Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program
|
|
- Phoebe Hodge
- 2 years ago
- Views:
Transcription
1 Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program Eric Loucks, P.E., D.WRE Kumar Gali, P.E. June 4, 2015
2 Outline MMSD Service Area Problem and Challenges Solution analysis Proposed Plan Project benefits
3 BACKGROUND Located northwest of Milwaukee downtown Corridor stretches for 5-miles along the railroad Major industries along Canadian Pacific Railroad
4 BACKGROUND North Corridor and South Corridor watersheds 11-square miles drainage area North Corridor South Corridor Combined Sewer system Partial separation near west area MMSD and City facilities
5 30 th STREET INDUSTRIAL CORRIDOR CHALLENGES 3,000 plus properties reported basement backups Approximately 50 locations experienced flooding Private sector damages alone exceeded $32 million
6 30th STREET INDUSTRIAL CORRIDOR CHALLENGES 1,000 plus foreclosure and tax delinquent properties Major industries moving away Among the highest violent and property crime rates 770 acres of brownfields Very low property values compared to the adjacent neighborhoods Economically depressed
7 PROJECT OBJECTIVES MMSD initiated the North Corridor stormwater study in 2012 MMSD and WHEDA initiated South Corridor stormwater study in 2013 to address the flooding problems while facilitating economic development efforts Collaborated to create a vision of Greenway Corridor that will not only address the drainage problems, but would also serve as a platform for revitalization and redevelopment of the Corridor
8 PROJECT OBJECTIVES and characterize basement backups and regional stormwater drainage problems and solutions in the Corridor area and formulate a complementary Greenway Corridor strategy to enable smart redevelopment and an enhanced quality of life for address flooding problems and also provide opportunities to enhance and complement
9 BASELINE ANALYSIS Existing EPA SWWM model for North Corridor Hydrologic and hydraulic models were built in HSPF and MIKE URBAN Models used for characterizing surface flooding problems, basement backups and the system capacity Most of the South Corridor system provides a 5-year level of service and North Corridor provides a 25-year
10 SOLUTION ANALYSIS - DESIGN CRITERIA Consistent with MMSD and City of Milwaukee objectives Regulatory Compliance City, MMSD, State and Federal Regulations 100-year level of service/protection 1-foot of freeboard for stormwater management improvements Street flow/ponding depth Parking lot ponding depth Maximum of 6 inches or within the right of way Maximum of 6 inches -
11 SOLUTION ANALYSIS POTENTIAL SOLUTIONS Underground sewer/tunnel improvements Separation of the existing system to downstream limitations and cost. The solution should prevent basement backups and complement Greenway Corridor Proposed solution concept Street inlet control Greenway Corridor
12 SOLUTION ANALYSIS GREENWAY CORRIDOR CONCEPT Green Corridor route / location analysis process Desktop analysis (Route) Drainage backbone Land ownership Institutional investment
13 SOLUTION ANALYSIS GREENWAY CORRIDOR CONCEPT Green Corridor route / location analysis process Desktop analysis (Route) Drainage backbone Land ownership Institutional investment In the field (locations) Block by block windshield survey Minimize impacts Feedback from stakeholders Greenway Opportunity Are Natural Drainage Path Neighborhood Institutions
14 NORTH AVE. TO CHERRY ST. GREEN CORRIDOR LOCATION CONCEPT Continuous Connector Re-imaged Environment Neighborhood Amenity Linking Institutions Redevelopment Sites Courtesy: American Design Inc. 14
15 SOLUTION ANALYSIS CONCEPT STREET INLET CONTROL Surcharging = Basement backups
16 SOLUTION ANALYSIS CONCEPT STREET INLET CONTROL Restrictors in inlets Stormwater on street Surface flow management Basement backup solution
17 SOLUTION ANALYSIS IMPROVEMENTS Drainage Component Inlet Restrictors Stormwater Conveyance Stormwater Storage Drainage Way Description 5,000 street inlet restrictors placed in selected subbasins (South Corridor) 7,000 feet of 72- to 144-inch storm sewer from the south end of the drainage way at W. Vliet and N. 27th Street to the Menomonee River (South Corridor) 2,200 feet of 24-inch storm sewer for street flow relief in the W. Center Street and N. 32nd Street area (South Corridor) 1,500 feet of 5.5- x 8.5-foot box culvert from the intersection of N. 35th Street and W. Capital Drive to the Bee Bus Storage basin near Lincoln Creek (North Corridor) 1,200 feet of 5- x 8-foot box culvert from N. 27th Street and W. Hope Avenue to the DRS East Basin (North Corridor) 965 feet of 4- x 6-foot box culvert connecting the East Basin to the North Basin (North Corridor) 52.2 Million Gallons (MG) of stormwater storage at nine locations in South and North Corridors 13,500 feet (or 2.6 miles) of drainage way from W. Auer Avenue to W. Vliet Street (South Corridor)
18 SOLUTION ANALYSIS GREENWAY CORRIDOR CONCEPTUAL CROSS SECTION
19 PROJECT BENEFITS
20 PROJECT BENEFITS Social Economic Recreational Opportunities - Jobs Creation - Connectivity to Neighborhoods - Playfields, game courts, and walk /bike path trails 1,290 short term and 70 long term jobs 8.5 miles of porous pavement bike path Foreclosed Property Maintenance - $1.5 million in annual savings Environmental Property Values - Water Quality Benefits - Flood Damage Reductions - Area of Green Space - Enhance property values by 2 to 3 times Reduce CSO volumes by 20 to 90 million gallons Savings of $130 million over 20 years 65 acres of green space
21 Thank you
Chapter 4 RECREATIONAL TRAIL INVENTORY
VILLAGE OF 2011 2015 COMPREHENSIVE OUTDOOR RECREATION Chapter 4 RECREATIONAL TRAIL INVENTORY MULTI-PURPOSE TRAILS AND BIKE LANES The provides approximately 14 miles of multi-purpose paved paths and bike
1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd
ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,
Kansas City s Overflow Control Program
Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater
MWRD Phase II Study. Session #2C: Optimizing Solutions to Urban Flooding
MWRD Phase II Study Session #2C: Optimizing Solutions to Urban Flooding Marty Michalisko, PE, CFM mmichalisko@eraconsultants.com Mike Maslowski, PE, CFM mmaslowski@eraconsultants.com Matt Bardol, PE, CFM,
5.14 Floodplains and Drainage/Hydrology
I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important
Environment Virginia Conference April 6, 2011. Integrating Stormwater, Urban Design, and Growth Policies
Environment Virginia Conference April 6, 2011 Integrating Stormwater, Urban Design, and Growth Policies Integrating Stormwater, Urban Design, and Growth Policies Sara Hollberg, AICP, Valley Conservation
Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M.
Fort Dodge Stormwater Master Planning Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Project Location Project Background Flooding History Localized flooding and storm sewer
Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience
Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Robert W. Carr 1 * and Stuart G. Walesh 2 1 Water Resources Modeling, LLC, 4144 S. Lipton Ave,
Westerly Creek, A Poster Child for Understanding the Benefit of Stormwater Investment
Westerly Creek, A Poster Child for Understanding the Benefit of Stormwater Investment Presented at the ASFPM Annual Conference Atlanta, GA June 1 June 5 2015 Jon Villines, EIT, CFM Aurora Water Alan Turner,
MEMORANDUM OF AGREEMENT Between THE CITY OF BALTIMORE And THE MID-ATLANTIC FEDERAL PARTNERSHIP FOR THE ENVIRONMENT
MEMORANDUM OF AGREEMENT Between THE CITY OF BALTIMORE And THE MID-ATLANTIC FEDERAL PARTNERSHIP FOR THE ENVIRONMENT The Mid-Atlantic Federal Partnership for the Environment ( MAFPE ) and the City of Baltimore
Shooks Run Drainage Study Basic Terminology
Shooks Run Drainage Study Basic Terminology PREPARED FOR: PREPARED BY: City of Colorado Springs CH2M DATE: April 9, 2015 Introduction This document is intended to provide an introduction to Colorado Springs
MEMORANDUM COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT
#19 MEMORANDUM COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT TO: SUBJECT: John C. Phillips, City Manager Downtown Riverfront Park Preliminary Design (Armory Park) REVISED Scope of Services Schreiber Anderson
Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program
Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program Field Inspection Notes 27 29 September 2012 Introduction The U.S. Army Corps of Engineers (Corps), in
Duggan Dry Pond and Storm Sewer Improvements. Public Information Session #1 - May 30, 2013
Duggan Dry Pond and Storm Sewer Improvements Public Information Session #1 - May 30, 2013 Introduction Introduction of project team Housekeeping items Presentation Question period Information boards Exit
MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements
MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements Presentation July 23, 2014 A. Morton Thomas and Associates, Inc. 800 King Farm Boulevard, 4 th Floor Rockville, Maryland 20850
Summary of Potential Storm Drain Projects and Programs
Summary of Potential Storm Drain Projects and Programs CAPITAL IMPROVMENTS PUMP STATION UPGRADES The storm runoff from a large portion of Palo Alto cannot flow by gravity into one of the local creeks.
Presented by Dani Wise Johnson Vanasse Hangen Brustlin, Inc.
Incorporating LID Stormwater Management Practices and Ecological Restoration on Redevelopment Properties Presented to LID Conference Philadelphia, Sept 2011 Presented by Dani Wise Johnson Vanasse Hangen
MOUNTAIN HOUSE SPECIFIC PLAN I 15.1 STORM DRAINAGE 15.1
CHAPTER FIFTEEN: STORM DRAINAGE AND FLOOD PROTECTION 15.1 STORM DRAINAGE 15.1 15.1.1 Introduction 15.1 15.1.2 Analysis and Design Criteria 15.1 15.1.3 Off-Site Drainage 15.1 15.1.4 Primary Storm Drain
CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
Green Infrastructure. 52 MMSD Regional Green Infrastructure Plan
Green Infrastructure Benefits and Costs 52 MMSD Regional Green Infrastructure Plan MMSD s 2035 Vision has two key elements: 1) Integrated Watershed Management and, 2) Climate Change Mitigation/Adaptation
G3 GRANT LID RETROFIT FOR THE ASHLAND MUNICIPAL PARKING LOT
G3 GRANT LID RETROFIT FOR THE ASHLAND MUNICIPAL PARKING LOT GREEN STREETS GREEN JOBS GREEN TOWNS PROJECT INFORMATION: Location: Ashland, VA Project Type: Design and Construction Restoration Practice: Bioretention,
Drainage Analysis for the McKownville Area
Drainage Analysis for the McKownville Area Town of Guilderland Albany County, New York Prepared by: DELAWARE ENGINEERING, P.C. 28 Madison Avenue Extension Albany, New York 12203 June 2010 Town of Guilderland
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance
Lansdowne Stormwater UPDATE
Lansdowne Stormwater UPDATE August 22, 2012 Ann Arbor Footing Drain Disconnection Stormwater Review Presentation Agenda Welcome and introductions Background on stormwater and sanitary sewer issues Footing
URBAN DRAINAGE CRITERIA
URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities
Green Values Stormwater Calculator Methodology
Green Values Stormwater Calculator Methodology The CNT Green Values Stormwater Calculator (greenvalues.cnt.org) is designed to arrive at a first approximation of the hydrologic and financial conditions
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to
Short-term. Action items that fall into this category need to take place over the next one to two years.
Implementation Plan Building Momentum Through Incrementalism Queensbury s vision for its future, which emerged from public discussion over the past year, is as a vibrant regional center for living, working,
Green Infrastructure in Action: Examples, Lessons Learned & Strategies for the Future December 2014
Green Infrastructure in Action: Examples, Lessons Learned & Strategies for the Future December 2014 New York City s Green Infrastructure Plan: Compliance Through Adaptive Management Presentation Overview
SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco
SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco Emilio Cruz AGM, Infrastructure Agenda + San Francisco s Sewer System + San Francisco
CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers
United States Environmental Protection Agency CASE STUDY City of Grand Rapids Stormwater Asset Management Program Overview With increasing pressure to meet water quality targets, address population growth,
Action plans for hotspot locations - Ash Study
Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS COMMUNITY OUTREACH MEETING AGENDA Introductions History of PWSA Actions August 31 Storm Impacts Short
September 8, 2008 City of Modesto Community and Economic Development Department and Public Works Department
September 8, 2008 City of Modesto Community and Economic Development Department and Public Works Department STORM DRAINAGE DESIGN INTERIM POLICY FOR INFILL/REDEVELOPMENT PENDING THE ADOPTION & IMPLEMENATATION
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
5. Environmental Analysis
5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the
Innovative Approaches in Flood Damage Reduction
Innovative Approaches in Flood Damage Reduction Solutions for the Stormwater Management High Level Results 3D geospatial model of storm water management pond (GRCA, 2013) Enhanced understanding of storm
BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE
BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE February 23, 2006 PROJECT INTRODUCTION Project Area 230 acres $50 million estimated market value (approximately) 50 acres parkland 100 residences (estimated)
Triple Bottom Line Analysis for Green Infrastructure A Case Study 2012 ARCADIS
Triple Bottom Line Analysis for Green Infrastructure A Case Study Imagine 1 25 June the 2013 result Learning Objectives Explain Green Infrastructure (GI) as a strategy for stormwater management Describe
JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN. Presentation to Insurance Companies 19 January 2012
JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN Presentation to Insurance Companies 19 January 2012 Topics of Discussion Investigation Levels of Service Cause of Flooding Analysis Undertaken
2004 Capital Budget Capital Improvement Program
2004 Capital Budget Capital Improvement Program Agency Name: Stormwater Utility Agency Number: 53 Capital Budget Future Year Estimates Project Name 2004 2005 2006 2007 2008 2009 1 Accompanying Storm Sewer
The Challenge of Urban Flooding. Steven E. Eubanks, P.E., CFM Chief Stormwater Engineer, City of Fort Worth
The Challenge of Urban Flooding Steven E. Eubanks, P.E., CFM Chief Stormwater Engineer, City of Fort Worth Urban Flooding Awareness Bill Introduced into Congress in 2014 & 2015 Based on Illinois law passed
Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey
Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Rutgers Cooperative Extension Water Resources Program Christopher C. Obropta, Ph.D., P.E. Email: obropta@envsci.rutgers.edu
APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.
Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations
Toronto s Wet Weather Flow Master Plan
Toronto s Wet Weather Flow Master Plan 1. The Master Plan 2. The Don And Waterfront Study 3. What the Individual Can Do Wet Weather Flow Management Master Plan 2000 Storm Presentation to Don Mouth Naturalization...
NOTE: A HARDCOPY OF THE DRAINAGE REPORT AND CONSTRUCTION DRAWINGS MUST BE SUBMITTED TO PUBLIC WORKS FOR REVIEW.
Weld County Public Works Change of Zone Drainage Report Outline The following checklist is to be utilized as guidance, and may not be all inclusive. Other concerns not included in this checklist may arise
LTCP Re-evaluation: Workplan and Status Update. Advisory Committee Questions and Discussion
08 July 2015 Prepared for City of South Bend, Indiana Welcome and Introductions Advisory Committee Mission and Structure LTCP Re-evaluation: Workplan and Status Update Triple-Bottom-Line (TBL) Evaluation
SECTION 108 - INLETS 108.1 INLET LOCATIONS
Greene County Design Standards -Adopted April 5, 1999 SECTION 108 - INLETS SECTION 108 - INLETS 108.1 INLET LOCATIONS 108.2 INLET INTERCEPTION CAPACITIES 108.2.1 Clogging Factors 108.3 INTERCEPTION AND
RESOLUTION NO. 1539 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BONNEY LAKE, PIERCE COUNTY, WASHINGTON, APPROVING THE 192 ND CORRIDOR STUDY AND DIRECTING THE MAYOR TO PROCEED WITH PARTIAL DESIGN AND
The Clean Water Project What Is The Stormwater Impact?
The Clean Water Project What Is The Stormwater Impact? Presentation To: Seminar On Water Issues Bob Weimar, PE, BCEE Chief of Program Management The Metropolitan District Sewage Overflows Have Become More
Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted
Engineering Agency Number: 53 Budget Function: Public Works and Transportation The Engineering Division is responsible for the design, supervision and inspection of all street, highway, sidewalk and bike
HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto
HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto Evergreen s Urban Watershed Forum 20 March 2015 Presented by Kurtis Elton Policy & Program Advisor, Toronto
Urban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting
Urban Stream Restoration Defining the Full Benefits of a Project Warren C. High MACTEC Engineering and Consulting Economics in the Decision Process Return on Investment Willingness to Pay Municipal Growth
Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization
Introduction A visual examination of Doolittle Creek in a highly developed suburban county in Georgia yielded telltale signs of a creek whose original streambed had been altered. Examination of official
MICHIGAN S LANDSCAPE ARCHITECTS
MICHIGAN S LANDSCAPE ARCHITECTS protecting the health, safety, and welfare of our citizens site design land use planning master planning streetscape design brownfield redevelopment guidelines and regulations
Brownfields. Technical Report # 7
Brownfields Technical Report # 7 Gateway Action Plan Task #7 Adirondack Gateway Council Saratoga, Warren and Washington County, New York Brownfields May 2015 The work that provided the basis for this publication
City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions
City of Atlanta Department of Watershed Management Post-Development Stormwater Management Ordinance Summary of Revisions Cory Rayburn, CPESC Environmental Program Manager crayburn@atlantaga.gov Stormwater
STORM DRAIN DESIGN STANDARDS SECTION 4
STORM DRAIN DESIGN STANDARDS SECTION 4 4.100 GENERAL All drainage facilities shall be designed in accordance with accepted engineering principles, and shall conform to these Design Standards. 4.200 SUBMITTAL
Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town
Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town MEETING NOTES April 16, 2015 6:00 8:00 PM VERI Project Overview With funding from the US Economic Development Administration
Chapter Nine, Drainage Subelement City of St. Petersburg Comprehensive Plan
DRAINAGE SUBELEMENT Chapter Nine, Drainage Subelement Sections: 9.3.1 INTRODUCTION 9.3.2 GOALS, OBJECTIVES AND POLICIES ISSUE: Adoption of a level of service standard for drainage (Quantity) ISSUE: Rehab/Upgrade
Stormwater Wetland Design and Construction Mitigation Duke Bitsko. Construction Activities, Schedule and Sequence Tom Ritchie
September 7, 2011 Welcome Catherine Daly Woodbury DCR Coordination Dan Driscoll Project Background Catherine Daly Woodbury Stormwater Wetland Design and Construction Mitigation Duke Bitsko Construction
THE RUSKIN COMMUNITY PLAN
THE RUSKIN COMMUNITY PLAN Introduction Ruskin is a historic community situated on the shores of Tampa Bay, the Little Manatee River and the Ruskin Inlet, approximately 16 miles southeast of Tampa. The
VACANT BASEMENTS FOR STORMWATER MANAGEMENT FEASIBILITY STUDY
VACANT BASEMENTS FOR STORMWATER MANAGEMENT FEASIBILITY STUDY CITY OF MILWAUKEE OFFICE OF ENVIRONMENTAL SUSTAINABILITY, MILWAUKEE, WISCONSIN CITY CONTRACT C523130516 July 2, 2014 PREPARED FOR City of Milwaukee
URBAN FLOOD AWARENESS ACT. Brian Eber, CFM IDNR Office of Water Resources
URBAN FLOOD AWARENESS ACT Brian Eber, CFM IDNR Office of Water Resources Report Overview Report sections: 1. Analyze Past, Current, and Future flooding 2. Effectiveness of Programs and Policies 3. Strategies
Sewer System Improvement Program Update
August 20, 2014 Sewer System Improvement Program Update Tommy T. Moala SFPUC Assistant General Manager, Wastewater Enterprise Agenda 1. SF Sewer System 2. Our Challenges 3. Sewer System Improvement Program
CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS
June 27, 2011 Chapter 9 Storm Drainage Design and Stormwater Quality Regulations Table of Contents CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS Table of Contents Chapter 9 Storm Drainage
STORMWATER AND URBAN DESIGN
STORMWATER AND URBAN DESIGN Atlanta BeltLine Fall 2012 DESIGN + RESEARCH Urban Design Strategies for Four Sites on the Atlanta BeltLine Maddox Park, Boone Blvd and Proctor Creek Ansley Mall and the Clear
Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by
Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Easy guide to Sustainable drainage systems 02 Contents Page Introduction 05 Purpose of this
1 Introduction. 1.1 Background. 1.2 Organization. 1.3 How to Use this Manual
1 Introduction 1.1 Background 1.1.1 Stormwater Ordinance and Regulations 1.1.2 The Changing Regulatory Environment 1.2 Organization 1.3 How to Use this Manual This Page Intentionally Left Blank 1.1 Background
CHAPTER 5. Storm Sewer
CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water
Prioritization Methodology Report For Urban Drainage Projects
Prioritization Methodology Report For Urban Drainage Projects December 2006 Contact: Lalit Jha, PE/CFM 650 J St., Suite 215 Lincoln, NE 68508 PH: (402) 435-3080 Fax: (402) 435-4110 www.jeo.com E-mail:
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile
Request for City Council Committee Action From the Department of Public Works
Date: June 7, 2011 Request for City Council Committee Action From the Department of Public Works To: Referral: Subject: Honorable Sandra Colvin Roy, Chair Transportation & Public Works Committee Honorable
Muddy River Restoration Project Project Description
Muddy River Restoration Project Project Description Since the fall of 1996, the Muddy River has flooded three times, causing damage to residents, businesses institutions and the public transit system in
2012 Program Report. Agricultural Group Drainage Program
2012 Program Report Agricultural Group Drainage Program Accomplishments: It was a successful year for the drainage program. We were able to complete two new projects and seven maintenance projects throughout
COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary
CITY OF LAKEWOOD COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary MAY 2006 storage conveyance treatment performance Prepared for: City of Lakewood, Ohio Prepared by: Metcalf & Eddy of Ohio,
What we build today will create Denver s tomorrow. Signature development projects will strengthen our economy, create jobs and improve neighborhoods.
Mayor Hancock s Vision for Building a World-Class City What we build today will create Denver s tomorrow. Signature development projects will strengthen our economy, create jobs and improve neighborhoods.
Omaha Combined Sewer Overflow (CSO) Control Program
Omaha Combined Sewer Overflow (CSO) Control Program Service Disabled Veteran Owned Small Business Outreach, Training, Industry Forum Marty Grate - City of Omaha May 28, 2009 Challenges Facing Omaha Meeting
Implementing Green Infrastructure in Atlanta
City of Atlanta Mayor Kasim Reed Department of Watershed Management Implementing Green Infrastructure in Atlanta SESWA Southeast Regional Stormwater Seminar April 9, 2014 Jo Ann J. Macrina, P.E. Commissioner
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank
Pittsburgh has attempted to incorporate green infrastructure projects
Pittsburgh, Pennsylvania A Case Study of How Green Infrastructure is Helping Manage Urban Stormwater Challenges Types of green infrastructure used: Green roofs, rain barrels/cisterns, permeable pavement,
DRAINAGE STUDY INFORMATION FORM
Name of Development: Location of Development: HYDROLOGIC CRITERIA AND DRAINAGE MANUAL DRAINAGE STUDY INFORMATION FORM Date: a) Descriptive (Cross Streets) rth/south: East/West: b) Section: Township: Range:
H. Khalid Jamil 9367 Verain Street San Diego, CA, 92129 (858) 663-9200
OFFSITE DRAINAGE REPORT Ramona Assisted Living 1236 "D" Street Ramona, CA 92065 re~*7lb3 Prepared for H. Khalid Jamil 9367 Verain Street San Diego, CA, 92129 (858) 663-9200 July 1 1, 2008 Daniel Tobar,
WATER QUALITY MODELING TO SUPPORT THE ROUGE RIVER RESTORATION
WATER QUALITY MODELING TO SUPPORT THE ROUGE RIVER RESTORATION Edward H. Kluitenberg, P.E., Applied Science, Inc. Gary W. Mercer, P.E., Camp, Dresser and McKee Vyto Kaunelis, Wayne County Department of
8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:
. Introduction Presented in this chapter are the criteria and methodology for design and evaluation of storm sewer inlets located in Town of Castle Rock. The review of all planning submittals will be based
Swannanoa River Flood Risk Management Study
Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River
Downtown South Salt Lake Redevelopment City of South Salt Lake
Project Information LOCAL PLANNING RESOURCE PROGRAM 2015 Downtown South Salt Lake Redevelopment City of South Salt Lake Overview of Objectives: Building a downtown city center could be the most significant
SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER
Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating
General Obligation Bond Projects FYE 2013-2018
General Obligation Bond Projects FYE 2013-2018 2009 City of Norman Community Survey Final Report 2011 CTP Survey Results Storm Drainage and Street Widening Projects Combined Storm Water/Transportation
The Milwaukee Metropolitan Sewerage District (MMSD) is a regional
Milwaukee, WIsconsin A Case Study of How Green Infrastructure is Helping Manage Urban Stormwater Challenges Types of green infrastructure used: Green roofs, blue roofs, rain barrels/cisterns, permeable
Quantifying LID Triple Bottom Line Benefits Milwaukee Case Study Kimberly Brewer, A.I.C.P. Tetra Tech
Quantifying LID Triple Bottom Line Benefits Milwaukee Case Study Kimberly Brewer, A.I.C.P. Tetra Tech Karen Sands, Manager of Sustainability, MMSD Heather Fisher, AICP, Tetra Tech 1 Background MMSD provides
Integrating Asset Management Principals to Watershed Management: A Risk-Based Approach to Managing Stormwater Assets
Integrating Asset Management Principals to Watershed Management: A Risk-Based Approach to Managing Stormwater Assets Presenters: Mark VanAuken, PE, CMS4S, ENV SP Stormwater/MS4 Discipline Leader Kevin
Planning and Zoning Commission Johnston, Iowa June 29, 2015
ITEM NO. 15-19 Planning and Zoning Commission Johnston, Iowa June 29, 2015 SUBJECT: Consider recommending approval of the Final Plat for Crosshaven Plat 6 subdividing 28.28 acres into 47 single family
Flood Reduction Strategies in the City of Ottawa. Presented by : Eric Tousignant, P.Eng Senior Water Resources Engineer, City of Ottawa
Flood Reduction Strategies in the City of Ottawa Presented by : Eric Tousignant, P.Eng Senior Water Resources Engineer, City of Ottawa Flooding in Ottawa Since amalgamation in 2000, there has been 4 significant
Project Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161
Rainbow Creek Master Plan Update Study The City of Vaughan june 2014 COLE ENGINEERING GROUP LTD. 70 Valleywood Drive Project Manager. Geoff Masotti, P.Eng. Markham, ON CANADA L3R 4T5 T. 905.940.6161 Ext.
Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington
Viewed broadly, the concept of ecosystem services describes the many resources and services provided by nature. Typically, traditional planning and development practices do not adequately represent the
WEST-END FLOODING INVESTIGATION 24 JULY 2009 RAINSTORM EVENT CONSOLIDATED REPORT AND ACTION PLAN
Background WEST-END FLOODING INVESTIGATION 24 JULY 2009 RAINSTORM EVENT MARCH 2011 TABLE OF CONTENT Summary Report 1. Background 2. Flood Investigation Process 3. Public Input 4. Level of Service Objective
Flood Protection in Garland Past, Present, and Future. Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas
Flood Protection in Garland Past, Present, and Future Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas A few facts about Garland: Originally incorporated in 1891 Population 226,876 (2010
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
APPENDIX B. PRO-RATA SHARE PROGRAM EVALUATION
APPENDIX B. PRO-RATA SHARE PROGRAM EVALUATION B.1 Introduction Across the United States, municipalities utilize mechanisms such as storm water utilities and pro rata share programs to fund activities required