1 PROPOSED DEVELOPMENT WEST SUSSEX FLOOD RISK ASSESSMENT CLIENT: ARORA MANAGEMENT SERVICES LIMITED [ISSUE 2] Warrington Office Cinnamon House Cinnamon Park Crab Lane Fearnhead Warrington Cheshire WA2 0XP Swindon Office Unit 2 York House Edison Park Dorcan Way Swindon Wiltshire SN3 3RB Tel Fax Tel Fax cec@coleeasdon.com Civil Engineering ~ Highways ~ Transportation ~ Flood Risk Assessment Incorporated in UK as Cole Easdon BMP Ltd No

2 C OLE EASDON CONSULTANTS (CEC) DOCUMENT ISSUE RECORD Client: Project: Arora Management Services Limited Proposed Development at the Sofitel Hotel North Terminal Gatwick Airport West Sussex Job Number: 2671 Document Title: Flood Risk Assessment Issue / Revision: Issue 1 Issue 2 Description / Status: Draft for Comment Planning application submission Date: December 2008 December 2008 Prepared: S Starr BSc (Hons) S Starr BSc (Hons) Signature: Document Check: K Legg K Legg Signature: Technical Check: D Frosoni CEng MCIWEM MICE D Frosoni CEng MCIWEM MICE Signature: Authorised: D Frosoni CEng MCIWEM MICE D Frosoni CEng MCIWEM MICE Signature: File Reference: 2611 FRA (Dec 08) 2611 FRA (Dec 08) Cole Easdon Consultants (CEC)

3 CONTENTS SECTION HEADING PAGE NO. 1.0 Introduction The Existing Site Flood Risk Issues Discussions and Conclusions 18 Appendices Appendix 1 Figures Figure 1 Location Plan Figure 2 EA Flood Zone Map Figure 3 EA Flood Zone Map 1:10,000 Figure 4 Existing Surface Water Drainage Catchments Appendix 2 Surface Water Drainage Calculations Appendix 3 Correspondence Appendix 4 British Geological Survey Borehole Logs Appendix 5 Drawings: Drawing No. 2671/500 - Existing Site Layout (Sheets 1 & 2) Drawing No. 2671/501 - Proposed Development Layout Drawing No. 2671/502 - Existing Site Drainage Drawing No. 2671/503 Compensatory Storage Proposal Cole Easdon Consultants (CEC)

4 1.0 INTRODUCTION 1.1 This Flood Risk Assessment has been prepared by Cole Easdon Consultants on behalf of Arora Management Services Limited in respect of a planning application for commercial development at the Sofitel Hotel Site, North Terminal, Gatwick Airport, West Sussex. National Grid Reference TQ Refer to Figure 1 - Site Location Plan [Appendix 1]. 1.2 This Study considers the issues relating to flood risk associated with the proposals. It has been prepared following discussions with officers from the Environment Agency (the EA) and British Airport Authority (BAA). Development Proposals 1.3 The proposed development is to comprise a new 630 bed, multi-storey Premier Inn hotel with associated access, parking areas and landscaping. The proposal includes for: 1. Ground (50 spaces) and first floor (65 spaces) car parking areas below the hotel; 2. Hotel entry level above the car parking areas; 3. 8 No. floors of accommodation; 4. 1 No. office floor 1.4 The new hotel will be located in the existing Sofitel Hotel car park. Additional car parking areas will be provided around the existing Sofitel Hotel building at ground level (188 spaces) and within a proposed two storey car park (184 spaces). Cole Easdon Consultants (CEC) - 1 -

5 1.5 This study is based on the proposed development layout shown on Drawing No SK031 prepared by Dexter Moren Associates in December 2008, and included in Cole Easdon Drawing No. 2671/501 - Proposed Development Layout [Appendix 5]. Need for Study 1.6 The purpose of this assessment is to demonstrate to the EA that the proposals outlined above can be satisfactorily accommodated without worsening flood risk for the area, as per guidance provided within Planning Guidance document PPS Accordingly, this study has been prepared to: i) assess flood risk to the development from fluvial sources; ii) assess flood risk to the development from other potential sources, including streams, ditches, sewers, groundwater and overland surface water; iii) ensure that the development proposed will fully comply with the requirements of the EA's policy on the safeguarding of floodplains, as detailed within the said Planning Policy Statement 25 (PPS25). iv) prepare a SUDS strategy for management of post development surface water runoff. 1.8 A site topographical survey (referenced to an Ordnance Datum) has been provided to Cole Easdon Consultants and has been reviewed as part of this study. Scope of Study 1.9 In Section 2.0, we describe the characteristics of the development site and surrounding area. In Section 3.0, we assess flood risk issues. Finally, conclusions are presented in Section 4.0. Cole Easdon Consultants (CEC) - 2 -

6 1.10 The following abbreviations are used in this report: EA Environment Agency SUDS Sustainable Urban Drainage Systems FZM Flood Zone Map prepared by the EA PPS25 Planning Policy Statement 25: Development and Flood Risk AOD Above Ordnance Datum BGS British Geological Survey SFRA Strategic Flood Risk Assessment LPA Local Planning Authority BAA British Airport Authority Cole Easdon Consultants (CEC) - 3 -

7 2.0 THE EXISTING SITE Refer to Drawing No. 2671/500 - Existing Site Layout [Appendix 5]. 2.1 The development site is brownfield land currently occupied by the Sofitel Hotel and associated car park. The site is located 150m east of the North Terminal, Gatwick Airport, West Sussex. It covers some 2 hectares and comprises the hotel building, associated car parking, access roads and landscaping. An elevated railway linking the North & South Terminals passes over the site. The site is accessed from the highway known as Northway. 2.2 The site is bounded on all sides by highways. Northway to the north and west and Crossway and North Terminal Approach to the south and east. Land use in the vicinity of the site is related to the operation of Gatwick Airport. 2.3 The existing topography of the land within the airport complex is flat. Development site ground levels vary from 56.00mAOD to 57.00mAOD. Existing Surface Water Drainage 2.4 Surface water runoff from the existing hard areas and buildings at the site is piped to a private surface water drainage system comprising of a 2900mm x 1500mm culvert at a depth of some 4 metres below the site. 2.5 The culvert outfalls to an attenuation pond (known as Pond D) at the northern extent of the airport, some 600 metres north of the development site. The total contributing area draining to Pond D comprises of the North Terminal area and is some 327 ha, of which 244 ha is impermeable surfacing. BAA relate that the pond has been designed to accommodate runoff from the 1:5 year event. The pond outfalls to the River Mole, situated 30m north, via Hydrobrake flow controls. Cole Easdon Consultants (CEC) - 4 -

8 2.6 The drainage network within the airport is privately owned and maintained by BAA. All drainage infrastructure located within the development site is under the joint ownership of BAA and Sofitel. Nearby Watercourses/Drainage Features 2.7 The River Mole, a tributary of the River Thames, drains the local catchment. All surface water runoff from the airport is directed to the River Mole. Attenuated flows from various storage ponds are discharged directly to the watercourse, or to Gatwick Stream or Crawter's Brook, both tributaries of the River Mole. Surface Water drainage catchments within the airport are shown on Figure 4 (Appendix 1). 2.8 The River Mole is located approximately 0.5km north of the site, at the northern boundary of the airport. The watercourse skirts around the western edge of Crawley, then flows north across some 1.5km of farmland before entering a culvert beneath Gatwick airport runway. It emerges as an open channel to the north of the runway and proceeds to flow in a north easterly direction, through the northern extent of the airport. The watercourse flows beneath the A23 highway in the north eastern corner of the site, then follows a northerly course through Surrey. Its confluence with the River Thames is near Hampton Court Palace, London, some 80km north of the site. 2.9 The Gatwick Stream flows north along the airport's eastern boundary. It flows under the A23 highway adjacent to Gatwick South Terminal before heading in a north easterly direction, following the route of the A23. It joins the River Mole downstream of the culvert, which conveys the Mole under the A23, some 600 metres north east of the site. Cole Easdon Consultants (CEC) - 5 -

9 2.10 Crawter's Brook flows north through Crawley, then flows west along the southern boundary of the airport. It meets the River Mole upstream of the culvert beneath the runway. Existing Ground Conditions Refer to Borehole Logs [Appendix 4] 2.11 An intrusive site investigation has yet to be undertaken. However, borehole data has been obtained from the British Geological Society. The data relate to three boreholes established along the M23 highway, adjacent to the airport. The boreholes were sunk to depth of 6m, 9m and 14.6m The boreholes indicate that clay strata are present to approximately 4m below ground level at the site. The clay strata are underlain by a mixture of clay, siltstone and shale material, encountered to depth in each borehole Groundwater was struck in two of the boreholes at levels of 4.4m and 5.6m below ground level. Cole Easdon Consultants (CEC) - 6 -

10 3.0 FLOOD RISK ISSUES 3.1 This section presents an assessment of flood risk to the development from: a) external sources; b) surface water discharge from the proposed development. 3.2 Recommended flood risk mitigation measures appropriate to the level of perceived risk are included in the assessment. The mitigation measures are summarised in Table 3.1 on page 14. The Sequential Test 3.3 PPS25 requires that LPAs adopt a sequential approach when allocating land for development. The sequential approach should be used in order to direct development to the lowest Flood Risk Zone available before higher risk areas are considered. 3.4 We can confirm that hotel use is classified as more vulnerable development, and is therefore considered to be an appropriate use within Flood Zone 2, as informed by Table D.3 of PPS25. However, this means only that the proposed development will not be required to pass the Exception Test. As footnote 22 (p. 27) of PPS25 explains, even though a development may be considered an appropriate use of a flood zone, it still requires the application of the Sequential Test to steer development first to areas at the lowest probability of flooding. 3.5 In this instance, the application of the Sequential Test has revealed that there are no other appropriate development sites in the locality for the following reasons: A significant proportion of Gatwick Airport lies within Flood Zones 2 and 3, including parts of the area for the proposed second runway. Cole Easdon Consultants (CEC) - 7 -

11 3.5 Contd. There are no feasible alternative sites for hotel development within lower risk Flood Zone 1 and only limited opportunities are available for hotel development within Flood Zone 2; The development site is located at the edge of Flood Zone 2. As such, the development site location conforms with the requirements of the Sequential Approach, which requires that development is directed to areas of lowest flood risk; This is the only available hotel site with pedestrian access to the North Terminal at Gatwick Airport; The development site makes efficient use of brownfield land at a very accessible public transport hub A) Assessment of Flood Risk to the Development Site from External Sources Ai) Assessment of Flood Risk from Fluvial Sources 3.6 The Flood Zone Map (FZM) for the locality as produced by the EA is shown on Figures 2 & 3 within Appendix 1. The FZM shows that the site encroaches upon Flood Zone 2 (medium risk). 3.7 The EA relate that although flood level data is available for node points along the River Mole and Gatwick Stream, these flood levels are not relevant to the development site due to their distant location from the site. Cole Easdon Consultants (CEC) - 8 -

12 3.8 Consequently, the EA has advised that in the absence of site specific flood level data related to the 1:100 year + 20% flood event, the Flood Zone 2 floodplain should be overlaid the development site. Refer to Drawing No. 2671/503 (Appendix 5). The 1:100 year + 20% floodplain extent is approximated by the 56.75mOD contour. At this level, some 50% of the proposed car parking areas would be sited within floodplain. The Crawley Borough Council Strategic Flood Risk Assessment 3.9 Crawley Borough Council Strategic Flood Risk Assessment states that much of the Gatwick Airport precinct (including the proposed development site) is within Flood Zone 2 (Medium Risk). The source of flood risk is identified as fluvial flooding from the River Mole. According to the assessment, the nature of this flooding is anticipated to be limited to shallow sheet flow. Fluvial Sources Flood Risk Mitigation Measures Finished Floor levels 3.10 The hotel entry level will be sited above the two levels of decked car parking at a finished floor level of some 5.7 metres above finished ground floor level at approximately 61.95mOD. Proposed Car parking in Floodplain 3.11 The following measures are proposed so as to mitigate flood risk posed by the car park development in floodplain: 1. Existing ground levels will be maintained (except in car park areas where ground level will be lowered so as to provide compensatory storage for floodplain lost as a result of the proposed hotel footprint); Cole Easdon Consultants (CEC) - 9 -

13 3.11 Contd. 2. Ground floor car parking below the hotel will be subject to flooding to depths of up to 500mm. However, vehicles will be prevented from being washed offsite by the walled confines of the car park itself. 3. Other car parking areas will flood to depths not exceeding 300mm and no mitigation is proposed. Emergency Planning 3.12 The following measures are proposed: 1. The developer will need to formulate and implement an Emergency Plan that details emergency procedures in the event of an extreme flood event; 2. As part of the emergency procedures, the proposed hotel will be linked to the Environment Agency's Flood Warning Directory service, ensuring that customers and staff can remove their vehicles from the site well in advance of any flood at the site; 3. adequate passive flood warning and clearly signed evacuation routes will be provided, with signs highlighting the susceptibility to flooding. All signage will be maintained by the landowner. The landowner will also be required to keep evacuation routes clear. Flood Resilient Construction 3.13 The developer will give consideration to the use of flood resilient construction practices and materials in the design and build phase of the proposed hotel and decked car parking. The following measures will be considered for implementation. The measures will protect the proposed development where floodwaters exceed the design floor level up to a depth of 1 metre. Water exclusion measures are described below. For flood depths exceeding 1 metre, water exclusion is not recommended. Cole Easdon Consultants (CEC)

14 3.13 Contd. In general, building materials with good resistance to water penetration, good drying ability and the ability to retain pre-flood characteristics should be selected up to floor slab level. Examples include engineering bricks and dense stone; Where ground conditions are favourable, foundations should be ground supported not suspended types. Floodwater and waterborne contaminants can become trapped beneath suspended floors. If ground supported flooring is unsuitable, a suspended concrete slab floor is recommended; Concrete blockwork should not be located below floor slabs. Blockwork provides a potential path for water ingress into wall cavities; Where possible, masonry walls should be constructed using engineering bricks up to floor slab level. Blocks and dense facing bricks have much improved resistance to water penetration if rendered; Insulation in the form of external insulated render or internal boards is preferable to cavity insulation; Door thresholds should be raised, whilst complying with level access requirements. Sealed PVC external framed doors should be used where possible; Periscopic air vents should be used; Fittings that will not be significantly affected by water should be installed. Fittings should be easily cleaned. Fittings such as electrical appliances should be placed on plinths; All service entries including electricity, communications, gas and water should be sealed with expanding foam or similar closed cell material; Water, electricity and gas meters should be located above the predicted flood level; Electrical sockets should be installed above flood level. Electric ring mains should be installed at a higher level with drops to sockets and switches; Heating systems such as boilers should be located above the predicted flood level; Cole Easdon Consultants (CEC)

15 3.13 Contd. Electrical switchgear and plant should be placed on raised plinths above the predicted flood level; Non-return valves are recommended in the drainage system to prevent back flow of diluted sewage resulting from potential foul sewer surcharging. Maintenance of these valves is required to ensure their effectiveness; Where possible, stored supplies should be placed on raised plinths/racking; Any floor level glazing should be strengthened so as to resist floodwater pressure resulting from water depths of up to 0.5m, if possible. This will also provide resistance to damage from floating debris; Compensatory Storage Refer to Drawing No. 2671/503 Compensatory Storage Proposal [Appendix 5] 3.14 Compensatory storage will be provided for the loss of floodplain resulting from development within the 1:100 year + 20% floodplain. Floodplain loss (170m 3 ) is due to ground floor development comprising of plant rooms and linen store within the hotel footprint area Lost floodplain volume will be compensated for on a 'level for level' basis by the removal of an existing landscaped bund located in the proposed car park area at the southern end of the development site, adjacent to the existing Sofitel Hotel. Some 450m 3 floodplain volume can be made available by the removal of the bund, thereby providing a 280m 3 net increase in floodplain storage. Cole Easdon Consultants (CEC)

16 Aii) Assessment of Flood Risk from Existing Sewers/Drains 3.16 In the event of existing site drainage flooding, overflow will be routed off-site in a westerly direction, due to topography. Two no. existing potential ponding areas adjacent to the existing Sofitel Hotel will be removed under the development proposal, due to the presence of the decked carparking area. Sewer Flood Risk Mitigation Measures 3.17 No mitigation measures proposed. Aiii) Assessment of Flood Risk from Overland Flow Refer to Drawing No. 2671/500 - Existing Site Layout [Appendix 5] 3.18 The site is bounded by highways, which are served by an appropriate highway drainage system. In any event, the grade of the bounding highways is such that any highway drain overflow will be routed along the highways and away from the site. Accordingly, flood risk to the site from overland flow is considered low. Overland Flow Flood Risk Mitigation Measures 3.19 No mitigation measures are proposed. Aiv) Assessment of Flood Risk from Groundwater 3.20 Clay strata exists to depth in the site vicinity, based on nearby BGS borehole data. As this strata is impermeable, a groundwater table is unlikely to exist. Accordingly, flood risk to the site from this source is considered low. Cole Easdon Consultants (CEC)

17 Groundwater Flood Risk Mitigation Measures 3.21 No mitigation measures proposed. Table Assessment of Flood Risk to the Development Site Arising from External Sources Source of Potential Flooding to the Development Site Fluvial Flood Risk Medium. Flood Zone 2 Mitigation/Comments Above ground decked car parking below hotel entry level Finished floor levels in utility rooms to be set 300mm above 1:100yr+20% flood level Compensatory storage Dry access Flood resilient construction Emergency planning Sewers Low No mitigation measures proposed Groundwater Low No mitigation measures proposed Overland Flow Low No mitigation measures proposed B) Assessment of Flood Risk Arising from Surface Water Discharge from the Proposed Development Refer to Drawing No. 2671/501 Proposed Development Layout [Appendix 5] 3.22 In order to mitigate flood risk posed by post development runoff, adequate control measures will be required within the site. Cole Easdon Consultants (CEC)

18 Bi) Surface Water Runoff Control 3.23 The proposed development will introduce areas of impermeable surfacing, which in turn will generate additional surface water runoff. In order to manage the disposal of surface water in a sustainable manner and in accordance with the requirements of PPS25, the EA advises the developer to accommodate excess surface water on-site and control its release from the site according to the following criteria: i) the rate at which surface water is discharged from the site must not exceed the existing site runoff rate for a given storm event up to and including the 1:100 year storm event; ii) excess surface water from storm events up to and including the 1:100 year storm event must be stored on-site and released to watercourses and drains at existing discharge rates; iii) Surface water flows are estimated to increase by 30% over the lifetime of the development due to climate change. Therefore, the impact of climate change on the surface water drainage system and flooding should be assessed for the 1:100 year storm event plus 30%. Mitigation measures should be implemented as necessary to ensure that property is protected from surface water flooding under extreme storm conditions Notwithstanding the above, BAA has advised that all surface water discharge from the development site shall be restricted to the existing 1:5 year discharge rate for runoff entering the BAA owned drainage system. This, on the basis that the downstream BAA owned balancing pond has storage capacity to attenuate runoff from storms up to the 1:5 year design event only The existing 1:5 year discharge rate has been calculated to be 78 l/s. Refer to Drawing No. 2671/502 - Existing Site Drainage [Appendix 5] and Appendix 2 for surface water drainage calculations. Cole Easdon Consultants (CEC)

19 3.26 In accordance with requirements of the EA, PPS25 and BAA, surface water runoff from the development will be restricted to the existing 1:5 year brownfield site runoff rate for storms up to the 1:100 year + 30% event by means of attenuation and flow restriction facilities. This will be achieved at the development site through the implementation of oversize pipework to be sited below the ground level car parking adjacent to the existing Sofitel Hotel. Development discharge to the BAA owned culvert (2900mm x 1500mm) will be restricted by the use of a Hydrobrake flow control. Refer to Drawing No. 2671/502 [Appendix 5] It has been calculated that some 140m 3 attenuation storage will be required for the development site. This is based on a proposed 0.69ha impermeable area. The storage can be provided by a 1.8m wide x 1.2 m deep box culvert (50 m long). Table 3.2 summarises existing and proposed discharge rates, together with proposed attenuation volumes for storm up to and including the 100 year storm + 30% climate change event. Refer to Appendix 2 for storm runoff calculations. All computer calculations have been undertaken using MicroDrainage software (W.11.2). Table Existing and Proposed Surface Water Discharge to the 2.9m x 1.8m box culvert (BAA owned) Storm Existing Hard Area Runoff Contributing Area (ha) Runoff (l/s) Permissible Development Discharge into Glastonbury Mill Stream (l/s) Proposed Impermeable Area (ha) Required Volume for On- Site Retention (m 3 ) 1:5 Year :30 Year 0.37 > :100 Year + 30% 0.37 > Cole Easdon Consultants (CEC)

20 Bii) Soakaway Drainage 3.28 Made ground, peat and clay sub-soils exist to depth beneath the site. These strata have poor infiltration potential and will prevent the efficient operation of infiltration devices. Additionally, groundwater has been encountered close to the surface in one part of the site during the intrusive soil investigation. Accordingly, this report does not promote the use of such devices at the site. Refer to BGS borehole logs [Appendix 4]. Biii) Water Quality 3.29 The proposals include 188 No. ground level outside car parking spaces around the existing Sofitel Hotel. Due to the large number of spaces, discharge from external car parking areas will pass through an oil interceptor prior to discharge to off-site. Bv) Adoption 3.30 It is proposed that all on-site drainage facilities will be maintained privately. Bvi) Design Exceedance 3.31 The surface water drainage system will be designed so as not to flood during the 1:100year + 30% storm event. In the event of storms exceeding this magnitude or in the event of blockage, drain overflow will gravitate across the site in a westerly direction without ponding. Cole Easdon Consultants (CEC)

21 4.0 DISCUSSION AND CONCLUSIONS Sequential Test 4.1 The application of the Sequential Test has revealed that there are no other appropriate development sites in the locality Assessment of Flood Risk from External Sources 4.2 Flood risk to the proposed development from various sources, such as fluvial, overland flow, sewers, groundwater and overland flow have been considered in this study. 4.3 Fluvial flow has been identified as a possible flood risk to the site. The site is located within medium risk Flood Zone Accordingly, in order to mitigate fluvial flood risk arising from the 1:100 year + 20% event, the following measures are proposed: 1. Two levels of decked car parking (ground & first floor) will be sited below hotel entry level. This will ensure that floodwaters will not enter the hotel; 2. Compensatory storage will be provided for loss of floodplain storage arising from the hotel footprint; 3. Flood resilient construction measures will be incorporated into the development; 4. Emergency planning measures will be incorporated into the development; 4.5 Flood risk arising from sewer flooding, overland runoff and groundwater is considered to be low. However, the measures proposed in order to mitigate fluvial flood risk will also provide residual risk protection from these sources of flooding. Cole Easdon Consultants (CEC)

22 Assessment of Flood Risk Arising from Surface Water Discharge from the Proposed Development 4.6 The existing strata beneath the site have poor infiltration potential. Infiltration SUDS is not appropriate for the development site. 4.7 In accordance with requirements of the EA, PPS25 and BAA, surface water runoff from the development will be restricted to the existing 1:5 year brownfield site runoff rate for storms up to the 1:100 year + 30% event by means of attenuation and flow restriction facilities. This will be achieved at the development site through the implementation of oversize pipework to be sited below the ground level car parking adjacent to the existing Sofitel Hotel. 4.8 The proposals include 188 No. ground level outside car parking spaces around the existing Sofitel Hotel. Due to the large number of spaces, discharge from external car parking areas will pass through an oil interceptor prior to discharge to off-site. 4.9 It is proposed that all on-site drainage facilities will be maintained privately This study has been undertaken in accordance with the principles set out in PPS25. We can conclude that providing the development adheres to the conditions advised in paragraphs 4.1 to 4.9 above, the said development proposals can be accommodated without increasing flood risk within the locality in accordance with objectives set by Central Government and the EA. Cole Easdon Consultants December 2008 Cole Easdon Consultants (CEC)

NOVEMBER 2009 [ISSUE 5]

NOVEMBER 2009 [ISSUE 5] 375 401 BRIGHTON ROAD CROYDON FLOOD RISK ASSESSMENT CLIENT: TRITHING LTD [ISSUE 5] Head Office: Unit 2 York House Edison Park Dorcan Way Swindon Wiltshire SN3 3RB Tel. 01793 619965 Fax. 01793 619967 Email:

More information

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared

More information

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY London Rd. WATERLOOVILE FOR McCarthy & Stone Ltd. July 2010 Such Salinger Peters Ltd 30558-1- Flood Risk Assessment & Drainage Strategy Contents Paragraph Page

More information

Taylor Wimpey UK Ltd. December 2007

Taylor Wimpey UK Ltd. December 2007 Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked

More information

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?

More information

Cole Easdon Consultants Limited

Cole Easdon Consultants Limited FLOOD RISK ASSESSMENT FOR PROPOSED EXPANSION OF WHITEHALL GARDEN CENTRE CORSHAM ROAD, LACOCK ON BEHALF OF WHITEHALL GARDEN CENTRES LTD. OCTOBER 2015 [ISSUE 2] Head Office: Unit 2 York House Edison Park

More information

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter ENVIRONMENTAL STATEMENT: VOLUME 1 9.1 INTRODUCTION 9.1.1 This Chapter considers the effects of the Project on surface water and groundwater

More information

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site

More information

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies.

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies. ODYSSEY MARKIDES TECHNICAL NOTE PROJECT : CHAILEY HOUSE, BLEWBURY JOB NO. : 14-216 NOTE TITLE : PRELIMINARY FLOODING AND DRAIANGE AUTHOR : STEVEN ROOTH APPROVED : ANDREAS MARKIDES DATE : 02/09/2014 1.0

More information

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House

More information

Development at 2 St Albans Road, Kingston, London, KT25HQ

Development at 2 St Albans Road, Kingston, London, KT25HQ Development at SuDS Report. Prepared for: Report prepared by: Dave Alonso Divine Ideas (UK) ltd Date: August 2015 Project/Issue number: Appendices Attached: 1510/01/SuDS A, B & C Divine Ideas (UK) Ltd

More information

Littleport Co-located Schools

Littleport Co-located Schools Littleport Co-located Schools February 2015 Morgan Sindall Littleport Co-located Schools 330763 BNI BSE 003 C P:\Cambridge\Murdoch\EST\PROJECTS\330763 Littleport Co-located Schools\12.0 Documents\12.2

More information

Vital Earth Composting Facility Flood Risk and Drainage Statement

Vital Earth Composting Facility Flood Risk and Drainage Statement Vital Earth Flood Risk and Drainage Statement Final December 2011 Prepared for Vital Earth Ltd Revision Schedule Flood Risk and Drainage Statement December 2011 Rev Date Details Prepared by Reviewed by

More information

Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH

Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH Proposed Construction of Basement Flood Risk Assessment 35 Edwardes Square London W8 6HH 1 Introduction This FRA has been carried out in accordance with the National Planning Policy Statement (NPPF), the

More information

DRAINAGE MANAGEMENT PLAN. HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council

DRAINAGE MANAGEMENT PLAN. HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council DRAINAGE MANAGEMENT PLAN HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council EMPLOYER: Veolia Environmental Services (UK) Plc Veolia House 154A Pentonville Road London N1 9PE Copy

More information

Flood Risk Assessment. For Application at: Brick House Farm Brick House Lane Hambleton Lancashire FY6 9BG

Flood Risk Assessment. For Application at: Brick House Farm Brick House Lane Hambleton Lancashire FY6 9BG Flood Risk Assessment For Application at: Brick House Farm Brick House Lane Hambleton Lancashire FY6 9BG Contents 1. Introduction 2. The Site 3. Flood Risk 4. Existing drainage 5. Proposed Development

More information

Proposed Residential Development Land off Cody Road Waterbeach Cambridgeshire. Flood Risk Assessment

Proposed Residential Development Land off Cody Road Waterbeach Cambridgeshire. Flood Risk Assessment Land off Cody Road Waterbeach Cambridgeshire Cedar Barn, White Lodge, Walgrave, Northampton, NN6 9PY T: F: E: W: 01604 781811 01604 781999 mail@jppuk.net jppuk.net Proposed Residential Development Land

More information

East Riding of Yorkshire Council

East Riding of Yorkshire Council East Riding of Yorkshire Council Lead Local Flood Authority Interim Standing Advice Revision A - April 2015 1. Introduction From April 2015 the Lead Local Flood Authority (LLFA) became a statutory consultee

More information

Essex County Council Flood Investigation Report

Essex County Council Flood Investigation Report Essex County Council Stock City of Chelmsford Rev Date Details Author Checked and Approved By 01 February 2015 Draft report for stakeholder consultation Ed Clarke Flood Investigation Engineer Lucy Shepherd

More information

Flood Risk Assessment and Drainage Statement

Flood Risk Assessment and Drainage Statement Trinity College, Cambridge Proposed Relocation of Felixstowe Rifle Range, Land north of Nicholas Road, Trimley St Mary, Felixstowe Quality Assurance Site name: Client name: Proposed Relocation of Felixstowe

More information

FLOOD RISK ASSESSMENT

FLOOD RISK ASSESSMENT SEVERN ROAD RESOURCE RECOVERY CENTRE FLOOD RISK ASSESSMENT REF 402.0036.00374 September 2009 Severn Road Resource Recovery Centre Ref: 402-0036-00374 Viridor Waste Management i PPS25 Flood Risk Assessment

More information

Proposed Re-development, At 321 London Road, Wyberton. Flood Risk Assessment - Revised

Proposed Re-development, At 321 London Road, Wyberton. Flood Risk Assessment - Revised Proposed Re-development, At 321 London Road, Wyberton Flood Risk Assessment - Revised Prepared By: C Mason C.Eng M.I.C.E May 2015 Contents Page No. 1. Introduction 2 2. Site Description 2 3. Flood Hazard

More information

Newbiggin House Farm,

Newbiggin House Farm, Newbiggin House Farm, Near Waberthwaite Flood Investigation Report 32 Flood Event 30/8/2012 Cumbria County Council Version Undertaken by Reviewed by Approved by Date Preliminary Colin Parkes Anthony Lane

More information

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership WYCA SuDS Guidance Introduction As part of the government s continuing commitment to protect people and property from flood risk, the Department for Communities and Local Government and the Department

More information

Mr & Mrs Clarke Proposed Development at The River House, Balderstone Flood Risk Assessment

Mr & Mrs Clarke Proposed Development at The River House, Balderstone Flood Risk Assessment Proposed Development at The River House, Balderstone D2192-FRA-01 5 Nov 2015 PSA Design Ltd Consulting Engineers The Old Bank House 6 Berry Lane Longridge Preston PR3 3JA Tel. 01772 786066 Fax. 01772 786265

More information

Cambridge House, Henry Street, Bath BA1 1UR

Cambridge House, Henry Street, Bath BA1 1UR Flood Risk Assessment Cambridge House, Henry Street, Bath BA1 1UR For Full Planning application to BANES Council June 2011 Introduction This report is prepared as requested by B&NES to accompany the planning

More information

Strategic Flood Risk Assessment

Strategic Flood Risk Assessment local development framework Strategic Flood Risk Assessment LOCAL DEVELOPMENT FRAMEWORK ROYAL BOROUGH OF KINGSTON UPON THAMES Level 1 and 2 April 2011 Contents Executive Summary 5 Part 1 - Aiding Planning

More information

London Road, Rayleigh Essex Flood Risk Assessment Addendum

London Road, Rayleigh Essex Flood Risk Assessment Addendum FINAL Countryside Properties (UK) Limited Submitted by AECOM 6-8 Greencoat Place London SW1P 1PL London Road, Rayleigh Essex Flood Risk Assessment May 2015 i Limitations AECOM Infrastructure & Environment

More information

(http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf

(http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf Possible Submission about Water and Flooding (See maps 3a and 3b) From Mole Valley Local Development Framework: Strategic Flood Risk Assessment Update 2012 (http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf

More information

Granville Road Estate, London Borough of Barnet. Flood Risk Assessment and Drainage Strategy August 2014. New Granville LLP

Granville Road Estate, London Borough of Barnet. Flood Risk Assessment and Drainage Strategy August 2014. New Granville LLP Granville Road Estate, London Borough of Barnet Flood Risk Assessment and Drainage Strategy August 2014 New Granville LLP Document History JOB NUMBER: 237 DOCUMENT REF: Granville Road FRA REVISIONS: Final

More information

Sutton Harbour Holdings PLC. March 2007

Sutton Harbour Holdings PLC. March 2007 Sutton Harbour Holdings PLC March 2007 Contents!! " # # $ % % &'(&'' ) ) ( * + ', *!$ -,!'! #. / $$ #% 00& ' 00&1 $ Executive Summary!! " WSP Development and Transportation has been engaged by Sutton

More information

Designed and produced by geo-graphicsdesign.com DP 300 3/02

Designed and produced by geo-graphicsdesign.com DP 300 3/02 Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended

More information

Norfolk House Hotel Development Gatwick Airport. Flood Risk Statement. May 2012. Bloc Hotels. Vantage Planning Ltd. www.vantageplanning.co.

Norfolk House Hotel Development Gatwick Airport. Flood Risk Statement. May 2012. Bloc Hotels. Vantage Planning Ltd. www.vantageplanning.co. Development Gatwick Airport May 2012 Bloc Hotels Vantage Planning Ltd www.vantageplanning.co.uk Vantage Planning Ltd Contents 1. Introduction... 2 2. The Proposed Development... 2 3. The Development Site...

More information

London Borough of Croydon Local Flood Risk Management Strategy

London Borough of Croydon Local Flood Risk Management Strategy London Borough of Croydon Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has

More information

Action plans for hotspot locations - Ash Study

Action plans for hotspot locations - Ash Study Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side

More information

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year Appendix C1 Surface Water Modelling 1 Overview 1.1 The Drain London modelling was designed to analyse the impact of heavy rainfall events across each London borough by assessing flow paths, velocities

More information

London Borough of Merton Local Flood Risk Management Strategy

London Borough of Merton Local Flood Risk Management Strategy Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood

More information

The site is Lot 1 DP 837271. Survey of this lot and Willarong Road and Koonya Circuit is given in Figure 2.

The site is Lot 1 DP 837271. Survey of this lot and Willarong Road and Koonya Circuit is given in Figure 2. Our Ref : NA49913151-019-L02:BCP/bcp Contact: Dr Brett C. Phillips 8 th May 2015 Cardno (NSW/ACT) Pty Ltd ABN 95 001 145 035 The Manager Bunnings Group Limited, c/- C&M Consulting Engineers 1/142 James

More information

Strategic Flood Risk Assessment (SFRA) Level 1

Strategic Flood Risk Assessment (SFRA) Level 1 Strategic Flood Risk Assessment (SFRA) December 2007 (Final Issue) London Borough of Brent Brent House 349 High Road, Wembley Middlesex HA9 6BZ EXECUTIVE SUMMARY Introduction 1. The London Borough of Brent

More information

Flood Risk Assessment Breakspear House, Hemel Hempstead. Kier Property. October 08

Flood Risk Assessment Breakspear House, Hemel Hempstead. Kier Property. October 08 Flood Risk Assessment Breakspear House, Hemel Hempstead. Kier Property October 08 Prepared by:... Approved by:... Simon Marcos Keith Searle Principal Engineer Associate Director Flood Risk Assessment Rev

More information

Urban Flood Modelling

Urban Flood Modelling Urban Flood Modelling Adrian J Saul Pennine Water Group Department of Civil and Structural Engineering University of Sheffield a.j.saul@sheffield.ac.uk 1 Need for Integrated Urban Drainage within an integrated

More information

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester.

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester. Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications klargester.com Stormwater Attenuation Systems Sustainable Urban Drainage

More information

ANNEX 2 Emergency / Pollution Incident Response Plan

ANNEX 2 Emergency / Pollution Incident Response Plan ANNEX 2 Emergency / Pollution Incident Response Plan Volume 5 of 5 Appendix 21.1 Annex 2 EPIRP Page 1 of 9 1 WIND FARM CONSTRUCTION ENVIRONMENTAL EMERGENCY / POLLUTION RESPONSE PLAN... 3 1.1 Policy...

More information

Managing Surface Water Flooding in Paddock Wood Briefing note - June 2011

Managing Surface Water Flooding in Paddock Wood Briefing note - June 2011 Managing Surface Water Flooding in Paddock Wood Briefing note - June 2011 Information for Editors What is the reason for this initiative? 1. Legal Requirements The main drivers are the Flood Risk Regulations

More information

Creating the environment for business

Creating the environment for business 1. Introduction 1.1 Introduction to Water Cycle Strategies (WCS) 1.1.1 Background The water cycle describes the pathways and processes through which water moves through the natural and built environment,

More information

Bolton s Flood Risk Management Strategy

Bolton s Flood Risk Management Strategy Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

Report Relating to Incidents of Flooding within the Dollar Catchment

Report Relating to Incidents of Flooding within the Dollar Catchment Joint Position Statement Report Relating to Incidents of Flooding within the Dollar Catchment October 2012 Eric McQuarrie, Scottish Water Stuart Cullen, Clackmannanshire Council TABLE OF CONTENTS 1. INTRODUCTION...

More information

Strategic Flood Risk Assessment Update 2015

Strategic Flood Risk Assessment Update 2015 Strategic Flood Risk Assessment Update 2015 On behalf of Contents Glossary... iv Executive Summary... 1 1 Introduction... 4 1.1 Overview... 4 1.2 Future Development in Lewisham Borough... 5 2 SFRA Approach...

More information

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details Appendix C - Risk Assessment: Technical Details Page C1 C1 Surface Water Modelling 1. Introduction 1.1 BACKGROUND URS Scott Wilson has constructed 13 TUFLOW hydraulic models across the London Boroughs

More information

Water and Flooding Position Statement

Water and Flooding Position Statement Derby City Local Plan, Part 1: Core Strategy Water and Flooding Position Statement August 2015 1. Introduction 1.1 This position statement provides an update to the Derby HMA Joint Water Issues Paper which

More information

FLOOD INFORMATION SERVICE EXPLANATORY NOTES

FLOOD INFORMATION SERVICE EXPLANATORY NOTES FLOOD INFORMATION SERVICE EXPLANATORY NOTES Part 1 About the flood maps Limitations of the mapping What the maps don t show Where to find more information Definitions of words used to describe flooding.

More information

To prevent increased stormwater runoff entering Council s drainage system and causing overloading of the system that in turn might cause flooding.

To prevent increased stormwater runoff entering Council s drainage system and causing overloading of the system that in turn might cause flooding. Background & Issues To provide guidelines and requirements for Developers, the Community and the Shire s Planning and Sustainability officers for connection to the Shire s Stormwater Drainage Disposal

More information

The application site is on the edge of flood zones 1 and 2 with flood zone boundary cutting across part of the southern boundary of the site.

The application site is on the edge of flood zones 1 and 2 with flood zone boundary cutting across part of the southern boundary of the site. Flood Risk Assessment Erection of Masjid/ Place of Worship, extended car parking following demolition of 11a Grafton Street & boundary treatment Land adjacent 11/ 11a Grafton Street, Preston, PR1 8JB 0723/

More information

Flood Risk & Surface Water Management. Page 1 of 20

Flood Risk & Surface Water Management. Page 1 of 20 Page 1 of 20 Flood Risk & Surface Water Management Flood Risk & Surface Water Management and the Planning Process Introduction The purpose of this document is to increase awareness of the potential of

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information

Anglian Water Services Limited. Sustainable drainage systems (SUDS) adoption manual

Anglian Water Services Limited. Sustainable drainage systems (SUDS) adoption manual Anglian Water Services Limited i towards sustainable water stewardship Sustainable drainage systems (SUDS) adoption manual Anglian Water Services Limited 1 Tomorrow s forecast is more frequent, more violent

More information

Drainage. Information for those with problem drains

Drainage. Information for those with problem drains Drainage Information for those with problem drains Contents 1 Purpose 2 Introduction 2 Explanations: what is a drain and what is a sewer 3 Explanation of the responsibilities for public and private sewers

More information

Sustainable Drainage Systems (SUDS) A guide for developers

Sustainable Drainage Systems (SUDS) A guide for developers Sustainable Drainage Systems (SUDS) A guide for developers We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission Civic Offices Havant Hampshire PO9 2AX Tel (023)9247 4174 Fax(023)9244 6588 DX50005 Havant www.havant.gov.uk To: ADP Architects Ltd Richmond Court 94 Botley Road Park Gate Southampton, Hants SO311BA For:

More information

11.2 The proposals to deal with the leachate within the closed Lodmoor North Landfill site are assessed in Chapter 10 Geology and Soils.

11.2 The proposals to deal with the leachate within the closed Lodmoor North Landfill site are assessed in Chapter 10 Geology and Soils. Chapter Eleven Water Quality, Drainage and Hydrogeology Introduction 11.1 This Chapter considers the impact of the Relief Road on the hydrology of the area and considers both surface and groundwater. Runoff

More information

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT APPENDIX 9 INFRASTRUCTURE SERVICING REPORT Lot 50 Cockram Street, Mundijong Infrastructure Servicing Report Peet Ltd August 2012 LOT 50 COCKRAM STREET, MUNDIJONG-INFRASTRUCTURE SERVICING REPORT Project

More information

Surface Water Management: Interim Guidance for Developers

Surface Water Management: Interim Guidance for Developers Surface Water Management: Interim Guidance for Developers www.shropshire.gov.uk Contents Executive Summary 1. Introduction...1 2. National Policy Context...2 Making Space for Water...2 Future Water...2

More information

SUSTAINABLE DRAINAGE IN LEEDS Supplementary Guidance No. 22 JULY 2004

SUSTAINABLE DRAINAGE IN LEEDS Supplementary Guidance No. 22 JULY 2004 SUSTAINABLE DRAINAGE IN LEEDS Supplementary Guidance No. 22 JULY 2004 BACKGROUND This guidance provides information for developers on the use of sustainable drainage techniques in new developments. It

More information

ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3

ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3 NORTH LONDON WASTE AUTHORITY NORTH LONDON HEAT AND POWER PROJECT ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3 AD06.02 NORTH LONDON WASTE AUTHORITY NORTH LONDON HEAT AND POWER PROJECT ENVIRONMENTAL

More information

Groundwater Flooding: a UK Perspective

Groundwater Flooding: a UK Perspective Groundwater Flooding: a UK Perspective David Macdonald British Geological Survey Maclean Building Crowmarsh Gifford Wallingford OX10 8BB Tel 01491 838800 NERC All rights reserved Talk outline Definition

More information

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may

More information

PROPERTY RISK MANAGEMENT BUSINESS EMERGENCY, FLOOD PLANNING AND MITIGATION GUIDANCE

PROPERTY RISK MANAGEMENT BUSINESS EMERGENCY, FLOOD PLANNING AND MITIGATION GUIDANCE PROPERTY RISK MANAGEMENT BUSINESS EMERGENCY, FLOOD PLANNING AND MITIGATION GUIDANCE 1 The most common cause of flooding is when the river catchment area receives far greater amounts of water than normal,

More information

London Borough Hillingdon. Ruislip Lido Improvement Programme Flood Risk Assessment September 2011. Halcrow Group Limited

London Borough Hillingdon. Ruislip Lido Improvement Programme Flood Risk Assessment September 2011. Halcrow Group Limited London Borough Hillingdon Ruislip Lido Improvement Programme Flood Risk Assessment September 2011 Halcrow Group Limited London Borough Hillingdon Ruislip Lido Improvement Programme Flood Risk Assessment

More information

BUSINESS, TRANSPORTATION AND HOUSING AGENCY CALIFORNIA DEPARTMENT OF HOUSING AND COMMUNITY DEVELOPMENT

BUSINESS, TRANSPORTATION AND HOUSING AGENCY CALIFORNIA DEPARTMENT OF HOUSING AND COMMUNITY DEVELOPMENT BUSINESS, TRANSPORTATION AND HOUSING AGENCY CALIFORNIA DEPARTMENT OF HOUSING AND COMMUNITY DEVELOPMENT Division of Financial Assistance Administers more than 20 programs awarding loans and grants to hundreds

More information

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide

More information

Preliminary Environmental Information Report: Appendix 16.C. Flood Warning and Evacuation Plan

Preliminary Environmental Information Report: Appendix 16.C. Flood Warning and Evacuation Plan Preliminary Environmental Information Report: Appendix 16.C Flood Warning and Evacuation Plan THIS PAGE IS LEFT INTENTIONALLY BLANK Page 2 of 30 Contents SUMMARY 1. INTRODUCTION... 9 1.1 Background...

More information

Floodplain Development Land Use Review

Floodplain Development Land Use Review COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review

More information

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES 5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people

More information

PLANNING POLICY 3.3.5

PLANNING POLICY 3.3.5 PLANNING POLICY 3.3.5 CHILD CARE PREMISES 1. Introduction A Child Care Premises is used to provide a child care service within the meaning of the Child Care Services Act 2007, but does not include a Family

More information

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley

More information

Thames Water key Messages for London Borough of Ealing 25 th October 2005

Thames Water key Messages for London Borough of Ealing 25 th October 2005 Thames Water key Messages for London Borough of Ealing 25 th October 2005 Item 1: Drainage & ownership The area of drainage is complex. Thames Water, the Local Authority, the Environment Agency and property

More information

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction ACE GLOBAL RISK ENGINEERING INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE Introduction The most common cause of flooding is due to established water storage areas (natural and man-made)

More information

SUBDIVISION AND DEVELOPMENT REGULATION

SUBDIVISION AND DEVELOPMENT REGULATION Province of Alberta MUNICIPAL GOVERNMENT ACT SUBDIVISION AND DEVELOPMENT REGULATION Alberta Regulation 43/2002 With amendments up to and including Alberta Regulation 119/2014 Office Consolidation Published

More information

PPG21. Pollution Prevention Guidelines. pollution incident response planning: PPG 21. 1. Introduction

PPG21. Pollution Prevention Guidelines. pollution incident response planning: PPG 21. 1. Introduction PPG21 February 2004 Environmental Alliance working together Pollution Prevention Guidelines pollution incident response planning: PPG 21 These guidance notes have been drawn up to assist those developing

More information

ORCHARD WAY / BROOM GROVE Knebworth

ORCHARD WAY / BROOM GROVE Knebworth ORCHARD WAY / BROOM GROVE Knebworth Technical Assessment Report to support Section 19 Flood Investigation Project No: Date: Reviewed By: Approved By: 0469 October 2014 Tom Butler Neil Harding NHTB Consultancy

More information

Basements and Deep Building Construction Policy 2014

Basements and Deep Building Construction Policy 2014 Basements and Deep Building Construction Policy 2014 APPROVAL Council / CEO 27 October 2014 VERSION NO: Version 1.0 TRIM REF: 14/67838 REVIEW 30/10/2019 RESPONSIBLE EXECUTIVE General Manager City Assets

More information

R enfrewshire Local Plan. Safe Environment. Page. Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179

R enfrewshire Local Plan. Safe Environment. Page. Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179 R enfrewshire Local Plan Safe Environment Page Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179 16 Flooding and Sustainable Urban Drainage OVERVIEW Flooding

More information

Project Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161

Project Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161 Rainbow Creek Master Plan Update Study The City of Vaughan june 2014 COLE ENGINEERING GROUP LTD. 70 Valleywood Drive Project Manager. Geoff Masotti, P.Eng. Markham, ON CANADA L3R 4T5 T. 905.940.6161 Ext.

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0

More information

Proposed plumbing system within units at the Bluewater Hotel, 10 West Quay, Ahuriri, Napier

Proposed plumbing system within units at the Bluewater Hotel, 10 West Quay, Ahuriri, Napier Determination 2010/125 Proposed plumbing system within units at the Bluewater Hotel, 10 West Quay, Ahuriri, Napier 1. The matters to be determined 1.1 This is a Determination under Part 3 Subpart 1 of

More information

Land to the rear of the Black Bull Public House Flood Risk Assessment March 10, 2014 Version 1.0 Ref: RAB 148

Land to the rear of the Black Bull Public House Flood Risk Assessment March 10, 2014 Version 1.0 Ref: RAB 148 Land to the rear of the Black Bull Public House Flood Risk Assessment March 10, 2014 Ref: RAB 148 Lindsey Phillips Turnbull Tweedale Ltd 61 Oaken Lanes Codsall South Staffordshire WV8 2AW R A B C O N S

More information

APPROVAL AMENDMENT HISTORY

APPROVAL AMENDMENT HISTORY Prepared by: Aurecon South Africa (Pty) Ltd STORMWATER MANAGEMENT PLAN TOKAI ESTATE (DRAFT 1) Submission date: 11 January 2013 Contact Person: Francois du Toit T: +27 21 526 6950 F: +27 21 526 9500 E:

More information

Your guide to sewer flooding

Your guide to sewer flooding Your guide to sewer flooding We re here to help 2 Severn Trent Water Your guide to sewer flooding This leaflet has been produced to give you further information on: What causes sewer flooding Who is responsible

More information

16. Storm water drainage

16. Storm water drainage 16. Storm water drainage There are three principal ways to dispose of rainwater from roofs, courtyards and paved areas: storm water sewers, soakaways and collection in storage tanks. Storm water sewers,

More information

Flooding in London. Figure 1 New commercial and residential developments on the Thames floodplain

Flooding in London. Figure 1 New commercial and residential developments on the Thames floodplain Flooding in London Abstract London faces a major risk of flooding. London s floods are caused by a mixture of river processes, tidal flooding and drains/sewers unable to cope with the volume of water.

More information

Making sustainable, flood proof houses - issues and opportunities by: John Alexander

Making sustainable, flood proof houses - issues and opportunities by: John Alexander Making sustainable, flood proof houses - issues and opportunities by: John Alexander With very few exceptions will flood protection be considered by many architects and property developers. In my view,

More information

VEHICLE CROSSOVER INFORMATION PACK

VEHICLE CROSSOVER INFORMATION PACK VEHICLE CROSSOVER INFORMATION PACK CONTENTS Introduction Section A Section B Section C Section D Section E Criteria for approving a vehicle crossover application (Diagrams to demonstrate measurement criteria)

More information

NEW DEVELOPMENT AND EMERGENCY FLOOD PLANS

NEW DEVELOPMENT AND EMERGENCY FLOOD PLANS 23 NEW DEVELOPMENT AND EMERGENCY FLOOD PLANS Turn page Northamptonshire Flood Toolkit This guidance has been developed to support applicants and developers who are required or encouraged to produce and

More information

Measures for reducing risk and increasing

Measures for reducing risk and increasing Design for Adaptation Measures for reducing risk and increasing resilience Flooding Avoiding flood risk areas, ensuring areas and buildings are resistant or resilient. Extreme weather Construction & design

More information

2 ND SEPTEMBER 2014. Report of the Bi-Borough Executive Director for Transport and Technical Services

2 ND SEPTEMBER 2014. Report of the Bi-Borough Executive Director for Transport and Technical Services London Borough of Hammersmith & Fulham COMMUNITY SAFETY, ENVIRONMENT & RESIDENTS SERVICES POLICY & ACCOUNTABILITY COMMITTEE 2 ND SEPTEMBER 2014 SURFACE WATER MANAGEMENT PLAN (SWMP) Report of the Bi-Borough

More information

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering

More information