1 Medway LDF Core Strategy Lodge Hill: Evidence Base Summary Report Flood Risk & Surface Water Hyder Consulting August 2011
2 1 Introduction 1.1 Land Securities Group Plc has been selected as the Land Sale Delivery Partner responsible for the delivery and sale of approximately 320 hectares of Ministry of Defence land at Lodge Hill. 1.2 In its role as Land Sale Delivery Partner, Land Securities Group Plc has appointed a consultant team to prepare viable and deliverable development solutions for the site, justified by robust and credible evidence, as well as sound professional judgement. 1.3 Pursuant to site investigation works and engagement with key stakeholders, the consultant team have prepared a comprehensive suite of site-specific information documents that have fed into the indicative masterplan for the development of the Lodge Hill site, which represents one way in which the site could be developed within the emerging Medway Core Strategy Plan Period (i.e. by 2028). 1.4 The purpose of the technical evidence reports, which have been prepared on behalf of Land Securities Group Plc and the Defence Infrastructure Organisation, is to support the identification of Lodge Hill as a Strategic Allocation within Medway Council s emerging Core Strategy Development Plan Document (DPD). The Core Strategy will form part of the Development Plan which provides the planning policy framework against which planning applications will be determined, to facilitate the delivery of the site. Hyder Consulting (Hyder) has contributed to the site-specific information through the production of Flood Risk and Surface Water technical evidence. 1.5 This summary report sets out the key findings and conclusions from the technical evidence prepared by Hyder which are considered essential to demonstrating the deliverability of the Lodge Hill site within the Core Strategy timescales, having regard to the guidance in PPS12 and the accompanying Plan-Making Manual. 2 Relevant Policy/Legislative Context National Planning Policy Guidance The relevant legislation is set out in the Land Drainage Act (1991), the Water Resources Act (1991) and its amendment the Water Act (2003), the Environment Act (1995), Water Framework Directive (2000), as well as the Flood and Water Management Act (2010). The Environment Agency (EA) would be a statutory 1
3 consultee on all planning matters from strategic policy formulation down to the advice on individual planning applications to the local authority. The determination of flood risk remains with the lead local flood authority. In accordance with the Environment Act (1995, Section 4), the Environment Agency's purpose is, "to protect or enhance the environment, taken as a whole" so as to promote "the objective of achieving sustainable development". Flood Risk and Surface Water have been assessed in accordance, and within the context of, the relevant legislation as well Planning Policy Statement 25 (PPS25): Development and Flood Risk. Regional Planning Policy (South East Plan) The South East Plan notes that local authorities should adopt the sequential approach to development in flood risk areas, as set out in PPS25. - The site does not lie in an identified flood risk area and as such the development is compliant with this objective. Policy NRM4 (Sustainable Flood Risk Management) requires local authorities in conjunction with the Environment Agency to, inter alia, require incorporation and management of Sustainable Drainage Systems (SUDS), other water retention and flood storage measures to minimise direct surface run-off (unless there are practical or environmental reasons for not doing so), and take account of increased surface water drainage on sewage effluent flows on fluvial flood risk. Policy KTG6 (Flood Risk) notes that the development will be planned to avoid the risk of flooding and will not be permitted if it would, inter alia, be subject to unacceptable risk of flooding or significantly increase the risk elsewhere. Policy KTG6 states that development plan documents will include policies to: Adopt a risk based approach to guiding categories of development away from flood risk areas; Ensure that development proposals are accompanied by flood risk assessments; Identify opportunities for flood storage areas to contribute to green infrastructure networks. - The development of the Lodge Hill is expected to appropriately manage the risk of flooding on site and not increase risk elsewhere. - Surface water runoff from the development can be managed on site, using sustainable drainage systems, before discharge to existing watercourses. - The development should be compliant with the above policies. Other Policies/Legislation of Relevance Medway Council is preparing a Local Development Framework (LDF) that will consist of a portfolio of documents. It will be the key spatial plan for Medway, guiding development over the period to 2028 and addressing issues relevant to the area. The first and most important of the documents is the Core Strategy, that will set out the vision, strategic objectives and an overall strategic framework for Medway. The Core Strategy is currently an emerging document. 2
4 3 Baseline Position The site is located on Lodge Hill. The topography of the site splits it into three main areas / catchments. The south-western area of the site lies on the southern side of Lodge Hill and slopes generally southwards, towards the River Medway. The remaining area of the site lies across the top of Lodge Hill, with the larger Eastern portion of this area draining to the east and a smaller Western portion draining to the west. The site is a mixture of hard surfacing and permeable areas, with the existing drainage on site consisting of a mixture of formalised piped sewers and open ditches. The site is classified as lying almost entirely within Flood Zone 1, the lowest flood risk classification. No evidence has been found to indicate that the proposed development area within the site has been affected by any historic flooding or that the site contributed to any historic flooding of downstream areas. A small part of the site, at the south west corner, is located within Flood Zones 2 and 3 (medium and high probability, respectively, of flooding from rivers and the sea). Necessary highway upgrades will be located within the onsite Flood Zone extents; however the impact of these works on flood risk can be fully mitigated on site. The proposed development is considered to pass the Sequential Test, as defined within PPS25. The ground conditions on site have been found to be primarily clay, thus the risk of flooding from ground water is considered low. The site is located on the top and side of Lodge Hill, thus there isn t a significant risk of surface water flooding from offsite sources. The redevelopment of the site will increase the volume surface water run-off generated on site. As such, there is a risk that the site itself may be a source of surface water flooding both to the site and to offsite third-party landowners. The development of a surface water management strategy for the site will ensure that the risk of surface water flooding onsite is reduced to appropriate levels and that the risk of flooding to offsite third-party landowners will not be increased. The site lies predominantly at the top of Lodge Hill, therefore the risk of fluvial flooding from minor watercourses and ditches is low. The development of the site has however the potential to increase the volume and rate of flow within the receiving offsite watercourses. 3
5 The effective management of water from the site by means of drainage infrastructure developed in accordance with the surface water management strategy should ensure the risk of the site contributing to fluvial flooding downstream from the site will not be increased. 4 Masterplan Response The development area within the site is defined as lying wholly within Flood Zone 1, thus the PPS25 Sequential Test has identified that there is no restraint on the type and location of development types (land uses) within the site (in terms of flood risk). The hierarchical management train principle of employing source, site and regional control technologies provides a methodology to utilise the most appropriate techniques sustainable drainage within developments. The current strategy of open storage ponds is one technique and the inclusion of other sustainable drainage systems (SuDS), such as green roofs, water butts, water harvesting, etc. will also be considered at further development planning stages. The inclusion of appropriate SuDS within the development will be an important ingredient towards the development achieving Code for Sustainable Homes. A preliminary surface water drainage strategy has been developed for the site and it has been demonstrated that there is sufficient space allowance within the indicative masterplan to accommodate the surface water infrastructure (in the form of ponds) assuming a 1 in 100 year plus climate change (30%) rainfall event and discharge restricted from the site to the agreed Greenfield runoff rate of 7 litres per second per hectare (l/s/ha), identified by the EA. 5 Infrastructure Delivery What, How, Where and When? The surface water drainage infrastructure serving development phases should be completed before individual development plot within the phase may be released for development. 4
6 6 Agreement with Relevant Statutory Authorities The Environment Agency has been consulted with regards to the future development of the site and have confirmed the following: - The Greenfield Runoff rate for the site is 7 l/s/ha; - With regards to existing developed areas, runoff should not exceed existing rates and where possible betterment should be included; - The surface water drainage strategy for the site should consider the 1 in 100 year plus climate change rainfall event; - The use of sustainable drainage (SuDS) is recommended wherever possible. 7 Conclusion The proposed development on site lies wholly within in Flood Zone 1, is not considered at risk of flooding, and in accordance with PPS25 is suitable for any use. The necessary highway upgrades at the south western corner of the site are located within Flood Zones 2 and 3 and the impact of these works on flood risk can be fully mitigated on site. A preliminary surface water drainage strategy has been developed in collaboration with the indicative masterplan and it has been demonstrated that the necessary surface water drainage infrastructure for the site can be delivered using sustainable drainage principles and in accordance with the requirements of the Environment Agency and the relevant national, regional and local policies. With the appropriate management of surface water on site and discharge of runoff from the site, the development should not be at risk of flooding and the flood risk to third-party landowners off site should not be increased as a result of the redevelopment. 5
Taylor Wimpey UK Ltd. December 2007
Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked
More informationFLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY
FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY London Rd. WATERLOOVILE FOR McCarthy & Stone Ltd. July 2010 Such Salinger Peters Ltd 30558-1- Flood Risk Assessment & Drainage Strategy Contents Paragraph Page
More informationLondon Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document
LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?
More informationFLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES
FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House
More informationChapter 2 Spatial Portrait
15 November 2013 Dear Julie Fylde Local Plan to 2030 Part 1 Preferred Options Thank you for the opportunity to meet with you on 9 October in respect of the above mentioned document. As discussed at the
More information2 ND SEPTEMBER 2014. Report of the Bi-Borough Executive Director for Transport and Technical Services
London Borough of Hammersmith & Fulham COMMUNITY SAFETY, ENVIRONMENT & RESIDENTS SERVICES POLICY & ACCOUNTABILITY COMMITTEE 2 ND SEPTEMBER 2014 SURFACE WATER MANAGEMENT PLAN (SWMP) Report of the Bi-Borough
More informationFlood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers
Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-
More informationEast Riding of Yorkshire Council
East Riding of Yorkshire Council Lead Local Flood Authority Interim Standing Advice Revision A - April 2015 1. Introduction From April 2015 the Lead Local Flood Authority (LLFA) became a statutory consultee
More informationWEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED
WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared
More informationRecommendations for future developments
C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site
More informationChapter 9: Water, Hydrology and Drainage Land West of Uttoxeter
Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter ENVIRONMENTAL STATEMENT: VOLUME 1 9.1 INTRODUCTION 9.1.1 This Chapter considers the effects of the Project on surface water and groundwater
More informationBolton s Flood Risk Management Strategy
Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk
More informationNorfolk House Hotel Development Gatwick Airport. Flood Risk Statement. May 2012. Bloc Hotels. Vantage Planning Ltd. www.vantageplanning.co.
Development Gatwick Airport May 2012 Bloc Hotels Vantage Planning Ltd www.vantageplanning.co.uk Vantage Planning Ltd Contents 1. Introduction... 2 2. The Proposed Development... 2 3. The Development Site...
More informationGranville Road Estate, London Borough of Barnet. Flood Risk Assessment and Drainage Strategy August 2014. New Granville LLP
Granville Road Estate, London Borough of Barnet Flood Risk Assessment and Drainage Strategy August 2014 New Granville LLP Document History JOB NUMBER: 237 DOCUMENT REF: Granville Road FRA REVISIONS: Final
More informationwww.gov.uk/defra Delivering Sustainable Drainage Systems
www.gov.uk/defra Delivering Sustainable Drainage Systems September 2014 Crown copyright 2014 You may re-use this information (not including logos) free of charge in any format or medium, under the terms
More information1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies.
ODYSSEY MARKIDES TECHNICAL NOTE PROJECT : CHAILEY HOUSE, BLEWBURY JOB NO. : 14-216 NOTE TITLE : PRELIMINARY FLOODING AND DRAIANGE AUTHOR : STEVEN ROOTH APPROVED : ANDREAS MARKIDES DATE : 02/09/2014 1.0
More informationENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3
NORTH LONDON WASTE AUTHORITY NORTH LONDON HEAT AND POWER PROJECT ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3 AD06.02 NORTH LONDON WASTE AUTHORITY NORTH LONDON HEAT AND POWER PROJECT ENVIRONMENTAL
More informationFLOOD RISK RECENT TRENDS AND POLICY RESPONSES
FLOOD RISK RECENT TRENDS AND POLICY RESPONSES DEVELOPING WESTMINSTER S LOCAL PLAN Booklet No. 2 LDF Consultation - CMP Revision November 2013 INTRODUCTION CLLR ROBERT DAVIS Westminster is at risk of flooding
More informationIntroduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership
WYCA SuDS Guidance Introduction As part of the government s continuing commitment to protect people and property from flood risk, the Department for Communities and Local Government and the Department
More informationStrategic Flood Risk Assessment Update 2015
Strategic Flood Risk Assessment Update 2015 On behalf of Contents Glossary... iv Executive Summary... 1 1 Introduction... 4 1.1 Overview... 4 1.2 Future Development in Lewisham Borough... 5 2 SFRA Approach...
More informationNewbiggin House Farm,
Newbiggin House Farm, Near Waberthwaite Flood Investigation Report 32 Flood Event 30/8/2012 Cumbria County Council Version Undertaken by Reviewed by Approved by Date Preliminary Colin Parkes Anthony Lane
More informationBIRMINGHAM DEVELOPMENT PLAN EXAMINATION MATTER L: CLIMATE CHANGE AND FLOOD RISK STATEMENT ON BEHALF OF BIRMINGHAM CITY COUNCIL
BIRMINGHAM DEVELOPMENT PLAN EXAMINATION MATTER L: CLIMATE CHANGE AND FLOOD RISK STATEMENT ON BEHALF OF BIRMINGHAM CITY COUNCIL Main Issue: Are the Plan s policies to mitigate and adapt to climate change
More informationLittleport Co-located Schools
Littleport Co-located Schools February 2015 Morgan Sindall Littleport Co-located Schools 330763 BNI BSE 003 C P:\Cambridge\Murdoch\EST\PROJECTS\330763 Littleport Co-located Schools\12.0 Documents\12.2
More informationFlood Risk & Surface Water Management. Page 1 of 20
Page 1 of 20 Flood Risk & Surface Water Management Flood Risk & Surface Water Management and the Planning Process Introduction The purpose of this document is to increase awareness of the potential of
More informationProposed Residential Development Land off Cody Road Waterbeach Cambridgeshire. Flood Risk Assessment
Land off Cody Road Waterbeach Cambridgeshire Cedar Barn, White Lodge, Walgrave, Northampton, NN6 9PY T: F: E: W: 01604 781811 01604 781999 mail@jppuk.net jppuk.net Proposed Residential Development Land
More informationCreating the environment for business
1. Introduction 1.1 Introduction to Water Cycle Strategies (WCS) 1.1.1 Background The water cycle describes the pathways and processes through which water moves through the natural and built environment,
More informationINFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for
More informationSUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY
SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY 1. Introduction 1.1 The Council recognises the threat to local communities from flooding following severe weather events and as a result
More informationAnglian Water Services Limited. Sustainable drainage systems (SUDS) adoption manual
Anglian Water Services Limited i towards sustainable water stewardship Sustainable drainage systems (SUDS) adoption manual Anglian Water Services Limited 1 Tomorrow s forecast is more frequent, more violent
More informationDesigned and produced by geo-graphicsdesign.com DP 300 3/02
Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended
More information5. Alternatives. 5.1 Introduction
5. Alternatives 5.1 Introduction 5.1.1 Chapter 4 of this Statement identifies the need, which will be met by the proposed development, the development itself described in detail in Chapter 3. 5.1.2 This
More informationSurface Water Management: Interim Guidance for Developers
Surface Water Management: Interim Guidance for Developers www.shropshire.gov.uk Contents Executive Summary 1. Introduction...1 2. National Policy Context...2 Making Space for Water...2 Future Water...2
More informationFlood Risk Management in Southwark
Flood Risk Management in Southwark 1 Presented to Borough & Bankside Community Council 25 th April 2012 By Flood and Drainage Team Agenda Item 11 IN BRIEF Background Legislation What have we done? What
More informationLondon Road, Rayleigh Essex Flood Risk Assessment Addendum
FINAL Countryside Properties (UK) Limited Submitted by AECOM 6-8 Greencoat Place London SW1P 1PL London Road, Rayleigh Essex Flood Risk Assessment May 2015 i Limitations AECOM Infrastructure & Environment
More informationLondon Borough of Croydon Local Flood Risk Management Strategy
London Borough of Croydon Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has
More informationRenfrewshire Strategic Flood Risk Assessment
Background Report Renfrewshire Strategic Flood Risk Assessment 16 Renfrewshire Local Development Plan Main Issues Report December 2011 Renfrewshire Local Development Plan Background Report X Renfrewshire
More informationLONDON INFRASTRUCTURE PLAN 2050 BUILDING A BIGGER AND BETTER LONDON
LONDON INFRASTRUCTURE PLAN 2050 BUILDING A BIGGER AND BETTER LONDON GROWTH We estimate that London s population became bigger than ever in February 2015. We reached a population of 8.6 million people,
More informationManaging Surface Water Flooding in Paddock Wood Briefing note - June 2011
Managing Surface Water Flooding in Paddock Wood Briefing note - June 2011 Information for Editors What is the reason for this initiative? 1. Legal Requirements The main drivers are the Flood Risk Regulations
More informationIntroduction to sustainable drainage. www.ciria.org/suds
Introduction to sustainable drainage Outline of presentation Challenges of existing drainage Drivers for SuDS SuDS philosophy and principles Benefits of SuDS Examples of SuDS Challenges of SuDS Summary
More informationAction plans for hotspot locations - Ash Study
Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side
More informationWater and Flooding Position Statement
Derby City Local Plan, Part 1: Core Strategy Water and Flooding Position Statement August 2015 1. Introduction 1.1 This position statement provides an update to the Derby HMA Joint Water Issues Paper which
More informationSUSTAINABLE DRAINAGE IN LEEDS Supplementary Guidance No. 22 JULY 2004
SUSTAINABLE DRAINAGE IN LEEDS Supplementary Guidance No. 22 JULY 2004 BACKGROUND This guidance provides information for developers on the use of sustainable drainage techniques in new developments. It
More informationLondon Borough of Merton Local Flood Risk Management Strategy
Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood
More informationPollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester.
Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications klargester.com Stormwater Attenuation Systems Sustainable Urban Drainage
More informationThe application site is on the edge of flood zones 1 and 2 with flood zone boundary cutting across part of the southern boundary of the site.
Flood Risk Assessment Erection of Masjid/ Place of Worship, extended car parking following demolition of 11a Grafton Street & boundary treatment Land adjacent 11/ 11a Grafton Street, Preston, PR1 8JB 0723/
More informationProposed Re-development, At 321 London Road, Wyberton. Flood Risk Assessment - Revised
Proposed Re-development, At 321 London Road, Wyberton Flood Risk Assessment - Revised Prepared By: C Mason C.Eng M.I.C.E May 2015 Contents Page No. 1. Introduction 2 2. Site Description 2 3. Flood Hazard
More informationVital Earth Composting Facility Flood Risk and Drainage Statement
Vital Earth Flood Risk and Drainage Statement Final December 2011 Prepared for Vital Earth Ltd Revision Schedule Flood Risk and Drainage Statement December 2011 Rev Date Details Prepared by Reviewed by
More informationR enfrewshire Local Plan. Safe Environment. Page. Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179
R enfrewshire Local Plan Safe Environment Page Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179 16 Flooding and Sustainable Urban Drainage OVERVIEW Flooding
More informationDraft Water Services Strategic Plan
Draft Water Services Strategic Plan A Plan for the Future of Water Services Customer Water Wastewater Environment Growth Investment Safeguarding your water for your future Irish Water at a glance... Irish
More informationSTAFF REPORT TO COMMITTEE OF THE WHOLE
STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None
More informationFlood Risk Assessment. For Application at: Brick House Farm Brick House Lane Hambleton Lancashire FY6 9BG
Flood Risk Assessment For Application at: Brick House Farm Brick House Lane Hambleton Lancashire FY6 9BG Contents 1. Introduction 2. The Site 3. Flood Risk 4. Existing drainage 5. Proposed Development
More informationBUILDING SURVEYING 313021
BUILDING SURVEYING 313021 Session topic SUDS - Sustainable Urban Drainage Systems Session objectives To examine various Sustainable Urban Drainage Systems (SUDS) for managing rainwater run-off and discuss
More informationSustainable Drainage Systems (SUDS) A guide for developers
Sustainable Drainage Systems (SUDS) A guide for developers We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your
More informationFlood Risk Assessment and Drainage Statement
Trinity College, Cambridge Proposed Relocation of Felixstowe Rifle Range, Land north of Nicholas Road, Trimley St Mary, Felixstowe Quality Assurance Site name: Client name: Proposed Relocation of Felixstowe
More informationGuidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by
Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Easy guide to Sustainable drainage systems 02 Contents Page Introduction 05 Purpose of this
More informationWiltshire SWMP Project Governance Framework
Wiltshire SWMP Project Governance Framework Final Framework Prepared on behalf of This document has been prepared in accordance with the scope of Scott Wilson's appointment with its client and is subject
More informationFlood Risk Assessment Breakspear House, Hemel Hempstead. Kier Property. October 08
Flood Risk Assessment Breakspear House, Hemel Hempstead. Kier Property October 08 Prepared by:... Approved by:... Simon Marcos Keith Searle Principal Engineer Associate Director Flood Risk Assessment Rev
More informationSite Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015
Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1
More informationCambridge House, Henry Street, Bath BA1 1UR
Flood Risk Assessment Cambridge House, Henry Street, Bath BA1 1UR For Full Planning application to BANES Council June 2011 Introduction This report is prepared as requested by B&NES to accompany the planning
More informationSurface Water Flooding Scrutiny Task Group - Final Report
Surface Water Flooding Scrutiny Task Group - Final Report TG No. 39 June 2008 If you would like additional copies of the report or further information, please contact: SCRUTINY LB RICHMOND UPON THAMES
More informationStrategic Flood Risk Assessment
local development framework Strategic Flood Risk Assessment LOCAL DEVELOPMENT FRAMEWORK ROYAL BOROUGH OF KINGSTON UPON THAMES Level 1 and 2 April 2011 Contents Executive Summary 5 Part 1 - Aiding Planning
More information5.14 Floodplains and Drainage/Hydrology
I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important
More informationStrategic Flood Risk Assessment (SFRA) Level 1
Strategic Flood Risk Assessment (SFRA) December 2007 (Final Issue) London Borough of Brent Brent House 349 High Road, Wembley Middlesex HA9 6BZ EXECUTIVE SUMMARY Introduction 1. The London Borough of Brent
More informationStormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer
Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer Novatech 2010, the 7th international conference on sustainable techniques and strategies in urban
More informationDraft Strategic Flood Risk Assessment Consultation version
Draft Strategic Flood Risk Assessment Consultation version November 2009 draft flood risk cover.indd 1 29/09/2008 15:44:16 What is the purpose of this draft Strategic Flood Risk Assessment? To provide
More informationDRAINAGE MANAGEMENT PLAN. HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council
DRAINAGE MANAGEMENT PLAN HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council EMPLOYER: Veolia Environmental Services (UK) Plc Veolia House 154A Pentonville Road London N1 9PE Copy
More informationPresentation on Flood Risk Management To Engineers Ireland 12 th February 2014. David Keane Cork County Council
Presentation on Flood Risk Management To Engineers Ireland 12 th February 2014 David Keane Cork County Council 1 Contents 1. The Power of Water 2. Defenses 3. Flooding & Flood Types 4. Flood Mitigation
More informationLondon Borough of Bromley LEAD LOCAL FLOOD AUTHORITY UPDATE AND GRANT DRAW-DOWN
Report No. ES15041 London Borough of Bromley PART ONE - PUBLIC Decision Maker: Executive Date: 9 th September 2015 Decision Type: Non-Urgent Executive Non-Key Title: Contact Officer: Chief Officer: Ward:
More informationLondon Borough of Barking & Dagenham Strategic Flood Risk Assessment (SFRA) Level 1
April 2008 London Borough of Barking & Dagenham Town Hall 1 Town Square Barking IG11 7LU (This page is intentionally left blank) April 2008 ii EXECUTIVE SUMMARY Introduction 1. The London Borough of Barking
More informationIssue: 2 Adopted by Council: 20/02/07. Directorate of Environment and Regeneration Planning Services
Issue: 2 Adopted by Council: 20/02/07 Directorate of Environment and Regeneration Planning Services LOCAL PLANNIING GUIIDANCE NOTE NO..19:: SUSTAIINABLE DRAIINAGE SYSTEMS Background The provision of adequate
More information1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year
Appendix C1 Surface Water Modelling 1 Overview 1.1 The Drain London modelling was designed to analyse the impact of heavy rainfall events across each London borough by assessing flow paths, velocities
More informationFlooding Matters. Introduction
Flooding Matters 19/07/2013 Issue 1 Introduction Hello and welcome to the 1 st Essex County Council flood and water management newsletter, Flooding Matters. As a Lead Local Flood Authority we now have
More informationGuidance Notes: GARDEN FLOODING
Page 1 of 7 Guidance Notes: GARDEN FLOODING If you are unsure about anything within these notes then please contact the Flood Risk Management (FRM) team using the details at the end of this document. Water
More informationThames Water is pleased to comment on the proposed changes to the London Plan 2014.
Boris Johnson Mayor of London (London Plan) Greater London Authority City Hall More London The Queen s Walk London SE1 2AA Thames Water Property Services Your ref Our ref Name Phone Email London Plan Review
More informationYour guide to sewer flooding
Your guide to sewer flooding We re here to help 2 Severn Trent Water Your guide to sewer flooding This leaflet has been produced to give you further information on: What causes sewer flooding Who is responsible
More informationCarterton Drainage Strategy. Stage 1 - Initialise/Prepare
Carterton Drainage Strategy Stage 1 - Initialise/Prepare Introduction Why sewer flooding Britain s first sewerage systems were constructed 150 years ago in the Victorian era, and have served us well for
More informationLand to the rear of the Black Bull Public House Flood Risk Assessment March 10, 2014 Version 1.0 Ref: RAB 148
Land to the rear of the Black Bull Public House Flood Risk Assessment March 10, 2014 Ref: RAB 148 Lindsey Phillips Turnbull Tweedale Ltd 61 Oaken Lanes Codsall South Staffordshire WV8 2AW R A B C O N S
More informationFLOOD RISK ASSESSMENT
SEVERN ROAD RESOURCE RECOVERY CENTRE FLOOD RISK ASSESSMENT REF 402.0036.00374 September 2009 Severn Road Resource Recovery Centre Ref: 402-0036-00374 Viridor Waste Management i PPS25 Flood Risk Assessment
More informationCosts and Benefits of Sustainable Drainage Systems
Costs and Benefits of Sustainable Drainage Systems Committee on Climate Change July 2012 Final Report 9X1055 CONTENTS Page 1 INTRODUCTION 1 1.1 Background 1 1.2 Report Structure 1 2 LITERATURE REVIEW
More information(http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf
Possible Submission about Water and Flooding (See maps 3a and 3b) From Mole Valley Local Development Framework: Strategic Flood Risk Assessment Update 2012 (http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf
More informationReference: 05/00928/FUL Officer: Mr David Jeanes
DEVELOPMENT CONTROL BOARD 5 January 2006 Reference: 05/00928/FUL Officer: Mr David Jeanes Location: Proposal: Applicant: Whiffens Farm Clement Street Sutton-At-Hone Kent BR8 7PQ Retrospective application
More informationNEW DEVELOPMENT AND EMERGENCY FLOOD PLANS
23 NEW DEVELOPMENT AND EMERGENCY FLOOD PLANS Turn page Northamptonshire Flood Toolkit This guidance has been developed to support applicants and developers who are required or encouraged to produce and
More informationCLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
More informationSURFACE WATER MANAGEMENT PLAN
SURFACE WATER MANAGEMENT PLAN DRAIN LONDON LONDON BOROUGH OF CROYDON Executive Summary Executive Summary This document forms the Surface Water Management Plan (SWMP) for the London Borough of Croydon which
More informationA Developer s Guide: Watershed-Wise Development
A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another
More informationUrban Flood Modelling
Urban Flood Modelling Adrian J Saul Pennine Water Group Department of Civil and Structural Engineering University of Sheffield a.j.saul@sheffield.ac.uk 1 Need for Integrated Urban Drainage within an integrated
More informationDECEMBER 2008 [ISSUE 2]
PROPOSED DEVELOPMENT WEST SUSSEX FLOOD RISK ASSESSMENT CLIENT: ARORA MANAGEMENT SERVICES LIMITED [ISSUE 2] Warrington Office Cinnamon House Cinnamon Park Crab Lane Fearnhead Warrington Cheshire WA2 0XP
More informationLONDON BOROUGH OF REDBRIDGE LOCAL FLOOD RISK MANAGEMENT STRATEGY
LONDON BOROUGH OF REDBRIDGE LOCAL FLOOD RISK MANAGEMENT STRATEGY December 2015 The Local Flood Risk Management Strategy for the Lead Local Flood Authority of the London Borough of Redbridge Version 1.2
More informationSewer Flooding Alleviation in the Counters Creek Catchment
Sewer Flooding Alleviation in the Counters Creek Catchment London Borough of Hammersmith and Fulham Monday, 14 November 2011 at 7.00pm The Small Hall, Hammersmith Town Hall, King Street, W6 9JU Agenda
More informationeco-towns A supplement to Planning Policy Statement 1
Planning shapes the places where people live and work and the country we live in. It plays a key role in supporting the Government s wider social, environmental and economic objectives and for sustainable
More informationStormwater harvesting
Stormwater harvesting How to collect and re-use stormwater from Sydney Water s stormwater system Most of the stormwater pipes and channels in the Sydney metropolitan area are the responsibility of local
More informationIntegrated Local Flood Management and Drainage Strategy OVERVIEW
Integrated Local Flood Management and Drainage Strategy OVERVIEW Flooding is a natural phenomenon. In urban areas where drainage relies on pipe networks, open channels and creeks, flooding can cause infrastructure
More informationINFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction
ACE GLOBAL RISK ENGINEERING INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE Introduction The most common cause of flooding is due to established water storage areas (natural and man-made)
More informationWater and Planning: The Fluid Challenge. How can we secure our future water resources?
Water and Planning: The Fluid Challenge How can we secure our future water resources? Water and Planning: The Fluid Challenge @RTPI_London #FluidChallenge Proudly sponsored by: Tse-Hui Teh UCL Geoff Darch
More informationEssex County Council Flood Investigation Report
Essex County Council Stock City of Chelmsford Rev Date Details Author Checked and Approved By 01 February 2015 Draft report for stakeholder consultation Ed Clarke Flood Investigation Engineer Lucy Shepherd
More informationImplementation of Regional Planning Guidelines Best Practice Guidance
Implementation of Regional Planning Guidelines Best Practice Guidance December 2010 Contents Section Page No Minister s Foreword Chapter 1: Purpose of Regional Planning Guidelines 3 1.1 Background 1.2
More informationKey Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.
Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is
More informationKensington, Chelsea, Hammersmith and Fulham. Strategic Flood Risk Assessment June 2010 FINAL REPORT
Kensington, Chelsea, Hammersmith and Fulham June 2010 FINAL REPORT Crowmarsh Battle Barns 100 Preston Crowmarsh WALLINGFORD Oxfordshire OX10 6SL UK tel: 01491 836688 fax: 08700 519307 This page is intentionally
More informationThames Water key Messages for London Borough of Ealing 25 th October 2005
Thames Water key Messages for London Borough of Ealing 25 th October 2005 Item 1: Drainage & ownership The area of drainage is complex. Thames Water, the Local Authority, the Environment Agency and property
More informationPROPERTY RISK MANAGEMENT BUSINESS EMERGENCY, FLOOD PLANNING AND MITIGATION GUIDANCE
PROPERTY RISK MANAGEMENT BUSINESS EMERGENCY, FLOOD PLANNING AND MITIGATION GUIDANCE 1 The most common cause of flooding is when the river catchment area receives far greater amounts of water than normal,