1 Foreword 04 Port Development Plan In these progressive times, ports have become more than a conduit for cargo movement. The South African ports system drives efficiency, and value-add to the supply chain, which in turn reduces the cost of doing business in South Africa and encourages continued growth. The port layouts in this chapter reflect the strategic vision of Transnet National Ports Authority to meet the demand for port services. Port development is focused on the principles of sustainability and ensuring environmental and socio-economic responsibility in port expansions. To maintain the relevance of the port plans, a spirit of collaboration with stakeholders was sustained throughout the process, and continues to form an integral part of the port planning cycle. Mr Tau Morwe Chief Executive: Transnet National Ports Authority

2 1. Introduction Table OF contents 1.1 Port system World trade routes World trade routes are global logistical networks used for the commercial transport of cargo to distant markets. Commercial transport of cargo is carried out under World Trade Routes Marine Traffic Figure 1: World trade routes marine traffic international trade agreements, which allows goods to cross borders with relaxed restrictions. The main trade routes are plied by sea going vessels, carrying 80% of all cargo by tonnage, with land-based modes transporting 20% and airlines transporting less than 0,5%. 1. Introduction Port system Port planning principles Transnet inter-governmental engagements Key port planning trends and issues Key port development opportunities Port demand forecast National port demand Container demand Dry bulk demand Break-bulk demand Liquid bulk and single buoy mooring (SBM) crude demand Automotive demand Infrastructure capacity analysis Long-term vision of port system National status quo summary Land use summary Waterside capacity summary Container capacity summary Dry bulk capacity summary Break-bulk capacity summary Liquid bulk capacity summary Automotive capacity summary Non-freight sector requirements Inland transport connectivity Port Authority fleet requirements Terminal equipment overview Vessel sizes and port capabilities Individual port development plans Port of Saldanha Bay Port of Cape Town Port of Mossel Bay Port of Port Elizabeth Port of Ngqura Port of East London Port of Durban Port of Richards Bay Alternative demand scenarios Beneficiation approach Additional beneficiation scenarios 211 South African ports The nine South Africa ports that fall under the custodianship of Transnet, as per the National Port Regulations of 2007, include: Port Nolloth, Saldanha Bay, Cape Town, Mossel Bay, Port Elizabeth, Ngqura, East London, Durban and Richards Bay. The nine ports are grouped into the western ports (Western Cape), central ports (Eastern Cape) and eastern ports (KwaZulu-Natal). Of the nine ports, eight are commercial ports handling mainly freight and have 30-year cargo demand forecasts. Port Nolloth on the other hand does not have a forecasted cargo demand and due to limitations of waterside infrastructure, currently only provides support services to the offshore mining operations. The port development plans of the Long-term Planning Framewrok (LTPF) focus mainly on the eight commercial ports. The primary role of a port is to provide adequate safe and efficient facilities for maritime freight activities. The older South African ports are geographically positioned to service their immediate hinterlands, with Cape Town providing for the Western Cape, Port Elizabeth and East London serving the Eastern Cape, and Durban serving KwaZulu-Natal, Gauteng and the more distant neighbouring states. In this role, the older ports have developed as general cargo ports providing a wide range of services, with more recent developments including important container handling facilities. 6. New emerging technologies Port investment overview Port Authority seven-year investment plan Terminal operator seven-year investment plan Port 30-year investment plan LTPF 2014 LTPF

3 1. Introduction South African port system South African Port and Rail System Figure 2: South African commercial port system Figure 3: South African port and rail system An integrated system of complementary regional ports and rail corridors WESTERN PORTS Saldanha Bay Cape Town Mossel Bay Port-rail corridor Port interconnect Cross-border interconnect High volume feeder Network operational flexibility CENTRAL PORTS Port Elizabeth Ngqura East London Durban Richards Bay EASTERN PORTS Saldanha Bay East London EASTERN PORTS Cape Town WESTERN PORTS Mossel Bay Ngqura Port Elizabeth CENTRAL PORTS Durban New Durban Dig-out Port Richards Bay The newer ports were developed primarily to provide for the handling of bulk cargo with Saldanha Bay providing export facilities for iron ore from the Northern Cape, Richards Bay handling exports from the coal mines situated mainly in Mpumalanga, and Ngqura planned with the aim of handling dry and liquid bulk cargo. The regional grouping of old and new ports has resulted in a complementary ports system that maximises advantages of scale, avoids duplication and provides a logical distribution of port facilities to meet the national need. The ports and their hinterlands are connected by an integrated rail system consisting of high volume port-rail corridors, port and over-border interconnections, and high volume feeders. 1.2 Port planning principles The key port planning principles are to guide the development of comprehensive plans, which are balanced and flexible enough to adapt to each port s infrastructure and operational needs over time. The following general planning principles were used to inform the development of South Africa s long-term port plans: Develop a complementary ports system with a regional grouping of old and new ports to provide a national range of facilities to meet local and hinterland demand, and avoid duplication of investment; Optimise capital investment across the ports system to meet the long-term national demand for freight throughput, and to meet the requirements of Transnet, the National Ports Act, and South Africa, and to ensure capacity meets demand; Align with the planning initiatives of local, provincial and national Government and other key stakeholders; Improve infrastructural and operational efficiencies and reduce transport and logistics costs; Zone port functions according to cargo types, and maximise available port space for berths, freight handling and operations; Develop back-of-port logistics areas to increase port capacity; Integrate and align port and rail capacity planning; Align port development planning with trends in shipping and equipment technology; Maintain the flexibility to respond to changing technological and economic conditions; and Respond to environmental opportunities and constraints in a sustainable manner. 1.3 Transnet inter-governmental engagements In order to give effect to the principles of cooperative governance and inter-governmental relations contemplated in Chapter 3 of the Constitution, Transnet s engagements with organs of State will be strengthened to ensure: effective oversight of Transnet infrastructure assets; coordination and promotion of joint planning with all organs of State; promote cooperative governance with organs of State in the national and international context; and conclude memorandum of understandings with organs of State. Transnet Group Planning together with Operating divisions will facilitate such engagements to achieve the desired objectives mentioned above. 120 LTPF 2014 LTPF

4 1. Introduction 2. Port demand forecast 1.4 Key port planning trends and issues Recent trends and issues that influence long-term port planning have been identified as follows: Increase in international seaborne trade due to demand from emerging economies; Slow-down in resources required in developed economies; Worldwide trend towards greater specialisation, centralisation and economies of scale; Exponential increases in vessel and parcel sizes due to economies of scale in transporting cargo; Innovative regional and global port operational models such as hub and spoke system; Restructuring of logistics networks and improvement in dealing with hinterland congestion and intermodal transport links; Worldwide trend in declining road use, as rail becomes more competitive as a sustainable transportation mode; Port reforms due to high costs and constraints of port infrastructure, such as port governance restructuring and deregulation; Awarding of concessions to global terminal operators to improve productivity, efficiencies and profitability of ports; Advanced port operational systems and more efficient cargo handling equipment; Transport and handling of alternative forms of energy, such as liquified petroleum gas (LPG) and liquified natural gas (LNG); and The need for sustainability in infrastructure solutions, as well as increased stakeholder engagement on issues such as carbon footprint, cleaner technologies, green and eco-ports, health and safety, and end-user costs. 1.5 Key port development opportunities The main port development opportunities over the 30 year planning period will be assessed and discussed in more detail in this port development chapter. The key opportunities include: Saldanha Bay iron ore expansion; Saldanha Bay ship repair precinct; Cape Town container seaward expansion; Ngqura/Durban liquid bulk terminal to support Project Mthombo; Ngqura manganese export facility; Durban Container Terminal (DCT) Pier 1 Phase 2 expansion; New Durban Dig-out Port (DDOP); Richards Bay dry, liquid and break-bulk capacity expansion; and LNG import terminals in Saldanha Bay, Mossel Bay, Ngqura and Richards Bay. 2.1 National port demand The port component of the LTPF demand forecast is used as the basis for the annual update of the port capacity requirements and development plans. National The forecasts Port are summarised Tonnage by Forecast port well as by commodity. The commodities include minor and major dry bulk, break-bulk, liquid bulk and SBM crude, containers, vehicles. The major dry bulk export commodities such as coal, iron ore and manganese are reflected separately. Figure 4: National port tonnage forecast, total Million t ons Export Coal Export Iron Ore Container Tons SBM Crude Dry Bulk Liquid Bulk Export Manganese Break Bulk Automotive Tons The demand for each port is summarised in graphs and tables, illustrating 30 years: Previous year/base year 2013; Current year 2014; Seven-year forecast (as per the Corporate Plan); and 30-year forecast. The current year s national demand for all cargo is expected to be 253 million tons, increasing to 335 million tons in seven years (5% average per year) and 560 million tons in 30 years (3% average per year). Annualised average growth rates are provided for a particular interval, where applicable. 122 LTPF 2014 LTPF

5 2. Port demand forecast National Port Demand Forecast National Port Demand Forecast (by cargo) Figure 5: National port tonnage forecast, by cargo and by port Million tons Million tonnes Million tons Million tonnes National port demand, by cargo type Automotive Break Bulk Container Dry Bulk Export Coal Export Iron Ore Export Manganese Previous year National cargo tonnage, by port Seven-year forecast 30-year Forecast Liquid Bulk SBM Crude Cape Town Durban East London Mossel Bay Port Elizabeth Richards Bay Ngqura Saldanha Bay Mandela Bay The forecasts for manganese exports reflect strong growth (7% average over 30 years), good growth from container exports (4%) and more moderate growth rates are predicted for dry bulk, liquid bulk, automotive volumes and SBM crude (3%). Coal, iron ore and breakbulk export volumes are expected to grow at a lower rate (2%). Coal, manganese and SBM crude have significantly high growth rates over the initial seven-year period (4,7%, 16,4% and 11,5%) compared to lower growth rates over the remaining 30-year forecast of (1,2%, 3,8% and 0,5%). Figure 6: National port demand by cargo Break-bulk (Tons) Minor dry bulk (Tons) Coal export (Tons) The individual national cargo demand forecasts are discussed in more detail below. Individual port forecasts are discussed in the individual port development plans, in order to determine the capacity expansion requirements for each port. 2.2 Container demand The role of the container ports There are three major container terminals, the largest located in Durban, followed by Cape Town and then Port Elizabeth/Ngqura. The Port of Durban is defined as the premier gateway port for the Gauteng hinterland. Cape Town is defined as a limited gateway for timesensitive cargo from the west, which is destined for Gauteng. Ngqura is defined as a secondary gateway to Gauteng, as well as a transshipment port. Each of the container ports will continue to serve their respective local hinterlands, and Richards Bay and East London will continue to handle containers through their multi-purpose terminals until volumes justify dedicated facilities. Iron ore export (Tons) Manganese export (Tons) The map of South Africa with the three main container ports shows the spatial basis for the container strategy. The inner blue circles represent the respective sizes of the ports, in terms of the current container volumes handled, while the outer dashed circles represent the sizes of the container volumes in 30 years. The blue lines indicate the distances and therefore the relative importance of the inland transport connections to the Gauteng hinterland, the major economic hub. The importance of Durban, in terms of the size of its own hinterland and its proximity to Gauteng, is evident in the dominant market share the gateway port continues to maintain over the next 30 years (65,3% currently and 65,5% in 30 years). The Mandela Bay metro, consisting of the Port of Ngqura and Port Elizabeth, currently handles 14% of the national container demand, which increases to 17% over the 30-year forecast. 124 LTPF 2014 LTPF

6 2. Port demand forecast Figure 7: Role of South Africa s container ports Dry Bulk Demand Forecast 2.3 Dry bulk demand The total volume of dry bulk handled nationally this past financial year was 168 million tons. The seven-year forecast predicts 221 million tons, with the 30-year forecast predicting 345 million tons. The current dry bulk demand is dominated by two ports, Richards Bay handling 55% (mainly coal) and Saldanha Bay handling 35% (mainly iron ore). The 30-year forecast projection sees Richards Bay reduce to 50% and Saldanha Bay decrease only slightly to 34% of the national dry bulk tonnage. Gauteng economic hub Figure 9: Dry bulk demand forecast Million tons Saldanha Bay 65% 65% Durban 2014: 2,7 m TEU 2021: 3,7 m TEU 2044: 8,8m TEU Richards Bay Port Elizabeth Ngqura Mossel Bay East London Cape Town 2014: 0, 9m TEU 2021: 1,1 m TEU 2044: 2,2 m TEU 20% 16% 14% 17% PE and Ngqura 2014: 0,8 m TEU 2021: 1,1 m TEU 2044: 3,0 m TEU Current demand Durban Cape Town Container demand forecast: The total volume of containers handled nationally this last financial year was 4,5 million twenty-foot equivalent units (TEUs). The seven-year forecast predicts 5,8 million TEUs, with the 30-year forecast predicting 14,4 million TEUs. The current container demand is dominated by the Port Container Demand Forecast Figure 8: Container demand forecast Million TEUs of Durban handling 65%. Cape Town currently handles 19% and between Port Elizabeth and the new terminal at Ngqura they handle 14%. The 30-year forecast projection sees Durban remain at 65% and Cape Town reduce to 16%, with the Mandela Bay metro increasing to 17%. Saldanha Bay Richards Bay Port Elizabeth Ngqura Mossel Bay East London Durban Cape Town 2.4 Break-bulk demand break-bulk Demand Forecast The total volume of break-bulk handled nationally this past financial year was 11 million tons. The seven-year forecast predicts 12 million tons, with the 30-year forecast predicting 18 million tons. The current break-bulk demand is dominated by two ports, with Durban handling 45% and Richards Bay handling 44% of the national break-bulk tonnage. The 30-year forecast projection sees Durban decrease to 28% and Richards Bay increase significantly to 60%. Figure 10: Break-bulk demand forecast Million tons Saldanha Bay Richards Bay Port Elizabeth Ngqura Mossel Bay East London Durban Cape Town LTPF 2014 LTPF

7 2. Port demand forecast 3. Infrastructure capacity analysis 2.5 Liquid bulk and SBM crude demand South Africa accounts for 28% of the sub-saharan refined market, and 53% of total oil consumption. Privately operated liquid bulk terminals are located in each port. Total volumes of liquid products (SBMs and berths) are forecast to grow from 38,5 million kilolitres to 86 million kilolitres over 30 years. Durban currently handles the majority of liquid bulk volumes at 68% of the national total, followed by Saldanha Bay at 13%. In 2018 the Port of Ngqura will experience a large increase in SBM crude, increasing Nelson Mandela Bay s liquid bulk handled dramatically to 40% of the national total demand. Over the Liquid 30-year forecast, Bulk Demand Durban continues Forecast to be the dominant liquid bulk handling port with 57% of the market share, followed by the increased demand of Nelson Mandela Bay at 26%, and Saldanha Bay at a decreased 6%. The total liquid bulk demand is currently split equally between liquid bulk exports and SBM crude imports. In seven years SBM crude imports dominate the liquid bulk demand at 70%, which evens out again at the end of 30 years to 50%. Figure 11: Liquid bulk demand forecast Million tons SBM Mossel Bay (crude) SBM Ngqura (crude) SBM Durban (crude) Mandela Bay Saldanha Bay Richards Bay Mossel Bay East London Durban Cape Town The infrastructure capacity analysis begins with an overview of the long-term vision of the South African port system. This is followed by a summary of the port status quos, and includes the number of berths, total berth lengths and national terminal capacities. The landside and waterside capacity is then assessed for each cargo type, for each of the current (seven-year), medium-term (30-year) and long-term (>30 years) plans. Then inland transport connectivity, port authority fleet requirements and a terminal equipment overview is summarised. The capacity analysis is then concluded with an assessment of current vessels and port capabilities with respect to the current port system. 3.1 Long-term vision of port system There are nine ports promulgated in South Africa under the Current National Ports port Act, system with Richards Bay the largest and Port Nolloth the smallest. According to the promulgation the ports fall under the jurisdiction of Transnet National Figure 13: Current port system Ports Authority (TNPA). The total landside area utilised by the ports is 6 100ha, and there is 30km of quay wall across the port system. A land use analysis indicates that the older ports are more fully developed (Cape Town, Port Elizabeth, East London and Durban) and that the newer ports have large areas of developable land available (Saldanha Bay, Ngqura and Richards Bay). The potential for the ports to develop to their full capacity is indicated below in the series of current and long-term layouts. The fully developed port layouts include the new DDOP at the old Durban airport site. The newer ports offer massive development potential, and ambitious options are put forward for the landward or seaward expansion of the more established ports. The total port landside area in the long term is predicted to be 9 500ha, with an associated quay wall length of 80km, a growth over 160%. 2.6 Automotive demand Automotive Demand Forecast The total number of vehicles handled nationally this past financial year was units. The seven-year forecast predicts around units, with the 30-year forecast predicting 1,1 million units. The current vehicle demand is dominated by Durban, Port Elizabeth and East London each handling 69%, 20% and 11% respectively. Cape Town makes up a very small if somewhat negligible percentage of the market share. Figure 12: Automotive demand forecast Millions Saldanha Bay Richards Bay Port Elizabeth Ngqura Mossel Bay East London Durban Cape Town LTPF 2014 LTPF

8 3. Infrastructure capacity analysis Long-term vision of the port system Figure 14: Long-term vision of the port system This summary of waterside capacity is based on the current, medium-term (30-year) and long-term (>30 years) development plans for each port. It categorises shallow, medium and deep draft berths, measured in metres of berth length. Current capacity is 30km of berth length, of which more than 50% is shallow berths in the older ports. The existing 7,5km (25%) of deepwater berthing is confined to the newer ports of Richards Bay, Saldanha and Ngqura. The medium-term plans show the total length of berth increasing to 50km, with the percentage of deepwater berths rising to almost 50%. Increasing The long-term Vessel plans show and a major Equipment potential increase Sizes to 80km of quay wall, two-thirds of which would be deepwater berths. Figure 15: Increasing vessel and equipment sizes The dual challenge of deepening existing berths, and providing ever deeper new berths, is a major component of the port development framework plans. Increasing vessel sizes: A dramatic increase in the size of container vessels and ship-to-shore cranes since the introduction of containerisation in the 1970s has required the deepening and strengthening of existing quay walls. This is the challenge facing port planners in the older ports of Durban, Cape Town and Port Elizabeth, where the existing berths were built in the 1970s to suit small vessels and cranes. This has resulted in important berth deepening projects being undertaken at the container terminals in Cape Town and Durban, as well as being considered in Port Elizabeth National status quo summary There are currently 127 berths across the port system, equating to 30 kilometres of berth length. The largest number of berths are utilised for break-bulk operations (42 berths), followed by dry bulk (30 berths), containers (18 berths) and liquid bulk (16 berths). Richards Bay Coal Terminal (RBCT) has a capacity of 97mtpa, followed by liquid bulk terminals with a combined capacity of 89 million kilolitres and Saldanha Iron Ore at 60mtpa. All other dry bulk terminals have a combined national capacity of 44mtpa and break-bulk a combined capacity of 31mtpa. The national container handling capacity is 5 million TEUs per year, with vehicle handling capacity at 1 million units nationally per year. 3.3 Land use summary The National Ports Authority operates as a landlord port authority; planning, providing and maintaining port land and infrastructure. Port land is defined by the port limits. The port layouts show the development of the ports from their current status, through short-term (seven-year), medium-term (30-year) and long-term plans (>30 years). Land within port limits is zoned according to port land use categories. The principle land uses are those relating to freight activities: containers, vehicles, dry bulk, breakbulk and liquid bulk. Other non-freight land uses include ship repair, fishing, and maritime commercial, all of which require water frontage. Commercial logistics, open space and the National Ports Authority other (land use category used for unspecified port authority use or for future expansion) do not necessarily require water frontage. 3.4 Waterside capacity summary Port waterside capacity, measured in terms of berth length and berth depth, is the most basic component of the port capacity plans. The port development layouts are premised on growth in waterside capacity to provide for growing freight demand, planned in conjunction with growth in landside capacity. In addition, secondary capacity is also required in terminal freight handling operations, back-of-port support activities, and inland transport connectivity (by road, rail and pipeline). Two major challenges face the port planners the requirement to adapt existing port waterside capacity to cope with new and larger vessel types, and the requirement to expand to new areas to provide large new tranches of waterside capacity. The first challenge naturally affects the older ports. East London is an example of a port that is not easily able to adapt due to the very restrictive river basin site of the port. East London also has limited opportunity to expand to new areas suited to the development of new waterside capacity. Even the newer ports of Saldanha Bay, Ngqura and Richards Bay have environmental and social constraints, which limit further expansion of their port limits. DCT North Quay at current depth of -12,8m with Alphen class vessel and quayside cranes as per original design The existing North Quay berths at DCT have a current depth of -12,8m CD. After deepening, the depth of the berths will be -16,5m CD. This will enable the Port of Durban to handle fully laden TEUs container vessels that are at the limit of the entrance channel. All new container berths in the port system are being designed to the standard -16,5m CD, although consideration is being given to accommodating even larger vessels in the new DDOP. DCT North Quay at -16,5m after deepening and widening, with TEU vessel and mega-max tandem lift STS cranes 3.5 Container capacity summary Container capacity planning was undertaken over the 30-year planning period, for the three main container terminals. The red demand line indicates the forecast container demand in TEUs, as per the LTPF demand 2014 (MDS aligned). The coloured bands reflect the timing and capacity gains of successive medium-term development plans for each container terminal. Short-term capacity planning, to accommodate maintenance and sustaining interventions, has not reflected in the below 30-year capacity planning. 130 LTPF 2014 LTPF

9 Scenario 3 3. Infrastructure capacity analysis lanning Durban s container development includes the following medium-term capacity options, to meet forecast demand over the 30-year planning period: Pier 1 Phase 2 Lite with capacity gain of +0,5 million TEUs, coming online in year 2019; Pier 1 Phase 2 Infill with capacity gain of +1,8 million TEUs, coming online in year 2022; and Durban dig-out port phase 1 with capacity of 2,45 million TEUs, coming online in year 2025 (fast track schedule). With these three expansion options, there are three broad development scenarios (see figures below): Scenario 1: Pier 1 infill with DDOP phase 1; Scenario 2: Pier 1 lite with DDOP phase 1; and Scenario 3: No Pier 1 development, but with DDOP phase 1. Scenario 1 results in a 1,5m TEU cumulative shortfall over a four-year period and only requires DDOP by Scenario 2 results in a 0,2m TEU cumulative shortfall over a two-year period and requires DDOP by Scenario 3 results in a 1,5m TEU cumulative shortfall over a four-year period and requires DDOP by 2023, but the fast track schedule suggests that 2024 is the earliest. Figure 17: Durban container planning Scenario 3 No Pier 1 expansion Scenario 3 No Pier 1 expansion: DDOP Ph 1 by berths 2 berths Figure 16: Durban container planning Scenario 1 and 2 Pier 1 expansion options Berth Deepening Scenario 1 Pier 1 Infill: DDOP Ph 1 by berths 2 berths Pier 1 Ph 2 Infill b a Cape Town container planning Berth Deepening Cape Town s container development includes the following medium-term capacity interventions, to meet forecast demand over the 30-year planning period: Completion of expansion phases 1 and 2 with capacity gain of +0,7 million TEUs; and Seaward terminal expansion with capacity gain of +0,5 million TEUs. Figure 18: Cape Town container planning Scenario 2 Pier 1 Lite: 2 berths Pier 1 Ph 2 Lite DDOP Ph 1 by berths 2 Berth Deepening Nelson Mandela Bay s container development includes the below short-term capacity interventions, as included in the current corporate plan. Due to the large volume of transshipments moving through Ngqura, a demand forecast excluding transshipments is also shown. Ngqura berths 3 and 4 completed with capacity gain of +1,5 million TEUs; and Port Elizabeth Terminal expansion with capacity gain of +0,3 million TEUs LTPF 2014 LTPF

10 Port Elizabeth and Ngqura Container Planning 3. Infrastructure capacity analysis Figure 19: Port Elizabeth and Ngqura container planning 3.6 Dry bulk capacity summary The Iron Ore Terminal at Saldanha Bay currently has two berths and stockpiles with a capacity of 60mtpa. Expansion projects will increase this capacity in increments to 82,5mtpa over the short term and then to 120mtpa in the medium term. This expansion would add an additional two berths to the terminal and increase the landside stockpile area from 73ha to 121ha. The Cape Town dry bulk terminal in Duncan Dock currently has two dedicated berths with a current terminal capacity of 2,1mtpa. No future expansion development plans for dry bulk are being considered. The Port Elizabeth manganese export terminal has a single berth and a current capacity of 6mtpa. This terminal will be decommissioned in 2018 and relocated to the new terminal in Ngqura. A new manganese export terminal is planned for Ngqura, with an initial capacity of 16mtpa in 2019 and stepping up to 22mtpa by The Development Framework Plan makes provision for additional terminal facilities in the longer term along berths in the river basin, to meet the future requirements of the Industrial Development Zone (IDZ) and hinterland. The Port of East London currently operates a one-berth dry bulk terminal with a capacity of around 2,2mtpa, stepping up to 4mtpa in anticipation of potential coal export volumes in the medium term. In Durban, the total dry bulk handlding capacity is 11mtpa, which includes: Bulk Connections on the Bluff handling coal and manganese, Maydon Wharf, Rennies Bulk Terminals, the Agriport terminal handling grain and woodchip products, and the Durban Bulk Shipping at the Island View complex. Dry bulk capacity is expected to increase to 13mtpa. Richards Bay is South Africa s premier dry bulk port, with a coal export terminal with a capacity of 110mtpa. Richards Bay Coal Terminal s (RBCT s) capacity is planned to be maintained over the 30-year planning period. Other dry bulk handling capacity is 21mtpa, made up of: dedicated woodchip export berths, and general purpose break-bulk berth. Other dry bulk capacity is planned to be increased to 51mtpa by Break-bulk capacity summary Port Terminals break-bulk and multi-purpose terminals are located in all ports, handling a range of generally palletised and skiptainer cargoes and mineral and agricultural products. Port Terminals has 65% market share in break-bulk cargoes, and faces increasing competition from private terminals. Initiatives to increase market share include efficiency improvements, sustainable handling methods and attractive pricing initiatives. The break-bulk facilities in the older ports and terminals are operating at below capacity, and there are proposals to rationalise these and to increase container handling. The shallow older berths and limited landside space restricts their effectiveness for modern port operations. The Maydon Wharf quay wall is being rebuilt to address this issue. The Richards Bay Multi-purpose Terminal is being modernised and expanded as an outcome of the Richards Bay Capacity Expansion Programme. The development of IDZs in Saldanha Bay, Ngqura, East London and Richards Bay will generate break-bulk and neo bulk cargoes, although the exact nature of the infrastructure required is not presently known. Provision has been made in the port development plans for this, and the development of a general cargo terminal in Ngqura is progressing. 3.8 Liquid bulk capacity summary Feasibility studies are being conducted for LNG terminals in Saldanha, Ngqura and Richards Bay. The section 56 process for the Ngqura liquid bulk terminal is progressing, with new berths and a tank farm planned. These will replace the Port Elizabeth facility, which will be decommissioned once Ngqura is operational. Imports through Island View in Durban to feed the coastal terminal of the NMPP will require ongoing upgrades to the loading and storage facilities of the existing Island View berths. The new DDOP will be able to provide liquid bulk handling capacity, and will include deepwater berths in the port entrance. 3.9 Automotive capacity summary Port Terminals operates car terminals handling automotive cargoes in Durban, East London and Port Elizabeth. There is currently adequate capacity to serve the forecasted volumes, and only additional capacity is required in the Port of Durban over the 30-year planning period. The Durban Ro-Ro Terminal has three berths with a capacity of units. The East London Car Terminal has one berth with an operationally reduced capacity of units. The Port Elizabeth terminal has one berth with a capacity of units. All three terminals have the ability to expand in their current locations to handle demand in the medium to long term. There is the potential to relocate the Port Elizabeth terminal to the southern side of the port once the manganese terminals have been decommissioned. There is also the potential to relocate the Durban car terminal to a new position at the DDOP. This will address the limited road and rail capacity of the existing Durban Point terminal Non-freight sector requirements The non-freight sector represents non cargo-based services offered by South Africa s ports. These include passenger terminals, ship repair facilities, oil and gas offshore supply bases, fishing and navy accommodation. Passenger terminals South Africa has a developing cruise liner industry. Passenger terminal demand has two components, one being seasonal local cruises with peaks in the summer months, and the second, ad hoc visits from international cruises. There is currently one dedicated passenger terminal in South Africa, in Durban (at N Berth), with MSC having home port bases in both Durban and Cape Town. Cape Town has future plans for a dedicated passenger terminal at E Berth, while Durban has future plans for relocating the existing cruise liner terminal to A and B Berths in the Point precinct (both based on section 56 on the Port Regulation). The National Ports Authority may provide dedicated berthing facilities from existing port infrastructure, but will not invest in new terminals. Passenger vessel calls to Durban currently operate from the N-shed berth (quay length = 250m). The Port of Durban s annual passenger numbers reached in The port s development plans do allow for the provision of a new, dedicated passenger terminal (quay length = 700m) at A and B berth in the Point precinct, which will offer a competitive cruise terminal. The passenger numbers are projected to peak at approximately in Passenger vessel calls to Cape Town currently operate from Duncan Dock (quay length = 250m). The Port of Cape Town s annual passenger numbers reached approximately in The port s development plans allow for the provision of a new, dedicated cruise terminal (quay length = 700m) at Berth E, which will offer a competitive cruise terminal. The passenger numbers are projected to peak at approximately in There are no future plans for dedicated terminals in Richards Bay, Port Elizabeth, Mossel Bay, East London and Saldanha Bay. Cruise liners visiting these ports will continue to use available infrastructure on arrival. The combined annual passenger volumes for these ports reached approximately in Ship repair facilities South African ports ship repair industry offers onshore (and at times offshore) industrial services to ship owners to improve operational efficiencies and earning potential in line with the International Maritime Organisation (IMO) regulations. The global ship repair industry is dependent on scheduled maintenance work from either passing ships or ships calling into the port, but there is significant growth in unscheduled maintenance work largely due to marine incidents, breakdowns, etc. South Africa s ship repair industry has been declining over the last decade mainly because of the fragmentation of the ship repair industry. This has been on the backdrop of growth of 34% worldwide for the period 2004 to This period has also seen a loss of 20% to 30% in ship repair capacity with the conversion of ship repair facilities to ship building facilities. Some of the factors resulting in the fragmentation of the ship repair industry include type and size of ships, trade routes, ship repair capacity and costs, etc. Most of the ships that are currently being repaired in South African ports are local and foreign trawlers, harbour, research and patrol vessels and some oil and gas rigs. South Africa currently has ship repair facilities at the Ports of Cape Town and Durban, with minor facilities at the Ports of East London, Port Elizabeth and Saldanha. The Port of Durban is equipped to handle ship repairs through a mixture of private and National Ports Authority operated facilities. The ship repair facilities comprise a 352m x 34m wide graving dock and three floating docks (254m x 47m wide with lifting capacity of tons). With the projected container traffic, the Port of Durban plans to provide an additional dry dock (300m x 50m wide), two new floating docks, synchrolifts, an oil rig repair booth and additional landside area ( m 2 ). The Port of Cape Town is equipped to handle ship repairs through a mixture of privately- and National Ports Authority-operated facilities. The ship repair facilities comprise a 370m x 45m wide graving dock (Sturrock Dry Dock) and a 161m x 21m wide dry dock (Robinson Dry Dock). In addition to these facilities, the Port of Cape Town has a synchrolift with lifting capacities up to tons, a repair quay at Duncan Dock, Berth A (privately run for ship repair) and a series of berths in the V&A Waterfront basin dedicated to ship and boat repairs. The Ports of Richards Bay, East London, Port Elizabeth and Saldanha have no dedicated ship repair facilities, with most ship repair work occurring along the quays, to generally smaller vessels. South Africa s ports are facing stiff competition from other ports in the region, which are refurbishing or building new facilities to capture the market of ships navigating around the African coastline. However, shipbuilding companies in the Asian markets are interested in building ship repair facilities at one of South Africa s eastern ports, selected because of its proximity to the mainstream cargo market. Ngqura has experienced exceptional pressure from the Coega Development Corporation and the Nelson Mandela 134 LTPF 2014 LTPF

11 3. Infrastructure capacity analysis Bay Business Forum to allocate land and infrastructure capacity inside the port for the ship repair industry. The Coega Development Corporation has been identified as an attractive location and major economic opportunities provided by this industry are also aligned with the strategic objectives of the Nelson Mandela Bay region. The National Ports Authority will commence with a project on ship repair facilities at the Port of Ngqura, however, they have not progressed the study further than an FER /FEL 1 level. Oil and gas offshore supply bases Offshore supply operations currently operate in the ports of Saldanha Bay and Mossel Bay. Significant demand exists for offshore supply bases along the South African coastline, with Saldanha Bay IDZ planning a dedicated offshore base for the oil and gas industry. Fishing facilities The commercial fishing industry in South Africa accounts for 0,5% of the GDP, which translates to direct jobs. In South Africa, 90% of the landings occur at Western Cape harbours (Ports of Cape Town and Mossel Bay). Long-term rights have been issued in 22 fishing sectors to rights holders and vessels. There was, however, a decline in fishing volumes from the peaks of the 2008/09 financial year to date (inferred from GDP figures). The Ports of Cape Town, Durban, Mossel Bay and Port Elizabeth have dedicated fishing facilities, with a total area of 18ha. There are currently plans to provide more facilities up to 75ha in the long term. Navy facilities The South African Navy (SAN) currently operates a naval base in Simons Town and naval stations in both the Ports of Durban and Port Elizabeth. The Port of Durban currently has a naval station at Salisbury Island with basic dockyard facilities. The SAN is considering plans to relocate some of its naval fleet to the naval station (which will then require it to be upgraded to a naval base) to deal with the threat of piracy on the east coast of Africa. Transnet has plans to relocate the SAN naval facility from the Salisbury Island to other locations in the port to allow the development of a container terminal at this location. But SAN would require facilities to accommodate the largest ship in her fleet viz. the SAS Drakensberg (length = 147m, beam = 20m, draft = 7,5m, displacement DWT), as well as the more recently acquired naval frigates and submarines. Port Elizabeth harbour has been established as a naval station, but there are currently no ships docked at the harbour. It is not envisaged that the SAN will require additional facilities at the port. Port of Cape Town does not have dedicated naval facilities, but has in the past docked navy vessels from the United States, Pakistan, Indian and Brazilian Navies at the V&A Waterfront basin. There are no plans to provide new facilities for the South African Navy, as the proposed port developments will accommodate these ships, especially the larger United States Navy vessels, should they call in the future. Most of the naval vessels dock at Simon s Town harbour close to Cape Town, which is the SAN s naval headquarters. Port development of Simon s Town harbour is the responsibility of the Department of Public Works Inland transport connectivity From a spatial planning perspective, there is a critical need for the ports to provide efficient rail facilities to allow access to competitive rail transportation, which will support the move from road to rail. Each port has well-developed rail infrastructure providing rail connectivity to the hinterlands and to adjacent regional ports. Rail infrastructure within the port limits is generally owned by the National Ports Authority and operated by Freight Rail. This includes in-port rail lines, yards and terminals. The Sishen-Saldanha heavy haul line terminates at the iron ore export terminal at Saldanha Bay. The Port of Cape Town is linked to Gauteng by the Cape Corridor. This handles a range of general freight cargo and containers. Port Elizabeth and Ngqura are similarly linked to the Gauteng hinterland by the Central Corridor, which also handles a range of general freight and containers. The export of manganese ore from Hotazel in the Northern Cape also uses this corridor, and East London is connected to it at De Aar. The Natal Corridor serves to connect the Port of Durban with Gauteng, and the North Coast line connects Durban to Richards Bay. The Richards Bay Corridor is a heavy haul line used primarily for the export of coal. The port rail corridors meet in Gauteng, where a planned rail ring will allow for a seamless connectivity between corridors, City Deep in Gauteng and other inland terminals, including in future Sentrarand. Over-border rail corridors to Namibia, Botswana, Zimbabwe and Mozambique also connect to the Gauteng rail ring, ensuring that the ports are integrated into a comprehensive regional rail network. The proposed Swazi rail link will increase capacity and provide flexibility for freight moving through both Richards Bay and Maputo. The ports are generally well connected to the national and regional road infrastructure. The N2 links all the ports from Cape Town to Richards Bay along the coastal route. The N1 from Gauteng to Cape Town and the N3 from Gauteng to Durban are the primary port road corridors. Port Elizabeth and Ngqura connect to the N1 via the N10, and East London via the N6. Planning is being undertaken with local, provincial and national road agencies to ensure alignment of port, rail and road planning Port Authority fleet requirements The National Ports Authority s fleet plan consists of an assessment of the current fleet, of seven-year plans and a projection of the 30-year fleet expansion requirements based on future development as laid out in the Port Development Framework Plan strategy. The fleet types under consideration include pilot boats, helicopters for pilot transfers, tugs, work boats, launches, floating cranes and corporate craft. The specifications of each of these vessels are summarised. Additionally, vessels used by dredging services and vessels operated by private operators for vessel mooring operations have been included. The fleet requirements consider the vessels required for port expansions. The fleet requirements are aligned with the National Ports Authority Marine Craft Management Plan Revision 6. Port Authority Fleet Planning The current fleet requirements: 75 marine craft of which 30 craft are harbour tugs and three tugs are operated by private operator. Over the next 30 years, 33 marine craft will be required, because of port expansion. This number includes all the craft requirements for the DDOP. The redeployment of harbour tugs is not considered in this marine fleet assessment. Figure 20: Port Authority fleet planning Pilot boat specifications Type: conventional twin screw Propulsion: 2 x 550kw Length overall: 27m Beam: 8m, draft: 1,8m Helicopter specifications Type: eight seater multi-purpose helicopter Propulsion: 2 x 440kw twin-engine Tug specifications Type: Voith Schneider Propulsion: 2 x 2 640kw Bollard pull: 80 tons Length overall: 31m Beam: 11,5m, draft: 6,2m Fleet planning methodology: Review existing fleet size Review workload of existing marine craft Ensure effective fleet management Craft lifespan to be taken as 35 years Dredger specifications Type: trail suction hopper Propulsion: 2580kw Length overall: 111m Beam: 18m, draft: 8m Workboat specifications Type: twin screw Propulsion: 2 x 522kw Length overall: 17,6m Beam: 6m, draft: 2,8m Launch specifications Type: single screw Propulsion: 1 x 272kw Length overall: 11.1m Beam: 2,9m, draft: 0,8m Determine bollard pull requirements Review propulsion requirements Align with Port Development Framework Align with Marine Craft Management Plan 136 LTPF 2014 LTPF

12 3. Infrastructure capacity analysis Port Authority Fleet Requirements Major Terminal Equipment Figure 21: Port Authority fleet requirements Figure 22: Major terminal equipment Port Type Current fleet Seven-year Expansion (E) Sustaining (S) 30-year Expansion (E) Sustaining (S) Port Type Current Fleet Seven-year Expansion (E) Sustaining (S) 30-year Expansion (E) Sustaining (S) Ship-to-shore Rubber tyred gantry Rail mounted gantry Saldanha Bay Tugs Pilot boat/workboat Launches (S) 1 (S) 1 (S) 2 (E) 1 (S) Durban dig-out Tugs Pilot boats Helicopters 5 (E) 2 (E) 1 (E) Cape Town Mossel Bay Port Elizabeth Ngqura East London Tugs Pilot boats Floating cranes Launches Workboats Launches Workboats Offshore tug (private) Tugs Pilot boats Launches Workboats Tugs Pilot boats Tugs Workboats (E) + 2(S) 2(S) 4 (S) 2 (S) 2 (S) 1 (S) 2 (S) 4 (E) + 2(S) 1(S) 1 (S) 1 (S) 1 (S) 2 (E) 1 (S) 3 (E) 1 (E) + 1 (S) 1 (S) Durban Richards Bay Dredging services Tugs Pilot boats Helicopters Floating cranes Corporate launch Workboats Launches Offshore tug (private) Tugs Pilot Boats Helicopters Workboat Suction dredgers Grab dredgers Launches (E) + 6 (S) 1 (S) 2 (S) 2(E) + 2 (S) 1 (S) 8 (E) + 4 (S) 1 (S) 1 (S) 1 (S) 1 (S) 1 (S) 2 (S) 1(E) + 1 (S) 1 (S) 1 (S) 1 (S) 1 (S) 4 (S) Bulk ship loader Break-bulk handling Straddle carrier Type Current fleet Seven-year Expansion (E) Sustaining (S) 30-year Expansion (E) Sustaining (S) Summary Stacker reclaimer Total Tugs Pilot Boats/workboats Helicopters Floating cranes Launches Dredgers Offshore tug (private) (E) + 18 (S) 8 (S) 7 (S) 25 (E) + 7 (S) 3 (E) + 8 (S) 1 (E) + 2 (S) 2 (S) 8 (S) 2 (S) 1 (S) 75 4 (E) + 33 (S) 29 (E) + 30 (S) Current fleet: 75 craft Sustaining: 63 craft Expansionary: 33 craft Fleet in 30 years: 108 craft 3.13 Terminal equipment overview Transnet Port Terminals operates 19 terminals across seven of Transnet s nine ports. These are in four major freight handling sectors: containers, dry bulk, break-bulk and automotive terminals. The terminals require various types of cargo handling equipment, from large ship-to-shore cranes, bulk ship loaders and stacker reclaimers, to medium sized rubbertyred gantries, rail mounted gantries, harbour cranes, mobile cranes and straddle carriers, to smaller forklifts, truck and trailers and reach stackers. Port Terminals strategic initiatives include: optimised capital spend to improve productivity and efficiency, growing revenue through new business opportunities, and the creation of capacity ahead of demand. To this end, significant equipment is required over the next 30 years, for sustaining and expansionary purposes, as described below. 138 LTPF 2014 LTPF

13 3. Infrastructure capacity analysis TPT Equipment Required over 30 Years, by Type Vessel Sizes and current Port Capabilities Figure 23: Terminal equipment required over 30 years Figure 24: Vessel sizes and current port capabilities Equipment 0-7 years 8-20 years years Units Vessel Side view Dimensions (LOA x beam x draft) SB CT PE Ng EL Dig - out Dbn RB Ship-to-shore cranes Rubber tyred gantries Container: Feeder TEU 210m x 30m x 11,0m ü ü ü ü ü ü ü Rail mounted gantries Straddle carriers Container: Panamax TEU 240m x 32m x 12,0m ü ü ü ü ü Mobile harbour cranes Bulk cranes Container: Post Panamax TEU 305m x 40m x 14,0m ü ü ü ü Reach stackers Haulers Trailers Container: Ultra large TEU 400m x 59m x 15,5m ü ü Number of Number of Dry bulk: Handysize t Dry bulk: Panamax t 177m x 28m x 10,0m ü ü ü ü ü ü ü 225m x 32m x 13,0m ü ü ü ü Dry bulk: Cape size t 289m x 45m x 18,0m ü Liquid bulk: Handymax t 183m x 32m x 11,0m ü ü ü ü ü ü ü ü Liquid bulk: Suezmax t 300m x 43m x 16,5m ü ü 3.14 Vessel sizes and port capabilities The current and future vessel sizes are derived from an analysis of global current and future vessel trends. The vessel types include container vessels, dry bulk and liquid bulk vessels. These vessel types reflect the major contributions to GDP in terms of cargo freight in the South African port system. Vessel sizes and port capabilities current and medium term: The maximum design vessels for container, dry bulk and liquid bulk vessels typically visiting South African ports are summarised for the current and medium term. This summary provides the critical dimensions of the vessels, and indicates the ports that are currently able to accommodate each vessel and which are subject to port expansion projects in the medium term. The criteria for assessing the suitability of a vessel depends on the physical constraints of the navigational channels and berth depths as well as the capabilities of the port in terms of material handling equipment. While some ports will accommodate larger vessel sizes in a partly laden condition, the criteria for physical constraints only consider the maximum vessel in a fully laden condition. The maximum container vessel, the ultra large container ship, can only be accommodated in the Port of Ngqura and can be accommodated in the proposed DDOP at the old Durban airport site. The largest dry bulk carrier, the Cape Size bulk carrier, can only be accommodated in the ports of Richards Bay and Saldanha Bay. The maximum liquid bulk carrier, the Suezmax tanker, can only be accommodated in the Port of Saldanha Bay and in the future in the proposed DDOP. The material handling equipment for the proposed DDOP has been assumed to meet the requirements of the maximum design vessels. The maximum design vessel at the Durban SBM is a very large crude carrier or VLCC. Typically, a VLCC has a capacity of t and is approximately 330m in length with a draft of 22m. The below figure summarises the current vessel calls at South Africa s eight commercial ports. Durban records the highest vessel calls at vessels per year, Cape Town receives vessels per year, while Richards Bay receives vessels per year. 140 LTPF 2014 LTPF

14 3. Infrastructure capacity analysis Typical Vessel Call Distributions, by Port Figure 25: Typical vessel call distribution Call distributions by port Vessel calls per year Richards Bay Durban East London Ngqura Port Elizabeth Mossel Bay Cape Town Saldanha Bay 4. Individual port development plans Saldanha Bay Role of Port 4.1 Port of Saldanha Bay Figure 26: Aerial view of the Port of Saldanha Bay Call distributions by port and vessel size Vessel calls per year 4,000 3,500 3,000 2,500 2,000 1,500 1, Small Size (120m) Handysize (160m) Handymax (180m) Panamax (230m) Post Panamax ( m) Cape Size or Super Post Panamax ( m) Very Large Bulk/Crude or Ultra Large Container Ship ( m) Richards Bay Durban East London Ngqura Port Elizabeth Mossel Bay Cape Town Saldanha Bay Role of the port The Port of Saldanha Bay is South Africa s deepest draft port and handles around 65 million tons of cargo per year, with the 30-year forecast predicting around 124 million tons of cargo per year. The iron ore export jetty provides berthing for two very large bulk carriers (VLBCs), as well as one liquid bulk berth for VLCCs for the import of crude oil. The port has iron ore stockpiles on reclaimed land, a multi-purpose terminal with four berths, and ship repair facilities for offshore rig servicing and fabrication. The port was initially conceived as an iron ore export facility in order to exploit the discovery of high-grade ore at Sishen in the Northern Cape, 860km to the north east of Saldanha Bay. The first shipment was loaded in 1976 and current levels of export are in the region of 54 million tons per year, which are carried by some 300 vessels per year to North and South America, Europe, Asia and the Middle East. The port also imports around 4,8 million kilolitres of crude a year, transported by around 30 vessels. The short-term port expansion will require extensive land acquisition and limited reclamation in the short and medium term. The port is focused on increasing its capacity for iron ore exports, with two additional berths and an increased stockpile area in the medium term. The port has the potential to expand its waterside and landside infrastructure to support the proposed industrial development zone. The proposed first phase of the IDZ includes facilities for the oil and gas industry, in the form of cargo handling and repair facilities. The Port of Saldanha Bay occupies an area of considerable ecological diversity and is surrounded by a complex socio-economic environment, which requires careful management of activities and careful planning of future infrastructure development. Metro context The Port of Saldanha Bay is on the eastern side of the bay, while the port s 4km causeway and trestle extends across the majority of the natural bay. The main port is currently surrounded by restricted development and industrial land use areas. The tug harbour (small craft harbour) is located on the western side of the bay, and is adjacent to the military base. In the long term, the proposed IDZ sees the development of a large area north of the port, adjacent to the existing Transnet land currently used for iron ore trains. Also in the long term, residential land on the way to Vredenburg, to the north east of the port and adjacent to the IDZ, has been earmarked. 142 LTPF 2014 LTPF

15 Saldanha Bay Metro Context Current Layout Saldanha Bay Status Quo Figure 27: Saldanha Bay metro context Figure 28: Saldanha Bay status quo port layout VREDENBURG SALDANHA IDZ BLUE WATER BAY DIAZVILLE MILITARY SALDANHA SALDANHA HARBOUR CLUB MYKONOS Status quo and vessel distribution Saldanha Bay has seven berths equating to 2 637m of berth length. Two berths make up the iron ore terminal, which has a current capacity of 60 million tons per year. The liquid bulk terminal is the second largest in the port, with one berth and a current capacity of 25 million kilolitres per year. The other terminals include a four berth multi-purpose terminal (3,3mtpa capacity), a general maintenance quay and the Mossgas ship repair facility. The average number of vessel calls for a typical calendar year is a total 500 vessels (or 1,5 vessels per day). The largest number of calls was approximately 300 vessels in the cape size range, with the majority being for iron ore export. 144 LTPF 2014 LTPF

16 Saldanha Bay Demand Forecast Demand The 30-year demand forecast for Saldanha Bay is summarised in the figure below: Figure 29: Saldanha Bay demand forecast Cargo type Break-bulk (t) Annual growth 3,06% 3,12% 3,12% 3,12% 3,12% 3,12% 3,12% 3,12% 3,13% 3,14% Dry bulk (t) Annual growth 7,64% 5,29% 7,09% 4,28% 4,43% -17,94% 2,60% 2,65% 2,48% 2,54% Export iron ore (t) Annual growth 7,20% 3,15% 0,00% 0,00% 6,09% 10,23% 0,00% 0,00% 2,50% 2,50% Export mangan. (T) Annual growth 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% Liquid bulk (kl) Annual growth 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% Million Million tonnes tons Million ton equivalent Saldanha Bay Demand Versus Capacity Demand versus capacity The demand versus capacity planning is summarised in the figure below: Figure 30: Saldanha Bay demand versus capacity Capacity (tons) Demand (tons) Capacity (tons) Demand (tons) Break-bulk Bulk Dry Bulk bulk Export Iron iron Ore ore Export Manganese manganese Liquid Bulk bulk Saldanha Bay Previous year Seven-year forecast 30-year forecast Saldanha Bay s freight volumes are dominated by the iron ore export volumes through the iron ore terminal. The forecasts for iron ore export show growth from current volumes of 54mtpa to more than 115mtpa over a 30-year period. Liquid bulk demand remains at a steady 4,8mtpa throughout the 30-year forecast. The growth forecast for break-bulk and dry bulk cargo over the next 30 years is stable and relatively low (2% to 3%). No container or vehicle volume demands are forecast in the 30-year planning period. The iron ore terminal s current capacity of 60mtpa is forecast to increase in increments to a total of 82,5mtpa by 2021 with the third berth installed. By 2033, the demand forecast requires a new expansionary project to come online, being an additional fourth berth. The current four berth multi-purpose terminal has a capacity of 3,3mtpa capacity, which will be insufficient in the short term to meet the anticipated demand of shortterm manganese exports (1,5mtpa for nine years). If the export manganese demand does materialise, additional operational systems will need to be implemented to increase the throughput capacity of the existing four berths. 146 LTPF 2014 LTPF

17 Current port layout The port is characterised by the iron ore export causeway/jetty, which projects some 4km into the bay, dividing the bay into Small Bay (Saldanha side) and Big Bay (Langebaan side). There are two iron ore dry bulk berths and a liquid bulk berth on the jetty, capable of handling vessels in excess of cape size. The iron ore stockpile is located at the root of the causeway on reclaimed land. An existing MPT terminal Saldanha Bay Current Layout on the Small Bay side of the jetty has four berths. Berth depths at the MPT range from -13 to -15m CD, and the jetty oil and bulk berths are at -23m CD. The Mossgas ship repair facility is 22ha in size and is located on the Saldanha side of the port. The Admin Craft Basin is on the town side of the bay, adjacent to the fishing harbour and naval base. Short-term port layout Short-term plans for the port include strategic land acquisitions to ensure improvements to the port access corridor, and to make sure that the future growth of the port is not restricted on the landside. The current Ore Line Expansion Project is planning expanded export capacity on the corridor and through the port to increase iron ore export capacity. In the short term this will require additional iron ore stockpiles (increased 22ha) and an Saldanha Bay Short Term Layout additional dry bulk berth along the jetty, with associated rail capacity expansions. In addition to the existing liquid bulk berth situated at the end of the jetty, a LPG multi-buoy mooring (MBM) facility and pipeline will be constructed in Big Bay. An oil and gas repair development is adding berthing to the Mossgas facility to provide capacity for oil and gas activities. Figure 31: Saldanha Bay current layout Figure 32: Saldanha Bay short-term layout 148 LTPF 2014 LTPF

18 Medium-term port layout Medium-term plans for the port include the addition of a major energy cluster to the east of the port in association with the adjacent IDZ, which will initially require extensive landside storage infrastructure, and the construction of a new liquid bulk basin with outer breakwater on the Big Bay side of the jetty, with potential bunker and liquid bulk berths if demand requires. The MBM facility has the opportunity to be relocated to this new energy precinct/basin. Saldanha Bay Medium Term Layout Importing LNG is being considered across the national ports system and is included in Saldanha Bay s mediumterm plan. One of several options under consideration is a liquified natural gas (LNG) single point mooring (SPM) buoy on the Big Bay side of the jetty. The dry bulk terminal capacity will be extended, increasing by a further 26ha and with an additional berth, bringing the total number of dry bulk berths to four. Long-term potential port layout The long-term plan for Saldanha is mainly concentrated around the further development of the liquid bulk terminal capacity. The total number of liquid bulk berths has the potential to increase to six within the energy precinct/basin, and to two berths along the main jetty. Saldanha Bay Long Term Layout Depending on whether new cargo is identified, there are plans to extend the Multi-Purpose Terminal, and provision has been made for the development of a new three berth terminal should demand justify it. Figure 33: Saldanha Bay medium-term layout Figure 34: Saldanha Bay long-term potential layout Landside and waterside infrastructure capacity There is currently 536ha of land within the port limits, increasing to 776ha in the medium term. Currently, 73ha is occupied by dry bulk operations, 20ha by break-bulk, and 22ha by the ship repair activities. A large proportion of port land is undeveloped, and is zoned as open space or for other National Ports Authority usage. This comprises 426ha of the total and provides a basis for future port expansions and terminal development. The total waterside capacity is currently 2 494m of berth length (1 620m at >16m CD), increasing to 7 810m in the medium term (5 480m at >16m CD). Inland transport capacity The port is linked to the interior by the Sishen-Saldanha rail corridor, which provides access to the Northern Cape iron ore mines. There is a rail line to Cape Town, Cape Corridor and the Gauteng hinterland. The N7 provides access to the national road network, and liquid fuel pipelines connect the port to the off-site Strategic Fuel Fund (SFF) storage facilities and to the Cape Town refinery. 150 LTPF 2014 LTPF

19 Cape Town Role of Port Cape Town Metro Context Current Layout 4.2 Port of Cape Town Figure 35: Aerial view of the Port of Cape Town Figure 36: Cape Town metro context CENTURY CITY EDGEMEAD BELLVILLE SEA POINT YSTERPLAAT KENSINGTON CAPE TOWN PINELANDS LANGA EPPING INDUSTRIA BONTEHEUWEL BELHAR Role of the port Cape Town is an established port in the western region, providing container, bulk and general cargo handling services to the Western Cape and its largely agricultural hinterland. The port handles around 12 million tons of cargo per year, with the 30 year forecast predicting around 26 million tons of cargo per year. The port provides much-needed ship repair services in the Western Cape region, and hosts local and foreign fishing fleets, oil rigs, cruise liners and recreational users. The much older basins of the port were developed into the Victoria and Alfred Waterfront and now fall outside of port limits, complementing the commercial port by providing berthing for smaller recreation and fishing vessels. The port is currently expanding the container terminal to handle larger vessels and increase throughput capacity. Short-term plans include a dedicated one berth passenger terminal and the development of 160ha of the Culemborg site for back-of-port commercial logistics. Medium-term plans include expanding the container stacking seaward and in the long-term plans include building an outer basin for an additional four berth container terminal, and five additional liquid bulk berths. It is anticipated that the Port of Cape Town will continue in its existing role as primary container and general cargo port for the Western Cape region, with the Port of Saldanha Bay playing a complementary role as the region s primary dry and liquid bulk port. Metro context The Port of Cape Town, seen in its metro context, is bordered by the city s commercial centre, Table Mountain to the south-west and the industrial area of Paarden Eiland to the east. Significant tracts of Transnet land are located to the south of the port s current boundary, offering potential synergy for back-of-port commercial or transport logistics. For the most part, the surrounding city land is zoned residential, with pockets of isolated industrial zones. TABLE MOUNTAIN NEWLANDS RONDEBOSCH ATHLONE M17 MANENBERG GUGULETHU CAPE TOWN INTERNATIONAL AIRPORT Status quo and vessel distribution Cape Town has 17 berths providing 3 851m of berth length. Four berths make up the container terminal, which has a current capacity of TEUs per year. The break-bulk terminal is the largest in the port, with seven berths and a current capacity of 10,8mtpa, followed by liquid bulk with two berths and a current capacity of 3,4mtpa. The other terminals include dry bulk and a ship repair facility. Figure 37: Cape Town status quo port layout Cape Town Status Quo 152 LTPF 2014 LTPF

20 The average number of vessel calls for a typical calendar year is approximately vessels (or seven per day). The largest number of calls was vessels in the small to handysize range, of which the majority were either fishing vessels or ships visiting for bunkering. The container terminal typically receives approximately 750 vessels, with the majority being post to super post panamax. Cape Town Demand Forecast Demand The 30-year demand forecast for Cape Town is summarised in the figure below: Figure 38: Cape Town demand forecast Cape Town Demand Versus Capacity Demand versus capacity The demand versus capacity planning is summarised in the figure below: Figure 39: Cape Town demand versus capacity Cargo type Automotive (unit) Annual growth (8,48)% (10,66)% (10,42)% (5,10)% (4,45)% (12,44)% (12,44)% (12,43)% (3,16)% (3,10)% Break-bulk (t) Annual growth (4,20)% (4,88)% 5,04% (6,11)% (4,12)% (2,08)% (1,20)% (0,15)% (3,15)% (1,91)% Container (TEU) Annual growth 2,98% 3,52% 3,66% 3,68% 3,46% 3,17% 3,18% 3,19% 3,32% 3,37% Dry bulk (t) Annual growth 1,07% 0,97% 0,93% 1,22% 1,19% 1,58% 1,88% 2,13% 2,08% 2,25% Liquid bulk (kl) Annual growth 8,86% 4,12% -57,02% 6,65% 1,15% 6,24% 6,05% 5,58% 4,81% 4,68% Million Million tonnes tons Million ton equivalent Automotive Break-bulk Bulk Container Dry Bulk bulk Liquid Bulk bulk Previous Year Cape Town Seven-year forecast 30-year forecast Container volumes are forecast to grow from 0,9 million TEUs in 2014 to 1,0 million TEUs by 2020, and to approximately 2,3 million TEUs by Dry bulk volumes are forecast to grow at a low rate from 0,7mtpa to 1,2mtpa over the 30-year period. Break-bulk volumes decrease over the 30-year forecast period, decreasing at a slightly greater rate over the initial seven-year period (0,28mtpa) and then decreasing only slightly after that to 0,17mtpa by Current liquid bulk volumes of 3,4 million kilolitres, mainly of petrochemical products, increase to 5,6 million kilolitres at the end of 30 years. Capacity (tons) Demand (tons) The container terminal s current capacity of TEUs is planned to be increased in increments up to a total 1,4 million TEUs by 2019, to meet forecasted demand. By 2026, capacity is to be further increased to 1,9 million TEUs with the seaward expansion project, which will be sufficient until 2037, when a new tranche of capacity will be required. Demand (tons) The current dry bulk (2,1mtpa) and break-bulk (10,8mtpa) terminals have sufficient capacity for the 30-year planning period. The liquid bulk terminal has a current capacity of 3,4 million kilolitres, which will be sufficient until 2030, where after an additional berth will be required to meet demand. 154 LTPF 2014 LTPF

GOVERNMENT OF PAKISTAN MINISTRY OF PORTS AND SHIPPING

GOVERNMENT OF PAKISTAN MINISTRY OF PORTS AND SHIPPING GOVERNMENT OF PAKISTAN MINISTRY OF PORTS AND SHIPPING Mission Statement As more than 95 per cent of the total freight trade of Pakistan is seaborne, the overall objective of the Ministry of Ports and Shipping

More information

Freight and energy demand forecast

Freight and energy demand forecast Freight and energy demand forecast 2 Table of Contents List of Tables and/or Figures List of Tables and/or Figures 21 Acronyms and Abbreviations 22 1. Introduction 23 2. Demand Planning Tools 24 3. Drivers

More information

TANZANIA HARBOURS AUTHORITY PO Box 9184 DAR-ES-SALAAM TANZANIA

TANZANIA HARBOURS AUTHORITY PO Box 9184 DAR-ES-SALAAM TANZANIA TANZANIA HARBOURS AUTHORITY PO Box 9184 DAR-ES-SALAAM TANZANIA Phone: +255 22 211 0401 Fax: +255 22 211 3938 E-mail: dg@tanzaniaports.com Website: www.tanzaniaports.com The Tanzania Harbours Authority

More information

SA port terminals: capacity and utilisation review 2014/15

SA port terminals: capacity and utilisation review 2014/15 SA port terminals: and utilisation review 2014/15 1. INTRODUCTION... 1 2. TOWARDS MEASURING PORT CAPACITY AND UTILISATION... 2 3. PURPOSE OF THE REVIEW... 8 4. CAPACITY OF SOUTH AFRICAN PORT TERMINALS...

More information

PRESENTATION ON THE PORT OF RICHARDS BAY Mr Brian Molefe Group Chief Executive 07 December 2011 PAGE

PRESENTATION ON THE PORT OF RICHARDS BAY Mr Brian Molefe Group Chief Executive 07 December 2011 PAGE PRESENTATION ON THE PORT OF RICHARDS BAY Mr Brian Molefe Group Chief Executive 07 December 2011 PAGE 1 TABLE OF CONTENTS OVERVIEW FUTURE GROWTH PLANS PORT DEVELOPMENT FRAMEWORK LAND USE STRATEGY LOTHAIR

More information

Pipeline development. Foreword

Pipeline development. Foreword Foreword 05 Pipeline development plan Pipeline networks form the infrastructure backbone for transporting large volumes of liquid petroleum and gas. The networks play a strategic role in the logistical

More information

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA BACKGROUND INFORMATION DOCUMENT 1 BACKGROUND Transnet Limited s (Transnet) existing

More information

SINGAPORE. A PREMIER GLOBAL HUB PORT THE WORLD S BUSIEST PORT

SINGAPORE. A PREMIER GLOBAL HUB PORT THE WORLD S BUSIEST PORT SINGAPORE. A PREMIER GLOBAL HUB PORT THE WORLD S BUSIEST PORT 01 THE WORLD S BUSIEST PORT THE WORLD S BUSIEST PORT Every two to three minutes, a ship arrives at or departs from the Singapore port. Every

More information

REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO

REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO Advantages of Port Lobito (1) Predominant geological locations Facing the Atlantic, Port Lobito locates around 30km north to Beguela City, and it

More information

How South Africa can Create Opportunities for Emerging Manufacturing Companies to Develop the Maritime Industry?

How South Africa can Create Opportunities for Emerging Manufacturing Companies to Develop the Maritime Industry? How South Africa can Create Opportunities for Emerging Manufacturing Companies to Develop the Maritime Industry? Tau Morwe CE Transnet Port Terminals The KwaZulu Natal Business Summit 27 November 2008

More information

Inland intermodal terminals and freight logistics hubs

Inland intermodal terminals and freight logistics hubs Inland intermodal terminals and freight logistics hubs INTRODUCTION Transport planning and land use management are intricately engaged in the spatial design of nodes and links from origin to destination

More information

Why infrastructure is so important

Why infrastructure is so important Maersk in Brazil Brazil is a key growth market for Maersk. We share a common interest with Brazil in promoting economic development, national competitiveness and prosperity for Brazil s population. Since

More information

WATERWAYS in Finland

WATERWAYS in Finland WATERWAYS in Finland The efficient and economical running of Finland s vital international transport demands a comprehensive and safe network of fairways. The mission of the Finnish Maritime Administration

More information

PORTS OF. sh i p to no r way

PORTS OF. sh i p to no r way PORTS OF NORWAY sh i p to no r way Annually between 12 and 14 million tonnes of cargo is imported and exported by truck to and from Norway. Norwegian ports work closely with authorities and shipping companies

More information

DECONSTRUCTING CONTAINER FORECASTING: COMMODITY-BASED SUPPLY CHAIN ANALYSIS FOR SOUTH AFRICA

DECONSTRUCTING CONTAINER FORECASTING: COMMODITY-BASED SUPPLY CHAIN ANALYSIS FOR SOUTH AFRICA DECONSTRUCTING CONTAINER FORECASTING: COMMODITY-BASED SUPPLY CHAIN ANALYSIS FOR SOUTH AFRICA Jan H. Havenga, Anneke de Bod and Zane P. Simpson (Stellenbosch University) Introduction The demand for intermodal

More information

Impact of Larger Vessel Size on Port Infrastructure Costs

Impact of Larger Vessel Size on Port Infrastructure Costs Balancing and Calculating ROI and Risk against Cost of Technical Developments Diego Quiroga, Associate Ports & Marine, AECOM Port Finance International - Casablanca 16-17 September 2015 Outline Introduction

More information

FREMANTLE PORTS. A Guide to Our Business

FREMANTLE PORTS. A Guide to Our Business FREMANTLE PORTS A Guide to Our Business Our Vision, Mission and Values VISION To be valued by our customers and the community for our leadership and excellence. MISSION To facilitate trade in a sustainable

More information

Port of Beira. 22/06/12, Pretoria. Félix Machado Sales & Marketing Manager

Port of Beira. 22/06/12, Pretoria. Félix Machado Sales & Marketing Manager Cornelder de Moçambique Port of Beira 22/06/12, Pretoria Félix Machado Sales & Marketing Manager Why Choose the Beira Corridor? Reason 1: Location & Costs Reason 1: Location & Costs Beira Corridor Reason

More information

South African Maritime Safety Authority

South African Maritime Safety Authority South African Maritime Safety Authority Marine Notice No. 12 of 2008 The Merchant Shipping (Maritime Security) Regulations, 2004 TO MASTERS AND OPERATORS OF INTERNATIONALLY TRADING SHIPS BOUND FOR SOUTH

More information

THE LIVORNO PLATFORM

THE LIVORNO PLATFORM THE LIVORNO PLATFORM Operational capabilities of the Livorno transport and logistics platform the infrastructures and services, intangible assets, the main development projects The Port of Livorno Livorno

More information

The Dynamics of the US Container Market and Shifting Trade Patterns Implications for East Coast and Gulf Coast Ports March 15, 2012

The Dynamics of the US Container Market and Shifting Trade Patterns Implications for East Coast and Gulf Coast Ports March 15, 2012 The Dynamics of the US Container Market and Shifting Trade Patterns Implications for East Coast and Gulf Coast Ports March 15, 2012 Jeff Sweeney Martin Associates 941 Wheatland Avenue, Suite 203 Lancaster,

More information

SEA Europe input on future EU-US Transatlantic Trade and Investment Partnership

SEA Europe input on future EU-US Transatlantic Trade and Investment Partnership SEA Europe input on future EU-US Transatlantic Trade and Investment Partnership SEA Europe is the Association for Ships and Maritime Equipment. Originating from the fusion of EMEC, the European Marine

More information

TRANSNET SOC LTD AND TRANSNET PORT TERMINALS - Visit by delegation from H E Mr. André Kimbuta, Governor of Kinshasa, DRC and his delegation

TRANSNET SOC LTD AND TRANSNET PORT TERMINALS - Visit by delegation from H E Mr. André Kimbuta, Governor of Kinshasa, DRC and his delegation TRANSNET SOC LTD AND TRANSNET PORT TERMINALS - Visit by delegation from H E Mr. André Kimbuta, Governor of Kinshasa, DRC and his delegation 6 August 2013 TABLE OF CONTENTS TRANSNET SOC LTD TRANSNET DIVISIONS

More information

A SOLUTION FOR THE NEW YORK HARBOR TODAY. A LEADER FOR THE SHIPPING WORLD TOMORROW.

A SOLUTION FOR THE NEW YORK HARBOR TODAY. A LEADER FOR THE SHIPPING WORLD TOMORROW. NYCT EXPANSION Last years record cargo volume was impressive under any circumstances. "It's kind of like having the family over for a big dinner and you've just started renovation of your kitchen," says

More information

SOUTH EAST EUROPE TRANSNATIONAL CO-OPERATION PROGRAMME. Terms of reference

SOUTH EAST EUROPE TRANSNATIONAL CO-OPERATION PROGRAMME. Terms of reference SOUTH EAST EUROPE TRANSNATIONAL CO-OPERATION PROGRAMME 3 rd Call for Proposals Terms of reference Efficient access to a SEE coordinated multimodal freight network between ports and landlocked countries

More information

APPENDIX 1 THE UK NEED FOR DEEPSEA CONTAINER HANDLING

APPENDIX 1 THE UK NEED FOR DEEPSEA CONTAINER HANDLING APPENDIX 1 THE UK NEED FOR DEEPSEA CONTAINER HANDLING THE UK NEED FOR DEEPSEA CONTAINER HANDLING The proposed Bathside Bay container port will meet a requirement for modern, efficient deepwater container

More information

1-Stop s Vehicle Booking System drives improvements for Ports of Auckland

1-Stop s Vehicle Booking System drives improvements for Ports of Auckland 1-Stop s Vehicle Booking System drives improvements for Ports of Auckland Customer Profile Company: Country: Industry: Ports of Auckland New Zealand Logistics Employees: 419 Website: www.poal.co.nz 1-Stop

More information

Maritime Trade and Transportation by the Numbers

Maritime Trade and Transportation by the Numbers By Matthew Chambers and Mindy Liu The nation will observe Maritime Day on May 22, which was designated by Congress in 1933 to honor U.S. merchant mariners and the maritime industry. 1 Water transportation

More information

2016 MAY. The brochure.

2016 MAY. The brochure. 2016 MAY The brochure. Local expertise worldwide coverage. THE PREFERRED WORLDWIDE SHIPPING AGENT. Next Maritime is the leading fully integrated Worldwide Shipping Agent. Our business is the Shipping Agency

More information

SIMPLIFYING LOGISTICS: THE BENEFITS OF RAIL IN A MULTIMODAL SHIPPING SYSTEM

SIMPLIFYING LOGISTICS: THE BENEFITS OF RAIL IN A MULTIMODAL SHIPPING SYSTEM SIMPLIFYING LOGISTICS: THE BENEFITS OF RAIL IN A MULTIMODAL SHIPPING SYSTEM A well-designed shipping plan has bottom-line implications for any business. Creating a sound logistics strategy supported by

More information

BACKGROUND INFORMATION DOCUMENT

BACKGROUND INFORMATION DOCUMENT BACKGROUND INFORMATION DOCUMENT BASIC ENVIRONMENTAL ASSESSMENT UPGRADING OF THE TRANSNET CITY DEEP CONTAINER TERMINAL, JOHANNESBURG SEPTEMBER 2008 INTRODUCTION Transnet Freight Rail would like to upgrade

More information

Customer Conference Improving Operational Efficiency in the Port System

Customer Conference Improving Operational Efficiency in the Port System Customer Conference Improving Operational Efficiency in the Port System -30 September 2013 Agenda Driving efficiencies in the Port System 3 Tiers Strategy Operations framework Port Logistics chain Embedding

More information

Mercator Limited. Driven by growth Sustained by values

Mercator Limited. Driven by growth Sustained by values Mercator Limited Group Driven by growth Sustained by values 1 Mercator at a Glance History Incorporated in 1983. Listed on both NSE and BSE Capacity Expansion by more than 1200% since 31 st March 2003

More information

The Carbon Footprint of Global Trade

The Carbon Footprint of Global Trade The Carbon Footprint of Global Trade Tackling Emissions from International Freight Transport 1 International Transport Forum: Global dialogue for better transport Growing concern Projected increase of

More information

Development of Shanghai Integrated Transport (2010-2015) XIAO Hui and GU Yu

Development of Shanghai Integrated Transport (2010-2015) XIAO Hui and GU Yu Development of Shanghai Integrated Transport (2010-2015) XIAO Hui and GU Yu Abstract This article summarises the general situation of Shanghai s integrated transport system and then determines the trends

More information

Recent evolutions in the tank storage sector in the Port of Antwerp. Rose-Marie Pype March 19th, 2013

Recent evolutions in the tank storage sector in the Port of Antwerp. Rose-Marie Pype March 19th, 2013 Recent evolutions in the tank storage sector in the Port of Antwerp Rose-Marie Pype March 19th, 2013 The Port of Antwerp The Antwerp Tank Storage Scene Sustainable growing Conclusion Location Organisation

More information

MAJOR CHANGES IN GLOBAL SHIPPING, MEETING THE DEMAND, IMPLICATIONS FOR PORT OPERATORS. Bernard MAZUEL, Délégué Général UNION DES PORTS DE FRANCE

MAJOR CHANGES IN GLOBAL SHIPPING, MEETING THE DEMAND, IMPLICATIONS FOR PORT OPERATORS. Bernard MAZUEL, Délégué Général UNION DES PORTS DE FRANCE MAJOR CHANGES IN GLOBAL SHIPPING, MEETING THE DEMAND, IMPLICATIONS FOR PORT OPERATORS Bernard MAZUEL, Délégué Général UNION DES PORTS DE FRANCE Papeete, October 19th, 2015 UNION DES PORTS DE FRANCE - FRENCH

More information

Table 5 Core Port and Transport Logistic Measures: Definitions, priorities, and sources of data

Table 5 Core Port and Transport Logistic Measures: Definitions, priorities, and sources of data Table 5 Core Port and Transport Logistic Measures: Definitions, priorities, and sources of data (Work in progress, latest revision 24 February, 2004 - PeteR)) Core Measure Unit Priority Definition of Term

More information

Making Rail the Smart Solution. Commercial Capacity Community. capability statement

Making Rail the Smart Solution. Commercial Capacity Community. capability statement Making Rail the Smart Solution Commercial Capacity Community capability statement Making Rail the Smart Solution OUR COMMITMENT To deliver a reliable, economical and efficient freight service. To provide

More information

Ownership and Management of Port Administration

Ownership and Management of Port Administration Ownership and Management of Port Administration Yi-Chih Yang Associate Professor, Department of Shipping and Transportation Management, National Kaoshiung Marine University 1.Port management objectives

More information

Multi-Modal Logistics Hub (MMLH) in Yanbu

Multi-Modal Logistics Hub (MMLH) in Yanbu Multi-Modal Logistics Hub (MMLH) in Yanbu 2nd RCYCI Forum program 5 January 2016 Agenda Multi-Modal Logistics Hub (MMLH) study outcome in 2014 Education and employment requirements in MMLH Current status

More information

Crowley LNG. Puget Sound Harbor Safety Committee June 3 rd, 2015. Matthew Sievert Director Business Development LNG

Crowley LNG. Puget Sound Harbor Safety Committee June 3 rd, 2015. Matthew Sievert Director Business Development LNG Crowley LNG Puget Sound Harbor Safety Committee June 3 rd, 2015 Matthew Sievert Director Business Development LNG Company Profile Crowley was founded in 1892. Largest US Jones Act Co. Focusing on Marine

More information

Infrastructure & Growth Leadership Pillar Strategy Statements from Existing Plans Developing Florida s Strategic 5-Year Direction, 29 November 2011

Infrastructure & Growth Leadership Pillar Strategy Statements from Existing Plans Developing Florida s Strategic 5-Year Direction, 29 November 2011 Infrastructure & Growth Leadership Pillar Strategy Statements from Existing Plans Developing Florida s Strategic 5-Year Direction, 29 November 2011 Key Themes Global trade infrastructure seaports, airports,

More information

Pocket Guide to South Africa 2011/12 TRANSPORT

Pocket Guide to South Africa 2011/12 TRANSPORT 95 Pocket Guide to South Africa 2011/12 Transport and its related services is a catalyst for economic growth, and direct and indirect job creation in South Africa. The provision of affordable, safe and

More information

Shipping, World Trade and the Reduction of

Shipping, World Trade and the Reduction of Shipping, World Trade and the Reduction of United Nations Framework Convention on Climate Change International Maritime Organization Marine Environment Protection Committee International Chamber of Shipping

More information

Plymouth Local Development Framework (LDF) Core Strategy Review and relevant Area Action Plans (AAPs);

Plymouth Local Development Framework (LDF) Core Strategy Review and relevant Area Action Plans (AAPs); Executive Summary Introduction Atkins Ltd was commissioned in November 2009 by Plymouth City Council (PCC) and its partners Devon County Council and Cattewater Harbour Commission, with support from the

More information

HAMBURGER HAFEN UND LOGISTIK AG

HAMBURGER HAFEN UND LOGISTIK AG HAMBURGER HAFEN UND LOGISTIK AG ANALYST CONFERENCE ON 2013 FINANCIAL YEAR RESULTS Hamburg, 27 March 2014 Hamburger Hafen und Logistik AG Agenda Chairman of the Executive Board Annual Financial Statements

More information

PORT of TAMPA. Presentation to: Tampa Bay Applications Group May 2, 2013

PORT of TAMPA. Presentation to: Tampa Bay Applications Group May 2, 2013 PORT of TAMPA Presentation to: Tampa Bay Applications Group May 2, 2013 Port of Tampa Preparing for Growth in Trade & Logistics The Port of Tampa Largest, most diversified port in Florida $8 billion in

More information

Port of Rotterdam International

Port of Rotterdam International Port of Rotterdam International Opportunities for partnership with Port of Constantza European Gateway Platform 15 September 2011 Content Port of Rotterdam International What we do Showcase Port of Sohar

More information

KRISHNAPATNAM PORT COMPANY LIMITED

KRISHNAPATNAM PORT COMPANY LIMITED Port Tariff KRISHNAPATNAM PORT COMPANY LIMITED Vessel Related Charges PORT DUES Vessel Type Coastal & Foreign-Going Container Vessels, Pure Car Carriers (PCC), Pure Car/Truck Carriers (PCTC), Project Cargo

More information

THE PORTS ACT 1998. Regulations made by the Mauritius Ports Authority under Section 65 of the Ports Act 1998

THE PORTS ACT 1998. Regulations made by the Mauritius Ports Authority under Section 65 of the Ports Act 1998 Government Notice No. 199.of 2008 THE PORTS ACT 1998 Regulations made by the Mauritius Ports Authority under Section 65 of the Ports Act 1998 1. These regulations may be cited as the Port (Fees) Regulations

More information

2011 REPORT ON CARGO HANDLING IN KLAIPöDA STATE SEAPORT

2011 REPORT ON CARGO HANDLING IN KLAIPöDA STATE SEAPORT SE KLAIPöDA STATE SEAPORT AUTHORITY MARKETING DEPARTMENT 2011 REPORT ON CARGO HANDLING IN KLAIPöDA STATE SEAPORT Arranged by Žymantas Sinkevičius Klaip da, 2012 CONTENT 1. THE OVERALL CARGO HANDLING OF

More information

HAMBURGER HAFEN UND LOGISTIK AG COMPANY PRESENTATION

HAMBURGER HAFEN UND LOGISTIK AG COMPANY PRESENTATION HAMBURGER HAFEN UND LOGISTIK AG COMPANY PRESENTATION UBS Global Transport Conference / London, 13 September 2011 Hamburger Hafen und Logistik AG DISCLAIMER The facts and information contained herein are

More information

Shipping, World Trade and the Reduction of

Shipping, World Trade and the Reduction of Shipping, World Trade and the Reduction of United Nations Framework Convention on Climate Change International Maritime Organization International Chamber of Shipping COP 19 WARSAW UNFCCC Must Support

More information

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk December 2014 FACT SHEET: TRANSPORT AND INFRASTRUCTURE Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk The Gold Coast Integrated Resort

More information

ETIHAD RAIL. Corporate Presentation

ETIHAD RAIL. Corporate Presentation ETIHAD RAIL Corporate Presentation The UAE - A Diversifying Economy Etihad Rail is in line with the objective for further diversification of the UAE s economy as set by the National Charter 2021 and the

More information

Eastern Cape Region: 04 November Commercial and Marketing (CRM, NBD & Property)

Eastern Cape Region: 04 November Commercial and Marketing (CRM, NBD & Property) Click to edit Master title style Heading heading heading Date Strategic Customer Forum Eastern Cape Region: 04 November Commercial and Marketing (CRM, NBD & Property) Contents Customer Relations Management

More information

Rail: Network Status Quo Branch Lines Strategy

Rail: Network Status Quo Branch Lines Strategy Branch Lines Strategy Source: Transnet Group Policy Slide 1 Network Classification / Transnet Freight Rail Slide 2 Core Network Port- Rail Corridor Port Interconnect Cross-border Interconnect High volume

More information

Overview of the U.S. Freight Transportation System

Overview of the U.S. Freight Transportation System Overview of the U.S. Freight Transportation System This report was prepared by the Center for Intermodal Freight Transportation Studies, The University of Memphis submitted to the U.S. Department of Transportation,

More information

Intermodal Handling TOP PERFORMANCE WITH SMART SOLUTIONS

Intermodal Handling TOP PERFORMANCE WITH SMART SOLUTIONS Intermodal Handling TOP PERFORMANCE WITH SMART SOLUTIONS Intelligent intermodal solutions ensure safe and sustainable transport of goods International trade is constantly changing its ways and requirements

More information

The A in America s ACE 6/26/2015

The A in America s ACE 6/26/2015 The A in America s ACE 6/26/2015 Moffatt & Nichol Background Established in 1945 in Long Beach, California, currently: Offices in the Americas, Europe, Middle East and Pacific Rim Practices: Goods Movement,

More information

ECT, shaping your gateway to Europe Opening Euromax Terminal and Delta Barge Feeder Terminal

ECT, shaping your gateway to Europe Opening Euromax Terminal and Delta Barge Feeder Terminal ECT, shaping your gateway to Europe Opening Euromax Terminal and Delta Barge Feeder Terminal 5 th September 2008 Press conference Jan Westerhoud President of Europe Container Terminals 1 Contents 1. Introduction

More information

Port of Narvik. The Gateway to the Arctic PORT LOGISTICS: RAIL-ROAD-SEA-AIR. No draft restrictions. Sheltered waters. Ice-free all year round

Port of Narvik. The Gateway to the Arctic PORT LOGISTICS: RAIL-ROAD-SEA-AIR. No draft restrictions. Sheltered waters. Ice-free all year round The Gateway to the Arctic PORT LOGISTICS: RAIL-ROAD-SEA-AIR Part of extension of the core EU TEN-T rail, port and road Network to neighboring countries. The Port: No draft restrictions Sheltered waters

More information

Republic of Turkey - Ministry of Economy, 2014 0

Republic of Turkey - Ministry of Economy, 2014 0 Republic of Turkey - Ministry of Economy, 2014 0 SHIPBUILDING INDUSTRY Turkey is surrounded by sea on three sides, is a natural bridge between Asia and Europe. Turkey borders the Black Sea, the Mediterranean,

More information

STRATEGIC ASSET MANAGEMENT AT THE PORT OF MELBOURNE

STRATEGIC ASSET MANAGEMENT AT THE PORT OF MELBOURNE STRATEGIC ASSET MANAGEMENT AT THE PORT OF MELBOURNE by by Domenic (Mick) Lo Bianco 1 and Barry Giddings 2 ABSTRACT The objective of this paper is to discuss the Port of Melbourne s journey and experiences

More information

Offshore Wind Operations. Fife, at the heart of renewable energy development in Scotland

Offshore Wind Operations. Fife, at the heart of renewable energy development in Scotland Offshore Wind Operations AND Maintenance Fife, at the heart of renewable energy development in Scotland Location of choice Fife s strategic location, company expertise, skilled workforce and excellent

More information

#1 2012/13. delivering freight reliably

#1 2012/13. delivering freight reliably #1 2012/13 delivering freight reliably We are poised to become one of the world's largest freight logistics groups. The Market Demand Strategy will see Transnet's revenue grow from R46bn in 2011/12 to

More information

Essex... A great location for offshore wind

Essex... A great location for offshore wind Essex... A great location for offshore wind The UK Government has very ambitious plans for the development of offshore wind farms in its coastal waters involving up to 40GW of installed capacity by 2020

More information

Shipping, World Trade and the Reduction of

Shipping, World Trade and the Reduction of Shipping, World Trade and the Reduction of International Chamber of Shipping CO DO P HA 18 United Nations Framework Convention on Climate Change International Maritime Organization UNFCCC Must Support

More information

OFFSHORE WIND Peter Robert

OFFSHORE WIND Peter Robert OFFSHORE WIND Peter Robert Business Development Manager Offshore Wind Damen Shipyards Group Phone: +31 (0)183 655177 Mobile: +31 (0)6 22856004 E-mail: peter.robert@damen.com ABOUT DAMEN FOUNDER: KOMMER

More information

Global Marine Trends 2030

Global Marine Trends 2030 Global Marine Trends 2030 Global Marine Trends 2030 A Positive Marine World in 2030 Optimism is a strategy for making a better future. Because unless you believe that the future can be better, you are

More information

THE FUTURE OF THE OCEAN ECONOMY: AN OECD/IFP FORESIGHT PROJECT

THE FUTURE OF THE OCEAN ECONOMY: AN OECD/IFP FORESIGHT PROJECT THE FUTURE OF THE OCEAN ECONOMY: EXPLORING THE PROSPECTS FOR EMERGING OCEAN INDUSTRIES TO 2030 AN OECD/IFP FORESIGHT PROJECT BARRIE STEVENS OECD/DSTI Verftskonferansen 2013 Alesund, Norway, 5 th November

More information

Offshore Wind OPERATIONS & MAINTENANCE. A National Renewables Infrastructure Plan Stage 2 Information Paper

Offshore Wind OPERATIONS & MAINTENANCE. A National Renewables Infrastructure Plan Stage 2 Information Paper A National Renewables Infrastructure Plan Stage 2 Information Paper With investment of 100 billion planned over the next 10 years, the offshore wind sector offers a huge opportunity for Scottish businesses.

More information

HAMBURGER HAFEN UND LOGISTIK AG

HAMBURGER HAFEN UND LOGISTIK AG HAMBURGER HAFEN UND LOGISTIK AG ANALYST CONFERENCE ON 2014 FINANCIAL YEAR RESULTS Hamburg, 30 March 2015 Hamburger Hafen und Logistik AG Agenda Business Development 2014 and Business Forecast 2015 Klaus-Dieter

More information

Southern California International Gateway Project Description

Southern California International Gateway Project Description Southern California International Gateway Project Description Introduction This Supplemental Notice of Preparation and Initial Study is to inform Responsible, Trustee Agencies, and the public that the

More information

Recent development in Maritime transport and challenges ahead for ports

Recent development in Maritime transport and challenges ahead for ports Recent development in Maritime transport and challenges ahead for ports Piraeus 18th September 2008 Vincent Valentine Transport Section Division on Technology and Logistics Contents A. Recent Developments

More information

Port of Southampton. Master Plan 2009-2030

Port of Southampton. Master Plan 2009-2030 Port of Southampton Master Plan 2009-2030 Aerial photograph of the Port of Southampton ABP Port of Southampton Master Plan 2009-2030 Foreword Foreword The Port of Southampton is the UK s premier international

More information

HAMBURGER HAFEN UND LOGISTIK AG ANALYSTS CONFERENCE

HAMBURGER HAFEN UND LOGISTIK AG ANALYSTS CONFERENCE HAMBURGER HAFEN UND LOGISTIK AG ANALYSTS CONFERENCE 31 MARCH 2008 Hamburger Hafen und Logistik AG DISCLAIMER The facts and information contained herein are as up to date as is reasonably possible and are

More information

GREEN SUPPLY CHAIN OVERVIEW

GREEN SUPPLY CHAIN OVERVIEW GREEN SUPPLY CHAIN OVERVIEW INTERVIEW WIH ABRIE DE SWARDT, MARKETING DIRECTOR 1. Why are green/sustainable supply chains causing such a buzz in the industry at the moment? Climate change reached the top

More information

PORT TARIFF SZCZECIN AND ŚWINOUJŚCIE SEAPORTS AUTHORITY 2010

PORT TARIFF SZCZECIN AND ŚWINOUJŚCIE SEAPORTS AUTHORITY 2010 PORT TARIFF SZCZECIN AND ŚWINOUJŚCIE SEAPORTS AUTHORITY 2010 Approved by the Board of Directors Resolution No. 5 of 23 rd August, 2010 Szczecin and Świnoujście Seaports Authority In case of any doubt the

More information

SUBMISSION ON INTERNATIONAL FREIGHT SERVICES

SUBMISSION ON INTERNATIONAL FREIGHT SERVICES CentrePort Ltd 30 August 2011 SUBMISSION ON INTERNATIONAL FREIGHT SERVICES Introduction This submission is made on behalf of CentrePort Limited. Some of the content is consistent with the Ports Group submission.

More information

The LNG supply chain scenarios: the downstream from port to land

The LNG supply chain scenarios: the downstream from port to land The LNG supply chain scenarios: the downstream from port to land Glasgow (United Kingdom, Scotland) September 15th, 2015 Eng. Simone Pacciardi Technical consultant La Spezia Port Authority The Port of

More information

CHAPTER 2. TOWARDS GREATER ALIGNMENT AND INTEGRATED PLANNING. CHAPTER 2 / AN ALIGNED & INTEGRATED PLANNING FRAMEWORK Page 2-1

CHAPTER 2. TOWARDS GREATER ALIGNMENT AND INTEGRATED PLANNING. CHAPTER 2 / AN ALIGNED & INTEGRATED PLANNING FRAMEWORK Page 2-1 CHAPTER 2. TOWARDS GREATER ALIGNMENT AND INTEGRATED PLANNING CHAPTER 2 / AN ALIGNED & INTEGRATED PLANNING FRAMEWORK Page 2-1 2.1 Introduction Recent developments in transport at national, provincial and

More information

Operations Systems of Container Terminals: A Compendious Overview

Operations Systems of Container Terminals: A Compendious Overview Chapter 2 Operations Systems of Container Terminals: A Compendious Overview Birgitt Brinkmann Abstract This section contains an overview of the different functional areas of a marine container terminal

More information

GUIDELINES FOR VOLUNTARY USE OF THE SHIP ENERGY EFFICIENCY OPERATIONAL INDICATOR (EEOI)

GUIDELINES FOR VOLUNTARY USE OF THE SHIP ENERGY EFFICIENCY OPERATIONAL INDICATOR (EEOI) INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref. T5/1.01 MEPC.1/Circ.684 17 August 2009 GUIDELINES FOR VOLUNTARY USE OF THE

More information

POLISH MARITIME CLUSTER

POLISH MARITIME CLUSTER POLISH MARITIME CLUSTER POLISH MARITIME CLUSTER Founded 2009 Over 90 members from maritime industry Activity Cooperation in the area of the Polish and international maritime industries, including maritime

More information

IN DEFENSE OF THE JONES ACT

IN DEFENSE OF THE JONES ACT IN DEFENSE OF THE JONES ACT ASBA Annual Cargo Conference Miami, FL September 26-28, 2012 Background of the Jones Act Section 27 of the Merchant Marine Act of 1920 (46 U.S.C. 883), commonly referred to

More information

The potential impact of South Africa s current intermodal strategies on national transport costs

The potential impact of South Africa s current intermodal strategies on national transport costs The potential impact of South Africa s current intermodal strategies on national transport costs SARF 2014, CSIR Convention Centre, Pretoria 4 September 2014 Nadia Viljoen Growth and Intelligence Network

More information

HAMBURGER HAFEN UND LOGISTIK AG. RESULTS JANUARY SEPTEMBER 2013 Analyst Conference Call, 13 November 2013

HAMBURGER HAFEN UND LOGISTIK AG. RESULTS JANUARY SEPTEMBER 2013 Analyst Conference Call, 13 November 2013 HAMBURGER HAFEN UND LOGISTIK AG RESULTS JANUARY SEPTEMBER 2013 Analyst Conference Call, 13 November 2013 1 Disclaimer The facts and information contained herein are as up to date as is reasonably possible

More information

CPCS Supply Chain Review. Eastern Canada Logistics Study By CPSC November 2012

CPCS Supply Chain Review. Eastern Canada Logistics Study By CPSC November 2012 CPCS Supply Chain Review Eastern Canada Logistics Study By CPSC November 2012 Disclaimers 1. Study was initially presented in July 2013 in Montreal and may be repetitive for some of you. 2. Some of the

More information

Fourth Generation Modular Construction

Fourth Generation Modular Construction Allianz Global Corporate & Specialty Fourth Generation Modular Construction Marine Insurance Challenges: A technical report. 1 2 3 4 Foreword by Ron Johnson Modular Construction Trends Challenges and common

More information

Passenger Terminal Amsterdam

Passenger Terminal Amsterdam Fact sheet large cruise ships to Passenger Terminal Amsterdam Port of Amsterdam Amsterdam-IJmond Pilot Organization 2009 Version: November 6 th 2009 This fact sheet provides information on the passage

More information

OUR CONVERSATION TODAY

OUR CONVERSATION TODAY OUR CONVERSATION TODAY Our goal is to raise the level of awareness around the oil supply chain among key stakeholders in order to facilitate positive working relationships and more informed decision making.

More information

European Strategy 2050 TEN-T Methodology: Italian TEN-T network proposal

European Strategy 2050 TEN-T Methodology: Italian TEN-T network proposal TEN-T Italian Transport Programme European Strategy 2050 TEN-T Methodology: Italian TEN-T network proposal Green Corridors in the TEN Network 6-7 September 2011 TRENTO Ministero delle Infrastrututre e

More information

Welcome to the Port of Larvik. the gateway to Europe

Welcome to the Port of Larvik. the gateway to Europe www.larvik.havn.no Welcome to the Port of Larvik the gateway to Europe 2 ÅBO LARVIK NORWEGIAN COAST HIRTSHALS GRENÅ LYSEKIL GOTHENBURG HALMSTAD RIGA HUNDESTED ESBJERG CUXHAVEN IMMINGHAM EEMSHAVEN HAMBURG

More information

CAPITAL MARKETS DAY DRY CARGO

CAPITAL MARKETS DAY DRY CARGO CAPITAL MARKETS DAY DRY CARGO THE PREFERRED PARTNER IN GLOBAL TRAMP SHIPPING UNIQUE PEOPLE, OPEN MINDED TEAM SPIRIT, NUMBER ONE New York City, 22 January 2008 1 GUIDANCE AGENDA Norden Dry cargo Organization

More information

THE COMMERCIAL ASPECTS OF FREIGHT TRANSPORT OCEAN TRANSPORT: FREIGHT RATES AND TARIFFS. Hans J. Peters

THE COMMERCIAL ASPECTS OF FREIGHT TRANSPORT OCEAN TRANSPORT: FREIGHT RATES AND TARIFFS. Hans J. Peters January 1991 Transport No. PS-3 TRANSPORTATION, WATER AND URBAN DEVELOPMENT DEPARTMENT THE WORLD BANK THE COMMERCIAL ASPECTS OF FREIGHT TRANSPORT OCEAN TRANSPORT: FREIGHT RATES AND TARIFFS Hans J. Peters

More information

APPENDIX A: Scope of Work for the 2016 Master Plan

APPENDIX A: Scope of Work for the 2016 Master Plan APPENDIX A: Scope of Work for the 2016 Master Plan Table of Contents Background... 2 Drivers for the 2016 Master Plan... 2 2016 Master Plan Approach... 4 Plan Objectives... 4 Project Description... 4 Consultant

More information

How To Develop A Waterborne

How To Develop A Waterborne Waterborne TP and Vessels for the Future Initiative in H2020 Luciano Manzon WATERBORNE Secretary, SEARDI Chairman the RDI Group of SEA Europe 27 November Santiago de Compostela ETP WATERBORNE All the Stakeholders

More information

NATIONAL PORTS AUTHORITY OF SOUTH AFRICA PO Box 32696 Braamfontein 2017 SOUTH AFRICA. Phone: +27 11 242 4022 Fax: +27 11 242 4027

NATIONAL PORTS AUTHORITY OF SOUTH AFRICA PO Box 32696 Braamfontein 2017 SOUTH AFRICA. Phone: +27 11 242 4022 Fax: +27 11 242 4027 NATIONAL PORTS AUTHORITY OF SOUTH AFRICA PO Box 32696 Braamfontein 2017 SOUTH AFRICA Phone: +27 11 242 4022 Fax: +27 11 242 4027 Internet: www.npa.co.za The National Ports Authority of South Africa: Until