1 1.0 Introduction Colorado Springs Utilities ( UTILITIES ) is an enterprise of the Municipal Government of the City of Colorado Springs, Colorado ( City ) that provides electric, natural gas, water, wastewater utility services to the citizens of the City and other customers in the Pikes Peak region. UTILITIES is one of the few municipally-owned, utility companies in the nation that provides all four of these utility services. UTILITIES operates an electric generation, transmission, and distribution system; a natural gas distribution system; a water collection, treatment and distribution system; and a wastewater collection and treatment system. The UTILITIES service area includes the City, the City of Manitou Springs, and many of the areas surrounding the City. Additionally, the military installations of Fort Carson Army Base ( Fort Carson ), Peterson Air Force Base ( Peterson ) and the United States Air Force Academy ( Academy ) receive water and electric service and natural gas supply and transportation from UTILITIES, and Peterson also receives wastewater treatment service. The UTILITIES Water Services Division is requesting proposals for program management services for the development of an Integrated Water Resource Plan (IWRP). This IWRP project requires program management services to initiate a program of study, analysis, evaluation, and planning that will define and describe the next phase of planning, development and management of UTILITIES water resources for the benefit of its customers and the citizens of the City. It is required that a portion of the Respondents staffing for this effort be located at Utilities offices. The amount and frequency of the Respondents co-located staff will be determined as part of the detailed work plan described in Section 4 below. This Statement of Work document provides the background for the entire IWRP planning project, but only specifies deliverables for the 1 st phase of program-management-services work to be completed in However, the successful respondent to this request-for-proposal will be required to complete the entire planning project and co-manage and collaborate with UTILITIES staff to perform to develop and implement the tasks and sub-projects necessary to complete the final IWRP document. This Contract will be awarded for an initial two (2) year period, with an option to extend for three (3) additional one year periods, exercisable at Colorado Springs Utilities (UTILITIES) discretion. Any such extension shall be made pursuant to a written amendment of this Agreement by mutual consent of the Parties. The Parties agree that time is of the essence and performance of the Services under this Agreement shall be developed, completed and implemented according to the Statement of Work. Any delays in performance within the control of Respondent, its consultants, subcontractors, employees or agents shall not be cause for extending the completion of Program Services beyond April Background UTILITIES has adopted the use of Integrated Resource Plan (IRP) processes for each utility service in order to identify, evaluate, and plan for the systematic and orderly acquisition, development and management of the resource portfolios required for each utility service. Examples include the Electric IRP, the Gas IRP, the Finished Water T (05/2007) Page 1 of 9
2 Master Plan, and most recently the trans-enterprise Master IRP. UTILITIES last completed a comprehensive water IRP in the early 90 s, which culminated1990 s culminating in the approval of its Water Resource Plan by Colorado Springs City Council in the spring of 1996 (the 1996 WRP ). That 1996 WRP included four principal objectives: Conservation & Demand Side Management, Existing System Improvements, Non-Potable Development, and Major Delivery System. These objectives have been largely achieved through implementation of the 1996 WRP over the last 15 years with the receipt of a Record of Decision for the Southern Delivery System (SDS) Project from the U.S. Bureau of Reclamation ( Reclamation ), City Council approval of the SDS Project Implementation Plan for the Preferred Action, and UTILITIES receipt of contracts from Reclamation for the storage, conveyance and exchange of water in Fryingpan- Arkansas Project facilities 3.0 Scope UTILITIES intends to execute a professional services contract with a firm to assist with the development, from concept to finish, of a comprehensive IWRP. The IWRP shall identify and define the water resource requirements for a time horizon to be determined and identify a portfolio of structural and nonstructural solutions, including strategies, projects, infrastructure, and options for providing safe, reliable, competitively-priced water services to the citizen-owners and customers of UTILITIES. It is expected that most of the program management work will be conducted at Utilities offices. It is anticipated this may involve 2 4 CONTRACTOR personnel hours per week depending on the phase of the program, engagement of specialty subcontractors, and the amount of field work and off-site engagement with stakeholders and other agencies. UTILITIES will provide office and meeting space, office supplies, and basic administrative support as needed. Computer equipment and network access will be negotiated with the selected respondent as part of contract negotiation. The IWRP shall consider customer water consumption, water rights, system yields, local, transmountain, and transferred agricultural water supplies, demand side management & conservation opportunities, raw-water collection, storage, and delivery systems, potable and tertiary treatment capacity, distribution system capacity, storage opportunities, and the environmental regulatory climate. The IWRP shall also address operating strategies to maximize supply yields. Strategic projects shall be identified for subsequent implementation plans. Construction and operation of the SDS Project, along with the completion of other smaller projects and programs, represents substantial implementation of Colorado Springs 1996 Water Resource Plan. This new IWRP planning effort will pick up the themes of the 1996 WRP, evaluate the efficacy of implementing any projects or processes from the 1996 WRP that have not been completed, and integrate new understandings of: risk identification, analysis, and management including linkages to multiple existing and on-going studies and assessments of the Colorado River Basin in terms of hydrology and institutional frameworks probabilistic analysis of supply, demand, and risks regional socioeconomics and development conservation and demand-side management T (05/2007) Page 2 of 9
3 simulation and modeling techniques drought identification and mitigation for both long-term and short-term events climate variability and change including vulnerability assessment and adaptation responses alternative agricultural water transfer concepts including rotational fallowing; periodic, temporary lease agreements; and partial consumptive use transfer with crop substitution structural and nonstructural solutions others as identified throughout the development of the plan The final form and total content of this IWRP will be determined, in part, by the initial phase of the program, which is the community engagement process. This community engagement process shall identify and define the stakeholder groups necessary to adequately address the issues identified above. These stakeholder groups will include: UTILITIES senior management and officer team, Colorado Springs City Council acting in its role as Utilities Board, and Utilities Policy Advisory Committee (UPAC). Additional stakeholder groups may also include select groups from the following: Military representatives Homeowner groups Service and philanthropic organizations Industry associations Economic development and sustainability committees Planning commissions and watershed groups Agricultural Interests Conservation and environmental organizations The IWRP planning process will be overseen internally by a selected management team and assisted by a select technical team, both of which are comprised of individuals from within the UTILITIES organization that either have responsibility for or are affected by the outcomes and deliverables of this IWRP. At milestones to be determined, UTILITIES may also elect to convene a 3 rd -party expert panel of planning and water resource professionals to review and provide advice on the development of the IWRP. UTILITIES Water Resource staff has participated in and is currently engaged in a number of collaborative planning processes with regional partners, the Water Research Foundation, Stockholm Environment Institute, and state and federal agencies. While none of these set the agenda for this IWRP process, the program manager shall become familiar with the major themes, outcomes, and current progress of these engagements. Publications from some of these efforts are provided as part of Section 8.0 Applicable Documents. UTILITIES Water Resource staff has been moving toward a risk-based and probabilistic planning approach that would provide a framework to plan, manage, and operate a T (05/2007) Page 3 of 9
4 water supply system over the long-term which is robust, resilient, and reliable in the face of the following identified risks: Drought, both long-term and short-term Climate variability and change Aging infrastructure Regulatory and legal mandates Changes in customer preferences and use patterns Economic variability and transformation Water rights litigation and administration As part of this risk-based planning approach, a suite of risk mitigation tools will be required. UTILITIES has identified the complimentary concepts of reserve margin and energy cost adjustment used within UTILITIES Energy Services Division as opportunities for development of analogs in a water resource context. A reserve margin may be defined as an amount of unused capacity and yield as a percentage or fraction of total system capacity that is reserved as a planning or operating buffer, which provides a factor of safety against service interruption. A water reserve margin or margins could serve as both short and long-term indicators of water supply shortage. An electric or gas cost adjustment factor is used by UTILITIES to maintain adequate energy revenues when the cost of fuel departs from forecast levels. A water cost adjustment factor could serve as a means to provide additional revenue over the short-term to fund temporary or interruptible water acquisitions, but infrequent shortages without the need to change long-term base rates. Other risk mitigation concepts shall also be developed and analyzed as appropriate. The resulting IWRP document shall: Be simple to understand and communicate Identify and conceptually design the actionable projects and programs necessary to achieve the IWRP s goals and objectives Provide a roadmap and timeline for the subsequent implementation plans, including the planned and permitted Phase II components of the SDS Project. Be robust and defendable in the context of ever more stringent requirements of legal and water court processes. 4.0 Tasks, Deliverables & Schedule 4.1 UTILITIES Responsibilities: Assign a designated Project Manager on behalf of UTILITIES who shall have responsibility for providing all project approvals, project information, and the day-to-day management of the IWRP planning program. The UTILITIES Project Manager shall be available to consult with CONTRACTOR to facilitate the delivery of the services per this Statement of Work ( SOW ) Provide CONTRACTOR with supervised access to all locations where services are to be performed. T (05/2007) Page 4 of 9
5 4.1.3 Provide available background information; e.g., existing studies, water rights information, system data, base mapping, and demand data Participate in workshops and public meetings conducted by the CONTRACTOR Provide CONTRACTOR with reasonable access to UTILITIES information, documents, and data as necessary to accomplish the intent of the program Provide CONTRACTOR with reasonable access to UTILITIES personnel as appropriate to accomplish the intent of the program UTILITIES will provide office and meeting space, office supplies, and basic administrative support as needed at a UTILITIES facility. 4.2 CONTRACTOR Responsibilities: Assign a designated Project Manager who shall have responsibility for providing all project approvals, project information, and the day-to-day project management of the Implementation Reassign and relocate such staff needed to prosecute the work to the Project Management Office as required and in compliance with the timephased sequences. As such, all assignments and relocations of all personnel will require approval by Utilities Participate with UTILITIES at a project kick-off meeting introducing the team, reviewing available resources, and setting a meeting schedule Provide a draft project plan developed with UTILITIES prior to the project kick-off meeting. During this meeting, a series of planning workshops shall be scheduled to refine and finalize a work plan to complete the IWRP Complete the entire IWRP planning project and co-manage and collaborate with UTILITIES staff to perform the necessary tasks and subprojects leading to the final IWRP document, including but not limited to the following: Conduct two (2) workshops to define goals, develop strategies, and define the project plan Develop with UTILITIES additional project tasks for work phases subsequent to Phase I, and to perform those tasks as approved and requested by UTILITIES Provide as needed project communication and updates to UTILITIES in both written and presentation form on a reasonable schedule to be developed cooperatively by UTILITIES and CONTRACTOR Prepare a draft and final scoping and community engagement report that summarizes the research conducted and stakeholder input (e.g., identified issues, potential solutions, & known opportunities) received during Phase I (2011) of the IWRP process. T (05/2007) Page 5 of 9
6 Public Involvement Support: Support UTILITIES staff as needed in its public involvement activities. Assist with critical stakeholder management and public involvementrelated activities Provide support staff to assist with the public involvement activities Assist in coordinating with the internal and external stakeholders Consult with UTILITIES staff concerning media relations Attend and assist with preparations for public functions required to facilitate the successful messaging of the IWRP program Participate in the Project Wrap-up Session and/or this could be a presentation to the UTILITIES BOARD Conduct project team coordination meetings weekly or as often as necessary to discuss and resolve issues relating to the management of all tasks. Document the meetings and record action items assigned to project team members Manage program resources and ensure necessary technical, management and support resources are available to meet the goals and objectives of the IWRP program. Management Assist UTILITIES in the preparation of material and presentations informing the public, citizen s advisory committees, advisory boards, and other governmental agencies on the status of the project Provide, organize and lead key staff to perform the program management services Prepare and review work authorizations or amendments with UTILITIES Assist UTILITIES in discussions with other governmental agencies or consultants as requested. Executive Review Meet with CONTRACTOR s staff to assess planned versus actual progress Obtain input from UTILITIES on the CONTRACTOR s performance Review current and projected resource requirements. Assist with development of additional work authorizations or amendments. Quality Management Provide CONTRACTOR QA/QC procedures and revise/reissue as requested by UTILITIES Conduct program management reviews. T (05/2007) Page 6 of 9
7 Program Controls The primary role of the CONTRACTOR shall be to maintain a reliable program controls management information system using proven program software and procedures. The CONTRACTOR shall monitor program and project progress from both schedule and cost perspectives and shall manage the flow of information with UTILITIES. 5.0 Performance Requirement and Methods of Measurement CONTRACTOR s performance measurement will be based on the following tabulated criteria. CONTRACTOR s performance shall be accessed after each task is completed. Item # Performance Measurement Methods Matrix Measurement Method Analysis Inspection Physical Test Measurement Component UTILITIES Project Lead/ Manager 1 Quality of Work 2 Timely Performance 3 Budget Compliance 4 Effectiveness of Management Completion of project on time or before UTILITIES Project Lead/ Manager Upon project completion Proper compliance to all standards and requirements to achieve UTILITIES goals Substantial completion date according to agreed upon Project Plan. Resolution and flexibility to task order issues; customer service; resource allocation; compliance with contract Score rating report Project Plan and deliverables, compliance with UTILITIES reporting and drawing standards Weekly schedule updates Timely response to issues Does not meet requirements or exceeds requirements Demonstration Acceptance of Contractor s Project Plan and deliverables Meets or exceeds substantial completion date of Task. Issue resolutions which meet or exceed UTILITIES requirements and resources assigned to task Score below minimum expectations will result in contract termination T (05/2007) Page 7 of 9
8 Performance Measurement Methods Matrix Item # Measurement Method Analysis Inspection Physical Measurement 6 Compliance with Contract Terms and Conditions Test Component Demonstration CONTRACTOR shall be rated as outstanding, satisfactory, or unsatisfactory. Unsatisfactory ratings shall be taken into consideration at the time of contract renewal. Based on performance measures Contractor s contract may not be renewed. 6.0 Contractor Key Contact The Contractor personnel listed below are considered to be essential to the work being performed hereunder. Prior to diverting the specified individual to other programs or in the event a key personnel terminates his/her employment, the Contractor shall inform UTILITIES in writing of any non-employee persons, consultants or firms CONTRACTOR intends to hire to perform any Work required by this Agreement and shall keep UTILITIES informed of any changes or additions to this information in advance and shall submit justification, including proposed substitutions, in sufficient detail to permit evaluation of the impact on the program. No diversion or substitution shall be made by the Contractor without written consent of UTILITIES. Name (TBD) Organization Name Organization (TBD) 7.0 Non-Disclosure of Information The selected Contractor will have access to information of a politically or legally sensitive nature, as well as restricted information regarding Utilities operations and security that shall not be disclosed. The selected Contractor will be required to sign a nondisclosure/confidentiality agreement before Utilities releases sensitive information for project purposes. Please see the sample non-disclosure/confidentiality agreement attached. 8.0 Applicable Documents Utilities will provide any documents (e.g., reports, diagrams, correspondence, etc.) that may be required to complete the work effort. The following information is provided as part of this RFP: T (05/2007) Page 8 of 9
9 Timeline 1996 WRP SDS Whitepaper Additional information that will also be available to the selected Contractor includes the following: Water Research Foundation Reports Raw Water Yield Study System Maps Other relevant reports, studies, and research completed for Utilities. 9.0 Outside Information It shall be the responsibility of UTILITIES to address all requests for outside information regarding the project including press releases, permission for news photographers, etc. All requests for such information shall be referred to UTILITIES. Under no circumstance shall any raw data, draft report, or final report prepared, on behalf of UTILITIES, be submitted to any third party or regulatory agency in the absence of explicit written authorization by UTILITIES Security Requirements Access to any properties or facilities owned or managed by UTILITIES shall be coordinated through the Watershed Planning Section, and may require prior approval by Water System Operations and/or Security Operations. Access will be granted according to applicable policies and procedures, including QBD 11671, Colorado Springs Utilities Security Plan and QBD 10213, Raw Water Access and Location of Watersheds. IT Network Security Requirements Remote access to Colorado Springs Utilities computer resources is provided to perform work authorized by UTILITIES. Access to general enterprise computing systems, using Utilities computer equipment with VPN technology, is enabled for all employees as a standard provision. Remote access by Contractors and temporary employees must be requested and authorized using the Remote Access Request process. Remote access to protected, critical systems or access through dialup solutions must be specifically requested and authorized using the Remote Access Request process. T (05/2007) Page 9 of 9
2009 Energy Policy. Background
2009 Energy Policy Background The citizens of Fort Collins created the municipal electric utility in 1935. In 1973, Fort Collins joined with Estes Park, Longmont and Loveland to create Platte River Power
More informationProject Review Board Governance Guide
King County Office of INFORMATION RESOURCE MANAGEMENT Project Review Board Governance Guide Developed by Version 2.1 October 2008 Table of Contents Table of Contents... i Table of Figures... i Governance
More informationREPORT 2016/066 INTERNAL AUDIT DIVISION. Audit of management of technical cooperation projects in the Economic Commission for Africa
INTERNAL AUDIT DIVISION REPORT 2016/066 Audit of management of technical cooperation projects in the Economic Commission for Africa Overall results relating to the effective management of technical cooperation
More informationCity of Fort Collins Water Supply and Demand Management Policy
City of Fort Collins Water Supply and Demand Management Policy The City of Fort Collins Water Supply and Demand Management Policy provides a foundational framework for water supply and demand management
More informationSAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE DIVISION PROCEDURES MANUAL PROGRAM AND PROJECT MANAGEMENT
SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE DIVISION PROCEDURES MANUAL PROGRAM AND PROJECT MANAGEMENT SECTION 6: QUALITY ASSURANCE PROCEDURE: PM 6.02 TITLE: QUALITY ASSURANCE AUDITS DATE:
More informationDrought Response Program: Draft Funding Criteria for Review and Comment
Drought Response Program: Draft Funding Criteria for Review and Comment U.S. Department of the Interior Bureau of Reclamation WaterSMART Program February 2015 Summary In fiscal year (FY) 2015, the Bureau
More informationColorado Springs Utilities
CASE STUDY Colorado Springs Utilities A City Prepared for an Uncertain Future: Colorado Springs Utilities Balances Water Conservation and Revenue Stability In partnership with SUMMARY Colorado Springs
More informationMEDICAL CAPTIVE INSURANCE COMPANY PROCUREMENT POLICIES AND PROCEDURES
MEDICAL CAPTIVE INSURANCE COMPANY PROCUREMENT POLICIES AND PROCEDURES GOVERNMENT OF THE DISTRICT OF COLUMBIA OFFICE OF RISK MANAGEMENT 441 Fourth Street, NW Suite 800 South Washington, DC 20001 Phone:
More informationLR 314 Working Group 5 Final Report
LR 314 Working Group 5 Final Report I. Nebraska Department of Natural Resources Table 1. NDNR and NATURAL RESOURCES COMMISSION WATER/INTEGRATED MANAGEMENT PLANNING RELATED RESEARCH, STUDIES AND RELATED
More informationPROCEDURES FOR ENVIRONMENTAL AND SOCIAL APPRAISAL AND MONITORING OF INVESTMENT PROJECTS
PROCEDURES FOR ENVIRONMENTAL AND SOCIAL APPRAISAL AND MONITORING OF INVESTMENT PROJECTS Approved 10 July 2015 CONTENTS 1. INTRODUCTION 1 2. OVERVIEW OF THE ENVIRONMENTAL AND SOCIAL APPRAISAL AND MONITORING
More informationAddressing Declining Elevations in Lake Mead
Integrated Resource Planning Advisory Committee July 23, 2014 Addressing Declining Elevations in Lake Mead 1 Meeting Topics Drought update Attribute finalization Interbasin Cooperation Intake Pumping Station
More informationSTATEMENT OF WORK (SOW) for CYBER VULNERABILITY ASSESSMENT
1.0 Introduction UTILITIES desires to contract with a CONTRACTOR to conduct an in-depth cyber vulnerability assessment and physical penetration vulnerability assessment of our IT Infrastructure as outlined
More informationProject Management Guidelines
Project Management Guidelines 1. INTRODUCTION. This Appendix (Project Management Guidelines) sets forth the detailed Project Management Guidelines. 2. PROJECT MANAGEMENT PLAN POLICY AND GUIDELINES OVERVIEW.
More informationCHAPTER TEN. Quality Assurance and Quality Control MAINE RIGHT OF WAY MANUAL
CHAPTER TEN Quality Assurance and Quality Control MAINE RIGHT OF WAY MANUAL December 2010 Section Table of Contents Page 10-1 PURPOSE AND OBJECTIVES... 10-1(1) 10-1.01 Purpose... 10-1(1) 10-1.02 Quality
More informationRequest for Proposal (RFP) Black Forest Community Wildfire Protection Plan (CWPP) Update
Black Forest Together Inc. (BFT) 11590 Black Forest Road, Suite 30 Colorado Springs, CO 80908 719-495-2445 (office) Request for Proposal (RFP) Black Forest Community Wildfire Protection Plan (CWPP) Update
More informationDigital Advisory Services Professional Service Description Network Assessment
Digital Advisory Services Professional Service Description Network Assessment 1. Description of Services. 1.1. Network Assessment. Verizon will perform Network Assessment services for the Customer Network,
More informationThe Job of the Project Manager. Robert Youker World Bank (retired) 5825 Rockmere Drive Bethesda, Md. USA 20816 bobyouker@worldnet.att.
The Job of the Project Manager Robert Youker World Bank (retired) 5825 Rockmere Drive Bethesda, Md. USA 20816 bobyouker@worldnet.att.net For any organization and for any project manager it is vitally important
More informationCovance Construction Management Staffing Plan Chandler, Arizona
INTRODUCTION: This Construction Management (CM) Staffing Plan has been prepared for Covance to identify the critical organizational structure necessary to successfully complete the Chandler project according
More informationFixed Income And Asset Allocation Funds Governance And Nominating Committee Charter
Fixed Income And Asset Allocation Funds Governance And Nominating Committee Charter I. Background The investment companies managed by Fidelity Management & Research Company or its affiliates (collectively,
More informationWater Security Agency. Plan for 2015-16. saskatchewan.ca
Water Security Agency Plan for 2015-16 saskatchewan.ca Statement from the Minister I am pleased to present the Water Security Agency s Plan for 2015-16. The Honourable Scott Moe Minister Responsible for
More informationCRD Wastewater Treatment Project: Observations and Recommendations on Project Governance
Appendix A - Governance May 3, 2016 CRD Wastewater Treatment Project: Observations and Recommendations on Project Governance Background In early April 2016, the Minister of Communities, Sport and Cultural
More informationHIPAA BUSINESS ASSOCIATE AGREEMENT
HIPAA BUSINESS ASSOCIATE AGREEMENT This HIPAA Business Associate Agreement and is made between BEST Life and Health Insurance Company ( BEST Life ) and ( Business Associate ). RECITALS WHEREAS, the U.S.
More informationThe Law of the City of Moscow. No. 30 dated the 30 th of June 2010. On the Chamber of Control and Accounts of Moscow
The Law of the City of Moscow No. 30 dated the 30 th of June 2010 On the Chamber of Control and Accounts of Moscow In accordance with the federal legislation and the Moscow City Charter, this Law shall
More informationCDBG DR Resilience Planning & Watershed Programs Grant Guide
CDBG DR Resilience Planning & Watershed Programs Grant Guide Table of Contents 1) CDBG DR Program Description page 2 2) Contact Information page 3 3) Grant Administration Requirements page 4 4) NOT Required
More informationSTATEMENT OF WORK (SOW) for LSF 9.0 Implementation
1.0 Introduction Colorado Springs Utilities (UTILITIES) requires professional services to assist in the upgrade from Lawson Environment version 8.0.3 to Lawson System Foundation (LSF) 9.0. This Statement
More informationTerms of References for Infrastructure Expert
1. BACKGROUND Terms of References for Infrastructure Expert Sustainable Development Account Moldova (SDA Moldova) (hereinafter the institution) is a public entity established by the Government of the Republic
More information5. Environmental Analysis
5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the
More informationCALIFORNIA ALTERNATIVE ENERGY AND ADVANCED TRANSPORTATION FINANCING AUTHORITY Meeting Date: February 18, 2014
CALIFORNIA ALTERNATIVE ENERGY AND ADVANCED TRANSPORTATION FINANCING AUTHORITY Meeting Date: February 18, 2014 Request to Consider and Approve Emergency Regulations for the Property Assessed Clean Energy
More informationPROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name
More informationCITY OF SAN MATEO, CALIFORNIA
1 Background The City of San Mateo, CA, a full-service city with a population of approximately 97,207, is soliciting for professional project management services related to the City s Permitting and Project
More informationFacilities Portfolio Management Tool
2016 Facilities Portfolio Management Tool Project Charter Budget- Facilities Oversight Office of Financial Management 4/10/2016 CONTENTS Overview... 2 Purpose Statement... 2 Background... 2 Goals & Objectives...
More informationCity of Powell Request for Proposals for a Total Compensation Survey
City of Powell Request for Proposals for a Total Compensation Survey Section I The City of Powell is soliciting proposals from qualified consulting firms, experienced in the development of a job evaluation
More informationDr. Donald A. Wilhite School of Natural Resources University of Nebraska-Lincoln
Dr. Donald A. Wilhite School of Natural Resources University of Nebraska-Lincoln Mexico s National Drought Program Meeting, Mexico City 25-26 November 2013 How do we prepare for and mitigate the impacts
More informationPROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:
PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Project Name Project Management Plan Document Information Document Title Version Author Owner Project Management Plan Amendment History
More informationPrincipal Project Manager
Office of Human Resources Principal Project Manager Page 1 of 7 GENERAL STATEMENT OF CLASS DUTIES Performs advanced, specialized professional level project management work on complex, multifaceted regional
More informationPENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WASTE MANAGEMENT
PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WASTE MANAGEMENT DOCUMENT NUMBER: 250-4000-004 TITLE: Program Implementation Guidance EFFECTIVE DATE: September 17, 2005 AUTHORITY: The Solid
More informationExhibit B. Clark County Desert Conservation Program Community Advisory Committee CHARTER
Exhibit B Clark County Desert Conservation Program Community Advisory Committee CHARTER Contents Mission, Purpose and Term 1 Membership 2 Roles, Accountability, and Mutual Responsibilities 2 Individuals
More informationExhibit A CWCB FLOOD RECOVERY GRANT PROGRAM Statement of Work
Exhibit A CWCB FLOOD RECOVERY GRANT PROGRAM Statement of Work Emergency Flood Recovery Assessment, Design and Recovery Project Description: The purpose of this grant is to provide technical assistance
More informationInformation Technology Governance Overview and Charter
Information Technology Governance Overview and Charter Prepared by: Project #: Date submitted Document version: IT Governance Charter v03.05.2012 1.0 48.0 - Page 1 of 34 Document History Version Date Author
More informationManager, Corporate Planning & Reporting BC Oil & Gas Commission, Victoria Applied Leadership. Office of the Commissioner - Corporate Affairs
Manager, Corporate Planning & Reporting BC Oil & Gas Commission, Victoria Applied Leadership Office of the Commissioner - Corporate Affairs The Manager, Corporate Planning & Reporting is responsible for
More informationSTAFF REPORT. Agreement With CSG Consultants, Inc. for Project Management Services
STAFF REPORT Meeting Date: August 26, 2014 Agenda Item # Agency: City of Belmont Staff Contact: Carlos de Melo, Community Development Director, (650) 595-7440 cdemelo@belmont.gov Agenda Title: Agreement
More informationIntroduction to the ITS Project Management Methodology
Introduction to the ITS Project Management Methodology In September 1999 the Joint Legislative Committee on Performance Evaluation and Expenditure Review (PEER) produced a report entitled Major Computer
More informationEXHIBIT "A" SCOPE OF SERVICES POLICY PLANNING CONSULTANT
EXHIBIT "A" SCOPE OF SERVICES POLICY PLANNING CONSULTANT PURPOSE The Department requires the professional planning services of a consultant to support Central Office, Office of Policy Planning (OPP) staff
More informationCity of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #37-15 REQUEST FOR PROPOSAL
City of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #37-15 REQUEST FOR PROPOSAL ENGINEERING CONSULTING SERVICES WATER SYSTEM ASSET MANAGEMENT PROGRAM INVITATION Sealed Proposals, plainly
More informationSTATEMENT THOMAS P. MICHELLI CHIEF INFORMATION OFFICER U.S. IMMIGRATION AND CUSTOMS ENFORCEMENT DEPARTMENT OF HOMELAND SECURITY REGARDING A HEARING ON
STATEMENT OF THOMAS P. MICHELLI CHIEF INFORMATION OFFICER U.S. IMMIGRATION AND CUSTOMS ENFORCEMENT DEPARTMENT OF HOMELAND SECURITY REGARDING A HEARING ON EXAMINING CHALLENGES AND WASTED TAXPAYER DOLLARS
More informationPROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT
PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT - INTRODUCTION 1.1. General. Kuwait Ports Authority (KPA) through the Ministry Of Finance (MOF) wishes
More informationLEGAL SERVICES CONTRACT. THIS LEGAL SERVICES CONTRACT (this "Contract"), entered into as of
LEGAL SERVICES CONTRACT THIS LEGAL SERVICES CONTRACT (this "Contract"), entered into as of, 20 by and between PHILADELPHIA REDEVELOPMENT AUTHORITY ("Redevelopment Authority"), acting as agent for PHILADELPHIA
More informationRequest for Proposals
Request for Proposals Connected Responder: Public Safety and Emergency Response Community Connected Vehicle Interest, Context and Business Case Development RFP Schedule RFP Release Date: April 30, 2015
More informationStrategic Plan. Valid as of January 1, 2015
Strategic Plan Valid as of January 1, 2015 SBP 00001(01/2015) 2015 City of Colorado Springs on behalf of Colorado Springs Page 1 of 14 INTRODUCTION Integrated and long-term strategic, operational and financial
More informationThe Rights of Landowners Under Wisconsin Eminent Domain Law. Procedures Under sec. 32.06 Wisconsin Statutes
The Rights of Landowners Under Wisconsin Eminent Domain Law Procedures Under sec. 32.06 Wisconsin Statutes FOREWORD This pamphlet is published by the Wisconsin Department of Commerce in cooperation with
More informationAppendix 3: Project Management Substation Guidelines (General Process Flow Template)
365 Appendix 3: Project Management Substation Guidelines (General Process Flow Template) Checkpoint Methodology The schedule is issued prior to the go decision. It covers the duration of the project. It
More informationCity and County of San Francisco
City and County of San Francisco Department of Human Resources REQUEST FOR QUOTES Workers Compensation Check Printing Services RFq# DHR2016-03 CONTACT: DHRContracts@sfgov.org Overview The City and County
More informationUNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Reliability Technical Conference Docket No. AD16-15-000 Prepared Statement of Mark Rothleder on behalf of the California Independent System
More informationMUNICIPAL DEBT FINANCIAL ADVISORY SERVICES
Request for Proposal MUNICIPAL DEBT FINANCIAL ADVISORY SERVICES Denver Urban Renewal Authority 1555 California Street, Suite 200 Denver, Colorado 80202 Issued: October 5, 2015 Response Date: October 23,
More informationProposal Deadline: 2:00 p.m., Wednesday April 27, 2016 Integrated Resource Plan (IRP) Request for Proposals (RFP) Strategic Consulting Services
Date: April 5, 2016 Proposal Deadline: 2:00 p.m., Wednesday April 27, 2016 Integrated Resource Plan (IRP) Strategic Consulting Services Requests for Proposals Denver Water is soliciting proposals to provide
More informationWater Resource Plan 2015 (Summary Report) Ensuring customers have clear, fresh, safe drinking water to 2040 and beyond
() Ensuring customers have clear, fresh, safe drinking water to 2040 and beyond November 2014 Overview Our Water Resource Plan sets out our strategy to secure the reliable supply of drinking water to
More informationMOBIS GSA. INTEK INC. 2300 Clarendon Blvd., Suite 310 Arlington, VA 22201, (703) 465-2200. Contract Number GS-10F-0125N.
GSA MOBIS Management, Organizational and Business Management, Organizational and Business Improvement Services Contract Number GS-10F-0125N Small Business INTEK INC. 2300 Clarendon Blvd., Suite 310 Arlington,
More informationSTATEMENT OF WORK LONG TERM CARE HOSPITAL PAYMENT SYSTEM REFINEMENT/EVALUATION
STATEMENT OF WORK LONG TERM CARE HOSPITAL PAYMENT SYSTEM REFINEMENT/EVALUATION I. SCOPE: The contractor shall provide a wide variety of statistical, data and policy analysis to support the CMS need to
More informationIBM Implementation Services for Power Systems IBM Systems Director
Sample Statement of Work for Services This an example and your Statement of Work may vary given your specific requirements and the related IBM engagement. IBM Implementation Services for Power Systems
More informationPRACTICE ADVISORIES FOR INTERNAL AUDIT
Société Française de Réalisation, d'etudes et de Conseil Economics and Public Management Department PRACTICE ADVISORIES FOR INTERNAL AUDIT Tehnical Assistance to the Ministry of Finance for Development
More informationHow To Write A Book On Risk Management
National Center for Risk and Economic Analysis of Terrorism Events CREATE FY2015 (Year 11) Call for White Papers CREATE, the DHS-sponsored Center of Excellence at the University of Southern California,
More informationSAP Product Stewardship Network Supplier Enablement Service Description (English)
SAP PRODUCT STEWARDSHIP NETWORK - SUPPLIER ENABLEMENT - SERVICE DESCRIPTION SAP Product Stewardship Network Supplier Enablement Service Description (English) Table of Content 1 Definitions... 3 2 Introduction...
More informationDescription: Publication Date: 9/21/2015. Closing Date/Time: Open Until Contracted
Description: The New River Valley Regional Jail Authority (NRVRJA) values and appreciates the contributions and efforts of its employees. Toward this end, the NRVRJA is committed to providing a supportive,
More informationBUSINESS ASSOCIATE AGREEMENT
COLUMBIA AGREEMENT BUSINESS ASSOCIATE AGREEMENT This Business Associate Agreement ( Agreement ) is entered into as of ( Effective Date ) by and between The Trustees of Columbia University in the City of
More informationData Center Assistance Group, Inc. DCAG Contact: Tom Bronack Phone: (718) 591-5553 Email: bronackt@dcag.com Fax: (718) 380-7322
Business Continuity and Disaster Recovery Job Descriptions Table of Contents Business Continuity Services Organization Chart... 2 Director Business Continuity Services Group... 3 Manager of Business Recovery
More informationEXHIBIT A SCOPE OF SERVICES CONSTRUCTION MANAGEMENT TEAM POSITIONS AND REQUIREMENTS
EXHIBIT A SCOPE OF SERVICES CONSTRUCTION MANAGEMENT TEAM POSITIONS AND REQUIREMENTS 1.0 SCOPE OF SERVICES 1.1 General Information LAUSD requires construction management services to manage and expedite
More informationCHARLESTON COUNTY PARK AND RECREATION COMMISSION Request for Proposal Insurance Product Broker No. 2014-033 June 16, 2014
Contents CHARLESTON COUNTY PARK AND RECREATION COMMISSION Request for Proposal Insurance Product Broker No. 2014-033 June 16, 2014 1 Insurance Product Broker PRICE PROPOSAL... 4 Introduction... 6 Scope
More informationProject Governance Plan Next Generation 9-1-1 Project Oregon Military Department, Office of Emergency Management, 9-1-1 Program (The OEM 9-1-1)
Oregon Military Department, Office of Emergency Management, 9-1-1 Program (The OEM 9-1-1) Date: October 1, 2014 Version: 3.1 DOCUMENT REVISION HISTORY Version Date Changes Updated By 0.1 02/13/014 Initial
More informationLocal Government Energy Efficiency Resources Guidebook 5: Project Management
Local Government Energy Efficiency Resources Guidebook 5: Project Management Prepared for: Los Angeles County ISD 1100 North Eastern Ave Los Angeles, CA 90063 Prepared by: The Energy Coalition 523 W. Sixth
More informationRequest for Proposal (RFP) Event Management Services. For. Project Management Institute Ottawa Valley Outaouais Chapter (PMI OVOC)
Request for Proposal (RFP) Event Management Services For Project Management Institute Ottawa Valley Outaouais Chapter (PMI OVOC) Project Management Institute Ottawa Valley Outaouais Chapter Page 1 SECTION
More informationREQUEST FOR PROPOSALS. Business Continuity Planning Consultant Services APPENDIX C RFP STATEMENT OF WORK EXHIBITS 1-3
REQUEST FOR PROPOSALS Business Continuity Planning Consultant Services APPENDIX C RFP STATEMENT OF WORK EXHIBITS 1-3 EXHIBITS EXHIBIT 1 EXHIBIT 2 EXHIBIT 3 Glossary of Terms and Acronyms Contract Discrepancy
More informationAudio-Visual & Multimedia Producer(s) Website and Mobile App Developer(s)
Audio-Visual & Multimedia Producer(s) Website and Mobile App Developer(s) Request for Qualifications No. FPCC-RFQ-001 Issue date: July 4, 2013 Closing location: MAIL ONLY: COURIER/BY HAND: First Peoples'
More informationSubject to FirstNet Board Review and Approval SPECTRUM MANAGER LEASE AGREEMENT I. PARTIES AND PURPOSE BETWEEN THE FIRST RESPONDER NETWORK AUTHORITY AND THE STATE OF NEW MEXICO This non-exclusive Spectrum
More informationPROJECT PROCUREMENT MANAGEMENT
12 PROJECT PROCUREMENT MANAGEMENT Project Procurement Management includes the processes required to acquire goods and services from outside the performing organization. For simplicity, goods and services,
More informationEXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction
EXECUTIVE SUMMARY Introduction The Asset Management Plan demonstrates sound stewardship of the Region s existing assets to support services at desired levels and to ensure the support of the Region s infrastructure
More informationCurrent Report No. 21/2011
Warsaw 10 August 2011 Current Report No. 21/2011 Drafts of resolutions of the Extraordinary General Shareholders Meeting of Bank Handlowy w Warszawie S.A. on 12 September 2011 Legal grounds: 38 section
More informationCommand Center, Inc. CORPORATE GOVERNANCE GUIDELINES
Command Center, Inc. CORPORATE GOVERNANCE GUIDELINES These (the Guidelines ) have been adopted by the Board of Directors of Command Center, Inc., to assist the Board and its committees in the exercise
More informationStatement of Work (SOW)
Statement of Work (SOW) 1.0 SCOPE OF REQUIREMENT ONLINE REGISTRATION SUPPORT The General Services Administration, Federal Acquisition Service, Region 7, Greater Southwest Acquisition Center (GSAC) is located
More informationAGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor December 9, 2015 9:30 a.m.
AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor 9:30 a.m. Minutes Approval of Minutes: Regular Commission Meeting November 11, 2015 Executive Director
More informationPROJECT MANAGEMENT PLAN CHECKLIST
PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,
More informationCommunity Participation Program
-Draft- Community Participation Program Comprehensive Master Plan 2 0 3 0 City of Cartersville, Georgia Table of Contents Introduction 1 Public Participation History 2 Process and Expectations 2 Elements
More informationGE Power & Water Water & Process Technologies. Water and Process Solutions for the Refining Industry
GE Power & Water Water & Process Technologies Water and Process Solutions for the Refining Industry Maximizing Refining and Fuel Production Processes For more than 100 years, GE has maintained its commitment
More informationRequest for Proposals (RFP) Communications Services RFP #CS-PY 15-I September 17, 2015
Request for Proposals (RFP) Communications Services September 17, 2015 PURPOSE Opportunity Inc. of Hampton Roads (OppInc.) seeks a communications consultant (the Consultant) to provide Communications Services
More informationOUTSOURCING. The Original Agreement provided for an optional 3-year extension to the original 10-year term.
Filed: -- EB--0 Exhibit C Tab Page of OUTSOURCING.0 BACKGROUND Hydro One Networks Inc. ( Networks ) entered into a -year master services agreement with Inergi LP ( Inergi ) on December, 0 for services
More informationSUMMARY MINUTES OF THE INFORMATION SYSTEMS ADVISORY COMMITTEE MEETING Friday, September 12, 2014
CITIZENS PROPERTY INSURANCE CORPORATION SUMMARY MINUTES OF THE INFORMATION SYSTEMS ADVISORY COMMITTEE MEETING Friday, The Information Systems Advisory Committee (ISAC) of Citizens Property Insurance Corporation
More informationDelaware Sustainable Energy Utility Request for Proposals for Financial Advisory Services
Delaware Sustainable Energy Utility Request for Proposals for Financial Advisory Services The Delaware Sustainable Energy Utility ( SEU ) requests proposals from firms and individuals qualified to provide
More informationDEVELOPMENT DUE DILIGENCE CHECKLIST
DEVELOPMENT DUE DILIGENCE CHECKLIST A. Title Condition. 1. Preliminary Title Reports. A current preliminary title report ( PTR ) for the Real Property. 2. Copies of Exceptions to Title. Copies of all documents
More informationIdentity & Access Management new complex so don t start?
IT Advisory Identity & Access Management new complex so don t start? Ing. John A.M. Hermans RE Associate Partner March 2009 ADVISORY Agenda 1 KPMG s view on IAM 2 KPMG s IAM Survey 2008 3 Best approach
More informationDEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WASTE MANAGEMENT
DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WASTE MANAGEMENT DOCUMENT NUMBER: 250-4000-002 EFFECTIVE DATE: September 17, 2005 TITLE: Enforcement Actions AUTHORITY: The Solid Waste Management Act,
More informationPROVO CITY UTILITIES NET METERING LICENSE AGREEMENT
PROVO CITY UTILITIES NET METERING LICENSE AGREEMENT Customer-Owned Electric Generating Systems of 25kW or Less This NET METERING LICENSE AGREEMENT ( Agreement ) is between ( Customer ) and Provo City -
More informationDesign Consultant Project Management Requirements
Design Consultant Project Management Requirements Version 2 April 25, 2013 AWTP Program Design Consultant Contents 1.0 Introduction... 1 2.0 General Management... 1 3.0 Project Management Plan... 1 4.0
More information2011-2012 Principal Performance Review
Principal Performance Review: 2011-2012 1 2011-2012 Principal Performance Review Principal Information Principal: School Year: School: Phone Number: Superintendent: District: Cluster: Network Leader: Status
More informationRequest for Proposals PROFESSIONAL SERVICES FOR DRINKING WATER, WASTEWATER AND STORMWATER PROJECTS OPEN-END CONTRACTS 2016-18
Request for Proposals PROFESSIONAL SERVICES FOR DRINKING WATER, WASTEWATER AND STORMWATER PROJECTS OPEN-END CONTRACTS 2016-18 Page 2 of 8 1. INTRODUCTION Capital Region Water (CRW) is requesting proposals
More informationCOMPREHENSIVE ASSET MANAGEMENT STRATEGY
COMPREHENSIVE ASSET MANAGEMENT STRATEGY APPROVED BY SENIOR MANAGEMENT COMMITTEE ON AUGUST 23, 2012 (TO BE FINALIZED AFTER APPROVAL OF CAM POLICY BY COUNCIL) August 2012 Contents CONTENTS EXECUTIVE SUMMARY
More informationAGREEMENT FOR PROFESSIONAL LAND SURVEYING SERVICES WITNESSETH: ARTICLE 1
AGREEMENT FOR PROFESSIONAL LAND SURVEYING SERVICES This Agreement, made as of the 29 th day of January, 1999, by and between the County of Wake (hereinafter, the "Owner") and McKim & Creed Engineers, P.A.,
More informationRequest for Qualifications Legal Services
Request for Qualifications Legal Services Overview: Minnehaha Creek Watershed District (MCWD) Counsel shall provide an ongoing process of setting the legal parameters within which the District will operate
More informationAudit Management Software Solution
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 Scope of Work I. Scope of Solicitation II. Instructions to Offerors III. Scope of
More informationREPORT 2014/078 INTERNAL AUDIT DIVISION
INTERNAL AUDIT DIVISION REPORT 2014/078 Audit of the Office for the Coordination of Humanitarian Affairs (OCHA) Managing Agent role for the Somalia Common Humanitarian Fund Overall results relating to
More informationCounty Attorney s Office Budget Workshop. June 9, 2015
Budget Workshop June 9, 2015 Purpose To provide the BCC with an overview of the County Attorney s Office and the proposed FY 2016 Budget. Presentation Outline Overview of Department Organizational Chart
More informationUniversal Program Review
1. DEPARTMENTAL DESCRIPTION A. DEPARTMENTAL DESCRIPTION The Corporate Services Department provides centralized professional support services to all City departments (Centres of Expertise or COEs) and direct