SECTION 7: C - STRUCTURAL ENGINEERS SPECIFICATIONS

Size: px
Start display at page:

Download "SECTION 7: C - STRUCTURAL ENGINEERS SPECIFICATIONS"

Transcription

1 SECTION 7: C - STRUCTURAL ENGINEERS SPECIFICATIONS

2 SITE C SHOPPING CENTRE, KHAYELITSHA PROJECT NO 2369 Project Specification Refer all queries to: John Meiring Tel: REVISION P01 john@sutheng.co.za Date: 14 February 2012 Structural, Civil, Mechanical and Electrical Engineers Page 1/6

3 0.0 GENERAL 0.1 All dimensions and levels to be checked on site and correlated with architects drawings and details before construction commences and any discrepancies are to be reported immediately to the architect and engineer. 0.2 All waterproofing details are to be in accordance with the architects specifications and instructions. The structural engineer is not responsible for any waterproofing whatsoever. 0.3 All details and dimensions shown on these drawings are subject to confirmation on site and during construction. 0.4 All construction methods and materials used are to be in accordance with the requirements of sans and sans and all other applicable SABS codes of practice available from the SABS at contact no A non inclusive list follows: (i) SANS 1200 A (1986): General (ii) SANS 1200 AA (1986): Small works (iii) SANS 1200 D (1986): Earthworks (iv) SANS 1200 G (1982): Concrete (structural) (v) SANS 1200 GB (1984): Concrete (ordinary buildings) (vi) SANS 1200 H (1990): Structural steelwork 0.5 It is the contractor s responsibility to ensure that he understands and complies with all relevant engineering drawings and specifications and is adequately experienced to undertake all aspects of the work safely. 0.6 All details and dimensions pertaining to any existing structures are to be confirmed on site by the contractor and the engineer is to be immediately informed of any unexpected aspects pertaining to them. 0.7 Gridlines and site boundaries are to be set out on site by a qualified and professionally registered land surveyor who has adequate professional indemnity cover. 0.8 All products specified for use are to be used strictly according to manufacturer s instructions and specifications at all times. 0.9 The contractor is at all times to be fully responsible for quality control on site ensuring strict compliance with all drawings, details and specifications issued for construction by the professional team The contractor is to comply at all times with all relevant municipal regulations and bylaws in the area of the site and is to ensure that he has a set of approved building plans on site at all times Sealing compounds for the building & construction industry to be in accordance with the requirements of: (i) SANS (1984) sealing compounds for the building and construction industry, twocomponent, polyurethane-base 0.12 Sika-pro 2hp universal one component polyurethane joint sealant or similar approved may be used on all wall joints and must be applied strictly to the manufacturer s specifications and the correct backing cord should be used where necessary Foundations and brickwork construction of single storey buildings, such as gatehouses to be in accordance with SAICE/istruct.e code of practice for foundations and super structures of single storey residential buildings of masonary construction as per NHBRC recommendations. 1.0 EXCAVATIONS AND FOUNDATIONS 1.1 All excavations for foundations (where not piled) to be checked and approved by the engineer before any concrete is cast. This approval will be delegated from the structural engineer to the specialist geotechnical engineer in many cases. All geotechnical input or instructions given by the geotechnical engineer which could have cost implications to the project are to be approved by Sutherland and/or the quantity surveyor prior to carrying out these instructions. 1.2 All foundations to be built on firm in-situ material (not on fill). Structural, Civil, Mechanical and Electrical Engineers Page 2/6

4 1.3 The top level of all foundations to be at least 300mm below final outside ground level or finished floor level, whichever is the lower. 1.4 Assumed safe bearing capacity of soil under foundations 150kpa. (Refer to Geotechnical report) 1.5 All rising foundation brickwork to have continuous brickforce every 2 nd course and cavity to be filled to underside of stepped DPC with 13mm aggregate, 15mpa concrete taking care not to allow any honeycombing. 1.6 All final foundation sizes, depth and details are subject to confirmation on site by engineer. 1.7 The contractor is responsible for ensuring the safety of all deep excavations and for erecting ready fence and or hoarding around the site to prevent entry after working hours and the general safety of the site at all times. 1.8 All foundation excavations to be below any signs of organic material or roots etc. 2.0 CONCRETE 2.1 Concrete characteristics 28 day strength (it not stated otherwise on the drawings): Blinding Unreinforced footings Reinforced footings RC slabs, beams, stairs & landings Surface bed Columns 15 MPa 15 MPa 25 MPa 25 MPa 30 MPa 40 MPa 2.2 Nominal aggregate size 19mm, unless otherwise stated. 2.3 No industrial waste product is to come from industrial facilities co-fired with hazardous waste; 2.4 Confirm that all of the concrete used on site complies with the requirements by identifying all concrete uses in the project and describing the mix and product used. 2.5 Concrete cube tests to be carried out on all pours as per relevant sans 1200 requirements with specific reference to sampling frequency. The contractor should closely monitor these results and problems are to be reported to the engineer immediately. 2.6 All precast concrete suspended slabs to be in accordance with the requirements of SANS 1879 (2004): precast concrete suspended slabs. 2.7 All structural use of concrete to be in accordance with the requirements of: (i) SANS (2000): The structural use of concrete part 1: design (ii) SANS (1994): The structural use of concrete part 2: materials and execution of work. 2.8 All performance tests for precast concrete floors should be in accordance with the requirements of SANS is (1993): Performance standards in building performance test for precast concrete floors behaviour under non-concentrated load 2.9 Curing and protection: After formwork has been removed (SANS 1200 G) and as soon as it is practicable in the opinion of the engineer, all concrete shall, subject to the provisions of (SABS 1200 G) be protected from contamination and loss of moisture by one or more of the following methods: COLUMNS: BEAMS: SLABS: Wrap in plastic sheeting immediately upon removal of formwork, alternatively spray with curing compound. Spray with curing compound immediately upon removal of side shuttering, alternatively leave shuttering in place for 7 days After formwork has been removed (sans 1200 G) all concrete shall, subject to the provisions of of SANS 1200 G (hot weather), be protected from loss of moisture by one or more of the following methods: A) Ponding the exposed surfaces by means of water, (within mortar or concrete kerbs) Structural, Civil, Mechanical and Electrical Engineers Page 3/6

5 B) Continuously spraying the exposed surfaces with water; (impractical in windy conditions) C) The use of an approved curing compound and in accordance with the manufacturer s instruction. WALLS: Spray with curing compound; alternatively, leave the shutters in place for 7 days. Recommended minimum stripping times are as follows: Type of structural member or formwork Type of cement used Portland cement & Portland cement 15 Rapid-hardening Portland Cement Portland blastfurnace cement a) Beam sides, walls and unloaded columns b) Slabs with props left underneath c) De-propping mpa 15mpa 15mpa d) Post tensioned flat slabs Min. Strength Min. Strength Min. Strength e) Beam soffits with props left underneath, and ribs of a ribbed floor construction f) Slab props including beam props g) Cantilevers Holes, chases, and fixing blocks: no holes or chases, other than those shown on the drawings or approved by the engineer, shall be cut or otherwise formed in the concrete. The manner of attaching fixtures to be embedded in the concrete shall be subject to approval by the engineer Permissible deviations appropriate to the degree of accuracy ll (Commonly called good work ) is required for linear dimensions, position, verticality, level, squareness and bow (refer to SANS 1200) 2.12 All exposed corners for columns and walls in the basements to receive 30mm chamfers and all columns in brickwork walls to have no chamfers Excess concrete such as, burrs, spillage, overcast, etc. Is to be rubbed down smooth and have a similar colour variation between the different concrete elements. 3.0 REINFORCEMENT 3.1 All reinforcement to be checked and approved by the engineer before casting concrete. 3.2 The engineer is to be given a minimum of 24 hours notice before reinforcement inspections and the work needs to 100% complete when he arrives for the inspection. 3.3 Bending schedules and fixing details for reinforcement are given separately at a later stage. Structural, Civil, Mechanical and Electrical Engineers Page 4/6

6 3.4 Minimum concrete cover to reinforcement (unless specified differently in bending schedules or drawings): Foundations (bases) Beams (internal) Beams (external) Columns Slab soffits and tops Slab edge 50mm (see bending schedule) 30mm 40mm 30mm 30mm 40mm 3.5 The contractor must take particular care to ensure that the specified concrete cover to all reinforcement has been attained throughout and all rebar is securely and neatly fixed before the engineer is called to undertake rebar inspections. 3.6 Reinforcement allowances for concrete work are as follows for initial estimating purposes: Bases Columns Beams Slabs 70kg/m³ 160kg/m³ 150kg/m³ 120kg/m³ 3.7 All concrete is to be mechanically vibrated and compacted. 3.8 On multi-storey buildings back propping is to be agreed with engineer in detail and no stripping is allowed before permission is obtained from the engineer. 3.9 It is the contractor s responsibility to ensure that all reinforcement and cover blocks are correctly and accurately fixed, and remain in place during pouring The engineer will not be responsible for any concrete cast where he was not notified to carry out a rebar inspection visit. 4.0 BRICKWORK 4.1 Precast lintols with a minimum of 4 courses of brickwork over with continuous brickforce in the lower 2 courses (extending 150mm either side of opening) over every opening not exceeding 3m. 4.2 All brickwork is to be connected to reinforced concrete columns by means of galvanised hoop-iron straps shotfired into concrete through 10mm jointex at a minimum of every 4 th course. Hoop-iron is to be built a minimum of 300mm into brickwork. 4.3 Two continuous layers of brickforce are to be laid in the first two courses below the first floor slab soffit level and also the eaves wall plate level. 4.4 All brickforce to have at least 300mm overlap at all joints. 4.5 Brickforce is to be laid in every 5 th course of brickwork. 4.6 Brickforce longitudinal reinforcement to have a minimum diameter of 2.8mm 4.7 Wall ties 2, 5 ties/m², as per SANS in standard cavity widths up to 75mm. All cavities greater than 75mm are to have vertical twist ties. 4.8 All brickwork to comprise bricks. Built in accordance with SANS 10164, in class 2 mortar. 4.9 Cement bricks to have a nominal compressive strength of 14mpa for foundation and load bearing walls in accordance with SANS Bricks to be at least 28 days old when delivered to site. Cement bricks and blocks are to be sans approved Thickness of foundation brickwork for various different heights required due to site conditions to be in accordance with the relevant section of SANS All internal non-load bearing brickwork to stop 20mm below soffit of slabs and sealed in accordance with the architectural and acoustic engineering specifications Chasing depth limits: Vertical chases in solid units should not exceed one third of the wall/leaf thickness. Structural, Civil, Mechanical and Electrical Engineers Page 5/6

7 Horizontal chases should not exceed one sixth of the wall/leaf thickness. Horizontal chasing is to be avoided where possible Movement joints to be allowed for as per the Engineer and Architect s requirements. 5.0 TEMPORARY SUPPORT WORK 5.1 It is the contractor s responsibility to ensure the adequacy of temporary support work at all times. This responsibility to include, interalia, lateral bracing, warning signs and public protection measures. 5.2 Support work to remain in place until new support beams are in place, and caulked and in the case of new cast in-situ concrete support, cured for a minimum of 14 days. 6.0 STRUCTURAL STEELWORK 6.1 Steelwork materials, manufacture and erection to be in accordance with the standardized specifications of civil engineering construction sans and SANS 1200h 6.2 Structural steelwork to be grade 355 JR as per SANS code. 6.3 Refer to project specification for painting requirements and surface preparation as well as the relevant SABS code of practice. 6.4 For galvanised steelwork, the galvaniser shall provide a certificate of conformance. 7.0 STRUCTURAL TIMBER 7.1 Gang nailed roof trusses to be designed by Mitek or similar approved. Mitek is to inspect erection of the roof trusses and sign off that they are satisfied with the erection. 7.2 All roof trusses are to be tied down by means of galvanised hoop-iron built in securely at least 6 brick courses below wallplate as per SANS All South African pine timber specified is to be grade 5 unless specified otherwise. 7.4 Galvanised steel strap anchors shall be taken up over the top of the rafter or tie beam, bent down on either side and nailed down from both sides, or galvanised roof ties shall be made up of two strands of wire which shall be taken up on either side of the rafter beam, twisted together so as to have no slack, but not so as to overstrain the wire, and the free ends then nailed down to prevent untwisting. 7.5 Any roof truss, rafter or beam shall be fixed to any wall by using one of the following types of anchors: (i) (ii) (iii) Type A: two strands of 4mm galvanised steel wire; Type B: 30mm x 1,2mm galvanised steel strap; Type C: 30mm x 1,6mm galvanised steel strap. 8.0 SURFACE BEDS AND SCREEDS 8.1 All screeds are to be minimum 30mm thick and jointed into panels of maximum size of 4mx4m. Joints should also be provided over joints in the slab/surface bed below. Joints in screed are to extend at least halfway through the thickness of the topping. The aspect ratio of the panel sizes should be no more than 1:1.2. Tile joints should coincide with the screed joints and sealed with polyurethane sealant. 8.2 The contractor shall provide results of compaction testing of the earthworks layers for approval, if requested by the engineer, before casting surface beds. A minimum requirement is at least 100mm of approved hardcore or 300mm of approved granular fill compacted to a minimum of 98% mod aashto. 8.3 All surface beds to have a minimum thickness 350 micron DPC below them with adequate laps and turned up to the full depth of surface bed as bond breaker against all brickwork on all sides. Top of surface bed level to be a minimum of 150mm above the final outside levels as per SANS Structural, Civil, Mechanical and Electrical Engineers Page 6/6

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

If stepping is required, step at 180mm as seen in this picture.

If stepping is required, step at 180mm as seen in this picture. Cast Foundations to standard building regulations requirements. Foundations must be cast completely level, 600mm wide by 230mm deep for single storey, double storey is not allowed by NHBRC. If stepping

More information

Chapter. Restoration of Damaged Structures

Chapter. Restoration of Damaged Structures 5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.

More information

GUIDELINES FOR SITE & HOUSE INSPECTION

GUIDELINES FOR SITE & HOUSE INSPECTION KZN Housing umnyango: wezezindlu ISIFUNDAZWE SAKWAZULU-NATALI GUIDELINES FOR SITE & HOUSE INSPECTION GUIDELINES FOR SITE & HOUSE INSPECTION TABLE OF CONTENTS Introduction 3 Part I: Regulations... 4 1.1

More information

HOUSE BUILDING DIGEST

HOUSE BUILDING DIGEST HOUSE BUILDING DIGEST (Construction Specifications-Foundations) Creating Enabling Environment for Affordable Housing for All This is an attempt by BMTPC to provide useful but often ignored information

More information

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything

More information

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:

More information

Chapter 2 Basis of design and materials

Chapter 2 Basis of design and materials Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural

More information

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................

More information

CHAPTER 2 QUANTITY TAKE-OFF

CHAPTER 2 QUANTITY TAKE-OFF CHAPTER 2 QUANTITY TAKEOFF The quantity takeoff is an important part of the cost estimate. It must be as accurate as possible and should be based on all available engineering and design data. Use of appropriate

More information

POST AND FRAME STRUCTURES (Pole Barns)

POST AND FRAME STRUCTURES (Pole Barns) POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:

More information

Design and Construction of Cantilevered Reinforced Concrete Structures

Design and Construction of Cantilevered Reinforced Concrete Structures Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-68 Design and Construction of Cantilevered Reinforced Concrete Structures

More information

Superform Products Ltd.

Superform Products Ltd. TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information

COMMONLY USED RESIDENTIAL BUILDING CODES

COMMONLY USED RESIDENTIAL BUILDING CODES COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 FOUNDATION 1. DESIGN OF FORMWORK. Section 1906.1 IBC 2009, Section R404.1.2.3.6 IRC 2009, ACI 318 Section

More information

Detailing of Reinforcment in Concrete Structures

Detailing of Reinforcment in Concrete Structures Chapter 8 Detailing of Reinforcment in Concrete Structures 8.1 Scope Provisions of Sec. 8.1 and 8.2 of Chapter 8 shall apply for detailing of reinforcement in reinforced concrete members, in general. For

More information

FORM DESIGN. easy to work with, and generally available.

FORM DESIGN. easy to work with, and generally available. Forms play a major role in concrete construction. They give the plastic concrete its shape and hold it until it hardens. Forms protect the concrete, assist in curing it, and support any reinforcing rods

More information

High Strain Dynamic Load Testing of Drilled Shafts

High Strain Dynamic Load Testing of Drilled Shafts Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

LAYING BLOCK AND BRICK

LAYING BLOCK AND BRICK LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct

More information

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW is a fully reinforced Pre-Applied system membrane designed for horizontal and vertical external blind-side

More information

6 RETROFITTING POST & PIER HOUSES

6 RETROFITTING POST & PIER HOUSES Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This

More information

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE 86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is

More information

How To Build A Gambrel Roof And A Gable End Roof

How To Build A Gambrel Roof And A Gable End Roof Dutch Gable or Gambrel Roof and The Scotch Valley The folowing pages are an extract from Carp 12 text TAFE NSW Construction and Transport Division 71 HIP and VALLEY ROOFING GAMBREL / DUTCH GABLE The effect

More information

Formwork Direct International Ltd Phone No +44 (0151) 532 0179 Fax no +44 (0151) 523 8330 E-Mail: sales@formworkdirect.co.

Formwork Direct International Ltd Phone No +44 (0151) 532 0179 Fax no +44 (0151) 523 8330 E-Mail: sales@formworkdirect.co. Tie Rod & Formwork s well as containing our comprehensive range of Formwork Tie Sytems; this section also covers our market leading Rapidobat Column Former. Exclusive also to Formwork Direct are innovations

More information

How To Retaining Wall Guide

How To Retaining Wall Guide How To Retaining Wall Guide Before you start: Consents and Engineering Building Consent Retaining walls over 1.5m high will require a building consent from the Local Body Council. Walls that carry extra

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS Johnson County Building Officials Association January 2008 Residential Foundation Guideline Foundation designs for one-and two-family dwellings may use

More information

Sample Drawing Package for One and Two Family Dwelling Applications

Sample Drawing Package for One and Two Family Dwelling Applications Sample Drawing Package for One and Two Family Dwelling Applications For a full list of submission requirements, refer to the relevant checklist for your application found on our website: http://vancouver.ca/home-property-development/application-forms-and-checklists.aspx

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

Hanson Building Products. precast basement solutions

Hanson Building Products. precast basement solutions Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY GENERAL SPECIFICATIONS These specifications are intended to cover the construction of the

More information

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Nathan A. Ingraffea, P.E., S.E. Associate, KPFF Consulting Engineers, Portland, Oregon, USA Abstract The use of steel sheet

More information

TORO STEEL BUILDINGS. BOLTS: o - 0.635" diam. x - 0.75 " diam. x - 1.00 " diam. C.J. - Control Joints to minimize cracking.(0.

TORO STEEL BUILDINGS. BOLTS: o - 0.635 diam. x - 0.75  diam. x - 1.00  diam. C.J. - Control Joints to minimize cracking.(0. 100 ' 0 " out to out of steel C 1 ' 3.25 " B Keep This Distance 37 ' 5.5 " ll sections and bolts have been blown up for clarification of placement. They are to be centered as much as possible on pier.

More information

Page & Turnbull imagining change in historic environments through design, research, and technology

Page & Turnbull imagining change in historic environments through design, research, and technology DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED

More information

Simplifying design and construction. Alan Tovey, Director The Basement Information Centre

Simplifying design and construction. Alan Tovey, Director The Basement Information Centre Simplifying design and construction Alan Tovey, Director The Basement Information Centre Simplifying design and construction Grades of construction Construction options Design and waterproofing issues

More information

Residential Deck Safety, Construction, and Repair

Residential Deck Safety, Construction, and Repair Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the

More information

METHOD OF STATEMENT FOR STATIC LOADING TEST

METHOD OF STATEMENT FOR STATIC LOADING TEST Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents

More information

Technical Notes 3B - Brick Masonry Section Properties May 1993

Technical Notes 3B - Brick Masonry Section Properties May 1993 Technical Notes 3B - Brick Masonry Section Properties May 1993 Abstract: This Technical Notes is a design aid for the Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402-92) and Specifications

More information

The minimum reinforcement for the stem wall is the placement of:

The minimum reinforcement for the stem wall is the placement of: PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20

More information

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near

More information

Timber Decks. Technical Note. March 2007

Timber Decks. Technical Note. March 2007 Timber Decks Technical Note. March 2007 This Technical Note contains general information for residential timber decks and floor frame structures for veranda s, patios etc which are exposed to the weather.

More information

How to build a Pizza Oven in 4 days

How to build a Pizza Oven in 4 days How to build a Pizza Oven in 4 days Preparation day (slab) 1. Foundation 1500 deep x 1300 wide x 75mm deep Required 20 bags cement pre mix. If you already have a concrete base, you save this prep day DAY

More information

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. CI/SfB Tn6 L6813 September 2013 RIW CAVITY DRAIN R20 R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. Other systems are available for specific uses,

More information

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona for Earthen Material and Straw Bale Structures SECTION 70 - GENERAL "APPENDIX CHAPTER 7 - EARTHEN MATERIAL STRUCTURES 70. Purpose. The purpose of this chapter is to establish minimum standards of safety

More information

PROJECT COST ESTIMATES & FEASIBILITIES

PROJECT COST ESTIMATES & FEASIBILITIES PROJECT COST ESTIMATES & FEASIBILITIES Project Cost and budget management Project success elements Scope meet the scope defined for the project Budget It is within established budget Programme It is designed

More information

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE By H P Gupta & D K Gupta DIFFERENT TYPES OF DAMAGES 1.Minor cracks 0.5 to 5 mm wide in load or non-load bearing walls 2.Major

More information

Sisal Composite Ltd. Apparel 4 Ltd. JM Knit Ltd. Natun Para, Hemayetpur, Savar, Dhaka-1340 (23.789416N,90.266135E)

Sisal Composite Ltd. Apparel 4 Ltd. JM Knit Ltd. Natun Para, Hemayetpur, Savar, Dhaka-1340 (23.789416N,90.266135E) Revision: issue 1 Date: 11 June 2014 Sisal Composite Ltd. Apparel 4 Ltd. JM Knit Ltd. Natun Para, Hemayetpur, Savar, Dhaka-1340 (23.789416N,90.266135E) 24 th May 2014 Structural Inspection Report Observations

More information

Construction Specification for Concrete Curb and Concrete Curb and Gutter

Construction Specification for Concrete Curb and Concrete Curb and Gutter Engineering & Construction Services Division Standard Specifications for Road Works TS 3.50 April 2015 for Concrete Curb and Table of Contents TS 3.50.01 SCOPE... 3 TS 3.50.02 REFERENCES... 3 TS 3.50.03

More information

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS FUTURE SLAB PENETRATIONS and DEMOLITION of POST-TENSIONED FLOORS 1.0 INTRODUCTION Post-tensioned floor slabs in Australia and South East Asia are now universally regarded as the most cost effective form

More information

DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES

DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES WBCA 403 DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES A guide to assist those intending to install or who are involved in installing conservatories. Includes information about: conservatory and component

More information

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS 1. 2. 3. 3.0 Scope 1.1 This application standard shall be used where the authority having jurisdiction has adopted its use, and

More information

0331 Brick and block construction

0331 Brick and block construction 0331 BRICK AND BLOCK CONSTRUCTION This worksection has been written for Class 1 and 10a buildings that fully conform to the scope of AS 4773.1. If the works include isolated structures, (totally separate

More information

Issue of the Guidelines on Prevention of Water Seepage in New Buildings

Issue of the Guidelines on Prevention of Water Seepage in New Buildings graphic: Buildings Department Your REF 來 函 檔 號 :. OUR REF 本 處 檔 號 :.BD GR/1-55/173 FAX 圖 文 傳 真 :..28400451 TEL 電 話 :..2626 1717 www.info.gov.hk/bd To : All Authorized Persons 7 March 2005 Registered Structural

More information

STANDARD INSPECTION & TEST PLAN (ITP) FOR CIVIL WORKS :

STANDARD INSPECTION & TEST PLAN (ITP) FOR CIVIL WORKS : CONSTRUCTION OF BG RAILAY SIDING AT KADAPA IRD (ITP) F CIVIL KS : 1.0 GENERAL NOTES: Inspection & Test Plan (ITP) given herein is indicative only. Contractor shall prepare and submit ITP for all activities.

More information

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS 13.1 13.2 2006 Edition SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS GENERAL

More information

QS 004 DEPARTMENT OF PUBLIC WORKS REPUBLIC OF SOUTH AFRICA BUILDING COST DATABASE

QS 004 DEPARTMENT OF PUBLIC WORKS REPUBLIC OF SOUTH AFRICA BUILDING COST DATABASE DEPATMENT OF PUBLIC WOKS EPUBLIC OF SOUTH AFICA BUILDING COST DATABASE AUGUST 2012 DEPATMENT OF PUBLIC WOKS EPUBLIC OF SOUTH AFICA BUILDING COST DATABASE POJECT DATA SHEET NOTE Bills of Quantities Stage

More information

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab, DESIGN OF SLABS Dr. G. P. Chandradhara Professor of Civil Engineering S. J. College of Engineering Mysore 1. GENERAL A slab is a flat two dimensional planar structural element having thickness small compared

More information

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...

More information

PART E SPECIFICATIONS

PART E SPECIFICATIONS PART E SPECIFICATIONS Page 1 of 5 PART E - SPECIFICATIONS GENERAL E1. APPLICABLE SPECIFICATIONS, STANDARD DETAILS AND DRAWINGS E1.1 The City of Winnipeg Works and Operations Division Standard Construction

More information

Construction. SikaProof A-08 Edge, A-12 Edge. Fully bonded FPO sheet membrane in L-shape for the SikaProof A waterproofing system. Product Description

Construction. SikaProof A-08 Edge, A-12 Edge. Fully bonded FPO sheet membrane in L-shape for the SikaProof A waterproofing system. Product Description Product Data Sheet Edition 15/10/2014 Identification no: 02 07 04 10 300 0 000002 SikaProof A Edge SikaProof A-08 Edge, A-12 Edge Fully bonded FPO sheet membrane in L-shape for the SikaProof A waterproofing

More information

Part 5 STRUCTURAL MASONRY

Part 5 STRUCTURAL MASONRY 5.1 STRUCTURAL DESIGN REQUIREMENTS Any building should be designed to provide strength, stability, serviceability and durability in accordance with accepted principles of structural design. The design

More information

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally

More information

How To Build A Luxury Apartment Complex In London

How To Build A Luxury Apartment Complex In London Post Tensioning Awards 2009 Project Summary Type of structure Location Architects Structural Engineer Residential with leisure suites including Swimming pool, Cinema, Virtual Golf, Wine Cellars, and Parking

More information

Connex. Mortarless Masonry Block System

Connex. Mortarless Masonry Block System Connex Mortarless Masonry Block System Connex Mortarless block wall system from Boral The Boral Connex mortarless system comprises three modular components which key together eliminating the need for mortared

More information

THE DEVELOPMENT OF DESIGN METHODS FOR REINFORCED AND UNREINFORCED MASONRY BASEMENT WALLS J.J. ROBERTS

THE DEVELOPMENT OF DESIGN METHODS FOR REINFORCED AND UNREINFORCED MASONRY BASEMENT WALLS J.J. ROBERTS THE DEVELOPMENT OF DESIGN METHODS FOR REINFORCED AND UNREINFORCED MASONRY BASEMENT WALLS J.J. ROBERTS Technical Innovation Consultancy Emeritus Professor of Civil Engineering Kingston University, London.

More information

GYPSUM BOARD, GYPSUM PANEL PRODUCTS AND PLASTER

GYPSUM BOARD, GYPSUM PANEL PRODUCTS AND PLASTER CHAPTER 25 GYPSUM BOARD, GYPSUM PANEL PRODUCTS AND PLASTER User note: Code change proposals to this chapter will be considered by the IBC Structural Code Development Committee during the 2016 (Group B)

More information

STEP-BY-STEP. construction guide. Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet.

STEP-BY-STEP. construction guide. Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet. STEP-BY-STEP construction guide Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet. Welcome to our CONSERVATORY AND SUNROOM CONSTRUCTION GUIDE What is the specification

More information

RESIDENTIAL WOOD DECKS

RESIDENTIAL WOOD DECKS RESIDENTIAL WOOD DECKS 1 A Building Permit is required for the construction of a wood deck where the deck is more than 600 mm above grade at any point. Definition: For the purposes of this pamphlet, a

More information

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035 Decra Plus Drawing no DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 Description Shown In Decra Brochure Most Commonly Used Detail t~êã=oççñ=b~îéë=aéí~áä=b~îéë=lîéêü~åö=táíü=fåëìä~íéç=c~ëåá~=~åç=pçññáí

More information

FORMWORK INTRODUCTION

FORMWORK INTRODUCTION FORMWORK INTRODUCTION Formwork is a mould or open box, like container into which fresh concrete is poured and compacted. When the concrete is set, the formwork is removed and a solid mass is produced in

More information

Design Manual to BS8110

Design Manual to BS8110 Design Manual to BS8110 February 2010 195 195 195 280 280 195 195 195 195 195 195 280 280 195 195 195 The specialist team at LinkStudPSR Limited have created this comprehensive Design Manual, to assist

More information

ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT

ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT GOVERNORATE : DISTRICT : LOCATION : DOHUK SUMEL SUMEL GO code : IRAK GEN ASSENG0 TITLE : Sharia / PHCC / Rehabilitation SO n : SO 03 WPA n : KIR16 0015 Job

More information

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide

More information

NEW AUSTRALIAN STANDARDS FOR MASONRY IN SMALL STRUCTURES S.J. LAWRENCE

NEW AUSTRALIAN STANDARDS FOR MASONRY IN SMALL STRUCTURES S.J. LAWRENCE NEW AUSTRALIAN STANDARDS FOR MASONRY IN SMALL STRUCTURES S.J. LAWRENCE Conjoint Professor Centre for Infrastructure Performance and Reliability The University of Newcastle Callaghan, NSW, Australia A.W.

More information

The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri

The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri Determination 2009/103 The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri 1. The matters to be determined 1.1 This is a determination under Part 3 Subpart 1 of the

More information

Code of Standard Practice for Timber Frame Structures

Code of Standard Practice for Timber Frame Structures TFEC 2-2013 Code of Standard Practice for Timber Frame Structures August 2013 Preface This Code is intended to represent a reasonable consensus of what constitutes ordinary and acceptable practice within

More information

INSTALLATION. General. Important Note. Design. Transport

INSTALLATION. General. Important Note. Design. Transport General The roof trusses you are about to install have been manufactured to precise engineering standards. To ensure that the trusses perform as designed, it is essential that they be handled, erected

More information

Proposed Minimum Subterranean Termite Treatment Standards

Proposed Minimum Subterranean Termite Treatment Standards Proposed Minimum Subterranean Termite Treatment Standards Introduction This document is intended to serve as a model for states considering the adoption of standards for soil application of termiticides.

More information

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline

More information

IRISH BUILDING CONTROL INSTITUTE HOTEL COURT HOTEL BALLYCONNELL CO CAVAN. 26 th MARCH 2009 TIMBER FRAME CONSTRUCTION

IRISH BUILDING CONTROL INSTITUTE HOTEL COURT HOTEL BALLYCONNELL CO CAVAN. 26 th MARCH 2009 TIMBER FRAME CONSTRUCTION IRISH BUILDING CONTROL INSTITUTE HOTEL COURT HOTEL BALLYCONNELL CO CAVAN 26 th MARCH 2009 TIMBER FRAME CONSTRUCTION Bill Robinson BSc. C. Eng. M. I. Struct. E. Timber Design Services 1 IS440 Timber frame

More information

Patio Covers / Carports

Patio Covers / Carports Patio Covers / Carports Building Guides for Homeowners Why Do I need a Permit? D I D Y O U K N O W? As owner-builder you are the responsible party of record on such a permit. If your work is being performed

More information

ASHULIA APPARELS LTD. Client Summary Report

ASHULIA APPARELS LTD. Client Summary Report Revision : Issue 1 Date: 18 March 2014 ASHULIA APPARELS LTD Samad Mansion, Sec # 6, Block # kha, Road No# 1, Plot #14, Shenpara Parbata, Mirpur, Dhaka (23.8065N,90.3683E) 4th March 2014 Client Summary

More information

Metropolitan Builders Association Masonry & Concrete Standard

Metropolitan Builders Association Masonry & Concrete Standard Metropolitan Builders Association Masonry & Concrete Standard Background Masonry and concrete work in residential construction often provides the base structure upon which the house is built or as a veneer.

More information

Installation PowerPoint for Grasscrete Formers

Installation PowerPoint for Grasscrete Formers Installation PowerPoint for Grasscrete Formers 1 This document describes the two single-use tools utilized to create the Grasscrete product. The original Former is a vacuum formed light gauge plastic mold

More information

How to secure your property after a disaster

How to secure your property after a disaster How to secure your property after a disaster The Red Guide to Recovery HOuse secured properly Board-Up of Windows, Doors and Roof Hole. Lot secured with Perimeter Fencing. Fires, floods, tornadoes, hurricanes,

More information

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are: When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory

More information

SikaProof A Technology

SikaProof A Technology SikaProof A Technology The fully bonded waterproofing system Keep your basements durably and securely watertight What is SikaProof A? How does it work? Where can it be used? What are the advantages of

More information

Energy Company Obligation (ECO): Technical Monitoring Questions

Energy Company Obligation (ECO): Technical Monitoring Questions Energy Company Obligation (ECO) Technical Monitoring Questions v1 30/05/2013 Energy Company Obligation (ECO): Technical Monitoring Questions Under ECO suppliers are required to instruct suitably qualified

More information

Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span

Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span formwork formwork Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span has grown to become one of the major players in the scaffolding and

More information

GYPSUM BOARD AND PLASTER

GYPSUM BOARD AND PLASTER CHAPTER 25 GYPSUM BOARD AND PLASTER SECTION 2501 GENERAL 2501.1 Scope. 2501.1.1 General. Provisions of this chapter shall govern the materials, design, construction and quality of gypsum board, lath, gypsum

More information

PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE

PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE Sl.No. PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE Description of item Qty Unit Rate Amount 1 Demolishing tile work/cement concrete/( carefully taking out the closet and other

More information

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with

More information

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14 Draft Table of Contents Building Code Requirements for Structural Concrete and Commentary ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318 14) Chapter 1 General 1.1 Scope of ACI 318

More information

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057 Lecturer: Jim Cahill 29 th November 2011 TABLE OF CONTENTS SUMMARY 1 MAIN BODY SECTION

More information

METHOD STATEMENT 006 TORCH APPLIED MEMBRANE TO BASEMENT WALLS

METHOD STATEMENT 006 TORCH APPLIED MEMBRANE TO BASEMENT WALLS This Document is designed to cover best practice installation procedures for a one layer torch applied sheet membrane system to basement walls. PRELIMINARY WORK Ensure that all surface preparation work,

More information

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced

More information

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures SECTION 7201 - PURPOSE The purpose of this appendix chapter is to establish minimum prescriptive standards

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information