1 DRAINAGE MANAGEMENT PLAN HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council EMPLOYER: Veolia Environmental Services (UK) Plc Veolia House 154A Pentonville Road London N1 9PE Copy No Rev. A03 Date: 14th January 2011 ISFT submission

2 Herts EfW Drainage Management Plan Revised December 2010 Client Name: Reference: Issue: Vinci Construction C11758 (DR) Herts EfW 0001 A02 3 rd issue, revision by VINCI for ISFT Quality Assurance Approval Status This document has been Prepared and checked in accordance with Waterman TDL IMS (BS EN ISO 9001: 2000 and BS EN ISO 14001: 2004) Prepared by: Harry Chetty Position: Associate Director Checked by: Harry Chetty Position: Associate Director Approved by: Richard Simmonds Position: Divisional Director Pickfords Wharf, Clink Street, London, SE1 9DG t f

3 A VINCI revised for ISFT layout change VINCI A Greywater Recycling added HC HC A Preliminary Issue HC HC Rev. Date Description Prepared Checked Approved Waterman Transport & Development Limited have prepared this report in accordance with the instructions of the Client, Vinci Construction. It is prepared solely for their specific use. It is nonassignable and Waterman Transport & Development Limited accept no liability for its use by a third party.

4 CONTENTS EXECUTIVE SUMMARY INTRODUCTION DEVELOPMENT PROPOSALS THAMES WATER REQUIREMENTS ENVIRONMENT AGENCY REQUIREMENTS SURFACE WATER DISPOSAL METHODOLOGY FOUL WATER DISPOSAL METHODOLOGY RECOMMENDATIONS REFERENCES...9 Tables Table 1 Table 2 Thames Water Sewers around the vicinity of the Site Take-off of Proposed Areas Appendices Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Site Location Plan Development Proposals Topographical Survey Thames Water Sewer Plans Correspondence with the Environment Agency/Thames Water Proposed Drainage Layout Drawings

5 EXECUTIVE SUMMARY This Drainage Management Plan has been prepared by Waterman Transport and Development Limited, and revised by VINCI for the ISFT layout, for the proposed development at New Barnfield Site. This report presents the drainage strategy for the site, identifies any areas that are susceptible to flood risks and indicate the locations of surface water attenuation and connections to the public sewer. Thames Water need to be consulted with regard to discharging both foul water and surface water to the adjacent sewers. The total surface water attenuation within the site based on discharge to the surface water sewer is an average of 1500 m 3 for the 1 in 100 storm events plus climate change. The number of deep borehole soakaways required will be confirmed once the permeability tests in the chalk layer are carried out. Based on permeability tests for a different site in Hertfordshire, a deep borehole soakaway solution has been provided. However the effect of dissolution in the chalk will need to be considered by a Geotechnical Engineer. Based on the flow rate from an industrial plant, the foul water discharge rate has been estimated to be a peak flow rate of 5 l/s. A 24 hour storage requirement of 110 cubic metres may be required if at the detailed design stage it is demonstrated that the discharge needs to be pumped to the outfall.

6 1. INTRODUCTION 1.1 Waterman Transport and Development Ltd (WTDL) have been commissioned to carry out a Drainage Management Plan for the Stage D submission for proposed drainage works at the Hertfordshire EfW development at the New Barnfield Site. 1.2 This report examines the strategy in conveying both surface water and foul water from the site to the surface water and foul water networks adjacent to the site and soakaways for the surface water only. 1.3 A Flood Risk Assessment (FRA) carried out by White Young and Green has already been submitted to the Local Planning Authority as part of the outline planning application. The Site 1.4 The Herts EfW development in Hatfield (thereafter referred to as the Site ) refers to a plot of land, approximately hectares (ha) in area, located between Hatfield and Welham Green. The Site is centred on National Grid Reference , and is shown in Appendix A. 1.5 The site is located to the south west of Travellers Lane and bounded to the north by a school and to the east by a distribution centre. The western and southern site boundary is formed of greenfield areas. The site boundary is presented in Appendix A. 1.6 A topographical site survey, shown in Appendix C, which forms part of the FRA, indicates a west to east fall with ground levels ranging from approximately 108.0m Above Ordnance Datum (AOD) towards the west of the site to 96.5m AOD to the east of the site. The existing building footprint appears to be carved into the hillside to a varying floor level of to m. 1.7 The site is located is located in an area designated by the EA as a major aquifer and is within the Total Catchment of the Source Protection Zone. 1.8 The EA flood maps indicate that the site is located within a Flood Zone I, which is considered to be an area with low probability from flooding. 1.9 From the intrusive site investigation, the geology of the site consists of a made ground over Boulder Clay ranging between 6.1 and 8.6mm depth over Reading Beds ranging between 5.1m and 12.3m depth over white chalk, comprising of sandy, silty chalk gravel. 2. DEVELOPMENT PROPOSALS 2.1 The proposals involve the total demolition of the existing site and redevelopment into an Energy for Waste plant. An architect s proposal has been attached in Appendix B. 2.2 The proposed building will encompass from administrative offices, to the waste bunker, turbine and steam generation halls and all other processes that is required to form an EfW plant.

7 3. THAMES WATER REQUIREMENTS 3.1 The sewer records (See Appendix D) shows that Thames Water sewers are present in the roads adjacent to the site as indicated below: Locations South Way Sewers 225mm Surface Water Sewer 225mm Foul Water Sewer Table 1: Thames Water Sewers around the vicinity of the Site 3.2 The Thames Water sewer plans do not appear to indicate any foul or surface water sewers in Travellers Lane, and therefore it likely that the sewers indicated by the topographical survey in Travellers Lane are private. 3.3 There will be a requirement to confirm the outfall location of the foul and surface water sewers from the proposed site into the private sewers in Travellers Lane. 4. ENVIRONMENT AGENCY REQUIREMENTS 4.1 There is a requirement to seek the Environment Agency approval to use soakaways at the above site. It is noted that the site is within a Source Protection Zone and that the use of deep borehole soakaways may need detailed negotiation with the Environment Agency. 4.2 Permeability tests using deep borehole soakaways will need to be carried out to confirm that this type of soakaway is feasible on this site and the depth of the borehole will need to be confirmed to the Environment Agency. 4.3 The site investigation carried out by White Young Green indicated that there was a possibility of chalk dissolution taking place which can lead to features being formed within the chalk. This needs to be fully investigated by a geotechnical engineer with regard to discharging water into the chalk layer which is located 15 to 18m below ground level. 4.4 The Environment Agency consent will be required to discharge rainwater run-off into deep borehole soakaways as the site is wholly located with a Source Protection Zone III.

8 5. SURFACE WATER DISPOSAL METHODOLOGY 5.1 The surface water sewer system shall be designed to convey effluent separately. Sewers will be designed to comply with BS EN 752 and Building Regulations Part H. 5.2 As the proposed development site is above surrounding ground level of adjacent properties, the surface water system has been designed not to flood for a 1 in 100 year storm event plus climate change as any surface water flooding is likely to flood adjacent properties. 5.3 Local Planning Authorities have recommended in the outline planning permission that all Sustainable Urban Drainage Systems (SUDS) should be considered and where appropriate, should be implemented to reduce the risk of flooding. 5.4 The implementation of sustainable water management through sustainable drainage systems (SUDS) and rainwater harvesting is becoming more common in an effort to use and manage water sustainably. The philosophy of SUDS is to mimic the natural drainage patterns of the land prior to development as closely as possible and treat runoff to remove pollutants. The use of vegetative features to treat pollution and reduce flow rates provides the opportunity to enhance the landscape and provide wildlife habitat. 5.5 SUDS provide a flexible approach to drainage with a wide range of options available. Individual techniques should be used in a management train that reinforces and, where possible, follows the natural drainage patterns. The management train incorporates a hierarchy of techniques, as detailed below:- 5.6 The following SUDS techniques that can be implemented on this site as shown in the in the Surface Water Drainage Layout are as follows: Rainwater Harvesting Tanks This SUDS method involves collecting rainwater from the roofs of buildings and storing this run-off in underground storage tanks. This rainwater shall undergo a filtration process before being recycled back into the building, to be used to flush toilets for example. To keep within the budgetary constraints, the rainwater harvesting tanks can be used for irrigation purposes only, which means that the capital cost of providing UV filtration and separate pipework within the building does not have to be considered. An overflow from the rainwater harvesting tank has been provided flowing directly into the pond for extreme rainfall events, where they may not be enough storage within the rainwater harvesting tank Greywater Recycling This SUDS method involves collecting rainwater from the showers and wash basins and storing this discharge in underground storage tanks. This water shall undergo a filtration, disinfection process before being recycled back into the building to be used to flush toilets. The most advantageous of this system is that it reduces the usage of potable water in the long term Swales System Swales are primarily used as conveyance systems, so they can be laid at very shallow longitudinal gradients. This is extremely important so that erosion cannot take place, so velocities are restricted to 1.5m/s. The swales will be dry during dry weather but during a rainfall event, flows will enter the swale and move slowly through the grass channel. The flow of surface water is retarded and filtered by the grass. Swales can be increased in depth to provide additional attenuation for the extreme storm events. Within this site, a swale can be provided between the existing pond and the visitors centre, with a discharge to the existing pond on site, and from there into the existing surface water drainage system at the site boundary.

9 5.6.4 Permeable Paving Permeable paving is a load bearing construction surfaced with materials that allow surface water to enter the underlying construction. It consists of block paviours that have slots cut into their sides or porous asphalt, allowing surface water to drain through the surfacing and into a granular sub base, from where infiltration into the underlying subsoil can occur. Permeable paving can successfully remove oil and other contaminants in the water via a membrane which breaks down hydrocarbons as it flows through the granular sub base layers, improving the quality of water discharged into the surface water sewer and from there into the river. In areas where permeable paving was installed, there would be no need for traditional drainage gullies network ironwork or for oil interceptors. Confirmation from the Environment Agency will be required to ensure that this surface water is clean enough to discharge to the ground via infiltration methods. Due to the underlying chalk, direct infiltration to this material through deep borehole soakaways may be accepted by the Environment Agency. Further consultation will be required to be sought. Permeable paving can only be used in the footway and car parking areas as they have been found to be unsuitable for HGVs manoeuvring areas. Exact details of the permeable paving will be provided based on the architectural layouts Green roofs Green roofs can intercept water and attenuate it within the soil or through an irrigation system, reducing the volume of runoff from buildings. Green roofs contribute to attenuation storage as they can prevent run-off from the roof for small rainfall events. For larger rainfall events the storage element is minimal however the time it takes for water to enter the surface water network is increased Cellular Attenuation or Infiltration Units Cellular attenuation units are plastic tanks that are installed below ground and can be used to provide storage before discharge or infiltration. Cellular units can be placed in all external areas where a minimum cover of 600mm can be accommodated but will need to be located close to the outfall. The soft landscaping will retain the predevelopment or greenfield surface water run-off profile. These areas will not require any attenuation as these areas will not positively drain into the surface water network. 5.7 A take-off impermeable areas has been carried out and the table below indicates these areas: Surfacing Area (m 2 ) Green Roof (beneath 260 main roof) Roof 20, 100 External Hard Paving 8, 000 Permeable Parking 700 Soft Landscaping 23, 900 Total 52, 700 Table 2: Take-off of Proposed Areas 5.8 Surface Water run-off will be restricted to the private sewer in Travellers Lane based on the full bore capacity of its last connection, which is a discharge rate of 23 l/s. 5.9 Permeability rates in the chalk have not been carried out as part of the site investigation and therefore the deep bore hole soakaways that can be used have been based on the permeability rates obtained at other sites. It is noted that the permeability rate used is 1 x 10-5 m/s with a safety

10 factor of 5, which a requirement under Clause of CIRIA 156 Infiltration Drainage-Manual for Good Practice The proposed drainage network option has been indicated on the drawing given in Appendix E Attenuation will be provided in a new pond, to be located close to the existing outfall For external areas which will be trafficked by HGV vehicles, Class 1 petrol interceptors have been provided to reduce the risk of contamination from petrol and oil. Surface Water Drainage Layout Option Gravity discharge to the outfall, via attenuation in ponds and / tanks Surface water attenuation provided based on discharge of 23 l/s Surface water attenuation of approximately 1500 cubic metres is required based on storm duration of 1 in 100 years with 20% climate change. Surface Water Drainage Option Gravity discharge to the soakaway field with pumping station provided at the manhole prior to the soakaways Surface water attenuation provided based on discharge into the chalk using deep borehole soakaways Based on the permeability rates, it is calculated that there is a requirement of 184 number of 1m diameter deep boreholes at a depth of 20m into the chalk layer, therefore overall borehole length of 40m This option is deemed to be not economically feasible and a drawing has not been provided.

11 6. FOUL WATER DISPOSAL METHODOLOGY 6.1 The foul water system shall be designed to convey effluent separately. Sewers will be designed to comply with BS EN 752 and Building Regulations Part H. 6.2 Sustainable forms of foul water drainage such as reed beds have not been considered due to the size and area required and the presence of the Thames Water sewer in the adjacent road to the site. 6.3 The total peak foul water flow from the site is 5.0/s. Foul Water Layout 6.4 Gravity discharge to the outfall. 6.5 Based on Building Regulation requirements, 24 hour storage is required where foul water is being pumped. Based on an average industrial flow of 550 cubic metres per 100 square metres, the foul water storage required for a day is 110,580 litres or cubic metres.

12 7. RECOMMENDATIONS 7.1 Direct connection into the surface water and foul water sewers in Travellers Lane are required based on the full bore capacity of the existing connections. 7.2 The site investigations carried out to date have not provided any permeability tests in the chalk layer. There is a requirement for the permeability test to be carried out in accordance to BRE 365 and to confirm that deep borehole soakaways can be used. 7.3 The proposed external levels throughout the site have been assumed without any groundworks modelling being carried out and therefore it is noted that the drainage strategy as indicated may be revised. 7.4 We have assumed at this stage that some green roof will be used but have not considered any possibility of storage within the green roof. 7.5 We will need confirmation from Thames Water that the peak foul water discharge of 5.0 l/s is acceptable from the proposed development. 8. REFERENCES 1. Communities and Local Government (December 2006), Planning Policy Statement 25: Development and Flood Risk. The Stationary Office, Norwich. 2. Communities and Local Government (June 2008), Planning Policy Statement 25: Development and Flood Risk. The Stationary Office, Norwich. 3. SUDS Manual (2007), CIRIA 697. Classic House, Old Street, London.

Development at 2 St Albans Road, Kingston, London, KT25HQ

Development at 2 St Albans Road, Kingston, London, KT25HQ Development at SuDS Report. Prepared for: Report prepared by: Dave Alonso Divine Ideas (UK) ltd Date: August 2015 Project/Issue number: Appendices Attached: 1510/01/SuDS A, B & C Divine Ideas (UK) Ltd

More information

Planning, Health and Environment Division

Planning, Health and Environment Division 18 Planning, Health and Environment Division A Planning Guide to Sustainable Drainage Systems Introduction Working in co-operation with the Environment Agency, Severn Trent Water Ltd., the Highway Authority

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY London Rd. WATERLOOVILE FOR McCarthy & Stone Ltd. July 2010 Such Salinger Peters Ltd 30558-1- Flood Risk Assessment & Drainage Strategy Contents Paragraph Page

More information

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared

More information

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House

More information

Taylor Wimpey UK Ltd. December 2007

Taylor Wimpey UK Ltd. December 2007 Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked

More information

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies.

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies. ODYSSEY MARKIDES TECHNICAL NOTE PROJECT : CHAILEY HOUSE, BLEWBURY JOB NO. : 14-216 NOTE TITLE : PRELIMINARY FLOODING AND DRAIANGE AUTHOR : STEVEN ROOTH APPROVED : ANDREAS MARKIDES DATE : 02/09/2014 1.0

More information

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester.

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester. Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications klargester.com Stormwater Attenuation Systems Sustainable Urban Drainage

More information

Anglian Water Services Limited. Sustainable drainage systems (SUDS) adoption manual

Anglian Water Services Limited. Sustainable drainage systems (SUDS) adoption manual Anglian Water Services Limited i towards sustainable water stewardship Sustainable drainage systems (SUDS) adoption manual Anglian Water Services Limited 1 Tomorrow s forecast is more frequent, more violent

More information

Vital Earth Composting Facility Flood Risk and Drainage Statement

Vital Earth Composting Facility Flood Risk and Drainage Statement Vital Earth Flood Risk and Drainage Statement Final December 2011 Prepared for Vital Earth Ltd Revision Schedule Flood Risk and Drainage Statement December 2011 Rev Date Details Prepared by Reviewed by

More information

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership WYCA SuDS Guidance Introduction As part of the government s continuing commitment to protect people and property from flood risk, the Department for Communities and Local Government and the Department

More information

Designed and produced by geo-graphicsdesign.com DP 300 3/02

Designed and produced by geo-graphicsdesign.com DP 300 3/02 Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended

More information

Development enquiry request

Development enquiry request Development enquiry request Water supply and/or drainage capacity assessment for a proposed development NOTE: Please ensure all relevant sections of the application are completed and refer to the attached

More information

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Easy guide to Sustainable drainage systems 02 Contents Page Introduction 05 Purpose of this

More information

SUSTAINABLE DRAINAGE IN LEEDS Supplementary Guidance No. 22 JULY 2004

SUSTAINABLE DRAINAGE IN LEEDS Supplementary Guidance No. 22 JULY 2004 SUSTAINABLE DRAINAGE IN LEEDS Supplementary Guidance No. 22 JULY 2004 BACKGROUND This guidance provides information for developers on the use of sustainable drainage techniques in new developments. It

More information

Sustainable Drainage Systems (SUDS) A guide for developers

Sustainable Drainage Systems (SUDS) A guide for developers Sustainable Drainage Systems (SUDS) A guide for developers We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your

More information

Granville Road Estate, London Borough of Barnet. Flood Risk Assessment and Drainage Strategy August 2014. New Granville LLP

Granville Road Estate, London Borough of Barnet. Flood Risk Assessment and Drainage Strategy August 2014. New Granville LLP Granville Road Estate, London Borough of Barnet Flood Risk Assessment and Drainage Strategy August 2014 New Granville LLP Document History JOB NUMBER: 237 DOCUMENT REF: Granville Road FRA REVISIONS: Final

More information

Flood Risk Assessment and Drainage Statement

Flood Risk Assessment and Drainage Statement Trinity College, Cambridge Proposed Relocation of Felixstowe Rifle Range, Land north of Nicholas Road, Trimley St Mary, Felixstowe Quality Assurance Site name: Client name: Proposed Relocation of Felixstowe

More information

Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH

Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH Proposed Construction of Basement Flood Risk Assessment 35 Edwardes Square London W8 6HH 1 Introduction This FRA has been carried out in accordance with the National Planning Policy Statement (NPPF), the

More information

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT APPENDIX 9 INFRASTRUCTURE SERVICING REPORT Lot 50 Cockram Street, Mundijong Infrastructure Servicing Report Peet Ltd August 2012 LOT 50 COCKRAM STREET, MUNDIJONG-INFRASTRUCTURE SERVICING REPORT Project

More information

Issue: 2 Adopted by Council: 20/02/07. Directorate of Environment and Regeneration Planning Services

Issue: 2 Adopted by Council: 20/02/07. Directorate of Environment and Regeneration Planning Services Issue: 2 Adopted by Council: 20/02/07 Directorate of Environment and Regeneration Planning Services LOCAL PLANNIING GUIIDANCE NOTE NO..19:: SUSTAIINABLE DRAIINAGE SYSTEMS Background The provision of adequate

More information

ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3

ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3 NORTH LONDON WASTE AUTHORITY NORTH LONDON HEAT AND POWER PROJECT ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3 AD06.02 NORTH LONDON WASTE AUTHORITY NORTH LONDON HEAT AND POWER PROJECT ENVIRONMENTAL

More information

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection

More information

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter ENVIRONMENTAL STATEMENT: VOLUME 1 9.1 INTRODUCTION 9.1.1 This Chapter considers the effects of the Project on surface water and groundwater

More information

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-

More information

Proposed Residential Development Land off Cody Road Waterbeach Cambridgeshire. Flood Risk Assessment

Proposed Residential Development Land off Cody Road Waterbeach Cambridgeshire. Flood Risk Assessment Land off Cody Road Waterbeach Cambridgeshire Cedar Barn, White Lodge, Walgrave, Northampton, NN6 9PY T: F: E: W: 01604 781811 01604 781999 mail@jppuk.net jppuk.net Proposed Residential Development Land

More information

BUILDING SURVEYING 313021

BUILDING SURVEYING 313021 BUILDING SURVEYING 313021 Session topic SUDS - Sustainable Urban Drainage Systems Session objectives To examine various Sustainable Urban Drainage Systems (SUDS) for managing rainwater run-off and discuss

More information

APPENDIX 12.2. Surface Water Drainage Strategy

APPENDIX 12.2. Surface Water Drainage Strategy APPENDIX 12.2 Surface Water Drainage Strategy London City Airport Proposed Surface Water Drainage Strategy London City Airport Development Programme 12 July 2013 London City Airport Surface Water Drainage

More information

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,

More information

Type of Sewer Systems. Solomon Seyoum

Type of Sewer Systems. Solomon Seyoum Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of

More information

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems 9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES Hunter Underground Systems 9.01 General 9.02 Surface water Drainage 9.03 Groundwater Drainage 9.04 Dispersal of Septic Tank Effluent 9.01 The use of

More information

16. Storm water drainage

16. Storm water drainage 16. Storm water drainage There are three principal ways to dispose of rainwater from roofs, courtyards and paved areas: storm water sewers, soakaways and collection in storage tanks. Storm water sewers,

More information

Flood Risk Assessment Breakspear House, Hemel Hempstead. Kier Property. October 08

Flood Risk Assessment Breakspear House, Hemel Hempstead. Kier Property. October 08 Flood Risk Assessment Breakspear House, Hemel Hempstead. Kier Property October 08 Prepared by:... Approved by:... Simon Marcos Keith Searle Principal Engineer Associate Director Flood Risk Assessment Rev

More information

pavements permeable GUIDE TO THE DESIGN, CONSTRUCTION AND MAINTENANCE OF CONCRETE BLOCK PERMEABLE PAVEMENTS www.paving.org.uk

pavements permeable GUIDE TO THE DESIGN, CONSTRUCTION AND MAINTENANCE OF CONCRETE BLOCK PERMEABLE PAVEMENTS www.paving.org.uk January 2010 Edition 6 Uniclass L534:L217 permeable pavements GUIDE TO THE DESIGN, CONSTRUCTION AND MAINTENANCE OF CONCRETE BLOCK PERMEABLE PAVEMENTS www.paving.org.uk permeable pavements GUIDE TO THE

More information

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions City of Atlanta Department of Watershed Management Post-Development Stormwater Management Ordinance Summary of Revisions Cory Rayburn, CPESC Environmental Program Manager crayburn@atlantaga.gov Stormwater

More information

Land to the rear of the Black Bull Public House Flood Risk Assessment March 10, 2014 Version 1.0 Ref: RAB 148

Land to the rear of the Black Bull Public House Flood Risk Assessment March 10, 2014 Version 1.0 Ref: RAB 148 Land to the rear of the Black Bull Public House Flood Risk Assessment March 10, 2014 Ref: RAB 148 Lindsey Phillips Turnbull Tweedale Ltd 61 Oaken Lanes Codsall South Staffordshire WV8 2AW R A B C O N S

More information

Introduction to sustainable drainage. www.ciria.org/suds

Introduction to sustainable drainage. www.ciria.org/suds Introduction to sustainable drainage Outline of presentation Challenges of existing drainage Drivers for SuDS SuDS philosophy and principles Benefits of SuDS Examples of SuDS Challenges of SuDS Summary

More information

To prevent increased stormwater runoff entering Council s drainage system and causing overloading of the system that in turn might cause flooding.

To prevent increased stormwater runoff entering Council s drainage system and causing overloading of the system that in turn might cause flooding. Background & Issues To provide guidelines and requirements for Developers, the Community and the Shire s Planning and Sustainability officers for connection to the Shire s Stormwater Drainage Disposal

More information

NOVEMBER 2009 [ISSUE 5]

NOVEMBER 2009 [ISSUE 5] 375 401 BRIGHTON ROAD CROYDON FLOOD RISK ASSESSMENT CLIENT: TRITHING LTD [ISSUE 5] Head Office: Unit 2 York House Edison Park Dorcan Way Swindon Wiltshire SN3 3RB Tel. 01793 619965 Fax. 01793 619967 Email:

More information

LONDON INFRASTRUCTURE PLAN 2050 BUILDING A BIGGER AND BETTER LONDON

LONDON INFRASTRUCTURE PLAN 2050 BUILDING A BIGGER AND BETTER LONDON LONDON INFRASTRUCTURE PLAN 2050 BUILDING A BIGGER AND BETTER LONDON GROWTH We estimate that London s population became bigger than ever in February 2015. We reached a population of 8.6 million people,

More information

Littleport Co-located Schools

Littleport Co-located Schools Littleport Co-located Schools February 2015 Morgan Sindall Littleport Co-located Schools 330763 BNI BSE 003 C P:\Cambridge\Murdoch\EST\PROJECTS\330763 Littleport Co-located Schools\12.0 Documents\12.2

More information

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS The following section provides descriptions, advantages, limitations, and schematics of allowable best management practices (BMPs) for

More information

East Riding of Yorkshire Council

East Riding of Yorkshire Council East Riding of Yorkshire Council Lead Local Flood Authority Interim Standing Advice Revision A - April 2015 1. Introduction From April 2015 the Lead Local Flood Authority (LLFA) became a statutory consultee

More information

Sustainable Drainage Systems (SUDS) An introduction

Sustainable Drainage Systems (SUDS) An introduction Sustainable Drainage Systems (SUDS) An introduction We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your environment

More information

SOAK UP YOUR STORMWATER

SOAK UP YOUR STORMWATER SOAK UP YOUR STORMWATER This booklet explains how you can apply soakage on your property to achieve efficient disposal of stormwater. The following information on soakage is intended as a guide only. All

More information

Creating the environment for business

Creating the environment for business 1. Introduction 1.1 Introduction to Water Cycle Strategies (WCS) 1.1.1 Background The water cycle describes the pathways and processes through which water moves through the natural and built environment,

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information

11.2 The proposals to deal with the leachate within the closed Lodmoor North Landfill site are assessed in Chapter 10 Geology and Soils.

11.2 The proposals to deal with the leachate within the closed Lodmoor North Landfill site are assessed in Chapter 10 Geology and Soils. Chapter Eleven Water Quality, Drainage and Hydrogeology Introduction 11.1 This Chapter considers the impact of the Relief Road on the hydrology of the area and considers both surface and groundwater. Runoff

More information

HIGHWAYS. Drainage design on M25 motorway widening project (J16 - J23) Brijesh Vats

HIGHWAYS. Drainage design on M25 motorway widening project (J16 - J23) Brijesh Vats Drainage design on M25 motorway widening project (J16 - J23) 76 Brijesh Vats Drainage Engineer Highways & Transportation Abstract Drainage design on the M25 motorway comprises complex drainage networks

More information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?

More information

Guidelines for. Permeable Pavement

Guidelines for. Permeable Pavement What is permeable pavement? Guidelines for Permeable Pavement When rainwater falls on conventional pavement, such as concrete, it accumulates and then flows across and off of this impervious surface as

More information

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

Sewer Flooding Alleviation in the Counters Creek Catchment

Sewer Flooding Alleviation in the Counters Creek Catchment Sewer Flooding Alleviation in the Counters Creek Catchment London Borough of Hammersmith and Fulham Monday, 14 November 2011 at 7.00pm The Small Hall, Hammersmith Town Hall, King Street, W6 9JU Agenda

More information

Briefing note: Sustainable Stormwater Management prepared by the NTUA

Briefing note: Sustainable Stormwater Management prepared by the NTUA Briefing note: Sustainable Stormwater Management prepared by the NTUA Sustainable drainage systems are cost-effective easy-to-manage solutions, designed to manage runoff flow rates, reduce the impact of

More information

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09 Guidelines for Control of Water Runoff on Small Lots Revised 6/09 Table of Contents Introduction and Purpose 3 Administrative Procedures 3 Plan Submittal Requirements 3 General Design Criteria 4 Dry Wells

More information

London Road, Rayleigh Essex Flood Risk Assessment Addendum

London Road, Rayleigh Essex Flood Risk Assessment Addendum FINAL Countryside Properties (UK) Limited Submitted by AECOM 6-8 Greencoat Place London SW1P 1PL London Road, Rayleigh Essex Flood Risk Assessment May 2015 i Limitations AECOM Infrastructure & Environment

More information

Introduction to Rainwater Harvesting. Department of Biological and Agricultural Engineering Texas A&M University

Introduction to Rainwater Harvesting. Department of Biological and Agricultural Engineering Texas A&M University Introduction to Rainwater Harvesting Department of Biological and Agricultural Engineering Texas A&M University Rainfall in your watershed What is a watershed? An area of land that drains to a common point

More information

A DESIGN AND ADOPTION GUIDE

A DESIGN AND ADOPTION GUIDE SUSTAINABLE DRAINAGE A DESIGN AND ADOPTION GUIDE Issue 2 July 2013 Issue History Issue Change Release Date 1 Document release 2 Planning Policy Sub February 2013 July 2013 2 PREFACE Sustainable Drainage

More information

Toronto s Wet Weather Flow Master Plan

Toronto s Wet Weather Flow Master Plan Toronto s Wet Weather Flow Master Plan 1. The Master Plan 2. The Don And Waterfront Study 3. What the Individual Can Do Wet Weather Flow Management Master Plan 2000 Storm Presentation to Don Mouth Naturalization...

More information

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto 89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto Prepared By: R.J. Burnside & Associates Limited 6990 Creditview Road, Unit

More information

4.3 Cisterns and Rain Barrels

4.3 Cisterns and Rain Barrels 4.3 Cisterns and Rain Barrels Rain barrels, cisterns, and tanks are structures designed to intercept and store runoff from rooftops. Rain barrels are used on a small scale while cisterns and tanks may

More information

Surface Water Management: Interim Guidance for Developers

Surface Water Management: Interim Guidance for Developers Surface Water Management: Interim Guidance for Developers www.shropshire.gov.uk Contents Executive Summary 1. Introduction...1 2. National Policy Context...2 Making Space for Water...2 Future Water...2

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

(http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf

(http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf Possible Submission about Water and Flooding (See maps 3a and 3b) From Mole Valley Local Development Framework: Strategic Flood Risk Assessment Update 2012 (http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf

More information

Defra s Water Availability and Quality Evidence Programme. COMPARATVE COSTINGS FOR SURFACE WATER SEWERS & SuDS

Defra s Water Availability and Quality Evidence Programme. COMPARATVE COSTINGS FOR SURFACE WATER SEWERS & SuDS Defra s Water Availability and Quality Evidence Programme COMPARATVE COSTINGS FOR SURFACE WATER SEWERS & SuDS Caledonian Road Housing, Islington, London. R&D Technical Report Produced: February 2011 Author:

More information

Flood Risk Management in Southwark

Flood Risk Management in Southwark Flood Risk Management in Southwark 1 Presented to Borough & Bankside Community Council 25 th April 2012 By Flood and Drainage Team Agenda Item 11 IN BRIEF Background Legislation What have we done? What

More information

Cole Easdon Consultants Limited

Cole Easdon Consultants Limited FLOOD RISK ASSESSMENT FOR PROPOSED EXPANSION OF WHITEHALL GARDEN CENTRE CORSHAM ROAD, LACOCK ON BEHALF OF WHITEHALL GARDEN CENTRES LTD. OCTOBER 2015 [ISSUE 2] Head Office: Unit 2 York House Edison Park

More information

Conveyance means a mechanism for transporting water from one point to another, including pipes, ditches, and channels.

Conveyance means a mechanism for transporting water from one point to another, including pipes, ditches, and channels. Glossary of Common Stormwater Terms Baffle means a device to check, deflect, or regulate flow. Beneficial Uses means uses of waters of the states which include but are not limited to - use for domestic,

More information

ACO Water Management: Civils + Infrastructure

ACO Water Management: Civils + Infrastructure ACO Water Management: Civils + Infrastructure Technical data Introduction to The unit provides an aesthetically pleasing solution when linking proprietary conveyance drainage systems to vegetated infiltration

More information

Guidance on the permeable surfacing of front gardens

Guidance on the permeable surfacing of front gardens Guidance on the permeable surfacing of front gardens www.communities.gov.uk community, opportunity, prosperity Guidance on the permeable surfacing of front gardens September 2008 Department for Communities

More information

topmix permeable The ultimate concrete solution for surface and storm water management

topmix permeable The ultimate concrete solution for surface and storm water management topmix permeable The ultimate concrete solution for surface and storm water management READYMIX concrete The built environment has grown rapidly over the last 50 years, resulting in large areas of land

More information

Building over or close to a public sewer

Building over or close to a public sewer Building over or close to a public sewer thameswater.co.uk/developerservices thameswater.co.uk/developerservices 1 Questions and answers Did you know Thames Water is legally responsible for more than 100,000

More information

Florida Department of Environmental Protection

Florida Department of Environmental Protection Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,

More information

Proposed Re-development, At 321 London Road, Wyberton. Flood Risk Assessment - Revised

Proposed Re-development, At 321 London Road, Wyberton. Flood Risk Assessment - Revised Proposed Re-development, At 321 London Road, Wyberton Flood Risk Assessment - Revised Prepared By: C Mason C.Eng M.I.C.E May 2015 Contents Page No. 1. Introduction 2 2. Site Description 2 3. Flood Hazard

More information

Household customer. Wastewater flooding guidelines. www.thameswateruk.co.uk

Household customer. Wastewater flooding guidelines. www.thameswateruk.co.uk Household customer Wastewater flooding guidelines www.thameswateruk.co.uk We are very sorry that you have recently suffered wastewater flooding to your property. This leaflet has been designed to answer

More information

CERTIFYING DRAINLAYER

CERTIFYING DRAINLAYER No. 9198 REGISTRATION EXAMINATION, NOVEMBER 2013 CERTIFYING DRAINLAYER ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2013. All rights reserved. No part of this publication may be reproduced

More information

Action plans for hotspot locations - Ash Study

Action plans for hotspot locations - Ash Study Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side

More information

FLOOD RISK ASSESSMENT

FLOOD RISK ASSESSMENT SEVERN ROAD RESOURCE RECOVERY CENTRE FLOOD RISK ASSESSMENT REF 402.0036.00374 September 2009 Severn Road Resource Recovery Centre Ref: 402-0036-00374 Viridor Waste Management i PPS25 Flood Risk Assessment

More information

Polypipe Continuing Professional Development. Rainwater Harvesting In The Sustainable Environment

Polypipe Continuing Professional Development. Rainwater Harvesting In The Sustainable Environment Polypipe Continuing Professional Development Rainwater Harvesting In The Sustainable Environment Introduction to Polypipe Terrain Aims and Objectives The Sustainable Environment The Concept of Rainwater

More information

Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s)

Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s) Permeable Pavers Permeable Interlocking Concrete Pavements (PICP s) CBC Title 24/ADA Compliant LEED Functional Optimum balance of surface infiltration and joint interlock Available in a 6 x 9 Quarry Stone

More information

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public

More information

Prepare a drainage system layout and specification notes for a low- rise building.

Prepare a drainage system layout and specification notes for a low- rise building. STUDENT MATERIALS Prepare a drainage system layout and specification notes for a low- Outcome 1 - rise building. In this outcome you will study the technology of below and above ground drainage systems.

More information

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12 CIVL 1112 - Part 1 1/12 The water cycle, also known as the hydrologic cycle, describes the continuous movement of water on, above and below the surface of the Earth. The water cycle, also known as the

More information

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater) Applicability: Required for projects that create and/or replace 5,000 square feet or greater of impervious surface (i.e. asphalt roads, concrete structures, building area, sidewalks, etc.). Impervious

More information

SEPTIC TANKS FOR THE COLLECTION & SETTLEMENT OF DOMESTIC SEWAGE

SEPTIC TANKS FOR THE COLLECTION & SETTLEMENT OF DOMESTIC SEWAGE SEPTIC TANKS FOR THE COLLECTION & SETTLEMENT OF DOMESTIC SEWAGE Let us help! Free professional site visit with friendly support and advice. helpingyou@klargester.com to make the right decision or call

More information

Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer

Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer Novatech 2010, the 7th international conference on sustainable techniques and strategies in urban

More information

Essex County Council Flood Investigation Report

Essex County Council Flood Investigation Report Essex County Council Stock City of Chelmsford Rev Date Details Author Checked and Approved By 01 February 2015 Draft report for stakeholder consultation Ed Clarke Flood Investigation Engineer Lucy Shepherd

More information

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses Managing Storm Water Runoff A Self-Assessment Guide for Wisconsin Businesses Storm water runoff is coming under increasing scrutiny as both a source of pollutants to our lakes and streams, and as a cause

More information

The application site is on the edge of flood zones 1 and 2 with flood zone boundary cutting across part of the southern boundary of the site.

The application site is on the edge of flood zones 1 and 2 with flood zone boundary cutting across part of the southern boundary of the site. Flood Risk Assessment Erection of Masjid/ Place of Worship, extended car parking following demolition of 11a Grafton Street & boundary treatment Land adjacent 11/ 11a Grafton Street, Preston, PR1 8JB 0723/

More information

Stormwater Management Functional Servicing Report

Stormwater Management Functional Servicing Report Stormwater Management Functional Servicing Report Part of Lot 12, Concession 10 Township of Cavan Monaghan Ian Cameron Rural Subdivision Engage Project No. 14016 Engage Engineering Ltd. January 7, 2015

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS Check here for Address or phone number change the fiscal year (July 1 June 30), and date(s) maintenance was performed. Under Inspection,

More information

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures. BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. PurRoses 1. To prevent sloping soils from becoming

More information

Stanford Graduate School of Business Knight Management Center Campus

Stanford Graduate School of Business Knight Management Center Campus Stanford Graduate School of Business Knight Management Center Campus Mathew Bamm, P.E. LEED AP courtesy: boora architects Overview Introductions Design Team and Project Overview Regulatory Framework and

More information

Stormwater Credit Open House Q&A

Stormwater Credit Open House Q&A Stormwater Credit Open House Q&A Stormwater Charge Project GENERAL INFORMATION AND APPLICATION PROCESS FOR STORMWATER CREDITS Question: What is the response time for an application - 30 business days or

More information

APPROVAL AMENDMENT HISTORY

APPROVAL AMENDMENT HISTORY Prepared by: Aurecon South Africa (Pty) Ltd STORMWATER MANAGEMENT PLAN TOKAI ESTATE (DRAFT 1) Submission date: 11 January 2013 Contact Person: Francois du Toit T: +27 21 526 6950 F: +27 21 526 9500 E:

More information

PART 5 : WASTEWATER DRAINAGE

PART 5 : WASTEWATER DRAINAGE Authorised by : City Waters Unit Manager Page 1 of 15 PART 5 : WASTEWATER DRAINAGE 5.1 INTRODUCTION This Manual sets out the basic design principles for drainage of wastewater. While some construction

More information