replacing manhole rings/lids, corbel, invert, clean-out, and point repairs, as well as street and pavement repairs resulting from activities associated with conducting the manhole repairs. These repairs were recommended in order to prevent inflow and infiltration of storm water and ground water which should lower the City s treatment costs to Trinity River Authority. No sewer rehabilitations done in Q4 FY15, remaining 36 manholes scheduled for mid Street Rehabilitation Partnership Program This is an annual project which involves the rehabilitation of arterial streets within Southlake in partnership with Tarrant County. The City of Southlake funds the costs of materials, and Tarrant County provides labor and equipment. The FY16 project is a reconstruction of Shady Oaks Drive from the northern property line of Bicentennial Park north approximately 3,000 feet the northern property line of 979 Shady Oaks Drive. Construction is currently underway and is anticipated to be complete by September Torian Lane Sanitary Sewer Lift Station This project consists of the design and construction of a sanitary sewer lift station at Torian Ln. to serve the Royal Oaks and Twin Creek Neighborhoods as well as future development along Torian Ln. Construction to begin July Expected completion in early Zena Rucker Culvert This project calls for culvert improvements for the crossing of Zena Rucker Road. The construction of a culvert is intended to facilitate the future extension of Zena Rucker Road. The engineering drainage study is complete. Construction will be incorporated with adjacent development. RECENTLY COMPLETED PROJECTS 8-inch Water Line connector from Lake Dr/Burney Ln to Palo Duro/Lonesome Dove This project involves connecting an 8-inch water line at Lake Dr. and Burney Ln. to the existing 6-inch waterline at Palo Duro and Lonesome Dove by installing 1600 feet of 8-inch PVC. The new line will provide increased water pressure and flow, and will establish a loop for fire protection to the Dove Estates Subdivision. This section of water line is located on the Southlake 2030 Master Water Plan. This project is substantially complete. 12-inch Water Line Extension on West Bob Jones This project involves installing a 12-inch water line in order to provide water service to the properties along West Bob Jones. The installation of the waterline will provide fire protection to nearby properties and allow for development in this area, which is currently vacant land. Construction of Phase I is complete. ROW acquisition is complete for Phase 2. Project completed in May 2015.
4 PUBLIC WORKS FM 1709 at Watermere Traffic Signal This project includes a traffic signal at the intersection of Watermere Drive/Jellico West and FM 1709 to better manage traffic flow through the intersection and facilitate access to FM 1709 (Southlake Blvd.). This project also includes an illuminated street name sign (ILSN). TxDOT construction is complete and the traffic signal is operational. FM1938 Waterline and Sewer Relocation Project for Phase II The FM 1938 Phase II widening project required that City water and sanitary sewer, along with franchise utilities, be relocated outside of the proposed drive lanes of FM 1938 between the intersection of FM 1709 and the Randol Mill bend. The project consisted of relocating approximately 10,000 linear feet of water line and approximately 5,400 linear feet of sanitary sewer relocation or extension. This project is complete. Illuminated Street Name Signs (ILSN) and Traffic Signal Battery Backups along Southlake Boulevard This project includes the installation of backlit intersection signage at up to 14 major intersections along Southlake Blvd. similar to the existing signage at Kimball Avenue and SH114. This project includes the intersections of FM1709 at SH114, Commerce St., Central Ave., Nolen Dr., Kimball Ave., Village Center Dr., Carroll Ave., Byron Nelson Parkway, White Chapel Blvd., Shady Oaks Dr., Waterford Dr., Peytonville Ave., Randol Mill Rd., and Pearson Ln. This project will improve safety for the driving public by improving the visibility of major intersection signage at night. This project is complete. Love Henry Ct. Drainage Improvements This project will implement drainage improvements along Love Henry Ct., north of Southlake Blvd. and Bicentennial Park, and east of Shady Oaks Dr. The improvements to the current drainage system will include upsizing of the pipe and additional grading to prevent possible flooding on Love Henry Ct. during heavy rainfall conditions. This project is complete. North Carroll Avenue at Federal Way This project will construct a traffic signal at the intersection of Federal Way at North Carroll Avenue. This is part of a larger intersection improvement project which includes a right turn lane from Federal Way to northbound Carroll Avenue as well as an 8-foot sidewalk along Federal Way. Construction of right turn lane and illuminated street sign are complete. Pressure Compensating Valves This project will include the installation of pressure regulating valves (PRV) between the City's high pressure and low pressure water systems. This will improve fire flow capacities in the event of an emergency during peak water use periods. This project will also require the construction of vaults, and the installation of electronic telemetry to monitor and activate the valves via the City's current remote system. This project is complete.
5 South Carroll Avenue at Zena Rucker Road Traffic Signal The recent additions of the Park Village retail development and the Winding Creek Addition residential development have accelerated the need for construction of a signal at the intersection of South Carroll Avenue and Zena Rucker Road. In October 2012 as part of Southlake 2030, Kimley-Horn, Inc. completed the South Carroll Avenue Improvements Study which provided recommendations to the City for improving mobility along South Carroll Avenue between Southlake Boulevard (FM 1709) and Breeze Way. The study included the extension of Zena Rucker Road from the west to the intersection of South Carroll Avenue between the commercial and residential site. The addition of the signal will reduce delays and improve ingress and egress to the commercial developments. Signal installation was completed in June South Kimball Avenue at East Continental Boulevard Traffic Signal The recent addition of the Stadium Southwest commercial development has prompted the need for a traffic signal at the intersection of South Kimball Avenue and East Continental Boulevard. The addition of the signal will reduce the potential for traffic conflicts at this intersection. Signal construction complete and the signal is operational. South White Chapel at Big Bear Creek Scour Mitigation This project will address the immediate problem of scour (erosion) around columns supporting the main bridge deck. Engineering design is complete. This is a joint project with Colleyville. This project is complete. Texas Turnaround at SH 114/North Carroll The Texas Turnaround project will ease the traffic congestion at the SH 114 and North Carroll Avenue intersection. The project will focus on easing traffic along the DFW Connector project and allow greater access to the Town Square retail developments. The Texas Turnaround is a partnership project between the City of Southlake, Tarrant County, TxDOT, Cooper & Stebbins and Gateway Church. TxDOT construction began January 2014 and the bridge is now open. Additionally, a decal lane extension was constructed to better guide traffic coming off the Texas Turnaround and decorative lights were installed on the turnaround bridge. North Kimball Avenue Street Widening from SH114 to Dove Road This project involves paving, utility, and drainage improvements for the widening of North Kimball Ave. from SH114 to Dove Rd. to its ultimate four lane divided pavement section with center landscaped medians and six-foot sidewalks on both sides of the street. Phase I for SH 114 to Kirkwood Blvd is complete. Phase II is the continuation along N. Kimball Ave. from Kirkwood Blvd. up to Dove Rd. Construction is complete Pearson GST Painting The project includes blasting and applying new coating systems for the existing 5.0 million gallon (MG) ground storage tanks (GST). Minor tank repairs and modifications
6 are also included in the project scope. The project site is located near the intersection of Southlake Boulevard (F.M. 1709) and N. Pearson Lane. The work on west tank is complete. The repainting of east tank will be performed in the fall when the water demand is less. State Street The City of Southlake is working with the developer of Southlake Town Square to complete the State Street gap between Federal Way and Division Street. The developer is responsible for installing the utilities after which the City constructed State Street and sidewalks. This project was completed fall 2015.
City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP
City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP PROJECT ESTIMATED COST ESTIMATED COUNCIL IDENTIFIED FUNDING SOURCES STRATEGIC COMPLETION INITIATIVES FM 2351/Beamer
More informationWater and Sewer Utilities
Water and Sewer Utilities Capital Improvement Program Utilities Water and Sewer Requested - $98,295,000 - $97,792,600 Funded - $32,951,600 Sewer 53.3% Sewer 54% Water 27% Water Water 46% 46.7% Sewer 73%
More informationKansas City s Overflow Control Program
Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater
More informationMoving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements
Moving Ruston Forward City of Ruston Infrastructure Maintenance and Improvements MLK Extension Project will be done in conjunction with proposed water and sewer improvements Connect Martin Luther King
More informationin Marina Del Rey Prepared by: County of Los Angeles Department of Public Works
Planned Public Works Projects in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Projects in Marina Del Rey Waterline Projects Phase II Phase III Roadway Projects Admiralty
More informationThe checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:
Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section
More informationPLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
More information2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES
2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES The Wastewater Treatment System (System)
More informationPROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
More informationCity of Colleyville Community Development Department. Site/Landscape Plan Application Packet
City of Colleyville Community Development Department Site/Landscape Plan Application Packet Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning
More informationTownship of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
More informationProject Rankings. Fiscal Year 2015 2019 Capital Improvement Plan
Fiscal Year 2015 2019 Capital Improvement Plan Project Rankings 99 CIP Ranking Worksheet 101 104 Final Ranking Scores The following matrix shows all of the projects within the five-year period that were
More informationTOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion
TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion Project Overview Sanitary Sewer System 2 Town of Surfside Project Overview Potable Water System 3 Town of Surfside Project Overview Storm Water
More informationCHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
More informationEngineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted
Engineering Agency Number: 53 Budget Function: Public Works and Transportation The Engineering Division is responsible for the design, supervision and inspection of all street, highway, sidewalk and bike
More informationSOLD. Lot 1. 1 Mile: Population: 10,200 Median HH Income: $33,100. 3 Mile: Population: 80,200 Median HH Income: $34,900
Walmart Outparcels For Sale College Station, TX Store # 1150 1815 Brothers Blvd FM 2818 W SOLD Texas Ave S/ Hwy 6 Longmire Dr Brothers Blvd Lot 1 For more information about this site, contact: Lot 1: ±2.41
More informationCITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to
More informationCHAPTER 8 CIVIL DESIGN
CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical
More informationBridges & Culverts Condition by Quantity
3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received
More informationCITY OF FARMERSVILLE, TEXAS
CITY OF FARMERSVILLE, TEXAS MANUAL FOR THE DESIGN OF WATER AND SANITARY SEWER LINES Subdivision Ordinance #2007-08 Exhibit B February 13, 2007 TABLE OF CONTENTS Description Page No. General... 1 Water
More informationDepartment of Planning & Development Services
Department of Planning & Development Services S T A F F R E P O R T June 3, 2016 CASE NO: PROJECT: EXECUTIVE SUMMARY: REQUEST DETAILS: ZA16-043 Specific Use Permit for a commercial school, including trade
More informationEXHIBIT A Accessible Truck Routes Map
EXHIBIT A Accessible Truck Routes Map ASHEVILLE, NORTH CAROLINA ROUTE: A ROUTE: B ROUTE: C ROUTE: D ROUTE: E EXHIBIT A EXHIBIT B Craven Street Improvements Map ASHEVILLE, NORTH CAROLINA EXHIBIT B EXHIBIT
More informationSummary of Potential Storm Drain Projects and Programs
Summary of Potential Storm Drain Projects and Programs CAPITAL IMPROVMENTS PUMP STATION UPGRADES The storm runoff from a large portion of Palo Alto cannot flow by gravity into one of the local creeks.
More informationComment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.
Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library
More informationCity of Hilshire Village Pine Creek Ln Reconstruction
City of Hilshire Village Pine Creek Ln Reconstruction OVERVIEW The City will be soliciting bids for the Pine Creek Reconstruction Project with construction scheduled to begin in January 2015. This project
More information5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons)
DATE: March 8, 2006 TO: FROM: SUBJECT: Plan Commission Larry D. Nelson, P.E., City Engineer 5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons) The City Engineering
More informationTown of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No.
Town of Essex Basement Flooding Study Town of Essex NE Lagoon Service Area Pumping Station No. 4 Essex Plant Service Area Wastewater Pumped To NE Lagoons (Treatment Plant No. 2) Essex Treatment Plant (Treatment
More informationGeneral Obligation Bond Projects FYE 2013-2018
General Obligation Bond Projects FYE 2013-2018 2009 City of Norman Community Survey Final Report 2011 CTP Survey Results Storm Drainage and Street Widening Projects Combined Storm Water/Transportation
More informationGranger Bay Boulevard and Green Point Roundabout
Granger Bay Boulevard and Green Point Roundabout INTRODUCTION Aurecon was appointed for the design and construction supervision of the Granger Bay Boulevard and Green Point roundabout that provides access
More informationComponents of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000
Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 SEMCOG 2000 Prepared
More informationSECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN
S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain
More informationDEPARTMENT OF ENVIRONMENTAL QUALITY
PROJECT IDENTIFICATION DEPARTMENT OF ENVIRONMENTAL QUALITY City of Burton Sanitary Sewer Collection System Improvements State Revolving Fund (SRF) Environmental Assessment April 2015 Applicant: Authorized
More informationLansdowne Stormwater UPDATE
Lansdowne Stormwater UPDATE August 22, 2012 Ann Arbor Footing Drain Disconnection Stormwater Review Presentation Agenda Welcome and introductions Background on stormwater and sanitary sewer issues Footing
More information2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS
2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS Water system improvements proposed for inclusion into Western s service area shall be designed in accordance with all appropriate AWWA standards, include
More informationSECTION 5 DRAFTING STANDARDS
SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.
More informationENVIRONMENTAL ASSESSMENT (EA) VILLAGE OF EAU CLAIRE - BERRIEN COUNTY INFILTRATION/INFLOW REMOVAL PROJECT APRIL 2015
ENVIRONMENTAL ASSESSMENT (EA) VILLAGE OF EAU CLAIRE - BERRIEN COUNTY INFILTRATION/INFLOW REMOVAL PROJECT APRIL 2015 I. PROJECT IDENTIFICATION Applicant: Authorized Representative: Village of Eau Claire
More informationReview of Footing Drain Disconnection Projects
Wastewater Master Plan DWSD Project No. CS-1314 Review of Footing Drain Disconnection Projects Technical Memorandum Original Date: August 8 2002 Revision Date: September 2003 Author: CDM Table of Contents
More informationORDINANCE NO. 511 ORDINANCE ESTABLISHING A COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENTION DEVICES
ORDINANCE NO. 511 ORDINANCE ESTABLISHING A COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENTION DEVICES WHEREAS, Wheaton Sanitary District had a cost reimbursement
More informationMIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.
MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade
More informationCITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST
CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST NOTE: The following list shall only be used as a guide and shall not be used in lieu of the specifications found in the CITY OF ANN ARBOR PUBLIC
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More informationCity of Santa Ana. FY 2014/2015 Capital Improvement Program. Broadway/Anahurst to 1 st Improvements. First Street Bridge Replacement
Broadway/Anahurst to 1 st Improvements First Street Bridge Replacement MacArthur Rehabilitation/Bristol to Flower Fisher Park Butterfly Garden Improvements 1 Finance, PRCSA, CDA and PWA Data Gathering
More informationRoadway Cost Per Centerline Mile Revised June 2014
Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743
More informationRESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY
CITY COUNCIL AGENDA REQUEST AGENDA OF: 07-01-14 AGENDA REQUEST NO: IV-D INITIATED BY: GREG NICHOLS PROJECT MANAGER RESPONSIBLE DEPARTMENT: ENGINEERING PRESENTED BY: TIMOTHY JAHN, P.E. SENIOR ENGINEER DIRECTOR:
More informationCity of Springboro 320 West Central Avenue, Springboro, Ohio. Planning Commission Regular Meeting. Wednesday, June 25, 2014
City of Springboro 320 West Central Avenue, Springboro, Ohio Wednesday, I. Call to Order and Roll Call Chairperson Hans Landefeld called the Springboro Planning Commission Meeting to order at the Springboro
More informationSEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS
UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line
More informationZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022
ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana
More informationImplementing a Work Order and. Asset Management System? Learning Objectives. What We Have. The City of Colleyville
A Small City s Story of Implementing a Work Order and Asset Management System American Public Works Association 2013 Congress August 28, 2013 Introductions Public Works Department City of Colleyville,
More informationMaryland Invests $845 Million in New Highway and Bridge Projects
Maryland Invests $845 Million in New Highway and Bridge Projects Completing Widening of MD 404 Talbot And Caroline Counties Top Regional Priority Queen Anne s, Talbot, and Caroline Counties Widening MD
More informationSwannanoa River Flood Risk Management Study
Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River
More informationDESIGN ASSISTANCE APPLICATION
DESIGN ASSISTANCE APPLICATION for FY 2016 NEW RIVER MULTI USE PATH: PINNACLE PEAK ROAD TO HAPPY VALLEY ROAD CITY OF PEORIA APPLICATIONS ARE DUE VIA ONLINE SUBMITTAL BY 10:00 AM ON MONDAY, JUNE 29, 2015
More informationAction plans for hotspot locations - Ash Study
Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side
More informationVILLAS OF TRADITIONS AT GREY OAKS
Report of Turnover Survey VILLAS OF TRADITIONS AT GREY OAKS Grey Oaks Development Naples, Collier County, Florida Forge Engineering Project Number 2907-001.01 March 2015 Richard P..Lundberg, P.E cn=richard
More informationSECTION 3 SANITARY SEWER DESIGN
SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary
More informationFISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES
FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES 1 FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN Wastewater Treatment Facilities The Wastewater Treatment System (System)
More informationWelcome! Purpose of Tonight s Meeting. Informational Open House to discuss two City projects: Goal is to LISTEN TO YOU
Purpose of Tonight s Meeting Informational Open House to discuss two City projects: Fairchild Street Subway Phase I Engineering: Immediate need to replace subway Bowman Avenue Feasibility Study Future
More informationSECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
More information2015 STATE OF THE URBAN TRAILS. Accomplishments, Active Projects, and Next Steps
2015 STATE OF THE URBAN TRAILS Accomplishments, Active Projects, and Next Steps Agenda What is an Urban Trail? Accomplishments Active Projects Next Steps What is an Urban Trail? Goals of Urban Trail Program:
More informationTOWN OF GRIMSBY ASSET MANAGEMENT PLAN
TOWN OF GRIMSBY ASSET MANAGEMENT PLAN August 20, 2014 DFA Infrastructure International Inc. Executive Summary ES1 Background The Town of Grimsby (Town) with a population of approximately 25,325 is located
More information1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.
SECTION 6: REQUIREMENTS FOR A DRIVEWAY CONNECTION A. Required information. The application shall be accompanied by a sketch of the proposed driveway which at a minimum shall indicate: 1. Geometric information
More informationCITY OF WEST PALM BEACH ZONING BOARD OF APPEALS Meeting Date: February 6, 2014 Zoning Board of Appeals Case No. 3302
CITY OF WEST PALM BEACH ZONING BOARD OF APPEALS Meeting Date: February 6, 2014 Zoning Board of Appeals Case No. 3302 1950 Golden Lakes Blvd. Class B Special Use Permit Location Aerial I. REQUEST Site is
More informationFlood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program
Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program Eric Loucks, P.E., D.WRE Kumar Gali, P.E. June 4, 2015 Outline MMSD Service Area Problem and Challenges Solution
More informationAPPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY
ALAMEDA POINT MASTER INFRASTRUCTURE PLAN March 31, 2014 APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY Carlson, Barbee & Gibson, Inc. Backbone Infrastructure Engineer
More informationSECTION 5: SANITARY SEWER SYSTEM DESIGN
SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities
More informationM I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y. Kansas City, Missouri s Trenchless Program
M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y Kansas City, Missouri s Trenchless Program Outline of Presentation Intro to Kansas City Water Services information Trenchless Program
More informationPUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015
PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015 AT ACTON TOWN HALL FAULKNER ROOM 472 MAIN STREET ACTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED ASSABET RIVER RAIL TRAIL (ARRT) IN THE TOWNS OF ACTON
More informationENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS
ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE
More informationWilmington to Newark Commuter Rail Improvement Project
Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion
More informationPUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
More information3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
More informationLAKES REGION SANITARY DISTRICT COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENT DEVICES
PROGRAM REQUIREMENTS The District will provide funds to building owners who have or may experience sanitary sewer backups during periods of heavy rainfall for the installation of overhead sewers or backflow
More informationHouse Bill 238 2015 Land Conveyance Pictorial Package
House Bill 238 2015 Land Conveyance Pictorial Package Ohio University Sale of Property, Athens Address: 366 Richland Avenue Parcel Nos.: A02-9060008600 A02-9060001700 A02-9030001001 A02-9060001801 A02-9060008000
More informationFILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request
FILE NO.: Z-6915-C NAME: Gamble Road Short-form PCD and Land Alteration Variance Request LOCATION: Located on the Northwest corner of Chenal Parkway and Gamble Road DEVELOPER: Davis Properties P.O. Box
More informationStandards for Water, Sewer, and Sewage Lift Station Design
Standards for Water, Sewer, and Sewage Lift Station Design February 2015 Edition I. Plan Format Requirements General Requirements Water Line Requirements Sewer Line Requirements II. III. IV. Water Design
More informationWESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24
Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge
More informationI-25 / Rio Bravo Interchange
I-25 / Rio Bravo Interchange TONIGHT S MEETING SCHEDULE OPEN HOUSE 6:00 PM TO 6:30 PM PRESENTATION BEGINS AT 6:30 PM Q & A FOLLOWING PRESENTATION CN A300280 / PNA300280 I-25 / Rio Bravo Interchange SECOND
More informationD3 April 8, 2015 Public Hearing
D3 April 8, 2015 Public Hearing APPLICANT AND PROPERTY OWNER: ASSEMBLY OF YAH, INC. STAFF PLANNER: Kevin Kemp REQUEST: Conditional Use Permit (Religious Facility - church) ADDRESS / DESCRIPTION: 5151 Locke
More informationENGINEERING & PUBLIC WORKS ASSET MANAGEMENT PLAN
ENGINEERING & PUBLIC WORKS ASSET MANAGEMENT PLAN NOVEMBER 2010 TABLE OF CONTENTS TABLE OF CONTENTS 1. Introduction...4 2. Mission Statements and Goals...5 3. How does the Asset Management Plan Support
More informationGoals & Objectives. Chapter 9. Transportation
Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system
More informationEmerging Technologies in Wastewater Collection Systems
Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation
More information3 Tappan Zee Bridge Rehabilitation Options
3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:
More informationExtreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods
Extreme Wet Weather in Brookfield How to Keep Your Basement Dry During Heavy Rains and Floods Relating Stormwater Drainage to Sewer Backups Brookfield has two separate sewer systems Storm sewer system
More informationGOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline
GOUVEIA ENGINEERING Pre-Bid Conference Meeting Minutes City of Los Banos Henry Miller Area Storm Drain and L Street Waterline Conference held at Intersection of West I Street and L Street, in Los Banos
More informationFlood Protection in Garland Past, Present, and Future. Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas
Flood Protection in Garland Past, Present, and Future Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas A few facts about Garland: Originally incorporated in 1891 Population 226,876 (2010
More informationGREENSBORO - HIGH POINT ROAD (SR 1486 / 4121)
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION GREENSBORO - HIGH POINT ROAD (SR 1486 / 4121) FROM PROPOSED US 311 BYPASS TO HILLTOP ROAD (SR 1424) TIP PROJECT U-2412 WBS Element 34802 Federal Project Number
More informationSurface Transportation Program (STP) Projects
Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE
More informationREPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING FLOOD REMEDIATION PROGRAM
J Wokking foh y or REPORT Meeting Date: November 28,2013 Regional Council DATE: October 22,201 3 REPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING
More informationChagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices
Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Amy H. Brennan (440) 975-3870 www.crwp.org abrennan@crwp.org Chagrin River Watershed Partners Formed
More informationG3 GRANT LID RETROFIT FOR THE ASHLAND MUNICIPAL PARKING LOT
G3 GRANT LID RETROFIT FOR THE ASHLAND MUNICIPAL PARKING LOT GREEN STREETS GREEN JOBS GREEN TOWNS PROJECT INFORMATION: Location: Ashland, VA Project Type: Design and Construction Restoration Practice: Bioretention,
More informationStaff Report General Development Plan/Master Plan Aldermanic District: 1 County Commission District: 2 MPC File No. 16-000526-PLAN February 23, 2016
Staff Report General Development Plan/Master Plan Aldermanic District: 1 County Commission District: 2 MPC File No. 16-000526-PLAN February 23, 2016 1101 Bull Street One West Park Avenue 1107 Bull Street
More informationHow To Write A City Of Lakewood
Click to edit Master title style Bay Village Sunset Area: Storm Sewer & Pavement Replacement Engineering Click toosborn edit Master title style Talented Staff Headquartered in Cleveland Resource Base of
More informationFOR IMMEDIATE RELEASE September 17, 2013 Contact:
NEWS RELEASE FOR IMMEDIATE RELEASE September 17, 2013 Contact: Diana L. Klink 757.514.4104 757.359.1845 Tim Kelley 757.514.4103 757.871.3039 UPDATE (Bridge Road/Mills Godwin Bridge) The work scheduled
More informationImproving Access in Florida International University Biscayne Bay Campus Executive Summary
EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared
More informationUCC-160630-01-01. PAR-Dove Springs Recreation Center Expansion
Austin Utility Location & Coordination Committee Agenda Meeting scheduled for Thursday June 30, 2016 One Texas Center, 505 Barton Springs Road, 10th floor Conference Room Time: 2:00 p.m. to 4:00 p.m. Project
More information89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto
89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto Prepared By: R.J. Burnside & Associates Limited 6990 Creditview Road, Unit
More informationAlternatives Design Report. Draft
Draft 3/4/2014 TABLE OF CONTENTS I Introduction... 1 A. HISTORY... 1 B. PROJECT BACKGROUND... 1 II. ALTERNATIVES DEVELOPMENT... 8 A. ALTERNATE 1 NO BUILD... 8 B. ALTERNATE 2 IMPROVE ROADWAY ON EXISTING
More informationThe Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08
The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are
More informationAccess Management South Dakota Department of Transportation
Public Meeting/ Open House October 21, 2014 Minnehaha County Environmental Assessment and Section 4(f) De Minimis Analysis Northern Segment of Hwy 100 I-90 to South of Madison Street Minnehaha County The
More informationMicromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience
Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Robert W. Carr 1 * and Stuart G. Walesh 2 1 Water Resources Modeling, LLC, 4144 S. Lipton Ave,
More informationPresented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E.
Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E. Engineer-City of Westlake City of Westlake Facts Founded