1 Austin Utility Location & Coordination Committee Agenda Meeting scheduled for Thursday June 30, 2016 One Texas Center, 505 Barton Springs Road, 10th floor Conference Room Time: 2:00 p.m. to 4:00 p.m. Project Contacts: The projects will be reviewed in the order listed after any announcements are made. Allowing for announcements, there should be ample time for discussion of each project; however, the discussion of each could take as little as 5 minutes or as long as 15 minutes to complete. If you have no representative present when your project comes up, the project will be rotated to the end of the agenda. Please sidebar lengthy discussions with the reviewers, if necessary, until the end of the meeting. The AULCC meeting is scheduled for 2 hours; however, the conference room is reserved until 4:30. Project Reviewers: Please keep your side discussions and noise level limited so that the meeting can proceed efficiently. Please make yourself available after the meeting for additional discussions, if requested, with the project managers or consultants. 1 PAR-Dove Springs Recreation Center Expansion UCC The City of Austin (COA) desires to expand the existing Dove Springs District Park Recreation Center building at 5801 Ainez Drive, in Southeast Austin. The recreation center was constructed under COA approved Site Plan No. SPC C. This expansion will include a new building and a shaded open area which connects the new building to the existing building. An extended fire lane and a fire hydrant is also proposed to meet Fire Code. The existing sidewalk from Ainez Drive to the building will be reconstructed to be ADA compliant. Chan & Partners Engineering (CPE) is responsible for site civil design. The domestic water line will be rerouted to provide water for the new building. A new wastewater line serving the Project Contact (Primary): Zhipeng Xing, E.I.T , ext. 25 Project Manager (Owner's): Kevin Johnson, Project Engineer: John R. King, P.E , ext. 12 zhipengx@chanpartners.com Est. Construction Dates: January 1, 2017 Plan Dist. Date: May 11, 2016 Designer: Chan & Partners Engineering, LLC. (site civil) Design Stage: Preliminary Design

2 2 SP-Studio East Tower Crane UCC Tower Crane installation at 1648 E. 6th Street for a mixed-use multi-family project, Studio East. Project Contact (Primary): Gregory Cole gcole@mpconstruct.com Project Manager (Owner's): Gregory Cole gcole@mpconstruct.com Project Engineer: Ellis Petersen gcole@mpconstruct.com Est. Construction Dates: 7/15/16-11/15/17 Plan Dist. Date: June 6, 2016 Designer: Wilder Belshaw Architects Design Stage: 100%

3 3 SP-Residence Hall 5 Student Housing UCC St Edwards University is planning to construct a new residence hall on the southern portion of the campus adjacent to Woodward Street and Theater Pass. As part of this construction, additional utilties will be installed both within the campus, and in the adjacent Woodward Street right-ofway. As shown on the Utility Plan we are proposing to install several underground duct banks, pull boxes, and manholes for power/telecommunications. Note: the depicted linework is from the final design by Austin Energy. Additionally, an 8" WW line will be installed across Woodward Street to tie to an existing WW manhole. There are several existing utilities within Woodward Street as shown (cable, overhead power, public water, storm sewer, wastewater, gas.) Note that the design engineer has already coordinated with the utility companies as depicted on the Utility Plan. Project Contact (Primary): Russell Tomer, Doucet & Associates, Inc Project Manager (Owner's): Micheal Peterson Project Engineer: Russell Tomer, Doucet & Associates, Inc rtomer@doucetengineers.com Est. Construction Dates: 07/01/16 to 07/31/16 Plan Dist. Date: June 7, 2016 Designer: Doucet & Associates, Inc. Design Stage: 100%

4 4 SP-Springwood Self Storage at 9206 Anderson Mill Road UCC The proposed acre site is currently developed with two one-story storage unit buildings and associated paving. The proposed development is for one three-story storage unit building and associated infrastructure. The site is located at 9206 Anderson Mill Rd., the Williamson County Parcel No. is R The site is located within the Lake Creek Suburban Watershed. The existing 6-inch waterline (COA # ) runs north and south in the Harmony Hill St. R.O.W. and will be used to serve the site with domestic water and fire protection. Wastewater flows from the site will tie into the existing wastewater manhole (COA #135187) located west of the southwest corner of the property. The proposed stormwater pipe will tie into the existing curb inlet along Anderson Mill Rd. just south of the southwest corner of the property. Work within the ROW to make connections to existing water and stormewater facilities will take place on the following streets: Address Range Street Cross Street 1 Cross Street 2 Project Contact (Primary): Erik Allore Project Manager (Owner's): Gemsong N. Ryan, PE Project Engineer: Gemsong N. Ryan, PE eallore@jonescarter.com Est. Construction Dates: 3/1/2017-6/1/2017 Plan Dist. Date: May 18, 2016 Designer: Jones Carter Design Stage: 50%

5 5 Tower Crane for Kline Hotel at 1109 E 6th St =No5!MUCC Tower Crane for Kline Hotel at 1109 E 6th St Project Contact (Primary): MWhite@lottbrothers.com Project Manager (Owner's): Colby Wallis (512) Project Engineer: Ricky Decamps (512) colby@walliscs.com MWhite@lottbrothers.com Est. Construction Dates: 7/15/16 to 10/1/17 Plan Dist. Date: May 17, 2016 Designer: Big Red Dog Engineering Design Stage: 100% Red Stamps

6 6 SP-Cottages at Lantana (5610 & 5804 Wier Hills Road) UCC The site is located within the Williamson Creek Suburban Watershed and Barton Springs Zone. The existing 16-inch waterline (COA W ) runs west to east on the north side of the site and then turns and parallels Wier Hills Road towards Rialto Blvd. This line will be used to serve the site with domestic water and fire protection. Wastewater flows from the site will tie into the existing wastewater main (COA ) utilizing a proposed manhole located just west of the property. The proposed stormwater system will treat all onsite water and discharge into the existing waterway located in the middle of the site. All offsite water will be collected and diverted to multiple locations of the existing waterway. Work within the ROW to make connections to existing water and stormewater facilities will take place on the following streets: Address Range Street Cross Street 1 Cross Street 2 Project Contact (Primary): Joshua W. Miksch, P.E. (512) Project Manager (Owner's): John Swanson Project Engineer: Joshua W. Miksch, P.E. jmiksch@jonescarter.com Est. Construction Dates: 10/1/2016-4/1/2017 Plan Dist. Date: May 24, 2016 Designer: Jones Carter Design Stage: 90%

7 7 WPD-Harris Branch Stirling Bridge Wetpond Repair (R01155) UCC The Stirling Bridge Subdivision Wetpond has suffered damage at both the inlet and outlet structures due to heavy rains in early The project will involve widening and armoring both the inlet and outlet structures to prevent further damage. Construction duration is about 2 months. Address Range Street Cross Street 1 Cross Street Gaelic Dr. Culloden Dr. Gaelic Ct. Project Contact (Primary): Sean Thompson Project Manager (Owner's): Tom Franke Project Engineer: Tom Franke sean.thompson@austintexas.gov tom.franke@austintexas.org Est. Construction Dates: 9/1/2016 to 11/1/2016 Plan Dist. Date: May 27, 2016 Designer: Sean Thompson Design Stage: 30%

LOCATIONS OF UTILITIES IN PUBLIC RIGHTS-OF-WAY Examples from various Cities

LOCATIONS OF UTILITIES IN PUBLIC RIGHTS-OF-WAY Examples from various Cities LOCATIONS OF UTILITIES IN PUBLIC RIGHTS-OF-WAY Examples from various Cities American Public Works Association Utilities & Public Right of Way Committee February 29, 2000 Table o of Contents Index...Page

More information

FILE NO.: Z-8403. LOCATION: Located on the Northeast and Southeast corners of West 12 th Street and Dennison Street

FILE NO.: Z-8403. LOCATION: Located on the Northeast and Southeast corners of West 12 th Street and Dennison Street FILE NO.: Z-8403 NAME: Glason Short-form POD LOCATION: Located on the Northeast and Southeast corners of West 12 th Street and Dennison Street DEVELOPER: Dennis Glason c/o the Law Office of Simmons S.

More information

FM 969 CORRIDOR. APPENDIX c

FM 969 CORRIDOR. APPENDIX c FM 969 CORRIDOR APPENDIX c c utility technical memorandum State of Texas Registered Firm No. F-3572 CAS CONSULTING & SERVICES, INC. Civil, Transportation, and Environmental Engineering Austin Dallas Houston

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

Kansas City s Overflow Control Program

Kansas City s Overflow Control Program Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater

More information

Planning Commission March 10, 2015 @ 6:00 P.M. City Hall Council Chambers 301 W. 2 nd Street Austin, TX 78701

Planning Commission March 10, 2015 @ 6:00 P.M. City Hall Council Chambers 301 W. 2 nd Street Austin, TX 78701 Planning Commission March 10, 2015 @ 6:00 P.M. City Hall Council Chambers 301 W. 2 nd Street Austin, TX 78701 Danette Chimenti Chair Richard Hatfield Alfonso Hernandez Parliamentarian Jeff Jack Ex-Officio

More information

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request FILE NO.: Z-6915-C NAME: Gamble Road Short-form PCD and Land Alteration Variance Request LOCATION: Located on the Northwest corner of Chenal Parkway and Gamble Road DEVELOPER: Davis Properties P.O. Box

More information

Staff Report General Development Plan/Master Plan Aldermanic District: 1 County Commission District: 2 MPC File No. 16-000526-PLAN February 23, 2016

Staff Report General Development Plan/Master Plan Aldermanic District: 1 County Commission District: 2 MPC File No. 16-000526-PLAN February 23, 2016 Staff Report General Development Plan/Master Plan Aldermanic District: 1 County Commission District: 2 MPC File No. 16-000526-PLAN February 23, 2016 1101 Bull Street One West Park Avenue 1107 Bull Street

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

SECTION 5 DRAFTING STANDARDS

SECTION 5 DRAFTING STANDARDS SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.

More information

RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY

RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY CITY COUNCIL AGENDA REQUEST AGENDA OF: 07-01-14 AGENDA REQUEST NO: IV-D INITIATED BY: GREG NICHOLS PROJECT MANAGER RESPONSIBLE DEPARTMENT: ENGINEERING PRESENTED BY: TIMOTHY JAHN, P.E. SENIOR ENGINEER DIRECTOR:

More information

STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page

STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS SECTION DESCRIPTION Page 1 Executive Summary / Brief History 2 2 Services Provided / Administration

More information

ENVIRONMENTAL ASSESSMENT (EA) VILLAGE OF EAU CLAIRE - BERRIEN COUNTY INFILTRATION/INFLOW REMOVAL PROJECT APRIL 2015

ENVIRONMENTAL ASSESSMENT (EA) VILLAGE OF EAU CLAIRE - BERRIEN COUNTY INFILTRATION/INFLOW REMOVAL PROJECT APRIL 2015 ENVIRONMENTAL ASSESSMENT (EA) VILLAGE OF EAU CLAIRE - BERRIEN COUNTY INFILTRATION/INFLOW REMOVAL PROJECT APRIL 2015 I. PROJECT IDENTIFICATION Applicant: Authorized Representative: Village of Eau Claire

More information

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Public Works Projects in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Projects in Marina Del Rey Waterline Projects Phase II Phase III Roadway Projects Admiralty

More information

How To Write A City Of Lakewood

How To Write A City Of Lakewood Click to edit Master title style Bay Village Sunset Area: Storm Sewer & Pavement Replacement Engineering Click toosborn edit Master title style Talented Staff Headquartered in Cleveland Resource Base of

More information

EXHIBIT A Accessible Truck Routes Map

EXHIBIT A Accessible Truck Routes Map EXHIBIT A Accessible Truck Routes Map ASHEVILLE, NORTH CAROLINA ROUTE: A ROUTE: B ROUTE: C ROUTE: D ROUTE: E EXHIBIT A EXHIBIT B Craven Street Improvements Map ASHEVILLE, NORTH CAROLINA EXHIBIT B EXHIBIT

More information

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop FILE NO.: Z-8958 NAME: Rock Structure Repair Short-form PID LOCATION: Located at 8024 Stanton Road DEVELOPER: Rock Structure Repair Attn. Rudy Gutierrez 3 Kipling Court Little Rock, AR 72209 ENGINEER:

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

PROFFER STATEMENT REZONING TLZM 2013-0001 LEEGATE November 1, 2013

PROFFER STATEMENT REZONING TLZM 2013-0001 LEEGATE November 1, 2013 PROFFER STATEMENT REZONING TLZM 2013-0001 LEEGATE November 1, 2013 Leegate LLC and Stanley Martin Companies, LLC, owner and applicant, (the Applicant ) of certain property described as Loudoun County Tax

More information

WATER & SEWER LINE REPLACEMENT PROJECT Downtown Tempe Neighborhoods

WATER & SEWER LINE REPLACEMENT PROJECT Downtown Tempe Neighborhoods WATER & SEWER LINE REPLACEMENT PROJECT Downtown Tempe Neighborhoods NEIGHBORHOOD MEETING Wednesday, February 10, 2016 6:00 7:00 p.m. Childsplay, 900 S. Mitchell Drive, Tempe, AZ Neighborhood Meeting Welcome,

More information

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to

More information

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE

More information

Abandoned Underground Utility Line Congestion A CONTRACTOR S PERSPECTIVE

Abandoned Underground Utility Line Congestion A CONTRACTOR S PERSPECTIVE Abandoned Underground Utility Line Congestion A CONTRACTOR S PERSPECTIVE PRESENTER: ROBERT BOB MEADS, PRESIDENT R&M Consultants & Project Management, LLC Virginia Beach, VA Purpose of Presentation To share

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

CHAN & PARTNERS ENGINEERING, LLC

CHAN & PARTNERS ENGINEERING, LLC July 2012 CHAN & PARTNERS ENGINEERING, LLC Consulting Civil Engineers Imagine Austin Comprehensive Plan Infrastructure, Operations, Maintenance & Service Cost Comparison Preferred Growth Scenario and Trend

More information

SOLD. Lot 1. 1 Mile: Population: 10,200 Median HH Income: $33,100. 3 Mile: Population: 80,200 Median HH Income: $34,900

SOLD. Lot 1. 1 Mile: Population: 10,200 Median HH Income: $33,100. 3 Mile: Population: 80,200 Median HH Income: $34,900 Walmart Outparcels For Sale College Station, TX Store # 1150 1815 Brothers Blvd FM 2818 W SOLD Texas Ave S/ Hwy 6 Longmire Dr Brothers Blvd Lot 1 For more information about this site, contact: Lot 1: ±2.41

More information

Planning and Zoning Commission Johnston, Iowa June 29, 2015

Planning and Zoning Commission Johnston, Iowa June 29, 2015 ITEM NO. 15-19 Planning and Zoning Commission Johnston, Iowa June 29, 2015 SUBJECT: Consider recommending approval of the Final Plat for Crosshaven Plat 6 subdividing 28.28 acres into 47 single family

More information

AGENDA LARIMER COUNTY PLANNING COMMISSION Wednesday, April 20, 2016/6:30 P.M./Commissioners' Hearing Room

AGENDA LARIMER COUNTY PLANNING COMMISSION Wednesday, April 20, 2016/6:30 P.M./Commissioners' Hearing Room AGENDA LARIMER COUNTY PLANNING COMMISSION Wednesday, April 20, 2016/6:30 P.M./Commissioners' Hearing Room A. CALL TO ORDER B. PLEDGE OF ALLEGIANCE C. PUBLIC COMMENT ON THE COUNTY LAND USE CODE D. PUBLIC

More information

FLORIDA ATLANTIC UNIVERSITY

FLORIDA ATLANTIC UNIVERSITY 9 Supporting Data The purpose of the Element is to ensure the provision of public facilities and services required to meet the future needs of the University, including: Stormwater management, to protect

More information

City of Springboro 320 West Central Avenue, Springboro, Ohio. Planning Commission Regular Meeting. Wednesday, June 25, 2014

City of Springboro 320 West Central Avenue, Springboro, Ohio. Planning Commission Regular Meeting. Wednesday, June 25, 2014 City of Springboro 320 West Central Avenue, Springboro, Ohio Wednesday, I. Call to Order and Roll Call Chairperson Hans Landefeld called the Springboro Planning Commission Meeting to order at the Springboro

More information

Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted

Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted Engineering Agency Number: 53 Budget Function: Public Works and Transportation The Engineering Division is responsible for the design, supervision and inspection of all street, highway, sidewalk and bike

More information

D3 April 8, 2015 Public Hearing

D3 April 8, 2015 Public Hearing D3 April 8, 2015 Public Hearing APPLICANT AND PROPERTY OWNER: ASSEMBLY OF YAH, INC. STAFF PLANNER: Kevin Kemp REQUEST: Conditional Use Permit (Religious Facility - church) ADDRESS / DESCRIPTION: 5151 Locke

More information

MINUTES OF THE WILLIAMSON COUNTY REGIONAL PLANNING COMMISSION MEETING OF MARCH 13, 2008

MINUTES OF THE WILLIAMSON COUNTY REGIONAL PLANNING COMMISSION MEETING OF MARCH 13, 2008 MINUTES OF THE WILLIAMSON COUNTY REGIONAL PLANNING COMMISSION MEETING OF MARCH 13, 2008 MEMBERS PRESENT Don Crohan Susan Fisher Holli Givens John Lackey Steve Lane Robert Medaugh Pete Mosley Tom Murdic

More information

MINUTES OF MEETING OF BOARD OF IRECTORS. June 29,2015

MINUTES OF MEETING OF BOARD OF IRECTORS. June 29,2015 MINUTES OF MEETING OF BOARD OF IRECTORS June 29,2015 THE STATE OF TEXAS COUNTY OF HARRIS TRAIL OF THE LAKES MUNICIPAL UTILITY DISTRICT The Board of Directors (the "Board") of Trail of the Lakes Municipal

More information

FOR SALE Office Building

FOR SALE Office Building 1712 West State Street Bristol, Tennessee 37620 State TR # 13-11-003 Open house on April 26, 2016 from 1:00-3:00pm EST FOR SALE Office Building OFFERING MEMORANDUM Contact Information Jeff Jones 615-445-9984

More information

Implementing a Work Order and. Asset Management System? Learning Objectives. What We Have. The City of Colleyville

Implementing a Work Order and. Asset Management System? Learning Objectives. What We Have. The City of Colleyville A Small City s Story of Implementing a Work Order and Asset Management System American Public Works Association 2013 Congress August 28, 2013 Introductions Public Works Department City of Colleyville,

More information

PLANNED DEVELOPMENT PERMIT

PLANNED DEVELOPMENT PERMIT FILE NO. LOCATION OF PROPERTY ZONING DISTRICT ZONING FILE NUMBER GENERAL PLAN DESIGNATION PROPOSED USE PLANNED DEVELOPMENT PERMIT PDA05-095-01 Southwest corner of Silver Creek Valley Road and Silver Creek

More information

City of Hilshire Village Pine Creek Ln Reconstruction

City of Hilshire Village Pine Creek Ln Reconstruction City of Hilshire Village Pine Creek Ln Reconstruction OVERVIEW The City will be soliciting bids for the Pine Creek Reconstruction Project with construction scheduled to begin in January 2015. This project

More information

Downtown Vancouver Full Block For Sale 1.03 Acre Redevelopment Opportunity

Downtown Vancouver Full Block For Sale 1.03 Acre Redevelopment Opportunity FOR SALE E Mill Plain & E Main Street, Vancouver, WA E 16th St Main St Columbia St Washington St E 15th St E Mill Plain Blvd Downtown Vancouver Full Block For Sale 1.03 Acre Redevelopment Opportunity $2,00,000

More information

MACOMB TOWNSHIP PLANNING COMMISSION MEETING MINUTES AND PUBLIC HEARING TUESDAY, May 5, 2009 PAGE 1 OF 8

MACOMB TOWNSHIP PLANNING COMMISSION MEETING MINUTES AND PUBLIC HEARING TUESDAY, May 5, 2009 PAGE 1 OF 8 PAGE 1 OF 8 LOCATION: PRESENT: ABSENT: ALSO PRESENT: MACOMB TOWNSHIP MEETING CHAMBERS 54111 BROUGHTON ROAD MACOMB, MI 48042 EDWARD GALLAGHER, CHAIRMAN DEAN AUSILIO, VICE CHAIRMAN MICHAEL D. KOEHS, SECRETARY

More information

King County/Skyway Water & Sewer District Infiltration and Inflow Reduction Project

King County/Skyway Water & Sewer District Infiltration and Inflow Reduction Project King County/Skyway Water & Sewer District Infiltration and Inflow Reduction Project Public Meetings March 30 and April 2, 2011 Summary of Public Comment In late March and early April 2011, the King County

More information

2015 STATE OF THE URBAN TRAILS. Accomplishments, Active Projects, and Next Steps

2015 STATE OF THE URBAN TRAILS. Accomplishments, Active Projects, and Next Steps 2015 STATE OF THE URBAN TRAILS Accomplishments, Active Projects, and Next Steps Agenda What is an Urban Trail? Accomplishments Active Projects Next Steps What is an Urban Trail? Goals of Urban Trail Program:

More information

PLANNING DIVISION STAFF REPORT February 23, 2015. Summary. Background Information PREPARED FOR THE PLAN COMMISSION. Legistar File ID # 36810

PLANNING DIVISION STAFF REPORT February 23, 2015. Summary. Background Information PREPARED FOR THE PLAN COMMISSION. Legistar File ID # 36810 PLANNING DIVISION STAFF REPORT PREPARED FOR THE PLAN COMMISSION Project Address: Application Type: Legistar File ID # 36810 Prepared By: Summary Conditional Use Timothy M. Parks, Planning Division Report

More information

CHAPTER 1181 Improvements

CHAPTER 1181 Improvements 139 CHAPTER 1181 Improvements 1181.01 Performance bond; 1181.07 Street name signs. construction plans; 1181.08 Street lighting. improvements. 1181.09 Improvements bond. 1181.02 Monuments. 1181.10 Maintenance

More information

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included

More information

S.R. 37 Pavement Rehabilitation Project. Wednesday, March 5, 2014 Orange County Community Center 6:30 p.m.

S.R. 37 Pavement Rehabilitation Project. Wednesday, March 5, 2014 Orange County Community Center 6:30 p.m. S.R. 37 Pavement Rehabilitation Project Wednesday, March 5, 2014 Orange County Community Center 6:30 p.m. Welcome Purpose and explanation of public meeting Public meeting format Visit our sign-in table

More information

Alternatives Design Report. Draft

Alternatives Design Report. Draft Draft 3/4/2014 TABLE OF CONTENTS I Introduction... 1 A. HISTORY... 1 B. PROJECT BACKGROUND... 1 II. ALTERNATIVES DEVELOPMENT... 8 A. ALTERNATE 1 NO BUILD... 8 B. ALTERNATE 2 IMPROVE ROADWAY ON EXISTING

More information

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3 TOWN OF SIDNEY Multi-Family, Commercial, Industrial and Institutional Building Permit Guide The information provided is intended as a guide only and does not replace current bylaws and regulations. Complete

More information

The meeting was called to order by Chairman Smith at 5:20 p.m.

The meeting was called to order by Chairman Smith at 5:20 p.m. TO: Planning Commission Members Honorable Mayor and City Council Members FROM: Shawn Wetterlin, Building/ Zoning Official DATE: May 6 th, 2015 RE: Meeting Minutes, Tuesday, May 5 th, 2015 The Planning

More information

Roadway Cost Per Centerline Mile Revised June 2014

Roadway Cost Per Centerline Mile Revised June 2014 Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743

More information

B.S. in Environmental Engineering, minor in Chemistry, Oregon State University, Corvallis, Oregon, 2001

B.S. in Environmental Engineering, minor in Chemistry, Oregon State University, Corvallis, Oregon, 2001 Gregory M. Hall, PE, QSD/QSP Project Engineer Oscar Larson & Associates REGISTRATION: EDUCATION: Civil Engineer #73260, California B.S. in Environmental Engineering, minor in Chemistry, Oregon State University,

More information

CHAPTER 8 CIVIL DESIGN

CHAPTER 8 CIVIL DESIGN CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical

More information

FILING REQUIREMENTS EXCERPTS FROM THE ZONING ORDINANCE SOLAR ENERGY SYSTEMS

FILING REQUIREMENTS EXCERPTS FROM THE ZONING ORDINANCE SOLAR ENERGY SYSTEMS County of San Diego, Planning & Development Services APPLICANT S GUIDE FOR A SOLAR ENERGY SYSTEM ZONING DIVISION These guidelines provide information on how to apply for a Solar Energy System. Review the

More information

5. Environmental Analysis

5. Environmental Analysis 5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the

More information

Moving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements

Moving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements Moving Ruston Forward City of Ruston Infrastructure Maintenance and Improvements MLK Extension Project will be done in conjunction with proposed water and sewer improvements Connect Martin Luther King

More information

Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY CATEGORY... 18 SMART CITY CIP 5 YEAR SUMMARY BY VISION...

Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY CATEGORY... 18 SMART CITY CIP 5 YEAR SUMMARY BY VISION... Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY VISION... 5 CIP 5 YEAR SUMMARY BY CATEGORY... 18 SMART CITY CIP 5 YEAR SUMMARY BY VISION... 33 CAPITAL IMPROVEMENT PROJECTS

More information

City of El Paso City Plan Commission Staff Report

City of El Paso City Plan Commission Staff Report City of El Paso City Plan Commission Staff Report Revised Case No: SUSU14-00124 Fresno Place Replat A Application Type: Resubdivision Combination CPC Hearing Date: February 12, 2015 Staff Planner: Joaquin

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

AREA: 0.16 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF

AREA: 0.16 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF FILE NO.: Z-9020 NAME: Hometown Tax Service Short-form PD-O LOCATION: Located at 3008 West 12 th Street DEVELOPER: Mark Green 65 Westfield Loop Little Rock, AR 72210 SURVEYOR: Kittler-Roberts Group, LLP

More information

Jackson Gulch Outlet Canal Rehabilitation Project

Jackson Gulch Outlet Canal Rehabilitation Project Jackson Gulch Outlet Canal Rehabilitation Project Preliminary Budgetary Estimate for Rehabilitation February 2004 Prepared for the Mancos Water Conservancy District Jackson Gulch Reservoir 42888 County

More information

Electronic Signature and Fee Payment Confirmation

Electronic Signature and Fee Payment Confirmation Jeff Levine, AICP, Director Planning & Urban Development Department Electronic Signature and Fee Payment Confirmation Notice: Your electronic signature is considered a legal signature per state law. By

More information

Private storm drain inlet retrofitting requirements - Purpose. Sec.13-21.1. Private storm drain inlet retrofitting requirements - Definitions.

Private storm drain inlet retrofitting requirements - Purpose. Sec.13-21.1. Private storm drain inlet retrofitting requirements - Definitions. 2011-7 AN ORDINANCE ESTABLISHING STANDARDS FOR THE PRIVATE STORM DRAIN INLET RETROFITTING AND AMENDING THE "CODE OF THE TOWNSHIP OF PRINCETON, NEW JERSEY, 1968". BE IT ORDAINED by the Township Committee

More information

VILLAGE OF ARLINGTON HEIGHTS. Sewer Back-up Rebate Program

VILLAGE OF ARLINGTON HEIGHTS. Sewer Back-up Rebate Program VILLAGE OF ARLINGTON HEIGHTS Sewer Back-up Rebate Program VILLAGE OF ARLINGTON HEIGHTS DEPARTMENT OF BUILDING & HEALTH SERVICES 33 S. Arlington Heights Rd. Arlington Heights, IL 60005 Phone: (847) 368-5560

More information

PRELIMINARY PROJECT REVIEW PROCESS

PRELIMINARY PROJECT REVIEW PROCESS CITY OF CYPRESS 5275 Orange Avenue Cypress, California 90630 (714) 229-6720 PRELIMINARY PROJECT REVIEW PROCESS 1. Discuss project with Planning staff to determine zoning regulations, unusual characteristics

More information

SERVICING REPORT SITE PLAN AND PLAN OF CONDOMINIUM BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO

SERVICING REPORT SITE PLAN AND PLAN OF CONDOMINIUM BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO MARCH 2014 BLOCK 53 Ferris Drive Plan 58M-379 & Part of Lot 4, Registered Plan 622 WELLESLEY, ONTARIO DOCUMENT

More information

City of Cape Coral, Florida FY 2015-2017 Proposed Operating Budgets

City of Cape Coral, Florida FY 2015-2017 Proposed Operating Budgets FUNDED CAPITAL IMPROVEMENT PROGRAM FY 2015-2020 SUMMARY OF REQUIRED REVENUES FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TOTAL All Hazards $ 100,000 $ - $ - $ - $ - $ - $ 100,000 Capital Facility Expansion

More information

Columbus State Community College MASTER PLANNING

Columbus State Community College MASTER PLANNING Columbus State Community College MASTER PLANNING Current State Facilities and Utilities Assessment November 2011 Columbus State Community College MASTER PLANNING EXISTING UTILITIES AND FACILITIES ASSESSMENT

More information

REZONING 16-000009 & PRELIMINARY PLAT 16-000005

REZONING 16-000009 & PRELIMINARY PLAT 16-000005 REZONING 16-000009 & PRELIMINARY PLAT 16-000005 REZONING REQUEST AND REVISED PRELIMINARY PLAT FOR THE BLUFFS AT WINDCASTLE - 4165 FAREDALE LANE Application: Engineer: Developer: Property Owner: Current

More information

Town of Yorktown Comprehensive Plan 8. INFRASTRUCTURE

Town of Yorktown Comprehensive Plan 8. INFRASTRUCTURE Town of Yorktown Comprehensive Plan 8. INFRASTRUCTURE 8. Infrastructure 8.1 VISION STATEMENT Infrastructure is a basic building block of the community essential for the health, safety, and welfare of residents.

More information

AGENDA URBAN COUNTY PLANNING COMMISSION SUBDIVISION ITEMS. December 12, 2013

AGENDA URBAN COUNTY PLANNING COMMISSION SUBDIVISION ITEMS. December 12, 2013 AGENDA URBAN COUNTY PLANNING COMMISSION SUBDIVISION ITEMS December 12, 2013 I. CALL TO ORDER - The meeting will be called to order at 1:30 p.m. in the Council Chambers, Urban County Government Building,

More information

Locust Valley High School Flood Remediation

Locust Valley High School Flood Remediation Locust Valley High School Flood Remediation Location: Locust Valley, NY Client: Locust Valley Central School District Design Firm(s): BBS Architects Prime, Greenman Pedersen Inc. Sub, Civil Engineering

More information

Waterstone Business Park

Waterstone Business Park Orange County, North Carolina Waterstone Business Park Parcel Size Price Location Zoning Topography Combined total of 47 acres (Parcel #5-22 acres, #7-25 acres) $74,545 per acre (Parcel #5), $32,880 per

More information

Opal Service District Plan

Opal Service District Plan 8 The Opal Service District includes a variety of planned land uses including commercial, mixed-use, flex office, industrial, and hospitality. This Plan seeks to simplify the land use categories to allow

More information

Anderson & Associates, Inc.

Anderson & Associates, Inc. Anderson & Associates, Inc. Professional Services for Community Colleges Access Road Mountain Empire Community College - Big Stone Gap, VA Firm s Responsibility: Base Mapping, Environmental Review, Cost

More information

19310 STONE OAK PKWY, STE. 201 SAN ANTONIO, TEXAS 78258 T: 210.402.6363 F: 210.402.6767 www.drakecommercial.com

19310 STONE OAK PKWY, STE. 201 SAN ANTONIO, TEXAS 78258 T: 210.402.6363 F: 210.402.6767 www.drakecommercial.com Multi-Family Land Sonoma Verde Kyle Seale Parkway San Antonio, Texas DRAKE COMMERCIAL GROUP DEBORAH BAUER TRAVIS BAUER 19310 STONE OAK PKWY, STE. 201 SAN ANTONIO, TEXAS 78258 T: 210.402.6363 F: 210.402.6767

More information

ESCAMBIA COUNTY FLOOD RECOVERY: 1- YEAR ANNIVERSARY REPORT

ESCAMBIA COUNTY FLOOD RECOVERY: 1- YEAR ANNIVERSARY REPORT Joy D. Blackmon, P.E. Director, County Engineer Public Works Department ESCAMBIA COUNTY FLOOD RECOVERY: 1- YEAR ANNIVERSARY REPORT EXECUTIVE SUMMARY One year after the devastating April 2014 floods hit

More information

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013 Red Wing Bridge Project PAC #5/TAC #8 Meeting July 18, 2013 Alternatives Analysis Agenda Overview of Past Progress Progress Since April PAC Bridge 9103 Rehabilitation Study Bridge 9040 Rehab vs. Replacement

More information

Reference Guide for Obtaining Permits and Utility Services For New Construction

Reference Guide for Obtaining Permits and Utility Services For New Construction Reference Guide for Obtaining Permits and Utility Services For New Construction (Revised 04-2012) Table of Contents City Offices Telephone Numbers...1 Application for Utilities...2 Building Permits New

More information

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

Westerly Creek, A Poster Child for Understanding the Benefit of Stormwater Investment

Westerly Creek, A Poster Child for Understanding the Benefit of Stormwater Investment Westerly Creek, A Poster Child for Understanding the Benefit of Stormwater Investment Presented at the ASFPM Annual Conference Atlanta, GA June 1 June 5 2015 Jon Villines, EIT, CFM Aurora Water Alan Turner,

More information

ORDINANCE NO. 2013 -

ORDINANCE NO. 2013 - ORDINANCE NO. 2013 - AN ORDINANCE OF BREVARD COUNTY, FLORIDA AMENDING CHAPTER 62, LAND DEVELOPMENT REGULATIONS SECTION 62-2891, LOT DRAINAGE, AND CHAPTER 22 BUILDINGS AND BUILDING REGULATIONS, SECTION

More information

CITY OF FARMERSVILLE, TEXAS

CITY OF FARMERSVILLE, TEXAS CITY OF FARMERSVILLE, TEXAS MANUAL FOR THE DESIGN OF WATER AND SANITARY SEWER LINES Subdivision Ordinance #2007-08 Exhibit B February 13, 2007 TABLE OF CONTENTS Description Page No. General... 1 Water

More information

CHAPTER 4 EXISTING STORMWATER MANAGEMENT SYSTEM

CHAPTER 4 EXISTING STORMWATER MANAGEMENT SYSTEM CHAPTER 4 EXISTING STORMWATER MANAGEMENT SYSTEM INTRODUCTION The analysis of stormwater management system performance requires knowledge of the system components. This chapter presents a description of

More information

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Robert W. Carr 1 * and Stuart G. Walesh 2 1 Water Resources Modeling, LLC, 4144 S. Lipton Ave,

More information

SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing

SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing This report is prepared by the James City County Planning Division

More information

Chapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination

Chapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination Chapter 7: Sanitary Sewer Plan Introduction The 2030 Sanitary Sewer Plan was prepared for two primary reasons. The first purpose is to provide recommendations and guidance to the City of Lino Lakes by

More information

Cypress Creek Sewer Break

Cypress Creek Sewer Break Arlenia H. Cole, Customer Affairs PIO City of Memphis Public Works Office: 901-636-6922- Cell: 901-569-1971 Email: arlenia.cole@memphistn.gov Cell: 901-569-1971 April 1. 2016 Cypress Creek Sewer Break

More information

Summary of Potential Storm Drain Projects and Programs

Summary of Potential Storm Drain Projects and Programs Summary of Potential Storm Drain Projects and Programs CAPITAL IMPROVMENTS PUMP STATION UPGRADES The storm runoff from a large portion of Palo Alto cannot flow by gravity into one of the local creeks.

More information

FIBER-OPTIC CABLE PLAN CHECK

FIBER-OPTIC CABLE PLAN CHECK Engineering Division 201 North Broadway, Escondido, CA 92025 (760) 839-4651, FAX (760) 839-4597 FIBER-OPTIC CABLE PLAN CHECK To: Date: Project: Project No. Address: Check No. Attn: Via: The attached plans

More information

Liquid Capital. Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia

Liquid Capital. Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia Liquid Capital Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia Basic Bank Permitting Process Submit Prospectus to IRT. If approved then: Conduct site visit with IRT. If approved then:

More information

SCHEDULE 12 DBFO AGREEMENT EXECUTION VERSION 4. LANDS

SCHEDULE 12 DBFO AGREEMENT EXECUTION VERSION 4. LANDS SCHEDULE 12 LANDS 1. GENERAL 1.1 Capitalized Terms Capitalized terms used in this Schedule have the definitions as set out in the Agreement to Design, Build, Finance and Operate Southeast Stoney Trail,

More information

THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330

THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330 THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330 REVIEW NOTES by CHUCK DUNN CHAPTER 10 Copyright 2010 by the Real Estate Division and Chuck Dunn. All rights reserved ARE 3 rd EDITION REVIEW

More information

Historic Bridges of Frederick County. Frederick County, Maryland Division of Public Works Department of Highways and Transportation (301) 600-1687

Historic Bridges of Frederick County. Frederick County, Maryland Division of Public Works Department of Highways and Transportation (301) 600-1687 Historic Bridges of Frederick County Frederick County, Maryland Division of Public Works Department of Highways and Transportation (301) 600-1687 Frederick County s Bridges We have 212 bridges over 20

More information

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

TENNESSEE GAS PIPELINE COMPANY, L.L.C. TENNESSEE GAS PIPELINE COMPANY, L.L.C. SILT FENCE DESIGN CRITERIA AND METHODOLOGY FOR THE ACCESS ROADWAYS CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,

More information

PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN

PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN FOR THE VILLAGE OF HUNTLEY, ILLINOIS 2015 Contents Introduction 1 Purpose 1 Officials Responsible for Implementation 2 Public Notice 2 Grievance Procedure

More information

Improving Access in Florida International University Biscayne Bay Campus Executive Summary

Improving Access in Florida International University Biscayne Bay Campus Executive Summary EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared

More information

CITY COUNCIL PACKET MEMORANDUM

CITY COUNCIL PACKET MEMORANDUM CITY COUNCIL PACKET MEMORANDUM DOCUMENT: Final Plan and Final Plat SUBJECT: City Center Lenexa The Domain at City Center CONTACT PERSON: Beccy Yocham, Director of Community Development DATE: December 3,

More information

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M.

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Fort Dodge Stormwater Master Planning Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Project Location Project Background Flooding History Localized flooding and storm sewer

More information

Wilmington to Newark Commuter Rail Improvement Project

Wilmington to Newark Commuter Rail Improvement Project Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion

More information