1 FLOOD RISK RECENT TRENDS AND POLICY RESPONSES DEVELOPING WESTMINSTER S LOCAL PLAN Booklet No. 2 LDF Consultation - CMP Revision November 2013

2 INTRODUCTION CLLR ROBERT DAVIS Westminster is at risk of flooding from a number of sources, including from the River Thames and from surface water flooding resulting from heavy rainfall. Such risks are projected to increase over the coming years as a result of our changing climate. As part of our emerging local plan, which covers the next years, the Council is therefore developing a new planning policy to specifically address flood risk management. The policy aims to ensure that flood risk and the impacts of flooding are effectively minimised and managed across the City of Westminster. Implementation of this policy should secure a more resilient City that is less vulnerable to flooding and the negative environmental impacts this brings (e.g. water pollution, damage to property and public realm), thereby protecting the long-term health and wellbeing of residents, visitors and workers and ensuring the sustained success of our businesses. This consultation paper sets out the background to the new policy and recommendations for our policy approach. We are now inviting your comments on our approach and look forward to working with you to ensure that the new planning policy provides an effective means of managing flood risk in the City of Westminster. Councillor Robert Davis DL Deputy Leader, Westminster City Council Cabinet Member for Built Environment

3 CONTENTS Trends 1. Historic Trends 2. Recent Trends Insights 1. Surface water flood risk 2. River and tidal flood risk 3. What can we do? Recommendations 1. Flood Risk This booklet sets out the Council s proposed approach to flood risk. It focuses on the most significant types of flood risk in Westminster, which are from the river Thames (river and tidal) and surface water flooding. This booklet covers one specific policy: S32 Flood Risk Picture credits: Evening Standard (top), Warwick Bambrook (bottom) Whilst all policies will need to be taken into account, some aspects of this topic are included in separate booklets, namely: Basements

4 TRENDS HISTORIC TRENDS In Westminster the greatest flood risks are from the River Thames and surface water. Flooding from the Thames In 1928 a tidal surge, at high tide, came up the River Thames resulting in the flood defence walls and embankments being overtopped. Most of the 14 fatalities in Westminster occurred in basement dwellings in Millbank. There was a also major tidal flood in 1953 which led to the construction of the Thames Barrier and associated defence improvements in the 1980s. Today the Thames Barrier, Embankment Wall and associated defences provide a very high level of protection against river and tidal flooding (protection against a tidal flood event with a 0.1% annual probability of occurring). Surface water flooding In highly developed areas, such as Westminster, surface water flooding occurs when intense rainfall is unable to soak into the ground or enter drainage systems, because of blockages, or breakages in water pipes or where drainage capacity has been exceeded. The City of Westminster has experienced localised surface water flooding in the past (e.g. resulting in the closure of Victoria station). However, the City has not suffered any past floods which had significant harmful consequences registered on a national scale (such as the summer 2007 floods). Flooding of Pimlico in Photo: Westminster Archives Centre. developments proposed in flood risk areas should show how they intend to adapt to the effects of climate change, by proposing specific flood risk resistance and resilience measures Environment Agency Flooding at Victoria station.

5 TRENDS RECENT TRENDS The latest climate change projections (UKCP09) indicate that winters will be characterised by increased rainfall (an increase of 19% by 2080; see graph on right) in the form of torrential downpours rather than consistent rainfall. More intense rainfall will cause more surface water runoff, increasing localised flood risk. This is a particular concern for Westminster so the Council is working to understand, communicate and mitigate the risk. The Government recently consulted on new proposals for home insurance in flood risk areas, an issue for property owners. For further details see the DEFRA website. Rainfall projections for London compared to baseline Rainfall (mm/month) Average Monthly Rainfall: All Scenarios against Baseline J F M A M J J A S O N D Baseline Rainfall 2020s 2050s 2080s Source: Alex Nickson, GLA. It is pure luck London has so far escaped the kind of flooding that devastated other parts of the country in 2007, and we know climate change makes severe rainstorms more likely in the future London Assembly s Environment Committee

6 INSIGHTS RIVER AND TIDAL FLOOD RISK Currently there is a low likelihood of tidal flooding and river flooding in Westminster. Although Westminster benefits from a high degree of protection from the Thames Barrier and the Embankment wall (which together provide for a 1 in 1000 annual probability of flooding), for the purposes of flood risk mapping the Environment Agency assumes a worst case scenario that no flood defences are in place. Therefore significant parts of Westminster fall into Flood Zone 3, having a 1 in 100 or greater annual chance of river flooding (non-tidal Thames and its tributaries) or a 1 in 200 or greater annual probability of flooding from the sea (the tidal Thames). Flood Zone 3 includes all of the Rapid Inundation Zone shown in blue on the map to the right; this zone represents flooding that would occur in the first hour if the Thames flood defences were breached. There is also a small section of the City (1%) within Flood Zone 2 which has a medium risk of flooding (0.1%) in any one year. The remainder of the City falls within Flood Zone 1 indicating only a low risk of flooding from the Thames. Please note that the mapped flood zones are based on no flood defences being in place.

7 INSIGHTS SURFACE WATER FLOOD RISK Key Depth (m) > Surface water flooding is the most likely type of flooding in Westminster. Approximately 22,100 properties are estimated to be at risk from surface water flooding (based on modelling) during a rainfall event with a 1 in 200 annual chance of occurring. The areas at highest risk are identified in dark blue on the indicative map on the right. Increased torrential rainfall as a result of climate change will increase the risk of surface water flooding. This risk is exacerbated by the dense built urban character of Westminster, with few permeable surfaces to absorb rainfall runoff. Increased flooding could result in damage to buildings and infrastructure, disruption to transport and business, stress and health problems. Surface water flood risk map for 1 in 100 event (including permanent water bodies)

8 WHAT CAN WE DO? In dense urban areas like Westminster most land identified as being at risk of flooding is already heavily developed. Thus, management of flood risk through the planning process is less about avoiding any development in high risk areas and more about: locating the most vulnerable uses outside these areas; ensuring that new schemes are designed to reduce flood risk; and ensuring they are safe and include suitable flood resistance and resilience measures. The provision of Sustainable Urban Drainage Systems (SUDs) is increasingly important in reducing surface water flood risk. They do this by reducing the peak water runoff from a site, for example by encouraging water to percolate into the ground, storing water, or slowing down the movement of water. Potential measures include: green roofs, rain gardens (planted areas designed to capture runoff water), permeable paving, and rainwater harvesting (see photos).

9 RECOMMENDATIONS FLOOD RISK POLICY S32 FLOOD RISK Core Strategy Policy CS29 Highly Vulnerable Uses will not be allowed within Flood Zone 3, and in Flood Zone 2 will be required to pass the Exception Test. Highly Vulnerable Uses should be located outside of Critical Flood Locations. Proposals for Essential Infrastructure and More Vulnerable Uses within Flood Zone 3 (with the exception of minor development and changes of use) will be required to pass the Exception Test. Within the Rapid Inundation Zone, new residential units below the tidal breach flood level and extensions to residential at basement level will not be acceptable. All development proposals should take flood risk into account and new development should reduce the risk of flooding. Development, particularly redevelopment, should incorporate Sustainable Urban Drainage Systems (SUDS) where relevant and feasible to manage surface water flood risk. Developments of one hectare or greater in Flood Zone 1 and, where appropriate, developments in Flood Zones 2 and 3 and Critical Flood Locations are required to produce a site specific flood risk assessment. This must demonstrate that where possible the development, particularly redevelopments, will reduce flood risk for the site and beyond through appropriate layout and design, use of flood resistance and resilience measures to reduce the impact of any flood, and ensure safe access to/ egress from the site. Highly Vulnerable Uses include police and fire stations, basement dwellings and installations requiring hazardous substances consent. More Vulnerable Uses include hospitals, residential care homes, dwelling houses and hotels. As mapped in the Strategic Flood Risk Assessment; these areas will be refined following the completion of enhanced flood modelling. In Westminster all areas are already developed and there are no large areas available for development in low flood risk areas. Thus rather than focusing on avoiding development in certain areas which are at higher risk of flooding, the focus is on the exception test. This requires a development to demonstrate wider sustainability benefits to the community and that it will be safe for its lifetime without increasing flood risk elsewhere. Details of surface water flooding were not readily available when the Core Strategy was adopted, so this change ensures that high risk development is not located in high risk areas, whether from tidal, riverine or surface flooding. The National Planning Policy Framework says applications for minor development and changes of use are not required to apply the exception test. This will be defined to exclude types of development with no implications for flood risk e.g. satellite dishes. This means that development must not lead to any increase in run-off from the site to the drainage system. Retrofitting measures to reduce flood risk is more difficult than designing such measures in from the start, hence the higher standard for redevelopments. Details of what information should be provided within a site specific flood risk assessment will be outlined in the supporting text to the policy. This will include demonstrating that the development will: be safe for its lifetime (taking climate change and the vulnerability of its users into account), including by considering layout and design and providing safe access/ egress routes and an appropriate evacuation plan; be appropriately resistant and resilient to flooding (e.g. threshold levels designed to minimise the risk of inundation, water resistant materials); not increase flood risk elsewhere, and will where possible reduce flood risk.

10 Have Your Say This booklet is part of the informal consultation for developing the statutory policies in Westminster s local plan. It builds on previous consultation on the City Management Plan. Further information can be found here. This booklet only includes the proposed policy. However, Westminster s local plan will include supporting text. The supporting text will include: Introductory text, setting out the background to the topic. Policy application: guidance as to how the policy will be applied, including details of how things will be measured or calculated etc. Reasoned justification: this is an explanation required by law to accompany a policy, setting out why a policy is applied. Glossary definitions: the statutory definitions used for terms that are included in the policies. If you wish to discuss the issues raised in this booklet with somebody, please telephone To comment on anything in this booklet, please ldf@westminster.gov.uk or write to us at: City Planning 11 th Floor Westminster City Hall 64 Victoria Street London SW1E 6QP Your comments will form part of the statutory record of consultation and will be made available on our website and to the public. Your contact details will not be made available, but we will use them to stay in touch with you about future policy development. If you do not want us to stay in touch, please let us know in your response. Further Reading Westminster s Strategic Flood Risk Assessment - planning/ldf/sfra Westminster s Preliminary Flood Risk Assessment - planning/ldf/sfra/ Environment Agency Flood web page - spx London Resilience flooding web page - Lloyd s of London East London Extreme Rainfall Report (2010) -

FLOOD RISKS IN LONDON

FLOOD RISKS IN LONDON Environment Committee FLOOD RISKS IN LONDON Summary of findings April 2014 About this summary 2 This is a summary of the findings of the Environment Committee s investigation into flood risk. In January

More information

Bolton s Flood Risk Management Strategy

Bolton s Flood Risk Management Strategy Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk

More information

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?

More information

LONDON INFRASTRUCTURE PLAN 2050 BUILDING A BIGGER AND BETTER LONDON

LONDON INFRASTRUCTURE PLAN 2050 BUILDING A BIGGER AND BETTER LONDON LONDON INFRASTRUCTURE PLAN 2050 BUILDING A BIGGER AND BETTER LONDON GROWTH We estimate that London s population became bigger than ever in February 2015. We reached a population of 8.6 million people,

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information

Flood Risk Management in Southwark

Flood Risk Management in Southwark Flood Risk Management in Southwark 1 Presented to Borough & Bankside Community Council 25 th April 2012 By Flood and Drainage Team Agenda Item 11 IN BRIEF Background Legislation What have we done? What

More information

Flooding in London A London Assembly Scrutiny Report Follow up review Submission by Association of British Insurers (revised April 2004)

Flooding in London A London Assembly Scrutiny Report Follow up review Submission by Association of British Insurers (revised April 2004) Flooding in London A London Assembly Scrutiny Report Follow up review Submission by Association of British Insurers (revised April 2004) 1. The Association of British Insurers (ABI) is the trade association

More information

NEW DEVELOPMENT AND EMERGENCY FLOOD PLANS

NEW DEVELOPMENT AND EMERGENCY FLOOD PLANS 23 NEW DEVELOPMENT AND EMERGENCY FLOOD PLANS Turn page Northamptonshire Flood Toolkit This guidance has been developed to support applicants and developers who are required or encouraged to produce and

More information

Climate Change Adaptation in London. Alex Nickson, Policy & Programmes Manager Climate Change Adaptation & Water, Greater London Authority

Climate Change Adaptation in London. Alex Nickson, Policy & Programmes Manager Climate Change Adaptation & Water, Greater London Authority Climate Change Adaptation in London Alex Nickson, Policy & Programmes Manager Climate Change Adaptation & Water, Greater London Authority Why adapt? We are not very well adapted to our existing climate

More information

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY London Rd. WATERLOOVILE FOR McCarthy & Stone Ltd. July 2010 Such Salinger Peters Ltd 30558-1- Flood Risk Assessment & Drainage Strategy Contents Paragraph Page

More information

London Borough of Merton Local Flood Risk Management Strategy

London Borough of Merton Local Flood Risk Management Strategy Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood

More information

WET10 - THE CITY WATER DEBATE 2015. When Will London Flood? Introduction. Dr Paul Leinster, CBE

WET10 - THE CITY WATER DEBATE 2015. When Will London Flood? Introduction. Dr Paul Leinster, CBE WET10 - THE CITY WATER DEBATE 2015 When Will London Flood? Introduction Roger Hewitt, Past Master of the Water Conservators, opened the event by thanking the Worshipful Companies of the Glaziers and the

More information

2 ND SEPTEMBER 2014. Report of the Bi-Borough Executive Director for Transport and Technical Services

2 ND SEPTEMBER 2014. Report of the Bi-Borough Executive Director for Transport and Technical Services London Borough of Hammersmith & Fulham COMMUNITY SAFETY, ENVIRONMENT & RESIDENTS SERVICES POLICY & ACCOUNTABILITY COMMITTEE 2 ND SEPTEMBER 2014 SURFACE WATER MANAGEMENT PLAN (SWMP) Report of the Bi-Borough

More information

Preliminary Environmental Information Report: Appendix 16.C. Flood Warning and Evacuation Plan

Preliminary Environmental Information Report: Appendix 16.C. Flood Warning and Evacuation Plan Preliminary Environmental Information Report: Appendix 16.C Flood Warning and Evacuation Plan THIS PAGE IS LEFT INTENTIONALLY BLANK Page 2 of 30 Contents SUMMARY 1. INTRODUCTION... 9 1.1 Background...

More information

London Borough of Croydon Local Flood Risk Management Strategy

London Borough of Croydon Local Flood Risk Management Strategy London Borough of Croydon Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has

More information

East Riding of Yorkshire Council

East Riding of Yorkshire Council East Riding of Yorkshire Council Lead Local Flood Authority Interim Standing Advice Revision A - April 2015 1. Introduction From April 2015 the Lead Local Flood Authority (LLFA) became a statutory consultee

More information

Sutton Harbour Holdings PLC. March 2007

Sutton Harbour Holdings PLC. March 2007 Sutton Harbour Holdings PLC March 2007 Contents!! " # # $ % % &'(&'' ) ) ( * + ', *!$ -,!'! #. / $$ #% 00& ' 00&1 $ Executive Summary!! " WSP Development and Transportation has been engaged by Sutton

More information

Planning Policy and Guidance on Flooding and Coastal Erosion

Planning Policy and Guidance on Flooding and Coastal Erosion Planning Policy and Guidance on Flooding and Coastal Erosion James Hooker (MRTPI) Senior Planning Manager Welsh Government RTPI Cymru - Water and Flooding Seminar Tuesday 20 th November 2012 Overview

More information

Strategic Flood Risk Assessment

Strategic Flood Risk Assessment local development framework Strategic Flood Risk Assessment LOCAL DEVELOPMENT FRAMEWORK ROYAL BOROUGH OF KINGSTON UPON THAMES Level 1 and 2 April 2011 Contents Executive Summary 5 Part 1 - Aiding Planning

More information

Managing Extreme Weather at Transport for London. ARCC Assembly - 12 June 2014 Helen Woolston, Transport for London Sustainability Coordinator

Managing Extreme Weather at Transport for London. ARCC Assembly - 12 June 2014 Helen Woolston, Transport for London Sustainability Coordinator Managing Extreme Weather at Transport for London ARCC Assembly - 12 June 2014 Helen Woolston, Transport for London Sustainability Coordinator Slide list (wont show) Long Term Climate Change 1. What TfL

More information

Proposed Re-development, At 321 London Road, Wyberton. Flood Risk Assessment - Revised

Proposed Re-development, At 321 London Road, Wyberton. Flood Risk Assessment - Revised Proposed Re-development, At 321 London Road, Wyberton Flood Risk Assessment - Revised Prepared By: C Mason C.Eng M.I.C.E May 2015 Contents Page No. 1. Introduction 2 2. Site Description 2 3. Flood Hazard

More information

Newbiggin House Farm,

Newbiggin House Farm, Newbiggin House Farm, Near Waberthwaite Flood Investigation Report 32 Flood Event 30/8/2012 Cumbria County Council Version Undertaken by Reviewed by Approved by Date Preliminary Colin Parkes Anthony Lane

More information

Flood Risk & Surface Water Management. Page 1 of 20

Flood Risk & Surface Water Management. Page 1 of 20 Page 1 of 20 Flood Risk & Surface Water Management Flood Risk & Surface Water Management and the Planning Process Introduction The purpose of this document is to increase awareness of the potential of

More information

For a Rainy Day the Mayor's role in managing London's flood risk in case of severe rainfall

For a Rainy Day the Mayor's role in managing London's flood risk in case of severe rainfall Environment Committee For a Rainy Day the Mayor's role in managing London's flood risk in case of severe rainfall July 2011 Environment Committee For a Rainy Day the Mayor's role in managing London's

More information

Draft Strategic Flood Risk Assessment Consultation version

Draft Strategic Flood Risk Assessment Consultation version Draft Strategic Flood Risk Assessment Consultation version November 2009 draft flood risk cover.indd 1 29/09/2008 15:44:16 What is the purpose of this draft Strategic Flood Risk Assessment? To provide

More information

Sewer Flooding Alleviation in the Counters Creek Catchment

Sewer Flooding Alleviation in the Counters Creek Catchment Sewer Flooding Alleviation in the Counters Creek Catchment London Borough of Hammersmith and Fulham Monday, 14 November 2011 at 7.00pm The Small Hall, Hammersmith Town Hall, King Street, W6 9JU Agenda

More information

Climate Change and Infrastructure Planning Ahead

Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Infrastructure the physical facilities that support our society, such as buildings, roads, railways, ports

More information

Cambridge House, Henry Street, Bath BA1 1UR

Cambridge House, Henry Street, Bath BA1 1UR Flood Risk Assessment Cambridge House, Henry Street, Bath BA1 1UR For Full Planning application to BANES Council June 2011 Introduction This report is prepared as requested by B&NES to accompany the planning

More information

Renfrewshire Strategic Flood Risk Assessment

Renfrewshire Strategic Flood Risk Assessment Background Report Renfrewshire Strategic Flood Risk Assessment 16 Renfrewshire Local Development Plan Main Issues Report December 2011 Renfrewshire Local Development Plan Background Report X Renfrewshire

More information

Essex County Council Flood Investigation Report

Essex County Council Flood Investigation Report Essex County Council Stock City of Chelmsford Rev Date Details Author Checked and Approved By 01 February 2015 Draft report for stakeholder consultation Ed Clarke Flood Investigation Engineer Lucy Shepherd

More information

Flooding in London. Figure 1 New commercial and residential developments on the Thames floodplain

Flooding in London. Figure 1 New commercial and residential developments on the Thames floodplain Flooding in London Abstract London faces a major risk of flooding. London s floods are caused by a mixture of river processes, tidal flooding and drains/sewers unable to cope with the volume of water.

More information

Climate Change Adaptation for London s Transport System

Climate Change Adaptation for London s Transport System Climate Change Adaptation for London s Transport System Helen Woolston London Climate Change Partnership, 1 Contents This presentation will cover: London Climate Change Partnership Climate Change Adaptation

More information

Managing flood risk in Camden The London Borough of Camden flood risk management strategy

Managing flood risk in Camden The London Borough of Camden flood risk management strategy Managing flood risk in Camden The London Borough of Camden flood risk management strategy Contents 1. Foreword 3 2. Executive summary 4 3. Glossary 6 4. Introduction 8 4.1 Strategy objectives 8 4.2 Guiding

More information

Environment Agency 2014 All rights reserved. This document may be reproduced with prior permission of the Environment Agency.

Environment Agency 2014 All rights reserved. This document may be reproduced with prior permission of the Environment Agency. Flood and coastal erosion risk management Long-term investment scenarios (LTIS) 2014 We are the Environment Agency. We protect and improve the environment and make it a better place for people and wildlife.

More information

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Easy guide to Sustainable drainage systems 02 Contents Page Introduction 05 Purpose of this

More information

Thames Water is pleased to comment on the proposed changes to the London Plan 2014.

Thames Water is pleased to comment on the proposed changes to the London Plan 2014. Boris Johnson Mayor of London (London Plan) Greater London Authority City Hall More London The Queen s Walk London SE1 2AA Thames Water Property Services Your ref Our ref Name Phone Email London Plan Review

More information

Household customer. Wastewater flooding guidelines. www.thameswateruk.co.uk

Household customer. Wastewater flooding guidelines. www.thameswateruk.co.uk Household customer Wastewater flooding guidelines www.thameswateruk.co.uk We are very sorry that you have recently suffered wastewater flooding to your property. This leaflet has been designed to answer

More information

Groundwater Flooding: a UK Perspective

Groundwater Flooding: a UK Perspective Groundwater Flooding: a UK Perspective David Macdonald British Geological Survey Maclean Building Crowmarsh Gifford Wallingford OX10 8BB Tel 01491 838800 NERC All rights reserved Talk outline Definition

More information

Managing Surface Water Flooding in Paddock Wood Briefing note - June 2011

Managing Surface Water Flooding in Paddock Wood Briefing note - June 2011 Managing Surface Water Flooding in Paddock Wood Briefing note - June 2011 Information for Editors What is the reason for this initiative? 1. Legal Requirements The main drivers are the Flood Risk Regulations

More information

Flood Risk Assessment. For Application at: Brick House Farm Brick House Lane Hambleton Lancashire FY6 9BG

Flood Risk Assessment. For Application at: Brick House Farm Brick House Lane Hambleton Lancashire FY6 9BG Flood Risk Assessment For Application at: Brick House Farm Brick House Lane Hambleton Lancashire FY6 9BG Contents 1. Introduction 2. The Site 3. Flood Risk 4. Existing drainage 5. Proposed Development

More information

Land to the rear of the Black Bull Public House Flood Risk Assessment March 10, 2014 Version 1.0 Ref: RAB 148

Land to the rear of the Black Bull Public House Flood Risk Assessment March 10, 2014 Version 1.0 Ref: RAB 148 Land to the rear of the Black Bull Public House Flood Risk Assessment March 10, 2014 Ref: RAB 148 Lindsey Phillips Turnbull Tweedale Ltd 61 Oaken Lanes Codsall South Staffordshire WV8 2AW R A B C O N S

More information

A supplement to the Guildford Borough Strategic Flood Risk Assessment, forming part of the Guildford Development Framework evidence base - November

A supplement to the Guildford Borough Strategic Flood Risk Assessment, forming part of the Guildford Development Framework evidence base - November A supplement to the Guildford Borough Strategic Flood Risk Assessment, forming part of the Guildford Development Framework evidence base - November 2010 www.guildford.gov.uk www.environment-agency.gov.uk

More information

Flooding in Brisbane

Flooding in Brisbane Flooding in Brisbane A guide for residents photo provided by Conan Whitehouse Brisbane is a thriving, world-class city, enjoyed by residents and visitors. Like many cities around the world, Brisbane has

More information

Norfolk House Hotel Development Gatwick Airport. Flood Risk Statement. May 2012. Bloc Hotels. Vantage Planning Ltd. www.vantageplanning.co.

Norfolk House Hotel Development Gatwick Airport. Flood Risk Statement. May 2012. Bloc Hotels. Vantage Planning Ltd. www.vantageplanning.co. Development Gatwick Airport May 2012 Bloc Hotels Vantage Planning Ltd www.vantageplanning.co.uk Vantage Planning Ltd Contents 1. Introduction... 2 2. The Proposed Development... 2 3. The Development Site...

More information

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-

More information

Strategic Flood Risk Assessment Update 2015

Strategic Flood Risk Assessment Update 2015 Strategic Flood Risk Assessment Update 2015 On behalf of Contents Glossary... iv Executive Summary... 1 1 Introduction... 4 1.1 Overview... 4 1.2 Future Development in Lewisham Borough... 5 2 SFRA Approach...

More information

Cities and Climate Change: Adaptation in London, UK

Cities and Climate Change: Adaptation in London, UK Adaptation in London, UK Alex Nickson Case study prepared for Global Report on Human Settlements 2011 Available from http://www.unhabitat.org/grhs/2011 Alex Nickson is Strategy Manager for Climate Change

More information

Creating the environment for business

Creating the environment for business 1. Introduction 1.1 Introduction to Water Cycle Strategies (WCS) 1.1.1 Background The water cycle describes the pathways and processes through which water moves through the natural and built environment,

More information

Westminster City Council s Residential Basement Report Prepared for Westminster City Council July 2013

Westminster City Council s Residential Basement Report Prepared for Westminster City Council July 2013 Westminster City Council s Residential Basement Report Prepared for Westminster City Council July 2013 Alan Baxter Westminster City Council s Residential Basement Report Prepared for Westminster City

More information

Surface Water Flooding Scrutiny Task Group - Final Report

Surface Water Flooding Scrutiny Task Group - Final Report Surface Water Flooding Scrutiny Task Group - Final Report TG No. 39 June 2008 If you would like additional copies of the report or further information, please contact: SCRUTINY LB RICHMOND UPON THAMES

More information

The application site is on the edge of flood zones 1 and 2 with flood zone boundary cutting across part of the southern boundary of the site.

The application site is on the edge of flood zones 1 and 2 with flood zone boundary cutting across part of the southern boundary of the site. Flood Risk Assessment Erection of Masjid/ Place of Worship, extended car parking following demolition of 11a Grafton Street & boundary treatment Land adjacent 11/ 11a Grafton Street, Preston, PR1 8JB 0723/

More information

R enfrewshire Local Plan. Safe Environment. Page. Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179

R enfrewshire Local Plan. Safe Environment. Page. Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179 R enfrewshire Local Plan Safe Environment Page Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179 16 Flooding and Sustainable Urban Drainage OVERVIEW Flooding

More information

Action plans for hotspot locations - Ash Study

Action plans for hotspot locations - Ash Study Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side

More information

Summary of SFRA Data. Contribution to SFRA. Data Category Format Source. Licensing

Summary of SFRA Data. Contribution to SFRA. Data Category Format Source. Licensing Summary of Data Data Category Format Source Climate Change Scenarios for the United Kingdom: The UKCIP02 Scientific Climate Climate Change and London Transport Systems Climate London s Warming: A Climate

More information

London Borough of Barking & Dagenham Strategic Flood Risk Assessment (SFRA) Level 1

London Borough of Barking & Dagenham Strategic Flood Risk Assessment (SFRA) Level 1 April 2008 London Borough of Barking & Dagenham Town Hall 1 Town Square Barking IG11 7LU (This page is intentionally left blank) April 2008 ii EXECUTIVE SUMMARY Introduction 1. The London Borough of Barking

More information

Climate Change Toolkit 07 Designing for Flood Risk

Climate Change Toolkit 07 Designing for Flood Risk Climate Change Toolkit 07 Designing for Flood Risk About this Document This is the seventh of eight components of Climate Change Tools, a package of guidance developed by the RIBA to encourage architects

More information

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies.

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies. ODYSSEY MARKIDES TECHNICAL NOTE PROJECT : CHAILEY HOUSE, BLEWBURY JOB NO. : 14-216 NOTE TITLE : PRELIMINARY FLOODING AND DRAIANGE AUTHOR : STEVEN ROOTH APPROVED : ANDREAS MARKIDES DATE : 02/09/2014 1.0

More information

FLOOD INFORMATION SERVICE EXPLANATORY NOTES

FLOOD INFORMATION SERVICE EXPLANATORY NOTES FLOOD INFORMATION SERVICE EXPLANATORY NOTES Part 1 About the flood maps Limitations of the mapping What the maps don t show Where to find more information Definitions of words used to describe flooding.

More information

Littleport Co-located Schools

Littleport Co-located Schools Littleport Co-located Schools February 2015 Morgan Sindall Littleport Co-located Schools 330763 BNI BSE 003 C P:\Cambridge\Murdoch\EST\PROJECTS\330763 Littleport Co-located Schools\12.0 Documents\12.2

More information

REQUEST FOR DIRECTOR DECISION DD1250. Title: Drain London Programme 2014-16

REQUEST FOR DIRECTOR DECISION DD1250. Title: Drain London Programme 2014-16 REQUEST FOR DIRECTOR DECISION DD1250 Title: Drain London Programme 2014-16 Executive Summary: A predicted 1.4 million properties in London are at risk from surface water flooding caused by heavy rainfall,

More information

City of Cambridge Climate Protection Action Committee. Recommendations for Adaptation to Climate Change. Purpose

City of Cambridge Climate Protection Action Committee. Recommendations for Adaptation to Climate Change. Purpose City of Cambridge Climate Protection Action Committee Recommendations for Adaptation to Climate Change Purpose The Climate Protection Action Committee (CPAC) is an advisory body to the City Manager on

More information

Local Flood Risk Management Strategy

Local Flood Risk Management Strategy Local Flood Risk Management Strategy Lewisham Local Flood Risk Management Strategy - June 2015 1 Foreword I am sure you will agree that flooding has been an issue for many over the past few years, particularly

More information

Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005

Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005 Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005 Speakers: Tom Chan, CEO, Global Risk Miyamoto Greg Bates, Principal, Global Risk Consultants Learning Objectives

More information

Chapter 2 Spatial Portrait

Chapter 2 Spatial Portrait 15 November 2013 Dear Julie Fylde Local Plan to 2030 Part 1 Preferred Options Thank you for the opportunity to meet with you on 9 October in respect of the above mentioned document. As discussed at the

More information

LATITUDES INTERNATIONAL DESIGN CHALLENGE 2015-16

LATITUDES INTERNATIONAL DESIGN CHALLENGE 2015-16 LATITUDES INTERNATIONAL DESIGN CHALLENGE 2015-16 Design Challenge Resilient working environments: carving the city for small businesses in London Submitted by: University of Westminster MSc Architecture

More information

Scottish Flood Forecasting Service. Working in partnership. Your guide to using the Flood Guidance Statement Third publication

Scottish Flood Forecasting Service. Working in partnership. Your guide to using the Flood Guidance Statement Third publication Scottish Flood Forecasting Service Working in partnership Your guide to using the Flood Guidance Statement Third publication Flooding in recent years, across many parts of the country, has reminded people

More information

Flood damage assessment and estimation of flood resilience indexes

Flood damage assessment and estimation of flood resilience indexes Flood damage assessment and estimation of flood resilience indexes Barcelona case study Marc Velasco CETaqua Workshop CORFU Barcelona Flood resilience in urban areas the CORFU project Cornellà de Llobregat,

More information

4.14 Netherlands. Interactive flood risk map of a part of the province of Gelderland in the Netherlands. Atlas of Flood Maps

4.14 Netherlands. Interactive flood risk map of a part of the province of Gelderland in the Netherlands. Atlas of Flood Maps 4.14 Netherlands The Netherlands is flood prone for about 60% of its surface. 95 so-called dike-rings protect the polders from being flooded from the North Sea, rivers or lakes. The protection level has

More information

Report on. The Pitt Review

Report on. The Pitt Review Report to Cabinet Scrutiny 20 January 2009 Item No 7.2 Report on The Pitt Review Report by Head of Emergency Planning This report looks at the current situation with regard to the recommendations put forward

More information

FLOOD CONTINGENCY PLAN

FLOOD CONTINGENCY PLAN Unrestricted Copy DERBYSHIRE LOCAL RESILIENCE FORUM FLOOD CONTINGENCY PLAN Issued January 2013 Revised Flood Contingency Plan CONTENTS CONTENTS RECORD OF AMENDMENTS CIRCULATION LIST Page i iii iv 1 BACKGROUND

More information

Flood Emergency Plans Guidance & Template National Planning Policy Framework (NPPF) and the Technical Guidance Note on Flooding

Flood Emergency Plans Guidance & Template National Planning Policy Framework (NPPF) and the Technical Guidance Note on Flooding Page 1 Flood Emergency Plans Guidance & Template National Planning Policy Framework (NPPF) and the Technical Guidance Note on Flooding Page 2 Introduction The Business Continuity & Emergency Planning team

More information

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership WYCA SuDS Guidance Introduction As part of the government s continuing commitment to protect people and property from flood risk, the Department for Communities and Local Government and the Department

More information

REQUEST FOR DIRECTOR DECISION DD899. Drain London programme

REQUEST FOR DIRECTOR DECISION DD899. Drain London programme REQUEST FOR DIRECTOR DECISION DD899 Title: Drain London programme Executive Summary: A predicted 1.3 million properties in London are at risk from flooding from heavy rainfall (surface water flooding),

More information

Water Security Action Plan 2011-2016

Water Security Action Plan 2011-2016 Water Security Action Plan 2011-2016 Approved on: 30 May 2011 Owner: Program Manager, Sustainable City 8203 7723 Trim Reference: ACC2011/59983 Net Review Date: 2013 1 1. Introduction Why Has Council Developed

More information

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to

More information

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction ACE GLOBAL RISK ENGINEERING INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE Introduction The most common cause of flooding is due to established water storage areas (natural and man-made)

More information

FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT

FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT Canterbury City Council January 2008 1 APPLICATION OF THE PPS25 SEQUENTIAL AND EXCEPTION TESTS 1.0

More information

London Borough of Bromley LEAD LOCAL FLOOD AUTHORITY UPDATE AND GRANT DRAW-DOWN

London Borough of Bromley LEAD LOCAL FLOOD AUTHORITY UPDATE AND GRANT DRAW-DOWN Report No. ES15041 London Borough of Bromley PART ONE - PUBLIC Decision Maker: Executive Date: 9 th September 2015 Decision Type: Non-Urgent Executive Non-Key Title: Contact Officer: Chief Officer: Ward:

More information

Code for Sustainable Homes Guidelines

Code for Sustainable Homes Guidelines Canoldir Penrhos Anglesey LL65 2TS Phone: 01407 860666 Email: saps@easonline.co.uk www.easonline.co.uk Code for Sustainable Homes Guidelines A CSH rating is the responsibility of the Developer/ Architect

More information

Water attenuation performance of experimental green roofs at Ruislip Gardens London Underground Depot Report 1 - July 2013

Water attenuation performance of experimental green roofs at Ruislip Gardens London Underground Depot Report 1 - July 2013 Water attenuation performance of experimental green roofs at Ruislip Gardens London Underground Depot Report 1 - July 2013 1 Water attenuation performance of experimental green roofs at Ruislip Gardens

More information

Your responsibilities...

Your responsibilities... Your responsibilities... Identify if you are living in a flood risk area: visit www.environment-agency.gov.uk/floodline or call Floodline on 0845 9881188. Protect your home or property. Provide your own

More information

Basement Development SPD: Discussion paper and questionnaire. December 2014

Basement Development SPD: Discussion paper and questionnaire. December 2014 Basement Development SPD: Discussion paper and questionnaire December 2014 1 Introduction 1.1. The purpose of this discussion paper is to set out the scope of a Supplementary Planning Document (SPD) and

More information

Flood Fact Sheet and Information for the Public in Essex

Flood Fact Sheet and Information for the Public in Essex Flood Fact Sheet and Information for the Public in Essex Introduction All local authorities in Essex have a responsibility to plan for, respond to and aid the recovery of their communities, as well as

More information

Objective 4: Enhanced community education, flood awareness and preparedness

Objective 4: Enhanced community education, flood awareness and preparedness Objective 4: Enhanced community education, flood awareness and preparedness Understanding the extent and full impacts of flooding is essential for planning for potential future pressures on the drainage

More information

Melbourne Water s Submission. Draft Victorian Floodplain Management Strategy

Melbourne Water s Submission. Draft Victorian Floodplain Management Strategy Melbourne Water s Submission Draft Victorian Floodplain Management Strategy Waterways, drainage and floodplains are essential to life and liveability. The rivers, creeks, estuaries, wetlands and floodplains

More information

Planning for sea level rise. Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region

Planning for sea level rise. Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region Planning for sea level rise Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region Table of contents Introduction 1 New flood levels for

More information

Strategic Flood Risk Assessment (SFRA) Level 1

Strategic Flood Risk Assessment (SFRA) Level 1 Strategic Flood Risk Assessment (SFRA) December 2007 (Final Issue) London Borough of Brent Brent House 349 High Road, Wembley Middlesex HA9 6BZ EXECUTIVE SUMMARY Introduction 1. The London Borough of Brent

More information

Planning Policy Statement 15 (PPS 15) Planning and Flood Risk

Planning Policy Statement 15 (PPS 15) Planning and Flood Risk Planning Policy Statement 15 (PPS 15) Planning and Flood Risk Planning Policy Statement 15 (PPS 15) Planning and Flood Risk Planning Policy Statements (PPSs) set out the policies of the Department of the

More information

Hoboken Resiliency & Readiness Plan

Hoboken Resiliency & Readiness Plan Hoboken Resiliency & Readiness Plan Layers of Protection Mayor Dawn Zimmer Challenge: Hoboken was once an island outcrop. Surrounding tidal marshes were filled in, but City remains vulnerable to storm

More information

Introduction to sustainable drainage. www.ciria.org/suds

Introduction to sustainable drainage. www.ciria.org/suds Introduction to sustainable drainage Outline of presentation Challenges of existing drainage Drivers for SuDS SuDS philosophy and principles Benefits of SuDS Examples of SuDS Challenges of SuDS Summary

More information

Community Services and Safety Scrutiny Sub-Committee 1 November 2011

Community Services and Safety Scrutiny Sub-Committee 1 November 2011 REPORT TO: Community Services and Safety Scrutiny Sub-Committee 1 November 2011 AGENDA ITEM: 6 SUBJECT: LEAD OFFICER: CABINET MEMBER: Flood Prevention Stephen McDonald Executive Director of Planning and

More information

London Road, Rayleigh Essex Flood Risk Assessment Addendum

London Road, Rayleigh Essex Flood Risk Assessment Addendum FINAL Countryside Properties (UK) Limited Submitted by AECOM 6-8 Greencoat Place London SW1P 1PL London Road, Rayleigh Essex Flood Risk Assessment May 2015 i Limitations AECOM Infrastructure & Environment

More information

(http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf

(http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf Possible Submission about Water and Flooding (See maps 3a and 3b) From Mole Valley Local Development Framework: Strategic Flood Risk Assessment Update 2012 (http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf

More information

Caravan Parks and Camping Sites. Flood Evacuation Plan Guidance for owners and operators of sites in Kent

Caravan Parks and Camping Sites. Flood Evacuation Plan Guidance for owners and operators of sites in Kent Caravan Parks and Camping Sites Flood Evacuation Plan Guidance for owners and operators of sites in Kent Prepared by the Kent Resilience Team Telephone: 01622 212409 E-mail@ krf@kent.fire-uk.org Version

More information

Types of flood risk. What is flash flooding? 3/16/2010. GG22A: GEOSPHERE & HYDROSPHERE Hydrology. Main types of climatically influenced flooding:

Types of flood risk. What is flash flooding? 3/16/2010. GG22A: GEOSPHERE & HYDROSPHERE Hydrology. Main types of climatically influenced flooding: GG22A: GEOSPHERE & HYDROSPHERE Hydrology Types of flood risk Main types of climatically influenced flooding: 1. Flash (rapid-onset) 2. Lowland (slow-rise) 3. Coastal (not covered here) But! Causal factors

More information

PLANNING APPLICATION: 12/00056/APP

PLANNING APPLICATION: 12/00056/APP PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports

More information

Presentation by Michael Wade. Old Library, Lloyd s

Presentation by Michael Wade. Old Library, Lloyd s Presentation by Michael Wade Old Library, Lloyd s 8 th December 2015 What are some of the roles for Government - funded by the Taxpayer - in regard to domestic flooding? To identify the risk and scope

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being