1 PMP Certification Exam Preparation PMBOK 5 th Edition Crash Course with Bill Doescher, PMP, MBA, CSM Pi Principal i lconsultant tand Product tdevelopment tdirector Bill Doescher, PMP Product Development Director and Principal Consultant, BMC Bill Doescher is a Principal Consultant and Product Development Director with Business Consultants based in Houston, Texas. In his 20 year career, he has led project teams in new product development, application development, technology introduction, project and portfolio management processes, business process change, and marketing program development. Mr. Doescher has a strong belief that projects are the instruments of change, and people are the power behind projects. For continued growth and evolution, businesses must be dedicated to improving their ability to translate strategy into projects, to enhancing the environment in which their projects operate, and to maturing the knowledge and skills of their project team members. Mr. Doescher has held engineering, engineering management, project and program management positions in the geophysical and high tech industries with Geosource, Compaq pqcomputer and Hewlett Packard. Mr. Doescher earned a B.S. in Electrical Engineering with Honors at the University of Texas at Austin and an M.B.A. at the University of Houston. He is a member of the Project Institute, a PMI certified Project Professional (PMP ) and Certified Scrum Master (CSM). He is also a member of the Engineering Society of the Institute of Electrical and Electronics Engineers (IEEE). 2 1
2 Presentation Objectives Introduction to PMI, PMP, and the exam Role of, and an introduction to, the PMBOK Guide, Fifth Edition Study recommendations Benchmark your current preparation Answer any questions you may have 3 Introduction to PMI, the PMP Certification, and the Exam 4 2
3 PMI, the PMP, and the Exam PMI was formed in 1969 to promote the profession of project management The PMP Certification was introduced in 1984 Most globally recognized The PMP is for experienced project team leaders CAPM, PgMP, PMI ACP, PMI RMP, PMI SP, OPM3 The PMP Exam tests for project management knowledge and experience 5 Two Essential Guides The PMP Handbook and the PMBOK Guide, Fifth Edition View online or download from PMI.org Purchase paper copy or download from PMI.org (Download is free for PMI members.) 6 3
4 The PMBOK Fifth Edition and New Test The PMBOK Guide Fourth Edition was introduced in December 2008, and the new Fifth Edition just released January 2013 The Certification i test changes on July 31, 2013 to reflect content in the fifth edition PMBOK Guide The PMP examination consists of 200 individually selected, multiplechoice questions, with a four hour time limit That s 72 seconds (or 1.2 minutes) per question The PMP examination tests for both your project management knowledge and your ability to apply that knowledge in typical project situations. Visit download PMP Certification Handbook 7 PMP Test Domain Content Project Initiation 13% Project Planning 24% Project Execution 30% Project Monitoring & Control 25% Project Closing 8% 25 of the 200 questions will not be graded, and are reserved by PMI for evaluation 8 4
5 Qualification Requirements PMP Exam Graduate A minimum of 4500 hours PM experience within the past 8 years Non Graduate + = 35 contact hours (PDU s) of PM education Application Fee: PMI Member = 340, $405 US Non Member = 465, $555 US (Three year renewal cycle) Eligibility to take the PMP examination A minimum of 7500 hours PM experience within the past 8 years 9 Apply to PMI to take the test Schedule a date with Prometric Application: Project Institute (PMI) Note: You have 90 days to complete application. Schedule a test date with Prometric ATHENS, GREECE THESSALONIKI, GREECE Control is through audit Random audit when you submit exam payment Rescheduling fee = $70 US from 30 to 2 days prior to exam date Candidates have three (3) opportunities to pass the exam in one year. If they do not pass any, they must wait 1 year from the date of the last attempt. 10 5
6 Types of questions to expect Questions requiring experience more than study You are advised that a major purchased part on your project will be delayed. What do you do? A. Ignore it. It will go away B. Notify your boss C. Let the customer know about it and talk over options D. Meet with the team and identify alternatives 11 Types of questions to expect Information that does not matter (distractors) A study shows that every time you double the production of widgets, unit cost goes down by 10%. Based on the study, the company concludes that the production of 4,000 widgets will cost $19,000. This illustrates: A. Learning curve effects B. Law of diminishing returns C. The 80/20 rule D. Bottomsup cost estimating 12 6
7 Types of questions to expect Questions designed to make you make you think carefully Thetheory optimum quality level is obtained when incremental revenue from product improvement equals incremental cost to secure it comes from A. Quality control analysis B. Marginal analysis C. Standard quality analysis D. Conformance analysis And many more types 13 The PMBOK Guide, Fifth Edition 14 7
8 The Role of the PMBOK Guide Generally accepted td good practice Project management body of knowledge PMBOK Guide A standard, not a methodology Common vocabulary Interpersonal skills Application area knowledge Not applied uniformly to all projects General management knowledge Understanding project environment Coordinates with the standards on program and portfolio management 15 Relationship between Project, Program, Portfolio Strategic Planning Role of the PM to lead the team responsible for delivery of the project objectives. of Operations by Projects Portfolio Program Project Processes, Tools, Metrics 16 8
9 Organizational influences on project management Organizational Communications Organizational Cultures and Styles Organizational Structures 17 Other Organizational Influences Organizational Process Assets Processes and Procedures Corporate Knowledge Base Enterprise Environmental Factors 18 9
10 Project Stakeholders and Governance Stakeholders are persons or organizations who are actively involved in the project or whose interests may be positively or negatively by the performance or completion of the project. A stakeholder may also exert influence over the project or its deliverables. Project governance framework provides the project manager the team with a structure, processes, decision making models and tools for managing the project, while supporting and controlling the project for successful delivery. The PMO may play a key role in project governance. 19 The Project Team Those who will act together in performing the work of the project to achieve its objectives. Project Manager Sellers Users / Customer PM Staff Project Staff Business Partners Team members may be full time, part time. PM may have full authority, or relatively no authority over team members
11 The PMI PM Process Groups Monitoring & Controlling Processes Initiating Processes Planning Processes Executing Processes Closing Processes The processes within and between the Process Groups overlap and interact. 21 PMI Project Process Framework Process Groups Monitoring & Initiating Planning Executing Knowledge Areas Controlling Closing 4. Project Integration 4.1 Dev. Project Charter 4.2 Develop Project 4.3 Direct & Manage 4.4 Monitor & Control Project Work 4.6 Close Project or Phase Plan Project Work 4.5 Perf. Integrated Change Control 5.1 Plan Scope Mgmt. 5.5 Validate Scope 5. Project Scope 5.2 Collect Requirements 5.6 Control Scope 5.3 Define Scope 5.4 Create WBS 6. Project Time 7. Project Cost 8. Project Quality 9. Project Human Resource 10. Project Communications 11. Project Risk 12. Project Procurement 13. Project Stakeholder 6.1 Plan Schedule Mgmt. 6.7 Control Schedule 6.2 Define Activities 6.3 Sequence Activities 6.4 Est. Activity Resources 6.5 Est. Activity Durations 6.6 Dev. Schedule 7.1 Plan Cost Mgmt. 7.3 Control Costs 7.2 Estimate Costs 7.3 Determine Budget 8.1 Plan Quality 8.2 Perform Quality 8.3 Control Quality Assurance 9.1 Plan Human Resource 9.2 Acquire Project Team 9.3 Develop Project Team 9.4 Manage Project Team 10.1 Plan Communications 10.2 Manage 10.3 Control Communications Communications 11.1 Plan Risk 11.6 Control Risks 11.2 Identify Risks 11.3 Perform Qual. Risk Analysis 11.4 Perform Quant. Risk Analysis 11.5 Plan Risk Responses 12.1 Plan Procurement 12.2 Conduct Procurements 12.3 Control Procurements 12.4 Close Procurements 13.1 Identify Stakeholders 13.2 Plan Stakeholder 13.3 Manage Stakeholder 13.4 Control Stakeholder Engagement Engagement From PMBOK Guide, Fifth Edition, page
12 The Project Life Cycle (vs. Product Life Cycle and Process Groups) Cost and Staffing Level Starting a Project Organizing and lp Preparing Executing the Work Closing a Project Project Charter Project Plan Time Accepted Deliverables Archived Project Documents 23 Project Life Cycles Life Cycle Phases Single Phase vs. Multi phase Sequential or Overlapping phases Life Cycle Approaches Predictive Iterative and Incremental Adaptive 24 12
13 Practice Exam Questions 2. Project sponsors have the GREATEST influence on the scope, quality, time, and cost of the project during the: A. Concept phase B. Development phase C. Execution phase D. Close down phase 25 Practice Exam Questions 1. All of the following are the responsibility of a project manager except? A. Maintain the confidentiality of customer confidential information B. Determine the legality of company procedures C. Ensure that a legal conflict of interest does not compromise the legitimate interest of the customer D. Provide accurate and truthful representations of cost estimates 26 13
14 PMI Project Process Framework Process Groups Monitoring & Initiating Planning Executing Knowledge Areas Controlling Closing 4. Project Integration 4.1 Dev. Project Charter 4.2 Develop Project 4.3 Direct & Manage 4.4 Monitor & Control Project Work 4.6 Close Project or Phase Plan Project Work 4.5 Perf. Integrated Change Control 5.1 Plan Scope Mgmt. 5.5 Validate Scope 5. Project Scope 5.2 Collect Requirements 5.6 Control Scope 5.3 Define Scope 5.4 Create WBS 6. Project Time 7. Project Cost 8. Project Quality 9. Project Human Resource 10. Project Communications 11. Project Risk 12. Project Procurement 13. Project Stakeholder 6.1 Plan Schedule Mgmt. 6.7 Control Schedule 6.2 Define Activities 6.3 Sequence Activities 6.4 Est. Activity Resources 6.5 Est. Activity Durations 6.6 Dev. Schedule 7.1 Plan Cost Mgmt. 7.3 Control Costs 7.2 Estimate Costs 7.3 Determine Budget 8.1 Plan Quality 8.2 Perform Quality 8.3 Control Quality Assurance 9.1 Plan Human Resource 9.2 Acquire Project Team 9.3 Develop Project Team 9.4 Manage Project Team 10.1 Plan Communications 10.2 Manage 10.3 Control Communications Communications 11.1 Plan Risk 11.6 Control Risks 11.2 Identify Risks 11.3 Perform Qual. Risk Analysis 11.4 Perform Quant. Risk Analysis 11.5 Plan Risk Responses 12.1 Plan Procurement 12.2 Conduct Procurements 12.3 Control Procurements 12.4 Close Procurements 13.1 Identify Stakeholders 13.2 Plan Stakeholder 13.3 Manage Stakeholder 13.4 Control Stakeholder Engagement Engagement From PMBOK Guide, Fifth Edition, page Knowledge Area Mind Maps 28 14
15 Initiating Process Group Initiating 4.1 Develop Project Charter 13.1 Identify Stakeholders Develop Project Charter 30 15
16 4.1 Develop Project Charter Exam Tip Identify Stakeholders It is critical for project success to identify the stakeholders early in the project, and to analyze their levels of interest, expectations, importance and influence Stakeholders should be classified according to their interest, involvement and influence in the project 32 16
17 Planning Process Group Planning 4.1 Develop Project Plan 5.1 Plan Scope 5.2 Collect Requirements 5.3 Define Scope 5.4Create WBS 6.1 Plan Schedule 6.2 Define Activities 6.3 Sequence Activities 6.4 Estimate Activity Resources 6.5 Estimate Activity Durations 6.6 Develop Schedule 7.1 Plan Cost 7.2 Estimate Costs 7.3 Determine Budget 8.1 Plan Quality 9.1Plan Human Resource 10.1 Plan Communications 11.1 Plan Risk 11.2 Identify Risks 11.3 Perform Qualitative Risk Analysis 11.4 Perform Quantitative Risk Analysis 11.5 Plan Risk Responses 12.1 Plan Procurement 13.1 Plan Stakeholder Develop Project Plan Scope Plan Requirements Plan Schedule Plan Cost Plan Quality Plan Process Improvement Plan Human Resource Plan Communications Plan Risk tplan Procurement Plan Stakeholder Plan Scope Baseline Schedule Baseline Cost Baseline 34 17
18 Scope : Planning 5.1 Plan Scope Scope management plan Requirements management plan 5.2 Collect Requirements Requirements documentation Traceability matrix MAILworks WBS 5.3 Define Scope Project Scope Statement Planning Server Preparation Documents Migrate PROFS Customers Migrate Other E- Mail Users Develop Migration Plan Class for Local Cust. Class for Off-site Cust. ID HORO Cust. Schedule Cust for Training Configure MAILworks Server Configure Dialup Access Training Ref. Material Review of Ref. Material Produce Final Docs. Migrate PCSA Cust. Notify Cust for Training Admin. Mailworks Accounts Train Cust. Change Cust to Mailworks Migrate Novell Cust. Notify Cust for Training Admin. Mailworks Accounts Train Cust. Change Cust to Mailworks Migrate Off-site PROFS Notify Cust for Training Admin. Mailworks Accounts Train Cust. Change Cust to Mailworks Migrate Remaining PROFS Notify Cust for Training Admin. Mailworks Accounts Train Cust. Change Cust to Mailworks Notify Cust for Training Admin. Mailworks Accounts Train Cust. Change Cust to Mailworks 5.4 Create WBS Scope Baseline (project scope statement, WBS, WBS dictionary) Work Packages 35 Time : Planning 6.1 Plan Schedule 6.2 Define Activities Sequence Activities Estimate Activity Resources Estimate Activity Duration 6.6 Develop Schedule 36 18
19 Cost : Planning 7.1 Plan Cost Cost management plan 7.2 Estimate Costs Activity cost estimates Basis of estimates 7.3 Determine Budget Cost baseline Project funding requirements Plan Quality Quality metrics Quality Plan Quality requirements Quality assurance Quality control Quality checklists Process Improvement Plan Project and product processes 38 19
20 9.1 Plan Human Resource Human Resource Plan Roles and responsibilities Role, authority, responsibility, competency Project organization charts Staffing management plan Staff acquisition, resource calendars, release plan, training needs, recognition and rewards, compliance and safety Plan Communications Tools & Techniques Communication requirements analysis Communication technology , video, websites, phone, texts, posters, Communication models Encode, Transmit, Decode, Acknowledge, Feedback Communication methods Push, pull, interactive Meetings Communications management plan 40 20
21 Risk : Planning 11.1 Plan Risk Risk management plan 11.2 Identify Risks Risk register 11.3 Qualitative Risk Analysis 11.5 Plan Risk Responses 11.4 Quantitative Risk Analysis Plan Procurement Outputs: Mk Make or Buy Decisions Procurement Statements of Work Change Requests 42 21
22 13.2 Plan Stakeholder Tools & Techniques Expert tjudgment Meetings Analytical techniques Stakeholder management plan 43 Practice Exam Questions 3. Thedecomposition process is a technique used to construct a: A. Precedence network B. Critical Path Method Diagram C. Variance analysis D. Work breakdown structure 44 22
23 Practice Exam Questions 2. If the numbers in the PDM network below represent days to complete each task, what is the overall duration of the project? A. 20 Days B. 23 Days C. 18 Days D. 21 Days 45 Practice Exam Questions 1. The project manager is preparing the budget for the project. There are a number of inputs to project budgeting that she will use. One of the things the project manager will not use is: A. Cost baseline B. Cost estimates C. Project schedule D. Work breakdown structure 46 23
24 Executing Process Group Executing 4.3 Direct and Manage Project Work 8.2 Perform Quality Assurance 9.2 Acquire Project Team 9.3 Develop Project Team 9.4 Manage Project Team 10.2 Manage Communications 12.2 Conduct Procurements 13.3 Manage Stakeholder Engagement Direct and Manage Project Work Outputs: Deliverables Work performance data Actual start/finish i Actual cost KPI s, technical performance measures Change requests Corrective action Preventive action Defect repair Document updates 48 24
25 8.2 Perform Quality Assurance Quality Assurance (QA): the process of auditing quality requirements, and the results from quality control (QC) measurements, to ensure quality standards and operational definitions areused. Quality assurance involves Quality Audits, and is part of the Execution Process Group. Quality Control (QC): the process of monitoring and recording results (both product and project management) of executing quality activities to assess performance and to recommend necessary changes. Involves identifying ways to remove the causes of quality defects. Quality control involves inspection and requires an understanding of sampling strategies, tolerances, and the causes of variation in a process. It is part of the Monitoring and Controlling Process Group. 49 Quality Tools, Tools, Tools Seven Basic Quality Tools Cause & Effect Diagrams Flowcharts Checksheets Pareto Diagrams Histograms Control Charts Scatter Diagrams Other Quality Tools Affinity Diagrams Process Decision Program Charts Interrelationship Diagraphs Tree Diagrams Pi Prioritization iti Mti Matrices Activity Network Diagrams Matrix Diagrams 25
26 Human Resource : Executing 9.2 Acquire Project Team Adjourning 9.3 Develop Project Team Performing Forming Norming Storming 9.4 Manage Project Team Observation and conversation Project performance appraisals Conflict management Interpersonal skills Manage Communications Manage Communications involves the activities required for information to be created, distributed, received, acknowledged, and understood. Outputs may include: Stakeholder notifications Performance reports Project presentations Project records Feedback from stakeholders Lessons learned documentation 52 26
27 12.2 Conduct Procurements Outputs: Selected sellers Agreements (contracts) Resource calendars Change requests Project plan or document updates Manage Stakeholder Engagement Tools & Techniques Communication methods Interpersonal skills skills Issue log Change requests Updates to plan, documents or OPAs 54 27
28 Practice Exam Questions 2. Which of the following is not a form of power derived from the project manager s position: A. Formal B. Reward C. Penalty D. Expert 55 Practice Exam Questions 1. The project team is arguing about the prospective sellers who have submitted proposals. One team member argues for a certain seller while another team member wants the project to be awarded to a different seller. The project manager should remind the team to focus on what item in order to make a selection? A. Procurement documents B. Procurement audits C. Evaluation criteria i D. Procurement management plan 56 28
29 Monitoring & Controlling Process Group Monitoring & Controlling 4.4 Monitor & Control Project Work 4.5 Perform Integrated Change Control 5.5 Validate Scope 5.6 Control Scope 6.7 Control Schedule 7.4 Control Costs 8.3 Control Quality 10.3 Control Communications 11.6 Control Risks 12.3 Control Procurements 13.4 Control Stakeholder Engagement 57 Integration : Mon. & Control 4.4 Monitor and Control Project Work Accept and analyze information from the control processes Develop work performance reports, change requests, updates to project plan and documents 4.5 Perform Integrated Change Control Review all change requests Approve/reject, maintain change log, update project plans and documents 58 29
30 5.5 Validate Scope Validate Scope is the process of formalizing acceptance of the completed project deliverables. Scope validation is different from quality control in that validate scope is primarily concerned with the acceptance of the deliverables Control Scope 60 30
31 6.7 Control Schedule & 7.4 Control Costs Cost, Hours, or Work Products AC Actual Cost PV Planned Value PV = Planned Value (was BCWS) (1) EV = Earned Value (was BCWP) (2) AC = Actual Cost (was ACWP) (3) Total Variance SV Schedule Variance (1) requires a performance baseline (2) requires a way to measure value of work completed (earned value) (3) requires a way to collect actual costs at work package level CV Cost Variance t When Planned EV Work Performed (Earned Value) Time t Actual Variances, Performance Indices & Forecasts Control Quality Know the difference between: Prevention and Inspection Attribute sampling and variables sampling Tolerances and control limits QC Outputs Quality control measurements Validated changes Verified (correct) deliverables Work performance information Change requests, document updates 62 31
32 The Other M&C Processes 10.3 Control Communications 11.6 Control Risks Implementing plans, reassessing risks, evaluating effectiveness of risk process 12.3 Control Procurements Performance reviews, reporting Claims administration 13.4 Control Stakeholder Engagement 63 Practice Exam Questions 3. Your most recent project status report contains the following information: EV (BCWP) = 3,000, AC (ACWP) = 3,500, and PV (BCWS) = 4,000. The schedule variance is: A. + 1,000 B C. 500 D. 1,
33 Practice Exam Questions 2. While completing a project, a projectmanagerrealizes realizes he needsto decrease project costs. After researching his options, he comes up with the following choices. Which choice would decrease project costs? A. Change to component A from component B. Component A costs more to purchase but has a lower lifecycle cost than B B. Change task A to be completed by resource B instead of resource C. Resource B is a more experienced worker C. Move tasks B and H to occur concurrently, and take the risk of a 30% increase in the need for five more resources later D. Delete an acceptance test from the project plan 65 Practice Exam Questions 1. You are halfway through a major new cell phone rollout. There are 200 locations in the U.S. with another 100 in Singapore. A software seller has just released a major software upgrade for some of the phones being produced. The upgrade would provide the customer with functionality they requested that was not available at the time the project began. What is the best course of action under these circumstances? A. Continue as planned, your customer has not requested a change B. Inform the customer of the upgrade and the impacts to the project s timeline and functionality C. Implement the change and adjust the schedule as necessary because this supports the customer s original request D. Implement the change for the remaining supply and continue with the schedule 66 33
34 Closing Process Group Close Project or Phase Outputs: Final product, service or result transition Organizational process assets updates Project files Project or phase closure documents Historical information, lessons learned 68 34
35 12.4 Close Procurements Tools & Techniques Procurement audits Procurement negotiations Records management system Outputs Closed procurements Organizational process assets updates 69 PMI Code of Ethics and Professional Conduct As practitioners of project management, we are committed to doing what is right and honorable. Aspirational and Mandatory Conduct Values Responsibility Respect Fairness Honesty 70 35
36 Practice Exam Questions 1. A KEY activity in closing out a project is to: A. Disseminate status reports and risk assessments B. Disseminate information to formalize project completion C. Monitor the specific project results to determine if they comply with relevant quality standards D. Transfer all the project records to the project owners 71 Preparing for the Exam 72 36
37 Reasons people fail the exam They do not read all the questions correctly They do not read all the choices in each question They are too nervous They have not studied enough or use source books other than the PMBOK They believe they can rely purely on experience They have not taken a PMP pre course 73 Personalized Study Guide Take the Practice/Diagnostic test; identify strong/weak areas Take a PMP Exam Prep Class, find out what you do/don t know Read the PMBOK Guide and Glossary carefully Review the PMBOK data flow diagrams; process interactions Read the PMI Code of Ethics & Professional Conduct Do plenty of practice questions, look up unknown concepts Use the internet; PMP + any topic ; look for 5 th Ed. updates Practice explaining i the PMBOK processes Practice filling in the PMI PM Process table Get in a study group 74 37
38 Any Questions? If you have questions later: online.comonline.com Bill Doescher, P.M.P Practice Test / Diagnostic 30 Questions, 36 minutes 75 38
Input, Output and Tools of all Processes
1 CIS12-3 IT Project Management Input, Output and Tools of all Processes Marc Conrad D104 (Park Square Building) Marc.Conrad@luton.ac.uk 26/02/2013 18:22:06 Marc Conrad - University of Luton 1 2 Mgmt /
More informationCertification Preparation Course LATVIKON (R.E.P.)Centre
PMP Certification Preparation Course LATVIKON (R.E.P.)Centre ABOUT THIS COURSE Your ability as a project manager to demonstrate best practices in Project Management both on the job and through professional
More informationwww.aryanengineering.com Email: info@aryanengineering.com
What is PMP Certification exam? www.aryanengineering.com PMP stands for Project Management Professional certification exam. PMP, is one of the most respected and globally recognized certification is offered
More informationQuick Reference Guide Interactive PDF Project Management Processes for a Project
Project Processes for a Project Click the Knowledge Area title (below and left in blue underline) to view the details of each Process Group. Project Process Groups and Knowledge Areas Mapping Project Process
More informationIntegration Mgmt / Initiating Process Group 4.1 Develop Project Charter
1 Mgmt / Initiating Process Group 4.1 Develop Project Charter Project statement of work Business case Agreements Facilitation techniques Project charter 26/02/2013 18:23:36 1 2 Mgmt / Planning Process
More informationMaking project management indispensable for business results. Project Management 101
Making project management indispensable for business results. Project Management 101 Donald E. Moore, MBA, PMP, President of PMI NB Kelly Barter, Chapter Manager of PMI NB AGM April 28, 2011 Topics of
More informationThe 10 Knowledge Areas & ITTOs
This document is part of a series that explain the newly released PMBOK 5th edition. These documents provide simple explanation and summary of the book. However they do not replace the necessity of reading
More informationDevelop Project Charter. Develop Project Management Plan
Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs
More informationPROJECT MANAGEMENT PROFESSIONAL CERTIFIED ASSOCIATE IN PROJECT MANAGEMENT (PMP & CAPM) EXAM PREPARATION WORKSHOP
TSE015 PROJECT MANAGEMENT PROFESSIONAL CERTIFIED ASSOCIATE IN PROJECT MANAGEMENT (PMP & CAPM) EXAM PREPARATION WORKSHOP Course Outline I. Introduction and Course Objectives A. About PMI B. PMP and CAPM
More informationProject Integration Management
Integration Initiating ning Executing Monitoring & Controlling Closing 4.1 Develop Charter Statement Of Work Business Case 4.2 Develop 4.3 Direct and Manage Work 4.4 Monitor and Control Work 4.5 Perform
More informationPMP 2013 Exam Prep. Course Overview
PMP 2013 Exam Prep Course Overview This course has been designed to prepare participants to take the Project Management Institute's Project Management Professional (PMP) Exam, 2013 edition and is based
More informationPMP Project Management Professional Study Guide, Third Edition
PMP Project Management Professional Study Guide, Third Edition Joseph Phillips McGraw-Hill is an independent entity from the Project Management Institute, Inc. and is not affiliated with the Project Management
More informationPMP Examination Tasks Puzzle game
PMP Examination Tasks Puzzle game Here is a great game to play to test your knowledge of the tasks you will be tested on in the actual examination. What we have done is take each of the domain tasks in
More informationProject Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas)
Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas) Nutek, Inc. 3829 Quarton Road, Suite 102 Bloomfield Hills, Michigan 48302, USA. Phone: 248-540-4827, Email: Support@Nutek-us.com
More informationProject Management Professional Exam Prep Plus
In this course, you ll gain the essentials preparation needed to pass the PMP exam. Concentrating on exam content form the Guide to the Project Management Body of Knowledge-Fifth Edition (PMBOK Guide)
More informationThe contact workshop is a mix of instructor lead and self paced learning, designed as per the PMBOK Fifth edition of Project Management Institute.
PMP Bootcamp workshop Duration: 4 Days - 35 PDUs GRT Consulting LLP brings you their eminent PMP Boot camp workshop to address the requirements of delegates preparing for the Project Professional (PMP
More informationA Comparison of PMI s PMBOK Guide Versions 4 & 3
PM WORLD TODAY FEATURED PAPER MAY 2009 A Comparison of PMI s PMBOK Guide Versions 4 & 3 By Germán Bernate The Project Management Institute PMI announced on December 31, 2008 the availability of PMBOK Version
More informationOverview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition
Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Topics for Discussion PMI Foundational Standards Harmonization of PMI s Foundational Standards Top 10 changes
More informationProject Management Professional (Certified by PMI)
Project Management Professional (Certified by PMI) PMI certified Project Management Professional credential is the most important industryrecognized certification for project managers. This recognition
More informationCourse Syllabus. Project Management Certificate
Course Syllabus Project Management Certificate Prerequisite(s): Some college and professional experience in managing projects. Required Materials/Texts: ISBN: PMBOK Guide 5 th Edition 978-1935589679 Managing
More informationProject Management Professional (PMP) Boot Camp
Project Management Professional (PMP) Boot Camp According to the Project Management Institute, the world's leading association for the project management profession: "PMP Certification is the profession's
More informationPMP and CAPM Exam Preparation Workshop - A 5 Day Workshop (or five 1 Days) -
PMP and CAPM Exam Preparation Workshop - A 5 Day Workshop (or five 1 Days) - Delivered in Classroom or as an Internet Receive 35 PDU s PMI's Project Management Professional certification is one of the
More informationProject Management (PMI Based)
Training Services ITIL, Cobit, ISO/IEC 20000, Project Management, Information Security, Business Continuity, Risk Management, Cloud Computing and Green-IT Project Management (PMI Based) Project Management
More informationKnowledge Area Inputs, Tools, and Outputs. Knowledge area Process group/process Inputs Tools Outputs
HUMAN RESOURCE MANAGEMENT Organizational planning Staff Acquisition Project interfaces such as organizational interfaces, technical interfaces and interpersonal interfaces. Staffing requirements Staffing
More informationManaging IT Projects. Chapter 2 The PMI Framework
Managing IT Projects Chapter 2 The PMI Framework The PMI Framework The Project Management Institute,USA is an internationally acclaimed organization Devoted to Creation & sharing of knowledge in the area
More informationCertification Exam Objectives: PK0-003
Certification Exam Objectives: PK0-003 INTRODUCTION The CompTIA Project + examination is designed for business professionals involved with projects. This exam will certify that the successful candidate
More informationImpact of PMBOK 5 th Edition
PMP Exam Changes Impact of PMBOK 5 th Edition When the PMI exam will change Major Updates X1.1 Scope of Update Comments and feedbacks for prior version Overall review for accuracy Appropriate alignment
More informationSample Examination Questions
Sample Examination Questions The following questions are examples of the type of questions that appear on the PMP Certification Examination. Disclaimer: These questions are intended for study purposes
More informationGPMCEP GLOBAL PROJECT MANAGEMENT, LLC C O U R S E
C O U R S E C E GPMCEP GLOBAL PROJECT MANAGEMENT, LLC Project Management Professional (PMP) Certification Exam Prep Global Project Management, LLC is a Global Registered Education Provider (R.E.P.) of
More informationProject Management Professional (PMP) Examination Content Outline
Project Management Professional (PMP) Examination Content Outline Project Management Institute Project Management Professional (PMP) Examination Content Outline June 2015 Published by: Project Management
More informationProject Management Professional (PMP ) Exam Preparation
Project Management Professional (PMP ) Exam Preparation Learn the most effective methods of delivering projects within cost, schedule and resource constraints April 10 14, 2011 American University of Sharjah
More informationMNLARS Project Audit Checklist
Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?
More informationOverview of: A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition
Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Overview of: A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition 1 Topics for Discussion
More informationProject Management Institute (PMBOK 2000) PMP Preparation Worksheet
Project Integration Management Processes required to ensure that the various elements of the project are properly coordinated to meet / exceed stakeholder expectations. Project Plan Development Other ning
More informationCertificate In Project Management (CIPM)
Conceptualize Plan Plan & Deliver Organize Implement Control Change if Required Integrate Deliver & Closeout Knowledge Leverage Certificate In Project Management (CIPM) Course Overview The Certificate
More informationA Guide To The Project Management Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition
A Guide To The Project Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition Major Changes The adoption of the verb-noun format for process names Amplification as to Enterprise
More informationProject Management Standards: A Review of Certifications/Certificates
Project Standards: A Review of Certifications/Certificates Standards for Project Supporting Certification and Certificates Certificate Certification The Project Body of Knowledge PMBOK Guide Projects in
More informationProgram Title: Advanced Project Management Knowledge, Skills & Software Program ID: #1039168 Program Cost: $4,690 Duration: 52.
Program Title: Advanced Project Management Knowledge, Skills & Software Program ID: #1039168 Program Cost: $4,690 Duration: 52.5 hours Program Description The Advance Project Management Knowledge, Skills
More informationTime Management. Herb Pollard III
Time Management A Small Business Perspective Herb Pollard III Project Manager for Time Management - Pollard PMI Slide 1 Introduction: Time Management - Pollard PMI Slide 2 Project Phases and the Areas
More informationAgile Project Management: Adapting project behaviors to the software development environment
Agile Project Management: Adapting project behaviors to the software development environment with Bill Doescher, PMP, CSM PrincipalConsultant and Product Development Director Business Management Consultants
More information1.3 What is Project Management? 1.4 Relationship Among Project Management, E-mail:info@iibs.ca
1 Project Management Professional (PMP) is a credential offered by the Project Management Institute (PMI).The PMP Certification Exam assesses the adeptness of a professional in applying the knowledge,
More informationAPPENDIX X1 - FIFTH EDITION CHANGES
APPENDIX X1 FIFTH EDITION CHANGES The purpose of this appendix is to give a detailed explanation of the changes made to A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition
More informationPMI Certified: PMP - Project Management 5 Days
www.etidaho.com (208) 327-0768 PMI Certified: PMP - Project Management 5 Days Course Description This PMP certification training class is designed for individuals who have on-the-job project management
More informationProject Management Process. Prepared by Jay Knape
Project Management Process Prepared by Jay Knape PMI Project Project is... temporary endeavor undertaken to produce a unique products, service or result. UITS Project Definition For Columbus State University
More informationPMP Exam Preparation Answer Key
Chapter 2 Answers 1) d) They are all of equal importance unless otherwise stated The Triple Constraint of Project Management is that Scope, Time, and Cost are all equal unless otherwise defined as such.
More informationVisit www.pm-prepcast.com for Exam Resources P a g e 16
Module and Lesson Directory No Lesson Title Type Duration Module 00.0 Welcome & Exam Overview 1. L00.00 Welcome Video 28:28 Module 00.1 Student Workbook 2. L00.10 PM PrepCast Student Workbook PDF -- Module
More informationProgram Title: Advanced Project Management Program ID: #1025924 Program Cost: $3,780 Duration: 37.5 hours. Program Description
Program Title: Advanced Project Management Program ID: #1025924 Program Cost: $3,780 Duration: 37.5 hours Program Description The Advance Project Management course is a training offering for professionals
More informationContrasting CMMI and the PMBOK. CMMI Technology Conference & User Group November 2005
Contrasting CMMI and the PMBOK CMMI Technology Conference & User Group November 2005 Wayne Sherer U.S. Army ARDEC Sandy Thrasher, PMP Anteon Corporation Agenda Purpose & Overview Considerations for Comparison
More informationAgile Project Management
Agile Project Management with Bill Doescher, PMP, MBA, CSM Pi Principal i lconsultant tand Product tdevelopment tdirector Bill Doescher, PMP, CSM Bill Doescher is a Principal Consultant and Product Development
More informationProject Management Professional PMP PMBOK 5
Project Management Professional PMP PMBOK 5 What are the Course Objectives? By the end of this training you will: Acquire the relevant knowledge and skills required to clear the PMP certification exam
More informationProject Risk Management
Project Risk Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Risk Management
More informationFamily Computer Centre
PMP - Project Professional 35 Contact Hours Comprehensive Training Program Designed on the basis of Project Body of Knowledge (PMBOK Guide) Family Computer Centre Ground Floor, Al Rayyan Complex P. O Box:
More informationProgram Title: Advanced Project Management Program ID: #1025924 Program Cost: $3,780 Duration: 37.5 hours. Course Description
Program Title: Advanced Project Management Program ID: #1025924 Program Cost: $3,780 Duration: 37.5 hours Course Description This course is the flagship course for Project Management certifications including
More informationPMP SAMPLE QUESTIONS BASED ON PMBOK 5TH EDITION
PMP SAMPLE QUESTIONS http://www.tutorialspoint.com/pmp-exams/pmp_sample_questions_set2.htm Copyright tutorialspoint.com BASED ON PMBOK 5TH EDITION Here are 200 more objective type sample questions and
More informationProfesor: Francisco Javier Sanz Pérez. by fjspsv, 2011. PMP Test C13_01
PMP Test C13_01 1. Near the end of your last project, additional requirements were demanded by a group of stakeholders when they learned they would be affected by your project. This became a problem because
More informationProject Management Professional (PMP) Examination Content Outline
Project Management Professional (PMP) Examination Content Outline Project Management Institute Project Management Professional (PMP ) Examination Content Outline Revised August 2011 Published by: Project
More informationCertified Associate in Project Management (CAPM) Examination Content Outline
Certified Associate in Project Management (CAPM) Examination Content Outline Project Management Institute PMI Certified Associate in Project Management (CAPM) Exam Content Outline Published by: Project
More informationDallas IIA Chapter / ISACA N. Texas Chapter. January 7, 2010
Dallas IIA Chapter / ISACA N. Texas Chapter Auditing Tuesday, October Project 20, 2009 Management Controls January 7, 2010 Table of Contents Contents Page # Project Management Office Overview 3 Aligning
More informationExpert Reference Series of White Papers. Importance of Schedule and Cost Control
Expert Reference Series of White Papers Importance of Schedule and Cost Control 1-800-COURSES www.globalknowledge.com Importance of Schedule and Cost Control Bill Scott, PE, PMP, PgMP Outline I. Project
More informationEXAM PREP COURSE. Course Overview. Course Objectives. Course Materials Include: Our PMP Exam Prep (Fifth Edition) training program:
PMP EXAM PREP COURSE Course Overview The purpose of this course is to prepare you to pass the Project Management Professional (PMP) certification exam. The course is based on the 10 knowledge areas in
More informationApplication of Standard Project Management Processes in Fiber Optic Cable Plant Project Management. Introduction. Alfred Sankara, DigiBridge TelCo
Application of Standard Project Management Processes in Fiber Optic Cable Plant Project Management Alfred Sankara, DigiBridge TelCo Introduction The Project Management Institute (PMI) is the world's leading
More informationProgram Management Professional (PgMP) Examination Content Outline
Program Management Professional (PgMP) Examination Content Outline Project Management Institute Program Management Professional (PgMP ) Examination Content Outline April 2011 Published by: Project Management
More informationProject Management Professional (PMP ) Exam Preparation
Project Management Professional (PMP ) Exam Preparation Learn the most effective methods of delivering projects within cost, schedule and resource constraints June 10 14, 2012 American University of Sharjah
More informationProject Management Plan for
Project Management Plan for [Project ID] Prepared by: Date: [Name], Project Manager Approved by: Date: [Name], Project Sponsor Approved by: Date: [Name], Executive Manager Table of Contents Project Summary...
More informationITTO Review (from I/O perspective)
PMBOK 5th Edition PMP ITTOs Notes and Pneumonics ITTO Review (from I/O perspective) Change Requests (CRs) as Input or Output: CRs are Input only to Perform Integrated Change Control (PICC) which converts
More informationIntroduction to the ITS Project Management Methodology
Introduction to the ITS Project Management Methodology In September 1999 the Joint Legislative Committee on Performance Evaluation and Expenditure Review (PEER) produced a report entitled Major Computer
More informationA COMPARISON OF PRINCE2 AGAINST PMBOK
Introduction This comparison takes each part of the PMBOK and gives an opinion on what match there is with elements of the PRINCE2 method. It can be used in any discussion of the respective merits of the
More informationMANAGING INFORMATION TECHNOLOGY PROJECTS
MANAGING INFORMATION TECHNOLOGY PROJECTS Kathy Schwalbe, Ph.D., PMP Augsburg College ; \ COURSE TECHNOLOGY»% CENGAGE Learning- Australia Brazil Japan Korea Mexico Singapore Spain United Kingdom United
More informationProject Management Certificate (IT Professionals)
Project Management Certificate (IT Professionals) Whether your field is architecture or information technology, successful planning involves a carefully crafted set of steps to planned and measurable goals.
More informationInterpreting the Management Process in IEEE/EIA 12207 with the Help of PMBOK
Interpreting the Management Process in IEEE/EIA 12207 with the Help of PMBOK Lewis Gray, Ph.D., PMP Abelia Fairfax, Virginia USA www.abelia.com Copyright 2002 by Abelia Corporation. All rights reserved
More informationProject Management Framework
Project Management Framework Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Please
More informationPMI Risk Management Professional (PMI-RMP ) - Practice Standard and Certification Overview
PMI Risk Management Professional (PMI-RMP ) - Practice Standard and Certification Overview Sante Torino PMI-RMP, IPMA Level B Head of Risk Management Major Programmes, Selex ES / Land&Naval Systems Division
More informationPartnering for Project Success: Project Manager and Business Analyst Collaboration
Partnering for Project Success: Project Manager and Business Analyst Collaboration By Barbara Carkenord, CBAP, Chris Cartwright, PMP, Robin Grace, CBAP, Larry Goldsmith, PMP, Elizabeth Larson, PMP, CBAP,
More informationComparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition and ISO 21500
Project Training Company Comparing PMBOK Guide 4 th Edition, Edition and STS Sauter Training & Simulation S.A. Avenue de la Gare 10 1003 Lausanne Switzerland Web: www.sts.ch E-mail: office@sts.ch Phone:
More informationA GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE
Project Management Institute A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE (PMBOK Guide) Fourth Edition An American National Standard ANSI/PMI 99-001-2008 ISBN: 978-1-933890-51-7 Published by: Project
More informationPROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name
More information10.1 Communications Planning 10.2 Information Distribution Figure 10 1 10.3 Performance Reporting 10.1 Communications Planning 10.
PROJECT 10 COMMUNICATIONS MANAGEMENT Project Communications Management includes the processes required to ensure timely and appropriate generation, collection, dissemination, storage, and ultimate disposition
More informationErrata. 133 Figure 5-15 Corrected the output for 8.3 Control Quality to read verified deliverables
Errata NOTE: The following errata only pertain to the first printing of the PMBOK Guide Fifth Edition. In order to verify the print run of your book (or PDF), refer to the bottom of the copyright page
More informationPMI Lexicon of Project Management Terms
Project Management Institute PMI Lexicon of Project Management Terms Version 3.0 Published by: Project Management Institute, Inc. 14 Campus Boulevard Newtown Square, Pennsylvania 19073-3299 USA Phone:
More informationPrinciples of Project Management
IPM 2012 Conference Principles of Project Management David Radkovich, PMP, EVP Subsystem Technologies david.g.radkovich.ctr@mail.mil Karen Jordan, PMP Subsystem Technologies karen.f.jordan.ctr@mail.mil
More informationMIS 460 Project Management
Ursuline College Accelerated Program CRITICAL INFORMATION! DO NOT SKIP THIS LINK BELOW... BEFORE PROCEEDING TO READ THE UCAP MODULE, YOU ARE EXPECTED TO READ AND ADHERE TO ALL UCAP POLICY INFORMATION CONTAINED
More informationPHASE 3: PLANNING PHASE
PHASE 3: PLANNING PHASE The ning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning
More informationErrata 1 st Printing. Errata 2 nd Printing
Errata 1 st Printing NOTE: The following errata only pertain to the first printing of the PMBOK Guide Fifth Edition. In order to verify the print run of your book (or PDF), refer to the bottom of the copyright
More informationCPM -100: Principles of Project Management
CPM -100: Principles of Project Management Lesson B: Time and Cost Management Presented by Bruce R. Shaw, P.E., PMP starshaw@starpower.net Ph: 703-922-2772 Presented at the PMI-CPM 2002 Fall Conference
More informationProject Management Professional (PMP)
Project Management Professional (PMP) Duration: 5 days Course Objectives: PMI s Project Management Professional (PMP) credential is the most important industry-recognized certification for project managers.
More informationPHASE 3: PLANNING PHASE
PHASE 3: PLANNING PHASE The Planning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning
More informationComparing the Differences and Complementary features of PRINCE2 and the PMI PMBOK Guide
Comparing the Differences and Complementary features of PRINCE2 and the Guide PRINCE2 is the UK Government s structured project management method. PMI stands for the Project Management Institute producing
More informationPMP Handouts Dr Pratul Sharma Project Management Framework
Project Management Framework Project: a temporary endeavour undertaken to create a unique product, service or result A project is: Temporary definite start & definite end project is temporary not the result
More informationCertified Software Quality Engineer (CSQE) Body of Knowledge
Certified Software Quality Engineer (CSQE) Body of Knowledge The topics in this Body of Knowledge include additional detail in the form of subtext explanations and the cognitive level at which the questions
More informationATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES
1. ROLE DEFINITIONS ATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES The purpose of this section is to distinguish among the roles interacting with the SPM obtained through
More informationLooking to. pass the exam. training is. America. (unauthorized. courseware) 5 Days. of Training. happy. first day. training) have a highh
PMP /CAPM Certification Looking to pass the PMP or CAPM exam on your first try? We have helped thousands to pass the exam on their first try. We are one of the top training provider of PMP /CAPM training.
More informationProject Scope Management in PMBOK made easy
By Dr. TD Jainendrakumar The main objective of any project is to fulfill the scope of the project on time and within the budget. What is Project Scope? Scope refers to all the work involved in creating
More informationIT4203 Information Technology Project Management (Compulsory)
Information Technology Project Management (Compulsory) INTRODUCTION Information Technology Project Management (ITPM) is one of the compulsory courses in Semester 4. A knowledge of the concepts and techniques
More informationThe Plan s Journey From Scope to WBS to Schedule
The Plan s Journey From Scope to WBS to Schedule Presented by: Rick Clare, CBAP, PMP, OCP, CSM PM Centers USA, LLC. 2013 Company Background Consulting and Training (Virtual, Public and Private Training)
More informationPMBOK for Dummies. Sean Whitaker, PMP Vice President, PMINZ
PMBOK for Dummies Sean Whitaker, PMP Vice President, PMINZ A short history of PMBOK A Guide to the Project Management Body of Knowledge (PMBOK Guide) was first published by the Project Management Institute
More informationUnit 6: Quality Management (PMBOK Guide, Chapter 8)
(PMBOK Guide, Chapter 8) Historically, quality management questions have been difficult for some exam takers for two major reasons: 1) over-reliance on their previous training and personal experience (rather
More information- ATTACHMENT - PROGRAM MANAGER DUTIES & RESPONSIBILITIES MARYLAND STATE POLICE W00B0400021
- ATTACHMENT - PROGRAM MANAGER DUTIES & RESPONSIBILITIES MARYLAND STATE POLICE W00B0400021 About this document this is a detailed description of typical Project Manager (PM) duties, responsibilities, and
More informationProject Management. Training Courses
Project Management Certification and Training Courses Table of Contents Page On Site Training 4 Custom Course Development and Training 5 Project Management Training and Certification Courses Project Management
More informationAIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)
AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP) Copyright: Australian Institute of Project Management Document Information Document
More informationThe PMP Exam Application Reference Guide
The PMP Exam Application Reference Guide Version 3.0 (4 th Ed. PMBOK Guide) September 2011 112 Townpark Dr. NW Suite 150 Kennesaw, GA 30144-3743 Toll-Free 888.568.2527 Local 770.424.3535 Fax 770.424-3565
More information