Appendix A Task Alternative Goods Movement Technology Analysis, Draft Working Paper, Review of Alternative Zero- Emission Container

Size: px
Start display at page:

Download "Appendix A Task 160.10.60 Alternative Goods Movement Technology Analysis, Draft Working Paper, Review of Alternative Zero- Emission Container"

Transcription

1 Appendix A Task Alternative Goods Movement Technology Analysis, Draft Working Paper, Review of Alternative Zero- Emission Container Transport Technologies (without Appendices)

2 TASK ALTERNATIVE GOODS MOVEMENT TECHNOLOGY ANALYSIS FINAL WORKING PAPER REVIEW OF ALTERNATIVE ZERO-EMISSION CONTAINER TRANSPORT TECHNOLOGIES Prepared for Los Angeles County Metropolitan Transportation Authority October 31, East First Street, Suite 400 Santa Ana, California 92705

3 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION Preliminary Assessment Technical Inquiry PRELIMINARY ASSESSMENT Methodology Preliminary Findings TECHNICAL INQUIRY Methodology Findings Proponent Responses Tabulated Summary Cost Estimate Comparison COMBINED COMMERCIAL AND TECHNICAL INQUIRY Methodology Findings APPENDICES Final Page 3 of 61 10/31/08

4 1.0 INTRODUCT ION This paper summarizes a review of alternative, zero-emission transportation technologies that may be considered for application to the transport of marine cargo containers in the I-710 Corridor. Earlier this year, URS Corporation (URS), under subcontract to Cambridge Systematics, Inc., completed for the Ports of Los Angeles and Long Beach an assessment of alternative technologies for transporting marine cargo containers within the ports, and between the ports and a near-dock intermodal facility less than 5 miles away. The Proponents and their systems identified for potential application to this short-haul scenario represent the same field of potential technologies to be considered for application to the longer-haul truck cargo diversion scenario being considered in the I-710 Corridor Project EIR/EIS. The objective of the Alternative Goods Movement Technology Analysis, Task of the I- 710 Corridor Project EIR/EIS scope of work, is to define a general, hypothetical alternative technology that may be reviewed as a surrogate for any of the several specific candidate technologies. The definition of the technology for this purpose draws directly on the Zero- Emissions / Electric Container Mover System Study, performed for the Ports of Los Angeles and Long Beach. The study area for potential new technology application showing preliminary alignment alternatives is shown in Figure 1. This study identified the broadest possible range of alternative technologies and Proponents for potential application to the near-dock intermodal market, or for circulation of containers with the port(s). The information used to characterize each technology was obtained directly from the Proponents, either via telephone or via written responses. On the basis of this information, the consultant team evaluated the responsiveness of each technology to the market scenario, and the commercial readiness of each Proponent to deploy their technology in a revenue service demonstration. The evaluations reflected: a.) The responsiveness of each Proponent to both the technical and commercial queries (i.e. Did the Proponent provide complete and knowledgeable answers?), b.) The assessed responsiveness of each proposed technology to the scenario (i.e. Is the proposed solution plausible, proven, or based on existing applications?), and Final Page 4 of 61 10/31/08

5 Final Page 5 of 61 10/31/08

6 c.) The assessed commercial capability of each Proponent to develop, deliver and assure their proposed solution (i.e. is this a viable commercial entity with a viable business plan?). The findings of the study include aggregated numerical scores for a range of criteria, each scored on a fixed scale. While these aggregated scores result in an apparent ranking of technologies and Proponents, they are not weighted to reflect actual priorities and needs of a potential operating agency, nor do they indicate how these Proponents could respond to an actual opportunity to deliver an operating system. The study does enable the categorization of the technologies into four general families, and scales the assessed readiness of the Proponents within each of those families to respond to a deployment opportunity. Finally, the technical information obtained about these families of technologies provides input to the definition of the generalized alternative technology surrogate to be evaluated in the I-710 Corridor Project EIR/EIS. The review of alternative technologies was accomplished in two steps: A Preliminary Assessment was prepared on the basis on telephone interviews with individual technology Proponents and their responses to a set of standard questions. The Preliminary Assessment reviewed the business capabilities of the Proponents and the general feasibility of their technology concepts as applied to the near-dock container transport market. (Preliminary Assessment of Alternative Technologies and Proponents September 4, 2007). A subsequent Technical Inquiry elicited the written responses of individual Proponents to a set of rudimentary standard performance requirements based upon two hypothetical service scenarios. (Technical Assessment of Alternative Technologies and Proponents December 14, 2007) Both components of the overall assessment are therefore based on information provided by the technology Proponents themselves. The technical inquiry gave Proponents an opportunity to refine the information they had provided previously, and resulted in some changes in the technical comparison of the technologies. This document presents the findings of the two steps as an integrated report, illustrating the sequential development of the assessment. Final Page 6 of 61 10/31/08

7 1.1 PRELIMINARY ASSESSMENT The Preliminary Assessment identified viable, interested Proponents that could be considered for demonstration and deployment of an alternative zero emission container transport system. Fourteen (14) Proponents of alternative technologies were identified by the ports and the consulting team, or identified themselves directly to the consultant team. The technologies represented are all in the research and development stage, with no version of the technology currently operating in a practical application. Figure 2 is a listing of the candidate technologies and their Proponents, with a short description of each technology. Figure 2 Original Field of Alternative Technologies and Proponents Name of Technology / Proponent Aeroscraft Worldwide Aeros Corporation AirHeLo TEECO International, Inc. Automated Shuttle Car System Automated Terminal Systems, Inc. CargoRail/Cargo Tram MegaRail Transportation Systems Container Port Skid Tubular Rail Container-Express Corridor CitiCar Electric Cargo Conveyor System General Atomics Environmental Mitigation and Mobility Initiative Logistics Solution American Maglev Technology Freightrapid Transrapid International-USA LIM-Rail and MagRailtm Innovative Transportation Systems Corporation Rail Motor and SPM Maglev Launch Point Technologies Skytech Gridrail System SkyTech Transportation Southern California Guideway Whelan and Associates Universal Freight Shuttle Summary Description of Technology Manned blimp that could eventually be operated by remote control Lighter-than-air airship Electric shuttle electrically driven motorized platforms Manual transport of trucks and containers in a train consist on an elevated guideway or in the street Electric power roller system Automated at-grade system partially using existing rail within the Port Permanent magnet, large-air-gap levitation, linear synchronous motor propulsion Magnetic levitation system using automated driverless vehicles Magnetic levitation with synchronous longstator linear motor propulsion LIM-Rail: Automated rail electrification system using linear induction motor MagRail: Automated magnetic levitation system above existing rail Rail Motor: Electric propulsion of conventional locomotives SPM Maglev: Retrofitting of permanent magnets and linear synchronous motors in existing railbed. Linear induction motor with electric transport above and below rails Linear induction motor with electric transport in an elevated guideway Linear induction motor in an automated, grade- Final Page 7 of 61 10/31/08

8 Name of Technology / Proponent Freight Shuttle Development Corporation Summary Description of Technology separated, elevated guideway system 1.2 TECHNICAL INQUIRY In the subsequent Technical Inquiry, Proponents were invited to respond to two hypothetical service scenarios, and to provide physical, operating, and estimated cost characteristics of their systems applications. The responses to this inquiry enabled a more detailed assessment of each technology s technical attributes, and of the stated capabilities of their Proponents. Of the originally identified Proponents, Worldwide Aeros Corporation, developer of the Aeroscraft lighter-than-air technology did not respond to the Technical Inquiry, so the assessment considered the technologies proposed by thirteen of the fourteen originally identified Proponents. The findings of the Technical Inquiry were presented in a separate draft report, combined herein with the preceding Preliminary Assessment in a summary of the entire process. 2.0 PRELIMINARY ASSESSMENT 2.1 METHODOLOGY The technologies and proponents included in the original list were (a) identified by the ports of Los Angeles and Long Beach, (b) obtained through independent consultant research and (c) identified directly by proponents themselves. The descriptions of these technologies and of their proponents were derived from the information provided to the ports by the proponents, websites of the proponents, information provided to the consultant team by the proponents, and telephone interviews with the proponents. Questions were asked of each proponent during the telephone interview to assist in filling out a Survey of Alternative Technologies and Proponents (Appendix A). In most instances the interview questions were the same for each proponent, to elicit their descriptions of such attributes as: The form and capabilities of the proponent company; The overall technology being proposed; The technology proposed for propulsion, vehicles and switching; and An operating concept for the technology s application to container transport. Final Page 8 of 61 10/31/08

9 The technologies and their proponents were described in a matrix that captures general information, firm capabilities and features of each technology. The preliminary evaluation matrix was developed to assess in general terms the proponents (business) capabilities and the maturity of their technologies. Commercial evaluation criteria included such items as: Whether the proponent has developed a marine container transport system that could reach an application demonstration stage within 5 years, Whether the proponent has built a working proof of concept for a part of its proposed technology; Whether the proponent has identified committed strategic or development partners for the proposed technology; Whether the proponent has developed other commercial transportation products, Whether the proponent has a business plan for commercialization of the technology that could be used to finance the technology and the proponent, and Whether the proponent could produce financial statements. Most of the proponents indicated that business plans and financial statements were proprietary. Thus, these criteria were evaluated based on a verbal reassurance that the proponent had a business plan and financial statements, if applicable to their business model. The assessment also included a high-level look at each of the technologies as identified below. Whether the proponent is considering the use of commercially proven systems or components in the technology, or is using proprietary technology. Whether the proponent defined a guideway for the technology. Whether the proponent defined a propulsion system to move the vehicles within the system. Whether the proponent defined a system for command and control that would ensure that the vehicles know where they are in the system at all times, maintain a safe distance between vehicles to avoid collisions, ensure the vehicles go to the correct location at a terminal, rail yard or a rail yard located outside port property, and ensure Final Page 9 of 61 10/31/08

10 that if an automated system is proposed there is communication between the vehicle, wayside signals and a communication center; protection between vehicles and the vehicles are dispatched to the correct destination. Whether the proponent defined a system for loading and unloading of the vehicles at various points in the system such as shipside, terminals, sorting yards and rail facilities, and where the technology would start. Whether the proponent defined a design for vehicles and if an automated vehicle is proposed what system is located on the vehicle to ensure its location is known when traveling in the system. Whether the proponent defined a physical system for switching with the ability to change from one guideway to another, to collect and distribute vehicles, to assist in system recovery, ability to move off the guideway to a location such as a terminal and to move back on the guideway in order to deliver the container to the end destination. Whether the proponent defined a physical system and algorithm for sorting and storage of the containers that would ensure the containers are moved to correct locations whether it is a storage facility, a terminal or a rail facility, and if multiple containers are transported on a vehicle how the multiple containers get to correct locations. Whether the proponent defined an operating plan for the technology with such things as operating rules and protocol, number of vehicles, staffing requirements and terminals served. Whether the technology is a zero based emissions technology. Each of technologies was evaluated for each of the technical criteria (guideway through sorting and storage) on the basis of whether the technology being proposed is (a) based on a conceptual idea or (b) based on a conceptual design, an existing design, an existing component and/or an existing system. 2.2 PRELIMINARY FINDINGS The 14 proponents represent independent systems that apply alternative technologies to transport containers from either a ship or a terminal to locations that could be on or off port property. Final Page 10 of 61 10/31/08

11 One of the proponents, TransRapid International, stated that they were not pursuing adaptation of their magnetic levitation (maglev) passenger technology for container freight transport. Two proponents, Alternative Hybrid Locomotive Technologies (proposing a locomotive operated on ethanol and batteries) and KACI Intermodal Systems (proposing diesel locomotives to move containers), were both eliminated from the evaluation process because they did not satisfy the qualifying criterion of zero emissions and therefore are not among the 14 proponents identified. Automated Terminal Systems (ATS), proponent of the Automated Shuttle Car System technology has stated that they are proposing to a private developer to build a system for the Port of Taranto, in southern Italy. This project will be privately financed, using a 90-year land lease concession from the Italian government. ATS has a letter of intent from the private developer and anticipated this intent will be converted to a supply contract by the end of September ATS intends to start demonstrating the equipment in early The current team for ATS includes (1) Ederer - fabrication and supply of equipment, (2) Halcrow - planning, detailed design and project management and (3) ATS - supply of the technology (ATS is responsible for the design of the shuttle cars, ancillary equipment and system configuration (software), the operating system and overall system integrator). Proponents of at least three other technologies identified strategic or development partners. The development team for MegaRail and its CargoRail technology includes MegaRail (system design and integration and prime contractor), Clark Precision Machines and Metals (vehicle production, guideway production and ramp and station production), Micrin Company (electronics production, electrical harness production and sheet metal fabrication) and Austin Bridge and Road (site engineering design, on-site guideway assembly and pier and guideway installation). The development team for General Atomics and its Electric Cargo Conveyor System technology includes General Atomics (prime contractor and maglev systems), California State University Long Beach (system architecture), Mackin Engineering (civil engineering), Hall Industries (chassis), Lawrence Livermore National Lab (magnetics analysis) and Union Switch & Signal (communications and signaling). Final Page 11 of 61 10/31/08

12 The development team for American Maglev Technology and its Environmental Mitigation and Mobility Initiative technology includes American Maglev Technology (developer and manufacturer of the maglev technology), Calyon Bank (for the debt portion of the project finance plan), and Jervis B. Webb Company (custom automatic guided vehicle to transfer containers between truck beds and maglev chassis). Among the principal findings, the interviews indicated that while most Proponents did not have operating plans tailored to a specific port application, they did have a clear intent for how their system would operate within a port or container line-haul setting. During the interview process, each Proponent was questioned on the steps to build an operating application demonstration of the technology, and how long that would take. All of the Proponents interviewed indicated that building and testing of an application demonstration could be accomplished in 5 years or less even though many Proponents did not identify strategic or development partners. All of the Proponents contacted are interested in participating in industry outreach to learn more about the goals and requirements of the ports of Los Angeles and Long Beach. Based on the responses to date, the technologies identified may be characterized by four general categories. These four categories are: Magnetic Levitation (Maglev) Systems Electric Cargo Conveyor System General Atomics Environmental Mitigation and Mobility Initiative Logistics Solution American Maglev Technology Freightrapid Transrapid International-USA Exclusive Contact Guideway Systems Automated Shuttle Car System Automated Terminal Systems, Inc. CargoRail/Cargo Tram MegaRail Transportation Systems Container Port Skid Tubular Rail Skytech Gridrail System SkyTech Transportation Universal Freight Shuttle Freight Shuttle Development Corporation Retrofits to Conventional Rail Container-Express Corridor CitiCar LIM-Rail and MagRail Innovative Transportation Systems Corporation Final Page 12 of 61 10/31/08

13 Rail Motor and SPM Maglev Launch Point Technologies Southern California Guideway Whelan and Associates Lighter-than-Air Aeroscraft Worldwide Aeros Corporation AirHeLo TEECO International Inc. Detailed information regarding each alternative technology and Proponent is presented in Appendix A. 3.0 T ECHNICAL INQUIRY 3.1 METHODOLOGY In the Task 1 Update of September 4, 2007, a preliminary assessment was made of the fourteen candidate technologies. Among the findings of the preliminary assessment was a ranking of technologies and Proponents based on their aggregate technical and commercial responses, collected via telephone interviews. To assess technical capabilities further, a list of technical questions (Appendix B) was developed and sent by to all fourteen Proponents. These questions were based on two hypothetical service scenarios, defined to establish a common understanding and enable comparison. Follow up calls were made to ensure receipt of the information. The marine termini defined for the hypothetical service scenarios were Berths 224 through 226 and Berth 301. They were selected because they serve several marine terminals, they are near land that could accommodate construction of the alternative technology and the siting of a transfer station in the marine terminal back lots should not impede current operations. Proponents were asked to provide their responses to the hypothetical service requirements, including alignments to two hypothetical sites, in addition to schedule, guideway, propulsion, command and control, loading and unloading interfaces, switching, sorting and storage, operations plans, start up and test, permits/approvals/code compliance, construction management and costs. A throughput requirement of 1,500 containers in an eight hour period was established based upon an 8,000 TEU ship, four cranes to offload, typical crane productivity and an estimate of intermodal lifts from one ship at berth. This estimate was provided to each Proponent. Final Page 13 of 61 10/31/08

14 A team of URS technical experts evaluated and scored the Proponents responses in terms of technical feasibility and responsiveness (whether the Proponent provided the information to allow for a technical evaluation). To assist the evaluators, a perfect score was defined to identify the total number of points assigned to each question in terms of technical feasibility and responsiveness. 3.2 FINDINGS Proponent Responses Of the fourteen originally identified Proponents, thirteen responded to the technical inquiry. Worldwide Aeros Corporation, Proponent of the Aeroscraft technology did not respond to the technical inquiry. In addition, Innovative Transportation Systems Corporation proposed Lim-Rail only with Magnemotion; while, LaunchPoint Technologies proposed two different alternative technologies (SPM Maglev and Rail Motor), so a total of fourteen alternative technologies were assessed. Some of the names of the alternative technologies and companies changed slightly from the preliminary assessment. The evaluations of the fourteen alternative technologies are summarized in the following profiles. AirHeLo TEECO International, Inc. AirHeLo would use a fleet of lighter-than-air airships to move transfer containers from ships to transshipment points; however the Proponent did not describe how the containers would be transferred from ships to airships. Integration No description of the integration of the various system elements (i.e., the air ships, power control, container loadingunloading mechanisms, etc.). Schedule The basic use of airships is an established technology; the adaptations necessary for this application could be developed within 5 years. However, the schedule is missing information such as proof of concept, steps leading to a working prototype, and working with the Federal Aviation Administration. Alignment Hypothetical Sites An air route between Berths 224 through 226 and the SCIG is feasible in principal, subject to Federal Aviation Administration approval. This Final Page 14 of 61 10/31/08

15 would require coordination with other commercial and general aviation traffic. However, the feasibility of storage of airships on the water when not in operation would have to be tested and proven or airships would have to be stored on-site (taking up additional port property) or at off-site land-based areas. Guideway Not applicable for airship operations. Propulsion In principle the propulsion system is a valid response to the zero emissions requirement. However would have to be proven for this application and power requirements. Command and Control The command and control system is feasible based on the assumption that the Proponent can obtain certification for a Federal Aviation Administration-approved air cargo operation for a manned airship whose landings and lift-off operations are monitored by an air traffic control tower. But if the Proponent is proposing a remote-controlled operation, this is not a currently Federal Aviation Administration-authorized airship operation. Loading and Unloading No description of the proposed operations or equipment for loading and unloading containers. Loading containers to and from an airship is not the same as the existing cranes. The Proponent may well be able to come up with a feasible system, but no description is provided with this submittal to substantiate feasibility. Vehicles A fleet of one to five airships was proposed for the fleet which more than likely would be insufficient to provide the throughput of containers required. In addition, while the propulsion system is a valid response to a zero emissions requirement, the system would need to be proven for an application of carrying cargo containers, given the power requirements and duty cycle. Switching Not applicable for airship operations. Sorting and Storage Insufficient description of what the sorting and storage system consists of to assess its feasibility. Operating Plan Insufficient information provided to support a realistic Operating Plan. Start Up and Test No information provided about the nature of the system startup or testing. Final Page 15 of 61 10/31/08

16 Permits, Approvals and Code Compliance Federal Aviation Administration certification of an air cargo operation may be possible, but Proponent s description of their approach to certification is insufficient. In addition, a community relations program is not supported by the information provided. Construction Management Most components of the proposed technology have a proven history; however no mention of a quality control program or who will monitor construction. Automated Shuttle Car System Automated Terminal Systems, Inc. Automated Shuttle Car System is proposed as a fully automated cargo container system for transporting cargo containers between marine/rail and other terminals, including a fully automated container yard. Integration The Proponent does not explain how all of the various system elements will be integrated into one alternative technology since no prototype is in service. The Proponent has identified a proven control system. Schedule The schedule shows approximately 4 years to start service; however the durations for some of the activities such as property acquisition/condemnation prototype testing, and testing and commissioning appear to be optimistic. Alignment Hypothetical Sites Alignment Feasibility The horizontal alignment curve radii appear feasible. The alignment is primarily along existing rail alignments; with the corridor width requirements this appears feasible. The dual track elevated trackway is approximately 44 feet wide while the at-grade dual trackway is approximately 50 feet wide except where power substations are provided (1 substation per ½ mile). It is not clear if the alignment would use the existing Henry Ford Avenue bridge crossing or if there is a need to construct a new bridge crossing. Final Page 16 of 61 10/31/08

17 Right-of-Way The guideway alignment/separate right-of-way corridor appears to primarily stay within or adjacent to Port owned rail right-of-ways. Although conflicts with existing rail lines and utilities are expected the right-of-way requirements conceptually appear feasible. Footprint and Space General footprint and space requirements are feasible at this stage of project development. A potential issue is storage yards; although Terminal areas are large and can therefore accommodate large storage yards, communication facility and a maintenance facility, there is insufficient information on the space/footprint requirements of the proposed yard. Guideway Feasibility Based upon a high level evaluation of the guideway alignment and cross-sections, the guideway appears feasible. There is a potential for the electric busbar (shown in cross-section parallel with and between tracks) to conflict with cross-traffic at grade crossings. No information is given on the elevated guideway span lengths nor concrete column supports type, size, spacing, location, etc. Configuration The Terminal configuration shown in the schematic appears feasible. Automated Shuttle Cars and traditional trucks are on opposite sides of the Terminal. The rail mounted gantry cranes extend to both sides of the Terminal enabling them to load/unload both the automated shuttle cars and/or trucks as needed. The Terminal also consists of an Inspection Facility, Command Control Room, and Maintenance Facility, which are all located such that they do not interfere with the loading/unloading operations. Final Page 17 of 61 10/31/08

18 Propulsion The propulsion system is feasible although no prototype is in service; it uses current passenger propulsion systems. Command and Control The command and control system is feasible from a conceptual standpoint although no prototype is in service. The Command and Control systems would use currently available positive train control technology. Loading and Unloading The Proponent proposes to use existing technology (trucks) to move cargo containers from the terminal to the system, then place the containers under load and unload stations that can move to load the containers. Vehicles The vehicle proposed appears to be able to accommodate cargo containers of various sizes, with the ability to secure containers. Switching The switch system as a stand-alone rail system is feasible. Sorting and Storage Containers are to be sorted into a long-haul shuttle car system or the yard depending on information associated with the container. Operating Plan Proponent has provided a reasonable operation plan for the technology at this stage of development. Start Up and Test The program appears to be feasible; however a test period of 48 consecutive hours without fault appears to be too short a timeframe. Permits, Approvals and Code Compliance Limited information on permits, approval and codes to determine if the Proponent understands the process. In addition, the response indicates a robust community relations program. Construction Management The designers of the system will manage/monitor the construction contractors. The quality control mentioned is brief but leads one to assume a good understanding of a quality control program. CargoRail/Cargo Tram MegaRail Transportation Systems CargoRail/Cargo Tram is proposed as a coupled dual-mode conveyance that could operate in port and railroad intermodal areas on existing paved surfaces. Final Page 18 of 61 10/31/08

19 Integration The response does not explain how all of the various system elements will be integrated into one alternative technology. Schedule The schedule appears to have all of the elements for a project but 30 months from preliminary design to demonstration could be optimistic. Alignment Hypothetical Sites Alignment Feasibility Feasibility of alignment is highly dependent on Caltrans approval of use of their rightof-way. Caltrans will likely object to any structures built within their right-of-way, specifically structures that are built adjacent and/or directly over their roadway facilities. In addition, the alignment is along existing State Route 47/103 where there does not appear to be adequate space within the median and/or along shoulders for placement of column supports. Although not likely, if Caltrans does approve a project, extensive coordination and interaction will be necessary, resulting in extended schedules and escalated costs Because Caltrans will likely not approve development within their right-of-way, proposed alignment is likely not feasible. Right-of-Way Proponent acknowledges that utility relocation will be unknown until a site survey is undertaken. This is a reasonable assumption. Footprint and Space General footprint and space requirements are feasible at this stage of project development. Some potential issues are: Communication facility Although space requirements for a small system control building is most likely minimal, insufficient information provided by Proponent on space requirements. Final Page 19 of 61 10/31/08

20 Maintenance facility Although the Terminal areas are relatively large and capable of accommodating a maintenance facility, insufficient information on space/footprint requirements is provided by the Proponent. Guideway Feasibility Insufficient information provided by the Proponent on the guideway. The information provided does not demonstrate the structural ability of the guideway to support the required loads. No thickness dimensions are given for the surface track on which vehicle tires rest/ are supported. Surface track/beams that support vehicle appear inadequate for required span lengths and loads. Piers also appear incapable of supporting required loads. Piers would need to have a maximum spacing of 40 feet to support the loads. Each pier is specified to support a maximum load of 94k lbs (thus one container per pier and one container per span). It is unclear how the Proponent proposes to carry three to five container cars (as specified) across spans greater than 40 feet such as the span required across the Cerritos Channel. Proponent specifies stainless steel columns to sit over tapered spud concrete base with no bolting required, this does not appear structurally sound. Cross-arm (bolted on) appears incapable of supporting asymmetrical loads (e.g., vehicles traveling around turns, containers loaded on one side only), also the guideway does not appear to have any means of resisting overturning forces applied to vehicles traveling along horizontal curves. Configuration Insufficient information provided by the Proponent. Propulsion The propulsion system is feasible, using current state of-the-art direct drive motors and monitoring systems. Even though designed as a separate guideway, Final Page 20 of 61 10/31/08

21 with the types of voltages described the power should not be connected to any existing railroad lines. Command and Control The command and control system is feasible. It would operate much in the same manner as do today s railroads. Loading and Unloading The technology is proposed to use existing processes and equipment for loading and unloading cargo containers. The CargoTrams will act like trucks with the ability to make similar turning movements. Vehicles The proposed vehicle appears to be able to accommodate cargo containers of various sizes, with the ability to secure containers and with enough clearance to operate on the street or guideway. Switching The system is feasible but not fail-safe. The central control system should have more control at switching then the tram operator. The central control monitoring system would know where other vehicles are and not rely on line of sight by the tram operator. Sorting and Storage The Proponent proposes to use existing systems and operate within the current terminal operator operations. Operating Plan The CargoTram portion of system seems fairly well thought-out and the operating plan between the Port and the SCIG seems feasible, though required headways, particularly at peak demand, could require multiple guideways to meet throughput requirements. There should be better documentation of how required headways are attained. Start Up and Test Acknowledges a potential start-up and test program in accordance with detailed test and start-up procedures. Permits, Approvals and Code Compliance Limited information on permits, approvals and meeting codes to determine if the Proponent understands the process. In addition, no mention of meeting the communities or people who live in the impacted communities. Construction Management MegaRail and partners; as designers of the system, are proposed as construction managers, thus as designers in the alternative technology are in the best position to manage the construction. Final Page 21 of 61 10/31/08

22 Container-Express Corridor CitiCar CitiCar is proposed to move cargo containers within an automated corridor using existing railroad track and specialized electrically-powered vehicles. Integration The response does not explain how all of the various system elements will be integrated into one alternative technology. Electrified third rail technology is not acceptable when involved with current two rail standard railroad track configurations. It would promote electrical hazards. Schedule The schedule does not take into account permitting, approvals, test and start up, working with Pacific Harbor Lines or working with Federal Railroad Administration about placing equipment on existing track. The schedule appears to be optimistic with 18 months proposed for prototype trials and certification to begin. Alignment Hypothetical Sites Alignment Feasibility Although more information would help, the alignment is most likely feasible. The map of alignment is a single-line diagram with no background (existing topography/infrastructure) information; however, Proponent does propose to route alignment along existing railroad alignments. Right-of-Way Insufficient information is provided by the Proponent. Assuming the guideway alignment can traverse along/adjacent to existing railroad right-of-way, proposed right-of-way requirements would appear to be feasible. Proponent does not specify whether guideway is at grade or elevated. If the guideway is at grade, potential conflicts with the existing railroad alignments must be addressed. Proponent implies no conflicts with cross traffic, if alignment is at grade this is likely not feasible. Final Page 22 of 61 10/31/08

23 Footprint and Space General footprint and space requirements are feasible at this stage of project development. Some potential issues are: (a) Other Systems Components insufficient data to evaluate and (b) Maintenance Facility Even if maintenance work is contracted out, inoperable vehicles will still need to be removed from track/guideway and serviced at alternate locations within the system to keep operations going. Guideway Feasibility Insufficient information provided by the Proponent. Proponent does not specify if guideway is at grade or elevated. No information given on structural methods and materials. Configuration Insufficient information provided by the Proponent. Propulsion Electrified third rail technology is not acceptable when involved with current two rail standard railroad track configurations. It would introduce electrical hazards. Command and Control The Command and Control System is highly conceptual, with little definition, and the command and control software for this system is in the planning stage. In addition, CitiCar proposes to use existing rail to move cargo containers and use an automated system to carry cargo containers. While the vehicle is sharing existing track, there is no mention of the need to monitor all vehicles (some beyond the control of the Proponent such as locomotives and rail cars) that occupy the existing rail system in order to avoid collisions. Loading and Unloading The system being proposed uses existing systems and terminal operators for loading and unloading. Cars will need to be spotted but with existing gantry cranes to load and unload specific spotting may not be an issue since the cranes can move to match the vehicle. Final Page 23 of 61 10/31/08

24 Vehicles The vehicle proposed is described as a standard railroad flatcar, which appears to be able to accommodate cargo containers of various sizes, and with the ability to secure containers. Switching Electrified third rail technology is not acceptable when involved with current two rail standard railroad track switching configurations. It would introduce electrical hazards. No details on how the switch is controlled or monitored. Sorting and Storage The Proponent leaves sorting and storage up to each terminal operator. Operating Plan The most basic elements of an operating plan are not included. Start Up and Test No information is provided on a start up and testing program. Permits, Approvals and Code Compliance Limited information on permits, approval and codes to determine if the Proponent understands the process. In addition, CitiCar assumes Bombardier (a potential vehicle supplier) has the only permits but there will be permits and approvals for the new track and system. In addition, no information is provided to indicate the need to communicate or coordinate with Pacific Harbor Lines or any other railroad. Also, there appears to be limited information on community relations to determine if the Proponent understands the process. Construction Management Based on limited information, construction management appears to be understood, but there is no apparent understanding of a quality control program. Container Port Skid Tubular Rail Container Port Skid is proposed to propel a container-carrying skid (vehicle) on an electric power roller system. Integration The response does not explain how all of the various system elements will be integrated into one alternative technology. There is no prototype in service; all data based from on a conceptual design. Schedule No schedule provided, unable to assess. Alignment Hypothetical Sites Final Page 24 of 61 10/31/08

25 Alignment Feasibility Alignment appears to be primarily along/adjacent to existing railroad alignments. Proponent provided information for one hypothetical application, not two as requested. Right-of-Way Although the alignment appears to follow along/adjacent to existing railroad alignments, the right-of-way requirements do not appear feasible. Proponent proposes a dual guideway (minus track/beams) to meet required throughput of containers. Although the skids operate on top of the columns with no guideway/track, required land acquisition for column supports will still be extensive and likely not feasible. A dual guideway (minus the track/beams) will still require a minimum 100-foot-wide right-of-way for the entire length of the alignment. Footprint and Space General footprint and space requirements are feasible at this stage of project development. Some potential issues are: Guideway There does not appear to be sufficient space along the proposed alignment to accommodate guideway space requirements. Other System Components Existing building/roadway infrastructure will likely not be capable of accommodating a turntable of the minimum required diameter for reversing vehicles. In addition space required for a dual guideway turntable will be even greater. Sorting Areas Insufficient information provided by Proponent. Not clear if the Proponent is proposing to develop new sorting area/system or use existing sorting area/system. Wayside Communications Communication Facility Insufficient information provided by Proponent. Final Page 25 of 61 10/31/08

26 Guideway Maintenance Facility Proponent proposes not to have a centralized maintenance facility and would therefore need to perform work on skids and support/roller columns while the system is operating. Given that the 275 total skids consumer 4/5 of the entire alignment, it is not clear how the remainder of operations will continue if one skid or support/roller column breaks down. Feasibility Insufficient information provided; the Proponent s description of the guideway is vague. No information/schematic is given regarding the structural design of skid and roller support columns. No information is given for the method of crossing the Cerritos Channel. Proponent proposes approximately one support/roller column every 60 feet; this equates to approximately 4.5 support/rollers per 275-foot skid. The skids (275 feet by 50 feet) can hold approximately. 35 containers; this equates to approximately 2.3 million lbs. Ultimately this means that each support/roller will need to support approximately 500,000 lbs. No technical information is given on type, shape and material of the support/roller columns. Configuration Insufficient information provided. Proponent did not provide any schematic on the configuration of the system such as loops, spurs, etc. Propulsion Unable to assess, propulsion either not described or identified as proprietary and confidential. Command and Control No prototype in service. Vague data on how the vehicles can not operate faster then the rollers. Visual operation for monitoring and anti-collision is not safe. Final Page 26 of 61 10/31/08

27 Loading and Unloading While some information was provided such as loading and unloading shipside, the use of a round house can be a limiting factor in operation of the system. In addition, if space is a premium at the port, this system could potentially not be accommodated within the existing space. Vehicles The vehicle may be feasible, but the weight of the vehicle with 25- to 40-foot containers will be enormous and requires massive infrastructure to accommodate the alternative technology. Also, no description of the vehicle and ability to accommodate cargo containers of various sizes and no schematic of the vehicle. Switching The approach to switching as described by the Proponent does not appear to be practical. It appears to be inefficient and time consuming. As proposed, it may not be able to handle the amount of container throughput. Sorting and Storage Limited information to determine if the Proponent understands basic principles of sorting and storage of cargo containers. Operating Plan The operating plan is not even developed to a basic degree. No description is provided of the simplest information required how a container or a vehicle moves through the system, how it is handled, sorted, loaded and unloaded. No description is provided of how the throughput requirements are met, nor how peaks or valleys in demand are handled. Start Up and Test No start up and test program identified. Permits, Approvals and Code Compliance Limited information on permits, approval, codes and a community relations program to determine if the Proponent understands the process. Construction Management Limited information on construction management to determine if the Proponent understands the process or the need for a quality control program. Electric Cargo Conveyor System General Atomics Electric Cargo Conveyor System (ECCO) is proposed as a grade separated, fully automatic driverless container transport system using stationary levitation magnets and linear synchronous motor propulsion. Final Page 27 of 61 10/31/08

28 Integration The response does not explain how all of the various system elements will be integrated into one alternative technology since. The Proponent has teamed with proven suppliers of signal and vehicle systems, and has built a test track. Schedule The schedule addresses the steps to be taken to place a system into operational service. Alignment Hypothetical Sites Alignment Feasibility Horizontal alignment curve radii appear feasible. Alignment primarily along/adjacent to existing railroad alignments, thus minimizing impact to existing buildings/facilities. Elevated dual trackway approximately 20 feet wide, with 5-foot-diameter concrete columns spaced approximately every 100 feet. Corridor width requirements appear feasible and minimize the required right-of-way impacts. However it should be noted that only 3 feet separate two vehicles passing side by side an opposite directions, the Port may want to increase offset between tracks. Proponent acknowledges need to coordinate with other agencies, as well as, special track/span considerations for crossing over the Cerritos Channel. Right-of-Way The elevated guideway alignment minimizes right-of-way impacts by maintaining an alignment primarily along/adjacent to existing railroad alignments. Although conflicts with existing entities and infrastructure are expected, the right-ofway requirements appear feasible. Footprint and Space General footprint and space requirements are feasible at this stage of project development. Guideway Final Page 28 of 61 10/31/08

29 Feasibility Guideway appears to be feasible; information provided by Proponent is very comprehensive. Guideway methods, materials, and dimensions all appear sound. Configuration System appears feasible as described; however, the diagrams do not clarify how vehicles circulate (return to origin). Schematic states that loops would only be used for higher throughputs (greater than 1500 container/direction per 8-hour period). If no loops are used, it appears that bidirectional operation would be required on each track. Propulsion The propulsion system was developed for military applications and has been proven on their test track. Command and Control The command and control system appears to have elements needed for operational service. It is based on equipment currently used for passenger and freight rail service. The software was developed under the Federal Transit Administration s Urban Maglev program. Loading and Unloading The loading and unloading system proposed has a mix of existing technology (cranes, etc.) and newer technology (GRID system). The Proponent proposes a one-stop location to loading and unload cargo containers, with terminal operators trucking containers to the site. The Proponent is also identifying that the system could operate ship side, with no need for trucking to the system. Vehicles The vehicle proposed appears to be able to accommodate cargo containers of various sizes, with the ability to secure containers and with enough clearance to accommodate subsystems underneath. Switching The proposed switch has the benefit of first being used 30 years ago. Sorting and Storage The sorting and storage system relies upon two different approaches. If the terminal operators truck the containers to the system, the terminal operators will sort and store, if containers are loaded directly from the ship, sorting and storage will be accommodated at the end of the line. Final Page 29 of 61 10/31/08

30 Operating Plan Proponent has provided a realistic operation plan for the technology at this stage of development. Start Up and Test Commissioning program appears to be comprehensive. Permits, Approvals and Code Compliance A requirements document should identify the permitting approval and code process. In addition, at this time a high-level, conceptual idea of community involvement was mentioned. Construction Management Possible consortium model with the construction managed by the consortium and General Atomics supplying the technology, with an engineering and construction firm as general contractor. Each firm to have a quality control program. Environmental Mitigation and Mobility Initiative Logistics Solution American Maglev Technology Environmental Mitigation and Mobility Initiative Logistics Solution (EMMI) is proposed to use a grade separated fleet of magnetically levitated trains to move cargo containers. Integration The response does not explain how all of the various system elements will be integrated into one alternative technology since no prototype is in service. On the positive side the Proponent has accomplished and validated full power control, dynamic braking and regeneration, and operational service of a 60-foot-long vehicle in actual operating conditions. Schedule The schedule indicates that the manufacturing, design, working prototype and proof of concept has been completed for a cargo application, when based on the interviews it has not. The schedule is optimistic. Alignment Hypothetical Sites Alignment feasibility Horizontal curve radii within the guideway alignment appear feasible. The alignment is primarily proposed along existing rail alignments. The dual track guideway without a vehicle is approximately 20.5 feet wide. Final Page 30 of 61 10/31/08

Southern California International Gateway Project Description

Southern California International Gateway Project Description Southern California International Gateway Project Description Introduction This Supplemental Notice of Preparation and Initial Study is to inform Responsible, Trustee Agencies, and the public that the

More information

ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001)

ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001) ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001) INTRODUCTION To supplement and expand its understanding of available fixed guideway transit system vehicle

More information

SYSTEMWIDE REQUIREMENTS

SYSTEMWIDE REQUIREMENTS SYSTEMWIDE REQUIREMENTS for the Peninsula Rail Program San Francisco to San Jose on the Caltrain Corridor Description of the Systemwide Context for the High Speed Train Project This document provides a

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

ZERO EMISSIONS ELECTRIC CONTAINER MOVING SYSTEM FOR

ZERO EMISSIONS ELECTRIC CONTAINER MOVING SYSTEM FOR ZERO EMISSIONS ELECTRIC CONTAINER MOVING SYSTEM FOR THE PORTS OF LONG BEACH/LOS ANGELES LSM Technology Program A Joint Proposal by INNOVATIVE TRANSPORTATION SYSTEMS CORP. AECOM GENERAL ATOMICS MACQUARIE

More information

Technology Implementation at the Port of Los Angeles Moving from Current to Emerging Technologies

Technology Implementation at the Port of Los Angeles Moving from Current to Emerging Technologies Technology Implementation at the Port of Los Angeles Moving from Current to Emerging Technologies Captain J. M. Holmes Deputy Executive Director Marine Technology Workshop July 30, 2010 Strong Commitment

More information

A C I O p e r a t i o n s a n d T e c h n i c a l Affairs Committee Meeting. Airport APM Overview May 6, 2008 - Denver

A C I O p e r a t i o n s a n d T e c h n i c a l Affairs Committee Meeting. Airport APM Overview May 6, 2008 - Denver A C I O p e r a t i o n s a n d T e c h n i c a l Affairs Committee Meeting Airport APM Overview May 6, 2008 - Denver Presentation Overview Introduction Industry Overview Contracting Methods ACRP Update

More information

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.1 FINANCIAL ANALYSIS The cost of a transportation investment falls into two categories: capital costs, and operating and maintenance (O&M) costs.

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Informational Workshop Public Meeting Kanawha Falls Bridge Project Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal

More information

IV. INDUSTRIAL TRACK DESIGN

IV. INDUSTRIAL TRACK DESIGN IV. INDUSTRIAL TRACK DESIGN 4.01 GENERAL The following sections govern the criteria to be used in the designing of industry tracks served, or to be served, by the Railway Company. Any deviation from these

More information

TABLE OF CONTENTS TABLES FIGURES

TABLE OF CONTENTS TABLES FIGURES TABLE OF CONTENTS Introduction...1 1. On-Site Stacking...2 2. Number of School Driveways...2 3. School Driveway Standards...3 3A. Driveway Spacing...3 3B. Driveway Location...4 3C. Driveway Lane Widths

More information

IMPROVING TRUCK MOVEMENT IN URBAN INDUSTRIAL AREAS: APPLICATIONS OF GIS, ACCIDENT & FIELD DATA

IMPROVING TRUCK MOVEMENT IN URBAN INDUSTRIAL AREAS: APPLICATIONS OF GIS, ACCIDENT & FIELD DATA IMPROVING TRUCK MOVEMENT IN URBAN INDUSTRIAL AREAS: APPLICATIONS OF GIS, ACCIDENT & FIELD DATA 11 th World Conference on Transport Research Susan L. Bok Los Angeles Department of Transportation May 7,

More information

APPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL

APPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL DRAFT APPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL Operations and Maintenance Cost Methodology and Results The Colorado Department of Transportation is conducting an Advanced Guideway System

More information

Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873

Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 February 16, 2010 TO: FROM: Members Joint Committee on Finance Bob Lang, Director SUBJECT: Governor's

More information

Operating Concept and System Design of a Transrapid Maglev Line and a High-Speed Railway in the pan-european Corridor IV

Operating Concept and System Design of a Transrapid Maglev Line and a High-Speed Railway in the pan-european Corridor IV Operating Concept and System Design of a Transrapid Maglev Line and a High-Speed Railway in the pan-european Corridor IV A. Stephan & E. Fritz IFB Institut für Bahntechnik GmbH, Niederlassung, Germany

More information

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS Business Procedure Traffic Management Document Number OHS-PROC-130 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro

More information

TRANSFERRING CONTAINER CRANES AROUND CORNERS USING CURVED RAILS DESIGN CONSIDERATIONS

TRANSFERRING CONTAINER CRANES AROUND CORNERS USING CURVED RAILS DESIGN CONSIDERATIONS TRANSFERRING CONTAINER CRANES AROUND CORNERS USING CURVED RAILS DESIGN CONSIDERATIONS Erik Soderberg, SE Liftech Consultants Inc. Michael Jordan, SE CEO, Liftech Consultants Inc. Reprinted from Ports 01

More information

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois

More information

Automated Container Handling in Port Terminals

Automated Container Handling in Port Terminals Automated Container Handling in Port Terminals Overview. Shipping containers revolutionized the movement of goods, driving change and efficiency throughout the global supply chain. The next revolution

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

SELF-DRIVING FREIGHT IN THE FAST LANE

SELF-DRIVING FREIGHT IN THE FAST LANE SELF-DRIVING FREIGHT IN THE FAST LANE DRIVERLESS VEHICLES ARE ABOUT TO REWRITE THE RULES FOR TRANSPORTING NOT JUST PASSENGERS, BUT FREIGHT, TOO JASON KUEHN JUERGEN REINER Driverless cars, which are in

More information

S-11: Tacoma Link Extension to Tacoma Community College

S-11: Tacoma Link Extension to Tacoma Community College Project Number S-11 Subarea Pierce Primary Mode Light Rail Facility Type Corridor Length 3.65 miles Version ST Board Workshop Date Last Modified 11-25-2015 PROJECT AREA AND REPRESENTATIVE ALIGNMENT SHORT

More information

Section ALTERNATIVES. 3. Alternatives

Section ALTERNATIVES. 3. Alternatives Section 3 ALTERNATIVES 3. Alternatives 3.0 Alternatives The Springfield Rail Improvements Project Build Alternatives would utilize different routes. The No Build Alternative includes the continuation of

More information

Nationwide Fixed Guideway

Nationwide Fixed Guideway 1. CONCEPT SUMMARY Solar Transportation Technologies is developing a completely new mass transit system, utilizing privately owned electric cars on an elevated fixed guideway, called Freedom Transit (FT).

More information

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 Background: It is in the national interest to maintain the Interstate System to provide the highest level of

More information

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan Transportation Authority (Metro) 2009 Transportation Improvement Program Call for Projects APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan

More information

Press News. Siemens at the Transport Logistic 2013 in Munich

Press News. Siemens at the Transport Logistic 2013 in Munich Press News www.siemens.com/press/transportlogistic2013 Siemens at the Transport Logistic 2013 in Munich Siemens is showcasing its portfolio under the slogan "Efficient Solutions for Transport and Logistics"

More information

HEAVY DUTY CROSSINGS TRANSIT CROSSINGS DRIP TRACK TANK CAR SPILL CONTAINMENT VEHICLE INSPECTION PITS CONVEYOR/UNLOADING PITS

HEAVY DUTY CROSSINGS TRANSIT CROSSINGS DRIP TRACK TANK CAR SPILL CONTAINMENT VEHICLE INSPECTION PITS CONVEYOR/UNLOADING PITS HEAVY DUTY CROSSINGS TRANSIT CROSSINGS DRIP TRACK TANK CAR SPILL CONTAINMENT VEHICLE INSPECTION PITS CONVEYOR/UNLOADING PITS RAIL SCALE APPROACHES & FOUNDATIONS SLAB TRACK TUNNEL TRACK SUPPORT WASH BAY

More information

NEW BLUE LINE CONNECTIONS

NEW BLUE LINE CONNECTIONS Washington Metropolitan Area Transit Authority NEW BLUE LINE CONNECTIONS 3/31/2014 A Major Capital Project of Momentum s Metro 2025 Program In support of its new strategic plan, Metro has considered the

More information

Downtown Tampa Transportation Vision

Downtown Tampa Transportation Vision Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org

More information

High Strain Dynamic Load Testing of Drilled Shafts

High Strain Dynamic Load Testing of Drilled Shafts Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain

More information

Chapter 5 Financial Plan

Chapter 5 Financial Plan The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA_LU) requires that the MTP incorporate a financial plan for the planning period. The MTP is required to

More information

Title: Integrating Management of Truck and Rail Systems in LA. INTERIM REPORT August 2015

Title: Integrating Management of Truck and Rail Systems in LA. INTERIM REPORT August 2015 Title: Integrating Management of Truck and Rail Systems in LA Project Number: 3.1a Year: 2013-2017 INTERIM REPORT August 2015 Principal Investigator Maged Dessouky Researcher Lunce Fu MetroFreight Center

More information

Position Classification Standard for Traffic Management Series, GS-2130. Table of Contents

Position Classification Standard for Traffic Management Series, GS-2130. Table of Contents Position Classification Standard for Traffic Management Series, GS-2130 Table of Contents SERIES DEFINITION... 2 EXCLUSIONS... 2 OCCUPATIONAL INFORMATION... 2 TITLES... 5 EVALUATING POSITIONS... 5 GRADE

More information

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,

More information

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions Evanston Main Street Station TOD Plan and Study Appendix A.1: Station Area Existing Conditions EvanstonMainStreetStation TODPlanandStudy A 1 AppendixA.1: ExistingConditions Table of Contents Station Locations

More information

How To Design A Crash Investigation Site

How To Design A Crash Investigation Site CHAPTER 7 CRASH INVESTIGATION SITES December, 2000 7. Crash Investigation Sites (CIS) 7.1. Introduction and Usage The idea of "crash investigation sites" or areas outside of the freeway mainline where

More information

What Is Regeneration?

What Is Regeneration? What Is Regeneration? Braking / Regeneration Manual Regeneration Overview Revision 1.0 When the rotor of an induction motor turns slower than the speed set by the applied frequency, the motor is transforming

More information

Cisco Positive Train Control: Enhancing End-to-End Rail Safety

Cisco Positive Train Control: Enhancing End-to-End Rail Safety Solution Overview Cisco Positive Train Control: Enhancing End-to-End Rail Safety What You Will Learn Positive Train Control (PTC), one of many new safety measures mandated by the U.S. Federal Government,

More information

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

ADA POST INSPECTION CHECKLIST. Job No. Route County Location ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks

More information

Research Report. Transportation/Logistics Industries Employment and Workforce. in San Bernardino and Riverside Counties

Research Report. Transportation/Logistics Industries Employment and Workforce. in San Bernardino and Riverside Counties Research Report Transportation/Logistics Industries Employment and Workforce in San Bernardino and Riverside Counties MAY 2011 This research report is a contribution of the following partners who worked

More information

The DOD V2G Pilot Project

The DOD V2G Pilot Project The DOD V2G Pilot Project Overview Presented by Camron Gorguinpour, PhD Office of the Assistant Secretary of the Air Force Installations, Environment & Logistics Camron.Gorguinpour@pentagon.af.mil 1 DOD

More information

The Port of the Future: The Potential of Fuel Cells to Green Our Nation s Ports

The Port of the Future: The Potential of Fuel Cells to Green Our Nation s Ports The Port of the Future: The Potential of Fuel Cells to Green Our Nation s Ports There are more than 100 ports in the U.S., moving goods as an essential part of the global economy. Ports have a large impact

More information

Green Line Extension Project Analysis of the Boston Engine Terminal for The Purposes of Siting a Light Rail Vehicle Support Facility

Green Line Extension Project Analysis of the Boston Engine Terminal for The Purposes of Siting a Light Rail Vehicle Support Facility Analysis of the Boston Engine Terminal for The Purposes of Siting a Light Rail Vehicle Support Facility During the alternatives analysis process for the Green Line Extension project, MassDOT and the MBTA

More information

9314 JEFFERSON BLVD DALLAS, TEXAS 75211 DALLASGLOBAL.COM

9314 JEFFERSON BLVD DALLAS, TEXAS 75211 DALLASGLOBAL.COM 9314 JEFFERSON BLVD DALLAS, TEXAS 75211 DALLASGLOBAL.COM Dallas Global Industrial Center is the most unique available industrial site in North America today at the intersection of industrial infrastructure

More information

Fourth Generation Modular Construction

Fourth Generation Modular Construction Allianz Global Corporate & Specialty Fourth Generation Modular Construction Marine Insurance Challenges: A technical report. 1 2 3 4 Foreword by Ron Johnson Modular Construction Trends Challenges and common

More information

Nissan Hypermini Urban Electric Vehicle Testing

Nissan Hypermini Urban Electric Vehicle Testing INL/EXT-06-01072 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Nissan Hypermini Urban Electric Vehicle Testing TECHNICAL REPORT Roberta Brayer James Francfort January 2006 Idaho National

More information

The Shanghai Maglev Route

The Shanghai Maglev Route The Shanghai Maglev Route 1 Contents 1. About the Shanghai Maglev... 3 2. Background information about EMS Technology... 4 3. Your train... 5 3.1 Getting to know the cab... 5 3.2 Central DMI screen additional

More information

Engineering Standard

Engineering Standard Public Transport Services Engineering Standard Stations - Bicycle Facilities PART 129013 AR-PW-PM-SPE-00129013 (D073) Document Control Document Status Document Amendment Record Revision Change Description

More information

VEHICLE INFRASTRUCTURE INTEGRATION (VII) U.S. DOT DAY-1 APPLICATION DEVELOPMENT PLANS

VEHICLE INFRASTRUCTURE INTEGRATION (VII) U.S. DOT DAY-1 APPLICATION DEVELOPMENT PLANS VEHICLE INFRASTRUCTURE INTEGRATION (VII) U.S. DOT DAY-1 APPLICATION DEVELOPMENT PLANS McLean, VA November 2006 VERSION 1.2 Revision History REVISION HISTORY Date Version Description July 2006 1.0 Initial

More information

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total

More information

How To Improve Safety

How To Improve Safety Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital

Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital June 21, 2007 The Grossmont Healthcare District (GHD) will accept proposals for Architectural and Engineering

More information

2.1 Prior Richmond to South Hampton Roads Rail Service

2.1 Prior Richmond to South Hampton Roads Rail Service 2.0 BACKGROUND 2.1 Prior Richmond to South Hampton Roads Rail Service The Norfolk and Western (N&W), now NS, the Seaboard Air Line (SAL) and the Atlantic Coast Line (ACL), both now CSXT, previously operated

More information

Executive Summary UNIVERSITY OF CALIFORNIA, SANTA BARBARA PAGE 7

Executive Summary UNIVERSITY OF CALIFORNIA, SANTA BARBARA PAGE 7 Executive Summary Port operations are at the heart of some of the most dynamic metropolitan centers in the world: London, New York, Los Angeles, Singapore and Hong Kong, to name a few. Ports are critical

More information

PART II SCHEDULE. Scope of Services. Special Terms and Conditions. Virginia Railway Express

PART II SCHEDULE. Scope of Services. Special Terms and Conditions. Virginia Railway Express PART II SCHEDULE SECTION TITLE D E Scope of Services Special Terms and Conditions 11 SECTION D SCOPE OF SERVICES D.1 OVERVIEW A. The selected firm is referred to herein as either the Consultant or the

More information

GEOMETRIC DESIGN CIVL 3161

GEOMETRIC DESIGN CIVL 3161 GEOMETRIC DESIGN CIVL 3161 Reading Assignment: p. 45-72 (4 th ed.) p.45-75 (previous ed.) in Mannering textbook. Geometric design of highway facilities deals with the proportion of physical elements of

More information

Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D

Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D Contents Introduction... 3 Introduction to Corridor Targets... 3 Surface Targets... 4 Width and Offset Targets... 5 Elevation or Slope Targets...

More information

Florida Maglev Project Description. Executive Summary

Florida Maglev Project Description. Executive Summary Florida Maglev Project Description Executive Summary FLORIDA MAGLEV DEPLOYMENT PROGRAM FLORIDA MAGLEV DEPLOYMENT PLANNING/DESIGN TEAM Florida Department of Transportation Maglev 2000 of Florida Corporation

More information

Lynn M. Suter and Associates

Lynn M. Suter and Associates 3 Lynn M. Suter and Associates Government Relations GM Memo No. 05-181 August 5, 2005 TO: Joe Wallace, President, and Members of the AC Transit Board of Directors Jim Gleich, DGM FR: RE: Lynn M. Suter

More information

MAKING TRACKS. A Primer for Implementing Transit Fixed Guideway Projects

MAKING TRACKS. A Primer for Implementing Transit Fixed Guideway Projects MAKING TRACKS A Primer for Implementing Transit Fixed Guideway Projects Introduction Demand for new fixed guideway projects is strong nationwide. Each year hundreds of new fixed guideway projects across

More information

IT S TIME TO EXPECT MORE FROM AN ENERGY STORAGE SOLUTION

IT S TIME TO EXPECT MORE FROM AN ENERGY STORAGE SOLUTION S U P E R I O R F L Y W H E E L E N E R G Y S T O R A G E S O L U T I O N S IT S TIME TO EXPECT MORE FROM AN ENERGY STORAGE SOLUTION POWER. REDEFINED. VYCON FLYWHEEL TECHNOLOGY APPLICATIONS: BACKUP GENERATOR

More information

The Need for Traffic Incident Management

The Need for Traffic Incident Management The Need for Traffic Incident Management With traffic incidents responsible for approximately 50-60% of the congestion delays motorists encounter on the nation s roadways every day, increased roadway capacity

More information

Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey

Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey In its second meeting, the Infrastructure and Growth Leadership Advisory Group expanded and refined the list of approaches/ideas

More information

LA/VENTURA REGION ITS STRATEGIC DEPLOYMENT PLAN TABLE OF CONTENTS

LA/VENTURA REGION ITS STRATEGIC DEPLOYMENT PLAN TABLE OF CONTENTS TABLE OF CONTENTS 1.0 Introduction 1.1 Purpose... 1-1 1.2 Background... 1-1 1.3 Methodology... 1-8 1.3.1 Development of the LA/Ventura Region ITS Strategic Deployment Plan... 1-10 1.3.2 Supporting Documents...

More information

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS CHAPTER 2 CAPACITY AND LEVEL-OF-SERVICE CONCEPTS CONTENTS I. INTRODUCTION...2-1 II. CAPACITY...2-2 III. DEMAND...2-2 IV. QUALITY AND LEVELS OF SERVICE...2-2 Service Flow Rates...2-3 Performance Measures...2-3

More information

TRANSPORTATION PARTNERSHIPS USING AN AUTOMATED VEHICLE MONITORING AND AUDIT SYSTEM

TRANSPORTATION PARTNERSHIPS USING AN AUTOMATED VEHICLE MONITORING AND AUDIT SYSTEM TRANSPORTATION PARTNERSHIPS USING AN AUTOMATED VEHICLE MONITORING AND AUDIT SYSTEM Prepared By: Curtis Berthelot Ph.D, P.Eng. Angela Lang M.Sc Brian Taylor P.Eng. Norm Burns ABSTRACT Saskatchewan Department

More information

Performance Goals and Objectives:

Performance Goals and Objectives: Online Briefing Winter 2011 2012 Purpose: The purpose of the Project is to examine and recommend ways of introducing higher passenger train speeds on the Empire Corridor and ways to improve reliability,

More information

Wilmington to Newark Commuter Rail Improvement Project

Wilmington to Newark Commuter Rail Improvement Project Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion

More information

HYDROMATRIX Jebel Aulia - Sudan

HYDROMATRIX Jebel Aulia - Sudan HYDROMATRIX Jebel Aulia - Sudan www.andritz.com HYDROMATRIX - Concept Jebel Aulia - Sudan HYDROMATRIX is a new concept of hydraulic energy generation, which has been developed by an American engineer in

More information

Transit in the United States 3. Operating Costs and Performance Measures 13. Quality of Transit Service 19. ADA Compliance Bus 28

Transit in the United States 3. Operating Costs and Performance Measures 13. Quality of Transit Service 19. ADA Compliance Bus 28 1999 National Transit Summaries and Trends Introduction 1 Introduces the transit modes discussed throughout the NTST. Transit in the United States 3 National statistics and trends in ridership, miles of

More information

When is BRT the Best Option? 1:30 2:40 p.m.

When is BRT the Best Option? 1:30 2:40 p.m. TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? 1:30 2:40 p.m. Paul Larrousse Director, National Transit Institute (NTI) (Moderator) TRB/APTA 2004 Bus Rapid Transit Conference Session

More information

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE

More information

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,

More information

Priority- Objective 1-1. Axe 1: Strengthening innovation capacities Objective 1.1: Dissemination of innovative technologies and know-how

Priority- Objective 1-1. Axe 1: Strengthening innovation capacities Objective 1.1: Dissemination of innovative technologies and know-how Promotion of Port Communities SMEs role in Energy Efficiency and GREEN Technologies for BERTHing Operations Priority- Objective 1-1 Axe 1: Strengthening innovation capacities Objective 1.1: Dissemination

More information

Chaudière Crossing Bridge Rehabilitation

Chaudière Crossing Bridge Rehabilitation Chaudière Crossing Bridge Rehabilitation Douglas K. Lowry P. Eng., Armtec Infrastructure Incorporated David Delicate, P.Eng. Public Works and Government Services Canada (Retired) Prepared for presentation

More information

THE PORT OF LOS ANGELES

THE PORT OF LOS ANGELES THE PORT OF LOS ANGELES Executive Director's Report to the Board of Harbor Commissioners DATE: MARCH 24, 2010 FROM: CLEAN TRUCK PROGRAM CONTRACT WITH VISION MOTOR CORPORATION OF SANTA MONICA, CALIFORNIA

More information

SR-18 Corridor Improvements in Wood County

SR-18 Corridor Improvements in Wood County Public Meeting Information Package SR- Corridor Improvements in Wood County Thursday, May 19, 2011 10:00 a.m. to 1:00 p.m. Meeting Location: Hancock-Wood Electric Cooperative Building 1399 Business Park

More information

Vehicle Replacement & Fleet Utilisation Policy To be considered as part of the overarching Fleet Strategy. Submitted: 29 September 2013

Vehicle Replacement & Fleet Utilisation Policy To be considered as part of the overarching Fleet Strategy. Submitted: 29 September 2013 Vehicle Replacement & Fleet Utilisation Policy To be considered as part of the overarching Fleet Strategy Submitted: 29 September 2013 To be Reviewed: September 2015 VERSION: AUTHOR: OWNER: v2.3 Barry

More information

Definition of a Lease

Definition of a Lease October 2015 Leases Project Update Definition of a Lease Project background The IASB and the FASB (the Boards) are working together to improve the accounting for leases. The Boards have concluded that

More information

Transport Problems & SuperWay Solutions

Transport Problems & SuperWay Solutions 32 Transport Problems & SuperWay Solutions Moving transport out of the 19th century ROAM graphics & photos 7-22-14 1 ROAM Transport Systems, Fort Worth, Texas SuperWay, MegaWay, CargoWay, MicroWay, CarLiner,

More information

Concept Design Synopsis

Concept Design Synopsis Washington Headquarters Services Facilities Services Directorate The Pentagon Electric Upgrade (Substation No. 2) Concept Design Synopsis September 4, 2014 Prepared for Consultations with VA SHPO, ACHP,

More information

Surface Transportation Program (STP) Projects

Surface Transportation Program (STP) Projects Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE

More information

SIMPLIFYING LOGISTICS: THE BENEFITS OF RAIL IN A MULTIMODAL SHIPPING SYSTEM

SIMPLIFYING LOGISTICS: THE BENEFITS OF RAIL IN A MULTIMODAL SHIPPING SYSTEM SIMPLIFYING LOGISTICS: THE BENEFITS OF RAIL IN A MULTIMODAL SHIPPING SYSTEM A well-designed shipping plan has bottom-line implications for any business. Creating a sound logistics strategy supported by

More information

The Coos Bay Rail Line Preserving Rail as an Intermodal Link for Marine and Industrial Sites in Southwest Oregon

The Coos Bay Rail Line Preserving Rail as an Intermodal Link for Marine and Industrial Sites in Southwest Oregon The Coos Bay Rail Line Preserving Rail as an Intermodal Link for Marine and Industrial Sites in Southwest Oregon American Association of Port Authorities - AAPA Communicating the Importance of Infrastructure

More information

SECTION 5: SANITARY SEWER SYSTEM DESIGN

SECTION 5: SANITARY SEWER SYSTEM DESIGN SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities

More information

The total estimated PFC revenue for the application is $266,900,000. The estimated charge effective date for this application is December 1, 2016.

The total estimated PFC revenue for the application is $266,900,000. The estimated charge effective date for this application is December 1, 2016. Public Notice of Application for Authority to Impose and Use Passenger Facility Charges (PFCs) at EWR, LGA, JFK and SWF and Amendment to Approved PFC Applications at EWR, LGA, and JFK The Port Authority

More information

Transit Technology Alternatives

Transit Technology Alternatives Transit Technology Alternatives Fixed Guideway Systems (see http://www.apta.com/research/info/define/index.cfm) Heavy rail - HR Heavy Rail is a system that is totally separated from its surroundings and

More information

Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015)

Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015) Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total Capital

More information

A SOLUTION FOR THE NEW YORK HARBOR TODAY. A LEADER FOR THE SHIPPING WORLD TOMORROW.

A SOLUTION FOR THE NEW YORK HARBOR TODAY. A LEADER FOR THE SHIPPING WORLD TOMORROW. NYCT EXPANSION Last years record cargo volume was impressive under any circumstances. "It's kind of like having the family over for a big dinner and you've just started renovation of your kitchen," says

More information

Background and Goals for the Project

Background and Goals for the Project City of Asheville, NC REQUEST FOR PROPOSALS Wilma Dykeman Riverway Environmental Analysis, Project Development, and Preliminary Design Submittal Address: Dan Baechtold, AICP City of Asheville Engineering

More information

Assessing Paved Trails for Compliance with Standards and Best Practices

Assessing Paved Trails for Compliance with Standards and Best Practices Assessing Paved Trails for Compliance with Standards and Best Practices Session Presenters: Kristin Maravilla, Planner/Designer Masters in Landscape Architecture (UC Berkeley) Masters in City and Regional

More information

DRAFT Freight Performance Measures

DRAFT Freight Performance Measures DRAFT Freight Performance Measures The purpose of the Industrial Areas Freight Access Project is to conduct a focused and pragmatic technical evaluation to identify and assess current and future freight

More information

KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER

KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER The New York State Department of Transportation (NYSDOT) is preparing an Environmental Impact Statement (EIS) to evaluate alternatives for the rehabilitation or

More information

5 ALTERNATIVE SOLUTIONS AND EVALUATION

5 ALTERNATIVE SOLUTIONS AND EVALUATION Page 23 5 ALTERNATIVE SOLUTIONS AND EVALUATION The process used for the assessment and evaluation of the alternatives follows the procedures of the Municipal Class EA, as described below: Identify a reasonable

More information

Railway Track Design

Railway Track Design Chapter Railway Track Design Basic considerations and guidelines to be used in the establishment of railway horizontal and vertical alignments. The route upon which a train travels and the track is constructed

More information

Wireless Traffic Management System

Wireless Traffic Management System Wireless Traffic Management System 1 Introduction The County of Los Angeles Department of Public Works (LADPW) manages surface street traffic flow in one of the world s largest metropolitan areas. The

More information

Financial Analysis and Funding

Financial Analysis and Funding California High- Speed Rail Authority Revised 2012 Business Plan Chapter 7 Financial Analysis and Funding Introduction This chapter presents the financial analysis and funding strategy for the California

More information