SECTION PIPELINE CONSTRUCTION

Size: px
Start display at page:

Download "SECTION 02600 - PIPELINE CONSTRUCTION"

Transcription

1 SECTION PART 1 -- GENERAL 1.1 WORK OF THIS SECTION A. The WORK of this Section includes providing general requirements for pipelines, including pipejoints, specials, and appurtenances, complete and in place. This Section is intended for use on gravity and pressure pipeline projects in trenches. It is not intended for trenchless projects. 1.2 STANDARD SPECIFICATIONS A. Amendment. Except as otherwise indicated in this Section of the Specifications, the CONTRACTOR shall comply with the latest edition of the Standard Specification for Public Works Construction (SSPWC) together with any latest Supplement 1.3 SHOP DRAWINGS AND SAMPLES A. In addition to the requirements of Section and the pipe material specifications, the following shall be submitted in compliance with SSPWC Subsection Post-installation videotape and inspection reports. 2. Shop drawings and design calculations for joint restraint systems using reinforced concrete encasement of pressure pipe and fittings. 3. Drawings and calculations for thrust blocks. PART 2 -- PRODUCTS 2.1 PIPE AND APPURTENANCES A. Provide pipe materials, coatings and linings, and appurtenances of the sizes and types indicated on the Drawings and comply with appropriate specification section for the pipe materials. 2.2 FILL AND BACKFILL MATERIAL A. Fill and backfill materials shall be in accordance with Section PART 3 -- EXECUTION 3.1 PREPARATION A. Traffic: Conform to California Department of Transportation requirements. B. Utility Relocation: Notify the CITY of existing public utilities and franchise holders which must be relocated and the reasonable time for doing so. The OWNER will contact the utility or franchise holder and request relocation. Relocation and protection of existing utilities are the CONTRACTOR s responsibility. PAGE

2 C. Where the proposed piping will connect to existing piping, the CONTRACTOR shall excavate the point of connection to verify size, layout, and depth. Prepare a sketch of the proposed point of connection for submittal to the City Engineer. The CONTRACTOR shall give the CITY a minimum of two hours to inspect the existing piping before backfilling. 3.2 DEWATERING A. Install and operate according to Section a continuous dewatering system capable of maintaining the ground water level 2 feet below the excavated trench bottom. Well points shall be located on both sides of the trench for dewatering, unless otherwise approved by the CITY. B. Operate the dewatering system 7 days per week, 24 hours per day with water level as indicated above until backfilling is completed. C. Field-determined departures from the dewatering plans may necessitate adjustments to the trench shoring and bracing methods to achieve soil stability. Adjustment shall be at no additional cost to the OWNER. D. Dewatering shall prevent softening of the bottom of excavations or formation of quick conditions. Dewatering shall not remove native soils. All loose soil shall be removed and recompacted in accordance with Section EXCAVATION A. Unless indicated otherwise, excavation and overexcavation shall be in accordance with Section B. Trench width shall be as indicated. C. Stabilize the trench subgrade by compaction to 95 percent relative density. Where trench bottom has been over-excavated, compact the bedding to 95 percent in 1-foot thick layers. 3.4 LAYOUT AND HANDLING A. Handling of Pipe and Accessories: Pipe shall be lifted in such a manner as to minimize bending and prevent damage to the pipe. During transport, pipe shall be supported to prevent distortion or damage to the pipe. When not being handled, pipe shall be stockpiled on timber cradles or properly prepared ground with all rocks larger than 3 inches eliminated. All pipe, fittings, valves and accessories shall be carefully lowered into the trench in such a manner as to prevent damage to pipe and fittings. Under no circumstances shall pipe or accessories be dropped or dumped into the trench. The CONTRACTOR shall smooth out any burrs, gouges, or weld splatter and repair other defects prior to laying the pipe. Any pipe section, including coatings and linings, that becomes damaged as a result of handling or stockpiling shall be replaced with a new unit or repaired at no additional cost to the OWNER. 3.5 DIVERSION PUMPING A. All diversion pumping shall require 100 percent redundant backup on site, prior to commencement of WORK. The CONTRACTOR shall submit for approval to the DWP General Manager a plan for spill containment. PAGE

3 B. Where the proposed piping will connect to existing piping which is in sewage service, install and operate bulkheads, plugs, piping, and diversion pumping equipment to maintain sewage flow and to prevent backup or overflow. C. Design diversion piping, joints, and accessories to withstand a minimum of 50 psi. D. No sewage shall be diverted into any open area outside of a sanitary sewer. E. CONTRACTOR shall be responsible in the event of spill or overflow. In an event of a spill or overflow, the CONTRACTOR shall completely contain the overflow and take action to clean and disinfect the spillage area to original condition. CONTRACTOR shall immediately notify the CITY. 3.6 INSTALLATION General: Pipe shall be installed in accordance with the pipe manufacturer's recommendations and the applicable provisions of SSPWC Subsection , and the requirements herein. A. Interferences 1. CONTRACTOR shall protect and maintain all underground and surface utility structures, drains, sewers, and other obstructions encountered in the progress of the WORK. Where indicated that the grade or alignment of the pipe is obstructed by existing utility structures such as conduits, ducts, or pipes, the obstruction shall be supported until it is relocated, removed, or reconstructed by the CONTRACTOR in cooperation with owners of such utility structures. 2. Where necessary to raise or lower the pipe due to unforeseen obstructions or other causes, the CITY may direct a change in the alignment or the grades. Such change shall be made by the deflection of joints, by the use of bevel adapters, or by the use of additional fittings. However, in no case shall the deflection in the joint exceed the maximum deflection recommended by the pipe manufacturer. No joint shall be misfit any amount, which will be detrimental to the strength and integrity of the finished joint. B. Line and Grade Tolerance: Each section of pipe shall be laid based on an alignment provided by a Registered Land Surveyor or Registered Civil Engineer. Unless indicated otherwise, the pipe shall be laid to the design line and grade, within approximately one inch plus or minus. Sags exceeding 3/8- inch on gravity sewers will not be accepted by the CITY. No tolerance is permitted on pipes designed for zero slope. C. Curved Alignments: Curved alignment may not be used on the gravity sewer lines. Where curved alignments are indicated on pressure sewer and water lines, deflecting the joints will be allowed only in accordance with the written instructions of the pipe manufacturer and these specifications. Where a smaller radius of curvature is required than can be accommodated by deflecting the joints, sections of pipe with beveled ends may be laid unless fabricated bends are indicated. Maximum joint deflection and maximum bevel for different pipe sizes and joint designs shall be in accordance with the pipe manufacturer's recommendations and these specifications. In no case shall a 2-degree joint deflection be exceeded. D. Cutting and machining of the pipe shall only be in accordance with the pipe manufacturer's standard procedures for this operation. Pipe shall not be cut with a cold chisel, standard iron pipe cutter, nor any other method that may fracture the pipe, produce ragged, uneven edges, or otherwise impair the condition of the pipe. PAGE

4 E. The CONTRACTOR shall install all pipe, fittings, closure pieces, bends, reducers, wyes, tees, crosses, outlets, manifolds, and other steel plate specials, bolts, nuts, gaskets, jointing materials, and all other appurtenances as indicated and as required to provide a complete and workable installation. No pipe or appurtenance shall be installed when the interior or exterior surfaces show cracks or other defects that may be harmful as determined by the CITY. Damaged interior and exterior surfaces shall be repaired to the satisfaction of the CITY or a new undamaged pipe or appurtenance shall be provided. F. Pipe laying operations shall be stopped and dewatering operations shall be adjusted to prevent the pipe from floating due to water entering the trench from any source. The CONTRACTOR shall reinstall all affected pipe to its specified condition and grade. G. All foreign matter or dirt shall be removed from the interior of the pipe before lowering into position in the trench. Pipe shall be kept clean during and after laying. All openings in the pipeline shall be closed with watertight expandable type sewer plugs or PVC test plugs at the end of each day's operation or whenever the pipe openings are left unattended. The use of burlap, wood, or other similar temporary plugs will not be permitted. H. Immediately before placing each section of pipe in final position for jointing, the bedding shall be checked for firmness and uniformity of surface. I. Pipe shall be laid directly on the bedding material. No blocking will be permitted and the bedding shall form a continuous, solid bearing for the full length of the pipe. Excavate to facilitate removal of handling devices after the pipe is laid. Bell holes shall be formed at the ends of the pipe to prevent point loading at the bells or couplings and to facilitate placement of grout bands. Excavation shall be adequate to permit access to the joints for bonding operations and for application of coating on field joints. J. Backfilling and compaction shall comply with Section and the pipe specifications. K. Sheet piling, if used for shoring shall extend at least [2] feet below the bottom of the trench. After completion of the pipe, it may be removed by cutting at least 12 inches above the top of the pipe. No vibratory methods for pile removal will be accepted, and piling lower than 12 inches above the top of the pipe shall be left in place. L. Lay section of pipe with the bell end upgrade. M. Except for short runs, which may be permitted by the CITY, sections of pipe shall be laid in a sequence moving in an upgrade direction on grades exceeding 10 percent. Pipe, which is laid in a downgrade direction, shall be blocked and held in place until sufficient support is furnished by the following pipes to prevent movement. N. Where indicated, concrete thrust blocks shall be provided. 3.7 FIELD TESTING A. Field testing shall be in accordance with Section AND Section 02730, as applicable. PAGE

5 3.8 POST-INSTALLATION TELEVISION INSPECTION A. Prior to final acceptance of newly constructed gravity sanitary sewers, CONTRACTOR shall perform cleaning and closed circuit television (CCTV) inspection. 1. Cleaning will be done via mandrel and flush and/or hydrojet and vacuum. The cleaning process includes collection, removal, transportation, and disposal of any sand, debris, and liquid wastes to legal disposal sites. 2. The mandrel size shall be SSPWC Table (B)2. A minimum of two (2) P-traps installed in series will be used in downstream manholes to prevent debris infiltration into City main line sewer. Locations will be determined by the Inspector and the Inspector must be present. The mandrel shall be pulled by hand via a string and shall have a 3/8-inch rope attached to the rear of the mandrel so that the mandrel may be dislodged. B. After cleaning, the CONTRACTOR shall perform a CCTV inspection according to SSPWC and the following. 1. Camera shall pan all manholes to document manhole conditions. Camera operator shall slowly pan each service connection and where sewer transitions from one pipe material to another. 2. Videocassette capacity shall be adequate to record inspection of at least one complete pipe segment between manholes. Recording of a single segment shall not extend to more than one videocassette. 3. No sewage flow is allowed in the gravity sanitary sewer while performing post-installation television inspection. C. Submit videotapes in VHS format, recorded at Standard Play (SP). Two permanent labels are required. One label shall be placed on the spine and the other on the face of the videotape. 1. Cassette Spine Information a. Contractor Name b. Project Name c. Tape Number d. Date Televised e. Date Submitted 2. Cassette Face Information a. Name of Street b. From Manhole Number c. To Manhole Number d. Pipe Length e. Project Name f. Tape Number PAGE

6 D. For each video tape prepare a complete written TV Inspection Report which will include at a minimum: 1. Distance Between Manholes 2. Lateral Locations / Stations 3. Cleanouts Locations / Stations E. All new sewers shall be CCTV inspected prior to CITY acceptance. F. All tapes will be reviewed by a senior inspector/supervisor and shall either pass or fail based on the following: 1. Pass: 1 Copy Report 1 Copy Video 1 Copy SI Plans 2. Fail: Repairs made and Re-Video after Repairs G. Send to Department of Water and Power: 1. Copy of all Reports in Inspector s Job File 2. Stamped/Signed and Reviewed 3.9 MISCELLANEOUS REQUIREMENTS FOR SEWERS A. Pavement Removal All existing pavement, curbs, gutters, driveways and sidewalks to be removed shall be cut parallel or perpendicular to centerline of improvement. All pavement to be removed shall be cut so as to leave a straight uniform edge for the replacement of the pavement. Concrete materials shall be cut with a concrete saw to a minimum depth of 1 inch. Bituminous materials shall be cut with tools that have a straight true edge and in such a manner that the adjacent pavement not being removed is neither raised nor depressed. Concrete or bituminous material that has been removed shall not be used as backfill if greater than 3 inches in size. B. Laterals -The CONTRACTOR shall construct the number of laterals shown on the plans and at locations specified by the CITY. All laterals, unless otherwise specified, shall be constructed at right angles to the sewer main and in accordance with the appropriate standard drawing. Unless otherwise specified, all laterals shall be PVC or D.I. as required and shall be on a minimum slope of ¼ inch per foot, with a minimum depth at property line of 5 feet to flow line. S shall be inscribed in the center of the curb face in line with each sewer lateral installation. The S shall be approximately 1 ½ high and 1/16 deep. C. Balling of Sewers After completion of all work, except the street or trench resurfacing, an approved type sewer ball equal to 95% of the diameter of the pipe shall be sent through the sewer from the uppermost structure to the lowermost structure. The CONTRACTOR shall, at his own expense, furnish all materials for carrying out the operation and removing any obstructions that prevent the ball from traveling through the pipe. D. Tunneling Tunneling will be permitted only when indicated on the plans or with the consent of the General Manager of the Department of Water and Power. PAGE

7 E. Cased Crossings Cased crossings shall be constructed as shown on the plans, and unless otherwise specified all joints within the casing shall be factory formed plastic joints. Casing shall be installed by boring or jacking. The method and equipment used in jacking or boring shall be optional with the CONTRACTOR, provided that the DWP General Manager first approves the proposed method. Such approval, however, shall in no way relieve the CONTRACTOR of the responsibility for damages of any nature, which might occur as a result of the method used. The minimum diameter and thickness of the casings used shall be as shown on the plan. However, the CONTRACTOR may use a larger diameter casing, provided that the DWP General Manager first approves the proposed diameter and pipe thickness. Every effort shall be made to avoid any loss of earth outside of the casing, and should such loss occur, the CONTRACTOR shall promptly backfill all voids. The sewer pipe shall be tested before grouting. Unless otherwise shown on the plans, the space between the casing and the sewer pipe shall be completely filled with grout. The CONTRACTOR shall take all measures necessary before grouting to prevent floating or displacement of the sewer pipe. Plaster sand may be used as an alternate to grout if the ends of the casing are sealed with brick and mortar. F. Ductile Iron Sewer Connection When connecting to a ductile iron pipe sewer, fittings must be used. No tapping will be permitted. G. Saddle Connections No sewer shall be broken into except in the presence of the CITY s authorized representative. The connection shall be made with a standard vitrified clay Y saddle constructed with lugs to prevent protrusion through the pipe or PVC molded or fabricated Y saddles with stainless steel straps. PVC Sewer Saddles The hole in the sewer shall be made with an appropriate cutting tool recommended by the manufacture. It shall be made with extreme care starting with as small a hole as possible and carefully enlarged so as to provide a hole approximately ¼ larger than the size of the branch diameter. The saddle shall be solvent welded or gasket skirt and held in place with stainless steel straps on each end of the saddle. Stainless steel straps shall be provided with the saddle by the saddle manufacture. The solvent shall be per manufacture s recommendation. A gasket skirt saddle is not allowed when air testing is required on the sewer line. No additional pipe may be joined to the saddle until the CONTRACTOR receives approval of the saddle connection from the CITY. Vitrified Clay Sewer Saddles The hole in the sewer shall be made with a diamond saw midway between joints. It shall be made with extreme care starting with as small a hole as possible and carefully enlarged so as to provide a hole approximately ¼ larger than the outside diameter of the saddle. The saddle shall be epoxied in place, filling the annular space between saddle and pipe wall with epoxy and attached with two (2) stainless steel pipe bands. The inside shall be wiped to provide a smooth joining of the saddle to the pipe wall. No additional pipe may be joined to the saddle until the CONTRACTOR receives approval of the saddle connection from the CITY. No dripping of pipe is allowed. PAGE

8 H. Concrete Encasement Where minimum cover over the pipe cannot be achieved or where circumstances dictate the sewer may be encased in a reinforced concrete encasement, the encasement must be designed and calculations must be submitted, stamped and signed by a current Registered Civil Engineer in the State of California. I. All valves shall be visually inspected prior to acceptance. This includes all sanitary sewer forcemain valves, water valves, cans and risers. J. Inspection will be a visual inspection by the Public Works Inspector. Any offsets or debris, or any other infraction will be listed and given to the CONTRACTOR, Developer or OWNER. Plans will reflect the situation and be dated with discovery date and correction date. K. A clean set of blueline plans will be used for redline marks and dated. Any corrections will be marked in red and dated with date of inspection. If corrections are to be made, a date of re-inspection will be written on the plans. Visual confirmation of repair will be made and documented by the Public Works Inspector. L. The marked up street improvement plan will be turned over to the Corona Department of Water & Power. The original design plans shall be corrected and as-built drawings shall be submitted to the Public Works Department prior to acceptance of any work MISCELLANEOUS REQUIREMENTS FOR WATER MAINS A. All Fire Hydrants All fire hydrants installed in water systems for the CITY shall be of the California or wet barrel type with a 6 Body. All hydrants shall have standard eight (8) hole drilling in the body flanges. One 4 steamer outlet and one 2-1/2 outlet shall be provided. Threaded outlets shall be National Standard Hose Screw Thread conforming to National Fire Protection Assoc. Standard No If hydrants have a cast iron body, they shall be provided with an epoxy protective lining. Hydrants shall be assembled with break-off bolts at junction of hydrant and hydrant break-off spool. Hydrant buries shall be 6 ductile iron with epoxy coating, with standard eight (8) hole drilling. Flange X flange or flange X mechanical joint with restraining glands shall be used unless otherwise noted on plans. Hydrant bodies shall be coated with a suitable primer coat. Primer coat shall be followed with two (2) coats of finish coats of Rust-O-Leum Old Cat Yellow - #7648G or approved equal. Standard head hydrants shall be Clow #850 and 2050, Jones 3710 and 4040B or approved equal. Super head hydrants shall be Clow #860, #865, #2065, Jones #3765, #3775, #4060B. Hydrants shall be 8 hole pattern with no adapters. B. Valve Boxes Valve boxes shall be of 8 C900, blue in color with a galvanized adjusted slip can, with heavy cast iron cover to be marked Water in accordance with standard plans as manufactured by U. S. Foundry or approved equal. C. Meter Boxes Meter boxes and covers shall be polymer manufactured by J & R Concrete Products, or approved equal, with the following sizes to be used for each size meter: PAGE

9 SERVICE METER BOX SIZE METER BOX SIZE 1 5F 15 X25 X12 2 6B 17 X30 X12 Covers shall be inter-changeable with H&C and J&R concrete meter boxes. D. Combination Air Release Valves Combination air release valves shall be 1 or 2 as required on the plans. The inlet shall have a 1 or 2 pipe thread. The air release valve shall be new and manufactured in the United States. The air release valve shall be installed in accordance with the Standard Plans. E. Valves 4 or Larger Gate valves, 4 or larger, shall be cast iron body, or D.I resilient wedge, epoxy coated inside and out, parallel seat, bottom wedging type with A 22 Low Zinc bronze internal working parts and Ni-Vee non-rising stems. Gate Valves shall conform to A.W.W.A. C509. All gate valves shall be flanged, flanged by M.J., or unless otherwise specified. Valve stem packing should be double O-Ring type recessed into grooves in O-Ring plate only. Grooves shall not be in stem. All gate valves shall have a 2 cast iron operating nut. All valves shall open by turning the operating nut in a counter clockwise direction. All valves are to be new. All valves shall be resilient wedge, epoxy lined and coated with 304 stainless steel bonnet bolts and nuts with anti-seize compound. Valves shall be wrapped with 8-mil polyethylene. Valves will be inspected by the CITY as follows: 1. All valves will visually be inspected prior to acceptance. This includes all sanitary sewer forcemain valves, water valves, cans and risers. 2. Inspection will be a visual inspection by the Public Works Inspector. Any offsets or debris, or any other infraction will be listed and given to the CONTRACTOR, Developer or OWNER. Plans will reflect the situation and be dated with discovery date and correction date. 3. A clean set of blueline plans will be used for redline marks and dated. Any corrections will be marked in red and dated with date of inspection. If corrections are to be made, a date of reinspection will be written on the plans. Visual confirmation of repair will be made and documented by the Public Works Inspector. 4. The marked up street improvement plan will be turned over to the Corona Department of Water & Power. F. Corporation Stops Corporation stops shall meet all of the requirements of the latest edition of AWWA C-800 and shall be bronze, full-way bore ball valve type. No direct taps are allowed. All corporation stops shall be installed with approved pipe saddles in accordance with Subparagraph I below. G. Angle Meter Stops Angle meter stops shall meet all of the requirements of the latest edition of AWWA C-800 and shall be bronze, full port angle ball valve type and shall be designed to permit the connection of copper tubing at the inlet with a female compression nut unless otherwise specified. H. Service Saddles Service saddles shall meet all of the requirements of the latest edition of AWWA C-800 and shall be all bronze for PVC pipe and nylon for DIP with double flattened stainless steel straps. The gasket is to be of Neoprene. All outlets shall have iron pipe thread (IPT). I. Thrust Blocks No thrust blocks shall be used unless written approval from the DWP General Manager is obtained. If approved, concrete thrust blocks shall be of adequate size and shape per PAGE

10 CITY Std 401 and 402 and shall be provided at all dead ends, tees, and at all bends. At all vertical bends where the thrust is upward, collars and tie rods, designed to take the full theoretical tension developed under the test pressure, shall be used. Thrust block areas shall be sufficient to provide bearing pressures below the safe limit. The Engineer shall determine the safe bearing load of the soil. Thrust blocks and all appurtenances used for vertical bends shall conform to the Standard Plans. Joint and bell restraints concrete thrust block upon approval of the Water Utilities Department. J. Taps for Construction Purposes All taps made in the pipeline for construction purposes, such as for chlorination, testing, and etc., shall be closed with proper plugs before backfill. K. Service Connection Installation Service connections shall be installed in accordance with the Standard Plans. The minimum service connection size shall be one (1) inch. Where mains are laid in paved streets, service connections of two (2) inch and smaller shall be installed by boring, rather than by cutting paving unless written approval of the Water Utilities Department is obtained to avoid conflict with other utilities. Service laterals shall be placed under curbs and gutters by boring rather than open trenching. The letter W shall be inscribed in the center of the curb face in line with each meter installation. The W shall be approximately 1-1/2 high and 1/16 deep. No reduction in diameter of service laterals, such as kinks, flats, crushes, etc. will be permitted. L. Fire Hydrant Installation -Fire hydrants shall be assembled and installed in accordance with the Standard Plans. Line shall be flushed through the fire hydrants with a Fire Department Representative in attendance to test for maximum fire flow capabilities. The CONTRACTOR shall notify the fire department 24 working hours in advance of such test. If the test indicates an obstruction, the CONTRACTOR shall find and remove the cause. M. Connections to Existing Lines All connections to existing mains, either for new mains or hydrant laterals, shall be made at the time and in the manner specified by the CITY. No shutting down of existing mains for connections will be permitted without 48 working hours notice being given to the the Department of Water and Power. No connections will be made without the presence of the CITY s authorized representative. In general, when conditions permit, tapping under pressure will be the method used in connecting to existing mains. N. Sleeve-Type Flexible and Transition Couplings Sleeve-type couplings shall be in accordance with ANSI/AWWA C219 - Standard for Bolted Sleeve-type couplings for Plain -End Pipe, and shall be of steel with steel bolts, without pipe stop, and be of sizes to fit the pipe and fittings indicated. The middle ring shall be not less than 1/4inch in thickness and shall be either 5 of 7 inches long for sizes up to and including 30 inches and 120 inches long for sizes greater than 30 inches, for standard steel couplings, and 16 inches long for long-sleeve couplings. The followers shall be single-piece contoured mill sections welded and cold-expanded as required for the middle rings, and of sufficient strength to accommodate the number of bolts necessary to obtain adequate gasket pressures without excessive rolling. The shape of the follower shall be of such design as to provide positive confinement of the gasket. Rods, bolts, and nuts shall be stainless steel. Buried sleeve-type couplings shall be epoxy-coated at the factory. These couplings shall be restrained by employing restrained type mechanical joints or harness sets. Gaskets for sleeve-type couplings shall be rubber-compound material that will not deteriorate from age or exposure to air under normal storage or use conditions. Gaskets for wastewater and sewerage applications shall be Buna N, Grade 60, or equivalent suitable elastomer. PAGE

11 The gaskets shall be immune to attack by impurities normally found in water or wastewater. All gaskets shall meet the requirements of ASTM D Classification System for Rubber Products in Automotive applications, AA709Z, meeting Suffix B13 Grade 3. All gaskets shall be compatible with the piping service and fluid utilized. Where insulating couplings are required, both ends of the coupling shall have a wedge-shaped gasket, which assembles over a rubber sleeve of an insulating compound in order to obtain insulation of all coupling metal parts from the pipe. All sleeve-type couplings on pressure lines shall be harnessed unless thrust restraint is provided by other means. Harnesses shall be in accordance with the AWWA M11 standard, or as indicated. O. Restrained Joints Restrained joints for PVC, where shown on the drawings, shall be full-circle split restraint rings with one installed behind the spigot and one connected behind the bell. The design of the restraint system shall be based on the design working pressure with a 2:1 safety factor. The restraint system shall include high strength threaded rods and nuts. The joint, after restraint system is installed, shall be wrapped with 8-mil polyethylene. P. Polyethylene Encasement All mechanical joints, flange connections, corporation stops, service saddles, tapping sleeves, valves shall be wrapped with 8-mil polyethylene. Q. Nuts, Bolts and Washers All nuts, bolts, and washers shall be 316 stainless steel including bolts for service saddles, tapping saddles, and flange connections. All nuts, bolts, and washers for flexible couplings and mechanical joints shall be high strength low alloy steel. Entire coupling shall be wrapped with 3 layers 8-mil polyethylene wrap. Bolts shall be lubricated with anti seize lubricant SITE RESTORATION A. Backfill and compact soil in accordance with Section B. Place subgrade and base materials in accordance with Section C. Replace damaged pavement, curbs, gutters, and sidewalks, shrubs, and trees as indicated in SSPWC Subsection D. Provide hydro-seeding in areas indicated. Grade surface as indicated on the Drawings. Provide a minimum of 4 inches of topsoil and apply hydro-seeding according to Section E. Provide sodding in areas indicated. Grade surface as indicated on the Drawings. Provide a minimum of 4 inches of topsoil and place sod in disturbed areas in accordance with Section PAVEMENT RESTORATION A. Limit of AC overlay shall extend to edge of pavement or nearest lane line with a 2 foot minimum taper. B. Disturbing more than one lane requires an overlay over the width of all lanes affected by the WORK. Two lane highways, requirements will be to centerline to edge of pavement overlay. ** END OF SECTION ** PAGE

STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223

STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223 STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES PART 1 - GENERAL A. Description This section describes the installation of gravity sewer pipelines fabricated of vitrified

More information

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, Storm Drain Installation, of these Standard Provisions. SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and

More information

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction

More information

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL PART 1 - GENERAL 1.1 WORK INCLUDED IN THIS SECTION A. The WORK of this Section includes the repair, demolition, and disposal of asbestos

More information

SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE

SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE PART 1: GENERAL 1.01 SECTION INCLUDES PVC pressure pipe and fabricated fittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

SECTION 02401 - SANITARY SEWER PIPE

SECTION 02401 - SANITARY SEWER PIPE PART 1 - GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for furnishing and installing sanitary sewer pipe, in accordance with

More information

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit

More information

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing

More information

LS 2540 SEWER LATERALS AND INSPECTION TEES

LS 2540 SEWER LATERALS AND INSPECTION TEES LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials. PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,

More information

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions. SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains

More information

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors. SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS

SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS PART 1: GENERAL 1.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of AW facilities. Closely coordinate construction work

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

Section 402. STORM SEWERS

Section 402. STORM SEWERS 402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide

More information

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

EXHIBIT A. Technical Specifications for Water and Sewer Service Lines EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding

More information

DIVISION 4300 STORM DRAINAGE

DIVISION 4300 STORM DRAINAGE DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES

More information

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees. The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

Section 02702 SEWER PIPE INSTALLATION AND TESTING

Section 02702 SEWER PIPE INSTALLATION AND TESTING PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete

More information

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials

More information

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY Approved and adopted as Official Document Number 800576 this 10th day of December, 1980 Donald R. Boyd, P.E., Director Water

More information

INDEX. Sec. No. Items Page Nos.

INDEX. Sec. No. Items Page Nos. INDEX Sec. No. Items Page Nos. 1. Types of Pipe............... MSSP- 2 2. Concrete Pipe............... MSSP- 2 thru MSSP-3 3. ABS and PVC Truss Pipe............... MSSP- 3 4. ABS and PVC Solid Wall Pipe...............

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these

More information

Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer

Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer The user may choose to adopt part or all of this Model Specification; however, the user should ensure that all parts

More information

Beacon Hill Sewer District Standard Specifications

Beacon Hill Sewer District Standard Specifications Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions

More information

SECTION 15105 DUCTILE IRON PIPE AND FITTINGS

SECTION 15105 DUCTILE IRON PIPE AND FITTINGS SECTION 15105 DUCTILE IRON PIPE AND FITTINGS PART 1 GENERAL.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of Owner facilities. Closely coordinate construction work and connections

More information

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL 155 E. Front Street (rear) Lititz, PA 17543 Phone (717) 625-1930 Fax (717) 625-1931 Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL CONSTRUCTION SPECIFICATIONS AND DETAILS

More information

CHAPTER 6 - SANITARY SEWER

CHAPTER 6 - SANITARY SEWER CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings

More information

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General General All sanitary sewers, manholes and force mains shall be acceptance tested, as hereinafter specified in the presence of a City representative. Acceptance testing shall be performed after backfilling

More information

Town House 11265 Center Highway North Huntingdon, PA 15642

Town House 11265 Center Highway North Huntingdon, PA 15642 APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House

More information

TABLE OF CONTENTS SECTION 500 SANITARY SEWER AND FORCE MAIN

TABLE OF CONTENTS SECTION 500 SANITARY SEWER AND FORCE MAIN TABLE OF CONTENTS SECTION 500 SANITARY SEWER AND FORCE MAIN Starts on Page 500 GENERAL... 2 501 MATERIALS... 2 502 CONSTRUCTION PROCEDURES... 7 503 ABANDONMENT OF EXISTING SANITARY SEWER FACILITIES...

More information

Section 3510: Reclaimed water Pipes, Valves, and Appurtenances February 11, 2011

Section 3510: Reclaimed water Pipes, Valves, and Appurtenances February 11, 2011 STANDARDS AND CONSTRUCTION MANUAL : Reclaimed water Pipes, Valves, and Appurtenances February 11, 2011 PART 1 - GENERAL 1.01 SCOPE OF WORK A. These specifications cover the pipes, fittings, and appurtenances

More information

SECTION 02732 BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers.

SECTION 02732 BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers. SECTION 02732 BUILDING SEWERS PART 1 GENERAL 1.01 SECTION INCLUDES A. Lateral piping, fittings, and accessories. B. Connection of building sanitary drainage system to municipal sewers. 1.02 REGULATORY

More information

SECTION 724 PIPE CULVERTS

SECTION 724 PIPE CULVERTS SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

08003-1 WATER SERVICE 2

08003-1 WATER SERVICE 2 08003_Mar08_2011.pdf Page 1 of 7 INDEX Page 08003-1 WATER SERVICE 2 1.1 Pipe 2 1.1.1 Copper 2 1.1.2 Polyethylene 2 1.2 Valves and Fittings 2 1.2.1 Main Stops 3 1.2.2 Curb Stops 3 1.2.3 Curb Box 3 1.2.4

More information

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS 1001 SOUTH LEECHBURG HILL LEECHBURG, PA 15656 Phone: 724-845-9355 Fax: 724-845-1186 SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS 1. General

More information

SECTION 221413 FACILITY STORM DRAINAGE PIPING

SECTION 221413 FACILITY STORM DRAINAGE PIPING SECTION 221413 FACILITY STORM DRAINAGE PIPING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

SECTION 33 12 19 FIRE HYDRANTS

SECTION 33 12 19 FIRE HYDRANTS SECTION 33 12 19 FIRE HYDRANTS PART 1: GENERAL 1.01 SCOPE A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 - Submittals.

More information

CONSTRUCTION PERMIT REQUIREMENTS

CONSTRUCTION PERMIT REQUIREMENTS CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department

More information

September 2012 Brunswick County Engineering Department Revision 1.0. Technical Specification 020.01 GRAVITY SANITARY SEWER SYSTEM

September 2012 Brunswick County Engineering Department Revision 1.0. Technical Specification 020.01 GRAVITY SANITARY SEWER SYSTEM 1.0 General Technical Specification 020.01 GRAVITY SANITARY SEWER SYSTEM a) It is the intent of this specification to ensure that all gravity sewer system infrastructure constructed within the service

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

SECTION 15056 DUCTILE-IRON PIPE AND FITTINGS

SECTION 15056 DUCTILE-IRON PIPE AND FITTINGS SECTION 15056 PART 1 GENERAL 1.01 DESCRIPTION This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems. A written request to use Ductile

More information

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS for (PVC) SANITARY SEWER MAIN CONSTRUCTION VI(A).1 General VI(A).2 Materials and Equipment VI(A).3 Installation of Sanitary Sewer Mains VI(A).4 Laying of

More information

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene

More information

Special Specification 7021 Water Main and Sewer Line Replacements

Special Specification 7021 Water Main and Sewer Line Replacements Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,

More information

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS PART 1: GENERAL 1.01 SECTION INCLUDES A. Abandonment in place, by cutting and capping, of existing sewers, junction structures, manholes, service lines, and

More information

Let Us Give Utilities the Respect that they Deserve.

Let Us Give Utilities the Respect that they Deserve. Water & Sewer Utilities Miscellaneous Design and Plan Preparation Guidelines Issued by: Ray Mowla, P.E. Jefferson Parish Department of Engineering, Utilities Section The purpose of issuing these miscellaneous

More information

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements 16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications

More information

Section C-1 Pipes and Fittings

Section C-1 Pipes and Fittings Section C-1 Pipes and Fittings C1.00 Work Included The work under this Division of the Specifications shall include all labor, materials, and equipment necessary to furnish and install all piping, pipelines,

More information

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent

More information

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,

More information

SECTION 33 41 00 REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section:

SECTION 33 41 00 REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section: SECTION 33 41 00 REINFORCED CONCRETE PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes construction of reinforced concrete pipe for storm drainage, culverts, and sanitary sewer, including

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

The Manitoba Water Services Board SECTION 027030 Standard Construction Specifications September 2013 Page 1 of 21

The Manitoba Water Services Board SECTION 027030 Standard Construction Specifications September 2013 Page 1 of 21 September 2013 Page 1 of 21 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of sewers including: the supply and installation of pipe, saddles, tees,

More information

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

1.3.2 Method of construction and restoration of existing water service connections. This shall include: 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions

More information

SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE

SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes all labor, materials, equipment, and incidentals required and installation of Polyvinyl Chloride

More information

SECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General

SECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General SECTION 15 AIR RELEASE VALVE ASSEMBLIES 15-1.01 Scope 15-1 General This section describes the requirements for furnishing and installing Air Release Valve Assemblies of the size and type shown on the plans,

More information

SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION

SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION PART 1 GENERAL.01 SECTION INCLUDES Furnishing and installing 4 inch through 16 inch high density

More information

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT The following are minimum requirements for installation of conventional trench sewage disposal systems in St. Mary s County,

More information

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...

More information

2013 Edition. Flanged fittings 30"-64" NSF. industrial Applications, water & Wastewater. Certified to ANSI/NSF 61

2013 Edition. Flanged fittings 30-64 NSF. industrial Applications, water & Wastewater. Certified to ANSI/NSF 61 30"-64" Ductile Iron industrial Applications, water & Wastewater 2 Table of Contents Flanged Fittings for Water 3 Flange Details 5 Flanged Fittings 6 90º and 45º Bend 6 22-1/2º and 11-1/4º Bends 7 Tees

More information

SECTION 15410 GROUND WATER STORAGE TANKS

SECTION 15410 GROUND WATER STORAGE TANKS SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design

More information

550 PIPE CULVERTS, SEWERS AND DRAINS

550 PIPE CULVERTS, SEWERS AND DRAINS 551.01 550 PIPE CULVERTS, SEWERS AND DRAINS 551 GENERAL 551.01 Description 551.02 Materials 551.03 Excavation 551.04 Protection of Excavation 551.05(a) Bedding for Rigid Pipe 551.05(b) Bedding for Non-Rigid

More information

Sewer Line Rehabilitation

Sewer Line Rehabilitation 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing sanitary sewers using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200 STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES PART 1 - GENERAL A. Description This section includes materials, testing, and installation of precast concrete

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11 Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;

More information

SECTION 15109 PRESTRESSED CONCRETE CYLINDER PIPE

SECTION 15109 PRESTRESSED CONCRETE CYLINDER PIPE SECTION 15109 PRESTRESSED CONCRETE CYLINDER PIPE PART 1 - GENERAL 1.01 DESCRIPTION A. Work Specified The work specified shall include all labor, materials, tools, equipment, services, and incidentals necessary

More information

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions The purpose of this application example is to provide assistance to small and medium sized rural communities in the drafting of documents necessary for the efficient operation of water, wastewater, and

More information

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or

More information

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm: Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section

More information

Specifications for Residential Property Owners Connection to New Public Sewer

Specifications for Residential Property Owners Connection to New Public Sewer Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the

More information

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of

More information

ASTM C76, Class III, Wall B, except as modified herein. Clean natural sand, ASTM C33. Artificial or manufactured sand will not be permitted.

ASTM C76, Class III, Wall B, except as modified herein. Clean natural sand, ASTM C33. Artificial or manufactured sand will not be permitted. SECTION 3000 - SANITARY SEWERS 3001 SCOPE. This section applies to sanitary sewer construction and shall consist of furnishing all labor, materials, and equipment for the complete installation of sewers

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

TECHNICAL SPECIFICATIONS GRAVITY AND PRESSURE SEWER LINE AND MATERIALS

TECHNICAL SPECIFICATIONS GRAVITY AND PRESSURE SEWER LINE AND MATERIALS TECHNICAL SPECIFICATIONS GRAVITY AND PRESSURE SEWER LINE AND MATERIALS Scope of Work Work performed under this contract shall consist of furnishing and installing, complete and ready for service, the sewer

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

SECTION 7- STORM SEWER

SECTION 7- STORM SEWER SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...

More information

SECTION 3 SANITARY SEWER DESIGN

SECTION 3 SANITARY SEWER DESIGN SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary

More information

SECTION 02221 SELECTIVE DEMOLITION

SECTION 02221 SELECTIVE DEMOLITION SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on

More information

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST NOTE: The following list shall only be used as a guide and shall not be used in lieu of the specifications found in the CITY OF ANN ARBOR PUBLIC

More information

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials

More information

CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS

CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS August 2010 CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications... 1 1.4 Referenced Standard Details...

More information

Mueller. Pipe Repair Products. Saddles Tapping Sleeves Pipe Repair Clamps A complete selection for all types of pipe... all from a single source.

Mueller. Pipe Repair Products. Saddles Tapping Sleeves Pipe Repair Clamps A complete selection for all types of pipe... all from a single source. Mueller Pipe Repair Products Saddles Tapping Sleeves Pipe Repair Clamps A complete selection for all types of pipe... all from a single source. SERVICE SADDLES Mueller service saddles, available in bronze,

More information