1 Denmark s fastest railway The New Line Copenhagen-Ringsted
2 Denmark s fastest railway will be completed in 2018 More departures, shorter travel time and fewer delays Between 2010 and 2018 Banedanmark will build a new dual track, electrified railway running from Copenhagen to Ringsted via Køge. The line will be Denmark s first high speed railway and will handle up to 250 km/h for passenger trains. Why a new railway? The existing line that runs from Copenhagen to Ringsted via Roskilde is one of Denmark s busiest and most important routes. It is used by commuters between Copenhagen and the rest of Zealand as well as for nationwide and international passenger and freight traffic. The current line has become a bottleneck when working at full capacity. The new track will result in a significantly improved timetable with more departures, shorter travel time and fewer delays. As Denmark s first high speed rail line it will contribute significantly to meeting the transport requirements of the future. Shorter travel time and new connections The new Køge Nord Station will create a central hub that allows transfers to and from the S-train system. There will also be opportunities to establish a park-andride facility just off the motorway. Trains will depart from here for Copenhagen, West Zealand, Funen and Jutland plus via Køge Station directly to Næstved. A journey from Køge Station to Copenhagen H by S-train takes 38 minutes today. The same journey will take only 24 minutes for regional trains on the new stretch via Køge Nord Station, a 14 minute gain. The travel time can be further reduced to 20 minutes for non-stop services between Køge and Copenhagen. The current travel time is 59 minutes for regional trains from Haslev to Copenhagen, including transfer to S-trains at Køge station. The new line, with direct regional connections, saves 21 minutes and cuts the journey to 38 minutes. The journey from Hårlev to Copenhagen along the East line (Østbanen) and transfer to the S-trains at Køge Station takes 61 minutes today. The same journey changing at Køge to the direct regional trains will take 45 minutes in future; that is 16 minutes saved. The new line will provide improved travel services. Other examples of time saved between Copenhagen and other cities include 6 minutes for Odense and 10 minutes for Næstved, Vordingborg and Nykøbing F. Most freight trains will move from the existing line to the new line, which allows for improving train services on the existing line via Roskilde, Ringsted, Holbæk and Kalundborg. 3
3 The New Line Copenhagen-Ringsted will mean more train traffic between the Danish regions, more regional train departures on Zealand and improve the conditions for international freight traffic in transit through Denmark. The first stage of The One Hour Target The new line is the future proof solution to the capacity problems between Copenhagen and Ringsted. It is also part of The One Hour Target, a political plan to shorten travel time between Denmark s largest cities so that passengers can travel by train between each of the cities Copenhagen, Odense, Aarhus and Aalborg in just one hour. The new line is the first stage of the One Hour Target and is part of the overall scheme. Other stages will be initiated within the next few years. The new line will run through 10 municipalities. The picture shows the track in Greve. What will be built? The new line is Denmark s largest rail project for many years. The approximately 60 kilometre stretch passes through 10 municipalities and involves many people, directly or indirectly. Preparatory work The client group for the new line manage and coordinate the project from an office in Brøndby. A number of consultants from Danish and international advisor teams have been attached to the project. Between 2010 and 2013 they will assist Banedanmark with a range of preparatory work such as drillings, utility relocation, archaeological preliminary investigations, expropriations and the final decision on the route. What we will build The physical construction work will begin in It will include: A new dual track, electrified railway between Copenhagen and Ringsted Platforms at Ny Ellebjerg Station for regional and long distance trains A new station (Køge Nord) with connections to a new station on the S-train line A connection at Køge Nord for the Lille Syd line to/from Køge and Næstved An additional track at Køge Station Track renovation at Ringsted Station The new line will be built for high speed trains travelling at up to 250 kilometres per hour. 4 5
4 The new line built out of Copenhagen will run close to the Holbæk motorway. Hvidovre can be seen at the bottom of the picture. The route The new line will pass through the municipalities of Copenhagen, Hvidovre, Brøndby, Vallensbæk, Høje-Taastrup, Ishøj, Greve, Solrød, Køge and Ringsted. It will run through densely populated and trafficked areas as well as historical, cultural and recreational locations. The new railway will follow the motorway network in the main but takes physical conditions and space constraints into account. These may be roads, buildings and environmentally sensitive areas as well as minimum curvature requirements for the line. As a result the railway may deviate away from the motorway in some places. In others it will cross the motorway as well as associated ramps and other roads. Tracing the route The route begins at Vigerslev at Frugtmarkedet where the two new tracks fork from the existing line. It will be constructed in a wide curve out of Copenhagen, through Vigerslevparken and on along the north side of the Holbæk motorway. The line then goes under and follows the south side of the motorway to Vallensbæk Mose. Here it crosses over Motorring 4 and continues along the west side of Køge Bugt motorway to the large curve at the Scandinavian Transport Centre at Køge. Banedanmark will build a new station named Køge Nord Station. It will be linked to a new station for the S-trains and to the Lille Syd line in the direction of Køge- Næstved. An additional track will be laid from Københavnsvej to Køge Station. Two new tracks will be built north of the West motorway from Køge Nord to Fjællebro. The line will follow the south side of the existing railway from Fjællebro to Ringsted Station. Roskilde Copenhagen Ny Ellebjerg At you will find a map of the new line. You can also find your address here and follow what will happen in your local area. The map will be updated continuously. Køge Nord Station Køge The new line Existing line New station Existing station N Ringsted 0 15 km 6 7
5 Improved rail connections are imperative if the railway is to be an attractive option for passengers and freight transport in the future. More efficient train services contribute significantly to increased mobility and development of society on a sustainable basis. Across national borders The New Line Copenhagen-Ringsted assumes international importance as part of the Trans-European Network that will link Scandinavia and the rest of Europe. The railway is also a significant part of the freight corridor from Northern Sweden to Northern Italy. The opportunities to expand freight traffic and to improve conditions for international travellers will increase after the opening of the Fehmarnbelt Fixed Link and the associated upgrading and expansion of the line from Ringsted to Rødby. Dialogue with citizens Banedanmark maintains close contacts with citizens, particularly landowners affected by the project. In part this is in relation to temporary or permanent expropriations but it is also with regard to measuring and drilling, nature studies, archaeological excavations and so on. This is achieved through meetings, phone calls and correspondence. Banedanmark updates the website regarding project activity and interested parties can subscribe to news and information on progress. When the construction work begins in 2012, signage will show diversions and re-routing of roads. Wherever possible the greatest possible consideration will be given to motorists and residents along the new line. In partnership with motorway expansion While Banedanmark builds the new railway line, the Danish Road Directorate (Vejdirektoratet) will upgrade the Køge Bugt motorway from six to eight lanes between Greve Syd and Solrød Syd. Given two major construction projects in the same vicinity, the authorities will maintain a close dialogue with affected citizens, businesses and municipalities. Accordingly, Banedanmark work closely with the Road Directorate with regard to planning, expropriations, construction work and communication. Consideration for nature and culture along the line Banedanmark will take nature and cultural heritage along the line into consideration. The project will be administered according to the Museum Act at construction locations and will work closely with the Danish Agency of Culture. It will also comply with the Nature Conservation Act and do so in collaboration with the Nature Agency. The Act and the Minister of Transport give the authority for Banedanmark to administer these two acts. 8 9
6 Timetable Soil and groundwater investigations Archaeological preliminary investigations Site survey Expropriation Cutting the first turf work work work Railway technology of Køge Nord Station Railway technology Trial runs Noise barriers Inauguration Utility relocation Further information You can keep up with what is happening on the project at If you have any questions you are welcome to contact Banedanmark on or at You can also sign up to the project s neighbour information service on the website. This will mean that you will automatically receive news updates via . Remember to check the item Copenhagen-Ringsted when signing up. 10 About Banedanmark Banedanmark s mission We develop and supply a safe, reliable and attractive railway while continuously improving punctuality, traffic information and efficiency. Banedanmark s vision Toward 2020 we are creating the railway of the future with the aim of doubling passenger and freight usage. Banedanmark s functions Approximately 2200 employees nationwide are working to: Plan, operate, renew and maintain the Danish state s railway infrastructure Manage and monitor traffic on the rail network Prepare the overall train timetable for the state rail network Allocate capacity to train operators Determine and collect revenue from the track operators The New Line Copenhagen-Ringsted mission We build the new railway between Copenhagen and Ringsted as a foundation for more and faster trains across and through Denmark. The New Line Copenhagen-Ringsted vision We want to construct The New Line Copenhagen-Ringsted European bestin-class by purchasing in a competitive market and leveraging from economy-ofscale and state-of-the-art technology in the life cycle perspective. The new railway will achieve a doubling of passenger and freight transport and provide the potential for optimising capacity and usage on adjacent lines. Because no similar tracks have been constructed in Denmark in recent times we will place emphasis on learning from comparable projects abroad. Holland, Belgium and France are among the countries from where we will acquire knowledge and experience with regard to high speed railways. This applies both to procurement of materials and hire of employees as well as when we exploit economies of scale and technological opportunities. 11 Frontpage photo: New French railway. Fotos: RFF/Photolabservices, Getty Images and Peter Thornvig fotografi. Design: Punktum Design. Print: Pekema. November 2012
7 The New Line Copenhagen-Ringsted Between 2010 and 2018 Banedanmark will construct a new dual track, electrified railway from Copenhagen to Ringsted via Køge. The track will be designed to handle speed of up to 250 km/h for passenger trains and will be Denmark s first railway for high speed trains. The Danish Parliament passed the Act for the new line on May 18th The total construction budget is DKK 10.4 billion. Banedanmark The New Line Copenhagen-Ringsted Ringager 4B 2605 Brøndby Telefon: [email protected] ISBN nr
Train Fund Denmark. Electrification of the main railway lines Realisation of the 1 Hour Model vision. 1 Hour. Transportministeriet
Train Fund Denmark Train Fund Denmark 3.7 billion Euro from harmonization of the tax revenues in the North Sea will finance a major modernisation of the Danish railway. Train Fund Denmark will finance
Banebranchen New line Copenhagen-Ringsted
Banebranchen New line Copenhagen-Ringsted 11th May 2011 High speed Copenhagen-Ringsted High speed Copenhagen Ringsted first phase of The one-hour target Caracteristics Denmark s first High-Speed railway,
The Danish Transport System. Facts and Figures
The Danish Transport System Facts and Figures 2 The Ministry of Transport Udgivet af: Ministry of Transport Frederiksholms Kanal 27 DK-1220 København K Udarbejdet af: Transportministeriet ISBN, trykt version:
Organizing the future railway
CEO Jesper Hansen, Banedanmark 21.05.2013 Railway of the Future Danish ambition to handle the major part of the growth in passenger and railway traffic Banedanmark will increase the capacity of the railway
A Greener Transport System in Denmark. Environmentally Friendly and Energy Efficient Transport
A Greener Transport System in Denmark Environmentally Friendly and Energy Efficient Transport Udgivet af: Ministry of Transport Frederiksholms Kanal 27 DK-1220 København K Udarbejdet af: Transportministeriet
The Follo Line Project
The Follo Line Project Longest. UrbAN. Complex. Faster. 2015/1 Norwegian National Rail Administration the follo line project 1 2 the follo line project The project The Follo Line Project is currently the
The Gotthard Base Tunnel
The Gotthard Base Tunnel The tunnel On 11 December 2016, the Gotthard Base Tunnel will come into scheduled operation. At 57 kilometres in length, it is the longest rail tunnel in the world. It has virtually
Agenda. 1. The basis for the Danish Signalling Programme 2. Procurement Phase 3. Way ahead 4. Benefits
A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll Agenda 1. The basis for the Danish Signalling Programme 2. Procurement Phase 3. Way ahead 4. Benefits
Why build the Silvertown Tunnel?
Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary
Member Nation Report 2010 from Denmark.
Member Nation Report 2010 from Denmark. The has during the year 2010 arranged 6 member meetings including two technical site visits. The first technical site visit covered the 5.3 km long Leipzig City
Success with three networks: SBB Infrastructure. InnoTrans 2012.
Success with three networks: SBB Infrastructure. InnoTrans 2012. 2 SBB is playing a central role in the success for Swiss economy. The efficient rail network and reliable transport services facilitate
Financial Analysis, Traffic Forecast and Analysis of Railway Payment
FIXED LINK ACROSS FEHMARNBELT Trafikministeriet, København Bundesministerium für Verkehr, Bau- und Wohnungswesen, Berlin Financial Analysis, Traffic Forecast and Analysis of Railway Payment Summary Report
Development Strategy. (English abstract)
Development Strategy (English abstract) Indhold Introduction.... 3 Overall objectives and prioritized areas............................................3 Animation and new media... 5 Green technology and
Informal meeting of EU ministers for Transport Luxembourg, October 7th, 2015. Declaration on Cycling as a climate friendly Transport Mode
Informal meeting of EU ministers for Transport Luxembourg, October 7th, 2015 Declaration on Cycling as a climate friendly Transport Mode Preamble Innovation Cycling is a European success story i. Bicycle
The Signalling Programme A total renewal of the Danish signalling infrastructure
The Signalling Programme A total renewal of the Danish signalling infrastructure Introduction January 2009 the Danish parliament decided to fund a Euro 3.2 billion replacement programme of renewing all
- WHERE DID WE COME FROM? -
- WHERE DID WE COME FROM? - Zuiderzee line Amsterdam-Lelystad-Emmeloord-Heerenveen-Drachten-Groningen (-northern Germany) Ambitious magnetic-levitation train High-speed railway line High-quality intercity
World Bank Transport Forum, April 2009
0 Railways for Development An overview of China s Railway Development Program World Bank Transport Forum, April 2009 John Scales: Transport Coordinator, Beijing. Paul Amos: Strategy and Management Consultant
COWI s Role in the Copenhagen Metro Project
COWI s Role in the Copenhagen Metro Project On the occasion of the award by the Copenhagen Cultural Foundation for COWI A/S part in the implementation of Phase 1 of the Copenhagen Metro 2 COWI s Role in
The UK Rail Industry: A Showcase of Excellence
The UK Rail Industry: A Showcase of Excellence 1 The UK Rail Industry: A Showcase of Excellence Today, nearly 20% of all European passenger journeys take place within the UK The UK Rail Industry: A Showcase
AARHUS LIGHT RAIL PROJECT
AARHUS LIGHT RAIL PROJECT Integrating Land Use and Public Transportation Planning Workshop, 10 October, 2012 Ole Sørensen Project Manager Light Rail Secretariat Established in 2007 by 8 municipalities
Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page:
Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page: Policy package: 2A: Rail liberalisation and harmonisation Measure 9: Updating the interoperability
Banedanmark. TØF Jernbane i vækst. Signalprogrammet. Morten Søndergaard, Programme Director
Banedanmark TØF Jernbane i vækst. Signalprogrammet Juni 2010 Morten Søndergaard, Programme Director Agenda 1. Background 2. Total renewal principles 3. Roll out plans and time schedule 4. Procurement and
HIGHWAYS ENGLAND STRATEGIC BUSINESS PLAN OVERVIEW 2015-2020
HIGHWAYS ENGLAND STRATEGIC BUSINESS PLAN OVERVIEW 05-00 STRATEGIC ROAD NETWORK 4,00 miles of motorways and major A roads A billion tonnes of freight transported each year 4 million people drive on the
Tendering of passenger rail traffic in Norway
Tendering of passenger rail traffic in Norway Rail passenger service tender 1: «Sør» Overview of current services and traffic Sørlandsbanen line Jærbanen line Arendalsbanen line Rail passenger service
Connecticut s Bold Vision for a Transportation Future
Connecticut s Bold Vision for a Transportation Future 1 Governor s Proposal: Presents bold vision Based on: technical analyses & public outreach done as part of TransformCT o 18-month strategic planning
This is why the Swedish Transport Administration was formed
This is why the Swedish Transport Administration was formed An approach that embraces all means of transportation A clearer customer perspective Strong regional ties A more efficient organisation To support
NETWORK EFFECTS IN RAILWAY SYSTEMS
NETWORK EFFECTS IN RAILWAY SYSTEMS Alex Landex Technical University of Denmark, Centre for Traffic and Transport Otto Anker Nielsen Technical University of Denmark, Centre for Traffic and Transport 1 ABSTRACT
Development of a Concept for the Public Transport Interconnectivity for Savaria International Airport. Report
Development of a Concept for the Public Transport Interconnectivity for Savaria International Airport Report CENTRAL EUROPE Programme Project CHAMPIONS February 2012 Development of a Concept for the Public
THE DANISH WADDEN SEA NATIONAL PARK THE DANISH APPROACH TO NATIONAL PARKS. FOTO: John Frikke
THE DANISH WADDEN SEA NATIONAL PARK THE DANISH APPROACH TO NATIONAL PARKS FOTO: John Frikke The Organisation for Economic Co-operation and Development OECD 1999: It is recommended to investigate the possibility
The Øresund Bridge and its Region 15 years
The Øresund Bridge and its Region 15 years Published by: Øresundsbro Konsortiet, 2015 Photo: Peter Brinch/Øresundsbron Carolina Romare/Filmlance Newcopter/Øresundsbron Femern A/S Design: Fikon Design AB
The development of the electronic health record in Denmark
The development of the electronic health record in Denmark Poul Erik Hansen, [email protected] Vice president Ministry of Health The National Institute of Health Data and Disease Control Agenda 1. A very short
Agenda. Welcome. Introduction to Ringsted Fehmarn. E3006 King Frederik IX s Bridge. E1001 Track Works. Break: Networking and Sandwich
1 Agenda Welcome Introduction to Ringsted Fehmarn E3006 King Frederik IX s Bridge E1001 Track Works Break: Networking and Sandwich Tender & Contract Information Questions, remarks, comments and answers
Road freight transport across a fixed Fehmarn Belt link
Road freight transport across a fixed Fehmarn Belt link Per Homann Jespersen 1 Draft version Introduction A fixed link between Denmark and Germany was agreed upon by the Danish and German governments on
Cathkin Relief Road Planning Statement
Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide
Strategies for goods transport in Skåne
Strategies for goods transport in Skåne Abridged version Final Draft, April 16, 2004 Contents Skåne the gateway to northern Europe... 3 Introduction... 4 Working process... 6 Development objectives...
Alignment design for Citybanan in Stockholm
Alignment design for Citybanan in Stockholm B. Kufver Halcrow, Vineyard House, 44 Brook Green, Hammersmith, London W6 7BY, United Kingdom Abstract The Western Main Line into Stockholm Central Station was
IQ-C Action plan 2006-2008-2012 for rail freight corridor Rotterdam-Genoa
IQ-C Action plan 2006-2008-2012 for rail freight corridor Rotterdam-Genoa July 2006 (Initial Document) August 2008 (Update) The action plan has been decided upon by the Ministries of Transport from Germany,
TEN-T guidelines and CEF
TEN-T guidelines and CEF 2e TEN-T CONFERENTIE Duurzame samenwerking in de logistieke sector Nederland Noordrijn-Westfalen Horst Herald Ruijters MOVE B1, 30 October 2014 What is the new trans-european transport
LETBANE PÅ RING 3. Information about the public procurement process
Information about the public procurement process Document ID: L3-X-LB-PRE-0001 Version: 2.0 Issue date: 2015-11-10 Issued by: Ring 3 Letbane I/S Approved by: AGF Anne-Grethe Foss Checked by: PAMA Patrik
Thameslink new Class 700 trains
Thameslink new Class 700 trains Your questions answered 1. When will the new trains enter service? The first trains are expected to enter passenger service in spring 2016 on the existing Bedford to Brighton,
Denmark - on your bike!
Denmark - on your bike! The national bicycle strategy July 2014 Denmark - on your bike! The national bicycle strategy 4. Denmark - on your bike! Denmark - on your bike! Published by: Ministry of Transport
usage of these types of fuels with production price far higher then diesel and petrol, is also a measure. We can say that in Bulgaria there are
TRANSPORT The basic goals of the national transport policy are focused on sustainable development of the road and railway infrastructure of national and international importance, improvement of the transport
LIGHT RAIL ON RING 3 NOVEMBER 19 TH 2014. Supplier Workshop. Islevbro station (Rødov
LIGHT RAIL ON RING 3 NOVEMBER 19 TH 2014 Supplier Workshop Islevbro station (Rødov 1 Agenda In the Auditorium: 1. Welcome and programme; purpose of the day 2. Ring 3 in Brief 3. Vision of Light Rail on
London Underground Environment Strategy
London Underground Environment Strategy 2008 2013 mayor of london Transport for London Contents Introduction 3 London Underground Environment strategy 4 Managing environmental impacts 5 Embedding environment
Copenhagen, Denmark - Trends in Public Perception
CYKELN TAR ÖVER GATAN NØRREBROGADE IN COPENHAGEN FROM TRAFFICSTREET TO CYCLE/BUSSTREET AGENDA Nørrebrogade before Green Wave V.1 The political vision Planning process Nørrebrogade today? FACTS Length:
Trade & Transport Corridors. European Projects & Initiatives
Trade & Transport Corridors European Projects & Initiatives Trade Corridors A concept in evolution WORLD BANK Assisting land-locked countries which depend on overland routes to access sea-ports for international
MELBOURNE METRO RAIL NEWSLETTER
Commercial Rd MELBOURNE METRO RAIL NEWSLETTER SHAPING MELBOURNE S RAIL FUTURE Welcome to the first edition of Melbourne Metro Rail News. This newsletter will keep you up-to-date on progress of the Melbourne
Transport planning in the Stockholm Region
Stockholm County Council Office of Regional Planning and Urban Transportation Hans Hede Transport planning in the Stockholm Region METREX/Moscow International workshop June 2006 A region with great potential
Connecticut s Bold Vision for a Transportation Future
Connecticut s Bold Vision for a Transportation Future Middlesex Chamber October 15, 2015 Commissioner Jim Redeker 1 2 The Challenge, Vision, & Plan The Challenge our infrastructure, our economy, our quality
ANNEX 1 Summary of Danish responses to consultation Page 1
ANNEX 1 Summary of Danish responses to consultation Page 1 ANNEX 1 A - Ministries 1 Danish Ministry of Ecclesiastical Affairs 2 Danish Ministry of Economic Affairs and the Interior B Agencies 1 Danish
SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM
SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM www.duqm.gov.om 1. INTRODUCTION 2. ACCESSIBILITY TO DUQM 3. SEZAD PREVIOUS MASTERPLAN 4. DUQM URBAN PLANNING 5. SPECIAL ECONOMIC ZONE DISTRICTS
The Danish Road Directorate Evaluation of test with European Modular System
Trafikudvalget 2010-11 TRU alm. del Bilag 99 Offentligt The Danish Road Directorate Evaluation of test with European Modular System Midway Report in cooperation with May 2010 Midway Report The Danish Road
Energy and. Resources
Tasmaniann Government 20122 Submission to Nation Buildin g 2 Program Domain Highway Planning (Part of Brooker Highway Upgrades submission to Infrastructure Australia) September 2012 Department of Infrastructure,
Lineside Signal Spacing and Speed Signage
Document to be withdrawn as of 03/12/11 To be superseded by GKRT0075 Iss 2 published on 03/09/11 Date March 11 Lineside Signal Spacing and Speed Synopsis This document specifies the minimum distances that
High speed railway principles
High speed railway principles Ignacio Barrón de Angoiti, Director High Speed, International Railway Association (UIC) Professional Conference on High Speed In the World and in the Czech Republic Praha,
Simulation of modified timetables for high speed trains Stockholm Göteborg
17 18 May 2010, Opatija, Croatia First International Conference on Road and Rail Infrastructure Simulation of modified timetables for high speed trains Stockholm Göteborg H. Sipilä Division of Traffic
Financing the European Mobility Network with the Connecting Europe Facility
Financing the European Mobility Network with the Connecting Europe Facility Stéphane Ouaki, Head of Unit DG MOVE, European Commission Budapest, 22 January 2013 Key elements of the new TEN-T policy Support
How to implement cycling solutions in a post-communist street system (and mentality) Marcin Hyła, VeloForum, 16 Oct.
How to implement cycling solutions in a post-communist street system (and mentality) Marcin Hyła, www.miastadlarowerow.pl VeloForum, 16 Oct. 2010 th What has communism to do with cycling? No free flow
ERTMS for a competitive railway
ERTMS for a competitive railway A joint cross-border traffic management system for railways Sweden and Europe need a competitive railway system. With the focus on this, EU decided in 1996 that a standardized
The Helsinki-Tallinn rail tunnel SHORT CUT TO CENTRAL EUROPE. Summary of the preliminary project plan 10.4.1997
The Helsinki-Tallinn rail tunnel SHORT CUT TO CENTRAL EUROPE Summary of the preliminary project plan 10.4.1997 A RAIL TUNNEL BETWEEN HELSINKI AND TALLINN will allow for train traffic between the cities
Evergreen Line Rapid Transit Project Business Case Executive Summary. February 2008. Reviewed by
Evergreen Line Rapid Transit Project Business Case Executive Summary February 2008 Reviewed by Recommendation and Executive Summary The business case for the Evergreen Line Rapid Transit Project (the Project)
REPORT OF THE ROAD SAFETY CAMERA COMMISSIONER TO THE MINISTER FOR POLICE AND EMERGENCY SERVICES
REPORT OF THE ROAD SAFETY CAMERA COMMISSIONER TO THE MINISTER FOR POLICE AND EMERGENCY SERVICES INVESTIGATION INTO THE OPERATION OF THE RED LIGHT CAMERA AND YELLOW TRAFFIC LIGHT PHASES AT THE INTERSECTION
Norwegian Foreign Visitor Survey 2011
Summary: Norwegian Foreign Visitor Survey 2011 TØI Report 1166/2011 Author(s): Eivind Farstad, Arne Rideng and Iratxe Landa Mata Oslo 2011, 67 pages Norwegian language In 2011 a total of 5.0 million foreign
News Service. The new DB: Satisfied customers for a successful future. The details of DB's customer and quality campaign
The new DB: Satisfied customers for a successful future The details of DB's customer and quality campaign 1. DB will make its train service much more punctual Deutsche Bahn will be making its train service
THE LOCAL GOVERNMENT REFORM IN BRIEF
THE LOCAL GOVERNMENT REFORM IN BRIEF Published by: The Ministry of the Interior and Health Department of Economics Slotsholmsgade 10-12 DK-1216 Copenhagen K Telephone: +45 72 26 90 00 Telefax: +45 72 26
ALIGNMENT ASSUMPTIONS
JUNE 2013 LETBANESEKRETARIATET ALIGNMENT ASSUMPTIONS REPORT ADDRESS COWI A/S Visionsvej 53 9000 Aalborg Denmark TEL +45 56 40 00 00 FAX +45 56 40 99 99 WWW cowi.com JUNE 2013 LETBANESEKRETARIATET ALIGNMENT
Broadband Mapping 2013
Broadband Mapping 2013 Broadband Mapping 2013 Summary Publisher: The Danish Business Authority A full Danish edition can be downloaded from the website of the Danish Business Authority: www.erst.dk BROADBAND
TRANSPORT IMPACTS OF THE COPENHAGEN METRO
TRANSPORT IMPACTS OF THE COPENHAGEN METRO Jane Ildensborg-Hansen TetraPlan A/S, Copenhagen, Denmark ([email protected]) Goran Vuk Danish Transport Research Institute, Lyngby, Denmark, ([email protected]) 1. INTRODUCTION
5 ALTERNATIVE SOLUTIONS AND EVALUATION
Page 23 5 ALTERNATIVE SOLUTIONS AND EVALUATION The process used for the assessment and evaluation of the alternatives follows the procedures of the Municipal Class EA, as described below: Identify a reasonable
Planning Railway Safety in Canada
Planning Railway Safety in Canada Mike Lowenger Vice President, Operations and Regulatory Affairs Railway Association of Canada July 10, 2014 ABOUT THE RAC 50+ members Represents virtually all railways
Cable action plan. 132-150 kv grids March 2009
Cable action plan 132-150 kv grids March 2009 Table of contents 1. Summary of the cable action plan 3 2. Introduction 7 3. Planning scenarios 8 4. Existing overhead lines 8 4.1 Economically optimal dismantling
Supplier Information Day October 19th 2015 Metroselskabet & Hovedstadens Letbane
Supplier Information Day October 19th 2015 Metroselskabet & Hovedstadens Letbane Read more about the individual projects on www.dinletbane.dk www.m.dk CEO Mr. Henrik Plougmann Olsen 2 WHO WE ARE METROSELSKABET
Mapping and Modelling the Impact of Land Use Planning and Management Practices on Urban and Peri-Urban Landscapes in the Greater Dublin Area
Mapping and Modelling the Impact of Land Use Planning and Management Practices on Urban and Peri-Urban Landscapes in the Greater Dublin Area Dr. Martin Critchley Era-Maptec Ltd 36 Dame Street Dublin 2
Prefeasibility Study for the High Speed Line HU-RO Border Bucharest - Constanta Description and Objectives
Prefeasibility Study for the High Speed Line HU-RO Border Bucharest - Constanta Description and Objectives Timisoara - 13 th of September 2012 1 The European Vision for Railway Transport The European Commission's
Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873
Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 February 16, 2010 TO: FROM: Members Joint Committee on Finance Bob Lang, Director SUBJECT: Governor's
Stouffville Corridor Rail Service Expansion
Stouffville Corridor Rail Service Expansion Stouffville Corridor Rail Service Expansion Class Environmental Assessment Study WELCOME PUBLIC INFORMATION CENTRE #2 Tuesday January 28, 2014 Agincourt Recreation
Application Form Part A
A1 Proposal TENtec nr. 2014-FI-TM-0142-M (26195427) MAP Call 2014 F01 Priority 1: (F01) Pre-identified projects on the Core Network corridors Railways Inland Waterways and Ports Roads Maritime Ports Priority
High Speed Rail in Poland plans & activities
High Speed Rail in Poland plans & activities UN ECE TER Project Workshop Master Plan for the future High Speed Rail network in Central and Eastern Europe Timisoara, 10 14 September 2012 Jerzy Kleniewski
Wilmington to Newark Commuter Rail Improvement Project
Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion