PLANNING & CONSTRUCTION COMMITTEE MEETING MINUTES May 15, 11:13 a.m. Conference Room A/B

Size: px
Start display at page:

Download "PLANNING & CONSTRUCTION COMMITTEE MEETING MINUTES May 15, 11:13 a.m. Conference Room A/B"

Transcription

1 Attendees: PLANNING & CONSTRUCTION COMMITTEE MEETING MINUTES May 15, 11:13 a.m. Conference Room A/B Acting Committee Chair: Committee Members: Other Trustees: Airport Authority Staff: Contractors: Public: Jerry Hall Steve Katzmann Dr. Kosta Arger, Mark Crawford, Adam Mayberry, Rick Murdock Krys Bart, A.A.E., Lissa Butterfield, Mike Dikun, C.M., Rick Gorman, Joyce Humphrey, C.M., Tina Iftiger, Dave Lazo, P.E., Gary Probert, P.E., Dean Schultz, A.A.E., Mike Scott, A.A.E., Trish Tucker Greg Erny, Architects+ LLC Walter Van Groningen, Brown-Buntin Associates, Inc. Patty Mamola, Special Project Manager Gateway Project, Atkins North America Max Hershenow, H + K Architects Tim Kretzschmar, Q&D Construction Linda Shields, Atkins North America Burnham Moffat Note: The official minutes of the Planning & Construction Committee meetings are maintained on digital recorders used to record the proceedings. The following is provided as a reference to the subject matter and conclusions reached from the discussion. I. Approval of meeting minutes from April 2012 The April 2012 Minutes were unanimously approved. II. Public Comment There was no public comment. III. Monthly Construction Report, including: 1. Board Action Items A. Authorization for the President/CEO to award a contract for the purchase of carpet material for the Terminal Building Gateway Project at the Reno- Tahoe International Airport, with InterfaceFlor in the amount of $234, exempt from competitive bidding per Nevada Revised Statute (m) Since this item was discussed at the Finance and Business Development Committee meeting just prior to this meeting with all the Planning and Construction Committee members present, it was not repeated at this Committee meeting. Page 1 of 8

2 The Committee unanimously recommended this item for Board approval at the upcoming Board meeting. B. Authorization for the President/CEO to accept a pending Airport Improvement Program grant offer and award of Owner-Construction Manager At Risk construction services contract for the Stead Terminal / Emergency Operations Center Project at Reno-Stead Airport, with Q&D Construction, in the amount of $4,767,430 This action will authorize an Owner-Construction Manager At Risk (CMAR) construction services contract, with Q&D Construction, Inc. for the Terminal / Emergency Operations Center project at Reno-Stead Airport (RTS). This action will also authorize the President/CEO to accept potential Airport Improvement Program funding from the Federal Aviation Administration (FAA) to help offset the costs of this project. Staff gave a brief presentation on the background of the project. The RTS is designated by the FAA as a reliever airport to the Reno-Tahoe International Airport (RNO). As a designated reliever airport, the RTS is expected to have facilities that support the capacity needs of the community s aviation community as well as to provide emergency operational support for the RNO. Being designated as a reliever airport, allows the RTS to be eligible for more funding from the FAA. Due to previously received grant funding, the airfield facilities were improved and are in excellent condition and meet the necessary requirements for the reliever designation. However, the landside facilities are not in the same condition and are in need of upgrading. The new terminal / emergency operations center will be a multi-functional building and not be used for just general aviation. The new facility will also house a pilots lounge, an emergency operations center (critical for the reliever status), police substation (if needed), and a community meeting room. In response to questions from the Committee, staff gave examples of how the RTS has been used as a reliever airport in the past. The RTS was used for all incoming and outgoing flights when the RNO was under construction. It was again available during the 1997 flood when the RNO was closed for approximately 36 hours. The RTS perimeter can be secured and locked down within 5 minutes during an emergency situation. Staff provided a PowerPoint presentation to the Committee giving them the specifics of the project and construction contract. The existing facilities to be replaced consist of the airport manager s office which is located in a 60-year old building and a pilots lounge located in double wide modular trailer that was moved onto the site after it was used at RNO. The existing facilities are inadequate in size and function. They have also come to the end of Page 2 of 8

3 their useful life and will require repairs and equipment replacement, in addition to building code issues. The proposed facility will consist of: core space (administrative offices, pilots lounge and visitor areas), site work and utilities, primary EOC / Community space, and revenue generating space. The project has progressed through the following milestones thus far: Feasibility Study (CSHQA) March 2009 Recommendations Adopted (RTAA) December 2010 Preliminary Design ((H & K Architects) March 2011 CMAR Pre-Construction Phase Services September 2011 Design Completed (H & K Architects) April 2012 Subcontractor and Self Performed Bids April 2012 Guaranteed Maximum Price Proposal May 2012 This item is only for Board approval of the Owner-CMAR construction contract, in the amount of $4,767,430. The tables below summarize the construction and overall project costs for the Stead Terminal / Emergency Operations Center program. Table 1 Building Construction Cost Building Construction Cost / Square Foot Site Construction Equipment Total Construction $3,335,572 $278/SF $1,211,651 $220,207 $4,767,430 Design / Pre-Construction Services $633,700 (Design) $24,700 (Atkins Pre-Const) $68,446 (CMAR Pre-Const) Table 2 Project Estimate At Completion Construction Management Construction Other Direct Costs Estimate At Completion $587,200 $4,767,430 $431,670 $6,513,146 The Design / Pre-Construction Services portion of this table are part of the soft costs for the project. The Construction Management portion for Owner s Representative Services will be addressed under Amendment No. 3 / Board Action Item C that will follow this item. The Construction portion is the amount for this Board Action Item Construction Manager At Risk construction services, and the Other Direct Costs portion of the table is for administrative costs, permits, utility fees, environmental testing, etc. The final column Estimate at Completion shows the estimate for total project costs. Page 3 of 8

4 The detail for the overall project budget is attached to the Board Memo as Table 3 Budget Summary. Staff then entertained questions from the Committee members. Staff explained how the RNO Emergency Operations Center (EOC) is used and to the extent it has been used in the past. The RNO EOC was used during the recent air race incident and has been activated many additional times, including snow and flood events as well as during bomb threats. The primary purpose for the proposed facility is to provide essential services. Revenue generating opportunities will be available from the leasable space on the first floor. Staff responded to a question regarding an empty hangar at RTS. Staff explained that although at one time the hangar was fully used by the Reno Air Race Association (RARA), they are now only using a portion of the hangar during the National Air Races. Two other tenants however, are currently leasing space in the hangar and the Fixed Base Operator (FBO) occasionally uses a portion of it as well. Trustee Mayberry gave a brief history of his experience with the North Vegas Airport when it was taken over by Clark County. It initially was not a revenue generating facility; however, once the county built a new terminal at the site, it became a hub for the general aviation community. This may occur out at the RTS with a new terminal / emergency operations center. Staff then provided a brief presentation regarding the financial impact for the project. The actual project cost is approximately $50,000 less that what was used for determining the financial plan. The sources of funds will come from the FAA ($350,000), the Special Fund ($475,000) and Subordinate Lien Note Series B ($5,738,100). At this point in the project, no money has been used from the bond fund. Approximately $600,000 debt service is included in next year s budget. If this project is not approved, approximately $300,00 would go back to the airlines. The $300,000 figure would reduce the cost per enplaned passenger for the airlines by $0.16. The committee then posed a question regarding the necessity of paying $587,000 for Owner s Representative services when Q & D Construction is very capable of doing the work required for this project. Staff responded that they have complete confidence in Q & D Construction s ability to do the project, but that there are certain items (daily inspections, quality assurance testing, etc.) that are required. Staff also explained that the FAA requires that the RTAA use construction management in order to receive FAA grant funding for the project. It was moved and seconded that this item be forwarded to the full Board without recommendation for discussion and consideration. Page 4 of 8

5 C. Authorization for the President/CEO to execute Amendment No. 3 to the Professional Service Agreement for 2012 Annual Program Management and Construction Management services for the Airport Capital Improvement Plan at Reno-Tahoe International Airport and Reno-Stead Airport, with Atkins North America, in the amount of $587,200, for a total of $2,671,800 Since this Board Action Item is connected to the previous item and as the previous item was forwarded to the Board for discussion, it was moved and seconded that this item also be forwarded to the full Board for discussion and consideration. 2. Project Status Items a. Staff Report on the Terminal Refurbishment, IT/Communication Relocation and Consolidated Security Screening Checkpoint of the Future project (Gateway Project) at Reno-Tahoe International Airport b. Staff Report on the Snow Removal Equipment Building project at Reno-Tahoe International Airport c. Staff Report on the Taxiway C North Extension project at Reno-Tahoe International Airport d. Staff Report on the General Aviation Aircraft Apron Project at Reno-Tahoe International Airport Page 5 of 8

6 e. Staff Report on the 2012 Water Line Reconfiguration Project at Reno-Tahoe International Airport f. Staff Report on the Stead Terminal / Emergency Operations Center project at Reno-Stead Airport This item was discussed as Board Action Item B and summarized in the monthly Project Status Report which was included in the monthly Board Packet. As there were no additional updates or questions regarding the information submitted, this item was not discussed g. Staff Report on Federal Aviation Administration Grant Close Outs IV. Review of Planning Projects, including: 1. Board Action Items D. Authorization for the President/CEO to accept a pending Airport Improvement Program grant and award a Professional Service Agreement for architectural design services for Phase 22 of the Sound Insulation Program for 404 residential apartment units, located in a Reno neighborhood, south of the Reno-Tahoe International Airport with Architects +, LLC in the amount of $670,415 E. Authorization for the President/CEO to award a Professional Service Agreement for acoustical design services for Phase 22 of the Sound Insulation Program for 404 residential apartment units, located in a Reno neighborhood, south of the Reno-Tahoe International Airport with Brown-Buntin Associates, Inc. in the amount of $182,990 At the request of Acting Committee Chair Hall, staff combined the presentations for Board Action Items D and E. These actions will authorize the President/CEO to accept a pending Airport Improvement Program (AIP) grant for Phase 22 of the Sound Insulation Program at the Reno-Tahoe International Airport (RTIA) and the award of Professional Services Agreements (PSA) with Architects+ LLC and with Brown-Buntin Associates, Inc. for the implementation of Phase 22 of the Sound Insulation Program at the RTIA. Page 6 of 8

7 In April 2012, the Reno-Tahoe Airport Authority (RTAA) submitted an application for an AIP grant in the amount of $7 million for Phase 22 of the Sound Insulation Program. The $7 million in funding is expected to allow for the acoustical treatment of at least a 404 apartment unit complex (The Village at Iron Blossom) located in Reno and potentially more homes at a later time. The Village at Iron Blossom apartment complex is the last large apartment complex in the eligible noise contour not yet mitigated. Requests for Qualifications (RFQs) for architectural and acoustical design services were last conducted in October At this time, Architects+ LLC and Brown- Buntin Associates, Inc. were selected for a potential five-phase involvement in the sound insulation program. The five phases are Phases 18 through 22 with Phase 22 being the last phase to be approved under these RFQs. The upfront costs of the design fees and associated services will be temporarily carried by the RTAA and then reimbursed by the FAA once the grant is offered. Motion was made, seconded and the Committee unanimously recommended both of these items be forwarded to the Board for approval at the upcoming Board meeting. 2. Project Status Items a. Staff Report on the Sound Insulation Program at Reno-Tahoe International Airport This item was discussed at Board Action Items D and E and summarized in the monthly Project Status Report which was included in the monthly Board Packet. As there were no additional updates or questions regarding the information submitted, this item was not discussed b. Staff Report on the progress of the Federal Aviation Administration s Airport Surveillance Radar (ASR-11) project at Reno-Tahoe International Airport c. Staff Report on the Reno-Stead Airport Regional Plan Conformance Review Project Page 7 of 8

8 V. Public Comment There was no public comment. VI. Adjournment Motion was made and seconded that the meeting be adjourned. The meeting was adjourned at 12:10 a.m. /fma Page 8 of 8

Developing and Maintaining Your Airport Property Map Lessons from St. Louis

Developing and Maintaining Your Airport Property Map Lessons from St. Louis Developing and Maintaining Your Airport Property Map Dana Ryan, St Louis Airport Authority Todd Madison, Central Region, FAA Chuck Reitter, Reitter Consulting, LLC Craig Bowles, St. Louis Airport Authority

More information

MISSOULA COUNTY AIRPORT AUTHORITY Regular Board Meeting April 26, 2016

MISSOULA COUNTY AIRPORT AUTHORITY Regular Board Meeting April 26, 2016 MISSOULA COUNTY AIRPORT AUTHORITY Regular Board Meeting April 26, 2016 THOSE PRESENT: STAFF: OTHERS: Chair Jeffrey Roth Commissioner Shane Stack Commissioner Larry Anderson Commissioner Paul Stafford Commissioner

More information

Medical Insurance and Drug Plan - A Review of the Discussion

Medical Insurance and Drug Plan - A Review of the Discussion AIRPORT AUTHORITY BOARD OF TRUSTEES FINANCE AND BUSINESS DEVELOPMENT COMMITTEE Minutes from the Meeting of November 3, 2008 ****REVISED**** In Attendance: Mary Simmons, Madame Chair, Finance & Business

More information

I. DOING BUSINESS WITH MIAMI INTERNATIONAL AIRPORT

I. DOING BUSINESS WITH MIAMI INTERNATIONAL AIRPORT DOING BUSINESS WITH MIAMI INTERNATIONAL AIRPORT H: Presentations/Doing Business with MIA I. DOING BUSINESS WITH MIAMI INTERNATIONAL AIRPORT INTRODUCTION Miami International Airport (MIA) has a $6.2 billion

More information

Case Study: Louisville Airport Kentucky

Case Study: Louisville Airport Kentucky Case Study: Louisville Airport Kentucky The Louisville International Airport is run by the Louisville Regional Airport Authority (LRAA) an autonomous municipal corporation that was established by Kentucky

More information

1 of 1. PO Box 285 Dallesport Washington 98617-0285 Airport Management 509-767-2272 airporttd@gorge.net. I. Call to Order.

1 of 1. PO Box 285 Dallesport Washington 98617-0285 Airport Management 509-767-2272 airporttd@gorge.net. I. Call to Order. PO Box 285 Dallesport Washington 98617-0285 Airport Management 509-767-2272 airporttd@gorge.net Agenda for the MEETING OF THE REGIONAL AIRPORT BOARD OF THE COLUMBIA GORGE REGIONAL AIRPORT (Established

More information

Strategic Business Plan

Strategic Business Plan Williams Gateway Airport Authority Strategic Business Plan Fiscal Years 2011-2015 Adopted May 24, 2010 by the Phoenix-Mesa Gateway Airport Authority Board of Directors Page 2 TABLE OF CONTENTS Purpose...4

More information

COMMISSION MEETING MINUTES TUESDAY, SEPTEMBER 13, 2011 AUSTIN AIRPORT ADVISORY COMMISSION MINUTES TUESDAY, SEPTEMBER 13, 2011

COMMISSION MEETING MINUTES TUESDAY, SEPTEMBER 13, 2011 AUSTIN AIRPORT ADVISORY COMMISSION MINUTES TUESDAY, SEPTEMBER 13, 2011 COMMISSION MEETING MINUTES TUESDAY, SEPTEMBER 13, 2011 AUSTIN AIRPORT ADVISORY COMMISSION REGULAR MEETING MINUTES TUESDAY, SEPTEMBER 13, 2011 The Austin Airport Advisory Commission convened in a regular

More information

PHOENIX-MESA GATEWAY AIRPORT AUTHORITY 5835 S. Sossaman Road Mesa, Arizona 85212 TELEPHONIC BOARD MEETING AGENDA. Monday, August 27, 2012 8:50 a.m.

PHOENIX-MESA GATEWAY AIRPORT AUTHORITY 5835 S. Sossaman Road Mesa, Arizona 85212 TELEPHONIC BOARD MEETING AGENDA. Monday, August 27, 2012 8:50 a.m. PHOENIX-MESA GATEWAY AIRPORT 5835 SOUTH SOSSAMAN ROAD MESA, ARIZONA 85212-6014 PHONE (480) 988 7600 FAX (480) 988 2315 PHOENIX-MESA GATEWAY AIRPORT AUTHORITY 5835 S. Sossaman Road Mesa, Arizona 85212 TELEPHONIC

More information

City of Chicago, Illinois Chicago O Hare International Airport

City of Chicago, Illinois Chicago O Hare International Airport City of Chicago, Illinois Chicago O Hare International Airport Basic Financial Statements for the Years Ended December 31, 2008 and 2007, Required Supplementary Information, Additional Information, Statistical

More information

ACI-NA DBE/Small/Minority Business Survey

ACI-NA DBE/Small/Minority Business Survey ACI-NA DBE/Small/Minority Business Survey September 2008 ACI-NA Insurance and Risk Management Committee ACI-NA Economic Affairs Department 1 TABLE OF CONTENTS BACKGROUND... 4 SURVEY RESULTS... 5 CONCLUSIONS...

More information

Managing Communications: Reno Air Races. ACI-NA Small Airports Conference June 5, 2013

Managing Communications: Reno Air Races. ACI-NA Small Airports Conference June 5, 2013 Managing Communications: Reno Air Races ACI-NA Small Airports Conference June 5, 2013 Reno-Tahoe Airport Authority Who we are Owners and operators of Reno-Tahoe International and Reno-Stead Airports RNO

More information

Airport and Aviation Funding Programs

Airport and Aviation Funding Programs Chapter 7 Airport and Aviation Funding Programs Airports and aviation projects across the nation benefit from many funding sources including the federal, state, and local units of government. Some improvement

More information

Airport Safety and Construction Management Under The FAA

Airport Safety and Construction Management Under The FAA U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Quality Management for Federally Funded Airport Construction Projects Date: DRAFT Initiated by: AAS-100 AC No.:

More information

Massport, Delta & Terminal A. Presented by Betsy Taylor May 21, 2007

Massport, Delta & Terminal A. Presented by Betsy Taylor May 21, 2007 Massport, Delta & Terminal A Presented by Betsy Taylor May 21, 2007 Topics of the Day Overview of Logan Airport Logan s Physical Challenge Original Project The Revised Lease Financial Structure Logan is

More information

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting January 6, 2015

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting January 6, 2015 PORT OF SEATTLE MEMORANDUM COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting January 6, 2015 DATE: TO: FROM: Michael Ehl, Director Airport Operations Wayne Grotheer, Director Aviation Project Management

More information

MEETING MINUTES PANAMA CITY BAY COUNTY AIRPORT AND INDUSTRIAL DISTRICT

MEETING MINUTES PANAMA CITY BAY COUNTY AIRPORT AND INDUSTRIAL DISTRICT 21233 MEETING MINUTES PANAMA CITY BAY COUNTY AIRPORT AND INDUSTRIAL DISTRICT Opening: The Board Meeting of the Panama City-Bay County Airport and Industrial District was called to order at 9:00 a.m., September

More information

REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES. PASSENGER SCREENING CHECKPOINT CONSOLIDATION PROJECT PROJECT No.

REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES. PASSENGER SCREENING CHECKPOINT CONSOLIDATION PROJECT PROJECT No. REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES PASSENGER SCREENING CHECKPOINT CONSOLIDATION PROJECT PROJECT No. FY15-805-67 Manchester-Boston Regional Airport is soliciting Proposals from qualified

More information

SAN FRANCISCO AIRPORT COMMISSION MINUTES

SAN FRANCISCO AIRPORT COMMISSION MINUTES SAN FRANCISCO AIRPORT COMMISSION MINUTES April 22, 2014 Special Meeting 9:00 A.M. Room 400 - City Hall #1 Dr. Carlton B. Goodlett Place (400 Van Ness Avenue) City and County of San Francisco EDWIN M. LEE,

More information

AIRPORT COMMISSION MINUTES March 7, 2006

AIRPORT COMMISSION MINUTES March 7, 2006 AIRPORT COMMISSION MINUTES Present David Hamby, Chair Jim Moran, Vice Chair Bill Gleaves Marion Rose Louise Parsons Tom Picht Todd Brown Absent Betty Griffiths, Council Liaison Lanny Zoeller Staff Jon

More information

Corporate Address 215 East Freeman, Suite 105 Duncanville, Texas 75038 (972) 465-8400 phone (972) 767-5122 fax www.hangarsales.com

Corporate Address 215 East Freeman, Suite 105 Duncanville, Texas 75038 (972) 465-8400 phone (972) 767-5122 fax www.hangarsales.com HANGAR #3 17,500 SF HANGAR #2 22,500 SF HANGAR #1-19,500 SF HANGAR #X54 11,200 SF Corporate Hangar Facilities Now Available FOR LEASE David Wayne Hooks Memorial Airport (KDWH) (Northwest) Actual Property

More information

SAN FRANCISCO AIRPORT COMMISSION MINUTES

SAN FRANCISCO AIRPORT COMMISSION MINUTES SAN FRANCISCO AIRPORT COMMISSION MINUTES July 19, 2011 9:00 A.M. Room 400 - City Hall #1 Dr. Carlton B. Goodlett Place (400 Van Ness Avenue) City and County of San Francisco EDWIN M. LEE, MAYOR COMMISSIONERS

More information

The City of Rockwall Request for Proposals for Fixed Base Operator Services at Ralph M. Hall / Rockwall Municipal Airport

The City of Rockwall Request for Proposals for Fixed Base Operator Services at Ralph M. Hall / Rockwall Municipal Airport The City of Rockwall Request for Proposals for Fixed Base Operator Services at Ralph M. Hall / Rockwall Municipal Airport All proposals shall be addressed to: City of Rockwall Attn: Lea Ann Ewing, Purchasing

More information

S11050A, page 1 Job decription Project Manager (Architect) S-21 Location: Washington Dulles International Airport

S11050A, page 1 Job decription Project Manager (Architect) S-21 Location: Washington Dulles International Airport S11050A, page 1 Job decription Project Manager (Architect) S-21 Nothing in this job description restricts management s right to assign or reassign duties and responsibilities to this job at any time. DUTIES

More information

CITY OF KALAMA REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES. Proposal Due Date: April 13, 2016

CITY OF KALAMA REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES. Proposal Due Date: April 13, 2016 CITY OF KALAMA REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES Proposal Due Date: April 13, 2016 The City of Kalama (CITY) invites proposals for the services of a registered architect and their team

More information

Current and Forecast Demand

Current and Forecast Demand Existing Facilities A new terminal opened in September 2005 at the Southwest Florida International Airport (RSW), replacing the 17-gate original terminal that opened in 1983. The $438 million Midfield

More information

AIRPORT DESIGN AND CONSTRUCTION MANAGER

AIRPORT DESIGN AND CONSTRUCTION MANAGER AIRPORT DESIGN AND CONSTRUCTION MANAGER Class specifications are intended to present a descriptive list of the range of duties performed by employees in the class. Specifications are not intended to reflect

More information

Richland County Airport Commission Jim Hamilton LB Owens Airport (CUB) Columbia, South Carolina. MEETING MINUTES January 12, 2015 12:00 Noon

Richland County Airport Commission Jim Hamilton LB Owens Airport (CUB) Columbia, South Carolina. MEETING MINUTES January 12, 2015 12:00 Noon Richland County Airport Commission Columbia, South Carolina Commission Members in attendance Jim Christopher, Chairman John Dean, Vice Chairman Stuart Hope, Treasurer Peter Mayers, Secretary Bruce Cole,

More information

Info NEWS MEDIA GUIDE

Info NEWS MEDIA GUIDE Info Office of Public Affairs Miami-Dade Aviation Department P.O. Box 592075 Miami, Florida 33159 Phone: (305) 876-7017 Fax: (305) 869-1270 www.iflymia.com NEWS MEDIA GUIDE Table of Contents Introduction.............................

More information

Portland International Jetport Noise Advisory Committee 1001 Westbrook Street, Portland, Maine 04102

Portland International Jetport Noise Advisory Committee 1001 Westbrook Street, Portland, Maine 04102 Portland International Jetport Noise Advisory Committee 1001 Westbrook Street, Portland, Maine 04102 Date Start End Next Meeting Next Time Prepared By Company 10/24/2013 5:30pm 6:38pm TBD 5:30pm J. Dunfee

More information

Operations at Coulter Airfield

Operations at Coulter Airfield Operations at Coulter Airfield Outline Background Assets Budget Options Questions/Direction Vision (January 2010) 1. Maximize Economic Viability of Coulter Field as an Asset to the City Strategic Issue

More information

City of San José DEPUTY DIRECTOR OF AVIATION (3547)

City of San José DEPUTY DIRECTOR OF AVIATION (3547) Rev. 4/98 City of San José DEPUTY DIRECTOR OF AVIATION (3547) CLASS PURPOSE Under administrative direction, plans, organizes and directs a major division of the Airport Department. Performs related work

More information

June 30, 2014 and 2013

June 30, 2014 and 2013 Basic Financial Statements and Supplementary Information (With Independent Auditors Report Thereon) Table of Contents Page Independent Auditors Report 1 Management s Discussion and Analysis Unaudited 4

More information

EDINBURGH AIRPORT CONSULTATIVE COMMITTEE.

EDINBURGH AIRPORT CONSULTATIVE COMMITTEE. EDINBURGH AIRPORT CONSULTATIVE COMMITTEE. MINUTES OF THE ONE HUNDRED AND FIFTY FIFTH MEETING HELD AT THE QUALITY HOTEL EDINBURGH AIRPORT ON MONDAY 21 st FEBRUARY 2011. PRESENT: Alastair O Neil (Chairman)

More information

GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES

GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES REQUEST FOR QUALIFICATIONS GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES NEW DINING HALL MONTANA STATE UNIVERSITY Bozeman, Montana PPA NO. 15-0103 Campus Planning, Design & Construction Plew Building

More information

MASTER PLAN PREPARATION

MASTER PLAN PREPARATION Located in the East Valley of the Phoenix Metropolitan Area, Phoenix-Mesa Gateway Airport is a former military airfield that has successfully made the transition to a full service commercial passenger

More information

Managing Managing Airport Airport Real Estate March h 29, 2012 March March 29, 2012

Managing Managing Airport Airport Real Estate March h 29, 2012 March March 29, 2012 Managing Airport Real Estate March 29, 2012 March 29, 2012 Airport Cooperative Research Program Report 47 Guidebook for developing and leasing airport property Presented by: Rick Crider, A.A.E. AE ACRP

More information

Business Information Technology. Airport Roundtable. ACI-NA Annual Conference and Exhibition BIT Workshop Atlanta, GA September 7, 2014

Business Information Technology. Airport Roundtable. ACI-NA Annual Conference and Exhibition BIT Workshop Atlanta, GA September 7, 2014 Business Information Technology Airport Roundtable ACI-NA Annual Conference and Exhibition BIT Workshop Atlanta, GA September 7, 2014 Asheville Regional Airport (AVL) Your Contact Information Name: Royce

More information

Nate Smith Executive Vice President DFW International Airport DALLAS/FORT WORTH INTERNATIONAL AIRPORT

Nate Smith Executive Vice President DFW International Airport DALLAS/FORT WORTH INTERNATIONAL AIRPORT Nate Smith Executive Vice President DFW International Airport DALLAS/FORT WORTH INTERNATIONAL AIRPORT DFW Airport: Connecting the World In four decades of existence, DFW has grown into a global super

More information

2012-2016 Draft Plan of Finance

2012-2016 Draft Plan of Finance A. Introduction 2012-2016 Draft Plan of Finance In 2011, the Port continued to navigate through the economic uncertainty and volatility that has plagued both the national and global economies. High unemployment

More information

Public-Private Partnerships

Public-Private Partnerships Public-Private Partnerships Patricia A. Filippone Executive Director UMass Building Authority March 30, 2016 1 Public-Private Partnerships (P3) Capital constraints combined with short and long-term capital

More information

METROPOLITAN AIRPORTS COMMISSION Department of Human Resources 6040 28th Avenue South Minneapolis, MN 55450

METROPOLITAN AIRPORTS COMMISSION Department of Human Resources 6040 28th Avenue South Minneapolis, MN 55450 METROPOLITAN AIRPORTS COMMISSION Department of Human Resources 6040 28th Avenue South Minneapolis, MN 55450 http://metroairports.org INVITES APPLICATIONS FOR THE POSITION OF: Project Manager, Airport Development

More information

Noise Land Reuse Plans. An Introduction to FAA Requirements

Noise Land Reuse Plans. An Introduction to FAA Requirements Noise Land Reuse Plans An Introduction to FAA Requirements Agenda 1. 1. Unison Consulting Introduction 2. 2. Noise Land Disposal (Background) 3. 3. FAA Noise Land Reuse Guidance PGL PGL 08-02 4. 4. How

More information

Village of Oak Park Community Services Department Single-Family Rehabilitation Loan Program Oak Park, Illinois POLICY GUIDELINES

Village of Oak Park Community Services Department Single-Family Rehabilitation Loan Program Oak Park, Illinois POLICY GUIDELINES Village of Oak Park Community Services Department Single-Family Rehabilitation Loan Program Oak Park, Illinois POLICY GUIDELINES A. ELIGIBLE PROPERTY OWNERS 1. Benefit to Very Low- and Low- Income Owner-Occupants.

More information

City of Chicago, Illinois Chicago O Hare International Airport

City of Chicago, Illinois Chicago O Hare International Airport City of Chicago, Illinois Chicago O Hare International Airport Basic Financial Statements as of and for the Years Ended December 31, 2010 and 2009, Required Supplementary Information, Additional Information,

More information

Existing Facilities. Current and Forecast Demand

Existing Facilities. Current and Forecast Demand Existing Facilities JIA is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual Service Volume (ASV) of the runway

More information

Signature Flight Support

Signature Flight Support Signature Flight Support Proposed Lease Amendments at Love Field Briefing to the Council Economic Development Committee Department of Aviation November 1, 2010 Purpose Background on leasing objectives

More information

SMS Implementation Study

SMS Implementation Study SMS Implementation Study (Don Scott Field) Columbus, Ohio Presented at the Thursday November 3, 2011 Washington, DC Seth Young, Ph.D., C.M., CFI OSU SMS Implementation Principal Investigator SMS Implementation

More information

HILLSBOROUGH COUNTY AVIATION AUTHORITY FINANCIAL STATEMENTS, OTHER FINANCIAL INFORMATION AND COMPLIANCE REPORTS

HILLSBOROUGH COUNTY AVIATION AUTHORITY FINANCIAL STATEMENTS, OTHER FINANCIAL INFORMATION AND COMPLIANCE REPORTS FINANCIAL STATEMENTS, OTHER FINANCIAL INFORMATION AND COMPLIANCE REPORTS YEARS ENDED SEPTEMBER 30, 2015 AND 2014 TABLE OF CONTENTS YEARS ENDED SEPTEMBER 30, 2015 AND 2014 INDEPENDENT AUDITORS REPORT 1

More information

COUNTY OF LOS ANGELES

COUNTY OF LOS ANGELES Gail Farber Director of Public Works COUNTY OF LOS ANGELES AVIATION COMMISSION "To Enrich Lives Through Effective and Caring Service" 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone:

More information

FRESNO YOSEMITE INTERNATIONAL AIRPORT CITY OF FRESNO AIRPORTS DEPARTMENT. REQUEST FOR QUALIFICATIONS (RFQ) Airport Master Plan

FRESNO YOSEMITE INTERNATIONAL AIRPORT CITY OF FRESNO AIRPORTS DEPARTMENT. REQUEST FOR QUALIFICATIONS (RFQ) Airport Master Plan FRESNO YOSEMITE INTERNATIONAL AIRPORT CITY OF FRESNO AIRPORTS DEPARTMENT REQUEST FOR QUALIFICATIONS (RFQ) Airport Master Plan A. PROGRAM NARRATIVE The City of Fresno Airports Department (City) is requesting

More information

Construction Management of Multiple Projects within a Large Scale Program. Tim Mentel, PMP RDM Rick Hines, P.E. RDM. Agenda

Construction Management of Multiple Projects within a Large Scale Program. Tim Mentel, PMP RDM Rick Hines, P.E. RDM. Agenda Construction Management of Multiple Projects within a Large Scale Program Tim Mentel, PMP RDM Rick Hines, P.E. RDM Agenda Overview of Port Columbus Airport (CMH) 10R/28L Replacement Program Planning the

More information

10 Aviation Element. 10.1 Introduction. 10.1.1 Purpose of Chapter

10 Aviation Element. 10.1 Introduction. 10.1.1 Purpose of Chapter 10 Aviation Element 10.1 Introduction 10.1.1 Purpose of Chapter This chapter provides the aviation element of the RFATS 2035 Long Range Transportation Plan. It describes the existing conditions and trends

More information

Development of An Analysis Tool For Performing Civil Aviation Security Risk Assessment

Development of An Analysis Tool For Performing Civil Aviation Security Risk Assessment Development of An Analysis Tool For Performing Civil Aviation Security Risk Assessment Allan R. Hunt AKELA, Inc. 5276 Hollister Avenue, Suite 263 Santa Barbara, CA 93111 Karl F. Kellerman FAA Office of

More information

Media Guidelines 2016

Media Guidelines 2016 Media Guidelines 2016 Eugene Airport Media Guide The Goal of public relations staff at the Eugene Airport is to provide all local, state and regional media with accurate and timely information. This media

More information

Economic Impact of Redeveloping The World Trade Center Site: New York City, New York State, And the New York-New Jersey Area

Economic Impact of Redeveloping The World Trade Center Site: New York City, New York State, And the New York-New Jersey Area Economic Impact of Redeveloping The World Trade Center Site: New York City, New York State, And the New York-New Jersey Area Appleseed October 30, 2003 Executive Summary The redevelopment of the World

More information

Planned Procurement Opportunities Report. March 2015

Planned Procurement Opportunities Report. March 2015 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report March 2015 Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted

More information

State Of Nevada STATE CONTRACTORS BOARD

State Of Nevada STATE CONTRACTORS BOARD JIM GIBBONS Governor MEMBERS Guy M. Wells, Chairman Kevin E. Burke Michael Efstratis John C. Ellison Jerry Higgins Nathaniel W. Hodgson, III William Bruce King State Of Nevada STATE CONTRACTORS BOARD Reply

More information

Nothing in this job description restricts management's right to assign or reassign duties and responsibilities to this job at any time.

Nothing in this job description restricts management's right to assign or reassign duties and responsibilities to this job at any time. S97601A, page 1 Nothing in this job description restricts management's right to assign or reassign duties and responsibilities to this job at any time. DUTIES Serves as a Project Coordinator in the Engineering

More information

Airport IT Services for Airlines. Kiel Barnekov, Manager Programs & Projects Greater Orlando Aviation Authority

Airport IT Services for Airlines. Kiel Barnekov, Manager Programs & Projects Greater Orlando Aviation Authority Airport IT Services for Airlines Presented By: Kiel Barnekov, Manager Programs & Projects Greater Orlando Aviation Authority Airline Business Drivers In general, when Approaching IT projects: Include Airlines

More information

WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN CITY OF WATSONVILLE, SANTA CRUZ COUNTY, CALIFORNIA CHAPTER 3. AVIATION FORECASTS REVISED APRIL 2010

WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN CITY OF WATSONVILLE, SANTA CRUZ COUNTY, CALIFORNIA CHAPTER 3. AVIATION FORECASTS REVISED APRIL 2010 WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN CITY OF WATSONVILLE, SANTA CRUZ COUNTY, CALIFORNIA CHAPTER 3. AVIATION FORECASTS REVISED APRIL 2010 TABLE OF CONTENTS WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN

More information

Air Support services are centred on four core practice areas, as indicated below and briefly described later on.

Air Support services are centred on four core practice areas, as indicated below and briefly described later on. Mission Statement Air Support is an aviation engineering and consulting company operating in the Italian, European, Africa end South America markets. Air Support is specialized in providing key aviation

More information

COEUR D ALENE TRIBAL HOUSING AUTHORITY HOUSING REHABILITATION POLICY (CDTHA REHAB)

COEUR D ALENE TRIBAL HOUSING AUTHORITY HOUSING REHABILITATION POLICY (CDTHA REHAB) COEUR D ALENE TRIBAL HOUSING AUTHORITY HOUSING REHABILITATION POLICY (CDTHA REHAB) Adopted by the Housing Board May 25, 2005 CDTHA HOUSING REHAB POLICY Programs Available... 3 Reconstruction... 3 Relocation/Displacement...

More information

Ms. Jarrette reported that operations at OEA, with inquiries/complaints. These approaches to runways 07 and

Ms. Jarrette reported that operations at OEA, with inquiries/complaints. These approaches to runways 07 and On Thursday, July 9, 2015 the Aviation Noise Abatement Committee (ANAC) of the Greater Orlando Aviation Authority met in regular session at University of Florida IFAS Extension, South Conway Road, Orlando,

More information

Cuyahoga County Airport - A Guide to Funding Capital Improvements

Cuyahoga County Airport - A Guide to Funding Capital Improvements 7.01 General CHAPTER 7 - FINANCIAL PLAN This chapter presents a financial plan to assist with future capital improvements and provide a guide for implementing the development of Cuyahoga County Airport.

More information

City of Syracuse Industrial Development Agency 333 West Washington St, Suite 130 Syracuse, NY 13202 Tel (315) 473 3275 Fax (315) 435 3669

City of Syracuse Industrial Development Agency 333 West Washington St, Suite 130 Syracuse, NY 13202 Tel (315) 473 3275 Fax (315) 435 3669 City of Syracuse Industrial Development Agency 333 West Washington St, Suite 130 Syracuse, NY 13202 Tel (315) 473 3275 Fax (315) 435 3669 Minutes Board of Directors Meeting Tuesday June 18, 2013 8:30 A.M.

More information

Miami-Dade County Board of County Commissioners. Office of the Commission Auditor. Legislative Analysis. Airport & Seaport Committee

Miami-Dade County Board of County Commissioners. Office of the Commission Auditor. Legislative Analysis. Airport & Seaport Committee Miami-Dade County Board of County Commissioners Office of the Commission Auditor Legislative Analysis Airport & Seaport Committee September 10, 2009 9:30 A.M. Commission Chamber Charles Anderson, CPA Commission

More information

RAD Implementation - Development Team RFQ. SF Housing Authority Commission. January 30, 2014

RAD Implementation - Development Team RFQ. SF Housing Authority Commission. January 30, 2014 RAD Implementation - Development Team RFQ SF Housing Authority Commission January 30, 2014 2 Background Consistent with the findings of the San Francisco Public Housing Re-Envisioning process and July

More information

Aviation Market Stimulus Program

Aviation Market Stimulus Program ATTACHMENT A City and County of San Francisco Airport Commission Aviation Market Stimulus Program C:\Documents and Settings\AWong\My Documents\_to_be_move_3\Attachment A - Final - Aviation Market Stimulus

More information

Westmoreland County Airport Authority. Westmoreland County Airport Authority Regularly Scheduled Meeting October 14, 2014

Westmoreland County Airport Authority. Westmoreland County Airport Authority Regularly Scheduled Meeting October 14, 2014 Westmoreland County Airport Authority Regularly Scheduled Meeting October 14, 2014 1 Regular Meeting The Regularly Scheduled Meeting of the Westmoreland County Airport Authority was held Tuesday, Oct.

More information

Self-Help Public Charter School Loan Application

Self-Help Public Charter School Loan Application Self-Help Public Charter School Loan Application Thank you for your interest in Self-Help. We have been a charter school lender since 1997 and look forward to using our experience to serve your school.

More information

Pe r f e c t i n g a. Ne va d a. Caryn S. Tijsseling. Prepared and Presented by. Lewis and Roca LLP 775-321-3426 CTijsseling@LRLaw.

Pe r f e c t i n g a. Ne va d a. Caryn S. Tijsseling. Prepared and Presented by. Lewis and Roca LLP 775-321-3426 CTijsseling@LRLaw. Pe r f e c t i n g a Mechanic s Lien in Ne va d a Prepared and Presented by Caryn S. Tijsseling Lewis and Roca LLP 775-321-3426 CTijsseling@LRLaw.com Overview of Construction Liens The Nevada Revised Statutes

More information

Page Intentionally Left Blank

Page Intentionally Left Blank Page Intentionally Left Blank Division Description The Airports Division, part of the Real Estate Assets Department (READ), is responsible for operating two general aviation airports, Montgomery Field

More information

OAKLAND PARK COMMUNITY REDEVELOPMENT AGENCY. DEVELOPMENT and RELOCATION INCENTIVE PROGRAM

OAKLAND PARK COMMUNITY REDEVELOPMENT AGENCY. DEVELOPMENT and RELOCATION INCENTIVE PROGRAM OAKLAND PARK COMMUNITY REDEVELOPMENT AGENCY DEVELOPMENT and RELOCATION INCENTIVE PROGRAM DEVELOPMENT AND RELOCATION INCENTIVE PROGRAM I. Introduction The Development/Relocation Incentive program is designed

More information

Oregon s Land Use Planning & Air Space Analysis (FAA 7560-1)

Oregon s Land Use Planning & Air Space Analysis (FAA 7560-1) Oregon s Land Use Planning & Air Space Analysis (FAA 7560-1) 836.035 Effect of statute on airport zoning. ORS 836.005 to 836.120, 836.200, 836.205, 836.215, 836.220 and 836.240 do not limit any right,

More information

DEPARTMENTAL STANDARD OPERATING PROCEDURE Miami-Dade Aviation Department DSOP No. 03-03 Effective: February 4, 2004

DEPARTMENTAL STANDARD OPERATING PROCEDURE Miami-Dade Aviation Department DSOP No. 03-03 Effective: February 4, 2004 DEPARTMENTAL STANDARD OPERATING PROCEDURE Miami-Dade Aviation Department DSOP No. 03-03 Effective: February 4, 2004 SUBJECT: REQUESTS FOR COPIES OF MIAMI-DADE AVIATION DEPARTMENT S SECURITY-RELATED RECORDS

More information

BOARD OF AIRPORT COMMISSIONERS LOS ANGELES WORLD AIRPORTS - CITY OF Los ANGELES

BOARD OF AIRPORT COMMISSIONERS LOS ANGELES WORLD AIRPORTS - CITY OF Los ANGELES rale' BOARD OF AIRPORT COMMISSIONERS LOS ANGELES WORLD AIRPORTS - CITY OF Los ANGELES AGENDA CT. Cr) Internet at www.lawa.aero Matters to come before the City of Los Angeles Board of Airport Commissioners

More information

4 EXISTING AND FORECAST NOISE EXPOSURE MAPS

4 EXISTING AND FORECAST NOISE EXPOSURE MAPS Updated 14 C.F.R. Part 150 Noise Exposure Maps page 53 4 EXISTING AND FORECAST NOISE EXPOSURE MAPS 4.1 Introduction As discussed in Section 1.3.1, the most fundamental elements of the NEMs submission are

More information

CITY OF SANTA MONICA RESIDENTIAL REHABILITATION PROGRAM GUIDELINES

CITY OF SANTA MONICA RESIDENTIAL REHABILITATION PROGRAM GUIDELINES CITY OF SANTA MONICA RESIDENTIAL REHABILITATION PROGRAM GUIDELINES Proposed June 2014 TABLE OF CONTENTS Page l. MULTIFAMILY REHABILITATION... 1 II. OWNER-OCCUPIED REHABILITATION... 2 III. ELIGIBLE REPAIRS/IMPROVEMENTS...

More information

Planning and Budgeting for Capital Projects and Other Capital Items at Vassar

Planning and Budgeting for Capital Projects and Other Capital Items at Vassar September 2, 2008 Memorandum To: From: Re: Members of the Administration Department and Program Chairs Betsy Eismeier, Vice President for Finance and Administration Planning and Budgeting for Capital Projects

More information

MINUTES OF A REGULAR VILLAGE BOARD MEETING. Village of Clarendon Hills One North Prospect Avenue, Clarendon Hills, Illinois.

MINUTES OF A REGULAR VILLAGE BOARD MEETING. Village of Clarendon Hills One North Prospect Avenue, Clarendon Hills, Illinois. MINUTES OF A REGULAR VILLAGE BOARD MEETING Village of Clarendon Hills One North Prospect Avenue, Clarendon Hills, Illinois President Karaba called the meeting to order at 7:00 p.m. 1. ROLL CALL Present

More information

PROJECT MINUTES. 2.1 Record Call to Order, 5:30 pm, meeting opened.

PROJECT MINUTES. 2.1 Record Call to Order, 5:30 pm, meeting opened. PROJECT MINUTES Project: New Holbrook PreK12 School Project No.: 13006 Prepared by: Joel Seeley Meeting Date: 1/14/2015 Re: CM Selection Committee Meeting Meeting No: 2 Location: Town Hall Time: 5:30 PM

More information

CLEVELAND PUBLIC LIBRARY Joint Finance & Human Resources Committee Meeting January 19, 2016. 12:00 Noon

CLEVELAND PUBLIC LIBRARY Joint Finance & Human Resources Committee Meeting January 19, 2016. 12:00 Noon CLEVELAND PUBLIC LIBRARY Joint Finance & Human Resources Committee Meeting January 19, 2016 Trustees Room Louis Stokes Wing 12:00 Noon Present: Absent: Ms. Butts, Mr. Seifullah, Ms. Rodriguez, Mr. Hairston,

More information

How To Hold A National Air Safety Conference On A Web Conference Call

How To Hold A National Air Safety Conference On A Web Conference Call NATA Air Charter Committee Web Meeting January 13, 2010 Meeting Minutes 1. Call to Order Chair Terri Farish called the meeting to order at 1:00 p.m. The following members and guests participated in the

More information

Deep Ellum Crossroads Redevelopment Project

Deep Ellum Crossroads Redevelopment Project Deep Ellum Crossroads Redevelopment Project Deep Ellum TIF District Economic Development Committee September 15, 2014 Office of Economic Development Overview Discuss the redevelopment and site improvements

More information

REQUEST FOR QUALIFICATIONS/ REQUEST FOR PROPOSAL. for CONSTRUCTION MANAGEMENT SERVICES. For CHAPEL OF PEACE AT RIVERSIDE CEMETERY. Project No.

REQUEST FOR QUALIFICATIONS/ REQUEST FOR PROPOSAL. for CONSTRUCTION MANAGEMENT SERVICES. For CHAPEL OF PEACE AT RIVERSIDE CEMETERY. Project No. REQUEST FOR QUALIFICATIONS/ REQUEST FOR PROPOSAL for CONSTRUCTION MANAGEMENT SERVICES For CHAPEL OF PEACE AT RIVERSIDE CEMETERY Project No. 08083 CITY OF ROCHESTER October 2009 TABLE OF CONTENTS GENERAL

More information

HERITAGE BUILDING REHABILITATION PROGRAM

HERITAGE BUILDING REHABILITATION PROGRAM City of Regina Heritage Property Incentive HERITAGE BUILDING REHABILITATION PROGRAM What incentives are available? o A tax exemption may be granted to a maximum value equivalent to 50% of eligible work

More information

Board of Trustees Committee on Finance, Business and Capital Planning Minutes of Meeting Volume FBCP 4 March 6, 2014

Board of Trustees Committee on Finance, Business and Capital Planning Minutes of Meeting Volume FBCP 4 March 6, 2014 FBCP 4-1 Board of Trustees Committee on Finance, Business and Capital Planning Minutes of Meeting Volume FBCP 4 March 6, 2014 A meeting of the Committee on Finance, Business & Capital Planning was held

More information

DEVELOPMENT FINANCE DIVISION APPLICATION GENERAL INFORMATION

DEVELOPMENT FINANCE DIVISION APPLICATION GENERAL INFORMATION DEVELOPMENT FINANCE DIVISION APPLICATION GENERAL INFORMATION FINANCING FORM 202 Funding Applied For Housing Production Trust Fund $ - Low-Income Housing Tax Credit (LIHTC) $ - Department of Mental Health

More information

Love Field Modernization Program (LFMP) & Airport Electronic Systems Management (AESM) Status Update

Love Field Modernization Program (LFMP) & Airport Electronic Systems Management (AESM) Status Update Love Field Modernization Program (LFMP) & Airport Electronic Systems Management (AESM) Status Update Transportation & Environment Committee February 27, 2012 Background LFMP will deliver a brand new airport

More information

1 of 1. PO Box 285 Dallesport Washington 98617-0285 Airport Management 509-767-2272 airporttd@gorge.net. I. Call to Order.

1 of 1. PO Box 285 Dallesport Washington 98617-0285 Airport Management 509-767-2272 airporttd@gorge.net. I. Call to Order. PO Box 285 Dallesport Washington 98617-0285 Airport Management 509-767-2272 airporttd@gorge.net Agenda for the MEETING OF THE REGIONAL AIRPORT BOARD OF THE COLUMBIA GORGE REGIONAL AIRPORT (Established

More information

Description of Airport Charges. Swedavia AB 2015. Appendix 3 to Conditions of Services, Swedavia AB

Description of Airport Charges. Swedavia AB 2015. Appendix 3 to Conditions of Services, Swedavia AB Description of Airport Charges Swedavia AB 2015 Appendix 3 to Conditions of Services, Swedavia AB Contents 1 Swedavias Charges... 3 2 Aircraft Related Charges... 4 2.1 Take-Off Charge... 4 2.2 Emission

More information

CITY OF UMATILLA CRA CRA COMMERCIAL IMPROVEMENT MATCHING GRANT PROGRAM. Criteria

CITY OF UMATILLA CRA CRA COMMERCIAL IMPROVEMENT MATCHING GRANT PROGRAM. Criteria CITY OF UMATILLA CRA COMMERCIAL IMPROVEMENT MATCHING GRANT PROGRAM Criteria I. Intent It is the intent of the Umatilla Community Redevelopment Agency (the CRA), under Part III Community Redevelopment Act,

More information

Los Angeles World Airports

Los Angeles World Airports M E M O R A N D U M Los Angeles World Airports Date: Memo To: From: Subject: LAX Station Managers Raymond Jack, Airport Manager II LAX Operations Division Weekly Coordinated Construction Activity Runway

More information

Village of Cambridge. Tax Incremental Financing Policy & Application

Village of Cambridge. Tax Incremental Financing Policy & Application Village of Cambridge Tax Incremental Financing Policy & Application Village of Cambridge, Wisconsin 200 Spring Street Cambridge, WI 53563 www.cambridge.wi.us (608) 423-3712 Table of Contents Table of Contents...1

More information

City of Moreno Valley Date Council Approved March 13, 2007 Date Effective April 6, 2007 CLASS SPECIFICATION Senior Electrical Engineer, P.E.

City of Moreno Valley Date Council Approved March 13, 2007 Date Effective April 6, 2007 CLASS SPECIFICATION Senior Electrical Engineer, P.E. City of Moreno Valley Date Council Approved March 13, 2007 Date Effective April 6, 2007 CLASS SPECIFICATION Senior Electrical Engineer, P.E. GENERAL PURPOSE Under direction, manages, oversees, evaluates,

More information

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Shideler Hall Renovation Response Deadline 12/20/13

More information

Welcome. Pemberton Regional Airport Planning Continuum. and opportunities for dialogue 2005 2006 2007 2008 2009... PEMBERTON REGIONAL AIRPORT

Welcome. Pemberton Regional Airport Planning Continuum. and opportunities for dialogue 2005 2006 2007 2008 2009... PEMBERTON REGIONAL AIRPORT Welcome. The Village of Pemberton is initiating a community process on the future potential of the Pemberton Regional Airport and wants to hear from you! The purpose of this engagement is to: Communicate

More information

CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT

CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT REQUEST FOR QUALIFICATIONS EAST VALLEY ADULT RESOURCES TENANT IMPROVEMENT Project Funding by the United States Department of Housing and Urban Development Through

More information

Advisory Circular. AC No: 150/5100-14E. Subject: Architectural, Engineering, and Planning Consultant Services for Airport Grant Projects

Advisory Circular. AC No: 150/5100-14E. Subject: Architectural, Engineering, and Planning Consultant Services for Airport Grant Projects U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Architectural, Engineering, and Planning Consultant Services for Airport Grant Projects Date: 9/30/2014 Initiated

More information