1 PLAN CHECK CORRECTION SHEET FOR PLUMBING SYSTEMS 2014 LAPC This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly. Section: Mechanical Plan Check Plan Check/PCIS Application No.: Date: Job Address: Applicant Name: Address: City/State/Zip: Phone: Plan Check Engineer: Telephone: Your feedback is important; please visit our website to complete a Customer Survey at w/ladbsweb/customer-survey.jsf. If you have any questions or need clarification on any plan check matters, please contact a plan check supervisor or call our Customer Hotline at (213) Your plans have been examined and the issuance of a permit is withheld for the reasons set forth. The approval of plans and specifications does not permit the violation of any section of the Code, or other local ordinance or state law. INSTRUCTIONS: Corrections with circled item numbers apply to this plan check. Additional corrections are at the end of the list. Incomplete or non-legible drawings or calculations will not be accepted. Incorporate all comments as marked on the checked set of plans and calculations and this correction sheet. For each correction indicate the sheet number and detail or note number on the plans where the corrections are made. WHEN YOU HAVE COMPLIED WITH ALL CORRECTIONS, CALL OR THE PLAN CHECK ENGINEER TO MAKE AN APPOINTMENT FOR VERIFICATION PLEASE BRING THE MARKED UP PLANS AND THE CORRECTIONS SHEET TO THE VERIFICATION APPOINTMENT SEE MARKED UP PLANS FOR CLARIFICATIONS OF CORRECTIONS. Page 1 of 15
2 GENERALREQUIREMENTS NOTES ON PLANS 1. Plans shall bear, on every sheet, the registration or license number and signature of an architect, contractor, or engineer, registered in the appropriate classification by the State of California. (Chap. 7, Div. 3, Business and Professional Code, Art. 2, Sec ; LAPC ; LAPC ; LAPC ) 2. Show the job address on each sheet of the plans. (LAPC ; LAPC ) 3. Indicate on the plans the scope of the work to be done. (LAPC ) 4. Provide an approved Request for Modification of Building Ordinances form to allow plans at a scale smaller than 1/8 inch per foot. (LAPC ; LAPC ) POTABLE WATER SYSTEM PLAN DETAILS P1. Specify which fixtures are for private use and which are for public use (LAPC ). P2. Specify the piping materials for the domestic water system (LAPC 604.0). P3. Add the following note on the plans: AAll fixtures, equipment, piping, and materials shall be listed.@ (LAPC , LAPC 301.1) P4. Add the following note on the plans: AAll plumbing fixtures shall meet the flow requirements specified in the Los Angeles Plumbing Code.@ (LAPC 403.0) P5. Add the following note on the plans: AAll faucets in public restrooms shall be self-closing or self-closing metering faucets.@ (LAPC 403.4) P6. Add the following note on plans: Public lavatories shall have controls to limit the water temperature to 110 F. (Title 24 Part (c)3) P7. Add the following note on the plans: Water pipe and fittings with a lead content which exceeds 0.25% shall be prohibited in systems conveying potable water (LAPC ; Health & Safety Code ). P8. Plans shall be legible, and the drawing scale shall not be smaller than 1/8 inch per foot. (LAPC ) P9. Provide site water piping plans (LAPC , LAPC ). P10. Provide lot subdivision. Water pipes shall not cross lot lines. (LAPC 609.6) P11. Install a control valve in the domestic water supply to each building (LAPC 606.2). P12. Provide riser diagrams for hot & cold water systems (LAPC , LAPC ). P13. The riser diagram shall indicate all the fixtures served the pipe sizes and the fixture unit count on each leg of pipe, pressure regulators, back flow prevention devices, and water meter. (LAPC ; LAPC ) P14. Show the size of a water meter on the riser diagram (LAPC , LAPC ; LAPC 610.1). P15. (A) Show all new and all existing devices located between the city water service and the building plumbing system that cause pressure losses or gains in the system. Devices shall include but not be limited to pumps, water softeners, and sub meters. (LAPC ; LAPC ; LAPC 610.2) (B) State the make(s), model(s), and size(s) of the devices shown in item (A), and indicate if they are new or existing. (LAPC ; LAPC ; LAPC 610.2) (C) Provide manufacturer=s specification sheets for the devices shown in item (A) indicating the pressure loss versus the flow. (LAPC ; LAPC ; LAPC 610.2) Page 2 of 15
3 P16. Indicate on the plans, all fixture unit loads in addition to the loads of the new fixtures including but not limited to, existing fixtures, irrigation load, make up water for cooling towers and boilers, demand for future use, and any other uses (LAPC , LAPC , LAPC Appendix A Sect. A2.0). P17. Show the future water demand (LAPC Appendix A Sec. A2.0). P18. Provide on the plan a table with calculations for the total number of fixture units to be installed. Table shall indicate the total of each type of fixture, the associated hot and/or cold fixture unit value for each, total contribution of hot and cold fixture units in the system and the total number of fixture units in the building. (LAPC ) P19. Indicate on the plans the type of the water closets and urinals (tank or flushometer valves) used (LAPC ; LAPC 610.0; LAPC Table 610.3; LAPC Appendix A Chart A 2.1, LAPC Appendix Table A 2.1). P20. An approved pressure regulating valve (PRV) shall be installed to reduce the water pressure at any fixture to 80 psi or less (LAPC 608.2). P21. The pressure regulating valve (PRV) shall be installed at above grade or finished floor. The PRV shall not be installed in a pit where it can become submerged in water (LAPC 608.2). P22. Show make(s), model(s) and size(s) of the PRV(s) on the plans. (LAPC , LAPC , LAPC 608.2) P26. Show make, model and size of the RP on the plans (LAPC , LAPC & LAPC 610.2). P27. Provide a copy of the manufacturer=s catalog for the RP used showing pressure losses. (LAPC ; LAPC ; LAPC 610.2) P28. Indicate the type, size and capacity of the water heater(s) and water storage tank(s). (LAPC ; LAPC 608.2) P29. State the first hour rating (in gallons) of the water heater and the number of bathrooms and bedrooms (LAPC 501.1, TABLE 501.1) P30. Provide the manufacturer=s printed sizing and installation instructions on the tank-less water heater. (LAPC 501.1) P31. Provide a temperature & pressure relief valve on the water heater. The valve shall discharge to an approved location. Pressure relief valves for water heaters installed inside a building shall discharge to a floor drain, floor sink or similar fixture (LAPC 608.3; LAPC 608.5). P32. Provide an approved thermal expansion tank at the water heater. Show the expansion tank on the riser diagram (LAPC 608.2; LAPC 608.3). P33. State make and model of the thermal expansion tank (LAPC & LAPC 608.3). P34. Provide the manufacturer=s sizing instructions for the thermal expansion tank. (LAPC ; LAPC ; LAPC 608.2, LAPC 608.3) P23. Provide a copy of the manufacturer=s catalog for the PRV(s) used showing pressure drop through them. (LAPC 608.2) P24. Provide a reduced pressure back flow device (RP) at the meter. (LAPC 603.0, Table 603.2, and DWP rule 16D) P25. The reduced pressure back flow device (RP) shall be installed at least 12 inches above grade or finished floor. The RP shall not be installed in a pit where it can become submerged in water (Table 603.2; LAPC ) P35. Install two hot water recirculation loops each serving half of the building. The recirculation loops shall meet the requirements of Title 24 sections 110.3(c)2 and 110.3(c)5 (Title 24 Part (c) 8 ii). P36. Showers shall be provided with individual tempering valves (LAPC 408.3). P37. State make, model, rated pressure, and g.p.m. of the water pump(s) (LAPC , LAPC 608.1). P38. Provide the pump performance curve for the water pump(s) being used. (LAPC ) Page 3 of 15
4 P39. The pump systems shall be approved by the City of Los Angeles Mechanical Testing Laboratory or other recognized agency (LAPC 301.1). P40. (A) The heat exchanger shall be listed, double wall type and the space between the two walls shall be vented to the atmosphere. (LAPC ) (B) State on plans the heater transfer medium. The medium shall be either potable water or fluids with toxicity rating of 1. (LAPC ) P41. Provide separate remote heaters or boosters to supply outlets requiring higher than service water temperature as listed in the ASHRAE Applications Handbook Chapter 49, Table 2 (higher than 120 F; LAPC 421.2; LAPC 409.4; LAPC 408.3; Title 24 Sect. 113(c)1) P42. Install solar water heating system with a minimum solar serving fraction of 0.2 (Title 24 Part (C) 8 iii). P43. Install a check valve between the recirculation pump and the water heating equipment (Title 24 Part (C) 5B). P44. Install a hose bib between the pump and the water heating equipment. (Title 24 Part (C) 5C). P45. Install an isolation valve between the hose bib and the water heating equipment (Title 24 Part (C) 5C). P46. Install isolation valves on both sides of the recirculation valve (Title 24 Part (C) 5D). P47. Provide separate sub-meters for each individual tenant that consumes more than100 gal/day. (LAGC ) CALCULATIONS P48. Provide hydraulic calculations for sizing the cold and hot water systems (LAPC ; LAPC 610.0; LAPC Appendix A) ) P52. Provide pipe sizing charts for each zone. (LAPC ; LAPC ) P53. For each down-feed zone, provide calculations for the highest and lowest floors in the zone to show that the pipe sizing chart is adequate for every floor in the zone and that no more than 80 psi is delivered to any point in the zone. (LAPC 608.2) OSHPD 3 REQUIREMENTS P54. Add the following note: Sensor operated flush valves shall be capable of functioning during loss of normal power. (LAPC 413.3) P55. CPVC piping is not allowed. Change the piping material to an approved one. (LAPC 604.1) P56. Install a sectional valve at each riser or branch both in hot and cold water systems. (LAPC 608.8) P57. State on the plans at which temperature hot domestic water is supplied. It shall be in compliance with Table (LAPC 613.0) P58. Provide at least two sources of hot water equipment to supply hot water for dishwashing and minimum patient services such as hand washing and bathing. (LAPC 613.2) P59. Install valves to automatically control the temperature of hot water to fixture used by patients within the range of 105 F to 120 F. (LAPC 613.5) P60. Hot water serving patience care areas shall have a continuous recirculating system. (LAPC 613.6) P61. Dialysis water feed lines shall be made out of material allowed by Section (LAPC 614.1) WASTE AND VENT SYSTEM PLAN DETAILS P49. The minimum water pressure supplied to the most remote fixture shall be not less than the requirements of that fixture and not less than 15 PSI, whichever is higher. (LAPC 608.1) P50. Clearly identify each hydraulic design zone on the riser diagram. Show any node points on the riser used in the calculations. (LAPC ) P51. For each zone, provide hydraulic calculations showing the pressure losses from the city main to the pressure reducing valve for each zone (LAPC Page 4 of 15 W1. Specify the slope of the horizontal drainage piping. (LAPC 708.0) W2. Provide site plans showing the building sewer and the city sewer main size (LAPC , LAPC ) W3. Provide lot subdivision. The building sewer shall not cross lot lines (LAPC 721.1).
5 W4. Provide complete riser diagrams for the waste and vent systems. The waste system shall extend to the property line (LAPC , LAPC ). W5. The riser diagram shall show all the fixtures served, the pipe size, and the fixture unit count on each branch of pipe (LAPC , LAPC ). W6. Indicate on the plans the piping materials (LAPC 701.0). W7. Show all pipe sizes on the plan (LAPC , LAPC ). W8. Show size of the sewer main in the street (LAPC , LAPC ). W16. Show location(s) of the grease interceptor(s) on the lay out (LAPC ) W17. Provide product literature for the grease interceptor. (LAPC , LAPC ; LAPC ) W18. The grease interceptor shall be approved by the City of Los Angeles Testing Laboratory or other City of Los Angeles recognized agency (LAPC 301.1). W19. Show details for the island venting (LAPC 909.1). W20. The island sink drain, upstream of the returned vent, shall serve no other fixtures (LAPC 909.1) W9. Provide suds relief (show them on the riser) (LAPC 711.0). W10. Clearly indicate on the plans the waste stacks that carry the discharge of suds producing fixtures (LAPC 711.0). W11. The aggregate cross sectional area of the vent shall not be less than that of the largest required building sewer (LAPC 904.1). W12. Pot sinks, scullery sinks, dishwashing sinks, silverware-washing machines, commercial dishwashers, shall be directly connected to the drainage system. Provide a floor drain adjacent to the fixture with the fixture connected on the sewer side of the floor drain trap. (LAPC 704.3) W13. Ice machines drink dispensers, coffee machines, freezers, refrigeration coils, and similar equipment shall be indirectly connected to the drainage system (LAPC 801.2). W14. Food-preparation sinks, steam kettles, potato peelers, dipper wells, and similar equipment shall be indirectly connected to the drainage system by means of an air-gap (LAPC ). W15. Provide clearance from AIndustrial Waste.@ The Industrial Waste Management Division of the Department of Public Works, Bureau of Sanitation may be contacted at and is located at 2714 Media Center Drive, Los Angeles (LAPC 306.1). W21. Install a clean out every 100 feet or a manhole every 300 feet in the building sewer (site sewer) in straight runs and for each aggregate horizontal change in direction exceeding 135 (LAPC 719.1, LAPC 719.6). W22. Provide yoke vents and show the yoke vents on the riser diagram (LAPC 907.1, LAPC 907.2). W23. All wet vented fixtures shall be within the same story (LAPC 908.1). W24. Only private bathroom groups may be wet vented horizontally. (LAPC 908.2) W25. No more than two bathroom groups located on the same floor may be connected to a horizontal wet vent system (LAPC 908.2) W26. Lavatories shall not be installed in horizontal wet vent systems. (LAPC 908.2) W27. The water closet in a horizontal wet vent system shall connect to the conventional sewer and shall be installed downstream of any wet vented fixture. (LAPC 908.2) W28. Combination waste and vent system is only allowed where structural conditions preclude the installation of a conventional system (LAPC 910.1). W29. Discharge from toilets or urinals is not allowed in a combination waste and vent system (LAPC 910.7). Page 5 of 15
6 W30. Combination waste and vent systems shall not be utilized where solids or grease waste is anticipated (LAPC Appendix B Sect. B1.0). W31. No vertical waste pipes are allowed in a combination waste and vent system. (LAPC 910.5) W32. Show a detail of the connection of the branches to the main horizontal line. (LAPC ; LAPC 910.2; LAPC 910.5) W33. Each drain pipe and each trap, in a combination waste and vent system, shall be 2 pipe sizes larger than the sizes required by Chapter 7 of the Plumbing Code (LAPC 910.4). W34. Show a typical detail of the tailpiece and trap (LAPC ; LAPC 910.2; LAPC 910.4) W35. Provide a separate vent for each waste branch line exceeding 15' in length (LAPC 910.3). W36. Provide a vent downstream of the uppermost fixture (LAPC 910.3). W37. Relief vents shall be provided every 100 feet along the mains. (LAPC Appendix B Sect. B3.0) W38. The minimum area of any vent installed in a combination waste and vent system shall be at least 2 the inside cross-sectional area of the drain pipe served (LAPC 910.3). W39. Show on plans type & use of each fixture served by the combination waste and vent system. (LAPC , LAPC ) W40. Show the combination waste and vent piping on floor plans. (LAPC , LAPC ) W41. Show size, length and type of material of the sewage ejector discharge line (LAPC , LAPC 701.0) W42. The discharge line from the sewage ejector shall be provided with an accessible check valve and gate valve or ball valve (LAPC 710.4). W44. Provide dual pumps each capable of handling the load independently (LAPC 710.9) W45. Provide air tight cover for the sump (LAPC ) W46. Sump(s) shall be provided with a vent pipe which shall extend through the roof (LAPC 710.7). W47. Show load discharging into the sump (LAPC , LAPC ) W48. Show make, model and HP of sewage ejector on plan (LAPC , LAPC ) W49. Provide pump performance curves (LAPC , LAPC ) W50. Provide a riser diagram showing the sump, sump inlet & outlet, check valve, gate valve, levels, alarm and gravity line. (LAPC , LAPC ) W51. The discharge line of the pump shall connect to the horizontal gravity line from the top through a wye branch fitting (LAPC 710.4). W52. State length of pipe & elevation difference between the bottom of the sump and the gravity line (LAPC , LAPC ). W53. Show high water level. It shall be at least 2 inches below the lowest inlet. (LAPC 710.9) W54. Sumps receiving waste from water closets shall have a minimum 2 inch discharge (single family dwelling). 3 inch discharge is required for commercial buildings. (LAPC 710.3) W55. Allow two fixtures units for each gallon per minute discharging from the sewage ejector. (LAPC 710.5) W56. Sump(s) shall be made of concrete, metal or other approved materials. Fiberglass sumps shall be approved by the Los Angeles City Mechanical Testing Laboratory, or listed by a City of Los Angeles recognized agency (LAPC & LAPC 301.1). W43. Gate valve or ball valve and check valve shall be W57. Specify the type of material of the sump on the located outside the pump pit (LAPC 710.4). plans, or specify make, model and research report Page 6 of 15
7 number of the prefabricated sump (LAPC 301.1, LAPC 710.8). W58. The fire pump room shall be provided with a floor drain and a floor sink. (2013 NFPA ) CALCULATIONS W59. Determine the flow of water in gallons per minute discharging into the sump (LAPC , LAPC ). W60. Provide calculations for the system curve. Take into consideration losses due to all the fittings, gate valve and backwater valve (LAPC , LAPC ). W61. Draw the system curve on the pump curve to determine the point of intersection, which will determine the volume flow rate coming out of the pump (LAPC , LAPC ). W62. Determine the waste fixture unit load of the gravity line by allowing 2 fixture units for every gallon per minute pumped by the sewage ejector. (LAPC 710.5) W63. Provide relief vent stack. (LAPC 907.1) OSHPD 3 REQUIREMENTS W64. Remove floor drains from operating and delivery rooms (LAPC ) W65. ABS and PVC for waste and vent systems are not allowed (LAPC 701.1(2); LAPC ) W66. Each vent shall terminate not less than 25 feet from any air intake or vent shaft (LAPC ) W67. Grease interceptor shall not be installed in the kitchen (LAPC (B); LAPC (C); LAPC ; LAPC ) GAS SYSTEM PLAN DETAILS G1. Provide a complete riser diagram for the gas system. (LAPC ; LAPC ) G2. The riser diagram shall indicate all of the appliances/equipment being served, the pipe sizes, and the hourly volume (CFH) of gas on each leg of pipe. (LAPC ; LAPC ; LAPC ; LAPC ) G3. Indicate on the plans the total length of the system from the gas meter or regulator to the most remote gas outlet. (LAPC ) G4. Indicate on the plans the material for the gas piping. (LAPC ; LAPC ) G5. Provide a separate gas shut-off valve for each tenant. (LAPC ) G6. Indicate on the plans the hourly volume (CFH) of gas required at each outlet. (LAPC ) G7. Provide an approved type seismic gas shut-off valve. (LAPC ; LAPC ) G8. Indicate on the plans the size, make, and model of the seismic gas shut-off valve. (LAPC ) G9. The seismic gas shut-off valve shall be mounted rigidly to the exterior of the building or structure containing the fuel gas piping. (LAPC ) G10. No gas pipe shall be installed under the building unless it is properly sleeved. (LAPC ) G11. Provide a letter from the gas company stating that they will deliver the desired pressure and volume of gas. (LAPC ) G12. Show on the plans the size, make, model, orifice size, spring number, pressure setting, and inlet pressure of the gas pressure regulator. (LAPC ) G13. Provide manufacturer=s cut-sheet for the gas pressure regulator showing the inlet and outlet pressures at the selected setting. (LAPC ; LAPC ) G14. An approved gas shut-off valve shall be installed immediately preceding each regulator. (LAPC ) G15. Pressure regulator shall be vented to the outside of the building. (LAPC ) Page 7 of 15
8 G16. The pressure regulator(s) shall be provided with factory installed overpressure protection devices to limit the pressure downstream of the line pressure regulator to 2 psi in the event of failure of the line pressure regulator. (LAPC ) G17. Provide a copy of an approved Request for Modification of Building Ordinances form allowing the use of high pressure gas. (LAPC ; LAPC ) G25. Include the losses due to the gas sub-meter (LAPC ) STORM DRAINAGE SYSTEM PLAN DETAILS S1. Provide complete riser diagrams for the rain water system. (LAPC , LAPC ). S2. Indicate on the riser diagram the area (ft 2 ) covered by each drain (LAPC , LAPC , Appendix D Sect. D-3.1, LAPC , LAPC Table , and LAPC Table ). SOIL REMEDIATION SYSTEMS G18. Provide a copy of approved Request for Modification of Building Ordinances form for the following items: A. Connecting unit to more than one gas system. (LAPC ) B. Not to use a two way three port valve. (LAPC ) G19. Provide a copy of manufacturer=s cut-sheet for vapor extraction unit showing volume and pressure of gas required to operate the unit. (LAPC ) G20. Provide an approved type check valve at each gas connection to the vapor extraction unit. (LAPC ) G21. Vapor extraction unit shall be approved by the Los Angeles City Mechanical Testing Laboratory. (LAPC 301.1) CALCULATIONS G22. Provide engineering calculations used in sizing the gas piping system. (LAPC ) G23. Provide any sizing tables published by the pipe manufacturer in the product literature. (LAPC ) S3. Indicate on the plans the piping material of the rain water system. (LAPC , LAPC ). S4. Indicate on the plan the slope of horizontal piping (LAPC Table ). S5. Provide overflow drains. Otherwise, indicate the reasons for not having them (LAPC ). S6. If scuppers are used as overflow drains, they shall be sized having area equivalent to the one of the drains as determined by section Furthermore, scupper openings shall not be less of 4 high and have a width at least equal to the circumference of the roof drain required for the area served (Diameter X π). (LAPC ). S7. Roof drains and over flow drains shall be piped independently to the outside of the building (LAPC (A)). S8. Backwater valves shall be installed to prevent flooding of the garage (LAPC ). S9. Provide an approved Request for Modification of Building Ordinances form from Grading allowing the site drainage to drain into a sump system ( ). S10. Provide a riser diagram showing the sump, sump inlet & outlet, backwater valves and gravity line (LAPC , LAPC ) G24. Provide product literature for the gas sub-meter(s) showing capacity, pressure losses, and listing. (LAPC ; LAPC ; LAPC ) S11. Backwater valve and gate valve shall be located outside the pit. (LAPC 710.6) S12. The gate valve shall be located on the discharge Page 8 of 15
9 side of the check valve (LAPC 710.4). S13. Sump(s) shall be made of concrete, metal or other approved materials. Fiberglass sumps shall be approved by the Los Angeles City Mechanical Testing Laboratory or other agency recognized by the City of Los Angles. (LAPC & LAPC 301.1) S14. Specify the material of the sump pit on the plans or specify make, model and research report number of the prefabricated sump (LAPC 101.5, LAPC 301.1). S15. The sump pit shall be installed with an air-tight cover. (LAPC ) S16. The sump pit shall be at least 15 inches in diameter and 18 inches in depth. (LAPC ) S17. The lowest inlet to the sump shall have a minimum clearance of 2 inches above the high water level. (LAPC 710.9) S18. Sump(s) shall be provided with a vent pipe which shall extend through the roof (LAPC & LAPC 906.1) S19. Show the high water level. It shall be at least 2 inches below the lowest inlet (LAPC 710.9). S20. Show load discharging into the sump (LAPC ) S21. Provide a detail showing the sump location, the inlet lines, the outlet line, and gravity line (LAPC , LAPC ). S22. Show the gravity line all the way to the approved point of disposal (LAPC , LAPC ). S23. When discharging to the public street the pressure line shall connect to a gravity pipe within the property (Department of Public Works requirement). three and four inches and a cross section equal or greater the cross section of the pipe, or manifold multiple pipes having aggregate cross sectional area equal or greater the cross sectional area of the gravity pipe (Department of Public Works requirement). S26. Show size, length and type of material of the pump discharge line (LAPC , LAPC ). S27. The discharge line from the sump pump shall be provided with an accessible backwater valve and gate valve. (LAPC 710.4) S28. Backwater valve and gate valve shall be located outside of the pit. (LAPC 710.4) S29. Provide dual sump pumps. (LAPC ) S30. Minimum size of pump shall be 15 gpm. (LAPC ) S31. The discharge line from the sump pump shall be at least 1 2 inch diameter. (LAPC ) S32. Where the sump pump discharge line connects to a horizontal drain line, such connection shall be made from the top through a wye branch fitting. (LAPC 710.4) S33. Show make, model and HP of pump on plan. (LAPC ) S34. Provide pump performance curves (LAPC ) S35. State the length of pipe & elevation difference between the bottom of the sump and the gravity line. (LAPC ; LAPC ) S36. Provide clearance from the Department of Public Works allowing the water velocity to exceed 7 ft/s at the point of discharge to the public street (Department of Public Works requirement). S24. When discharging under the curb, the drain line shall not be smaller than three inch diameter or greater than four inch diameter (Department of Public Works requirement) S25. When the gravity line from rain water exceeds four inch in diameter, for the portion under the curb, either use rectangular fitting having height between Page 9 of 15 CALCULATIONS S37. Determine the flow of water in gallons per minute going into the sump. (LAPC ; LAPC ) S38. Calculate the amount of water collected at the rate of gpm per square foot (LAPC Table D 1.1).
10 S39. Provide a hydrologic report based on the proper 50- year isohyetal, and the calculations shall be according to the Peak Rate Method for a concentration time of 5 minutes ( ). S40. Provide calculations for the system curve. Take into consideration all the fittings, gate valve and backwater valve (LAPC , LAPC ) S41. Draw the system curve on the pump curve to determine the point of intersection, which will determine the volume flow coming out of the pump. (LAPC , LAPC ) ) SS7. Backwater valve and gate valve shall be located outside the pit. (LAPC 710.6) SS8. The gate valve shall be located on the discharge side of the check valve (LAPC 710.4). SS9. Sump(s) shall be made of concrete, metal or other approved materials. Fiberglass sumps shall be approved by the Los Angeles city Mechanical Testing Laboratory (LAPC & LAPC 301.1). SS10. Specify the type of material of the sump on the plans or specify make, model and research report number of the prefabricated sump (LAPC , LAPC 301.1). S42. Determine the square footage loading of the gravity drain by allowing square feet of area for every gallon per minute pumped by the sump pump (LAPC Table D 1.1). S43. Provide calculations showing that the discharge to the street does not exceed 7 ft/s (Department of Public Works requirement). SUBSURFACE DRAINAGE SYSTEMS PLAN DETAILS SS1. Show the subsurface drainage piping on the floor plans. (LAPC ) SS2. State the piping material. (LAPC ) SS3. Non perforated piping shall be made of metal as in sanitary drainage systems.(lapc ) SS4. Provide a statement from a California registered civil engineer showing the required flow. (LAPC ) SS5. Either terminate the subsurface drains to the city storm drain, or provide a soil report showing that there is no continuously flowing springs or ground water. (LAPC ) SS6. Provide a riser diagram showing the sump, sump inlet & outlet, backwater valves, gate valves, levels, alarm and gravity line (LAPC , LAPC SS11. Provided an airtight cover. (LAPC ; LAPC ) SS12. The sump pit shall be at least 15 inches in diameter and 18 inches in depth. (LAPC ) SS13. The lowest inlet to the sump shall have a minimum clearance of 2 inches above the highwater level. (LAPC 710.9; LAPC ) SS14. Sump(s) shall be provided with a vent pipe which shall extend a minimum of six inches above the solid sump cover (LAPC 710.7; LAPC 906.0) SS15. Show the fixture unit load discharging into the sump (LAPC ; LAPC ) SS16. Provide a detail showing the sump location, the inlet lines, the outlet line, and gravity line (LAPC , LAPC ). SS17. Show the gravity line all the way to the property line (LAPC , LAPC ). SS18. When discharging to the public street the pressure line shall connect to a gravity pipe within the property (Department of Public Works requirement). SS19. When discharging under the curb, the drain line shall not be smaller than three inch diameter nor Page 10 of 15
11 greater than four inch diameter (Department of Public Works requirement SS20. When the gravity line from rain water exceeds four inch in diameter, for the portion under the curb, either use rectangular fitting having height between three and four inches and a cross section equal or greater the cross section of the pipe, or manifold multiple pipes having aggregate cross sectional area equal or greater the cross sectional area of the gravity pipe (Department of Public Works requirement). SS21. Show size, length and type of material of the pump discharge pipe (LAPC , LAPC ). into consideration all the fittings, gate valve and backwater valve (LAPC , LAPC ). SS32. Draw the system curve on the pump curve to determine the point of intersection, which will determine the volume flow coming out of the pump (LAPC , LAPC ). SS33. Determine the required size of gravity drain according to Table D1.1 by allowing square feet of area for every gallon per minute pumped by the sump pump (LAPC Table D1.1). SS34. Provide calculations showing that the discharge to the street does not exceed 7 ft/s (Department of Public Works requirement). SS22. The discharge pipe from the sump pump shall be provided with an accessible backwater valve and gate valve. (LAPC 710.6) SS23. Provide dual sump pumps. (LAPC ) SS24. Minimum size of pump shall be 15 gpm. (LAPC ) SS25. The discharge line from the sump pump shall be at least 1 2 inch diameter. (LAPC ) SS26. Where the sump pump discharge line connects to a horizontal drain line, such connection shall be made from the top through a wye branch fitting. (LAPC 710.4) SS27. Show make, model and HP of pump on plan. (LAPC ; LAPC ) SS35. Provide clearance from the Department of Public Works allowing the water velocity to exceed 7 ft/s at the point of discharge to the public street (Department of Public Works requirement). SEWAGE AND SUMP PUMP SYSTEMS PLAN DETAILS SE1. Provide air tight cover for the sump (LAPC ). SE2. Show the load discharging into the sump (LAPC , LAPC ). SE3. Show the make, model, and horse power of the pump on the plans (LAPC , LAPC ). SE4. State the length of the pipe from the pump to the gravity line, and the elevation difference between the bottom of the sump and the gravity line (LAPC , LAPC ). SS28. Provide pump performance curves (LAPC & ) SS29. State length of pipe & elevation difference between the bottom of the sump and the gravity line. (LAPC ; LAPC ) CALCULATIONS SS30. Determine the gallons per minute going into the sump (LAPC , LAPC ). SS31. Provide calculations for the system curve. Take Page 11 of 15 SE5. Sump(s) shall be made of concrete, metal or other approved materials. Fiberglass sumps shall be approved by the Los Angeles City Mechanical Testing Laboratory, or other City of Los Angeles recognized agency (LAPC 710.8, LAPC 301.1). SE6. Please specify the type of material of the sump on the plans, or specify make, model and research report number of the prefabricated sump (LAPC , LAPC 301.1). SE7. The sump pit shall be at least 15 inches in diameter and 18 inches in depth (Rain water only, LAPC ).
12 SE8. Provide an approved modification from Grading allowing the site drainage to drain into a sump system (LABC ). SE9. Provide a plot plan or lay out showing the sump location, the inlet lines, the outlet line, and gravity line (LAPC , LAPC ). SE10. Show the gravity line all the way to the property line (LAPC , LAPC ). SE11. When discharging to the public street the pressure line shall connect to a gravity pipe within the property (Department of Public Works requirement). SE12. When discharging under the curb, the drain line shall not be smaller than three inch diameter nor greater than four inch diameter (Department of Public Works requirement). SE13. When the gravity line from rain water exceeds four inch in diameter either use rectangular fitting having height between three and four inches and a cross section equal or greater the cross section of the pipe, or manifold multiple pipes having aggregate cross sectional area equal or greater the cross sectional area of the gravity pipe (Department of Public Works requirement). SE14. Provide a riser diagram showing the sump, sump inlet & outlet check valves and gravity line (LAPC , LAPC ). SE15. The discharge line shall connect to the horizontal gravity line from the top through a wye branch fitting (LAPC 710.4). SE16. Show size, length and type of material of the pump discharge line (LAPC , LAPC ). SE17. The discharge line from the ejector or sump pump shall be provided with an accessible check valve and gate valve (LAPC 710.4). SE18. The gate valve shall be located on the discharge side of the check valve (LAPC 710.4) SE19. Gate valves and check valves shall be located outside the pit (LAPC 710.6). SE20. Provide dual pumps each capable of handling the load independently (LAPC 710.9; LAPC ). SE21. Sump(s) shall be provided with a vent pipe which shall extend through the roof (LAPC 710.7). SE22. Show high water level. It shall be at least 2 inches below the lowest inlet (LAPC 710.9). SE23. Sewage ejectors located in single family dwellings and receiving waste from water closets or urinals, shall be able to pass a 1-1/2 inch diameter ball (LAPC (2) ) SE24. Sewage ejectors located in single family dwellings and receiving waste from water closets or urinals, shall have a minimum pump size of 2" and shall be connected to a discharge pipe of at least 2 inch (LAPC (2)). SE25. In other than single dwellings, sewage ejectors receiving waste from water closets or urinals, shall be able to pass a 2 inch diameter ball (LAPC 710.3(3)). SE26. Sewage ejectors, in other than single dwellings, and receiving waste from water closets or urinals shall have discharge piping, check valves, and gate valves not less than 3 inch in diameter (LAPC 710.3(3)) SE27. The discharge line from the sump shall be at least 1 ½ inch diameter (Subsoil only) (LAPC ) SE28. Backwater valves shall be installed to prevent flooding of the garage from outside water (Subsoil and Rain water only LAPC ) SE29. Show all pipe sizes on the plan (LAPC , LAPC ). CALCULATIONS SE30. Determine the gallons per minute going into the sump (LAPC , LAPC ). SE31. Calculate the amount of water collected at the rate of gpm per square foot (LAPC Table D1.1). SE32. Provide a hydrology report based on the proper 50-year isohyetal. Calculations shall be according to the Peak Rate Method for a concentration time of 5 minutes (LABC ). SE33. Provide pump performance curve LAPC , LAPC ). SE34. Provide calculations for the system curve. Take into consideration all the fittings, gate valve and backwater valve (LAPC , LAPC ). Page 12 of 15
13 SE35. Draw the system curve on the pump curve to determine the point of intersection, which will determine the volume flow coming out of the pump (LAPC , LAPC ). SE36. Determine the fixture unit loading of the gravity drain by allowing two (2) fixture units for every gallon per minute pumped by the sewage ejector (LAPC 702.3, LAPC 710.5). SE37. Determine the square footage loading of the gravity drain by allowing square feet of area for every gallon per minute pumped by the sump pump (LAPC Table D1.1). SE38. The pump shall have a discharge capacity of not less than 15 gpm. (Subsoil drainage only) (LAPC ) SE39. The pump shall have a discharge capacity of not less than 20 gpm (Sewage ejectors LAPC 710.3(1)) SE40. Provide calculations showing that the discharge to the street does not exceed 7 ft/s (Department of Public Works requirement). SE41. Provide clearance from the Department of Public Works allowing the water velocity to exceed 7 ft/s at the point of discharge to the public street (Department of Public Works requirement). Page 13 of 15
14 ADDITIONAL CORRECTIONS CODE SECTION Page 14 of 15
15 ADDITIONAL CORRECTIONS CODE SECTION Page 15 of 15
CITY OF LOS ANGELES 2011 PLUMBING/MECHANICAL PLAN CHECK LIST
CITY OF LOS ANGELES 2011 PLUMBING/MECHANICAL PLAN CHECK LIST Plan Check No. Plan Check Expiration Date Job Address: Square Footage Use Zone Fire Zone Occ. Group Type of Construction No. of Stories Applicant
Plumbing Code Sections For Commercial Food Facilities
Plumbing Code Sections For Commercial Food Facilities SCOPE The following list of requirements summarizes the plumbing issues that are commonly addressed in commercial retail food facilities by health
Residential Plumbing BCN 1058
Residential Plumbing BCN 1058 CHAPTER 7 Plumbing Fixtures and Sizing the Drain, Waste, and Vent System MICHAEL KNOTEK 74 Plumbing Fixtures and Sizing the Drain, Waste, and Vent System PLUMBING FIXTURES
CITY of LOS ANGELES DEPARTMENT of BUILDING and SAFETY
Draft CITY of LOS ANGELES DEPARTMENT of BUILDING and SAFETY Draft Los Angeles Plumbing Code (LAPC) 2008 California Plumbing Code (CPC) 2007 Uniform Plumbing Code (UPC) 2006 Major Code Changes Preliminary
CHAPTER 9 VENTS. copper drainage tube Type DWV, Schedule 40 plastic piping, or borosilicate glass.
CHAPTER 9 VENTS 901 GENERAL 901.1 Scope The provisions of this chapter shall govern the materials, design, construction, and installation of vents. 901.2 Protection of Trap Seals The protection of trap
Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling
Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling February 2001 contents General Information 3 Inspection 4 New Drain and Vent Installations
Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,
4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.
Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling
PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling October 2014 contents General Information
Element D Services Plumbing
PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses domestic cold, hot and hot water return distribution systems within and to five feet beyond building perimeter. PART 2 - DESIGN CRITERIA 2.01 GENERAL
Top 10+ Mistakes of DWV plumbing design
Top 10+ Mistakes of DWV plumbing design Listed below are the some of the most frequently missed items, noticed by our inspectors, at plumbing rough-in when non-plumbers attempt plumbing design. Most of
CHAPTER 11 STORM DRAINAGE
CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be
Amendments to the 2012 International Plumbing Code
Amendments to the 2012 International Plumbing Code North Central Texas Council of Governments region The following sections, paragraphs, and sentences of the 2012 International Plumbing Code are hereby
Plumbing. Helpful Hints Residential Construction. Lincoln County. Bert Polk Plumbing Inspector
Plumbing Helpful Hints Residential Construction Bert Polk Plumbing Inspector Lincoln County 2015 Waste and vent fittings Vent 90 medium 90 long 90 1/16 bend,1/8 bend,1/6 bend, medium 90 san tee combination
CHAPTER 11 STORM DRAINAGE
CHAPTER 11 STORM DRAINAGE SECTION 11 GENERAL 11.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. 11.2 Where required. All roofs,
What to Expect From the Examination. How to Study the Plumbing Codes
Texas State Board of Plumbing Examiners Plumbing Inspector Examination Review Course The following Examination Review Course is designed to assist an applicant in preparing for the Plumbing Inspector examination.
Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842
Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842 APPLICATION for ZONING and BUILDING PERMIT APPLICATION INSTRUCTIONS:
Dominic i Barbato Dpt. Of Building and Safety (818) 374 4361 [email protected]
Dominic i Barbato Dpt. Of Building and Safety (818) 374 4361 [email protected] b 2011 Los Angeles Plumbing Code LAPC changes from 2008 2011 Los Angeles Plumbing Code Consists of the following:
PMA ONLINE TRAINING Venting for Plumbing Systems
PMA ONLINE TRAINING Venting for Plumbing Systems One Hour Continuing Education Venting PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended
One of the fundamental design elements that every
Preliminary Design Information Before starting the water system design, you must assemble a collection of information. This includes information from the owner, the local utility, and the architect. Things
SIZING OF WATER PIPING SYSTEM
SIZING OF WATER PIPING SYSTEM SECTION E101 GENERAL E101.1 Scope. E101.1.1 This appendix outlines two procedures for sizing a water piping system (see Sections E103.3 and E201.1). The design procedures
SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13D
July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13D Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: A-Approved;
CHAPTER 26 PLUMBING CODE
CHAPTER 26 PLUMBING CODE 26.01 PLUMBING CODE The Illinois Plumbing Code as promulgated by the Illinois Department of Public Health at 77 Illinois Administrative Code, Part 890, is hereby adopted as the
APPENDIX A RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEM
APPENDIX A RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEM Because of the variable conditions encountered, it is impractical to lay down definite detailed rules of procedure for determining the sizes
WELCOME INTERNATIONAL RESIDENTIAL CODE 2009 EDITION PLUMBING SECTION
WELCOME INTERNATIONAL RESIDENTIAL CODE 2009 EDITION PLUMBING SECTION 1 HOUSEKEEPING 2 CHANGES We will be covering the significant changes to the International Residential Code and the changes common to
Plumbing Code in Commercial Kitchens
Plumbing Code in Commercial Kitchens City of Concord Code Administration 225-8580 Dan Clark Plumbing Inspector Tedd Evans, Chief Building Inspector Code References from the 2009 edition of the International
2014 Oregon Plumbing Specialty Code New Oregon Amendments
2014 OPSC Oregon Amendments Effective October 1, 2014 2014 Oregon Plumbing Specialty Code New Oregon Amendments This document outlines all the new Oregon Amendments adopted during the code promulgation
CALIFORNIA PLUMBING CODE MATRIX ADOPTION TABLE CHAPTER 8 - INDIRECT WASTES
CALIFORNIA PLUMBING CODE MATRIX ADOPTION TABLE CHAPTER 8 - INDIRECT WASTES Adopting Agency BSC SFM HCD DSA OSHPD CSA DPH AGR DWR CA 1 2 1/AC AC SS SS/CC 1 2 3 4 Adopt Entire Chapter X X X X X X X X X Adopt
ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.
ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of
2006 Codes. Please verify the following before calling for inspection
INSPECTION CHECKLIST RESIDENTIAL PLUMBING ROUGH IN 2006 Codes This checklist is intended for use to prepare for an inspection. This is only a general list and is not intended to address all possible conditions.
Brian Coppock, Regional Compliance Officer. Office of Statewide Health Planning and Development Facilities Development Division
Brian Coppock, Regional Compliance Officer Office of Statewide Health Planning and Development Facilities Development Division CHAPTER 6 WATER SUPPLY AND DISTRIBUTION 601.0 Hot and Cold Water Required.
City of Elk River BASEMENT Office Use Only
City of Elk River BASEMENT Office Use Only Fire and Building Safety Division (FABS) Building Permit Application Notes Scan Permit Total Date Permit # PID # $ Site Address Suite/Unit Structure Type Single
PLUMBING ROUGH IN INSPECTION
This Program is made Possible through the Code Officials Education & Training Fund. Revenue for the Fund comes from Assessments on Building Permits. Please turn down cell phones and put pagers on vibrate.
All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.
2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other
Oregon Plumbing Rule and Law RV 3.3.16
PLEASE DO NOT BOOKMARK ANY ANYTIMECE WEBPAGES! Our system will remember the last page you viewed when logging out and back in but please DO NOT exit out when taking a test. Your place will NOT be saved.
Land Use and Environmental Service Agency (Code Enforcement) NC Plumbing Code. Table of Contents
Chapter 1 Administration Chapter 3 General Regulations Chapter 5 Water Heaters Chapter 7 Sanitary Drainage Chapter 9 Vents Chapter 11 Storm Drainage Policy Statements Table of Contents Chapter 2 Definitions
Plumbing Code in Commercial Kitchens. NH BOA May 9, 2012
Plumbing Code in Commercial Kitchens NH BOA May 9, 2012 Main Topics Grease Interceptors Indirect Waste Receptors Cleaning Chemical Dispensers Thermal Expansion IPC - Chapter 10 Traps Interceptors Separators
DIVISION 22 PLUMBING. 22 30 00 PLUMBING EQUIPMENT 22 33 00 Domestic Water Heaters
DIVISION 22 PLUMBING 22 00 00 PLUMBING 22 00 50 Design Criteria 22 01 00 General Requirements 22 05 00 Common Work Results 22 06 00 General Duty Valves 22 07 00 Insulation 22 08 00 Commissioning 22 10
CONSTRUCTION CHECKLIST Residential Plumbing Rough-In September 2004
Bellevue Bothell Kenmore Kirkland Issaquah Mercer Island Sammamish Snoqualmie Woodinville CONSTRUCTION CHECKLIST Residential Plumbing Rough-In September 2004 This checklist is intended for use to prepare
Codes and High Performance Hot Water Systems. Gary Klein Affiliated International Management, LLC 916 549 7080 gary@aim4sustainability.
Codes and High Performance Hot Water Systems Gary Klein Affiliated International Management, LLC 916 549 7080 [email protected] Annual Energy Use for Heating Water Natural Gas Gallons Per Day
PLAN REVIEW AND APPROVAL FOR FOOD ESTABLISHMENTS PLUMBING REQUIREMENTS FOR FOOD ESTABLISHMENT PREMISES
PLAN REVIEW AND APPROVAL FOR FOOD ESTABLISHMENTS PLUMBING REQUIREMENTS FOR FOOD ESTABLISHMENT PREMISES Health Systems Protection Rev. 07/2006 35-05-20/06/07/18 OFFICE OF FOOD PROTECTION 417 FEDERAL ST
WHITE PLAINS PLUMBING CODE PART 1. GENERAL REQUIREMENTS
WHITE PLAINS PLUMBING CODE PART 1. GENERAL REQUIREMENTS a. New Plumbing and Gas Piping Systems. This code in conjunction with the Plumbing and Fuel Gas Codes of the State of New York shall apply to plumbing
MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION
MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Plan Review 2009 International Fire Code and NFPA 20 Date of Review / / BLD201 - Project Address: Project Name: Contractor s Business
APPLICATION FOR NEW CONSTRUCTION
CITY OF ELKINS 401 DAVIS AVE ELKINS WV 26241 Date Pd: Receipt #: Session #: PHIL ISNER BLDG INSPECTOR / CODE ENFORCEMENT OFFICER 304-636-1414 Ext 1431 APP. DATE APPLICATION FOR NEW CONSTRUCTION APPLICANT
Applications for building permits will not be reviewed until all of the required information has been submitted.
NOTICE: Applications for building permits will not be reviewed until all of the required information has been submitted. Once all items are submitted a minimum of ten (10) working days are required to
Arapahoe County Residential Water Heater Installation and Inspection Guide
Arapahoe County Residential Water Heater Installation and Inspection Guide The attached handout is designed to be a general permit submittal and inspection guide covering most installation instances, however
Sanitary Waste & Vent TS 100 1 1 Friday 9:00am 12:00pm Peter Kraut PE
Sanitary Waste & Vent TS 100 1 1 Friday 9:00am 12:00pm Peter Kraut PE Waste & Vent Part 1 October 28, 2011 9:00 10:30 AM Peter A. Kraut, P.E. B.S. Architectural Engineering Technology Wentworth Institute
Georgia State Amendments to the International Plumbing Code
Georgia State Amendments to the International Plumbing Code (2006 Edition) Georgia Department of Community Affairs Local Government Assistance Division 60 Executive Park South, N.E. Atlanta, Georgia 30329-2231
New or Remodeled Food Service Establishment Checklist**
ToTo Protect and Promote the Health and the Environment of the People of Kittitas County New or Remodeled Food Service Establishment Checklist** **Some items may not be required for limited food service
REGISTRATION EXAMINATION, JUNE 2009 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours
Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 99 REGISTRATION EXAMINATION, JUNE 009 PLUMBING INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time allowed THREE
Backflow Bulletin #1
Backflow Bulletin #1 FIRE PROTECTION SYSTEMS Chemicals in the System Anti-Freeze, Foam, Corrosion Inhibitors, etc. Chemicals in the System Glycerin Glycerin or similar food-grade non-toxic additive Siamese
Does Wall Township require an inspection by the building department on resale of a home?
Selling your home Does Wall Township require an inspection by the building department on resale of a home? No. We do not require a Certificate of Continued Occupancy on the resale of home. A Smoke Detector,
Fats, Oil and Grease. Best Management Practices Manual. Information, Pollution Prevention, and Compliance Information For Food Service Facilities
Fats, Oil and Grease Best Management Practices Manual Information, Pollution Prevention, and Compliance Information For Food Service Facilities Pinellas County Utilities Water Quality Management Division
TANKLESS WATER HEATER INSTALLATION DIAGRAMS
TANKLESS WATER HEATER INSTALLATION DIAGRAMS Installation Diagrams Tankless Installation / Optional Return Small 10-15 Gallon Point-of-Use Water Single and Optional Return : One single, small capacity water
ONE AND TWO FAMILY DWELLINGS Plumbing July, 2007
ONE AND TWO FAMILY DWELLINGS Plumbing July, 2007 The following are general requirements pertaining to plumbing in one and two family dwellings. This does not represent all the provisions regulating plumbing
SANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
Division A. Compliance, Objectives and Functional Statements
Division A Compliance, Objectives and Functional Statements British Columbia Plumbing Code 2012 Division A Part 1 Part 1 Compliance Section 1.1 General 1.1.1. Application of this Code... 5 1.1.2. Internal
Cost Estimation for Materials and Installation of Hot Water Piping Insulation
Cost Estimation for Materials and Installation of Hot Water Piping Insulation Prepared for Pacific Northwest National Laboratory Under Contract Number: 18O9O2 By Gary Klein, Managing Partner Affiliated
EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection
EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection 1. ROOF DRAINS/DECK DRAINS (INTERIOR ) All roof and deck drains within the perimeter of the building shall be APPROVED
When Should Examination Preparation Begin?
Texas State Board of Plumbing Examiners Tradesman Plumber-Limited Licensee Examination Review Course The following Examination Review Course is designed to assist a registered Plumber s Apprentice in preparing
DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION 15430 PLUMBING SPECIALTIES
PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES A. Roof drains 1. Coordinate location and depth of drains to assure adequate pitch of the drainage area to drain. 2. Overflow system shall be piped
Fire Pump Plan Review March 2010
Fire Pump Plan Review March 2010 Date of Review: / / Permit Number: Business/Building Name: Address of Project: Designer Name: Designer s Phone: Contractor: Contractor s Phone: Occupancy Classification:
REGISTRATION EXAMINATION, NOVEMBER 2013 CERTIFYING PLUMBER ANSWER SCHEDULE
No. 9195 REGISTRATION EXAMINATION, NOVEMBER 2013 CERTIFYING PLUMBER ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2013. All rights reserved. No part of this publication may be reproduced
How To Build A Backwater Valve
Photos by: Bobby Thompson, Jeff Napier Illustrations: Rudy Martinez Bobby Thompson July 16, 2009 Presented by Jeff Napier A Backwater Valve is a one way valve that is installed on a building sewer to prevent
SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13R
July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13R Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: A-Approved;
Apprenticeship Curriculum Standard. Plumber. Level 2. Trade Code: 306A
Apprenticeship Curriculum Standard Plumber Level 2 Trade Code: 306A Date: 2007 Please Note: Apprenticeship Training and Curriculum Standards were developed by the Ministry of Training, Colleges and Universities
This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.
Basement Finishing Guide Community Development Department Building Inspections Division 5200 85 th Avenue North / Brooklyn Park, MN 55443 Phone: (763) 488-6379 / Fax: (763) 493-8171 6/15 www.brooklynpark.org
2010 Residential Water Heater Replacement Check List
2010 Residential Water Heater Replacement Check List The intent of this check list is to provide installers a general reference for the enforcement of code requirements in the Greater San Diego Area. This
CHAPTER 9 VENTS TRANSPORTATION OF SEWER GAS
PlumbingCode06_ch09 5/29/06 8:16 AM Page 1 CHAPTER 9 VENTS Most people don t think much about vents when they consider the plumbing in their home or office, but vents play a vital role in the scheme of
Editorial Note: bold and underline denotes added text, strikethrough denotes deleted text
Code Amendment 12/20/12 2011 Oregon Plumbing Specialty Code, Grease Interceptors & Fats, Oils and Greases Editorial Note: bold and underline denotes added text, strikethrough denotes deleted text 204.0
FOOD ESTABLISHMENT GUIDE FOR DESIGN, INSTALLATION, AND CONSTRUCTION RECOMMENDATIONS
FOOD ESTABLISHMENT GUIDE FOR DESIGN, INSTALLATION, AND CONSTRUCTION RECOMMENDATIONS PART 9 - HOT WATER SUPPLY REQUIREMENTS The hot water supply shall be sufficient to satisfy the continuous and peak hot
SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes)
SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) Maintenance Office Administrative Office Billing Office 530-426-7802 530-426-7800 916-332-4872
C I T Y O F S E L M A F I R E D E P A R T M E N T
C I T Y O F S E L M A F I R E D E P A R T M E N T Informational Bulletin Regarding Residential Fire Sprinkler Systems for One and Two Family Homes: Frequently Asked Questions ADMINISTRATIVE PROVISIONS:
DIVISION 22 PLUMBING. 22 30 00 PLUMBING EQUIPMENT 22 33 00 Domestic Water Heaters
DIVISION 22 PLUMBING 22 00 00 PLUMBING 22 00 50 Design Criteria 22 01 00 General Requirements 22 05 00 Common Work Results 22 06 00 General Duty Valves 22 07 00 Insulation 22 08 00 Commissioning 22 10
DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED
DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATETYPE REVIEW_ REVIEWER DRAWINGS REVIEWED EVERY ITEM WILL BE REVIEWED AND NOTED FOR COMPLIANCE (C), OR NON- APPLICABILITY (NA). A. GENERAL SECTION 7 PLUMBING
Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5
PROTECTIVE PLUMBING - WHAT IS IT? TABLE OF CONTENTS Protective Plumbing What is it?...page 1 What is Foundation Drainage?...Page 2 What is a Sump Pumping System?...Page 4 Does Part of My Basement Floor
INSPECTION CHECKLIST Residential Plumbing Rough In April 2011 Mercer Island Mill Creek Sammamish Snohomish County Snoqualmie Woodinville
Bellevue Bothell Burien Issaquah Kenmore Kirkland INSPECTION CHECKLIST Residential Plumbing Rough In April 2011 Mercer Island Mill Creek Sammamish Snohomish County Snoqualmie Woodinville 2009 Codes This
Saving Water and Energy in Residential Hot Water Distribution Systems. Gary Klein California Energy Commission
Saving Water and Energy in Residential Hot Water Distribution Systems Gary Klein California Energy Commission What Do You Want from your Hot Water System? Safety Not too hot Not too cold No harmful bacteria
Element D Services Plumbing
Medical Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses medical vacuum, waste anesthetic gas disposal, compressed air, oxygen, nitrous oxide, nitrogen and carbon dioxide systems.
PLUMBING & CROSS-CONNECTION CONTROL
PLUMBING & CROSS-CONNECTION CONTROL. MODULE 4 VII. Typical Retail Food Service Cross-Connections VIII. Air Gaps and Air Breaks for Drains and Waste IX. Grease Interceptors VII. TYPICAL RETAIL FOOD SERVICE
2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS
2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS Water system improvements proposed for inclusion into Western s service area shall be designed in accordance with all appropriate AWWA standards, include
CHAPTER 2: The Plumbing System
CHAPTER 2: The Plumbing System SECTION I: SIZING REQUIREMENTS Establish building dimensions Building height can be determined either by architectural drawings or # of floors times height/floor. (ex: 1
ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM REQUIREMENTS
Onsite Sewage Treatment & Disposal System Requirements ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM REQUIREMENTS 1. City of Ventura onsite sewage treatment and disposal system (Septic system) permit application
PLUMBING CODE REQUIREMENTS AND SIZING GUIDE FOR RESIDENTIAL WATER SOFTENERS. Second Edition. Prepared by
PLUMBING CODE REQUIREMENTS AND SIZING GUIDE FOR RESIDENTIAL WATER SOFTENERS Second Edition Prepared by NAHB Research Center, Inc. 400 Prince Georges Boulevard Upper Marlboro, MD 20774-8731 DISCLAIMER This
(a) Purpose. The purpose is to safeguard potable water supplies by preventing backflow into public water systems.
12.33 - CROSS-CONNECTION CONTROL. (a) Purpose. The purpose is to safeguard potable water supplies by preventing backflow into public water systems. (b) Definitions. The following definitions shall apply
Lot Number. City. Architect Name SUBCONTRACTORS - COMPLETE AND ATTACH LIST ON PAGE 4
New Construction Permit Application Village of Shorewood Building Division One Towne Center Blvd Shorewood, IL 60404 (815)553-2310 Fax (815)744-6766 SUBMISSION CHECKLIST - Complete this application and
NAVIEN AMERICA INC. 17855 FITCH AVENUE
Navien America Inc. Specification Details for the Navien models: CC-240 CC-240A For Potable Water Heating and Space Heating NAVIEN AMERICA INC. 17855 FITCH AVENUE IRVINE, CALIFORNIA, USA 92614 Toll Free:
CHAPTER 9: WATER HEATING
Chapter 9: Water Heating 145 CHAPTER 9: WATER HEATING Energy costs for water heating can be as great as the costs for heating, for an energy efficient house, in a mild climate. Estimating hot water usage
Chapter 19 PLUMBING CODE
Chapter 19 PLUMBING CODE Articles: 1. General Provisions 2. Administration and Enforcement 3. Qualification of Performers of Work Under Plumbing Code 4. Installation Requirements 5. Plumbing Work Within
Understanding and Designing Plumbing Systems
Lesson A3 15 Understanding and Designing Plumbing Systems Unit A. Mechanical Systems and Technology Problem Area 3. Construction Systems Lesson 15. Understanding and Designing Plumbing Systems New Mexico
General Information on Starting a Restaurant Business in Alabama
General Information on Starting a Restaurant Business in Alabama This information is intended to give a general idea and overview of Health Department construction requirements for starting a retail food
Montgomery County Health Department Mobile Food Guidelines. Definitions
Montgomery County Health Department Mobile Food Guidelines Definitions Commissary A permitted food establishment to which a mobile unit returns on a daily basis for such tasks as discarding liquid and/or
2012 British Columbia Plumbing Code Update
2012 British Columbia Plumbing Code Update 2012 British Columbia Plumbing Code is published as a separate document and is broken down into Divisions similar to BCBC 2 Division A Part 1 Compliance Part
Plumbing Supply Piping Planning Tool Reducing Water Wasted Waiting for Hot
Plumbing Supply Piping Planning Tool Reducing Water Wasted Waiting for Hot Craig Selover Selover Consulting [email protected] H:248 542-3010 C:248 917-1380 Floor Plan Floor Plan All Piping WaterSense,HERS,
RECON WATER HEATER INSTALLATION FORM
RECON WATER HEATER INSTALLATION FORM Please complete ONE (1) form for each SITE and return to AERCO for warranty validation within 30 days of start-up. After completion, e-mail this form to: [email protected].
A HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS
GEORGIA DEPARTMENT OF HUMAN RESOURCES ENVIRONMENTAL HEALTH SECTION A HOMEOWNERS GUIDE TO ON-SITE SEWAGE MANAGEMENT SYSTEMS March 12, 2002 WHAT IS AN ON-SITE SEWAGE MANAGEMENT SYSTEM An on-site sewage management
PERMITS REQUIRED & PERMIT EXEMPTIONS
PERMITS REQUIRED & PERMIT EXEMPTIONS This guideline is intended to assist the applicant in determining what types of construction work require a permit. The 1997 California Uniform Administrative Code,
The City of Basehor, Kansas
The City of Basehor, Kansas Residential and Miscellaneous Permits This list provides general information regarding permit requirements for various residential construction and maintenance activities. The
77 ILLINOIS ADMINISTRATIVE CODE, PART 890 (NEW) ILLINOIS PLUMBING CODE (02/04) SUBPART I: WATER SUPPLY AND DISTRIBUTION
SUBPART I: WATER SUPPLY AND DISTRIBUTION Section 890.1110 Quality of Water Supply All premises intended for human habitation or occupancy shall be provided with a potable water supply. The potable water