Executive Summary. The functional groupings of LSD s operations are:

Size: px
Start display at page:

Download "Executive Summary. The functional groupings of LSD s operations are:"

Transcription

1 Executive Summary Land Systems Division (LSD) is a Division within the (DMO) that is responsible for acquisition and sustainment of designated land systems for the Australian Defence Force (ADF). LSD provides project and sustainment support to Army, Air Force and, to a lesser extent, Navy. As at October 2012 there were 1,327 1 staff working for LSD compared to a budgeted workforce for financial year 2012 / 2013 of 1, Due to HR and Finance shared service arrangements, voluntary redundancies and natural attrition, LSD s workforce has reduced, and is currently 1, The LSD portfolio is extensive, comprising some large projects and many medium to smaller size projects. Over the past decade, LSD has played a significant role in providing support to Australia s operations overseas and the preparation of forces to deploy. The functional groupings of LSD s operations are: Land Manoeuvre Systems Integrated Soldier Systems Land Support Systems Land Vehicle Systems Combined Arms Fighting Systems Land Engineering Operational Business Development and Planning Financial Land Contracting Land In recent years, there have been a number of factors that have contributed to a challenging operating environment for LSD. These have included providing the required support to ADF operations, while implementing reform and business improvement initiatives to meet budgetary constraints. To meet the needs of the changing environment, LSD has been proactive in initiating a number of business changes, internal reviews and programs such as: Establishing Integrated Soldier Systems (ISS) Establishing Diggerworks Establishing proactive industry engagement programs through ISS Industry forum and Integrated Product Teams (IPTs) Normalising relations with the Textile, Clothing and Footwear (TCF) industry Reforming sustainment planning Strengthening sustainment management practices Establishing the Engineering and Logistics graduate programs Establishing the Materiel Logistics Employee Development program Conducting a program to remediate legacy projects which exceeded agreed performance thresholds Initiating the LSD Organisational Business Review (OBR) Initiating an organisational change program The LSD OBR, conducted in 2012, assessed the way LSD does business and identified opportunities for increased efficiency and productivity, to deliver on the budgetary constraints which aim to help LSD meet its workforce target. 1 Source: LSD Business Performance Report October Source: Combined DMO Workforce (APS, ADF and Contractor) as at Pay Mar 13 3 Source: PMKeyS data 0119_LSD Pay 19 as at 14 March 13 LSD Division Assessment Ernst & Young

2 LSD has commenced implementing a number of recommendations contained within the LSD OBR through the Business Case for Organisational Change which was released by LSD in November 2012, as required by the Defence Enterprise Collective Agreement (DECA). This proposes to: Establish a new organisational structure that can efficiently and effectively deliver the same required outcomes in the new environment Reduce the LSD APS workforce to meet its budgetary requirements Whilst there is evidence to suggest that the OBR is heading in the right direction for improving the performance of LSD, there have been a range of reporting and project issues over recent months, which have impacted the Ministers and the DMO Executive s confidence levels in LSD. In October 2012, the Minister for Defence and the Minister for Defence Materiel asked the Chief Executive Officer (CEO) of the DMO to undertake a review of the structure and functions of various Divisions within the DMO which manage capability projects. Due to a number of problem projects, 4 the first review announced was a structural review into LSD. In December 2012, the CEO released the DMO Strategic detailing the high level plan to describe what the DMO does, what the DMO is aiming to achieve and how the organisation will achieve its goals. To support the implementation of the DMO Strategic, assessments of each Division within the DMO are needed to identify efficiencies and achieve alignment, consistency and integration across the organisation. Ernst & Young was engaged to undertake the initial divisional assessment and LSD was the first Division selected, in compliance with the Minister s directions. The objective of this assessment is to identify how LSD can improve its performance to deliver outcomes for the DMO, and provide improved support and advice to Government, the DMO Executive and Capability Managers. Since the Minister announced the LSD review, planned changes at the Head Land Systems (HLS) and Director General (DG) level have occurred. Whilst it is evident that LSD has been proactive in instigating a range of improvement initiatives and the impact of the new HLS and DG s changes is unclear at this point in time, there are further improvements that can be made. Our review assessed LSD across the areas of structure, resources, capability, roles, process, governance, infrastructure, culture, performance management and talent management. We have identified 41 recommendations against each of the areas assessed. Our recommendations focus on addressing performance challenges and building upon LSD s strengths to help improve the performance of LSD. Aligned to the areas assessed, the focus of our recommendations are set out in Table 1: 4 Minister for Defence and Minister for Defence Materiel Defence Capability Reform, 16 October 2012 LSD Division Assessment Ernst & Young

3 Table 1: Focus of Ernst & Young s recommendations Area assessed Structure Capability Roles Process Infrastructure Performance Talent Focus of recommendations Current LSD structure LSD s proposed structure LSD demographics (staff age profile, gender profile, military and APS mix, and ex-military mix) Staff retention Deployment of resources Advice to Government capability Project management capability Understanding Army s requirements Role definition and execution Command and control Process focus Advice to Government process layers Delegation levels Leadership cohesiveness and awareness Accommodation Location Software infrastructure Risk aversion Impact of Army on LSD culture Absenteeism Individual performance management LSD performance reporting Career development and progression Training and education Some of the recommendations included in this report should be implemented as soon as possible to make a significant impact in a short time frame and to rebuild confidence with the Ministers and the DMO Executive. Other recommendations will take longer for LSD and the DMO to implement and for improved performance to be realised. As such, we have grouped our recommendations to the themes of consolidate, align, strengthen and refine, and suggested timeframes to commence implementation. There are 10 key messages flowing from our 41 recommendations. In summary, these are: 1. Enhance accountability within LSD by improving performance reporting, empowering decision making at the delegated levels and strengthening performance reviews. 2. Increase staff capability to provide accurate, complete, timely and well-supported advice to Government by strengthening training programs. Capability could also be enhanced by seconding LSD staff to DMO s Ministerial co-ordination area to gain experience. In addition, the use of DPAWS needs to be mandated across LSD and the roles of Head of Land Systems (HLS) and the Director Generals (DGs) in the coordination and clearance of Ministerial Submissions strengthened. LSD Division Assessment Ernst & Young

4 3. LSD remain based in Melbourne, with all staff accommodated in one location. Further, the provision of adequate Defence Secure Network (DSN) access, increased meeting room space and video conferencing technology for LSD staff must be addressed as a matter of priority. To strengthen relationships and better connect LSD to Ministers, the DMO Executive and other Divisions, HLS should spend structured time in Canberra and the DMO Executive should increase their visibility and presence at LSD. 4. All SES / Star positions should be contestable. This will not only support career progression opportunities for APS staff within LSD, but it will also ensure the most suitable candidate is appointed to leadership roles. This will also help to balance Military and APS experience amongst LSD s leadership. In the short term, all SES Band 1 / 1 Star positions should be contestable. In the longer term HLS should be contestable. 5. LSD s OBR proposes reducing LSD s SPO Branch structure from 5 to 3 Branches. To balance workloads across LSD more evenly, relieve capacity constraints that the OBR s proposed structure would impose on DGs and to minimise the risk of making a significant organisational structural change as LSD transitions to a new HLS, LSD should only reduce its structure to 4 SPO Branches. 6. Strengthen career management of APS and Military staff by establishing talent management programs across the DMO. 7. LSD implement the planned workforce management system to improve the prioritisation and allocation of Divisional workload. This system is critical for managing overall resourcing levels across LSD, supporting talent management, aligning work expectations to resourcing levels and improving the efficiency of work prioritisation across LSD. 8. Strengthen the cohesiveness of LSD s Executive team and increase their focus on actively and deliberately engaging across LSD with consistent and united messages. 9. Continue to adopt DMO-wide programs, and focus on developing new initiatives to improve the age and gender profiles within LSD. 10. Establish a mechanism to align individual Key Performance Indicators (KPIs) and performance agreements throughout LSD and to the DMO Strategic. We believe that the recommendations proposed in this report will supplement and complement the recommendations made in the LSD OBR to improve the performance of LSD. Our team has made every effort to source the necessary data to support this review. However, not all of the required data could be provided by the DMO within the timeframes of this review. As this review commenced in December 2012, the most current data available at that time has been used throughout this report to determine ratios, proportions and enable comparisons to other Divisions across the DMO. As at March 2013, LSD staff numbers are 1, The reduction in staff numbers since October is due to HR and Finance shared service arrangements, voluntary redundancies and natural attrition. The reduction in staff numbers is unlikely to change our conclusions or the relativity of comparisons made between LSD and other Divisions across the DMO. 5 Source: PMKeyS data 0119_LSD Pay 19 as at 14 March 13 LSD Division Assessment Ernst & Young

5 Summary of Recommendations The 41 recommendations documented throughout the report, against each of the DMO Divisional Assessment elements, have been classified against four themes: Consolidate Commence within 3 months Align Commence within 3 to 6 months Strengthen Commence within 6 to 9 months Refine Commence after 12 months These classifications are based on our experience achieving performance improvement within large and complex Government departments, our understanding of the maturity and resources available to LSD and the DMO, and the issues requiring prioritised attention. Figure 1 shows the four themes and the key activities and improvements expected from implementing our recommendations within the defined time periods. Figure 1: Key activities and Improvements by theme 12 Months 6 Months Refine Consolidate Revise structure Enhance support for HLS Workload and workforce management Robust reporting Provide cohesive leadership Reset and build relationships Improve IT access and facilities Increase personal accountability 3 Months Align Clarify accountabilities and responsibilities Update governance framework & business planning Communicate consistentlywith all stakeholders Increase Executive visibility Streamline support arrangements to DGs Strengthen Enhance people capability Simplify processes Develop an empowered culture Bolster talent and performance management Consider long term structure Strive for continuous improvement Improve workforce profile and succession planning Our recommendations are classified by theme and against each framework element in the following sections. LSD Division Assessment Ernst & Young

6 Consolidate Table 2: Consolidate Phase Implementation Recommendations Recommendation 2. Adjust the structure proposed in LSD s Business Case for Organisational Change to reflect a four SPO Branch structure, instead of three. The budgetary impact on LSD of this amendment needs to be considered 9. LSD implement the planned system to improve the prioritisation and allocation of Divisional workload and workforce tracking 13. LSD re-set and clearly define the CoS role to increase the support provided to HLS including assisting with the centralised prioritisation of work within LSD. Structure Roles Either the current CoS could be given the opportunity to provide this redefined role, or the existing DG Land Engineering or DG Land Manoeuvre Systems could take on this responsibility in addition to their existing role, with support from the current CoS. This option is only a short term arrangement to assist the new HLS and should be reviewed in three months time. Future support arrangements need to be in line with the Minute released by the Secretary of Defence on 26 February, which outlined support arrangements for SES staff 17. LSD continue to build the maturity of its Ministerial correspondence processes 18. LSD, with support from the DMO Ministerial Services and FOI team, continue to strengthen the coordination of the Ministerial Correspondence team within LSD and mandate the use of DPAWS to manage Ministerial correspondence. The roles of HLS and Branch Heads in the coordination and clearance of Ministerial Submissions should also be strengthened as part of this initiative Process Process 19. LSD establish due dates for Division initiated Ministerial Submissions Process 20. LSD re-instate the weekly Ministerial Task List with the following adjustments made: a. Develop a consistent and forward-looking report each week b. Define parameters to trigger red / amber / green alerts c. Include due dates for LSD initiated Ministerial Submissions d. Include a separate breakdown of Quarterly Reports. These reports should be a standing task on each week s report to maintain sight of the due date and information updated as necessary e. Include in the status column information on activities being undertaken to mitigate risks or delays and likely timeframes to rectify f. Provide a set of recommendations for action by HLS, as required (these actions should be triggered when escalation of an issue is required, for example) g. Include a column to indicate whether drafting instructions have been completed and issued to the Action Officer 23. LSD improve the cohesiveness of the LSD Executive. HLS needs to enhance the LSD leadership team s focus on actively engaging across LSD and developing a communication / engagement plan for Process LSD Division Assessment Ernst & Young

7 Recommendation internal and external stakeholders 26. Increase access to Defence Secure Network (DSN) terminals for LSD staff 27. Increase access to DSN, Defence Restricted Network (DRN) and Unclassified video conferencing facilities for LSD staff Infrastructure Infrastructure 28. LSD remain based in Melbourne Infrastructure 29. All LSD staff should be accommodated in the same location Infrastructure 30. HLS to spend structured time in Canberra (e.g. one week per fortnight or two days per week) to build and maintain relationships with the Ministers, Ministers Offices, the DMO Executive and colleagues 34. LSD hold staff to greater account to instill a culture of accountability and responsibility Infrastructure Align Table 3: Align Phase Implementation Recommendations Recommendation 1. Review and balance support arrangements for the LSD DGs and HLS. Re-balancing support arrangements could be used to harvest savings, to meet LSD s workforce target or to re-allocate staff to high priority activities in LSD 6. Change at least one current 1 Star position to a contestable or SES Band 1 position. 14. LSD should clarify to all staff the accountabilities and relationships HLS and LSD has to the DMO and Capability Managers. This should be done in conjunction with embedding the accountabilities detailed in the DMO Strategic 21. LSD update its governance framework to align to the DMO s new governance arrangements, that come into effect on 1 February 2013, and communicate this to all staff 24. LSD Executive engage more frequently and deliberately with all staff and present consistent and united messages 25. LSD revise their business plan to reflect the new DMO Strategic to ensure all staff are aware of the new DMO principles and that they are embedded within the daily operations of LSD 31. The DMO Executive increase their engagement and visibility at LSD in Melbourne 33. LSD develop a communications strategy that enables communication of LSD success and communication of issues with key stakeholders 35. LSD Executive reinforce to their staff about the need to maintain a balance of delivering capability to Army whilst working within DMO priorities and principles 36. LSD continue to build and celebrate the strong culture of delivering land systems capability Structure Roles Infrastructure LSD Division Assessment Ernst & Young

8 Recommendation 37. LSD establish a mechanism to align individual KPIs throughout LSD and to the DMO Strategic. This should be done in conjunction with broader initiatives to align DMO Business Plans and individual performance arrangements to the DMO Strategic Performance Strengthen Table 4: Strengthen Phase Implementation Recommendations Recommendation 8. LSD develop a strategic workforce management plan that aligns with the broader DMO workforce strategy 10. LSD increase the capability of staff to provide accurate, complete, timely and well-supported advice to Government, by: a. Educating all LSD staff on the importance of providing accurate, timely and well-supported advice b. Building the capability of all staff through focused and ongoing training programs c. Holding all staff to greater account for quality of work in relation to Ministerial Submissions d. Providing additional focused training for all staff on Ministerial correspondence. This may involve members of DMO s Ministerial Correspondence team visiting LSD to conduct on-site training e. Introducing a rotation policy of seconding LSD staff to Canberra, for a finite period, in the Ministerial co-ordination area f. Enhancing staff performance arrangements to focus on Ministerial correspondence as part of their performance agreements 12. LSD provide training to staff to improve their financial acumen and ability to provide Army with accurate measures of committed and discretionary funds 15. Complete a Functional Analysis within LSD to understand where opportunities exist to align effort to the future direction and priorities of LSD and the DMO 16. LSD review its process model, identify further opportunities for streamlining processes and build flexibility into decision making. This should be done in conjunction with the Standardisation Office and activities to embed the DMO Strategic behaviour simplify processes 22. LSD review the Ministerial Submission delegation levels in 6 months or once HLS has determined that capability and trust has been rebuilt with the Ministers, Ministers Offices and the DMO Executive 32. LSD address the culture of risk aversion by empowering decision making back down at the delegated levels and embedding the key behaviors of the DMO Strategic, specifically Personal Accountability Capability Capability Roles Process LSD Division Assessment Ernst & Young

9 Recommendation 38. LSD Executive review the suite and frequency of performance reports to achieve the optimum level and effort of reporting from consistent sources 39. LSD refocus the monthly Business Performance Report to increase the capacity of HLS, provide context, structure and consistency to the report, and reduce the time taken to compile and complete the report 40. LSD reinstate its HR strategy and develop a talent management program, aligned to the DMO talent management program (once established) that: Clearly defines career progression and promotion pathways for staff Supports succession planning, consistent with the DECA Systematically identifies and retains talent Provides further opportunities to develop high performing staff at all levels Strengthens LSD s existing Training Needs Analysis program and, subject to resources being made available, provides training opportunities that meet the current and future capability needs of LSD Provides incentives for completing relevant qualifications Increases the focus on individual performance management (e.g. EPAs) Achieves consistent performance management of all LSD staff (Military and APS), and alignment to the Strategic behaviours Supports the alignment of the DMO Strategic from organisational level to individuals 41. LSD extend the Training Needs Analysis to track attendance at training programs and ensure those staff who identify training needs and where budget is allocated, attend training Performance Performance Talent Talent LSD Division Assessment Ernst & Young

10 Refine Table 5: Refine Phase Implementation Recommendations Recommendation 3. Review the LSD structure in twelve months time, with a view to moving to a three SPO Branch structure 4. LSD continue to adopt DMO-wide programs and focus on developing new initiatives to improve and balance the age and gender profiles across LSD 5. LSD monitor staff retention to ensure the increasing trend in staff turnover does not continue Structure 7. Make all SES / Star positions contestable in the longer term 11. DMO and LSD to continue to collect and closely monitor Gate Review data and time taken from 2 nd pass approval to contract signature to identify project management capability issues Capability LSD Division Assessment Ernst & Young

11 Limitations We believe that the statements made in this report are accurate, but no warranty of completeness, accuracy or reliability is given in relation to the statements and representations made by, and the information and documentation provided by DMO management and personnel. We have indicated within this report the sources of the information provided. We have not sought to independently verify those sources unless otherwise noted with the report. We are under no obligation in any circumstance to update this report, in either oral or written form, for events occurring after the report has been issued in final form unless specifically agreed with DMO. The findings expressed in this report have been formed on the above basis. Third party reliance This report is solely for the purpose set out in section 2.2 of this report and for DMO information, and is not to be used for any other purpose or distributed to any other party without Ernst & Young's prior written consent. In carrying out our work and preparing this report, Ernst & Young has worked solely on the instructions of the DMO, and has not taken into account the interests of any party other than DMO. The report has been constructed based on information received since the commencement of the engagement, and which have been provided by DMO. Since this date, material events may have occurred since completion which is not reflected in the report. This report has been prepared at the request of DMO in connection with our engagement to perform the services as detailed in the engagement letter dated 29 November Ernst & Young, nor the parties which have endorsed or been involved in the development of the report, accept any responsibility for use of the information contained in the report and make no guarantee nor accept any legal liability whatsoever arising from or connected to the accuracy, reliability, currency or completeness of any material contained in this report. Ernst & Young and all other parties involved in the preparation and publication of this report expressly disclaim all liability for any costs, loss, damage, injury or other consequence which may arise directly or indirectly from use of, or reliance on, the report. This report (or any part of it) may not be copied or otherwise reproduced except with the written consent of Ernst & Young. LSD Division Assessment Ernst & Young

WORKFORCE PLAN Page 1

WORKFORCE PLAN Page 1 2015 2019 WORKFORCE PLAN Page 1 Contents 1. Introduction... 3 2. Developing the Plan... 6 3. Organisational Structure... 9 4. Workforce Profile... 10 5. Workforce Requirements... 11 6. Workforce Strategies...

More information

the Defence Leadership framework

the Defence Leadership framework the Defence Leadership framework Growing Leaders at all Levels Professionalism Loyalty Integrity Courage Innovation Teamwork Foreword One of the founding elements of Building Force 2030, as outlined in

More information

Confident in our Future, Risk Management Policy Statement and Strategy

Confident in our Future, Risk Management Policy Statement and Strategy Confident in our Future, Risk Management Policy Statement and Strategy Risk Management Policy Statement Introduction Risk management aims to maximise opportunities and minimise exposure to ensure the residents

More information

City of Canning. Asset Management Strategy 2015 2018

City of Canning. Asset Management Strategy 2015 2018 City of Canning Asset Management Strategy 2015 2018 Document Control Version No Version Date Description TRIM Reference 1.0 11 December 2012 Asset Management Strategy D12/68776 2.0 23 September 2015 Updated

More information

Employee Engagement FY15. 1. Introduction. 2. Employee Engagement. 3. Management Approach

Employee Engagement FY15. 1. Introduction. 2. Employee Engagement. 3. Management Approach 1. Introduction This document forms part of our Disclosures on Management Approach (DMA) series, prepared in accordance with the Global Reporting Initiative s G4 Guidelines. The DMA series is designed

More information

DEFENCE INSTRUCTIONS (GENERAL)

DEFENCE INSTRUCTIONS (GENERAL) DEFENCE INSTRUCTIONS (GENERAL) New instruction 0 LOG 4 5 012 Regulation of technical integrity of Australian Defence Force materiel Department of Defence CANBERRA ACT 2600 10 September 2010 Issued with

More information

Human resource management strategy

Human resource management strategy Human resource management strategy Executive summary Since 2007, the Department for International Development (DFID) has been supporting the implementation of the International Federation human resource

More information

Risk Management. Group Standard

Risk Management. Group Standard Group Standard Risk Management Effective risk management allows Serco to improve customer service, maximize opportunities and reduce business loss from overruns and cost from risks that materialise SMS

More information

Attachment 16.1 SA Power Networks: Customer Data Quality Plan 2015-2020 September 2014

Attachment 16.1 SA Power Networks: Customer Data Quality Plan 2015-2020 September 2014 Attachment 16.1 SA Power Networks: Customer Data Quality Plan 2015-2020 September 2014 Customer Data Quality Plan 2015-2020 V1.1 Executive Summary The commencement of Full Retail Contestability in 2004

More information

THE SOUTH AFRICAN HERITAGE RESOURCES AGENCY MANAGEMENT OF PERFORMANCE INFORMATION POLICY AND PROCEDURES DOCUMENT

THE SOUTH AFRICAN HERITAGE RESOURCES AGENCY MANAGEMENT OF PERFORMANCE INFORMATION POLICY AND PROCEDURES DOCUMENT THE SOUTH AFRICAN HERITAGE RESOURCES AGENCY MANAGEMENT OF PERFORMANCE INFORMATION POLICY AND PROCEDURES DOCUMENT ACCOUNTABLE SIGNATURE AUTHORISED for implementation SIGNATURE On behalf of Chief Executive

More information

Swinburne University of Technology Gender Equality Strategic Action Plan 2015-2016

Swinburne University of Technology Gender Equality Strategic Action Plan 2015-2016 Swinburne University of Technology Gender Equality Strategic Action Plan 2015-2016 Page 1 of 8 1. Introduction 1.1. Context and Swinburne s HR Strategic Planning Framework Swinburne has established its

More information

Meeting 2/07/10. consider and discuss the report s recommendations (as relevant to HE and HEFCW) and initial proposals for addressing these

Meeting 2/07/10. consider and discuss the report s recommendations (as relevant to HE and HEFCW) and initial proposals for addressing these For discussion PricewaterhouseCoopers Report Review of the cost of administering the education system in Wales Disclosable Meeting 2/07/10 Agenda Item 13 Reference No HEFCW/10/62 1 Issue This paper presents

More information

BUILDING A HIGH PERFORMING SYSTEM. A business improvement plan for the Department for Education and Child Development

BUILDING A HIGH PERFORMING SYSTEM. A business improvement plan for the Department for Education and Child Development BUILDING A HIGH PERFORMING SYSTEM A business improvement plan for the Department for Education and Child Development BUILDING A HIGH PERFORMING SYSTEM 1 Contents Executive summary 3 Increasing local decision-making

More information

Risk Management & Business Continuity Manual 2011-2014

Risk Management & Business Continuity Manual 2011-2014 ANNEX C Risk Management & Business Continuity Manual 2011-2014 Produced by the Risk Produced and by the Business Risk and Business Continuity Continuity Team Team February 2011 April 2011 Draft V.10 Page

More information

Australian National Audit Office. Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO

Australian National Audit Office. Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO Australian National Audit Office Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO Commonwealth of Australia 2002 ISBN 0 642 80678 0 10 December 2002 Dear Mr

More information

The Compliance Universe

The Compliance Universe The Compliance Universe Principle 6.1 The board should ensure that the company complies with applicable laws and considers adherence to non-binding rules, codes and standards This practice note is intended

More information

5/30/2012 PERFORMANCE MANAGEMENT GOING AGILE. Nicolle Strauss Director, People Services

5/30/2012 PERFORMANCE MANAGEMENT GOING AGILE. Nicolle Strauss Director, People Services PERFORMANCE MANAGEMENT GOING AGILE Nicolle Strauss Director, People Services 1 OVERVIEW In the increasing shift to a mobile and global workforce the need for performance management and more broadly talent

More information

Government Communication Professional Competency Framework

Government Communication Professional Competency Framework Government Communication Professional Competency Framework April 2013 Introduction Every day, government communicators deliver great work which supports communities and helps citizens understand their

More information

Introduction. Page 2 of 11

Introduction. Page 2 of 11 Page 1 of 11 Introduction It has been a year since The Walton Centre brought its recruitment function in-house and it was critical that the organisation took this step. This is a specialist organisation

More information

Quality Assurance Checklist

Quality Assurance Checklist Internal Audit Foundations Standards 1000, 1010, 1100, 1110, 1111, 1120, 1130, 1300, 1310, 1320, 1321, 1322, 2000, 2040 There is an Internal Audit Charter in place Internal Audit Charter is in place The

More information

How To Prepare A Configuration Change Change Request For The Tfnsw Cmaac

How To Prepare A Configuration Change Change Request For The Tfnsw Cmaac Guide TfNSW Configuration Management and Asset Assurance Committee Submissions Guide Important Warning This document is one of a set of standards developed solely and specifically for use on public transport

More information

ESM Management Comments on Board of Auditors Annual Report to the Board of Governors for the period ended 31 December 2014

ESM Management Comments on Board of Auditors Annual Report to the Board of Governors for the period ended 31 December 2014 ESM Management Comments on Board of Auditors Annual Report to the Board of Governors for the period ended 31 December 2014 Dear Chairperson, I would like to thank you for the opportunity to provide management

More information

Part B1: Business case developing the business case

Part B1: Business case developing the business case Overview Part A: Strategic assessment Part B1: Business case developing the business case Part B2: Business case procurement options Part B3: Business case funding and financing options Part C: Project

More information

CENTRE FOR DEFENCE AND STRATEGIC STUDIES. Strategic Management Papers

CENTRE FOR DEFENCE AND STRATEGIC STUDIES. Strategic Management Papers CENTRE FOR DEFENCE AND STRATEGIC STUDIES Strategic Management Papers A Total and Integrated Defence Workforce Colonel Shane Caughey September 2008 The Centre for Defence and Strategic Studies (CDSS) is

More information

Web section 7 Non-operational training

Web section 7 Non-operational training Web section 7 Non-operational training This section contains additional detailed information, further to that contained in the print version of the Defence Annual Report 2006 07. 482 defence annual report

More information

First Principles Review Creating One Defence

First Principles Review Creating One Defence First Principles Review Creating One Defence Framework for First Principles Review What is the strategy and mission of Defence? Deter, deny and defeat attacks or threats to Australia, its national interests,

More information

Position description. Marketing & Member Relationship. Classification

Position description. Marketing & Member Relationship. Classification Position description Position title Division Business Business unit Classification Responsible for Campaign Manager Online Insurance Product & Sales Marketing & Member Relationship D Planning, development

More information

An effective working relationship is required with the WP Group Board of Directors, Leadership Team members and the Operations team.

An effective working relationship is required with the WP Group Board of Directors, Leadership Team members and the Operations team. Key Account Manager Role reports to: Group Commercial Director WP Group Overview WP Group is an integrated fuels and lubricants company focused on providing bespoke service solutions to its growing customer

More information

UNCLASSIFIED UNCONTROLLED-IF-PRINTED. Public

UNCLASSIFIED UNCONTROLLED-IF-PRINTED. Public Defence Security Manual DSM Part 2:41 Security for Projects and Capability Planning Version 3 ation date July 2015 Amendment list 24 Optimised for Screen; Print; Screen Reader Releasable to Compliance

More information

Key Words: Flood Reconstruction, Resource Contracts, Coal Seam Gas, Contract Management, Project Management, Relationship Contracting

Key Words: Flood Reconstruction, Resource Contracts, Coal Seam Gas, Contract Management, Project Management, Relationship Contracting Rebuilding Flood Damaged Roads in South East Queensland in the middle of the Coal Seam Gas Expansion/Explosion - A Local Governments Experience and Learning's David Pemberton davep@logit.com.au Mobile

More information

Operations. Group Standard. Business Operations process forms the core of all our business activities

Operations. Group Standard. Business Operations process forms the core of all our business activities Standard Operations Business Operations process forms the core of all our business activities SMS-GS-O1 Operations December 2014 v1.1 Serco Public Document Details Document Details erence SMS GS-O1: Operations

More information

REPORT OF THE SERVICE DIRECTOR CUSTOM ERS AND HUMAN RESOURCES WORK BASED COACHING IN NOTTINGHAMSHIRE COUNTY COUNCIL

REPORT OF THE SERVICE DIRECTOR CUSTOM ERS AND HUMAN RESOURCES WORK BASED COACHING IN NOTTINGHAMSHIRE COUNTY COUNCIL Report to Personnel Committee REPORT OF THE SERVICE DIRECTOR CUSTOM ERS AND HUMAN RESOURCES 20th January 2016 WORK BASED COACHING IN NOTTINGHAMSHIRE COUNTY COUNCIL Agenda Item: 4 Purpose of the Report

More information

Zurich Insurance Group. Our people 2014

Zurich Insurance Group. Our people 2014 Zurich Insurance Group Our people 2014 Zurich Insurance Group 1 Our people 2014 We aim to create sustainable value for all our stakeholders, in line with our values as set out in Zurich Basics, our code

More information

DEFENSE ACQUISITION WORKFORCE

DEFENSE ACQUISITION WORKFORCE United States Government Accountability Office Report to Congressional Committees December 2015 DEFENSE ACQUISITION WORKFORCE Actions Needed to Guide Planning Efforts and Improve Workforce Capability GAO-16-80

More information

Review of Self-Insurance Arrangements in Victoria Report of the Self-Insurance Review Team August 2005

Review of Self-Insurance Arrangements in Victoria Report of the Self-Insurance Review Team August 2005 Review of Self-Insurance Arrangements in Victoria Report of the Self-Insurance Review Team August 2005 2005 Victorian Workcover Authority About this Report This report presents the outcomes of the Victorian

More information

Solihull Clinical Commissioning Group

Solihull Clinical Commissioning Group Solihull Clinical Commissioning Group Business Continuity Policy Version v1 Ratified by SMT Date ratified 24 February 2014 Name of originator / author CSU Corporate Services Review date Annual Target audience

More information

Compliance. Group Standard

Compliance. Group Standard Group Standard Compliance Serco is committed to good governance practices and the management of risks supported by a robust business compliance process SMS-GS-G2 Compliance July 2014 v1.0 Serco Public

More information

Reporting Service Performance Information

Reporting Service Performance Information AASB Exposure Draft ED 270 August 2015 Reporting Service Performance Information Comments to the AASB by 12 February 2016 PLEASE NOTE THIS DATE HAS BEEN EXTENDED TO 29 APRIL 2016 How to comment on this

More information

POSITION DESCRIPTION

POSITION DESCRIPTION POSITION DESCRIPTION Salary range: Manager Band Hours of work: In Accordance with the New South Wales Nurses and Midwives Association (NSWNMA) Employment Enterprise Agreement Status: Approved Position:

More information

Association of Consulting Architects Australia Strategic Plan

Association of Consulting Architects Australia Strategic Plan Association of Consulting Architects Australia Strategic Plan Box 17 Flinders Lane Post Office Melbourne Vic 8009 T 1300 653 026 E nat@aca.org.au www.aca.org.au Contents 1. Introduction 5 2. Survey 7 3.

More information

Human Capital Advantage for Business What is the Value of ADP ihcm for CEOs?

Human Capital Advantage for Business What is the Value of ADP ihcm for CEOs? Human Capital Advantage for Business What is the Value of ADP ihcm for CEOs? HR.Payroll.Benefits. ADP ihcm: Rethink Human Capital Management The need for HR to be a true business partner has never been

More information

Universities Australia Response to the Review of the ESOS Framework Discussion Paper

Universities Australia Response to the Review of the ESOS Framework Discussion Paper Universities Australia Response to the Review of the ESOS Framework Discussion Paper October 2014 This work is licensed under a Creative Commons Attribution 4.0 International Licence. Further inquiries

More information

Strategic Plan 2011 2012 to 2014 2015. Working Together for Australian Sport

Strategic Plan 2011 2012 to 2014 2015. Working Together for Australian Sport Strategic Plan 2011 2012 to 2014 2015 Working Together for Australian Sport Strategic Plan 2011 2012 to 2014 2015 Working Together for Australian Sport Australian Sports Commission 2011 Ownership of intellectual

More information

The University of Melbourne. Response to TEQSA Discussion Papers. 3 December 2013

The University of Melbourne. Response to TEQSA Discussion Papers. 3 December 2013 The University of Melbourne Response to TEQSA Discussion Papers 3 December 2013 Summary The University of Melbourne welcomes the opportunity to provide its views to the Tertiary Education Quality and Standards

More information

NORTH ATLANTIC TREATY ORGANIZATION STRATEGIC PLAN

NORTH ATLANTIC TREATY ORGANIZATION STRATEGIC PLAN NORTH ATLANTIC TREATY ORGANIZATION STRATEGIC PLAN 27 March 2015 INTERNATIONAL BOARD OF AUDITORS FOR NATO (IBAN) STRATEGIC PLAN 2015-2019 1 TABLE OF CONTENTS Page No. 1. IBAN AT A GLANCE 3 2. OVERVIEW 3

More information

IT Services Risk Management Strategy

IT Services Risk Management Strategy Prepared by: DOCUMENT CONTROL Change Control Table Version Amendment Description Release Date 1.00 Initial Draft Reviewed by DIB 16.01.14 Updated by 1.00 Approved by IT Lead

More information

Restructure, Redeployment and Redundancy

Restructure, Redeployment and Redundancy Restructure, Redeployment and Redundancy Purpose and Scope From time to time the Lake District National Park Authority will need to reorganise its services and staffing to meet changes that arise in future

More information

Collaborative development of evaluation capacity and tools for natural resource management

Collaborative development of evaluation capacity and tools for natural resource management Collaborative development of evaluation capacity and tools for natural resource management Helen Watts (Adaptive Environmental Management, formerly NSW Department of Environment and Climate Change) Sandra

More information

Ongoing N/A TBC. Baseline

Ongoing N/A TBC. Baseline Position Title: Executive General Manager, Core Services Systems Operations Classification: SES Band 2 Position Number: 1018 Position Status (ongoing/nonongoing): Ongoing Division: Core Services Systems

More information

Consultation Questionnaire. The case for change

Consultation Questionnaire. The case for change Annex G Consultation Questionnaire The case for change Question 1: Is the proposal to focus initially, after legislation is enacted, on improving outcomes for older people, and then to extend our focus

More information

John A Manzoni Chief Executive of the Civil Service. Email chief.executive@cabinetoffice.gov.uk

John A Manzoni Chief Executive of the Civil Service. Email chief.executive@cabinetoffice.gov.uk John A Manzoni Chief Executive of the Civil Service Email chief.executive@cabinetoffice.gov.uk 70 Whitehall London SW1A 2AS Telephone +44 (0) 20 7271 8822 Web www.cabinetoffice.gov.uk Paul Chinn Cabinet

More information

Entrepreneurs Programme - Business Evaluation. Version: 3

Entrepreneurs Programme - Business Evaluation. Version: 3 Entrepreneurs Programme - Business Evaluation Version: 3 20 October 2015 Contents 1 Purpose of this guide... 4 2 Programme overview... 4 2.1 Business Management overview... 4 3 Business Evaluations...

More information

Right: People Roles Recognition - Culture

Right: People Roles Recognition - Culture Our HR Strategy sion Vi Our ambitious new strategy requires a workforce which can demonstrate speed and agility; to achieve this we need to recruit, develop and retain people with the right skills, knowledge

More information

Disability Employment Services Quality Framework Advice V 2.0

Disability Employment Services Quality Framework Advice V 2.0 Disability Employment Services Quality Framework Advice V 2.0 Disclaimer This document is not a stand-alone document and does not contain the entirety of Disability Employment Services Providers' obligations.

More information

Guidance EARLY EDUCATION. Supporting children aged 0-5 with SEND to access their childcare

Guidance EARLY EDUCATION. Supporting children aged 0-5 with SEND to access their childcare This guidance has been reviewed following the publication of the Special Educational Needs and Disability Code of Practice: 0 to 25 years published by the Department for Education and Department of Health

More information

Human Capital Advantage for Business What is the value of ADP ihcm for HR Directors?

Human Capital Advantage for Business What is the value of ADP ihcm for HR Directors? Human Capital Advantage for Business What is the value of ADP ihcm for HR Directors? HR.Payroll.Benefits. ADP ihcm: Rethink Human Capital Management The need for HR to be a true business partner has never

More information

Implementation Plan: Development of an asset and financial planning management. Australian Capital Territory

Implementation Plan: Development of an asset and financial planning management. Australian Capital Territory Implementation Plan: Development of an asset and financial planning management framework for TAMS Australian Capital Territory NATIONAL PARTNERSHIP AGREEMENT TO SUPPORT LOCAL GOVERNMENT AND REGIONAL DEVELOPMENT

More information

V1.0 - Eurojuris ISO 9001:2008 Certified

V1.0 - Eurojuris ISO 9001:2008 Certified Risk Management Manual V1.0 - Eurojuris ISO 9001:2008 Certified Section Page No 1 An Introduction to Risk Management 1-2 2 The Framework of Risk Management 3-6 3 Identification of Risks 7-8 4 Evaluation

More information

Consideration of HR Management Strategy Framework and Impact of the Root and Branch Review recommendations. Summary of Progress since March 2009

Consideration of HR Management Strategy Framework and Impact of the Root and Branch Review recommendations. Summary of Progress since March 2009 CoC-IEE Working Group III 20 May 2009 Consideration of HR Management Strategy Framework and Impact of the Root and Branch Review recommendations Summary of Progress since March 2009 Since the last meeting

More information

Registration standard: Endorsement as a nurse practitioner

Registration standard: Endorsement as a nurse practitioner Registration standard: Endorsement as a nurse practitioner Consultation report February 2016 Nursing and Midwifery Board of Australia G.P.O. Box 9958 Melbourne VIC 3001 www.nursingmidwiferyboard.gov.au

More information

Response from the Department of Treasury, Western Australia, to the Productivity Commission s Draft Report Regulatory Impact Analysis: Benchmarking

Response from the Department of Treasury, Western Australia, to the Productivity Commission s Draft Report Regulatory Impact Analysis: Benchmarking Response from the Department of Treasury, Western Australia, to the Productivity Commission s Draft Report Regulatory Impact Analysis: Benchmarking Context Regulatory Impact Assessment (RIA) began in Western

More information

nine Human Resource Management nine

nine Human Resource Management nine nine Human Resource Management Finance has a comprehensive human resources (HR) policy framework which is designed to help attract, develop and retain talented, high-performing staff and facilitate the

More information

The anglo american Safety way. Safety Management System Standards

The anglo american Safety way. Safety Management System Standards The anglo american Safety way Safety Management System Standards 2 The Anglo American Safety Way CONTENTS Introduction 04 Anglo American Safety Framework 05 Safety in anglo american 06 Monitoring and review

More information

Information and Communications Technology (ICT) Steering Committee - Information Sheet

Information and Communications Technology (ICT) Steering Committee - Information Sheet Information and Communications Technology (ICT) Steering Committee - Information Sheet Version 2.2 Thursday, June 30, 2011 Document Ownership Information Document Owner M Livesley Document Preparation

More information

Recruitment and retention strategy Safeguarding and Social Care Division. What is the recruitment and retention strategy? 2. How was it developed?

Recruitment and retention strategy Safeguarding and Social Care Division. What is the recruitment and retention strategy? 2. How was it developed? Contents What is the recruitment and retention strategy? 2 How was it developed? 2 Newcastle story where were we? 2 Newcastle story where are we now? 3 Grow your own scheme 4 Progression 4 NQSW support

More information

Wales Procurement Policy Statement

Wales Procurement Policy Statement Wales Procurement Policy Statement In December 2012 I launched the Wales Procurement Policy Statement (WPPS) setting out the principles by which I expect public sector procurement to be delivered in Wales.

More information

Intelligent Field Service. The complete solution for field-based organisations

Intelligent Field Service. The complete solution for field-based organisations Intelligent Field Service The complete solution for field-based organisations Kirona Intelligent Field Service 01 Introducing Kirona Kirona helps organisations to deliver exceptional field-based services

More information

Housing Association Regulatory Assessment

Housing Association Regulatory Assessment Welsh Government Housing Directorate - Regulation Housing Association Regulatory Assessment Melin Homes Limited Registration number: L110 Date of publication: 20 December 2013 Welsh Government Housing

More information

COMPLIANCE FRAMEWORK AND REPORTING GUIDELINES

COMPLIANCE FRAMEWORK AND REPORTING GUIDELINES COMPLIANCE FRAMEWORK AND REPORTING GUIDELINES DRAFT FOR CONSULTATION June 2015 38 Cavenagh Street DARWIN NT 0800 Postal Address GPO Box 915 DARWIN NT 0801 Email: utilities.commission@nt.gov.au Website:

More information

AUSTRAC. supervision strategy 2012 14

AUSTRAC. supervision strategy 2012 14 AUSTRAC supervision strategy 2012 14 Commonwealth of Australia 2012 This work is copyright. You may download, display, print and reproduce this material in unaltered form only (retaining this notice) for

More information

PERFORMANCE APPRAISAL AND DEVELOPMENT AND KSF ANNUAL REVIEW

PERFORMANCE APPRAISAL AND DEVELOPMENT AND KSF ANNUAL REVIEW SECTION: HUMAN RESOURCES POLICY AND PROCEDURE No: 10.16 NATURE AND SCOPE: SUBJECT: POLICY AND PROCEDURE TRUST WIDE PERFORMANCE APPRAISAL AND DEVELOPMENT AND KSF ANNUAL REVIEW This policy explains the Performance

More information

Procurement Solutions. Business Plan 2013 18

Procurement Solutions. Business Plan 2013 18 Procurement Solutions Business Plan 2013 18 CONTENTS Vision 1 We will 1 Procurement Solutions Business Values 2 Probity 2 Innovation 2 Transparency 2 Flexibility 2 Equity 2 Professionalism 2 Our Strategic

More information

Helping our clients win in the changing world of work:

Helping our clients win in the changing world of work: Helping our clients win in the changing world of work: Recruitment Process: Why Outsource? A Manpower Insights Paper The future of RPO looks strong despite or perhaps aided by the current global recession.

More information

Chapter 3 Office of Human Resources Absenteeism Management

Chapter 3 Office of Human Resources Absenteeism Management Office of Human Resources Absenteeism Management Contents Section A - Background, Objective and Scope............................ 24 Section B - Criterion 1 - Communicating Expectations.......................

More information

Beyond RDR: The Emergence of the Independent Wealth Adviser

Beyond RDR: The Emergence of the Independent Wealth Adviser Beyond RDR: The Emergence of the Independent Wealth Adviser Three challenging forces have created a perfect storm within the UK wealth management industry: the regulatory demands in the FSA s Retail Distribution

More information

Reporting to: Director Policy, Policy Group Location: Wellington Salary range: Policy Band J

Reporting to: Director Policy, Policy Group Location: Wellington Salary range: Policy Band J Policy Manager Policy Group, Policy, Regulatory and Ethnic Affairs Branch The DIA Policy Group is responsible for policy and ministerial servicing relating to the Internal Affairs, Local Government, Community

More information

Guide. Minister s Guide to Auditing for Building Surveyors. April 2014

Guide. Minister s Guide to Auditing for Building Surveyors. April 2014 Guide Minister s Guide to Auditing for Building Surveyors April 2014 Guide Minister s Guide to Auditing for Building Surveyors April 2014 Department of Planning, Transport and Infrastructure 136 North

More information

Health and Safety Policy and Procedures

Health and Safety Policy and Procedures Health and Safety Policy and Procedures Health & Safety Policy & Procedures Contents s REVISION AND AMENDMENT RECORD : Summary of Change Whole Policy 4.0 05 Nov 08 Complete re-issue Whole Policy 4.1 10

More information

INTERNAL AUDIT REPORT ON THE FINANCIAL MANAGEMENT CONTROL FRAMEWORK FOR INITIATIVES RELATED TO CANADA S ECONOMIC ACTION PLAN (EAP) REPORT.

INTERNAL AUDIT REPORT ON THE FINANCIAL MANAGEMENT CONTROL FRAMEWORK FOR INITIATIVES RELATED TO CANADA S ECONOMIC ACTION PLAN (EAP) REPORT. INTERNAL AUDIT REPORT ON THE FINANCIAL MANAGEMENT CONTROL FRAMEWORK FOR INITIATIVES RELATED TO CANADA S ECONOMIC ACTION PLAN (EAP) REPORT July 2010 PREPARED BY THE INTERNAL AUDIT BRANCH (IAB) Project No:

More information

Supply Chain Specialist

Supply Chain Specialist CALL 13 19 01 defencejobs.gov.au/army/jobs/supplychainspecialist Document generated on Tuesday, 5 July 2016 at 3:40:10 AM Supply Chain Specialist Do you believe everything has its place and prefer order

More information

RISK MANAGEMENT POLICY (Revised October 2015)

RISK MANAGEMENT POLICY (Revised October 2015) UNIVERSITY OF LEICESTER RISK MANAGEMENT POLICY (Revised October 2015) 1. This risk management policy ( the policy ) forms part of the University s internal control and corporate governance arrangements.

More information

REHABILITATION MANAGEMENT SYSTEM AUDIT TOOL

REHABILITATION MANAGEMENT SYSTEM AUDIT TOOL REHABILITATION MANAGEMENT SYSTEM AUDIT TOOL Reviewing rehabilitation management systems and compliance under the Safety, Rehabilitation and Compensation Act 1988 and Guidelines for Rehabilitation Authorities

More information

A Framework for Information, Linkages and Capacity Building

A Framework for Information, Linkages and Capacity Building A Framework for Information, Linkages and Capacity Building Overview People with disability have the same right as other members of Australian society to realise their full potential. They should be supported

More information

Work with highly qualified people and latest technology in this exciting role that could take you just about anywhere in Australia.

Work with highly qualified people and latest technology in this exciting role that could take you just about anywhere in Australia. CALL 13 19 01 defencejobs.gov.au/airforce/jobs/dentalassistant Document generated on Saturday, 2 July 2016 at 8:51:34 PM Dental Assistant Work with highly qualified people and latest technology in this

More information

TGA key performance indicators and reporting measures

TGA key performance indicators and reporting measures TGA key indicators and reporting measures Regulator Performance Framework Version 1.0, May 2015 About the Therapeutic Goods Administration (TGA) The Therapeutic Goods Administration (TGA) is part of the

More information

Transform HR into a Best-Run Business Best People and Talent: Gain a Trusted Partner in the Business Transformation Services Group

Transform HR into a Best-Run Business Best People and Talent: Gain a Trusted Partner in the Business Transformation Services Group SAP Services Transform HR into a Best-Run Business Best People and Talent: Gain a Trusted Partner in the Business Transformation Services Group A Journey Toward Optimum Results The Three Layers of HR Transformation

More information

Continuous. Improvement. Review Kit. for planning and responsible authorities February 2006. A Victorian Government Initiative

Continuous. Improvement. Review Kit. for planning and responsible authorities February 2006. A Victorian Government Initiative Continuous Improvement Review Kit for planning and responsible authorities February 2006 A Victorian Government Initiative Published by the Victorian Government Department of Sustainability and Environment

More information

Insurance Commission of Western Australia

Insurance Commission of Western Australia Summarised Version March 2014 1. Executive summary 1.1 Background As part of the routine internal audit program, ICWA has requested Ernst & Young (EY) to undertake a claims management review of RiskCover

More information

CHARLES STURT UNIVERSITY WORKFORCE PLANNING FRAMEWORK 2007 2011

CHARLES STURT UNIVERSITY WORKFORCE PLANNING FRAMEWORK 2007 2011 CHARLES STURT UNIVERSITY WORKFORCE PLANNING FRAMEWORK 2007 2011 1. DEFINITION... 1 2. CONTEXT... 1 3. STRATEGIC ALIGNMENT AND DRIVERS... 1 4. VALUES... 2 5. PRINCIPLES OF PRACTICE... 2 6. PERFORMANCE INDICATORS...

More information

Workforce Management Plan 2013-2017

Workforce Management Plan 2013-2017 Workforce Management Plan 2013-2017 Adopted on Wednesday 19 June 2013 Contents Message from the General Manager 5 city Plan: Cascade of Plans 6 our Vision, Mission and Community Outcomes 7 Introduction

More information

NSW Public Service Commissioner NSW Health Good Health Great Jobs Stepping Up Forum 2015

NSW Public Service Commissioner NSW Health Good Health Great Jobs Stepping Up Forum 2015 NSW Public Service Commissioner NSW Health Good Health Great Jobs Stepping Up Forum 2015 Our Aboriginal workforce The Australian Bureau of Statistics figures from 2011 estimate that 2.9% of the NSW population

More information

ING Group Compliance Risk Management Charter and Framework

ING Group Compliance Risk Management Charter and Framework ING Group Compliance Risk Management Charter and Framework Corporate Compliance Risk Management ING GROUP COMPLIANCE RISK MANAGEMENT CHARTER AND FRAMEWORK Information sheet Target audience: All employees

More information

Removal of Gender Restrictions on Australian Defence Force Combat Role Employment Categories

Removal of Gender Restrictions on Australian Defence Force Combat Role Employment Categories Removal of Gender Restrictions on Australian Defence Force Combat Role Employment Categories Risk Management Plan INTENTIONALLY BLANK 1. Introduction The purpose of this Risk Management Plan (RMP) is to

More information

DIGITAL MARKETPLACE (G CLOUD 7) OFFERING. Sopra Steria Integration Platform Support as a Service. Service Overview. Sopra Steria in the public sector

DIGITAL MARKETPLACE (G CLOUD 7) OFFERING. Sopra Steria Integration Platform Support as a Service. Service Overview. Sopra Steria in the public sector DIGITAL MARKETPLACE (G CLOUD 7) OFFERING Sopra Steria Integration Platform Support as a Service Sopra Steria in the public sector Organisations across the public sector choose Sopra Steria to deliver transformation

More information

Note that the following document is copyright, details of which are provided on the next page.

Note that the following document is copyright, details of which are provided on the next page. Please note that the following document was created by the former Australian Council for Safety and Quality in Health Care. The former Council ceased its activities on 31 December 2005 and the Australian

More information

Change Leader Director 2015 Team

Change Leader Director 2015 Team Change Leader Director 2015 Team New Position Executive Level 2 Office of the CEO Non-ongoing Vacancy Full-time (18 months contract with a possible extension to two years in total) Canberra or Melbourne

More information

Future of Queensland s international education and training sector

Future of Queensland s international education and training sector Submission to the International Education and Training Advisory Council Queensland on the Future of Queensland s international education and training sector Prepared by: Queensland Tourism Industry Council

More information

Risk Management Policy and Process Guide

Risk Management Policy and Process Guide Risk Management Policy and Process Guide Status: pending Next review date: December 2015 Page 1 Information Reader Box Directorate Medical Nursing Patients & Information Commissioning Operations (including

More information

Job Description Strategic Projects Team Leader

Job Description Strategic Projects Team Leader Strategic Projects Team Leader Department: Group: Direct Line Manager: Responsible For: Planning & Community Relations Manager - & Community Relationships Three (3) Strategic Project Drivers Delegations:

More information

Policy Profession. Skills and Knowledge framework. Find out more now by going to www.civilservice.gov.uk/learning

Policy Profession. Skills and Knowledge framework. Find out more now by going to www.civilservice.gov.uk/learning Policy Profession Skills and Knowledge framework Find out more now by going to www.civilservice.gov.uk/learning Introduction to the Policy Profession Skills and Knowledge framework The policy profession

More information